Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0447750B2 - - Google Patents
[go: Go Back, main page]

JPH0447750B2 - - Google Patents

Info

Publication number
JPH0447750B2
JPH0447750B2 JP59080710A JP8071084A JPH0447750B2 JP H0447750 B2 JPH0447750 B2 JP H0447750B2 JP 59080710 A JP59080710 A JP 59080710A JP 8071084 A JP8071084 A JP 8071084A JP H0447750 B2 JPH0447750 B2 JP H0447750B2
Authority
JP
Japan
Prior art keywords
conduit
insertion holes
concrete
insertion hole
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP59080710A
Other languages
Japanese (ja)
Other versions
JPS60223568A (en
Inventor
Seiichi Matsumoto
Masao Nishino
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP59080710A priority Critical patent/JPS60223568A/en
Publication of JPS60223568A publication Critical patent/JPS60223568A/en
Publication of JPH0447750B2 publication Critical patent/JPH0447750B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Duct Arrangements (AREA)
  • Installation Of Indoor Wiring (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、建築物のコンクリート構造体を形成
するに際し、コンクリート打設前にコンジツトを
敷設し、コンクリート打設後に前記コンジツト内
にフレキシブルパイプを挿入する設備配管工法、
並びに、その工法に使用するコンジツトに関す
る。
[Detailed Description of the Invention] [Field of Industrial Application] When forming a concrete structure for a building, the present invention lays a conduit before pouring the concrete, and inserts a flexible pipe into the conduit after pouring the concrete. Equipment piping method to insert,
Also, it relates to the conduit used in the construction method.

〔従来技術〕[Prior art]

従来、第4図イに示すように、市販の電気配線
用コンジツト17を敷設し、かつ、配管や配線の
必要本数と同数のコンジツト17を配置し、第4
図ロに示すように、コンクリート13打設後に、
コンジツト17の夫々にフレキシブルパイプ14
や電線15を1本づつ押込みや引張りによつて挿
入していた。
Conventionally, as shown in FIG.
As shown in Figure B, after pouring concrete 13,
A flexible pipe 14 is attached to each of the conduits 17.
and electric wires 15 were inserted one by one by pushing or pulling.

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

しかし、1本のコンジツト17に1本のフレキ
シブルパイプ14や電線15しか挿入できないた
めに、配管や配線の必要本数が多くなるほど多数
のコンジツト17をコンクリート打設前に敷設し
なければならず、コンジツト17敷設に多くの時
間や作業人員が必要となつて、建築費が高くなつ
たり、建築期間が長くなる一因となつていた。殊
に、ガス配管、水道配管、冷暖房用配管、電源配
線、制御用配線等の多種の配管や配線を設ける場
合、各設備業者が工事対象とするコンジツト17
を各別に敷設しており、コンジツト17敷設に起
因する建築費高騰や建築期間延長が著しい欠点が
あつた。
However, since only one flexible pipe 14 or electric wire 15 can be inserted into one conduit 17, as the number of required piping and wiring increases, a large number of conduits 17 must be laid before concrete pouring. 17 It required a lot of time and labor to lay the ground, which was one of the causes of high construction costs and a long construction period. In particular, when installing various types of piping and wiring such as gas piping, water piping, heating and cooling piping, power supply wiring, control wiring, etc., each equipment contractor will be responsible for the construction of conduits17.
Each conduit was laid separately, and there were significant drawbacks such as a rise in construction costs and an extension of the construction period due to the construction of conduit 17.

本第1発明1発明の目的は、配管本数の割には
コンジツト敷設を短時間にかつ労力少く行える工
法を開発する点にある。
An object of the first invention is to develop a construction method that can lay conduit in a short time and with less labor compared to the number of pipes.

本第2発明の目的は、集合住宅におけるガス燃
料式冷暖房や給湯のための配管に便利な設備配管
用コンジツトを提供する点にある。
It is an object of the second invention to provide a conduit for equipment piping that is convenient for piping for gas-fueled heating and cooling or hot water supply in an apartment complex.

