JPH0443524B2 - - Google Patents
Info
- Publication number
- JPH0443524B2 JPH0443524B2 JP8968987A JP8968987A JPH0443524B2 JP H0443524 B2 JPH0443524 B2 JP H0443524B2 JP 8968987 A JP8968987 A JP 8968987A JP 8968987 A JP8968987 A JP 8968987A JP H0443524 B2 JPH0443524 B2 JP H0443524B2
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- concrete
- medium
- siebold
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Description
【発明の詳細な説明】
〈産業上の利用分野〉
この発明は型枠を自動的に上昇移動させなが
ら、順次多階層にコンクリート打設を行なつて、
ダムなどの高層構築物を構築する自昇型枠装置に
関するものである。[Detailed Description of the Invention] <Industrial Field of Application> This invention sequentially places concrete in multiple levels while automatically moving the formwork up.
This relates to self-lifting formwork equipment for constructing high-rise structures such as dams.
〈従来の技術〉
従来、ダムなどのコンクリート打設を行なう型
枠として、型枠支持フレームの下部をシーボルト
により下層の既設コンクリートに固定し、その型
枠をコンクリート打設面に設置するものがある。<Conventional technology> Conventionally, as formwork for pouring concrete for dams, etc., there is a type of formwork in which the lower part of the formwork support frame is fixed to the existing concrete layer below with Siebolds, and the formwork is installed on the concrete pouring surface. .
〈発明が解決しようとする問題点〉
しかしながら、かかる従来の型枠装置では、型
枠の設置および剥離に際して、小型のクレーンを
現場に持ち込み、これを用いて実施する必要があ
り、この作業に熟練を要するとともに、作業性、
安全性および経済性の点で不利な点が多いなどの
問題点があつた。<Problems to be Solved by the Invention> However, with such conventional formwork equipment, it is necessary to bring a small crane to the site and use it to install and peel off the formwork, which requires a skilled worker to carry out the work. In addition to requiring workability,
There were many problems in terms of safety and economy.
この発明は上記のような諸問題点を解決するも
ので、型枠上昇の操作並びに剥離などの作業を簡
単な操作で、安全かつローコストに実施できる自
昇型枠装置を得ることを目的とする。 This invention solves the above-mentioned problems, and aims to provide a self-lifting formwork device that can perform operations such as lifting and peeling of formwork with simple operations, safely and at low cost. .
〈問題点を解決するための手段〉
この発明にかかる自昇型枠装置は、複数の型枠
支持フレームに取り付けられた中型枠とこれを両
側から挟む各1の側型枠とを有し、上記中型枠お
よび側型枠の上部に、その中型枠の型枠支持フレ
ームを揺動自在に支持する梁材を設け、この梁材
の両端部と上記側型枠との間に上記中型枠と側型
枠の交互上昇用のジヤツキを取り付けるととも
に、上記各型枠支持フレームにシーボルトを抜き
差し自在に取り付けられるように構成したもので
ある。<Means for Solving the Problems> A self-lifting formwork apparatus according to the present invention includes a medium formwork attached to a plurality of formwork support frames and one side formwork each sandwiching the medium formwork from both sides, A beam material that swingably supports the formwork support frame of the medium formwork is provided on the upper part of the medium formwork and the side formwork, and between both ends of this beam material and the side formwork, the medium formwork and The structure is such that a jack for alternately raising the side formwork is attached, and a Siebold can be attached to and removed from each of the above-mentioned formwork support frames.
