JPH0458526B2 - - Google Patents
Info
- Publication number
- JPH0458526B2 JPH0458526B2 JP59173392A JP17339284A JPH0458526B2 JP H0458526 B2 JPH0458526 B2 JP H0458526B2 JP 59173392 A JP59173392 A JP 59173392A JP 17339284 A JP17339284 A JP 17339284A JP H0458526 B2 JPH0458526 B2 JP H0458526B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- steel
- construction method
- steel rod
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/10—Follow-blocks of pile-drivers or like devices
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
この発明は土木、建築工事において、主として
杭あるいは矢板等の土止材を所定深さまで打下げ
る工法に関するものである。[Detailed Description of the Invention] [Industrial Application Field] The present invention mainly relates to a construction method for driving down earth mooring materials such as piles or sheet piles to a predetermined depth in civil engineering and construction work.
[従来の技術]
掘削工事においては、場所により掘削深さを異
ならしめる段掘削工事を行なうことがある。この
ような場合には、掘削深さの異なる位置に土止め
を施す必要があつて、通常は第1図に示す如く、
鋼杭aを地表面より打設し、掘削の進行に伴い、
上方杭bは切梁や掘削用重機の邪魔になるので切
断するなどして回収しているが、例えば後記する
ガイド式とか、やつとこ式とか呼ばれる方法で打
設して所定の深さまで打ち下げることが行なわれ
ていた。[Background Art] In excavation work, step excavation work is sometimes performed in which the depth of excavation varies depending on the location. In such cases, it is necessary to install earth retainers at different excavation depths, and usually, as shown in Figure 1,
A steel pile a is driven from the ground surface, and as the excavation progresses,
Since the upper pile b gets in the way of struts and heavy excavation equipment, it is removed by cutting it, but for example, it is driven by a method called the guide method or the Yatsutoko method, which will be described later, and is driven down to a predetermined depth. Something was being done.
[発明が解決しようとしいる問題点]
しかし、杭を切断してしまう従来の方法による
と上記切断した杭は回収後再使用しえなくなり、
スクラツプ量が多くなつて極めて不経済である。
そのうえガイド方式にあつては、打下げる杭を地
盤表面まで打設し、しかる後、その杭の上部に上
杭を拘束するためアングル材、チヤンネル材から
なるガイドを取付け、このガイドを介して前記杭
の上端に上方杭を嵌め込んでこれらを所定の深さ
まで打込むものであるから、打ち込みの中断を要
し、かつガイド取付けに手間がかかる反面、打込
み時に上方杭と下方杭との間でズレを生じ易く、
打込み精度が低下するという欠点があつた。[Problems to be solved by the invention] However, according to the conventional method of cutting the piles, the cut piles cannot be reused after being collected.
This increases the amount of scrap and is extremely uneconomical.
Furthermore, in the guide method, a pile is driven down to the ground surface, and then a guide made of angle material or channel material is attached to the top of the pile to restrain the upper pile. Since the upper pile is inserted into the upper end of the pile and driven to a predetermined depth, it is necessary to interrupt driving and it takes time to install the guide. easy to occur,
The drawback was that the driving accuracy decreased.
一方、やつとこ式は掘削深さが3m程度の浅い
場合に汎用されている方法で、打下げる杭の頭部
にやつとこと呼ばれるキヤツプをかぶせて打下げ
る方式であるが、この方式にあつては、キヤツプ
の周面積が大きいために、土質の影響をまともに
受け打込み時に打込みづらく、深い杭の打下げが
不可能であり、また回収時には土の付着力のため
キヤツプが回収しづらいという難点があつた。 On the other hand, the Yatsutoko method is a method that is commonly used when the excavation depth is shallow, about 3 m, and the pile is driven down by covering the head of the pile with a cap called Yatsutoko. Because the circumferential area of the cap is large, it is affected by the soil quality, making it difficult to drive the pile, making it impossible to drive deep piles, and when collecting the cap, it is difficult to collect due to the adhesion of the soil. It was hot.