〔問題を解決するための手段〕[Means to solve the problem]

本第1発明による建築物用設備配管工法の特徴
手段は、コンクリート打設前に敷設するコンジツ
トを可撓性を有するように構成し、かつ、そのコ
ンジツトに少なくとも複数本のパイプ用挿通孔を
形成しておいて、前記コンジツトを所望位置に所
望姿勢で位置させた状態で敷設し、前記複数本の
挿通孔に各別に、複数本のフレキシブルパイプを
コンクリート打設後に挿入することにあり、その
作用効果は次の通りである。
The characteristic means of the building equipment piping construction method according to the first invention is that the conduit to be laid before concrete pouring is configured to have flexibility, and at least a plurality of pipe insertion holes are formed in the conduit. The method is to lay the conduit at a desired position and in a desired posture, and insert a plurality of flexible pipes into the plurality of insertion holes separately after concrete is poured. The effects are as follows.

〔作用〕[Effect]

つまり、コンジツトを可撓性を有するように構
成し、かつ、その一本のコンジツトに複数本のパ
イプ用挿通孔、必要に応じて配線用挿通孔を形成
しておくことによつて、コンジツトを所望位置に
所望姿勢で位置させた状態で敷設することができ
るようになり、しかも配管や配線が多くても1本
あるいは少ない本数のコンジツトを敷設するだけ
で済むようになつた。
In other words, by configuring the conduit to be flexible and by forming multiple pipe insertion holes in one conduit and, if necessary, wiring insertion holes, the conduit can be made flexible. It is now possible to lay the conduit in a desired position and in a desired attitude, and even if there are many pipes and wiring, it is now possible to lay only one or a small number of conduits.

〔発明の効果〕〔Effect of the invention〕

その結果、コンクリート打設前のコンジツト敷
設を、配管や配線の本数や種類が多い割には短時
間に少い作業人員で行えるようになり、建築費の
低減及び建築期間の短縮を図れるようになつた。
As a result, conduit installation prior to concrete pouring can be done in a short time and with fewer workers, despite the large number and types of pipes and wiring, reducing construction costs and construction periods. Summer.

〔問題を解決するための手段〕[Means to solve the problem]

本第2発明による建築物設備配管用コンジツト
の特徴構成は、可撓性を有するように構成し、か
つ、冷暖房用フレキシブルパイプを挿入するため
の1本以上の第1挿通孔、燃料ガス用フレキシブ
ルパイプを挿入するための1本の第2挿通孔、冷
水供給用フレキシブルパイプを挿入するための1
本の第3挿通孔、給湯用フレキシブルパイプを挿
入するための1本以上の第4挿通孔、並びに、電
線を挿入するための1本以上の第5挿通孔を区画
形成してあることにあり、その作用効果は次の通
りである。
The characteristic structure of the conduit for building equipment piping according to the second invention is that it is configured to have flexibility, and includes one or more first insertion holes for inserting flexible pipes for heating and cooling, and flexible pipes for fuel gas. One second insertion hole for inserting a pipe, one for inserting a flexible pipe for cold water supply
The third insertion hole of the book, one or more fourth insertion holes for inserting a flexible pipe for hot water supply, and one or more fifth insertion holes for inserting an electric wire are defined. , its effects are as follows.

〔作用〕[Effect]

つまり、集合住宅においては、入口側に燃料ガ
スや水道の元管や配電盤が、かつ、ベランダに冷
暖房用や給湯用の本機が設置され、元管から本機
への燃料ガス供給用及び冷水供給用配管、配電盤
から本機への電線、本機と冷暖房用室内機にわた
る1本以上の熱媒体用配管、並びに、本機から給
湯部への給湯用配管を、入口側とベランダにわた
つて設けることが多い。
In other words, in an apartment complex, the fuel gas and water main pipes and switchboards are installed at the entrance, and the main unit for heating, cooling, and hot water is installed on the balcony, and the main pipes are used to supply fuel gas and cold water to the main unit. Supply piping, electric wires from the switchboard to this machine, one or more heat medium piping between this machine and the indoor air-conditioning unit, and hot water piping from this machine to the hot water supply section, from the entrance side to the balcony. Often set up.