〈作 用〉
この発明における型枠支持フレームは、これに
出入自在に取り付けられるシーボルト先端をコン
クリート打設部に埋設してあるアンカーボルトに
固定し、このコンクリートの固化後に、中型枠の
型枠支持フレームに差し込んであるシーボルトを
抜き取つた後、側型枠上のジヤツキを伸長して、
梁材に連設した中型枠を自動的に上昇させ、その
所定の上昇位置でその中型枠の型枠支持フレーム
にシーボルトを差し込んで、コンクリートを打設
し、このコンクリート打設部にそのシーボルトの
先端のアンカーボルトを埋設する。そして、この
コンクリート固化後、側型枠の型枠支持フレーム
に差し込んである、シーボルトを抜き取り、続い
て上記ジヤツキを収縮させ、その側型枠を中型枠
の位置まで上昇させた後、その側型枠の内側にコ
ンクリートを打設し、型枠支持フレームにシーボ
ルトを差し込んで、そのシーボルトの先端部をコ
ンクリート中に埋設する。このように、中型枠お
よび側型枠を交互に上昇し、ダムのコンクリート
打設を実施するように作用する。<Function> The formwork support frame according to the present invention fixes the Siebold tip, which is attached to the frame so as to be freely removable and removable, to an anchor bolt buried in the concrete placement part, and after the concrete hardens, the formwork support frame of the medium formwork is attached. After removing the Siebold inserted into the frame, extend the jacks on the side formwork,
The medium formwork connected to the beam material is automatically raised, and at the predetermined raised position, a Siebold is inserted into the formwork support frame of the medium formwork to pour concrete, and the Siebold is placed in the concrete pouring area. Bury the anchor bolt at the tip. After the concrete hardens, the Siebold inserted into the formwork support frame of the side formwork is removed, the jacks are contracted, the side formwork is raised to the position of the middle formwork, and the side formwork is raised to the position of the middle formwork. Concrete is poured inside the frame, a Siebold is inserted into the formwork support frame, and the tip of the Siebold is buried in the concrete. In this way, the middle formwork and the side formwork are raised alternately and act to perform concrete pouring of the dam.
〈発明の実施例〉
以下に、この発明の一実施例を図について説明
する。第1図において、1は中型枠、2はこれを
挟むように両側に摺動可能に並設された一対の側
型枠、3はこれらの各型枠1,2を構成する複数
の型枠板4を一体固定する複数本の横木、5,6
は中型枠1および側型枠2に、上記横木3を介し
てそれぞれ複数個ずつ取り付けられた型枠支持フ
レーム、7は各型枠支持フレーム5,6の上下部
に抜差し自在にねじ込まれて、ナツト8で固定さ
れるシーボルト(ダミーボルト)、9は各型枠支
持フレーム5,6の中程に出入自在に取り付けら
れた車輪軸で、これのコンクリート打設側端に車
輪10が取り付けられている。11は各型枠支持
フレーム5,6の下部に出入自在に取り付けられ
た支持ジヤツキで、各型枠11,2とともにコン
クリート打設面に接触する。12は中型枠1およ
び側型枠2のコンクリート打継面に突設した面木
で、第2図乃至第4図に示すように溝状をなす。<Embodiment of the Invention> An embodiment of the invention will be described below with reference to the drawings. In Fig. 1, 1 is a medium formwork, 2 is a pair of side formworks that are slidably arranged side by side on both sides so as to sandwich this formwork, and 3 is a plurality of formworks that constitute each of these formworks 1 and 2. A plurality of crosspieces 5, 6 that integrally fix the board 4
A plurality of formwork support frames are respectively attached to the middle formwork 1 and the side formwork 2 via the crossbars 3, and 7 is screwed into the upper and lower parts of each formwork support frame 5, 6 so as to be freely insertable and removable. Siebolds (dummy bolts) are fixed with nuts 8, and 9 is a wheel axle that is attached to the middle of each formwork support frame 5, 6 so that it can move in and out, and a wheel 10 is attached to the end of this on the concrete pouring side. There is. Reference numeral 11 denotes a support jack that is attached to the lower part of each formwork support frame 5, 6 so as to be freely removable and comes into contact with the concrete pouring surface together with each formwork 11, 2. Reference numeral 12 denotes a face plate protruding from the concrete joint surfaces of the middle formwork 1 and the side formwork 2, and has a groove shape as shown in FIGS. 2 to 4.