[発明の目的]
本発明は、上記のような従来技術の問題点を解
消することを目的とするものであつて、深い杭の
打下げが可能であり、しかも上方杭を切断するこ
となく容易に回収することができ、かつ打込み施
工精度も高く、そのうえ鋼矢板の施工も容易な打
下げ工法を提案せんとするものである。[Object of the Invention] The present invention aims to solve the problems of the prior art as described above, and it is possible to drive down deep piles easily without cutting the upper pile. The purpose of this project is to propose a downhill construction method that can be recovered quickly, has high driving accuracy, and is easy to install steel sheet piles.
[問題点を解決するための手段]
上記の目的を達成するために本発明の方法は、
打下げようとする杭または矢板等(以下これらを
下方側土止材という)と、その上から打込みを行
なう上杭または矢板等(上方側土止材、以下同
じ)を、カツプラ・ナツトとこれと螺合するネジ
状リブを形成させた鋼棒とを使用して一体に連接
してから、これらを一緒に地中に打込み、打込み
終了後、鋼棒を逆転して下方側土止材から鋼棒を
抜き取つて同側土止材を地中に打ち残し、上方側
土止材のみを鋼棒と一緒に引抜き回収するもので
ある。[Means for solving the problems] In order to achieve the above object, the method of the present invention includes:
The piles or sheet piles, etc. that are to be driven down (hereinafter referred to as the "lower side retaining material") and the upper piles or sheet piles, etc. (hereinafter referred to as the "upper side retaining material") that are to be driven from above are the Katsupura Nuts and this. and a steel rod formed with threaded ribs to be screwed together to connect them together, and then drive them into the ground together.After driving, reverse the steel rod and insert it from the lower side earthwork material. The steel rod is pulled out, the same side dowel material is left in the ground, and only the upper side dowel material is pulled out and recovered together with the steel rod.
[実施例]
以下本発明の方法を実施例について更に具体的
に説明する。[Examples] The method of the present invention will be described in more detail below with reference to Examples.
第2A図は本発明を実施するにあたり使用する
鋼杭の平面図、第2B図は同上杭の連接状態を示
す正面図であつて、一例として符号1で示される
H杭のフランジ2,2の内面に予めカツプラ・ナ
ツト3,3を固着しておく。このカツプラ・ナツ
ト3,3は少なくとも上方側H杭1の上下両端に
各一個を、また下方側H杭1′の上端に一個を溶
接により固着する。なおこれらのカツプラ・ナツ
トを、それぞれ第2A図に示すように2個1組と
して左右両面に対称状に固着し、また必要に応じ
てH杭1の長さ方向における中間部にも所定の距
離を隔てて複数のカツプラ・ナツト3′,3′を固
着してもよい。なお、同一面側に取付けられたカ
ツプラ・ナツト3,3′は、後記する鋼棒を嵌め
込むために、その軸心を全て一致させておく必要
があることは勿論である。 FIG. 2A is a plan view of a steel pile used in carrying out the present invention, and FIG. 2B is a front view showing the connected state of the same pile, and as an example, the flanges 2, 2 of the H pile designated by reference numeral 1 are shown. Fix the cutlet plastic nuts 3 and 3 to the inner surface in advance. At least one coupler nut 3, 3 is fixed to each of the upper and lower ends of the upper H pile 1, and one to the upper end of the lower H pile 1' is fixed by welding. As shown in Fig. 2A, these cut-off nuts are fixed symmetrically on both the left and right sides in pairs, as shown in Figure 2A, and if necessary, they are also attached at a predetermined distance in the middle of the H pile 1 in the length direction. A plurality of coupler nuts 3', 3' may be fixedly spaced apart from each other. It goes without saying that the axes of the coupler nuts 3, 3' attached to the same surface must be aligned in order to fit a steel rod to be described later.