従つて、コンジツトを可撓性を有するように構
成し、かつ、そのコンジツトに上述の第1ないし
第5挿通孔を形成しておけば、コンジツトを所望
の位置に所望の姿勢で位置させる状態で、入口側
からベランダにわたつて所望の経路に沿わせて敷
設することができ、しかも、コンクリート打設前
に1本のコンジツトを前述の如く入口側からベラ
ンダにわたつて敷設しておくだけで、ガス燃料式
の冷暖房や給湯に必要な各種のフレキシブルパイ
プ及び配線を、コンクリート打設後にコンジツト
により設置できる。
Therefore, if the conduit is configured to have flexibility and the above-mentioned first to fifth insertion holes are formed in the conduit, the conduit can be positioned at a desired position and in a desired posture. The conduit can be laid along the desired route from the entrance side to the balcony, and by simply laying one conduit from the entrance side to the balcony as described above before concrete pouring. Various flexible pipes and wiring required for gas-fueled air conditioning and hot water supply can be installed using conduits after concrete is poured.

〔発明の効果〕〔Effect of the invention〕

その結果、集合住宅においてガス燃料式冷暖房
や給湯のためにコンクリート打設前にコンジツト
を敷設するに、従来では5本以上ものコンジツト
を設置する必要があつたに反して、単に1本のコ
ンジツトを設置するだけで済むようになり、一般
に住宅個数が相当多い集合住宅全体として、コン
ジツト敷設に必要な期間及び作業人員を大巾に少
くでき、建築費の低減及び建築期間の短縮を効果
的に図れるようになつた。
As a result, when conduit is laid before concrete pouring for gas-fueled heating and cooling or hot water supply in apartment complexes, it is now possible to simply lay one conduit, whereas in the past it was necessary to install five or more conduits. It is now only necessary to install the conduit, and the time required for laying conduit and the number of workers can be greatly reduced for the entire housing complex, which generally has a large number of housing units, and it is possible to effectively reduce construction costs and shorten the construction period. It became like that.

〔実施例〕〔Example〕

次に、第1図及び第2図により実施例を示す。
第1図に示すように、コンジツト1を可撓性、電
気絶縁性、及び不透水性の合成樹脂にて可撓性を
有するように構成し、かつ、そのコンジツト1
に、、冷暖房用配管のための3本の第1挿通孔2、
燃料ガス用配管のための1本の第2挿通孔3、冷
水供給用配管のための1本の第3挿通孔4、給湯
用配管のための1本の第4挿通孔5、並びに、電
源用及び制御用配線のための2本の第5挿通孔6
を、夫々に必要な径でかつ互に並行に区画形成す
る。
Next, an example will be shown with reference to FIGS. 1 and 2.
As shown in FIG. 1, the conduit 1 is made of flexible, electrically insulating, and water-impermeable synthetic resin, and has flexibility.
, three first insertion holes 2 for heating and cooling piping;
One second insertion hole 3 for fuel gas piping, one third insertion hole 4 for cold water supply piping, one fourth insertion hole 5 for hot water supply piping, and a power source. Two fifth insertion holes 6 for use and control wiring
are formed into sections in parallel with each other and each having a required diameter.

第2図イ及びロに示すように、集合住宅の各戸
に対してスラブコンクリート打設前に、都市ガ
ス、水道、電気用メータボツクス7に近い入口側
の配管集合箇所(A)からベランダ8の冷暖房用及び
給湯用本機の設置箇所(B)にわたつて、第1図のコ
ンジツト1を筒9で接着して接続し、所望の位置
に所望の姿勢で位置させる状態で所望の経路に沿
わせて、鉄筋11間に敷設する。
As shown in Figure 2 A and B, before slab concrete is poured into each unit of an apartment complex, the pipes are connected to the veranda 8 from the pipe gathering point (A) on the entrance side near the meter box 7 for city gas, water, and electricity. Glue and connect the conduit 1 shown in Fig. 1 with the tube 9 across the installation location (B) of this unit for cooling/heating and hot water supply, and position it at the desired position and attitude along the desired route. At the same time, it is laid between the reinforcing bars 11.