13は上記各型枠1,2の上部に配設されたH
鋼などからなる梁材で、この梁材13に突設した
突片14には、上記中型枠1の型枠支持フレーム
5の上端が、第4図に示したようにピン15によ
つて揺動自在に枢支されている。なお、この梁材
13には軽量化などのために多数の透孔16が設
けられている。 13 is an H provided above each of the formworks 1 and 2 above.
The upper end of the formwork support frame 5 of the medium formwork 1 is swung by a pin 15 as shown in FIG. It is pivoted for free movement. Note that this beam member 13 is provided with a large number of through holes 16 for weight reduction and the like.
また、各側型枠2の中央部にはジヤツキ17の
一端であるシリンダ部17aがボルトや横木3を
介して固定され、さらに一対の型枠支持フレーム
6,6間に架設した架設棒18にもボルトなどに
よつて固定されている。17bはジヤツキ17の
ピストン部で、これに連設した突片19が、第3
図にも示すように、梁材13の下面に突設したブ
ラケツト20に、ボルト21によつて連結されて
いる。なお、第1図では図示していないが、第2
図および第4図に示すように型枠支持フレーム
5,6の全部または一部に、作業足場を取り付け
るための足場取付部材22が、取付棒23を介し
て連設されている。 A cylinder portion 17a, which is one end of the jack 17, is fixed to the center of each side formwork 2 via bolts or crossbars 3, and is further attached to an erection rod 18 installed between the pair of formwork support frames 6, 6. It is also fixed with bolts etc. 17b is the piston part of the jack 17, and the protruding piece 19 connected thereto is the third piston part.
As shown in the figure, it is connected to a bracket 20 protruding from the lower surface of the beam 13 by a bolt 21. Although not shown in Fig. 1, the second
As shown in the drawings and FIG. 4, a scaffold attachment member 22 for attaching a work scaffold is connected to all or part of the formwork support frames 5, 6 via attachment rods 23.
24は側型枠1の中型枠2と接触する面側に取
り付けられた固定枠、25はこれに接触させた抜
き枠で、これらの両枠は、第5図に示すように互
いに傾斜面26で接触している。27は抜き枠2
5に対して回転自在に取り付けたねじ棒で、この
ねじ棒27が固定枠24に取り付けたナツト28
に螺合している。従つて、このねじ棒27の回転
操作により、抜き枠25を固定枠24に対して斜
め上方、つまり、中型枠1の側縁から離れる方向
に上昇させることができる。 Reference numeral 24 denotes a fixed frame attached to the side of the side formwork 1 that is in contact with the middle formwork 2, and 25 denotes a punching frame that is in contact with this. Both of these frames are arranged on the inclined surface 26 of each other as shown in FIG. I am in contact with. 27 is the punching frame 2
This threaded rod 27 is rotatably attached to the nut 28 attached to the fixed frame 24.
are screwed together. Therefore, by rotating the threaded rod 27, the punching frame 25 can be raised diagonally upward relative to the fixed frame 24, that is, in a direction away from the side edge of the medium frame 1.
一方、型枠支持フレーム6の中央部および下部
に取り付けられるシーボルト7には、第6図に示
すように、型枠支持フレーム6に一体の取付材2
9に螺合したボルト30の頭が当接されており、
この当接圧を調節するナツト31がそのボルト3
0に螺合されている。 On the other hand, as shown in FIG.
The head of bolt 30 screwed into 9 is in contact with
The nut 31 that adjusts this contact pressure is the bolt 3.
It is screwed to 0.
かかる構成になる自昇型枠装置は、第1図に示
すような状態にて、ダム下部のコンクリート打設
部に設置されて用いられ、中型枠1および側型枠
2の内側にコンクリートを打設し、これと前後し
て各型枠支持フレーム5,6にシーボルト7を差
し込んで貫通させる。このとき、シーボルト7の
先端はコンクリート内に埋設させる。このコンク
リートが硬化した後は、型枠支持フレーム5にね
じ込んだシーボルト7をコンクリートから抜き取
り、車輪軸9を突出させて車輪10をコンクリー
ト打設面Pに、第7図に示すように当接させ、さ
らに支持ジヤツキ11を引き込める。このように
すれば、型枠支持フレーム5はピン15を中心と
して、第7図中、矢印Q方向に傾動し、中型枠1
はコンクリート打設面から剥離する。また、この
剥離作業に前後して、第5図に示すねじ棒27を
回転操作して、固定枠24に対して抜き枠25を
斜め上方に上昇させる。このため、この抜き枠2
5と中型枠1の側縁との圧接が解除されてすべり
摩擦をなくすことにより、中型枠1の移動を容易
に行うことができる状態となる。 The self-lifting formwork device having such a configuration is installed in the concrete pouring area at the bottom of the dam in the state shown in FIG. The Siebolds 7 are inserted into each of the formwork support frames 5 and 6 before and after this. At this time, the tip of the Siebold 7 is buried in concrete. After this concrete has hardened, the Siebold 7 screwed into the formwork support frame 5 is extracted from the concrete, the wheel axle 9 is protruded, and the wheel 10 is brought into contact with the concrete pouring surface P as shown in FIG. , the support jack 11 can be further retracted. In this way, the formwork support frame 5 is tilted about the pin 15 in the direction of arrow Q in FIG.
peels off from the concrete surface. Also, before and after this peeling operation, the threaded rod 27 shown in FIG. 5 is rotated to raise the punching frame 25 obliquely upward relative to the fixed frame 24. For this reason, this punching frame 2
5 and the side edge of the medium form frame 1 is released and the sliding friction is eliminated, so that the medium form frame 1 can be easily moved.
次に、中型枠1をさらに大きく剥離方向に回動
して、上記一対のジヤツキ17を作動させる。こ
れにより、シリンダ部17aに対してピストン部
17bが上方へ伸長していき、梁材13に連なる
型枠支持フレーム5を介して、中型枠1が略平行
に上方へ移動し、第8図に示す状態に保持する。
かかる状態においては、中型枠1の型枠支持フレ
ーム5の車輪軸9を引き込め、その中型枠1を、
ピン15を中心として上記とは逆方向に回動し
て、所定の角度に戻し、その内側にコンクリート
を打設するとともに、これに前後してシーボルト
7の先端をそのコンクリート内に突出させる。こ
うして、このコンクリートが固化した場合には、
今後は側型枠2の型枠支持フレーム6に貫通させ
た上記シーボルト7を抜き取り、上記同様の図示
しない車輪軸を突出させるとともに、支持ジヤツ
キ11を引き込めて、側型枠2をコンクリート打
設面Pから剥離する。 Next, the medium frame 1 is rotated further in the peeling direction, and the pair of jacks 17 are activated. As a result, the piston part 17b extends upward with respect to the cylinder part 17a, and the middle formwork 1 moves upward in a substantially parallel manner via the formwork support frame 5 connected to the beam material 13, as shown in FIG. Keep it in the state shown.
In such a state, the wheel axle 9 of the formwork support frame 5 of the medium formwork 1 is retracted, and the medium formwork 1 is
It is rotated about the pin 15 in the opposite direction to the above, returned to a predetermined angle, concrete is poured inside the pin 15, and the tip of the Siebold 7 is made to protrude into the concrete before and after this. In this way, when this concrete hardens,
From now on, the Siebold 7 that has passed through the formwork support frame 6 of the side formwork 2 will be removed, the same wheel axle (not shown) as above will be protruded, the support jack 11 will be retracted, and the side formwork 2 will be poured into concrete. It peels off from the surface P.