また、第2図イに示すように、本機の設置箇所
(B)から部屋()及び()の冷暖房用室内機の
ための接続具設置箇所(C)にわたつて、配管集合箇
所(A)からキツチン、バス、洗面所の給湯部D1
D2,D3夫々にわたつて、かつ、配管集合箇所(A)
から部屋()及び()の冷暖房用室内機のた
めの接続具設置箇所(E)にわたつて、可撓性を
有するように構成し、かつ、夫々に必要な種類及
び本数の挿通孔を区画形成したコンジツト12
a,12b,12c,12d,12eを、所望の
位置に所望の姿勢で位置させる状態で所望の経路
に沿わせて、スラブコンクリート打設前に鉄筋1
1間に敷設する。
In addition, as shown in Figure 2 A, the installation location of this machine is
From (B) to the room () and the connection installation point (C) for the indoor air-conditioning unit in (), from the pipe collection point (A) to the hot water supply section D 1 of the kitchen, bath, and washroom,
Across each of D 2 and D 3 , and the piping gathering point (A)
From the room () to the connection fitting installation location (E) for the indoor air-conditioning unit in (), it is constructed to have flexibility, and the necessary types and numbers of insertion holes are defined for each. Formed conduit 12
a, 12b, 12c, 12d, and 12e are positioned at desired positions and in desired postures along the desired path, and the reinforcing bars 1 are placed before placing the slab concrete.
Lay it between 1 and 2.

次に、スラブコンクリート13を打設し、コン
クリート13が固化した後で、第2図ハに示すよ
うに、コンジツト1の第1ないし第4挿通孔2,
5、及び、その他のコンジツト12aないし12
eの挿通孔に、夫々に見合つた径のフレキシブル
パイプ14を押込みや通線による引張りで挿入
し、フレキシブルパイプ14夫々の両端部を、コ
ンジツト1,12aないし12eの両端から適当
長さだけ突出させる。
Next, concrete slab 13 is poured, and after the concrete 13 has hardened, the first to fourth insertion holes 2,
5, and other conduits 12a to 12
Insert flexible pipes 14 of appropriate diameters into the insertion holes e by pushing or pulling by threading, and make both ends of each flexible pipe 14 protrude by an appropriate length from both ends of the conduits 1, 12a to 12e. .

また同様に、コンジツト1の第5挿通孔6に電
源用及び制御用電線15を各別に挿入する。
Similarly, the power supply and control wires 15 are inserted into the fifth insertion hole 6 of the conduit 1 separately.

その後で、配管系や配線系における必要な接続
工事や器具設置工事、あるいは、住宅の内部仕上
げ工事、その他を、適当な順序で行う。
After that, necessary connection work and equipment installation work for piping and wiring systems, interior finishing work for the house, and other work are performed in an appropriate order.

〔別実施例〕[Another example]

次に、別の実施例を説明する。 Next, another example will be described.

本第1発明において、コンジツト1を敷設する
場所は、例えば、壁面や天井に沿わせたり、コン
クリート壁を貫通させる箇所等、建築物のコンク
リート構造体のいかなる場所でもよい。
In the first invention, the conduit 1 may be laid anywhere in the concrete structure of a building, such as along a wall or ceiling, or through a concrete wall.

本第1発明において、コンジツト1に形成した
挿通孔の本数や種類は、必要に応じて適当に変更
でき、少くとも複数本のパイプ用挿通孔をコンジ
ツト1に形成してあればよい。また、コンジツト
1の材質は金属、その他であつてもよく、そし
て、コンジツト1の形状、寸法、その他において
も適宜変更ができ、さらに、複数本のコンジツト
1を並設してもよい。
In the first aspect of the present invention, the number and type of the insertion holes formed in the conduit 1 can be changed as necessary, and it is sufficient that at least a plurality of pipe insertion holes are formed in the conduit 1. Further, the material of the conduit 1 may be metal or other materials, and the shape, dimensions, etc. of the conduit 1 may be changed as appropriate. Furthermore, a plurality of conduits 1 may be arranged in parallel.

本第1発明において、フレキシブルパイプ14
の材質、構造、寸法、その他は、その用途に見合
つて適当に選択できる。
In the first invention, the flexible pipe 14
The material, structure, dimensions, etc. can be appropriately selected depending on the intended use.

本第2発明によるコンジツト1を形成するに、
下記のような各種変形が可能である。
To form the conduit 1 according to the second invention,
Various modifications as described below are possible.

(イ) 第3図イに示すように、第1ないし第5挿通
孔2ないし6を第1図に示したものと同様に形
成すると共に、挿通口周壁部1a及びそれらに
対する支持部1b以外を中空にして、軽量化及
び材料節約を図る。
(A) As shown in FIG. 3A, the first to fifth insertion holes 2 to 6 are formed in the same manner as shown in FIG. Make it hollow to reduce weight and save materials.