次に、かかる状態にて、ジヤツキ17を作動し
て、ピストン部17bを第8図に示す状態から第
1図に示す状態に収縮させる。このため、コンク
リート打設面Pに対してフリーになつた側型枠2
は梁13を介して上方に持ち上げられる。次に、
この側型枠2の内側にコンクリートを打設すると
ともに、その側型枠2上の型枠支持フレーム6に
差し込んだシーボルト7の一端を、そのコンクリ
ート内に埋設させる。こうして、このコンクリー
トが固化した場合には、再び中型枠1の型枠支持
フレーム5にあるシーボルト7を抜き取り、以下
上記同様の作業によつて、中型枠1を側型枠2に
対して上昇せしめ、コンクリートを打設してい
く。このように、中型枠1および側型枠2を順次
交互に迫り上げる作業によつて、ダムの壁面を構
築する。なお、上記各型枠1,2にはコンクリー
ト打設によつて、これらが外側方向の押圧力を受
け、特に中央部や下部のシーボルト7に曲げ力が
作用するが、第6図に示すように、これらのシー
ボルト7に型枠支持フレーム6に取り付けた取付
板29のボルト30の頭を圧接することにより、
そのシーボルト7の曲がりを防止し、各型枠1,
2の起き上がりを生じなくさせることができる。
かくして、コンクリート打設面を全領域に亘つて
均一にすることができる。 Next, in this state, the jack 17 is operated to contract the piston portion 17b from the state shown in FIG. 8 to the state shown in FIG. 1. Therefore, the side formwork 2 becomes free with respect to the concrete pouring surface P.
is lifted upward via the beam 13. next,
Concrete is poured inside this side formwork 2, and one end of the Siebold 7 inserted into the formwork support frame 6 on the side formwork 2 is buried in the concrete. When this concrete has solidified in this way, the Siebold 7 on the formwork support frame 5 of the medium formwork 1 is pulled out again, and the medium formwork 1 is raised relative to the side formwork 2 by the same operation as described above. , pouring concrete. In this way, the dam wall is constructed by sequentially and alternately pushing up the middle formwork 1 and the side formwork 2. In addition, each of the formworks 1 and 2 is subjected to an outward pressing force due to concrete pouring, and a bending force is applied particularly to the Siebold 7 in the center and lower part, as shown in FIG. By pressing the heads of the bolts 30 of the mounting plate 29 attached to the formwork support frame 6 to these Siebolds 7,
To prevent the Siebold 7 from bending, each formwork 1,
2 can be prevented from occurring.
In this way, the concrete pouring surface can be made uniform over the entire area.
〈発明の効果〉
以上のように、この発明によれば、中型枠と側
型枠とを、これらの上部に設けた梁を介してジヤ
ツキに関連せしめ、各型枠に一体の型枠支持フレ
ームにシーボルトを抜き差し自在に取り付けるよ
うにしたので、上記中型枠および側型枠を簡単な
作業で、コンクリート打設面に沿つて、交互に自
動的に迫り上げることができるなど、従来装置に
ない利点が得られるという効果がある。<Effects of the Invention> As described above, according to the present invention, the middle formwork and the side formwork are connected to the jack via the beams provided on the upper part of the middle formwork, and the formwork supporting frame is integrated with each formwork. Since the Siebold can be attached and removed freely, the middle formwork and side formwork can be automatically raised alternately along the concrete pouring surface with simple work, which is an advantage not found in conventional equipment. This has the effect that it can be obtained.