(ロ) 第3図ロに示すように、多数の挿通口aを碁
盤目状に形成して、それら挿通口aを前述の第
1ないし第5挿通孔2ないし6として適当に利
用できるようにしてもよい。
(B) As shown in FIG. 3B, a large number of insertion holes a are formed in a grid pattern so that these insertion holes a can be appropriately used as the first to fifth insertion holes 2 to 6 described above. It's okay.

(ハ) 第3図ハに示すように、3本の第1挿通孔2
と1本づつの第2ないし第5挿通孔3ないし6
を夫々適当な大きさで形成しておき、複数本の
挿通孔aを有する補助コンジツト16を必要に
応じて組合わせて、補助コンジツト16の挿通
孔aを第1、第4あるいは第5挿通孔2,5,
6として適当に利用できるようにしてもよい。
(C) As shown in Figure 3C, the three first insertion holes 2
and one second to fifth insertion hole 3 to 6
are formed to have appropriate sizes, and the auxiliary conduits 16 having a plurality of through holes a are combined as necessary, so that the through holes a of the auxiliary conduits 16 are connected to the first, fourth, or fifth through holes. 2,5,
6 may be used as appropriate.

(ニ) 形状においてハニカム状や全体が丸形やその
他適当な変更ができ、また、材質において金属
やその他適当に変更ができ、さらには、表面を
内装に合わせたものにして、一部を露出できる
ようにしてもよい。
(d) The shape can be changed to a honeycomb shape, the whole is round, or other suitable changes, the material can be changed to metal or other suitable changes, and the surface can be made to match the interior, with some parts exposed. It may be possible to do so.

要するに、本第2発明のコンジツト1は、少く
とも、可撓性を有するように構成し、かつ、冷暖
房用フレキシブルパイプを挿入するための1本以
上の第1挿通孔2、燃料ガス用フレキシブルパイ
プを挿入するための1本の第2挿通孔3、冷水供
給用フレキシブルパイプを挿入するための1本の
第3挿通孔4、給湯用フレキシブルパイプを挿入
するための1本以上の第4挿通孔5、並びに、電
線を挿入するための1本以上の第5挿通孔6を区
画形成してあればよい。
In short, the conduit 1 of the second invention is configured to have at least flexibility, and includes at least one first insertion hole 2 for inserting a flexible pipe for heating and cooling, and a flexible pipe for fuel gas. One second insertion hole 3 for inserting a cold water supply flexible pipe, one third insertion hole 4 for inserting a cold water supply flexible pipe, and one or more fourth insertion holes for inserting a hot water supply flexible pipe. 5, and one or more fifth insertion holes 6 for inserting electric wires.

【図面の簡単な説明】[Brief explanation of drawings]

第1図及び第2図イ,ロ,ハは本発明の実施例
を示し、第1図はコンジツトの一部省略斜視図、
第2図は工法手順の説明図である。第3図は、本
発明のコンジツトの別実施例を示す一部省略斜視
図である。第4図イ,ロは従来工法の説明図であ
る。 1……コンジツト、2……第1挿通孔、3……
第2挿通孔、4……第3挿通孔、5……第4挿通
孔、6……第5挿通孔、14……フレキシブルパ
イプ。
1 and 2 A, B, and C show embodiments of the present invention, and FIG. 1 is a partially omitted perspective view of a conduit;
Figure 2 is an explanatory diagram of the construction method procedure. FIG. 3 is a partially omitted perspective view showing another embodiment of the conduit of the present invention. Figures 4A and 4B are explanatory diagrams of the conventional construction method. 1... Conduit, 2... First insertion hole, 3...
2nd insertion hole, 4...3rd insertion hole, 5...4th insertion hole, 6...5th insertion hole, 14...flexible pipe.

Claims (1)