第1図はこの発明にかかる自昇型枠装置の正面
図、第2図は第1図におけるA−A線断面図、第
3図は第1図におけるB−B線断面図、第4図は
第1図におけるC−C線断面図、第5図は側型枠
端における抜き枠構造を示す横断面図、第6図は
シーボルトの曲げ防止構造を示す側面図、第7図
は中型枠のコンクリート打設面からの剥離状態を
示す側面図、第8図は中型枠の上昇状況を示す一
部破断した正面図である。
1…中型枠、2…側型枠、5,6…型枠支持フ
レーム、7…シーボルト、13…梁材、17…ジ
ヤツキ。
FIG. 1 is a front view of a self-lifting formwork apparatus according to the present invention, FIG. 2 is a cross-sectional view taken along line A-A in FIG. 1, FIG. 3 is a cross-sectional view taken along line B-B in FIG. 1, and FIG. is a sectional view taken along the line C-C in Fig. 1, Fig. 5 is a cross-sectional view showing the punched frame structure at the end of the side formwork, Fig. 6 is a side view showing Siebold's bending prevention structure, and Fig. 7 is the middle formwork. FIG. 8 is a side view showing how the medium formwork has peeled off from the concrete placement surface, and FIG. 1... Medium formwork, 2... Side formwork, 5, 6... Formwork support frame, 7... Siebold, 13... Beam material, 17... Jacket.
Claims (1)
型枠およびこれを両側から挟む各1の側型枠と、
上記中型枠および側型枠の上部に位置して、その
中型枠の型枠支持フレームを支持する梁材と、こ
の梁材の両側部と上記側型枠との間に取り付けた
上記中型枠と側型枠の交互上昇用のジヤツキと、
上記各型枠支持フレームに抜差し自在に取り付け
られるシーボルトとを備えた自昇型枠装置。1. A medium formwork attached to a plurality of formwork support frames, and one side formwork each sandwiching the medium formwork from both sides,
A beam material located above the medium formwork and the side formwork to support the formwork support frame of the medium formwork, and the medium formwork installed between both sides of the beam material and the side formwork. Jackets for alternately raising the side formwork,
A self-lifting formwork device comprising a Siebold that is removably attached to each of the above formwork support frames.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8968987A JPS63277311A (en) | 1987-04-14 | 1987-04-14 | Self-lifting type formwork device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8968987A JPS63277311A (en) | 1987-04-14 | 1987-04-14 | Self-lifting type formwork device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63277311A JPS63277311A (en) | 1988-11-15 |
| JPH0443524B2 true JPH0443524B2 (en) | 1992-07-16 |
Family
ID=13977730
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8968987A Granted JPS63277311A (en) | 1987-04-14 | 1987-04-14 | Self-lifting type formwork device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63277311A (en) |
-
1987
- 1987-04-14 JP JP8968987A patent/JPS63277311A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63277311A (en) | 1988-11-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH0623506B2 (en) | Concrete formwork core assembly for forming a drainage basin | |
| CN107988918A (en) | Concrete rolls up mould constructing device | |
| JP2650820B2 (en) | All-weather concrete column construction slide formwork device | |
| JPH0443524B2 (en) | ||
| JPS6218694B2 (en) | ||
| JP2838158B2 (en) | Formwork setting device | |
| JP2754265B2 (en) | Traveling formwork support | |
| JPS6015774Y2 (en) | Mobile concrete formwork equipment for embankments | |
| JP2987068B2 (en) | Pillar formwork device | |
| JP2754256B2 (en) | Traveling formwork support | |
| JP2772886B2 (en) | Construction method of concrete dam with masonry pattern | |
| JPH03287977A (en) | Form method and form device | |
| JP3254509B2 (en) | Beam unit formwork | |
| JPS6122705B2 (en) | ||
| JP3048259B2 (en) | Multi-stage construction method and formwork system for concrete structures | |
| JP2775215B2 (en) | Method and apparatus for placing concrete in concrete structure | |
| JPH0373689B2 (en) | ||
| JPS6134454Y2 (en) | ||
| JPS6114307B2 (en) | ||
| JPH0244975B2 (en) | OOGATAKATAWAKUNODATSUGATAKOHO | |
| JPS6023511A (en) | Bolt-supporting type movable form device for constructing concrete structure | |
| JP2775216B2 (en) | Concrete casting method and concrete form moving device for concrete structure | |
| JPS594755A (en) | Slide type frame apparatus for casting concrete structure | |
| JPH02200402A (en) | Method and apparatus for preparing semi-pc floor panel with small beams | |
| JPH0352811Y2 (en) |