【特許請求の範囲】 1 建築物のコンクリート構造体を形成するに際
し、コンクリート打設前に長尺状のコンジツト1
を敷設し、コンクリート打設後に前記コンジツト
1内にフレキシブルパイプ14を挿入する設備配
管工法であつて、 前記コンジツト1を可撓性を有するように構成
し、かつ、そのコンジツト1に少なくとも複数本
のパイプ用挿通孔を形成しておいて、前記コンジ
ツト1を所望位置に所望姿勢で位置させた状態で
敷設し、前記複数本の挿通孔に各別に、複数本の
フレキシブルパイプ14をコンクリート打設後に
挿入する建築物用設備配管工法。 2 可撓性を有するように構成し、かつ、冷暖房
用フレキシブルパイプを挿入するための1本以上
の第1挿通孔2、燃料ガス用フレキシブルパイプ
を挿入するための1本の第2挿通孔3、冷水供給
用フレキシブルパイプを挿入するための1本の第
3挿通孔4、給湯用フレキシブルパイプを挿入す
るための1本以上の第4挿通孔5、並びに、電線
を挿入するための1本以上の第5挿通孔6を区画
形成してある建築物設備配管用コンジツト。
[Claims] 1. When forming a concrete structure for a building, a long conduit 1 is placed before concrete pouring.
This is an equipment piping construction method in which a flexible pipe 14 is inserted into the conduit 1 after laying concrete, and the conduit 1 is configured to have flexibility, and at least a plurality of pipes are inserted into the conduit 1. Pipe insertion holes are formed, the conduit 1 is laid at a desired position and in a desired posture, and a plurality of flexible pipes 14 are individually inserted into the plurality of insertion holes after concrete is poured. Building equipment piping construction method to be inserted. 2. One or more first insertion holes 2 configured to have flexibility and into which flexible pipes for air conditioning and heating are inserted, and one second insertion hole 3 into which flexible pipes for fuel gas are inserted. , one third insertion hole 4 for inserting a cold water supply flexible pipe, one or more fourth insertion holes 5 for inserting a hot water supply flexible pipe, and one or more fourth insertion holes for inserting an electric wire. A conduit for building equipment piping in which a fifth insertion hole 6 is defined.
JP59080710A 1984-04-20 1984-04-20 Equipment piping construction for building and consit used therein Granted JPS60223568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP59080710A JPS60223568A (en) 1984-04-20 1984-04-20 Equipment piping construction for building and consit used therein

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP59080710A JPS60223568A (en) 1984-04-20 1984-04-20 Equipment piping construction for building and consit used therein

Publications (2)

Publication Number Publication Date
JPS60223568A JPS60223568A (en) 1985-11-08
JPH0447750B2 true JPH0447750B2 (en) 1992-08-04

Family

ID=13725887

Family Applications (1)

Application Number Title Priority Date Filing Date
JP59080710A Granted JPS60223568A (en) 1984-04-20 1984-04-20 Equipment piping construction for building and consit used therein

Country Status (1)

Country Link
JP (1) JPS60223568A (en)

Also Published As

Publication number Publication date
JPS60223568A (en) 1985-11-08

Similar Documents

Publication Publication Date Title
US20050188632A1 (en) Modular core wall construction system
US3442058A (en) Concrete floor construction with duct-forming voids
JPH0447750B2 (en)
FI75634B (en) ELEMENT FUER ANVAENDNING I VVSE-KONSTRUKTIONER I FASTIGHETER.
EP1174557A1 (en) Method for erecting a building and building element
JP3249454B2 (en) Equipment plumbing for apartment houses
JPS63290113A (en) Method and apparatus for wiring on installation type free-access floor
JP3160117B2 (en) Piping unit and piping method using the same
FI91791B (en) Procedure for installing utility water and / or hot water heating pipe systems in building and coupling and dividing unit for carrying out the process
JP2515464B2 (en) Piping / wiring system
IL313627A (en) Communication line laying method
CS553290A3 (en) Flooring with individual channels for industrial premises
JP3713652B2 (en) Construction method for interior equipment
KR101022488B1 (en) Piping Level Adjuster in Underfloor Heating Structure
JPH0352374Y2 (en)
JPS60132193A (en) Water piping changing and piping method of building such as public residence
Manufacturers et al. SECTION 22 0719 PLUMBING PIPING INSULATION PART 1 GENERAL 1.01 SECTION INCLUDES
EP3190594B1 (en) Preassembled electrical wiring assembly for a building
JPH11247303A (en) Building plumbing methods and buildings
FI64216C (en) STOMKONSTRUKTION FOER MONTERING AV VVS-ROER
SE458536B (en) SETTING TO MANUFACTURE A FIREFIGHTER IMPLEMENTATION THROUGH A BUILDING PART
Raceways et al. SECTION 26 05 33–RACEWAYS, CONDUITS AND BOXES PART 1-GENERAL 1.1 WORK INCLUDED
JPH10213271A (en) Piping unit
JPH05130724A (en) Wiring line construction for wall, floor and ceiling
JP3313278B2 (en) Building plumbing method