符号4が高強度鋼棒(以下PC鋼棒という)で
あり、その両側面に前記カツプラ・ナツト3,
3′と螺合しうるネジ状リブ5を有している。こ
のPC鋼棒4は、前記H杭1の長さ以上に形成し
ておき、該鋼棒4を第2B図に示すように上方杭
と下方杭における左右両面のカツプラ・ナツト
3,3′にそれぞれ螺入して、上下両杭を一体に
連接する。 The code 4 is a high-strength steel bar (hereinafter referred to as a PC steel bar), and the above-mentioned Katsupura Nut 3,
It has a threaded rib 5 that can be threadedly engaged with 3'. This PC steel rod 4 is formed to be longer than the length of the H pile 1, and the steel rod 4 is attached to the left and right coupling nuts 3, 3' of the upper pile and the lower pile as shown in Fig. 2B. Screw in each to connect both the upper and lower stakes together.
このようにして連接したH杭はこれを施工地点
にワイヤ等によつて吊り込み、しかる後常法に従
い杭打機により打設を行なう。下方杭と上方杭の
地中への打込みは従来法と異なり中断することな
く連続して行なう。そして下方杭を所定の深さま
で打下げた後、PC鋼棒4をスパナ等の治具で逆
転させて、下方杭から該鋼棒を抜き取る。次いで
下方杭は土中にそのまま打ち残し、上方杭のみを
ウインチ又は振動ハンマ等で前記鋼棒と一緒に引
抜き回収して打下げ作業を終了する。 The thus connected H piles are suspended at the construction site using wires or the like, and then driven using a pile driver according to a conventional method. Unlike conventional methods, the lower and upper piles are driven into the ground continuously without interruption. After driving down the lower pile to a predetermined depth, the PC steel rod 4 is reversed using a jig such as a wrench, and the steel rod is extracted from the lower pile. Next, the lower pile is left as it is in the soil, and only the upper pile is pulled out and recovered together with the steel rod using a winch, vibrating hammer, etc., and the driving operation is completed.
第3A図および第3B図は鋼矢板6にカツプ
ラ・ナツト3,3′を取付けて、PC鋼棒4によつ
て上方矢板と下方矢板とを連接させた状態を示し
ている。この矢板においては、フランジ7および
セクシヨン8の各部に左右対称状にカツプラ・ナ
ツトを固着し、これに螺合するPC鋼棒によつて、
上下両矢板を一体に連接させると共に、セツクシ
ヨンのズレを防止している。 FIGS. 3A and 3B show a state in which coupling nuts 3, 3' are attached to the steel sheet pile 6, and the upper sheet pile and the lower sheet pile are connected by a PC steel rod 4. In this sheet pile, cutlet pull nuts are fixed symmetrically to each part of the flange 7 and section 8, and PC steel rods are screwed into the nuts.
Both the upper and lower sheet piles are connected together and the sections are prevented from shifting.
このように連接した矢板を施工地点に吊り込ん
で、打下げる作業の要領および打下げ後上方矢板
を引抜き回収する作業の要領は、H杭の場合とほ
とんど同じであるからその説明は省略する。 The procedures for suspending and lowering the connected sheet piles at the construction site and for pulling out and recovering the upper sheet piles after the driving are almost the same as in the case of H piles, so a description thereof will be omitted.
なお、この明細書ではH杭と矢板についてのみ
説明したが、これらに限られず鋼管杭等について
も本発明は適用可能である。 In this specification, only H piles and sheet piles have been described, but the present invention is not limited to these and can also be applied to steel pipe piles and the like.
[発明の効果]
以上の通り、本発明の打下げ工法によれば、上
下両土止材を一体に連接するにあたつては、カツ
プラナツトと鋼棒とを、ネジ機構を利用して単に
螺合のみの操作で簡易迅速かつ上下土止材のセク
シヨンを互いにズレを生じないように一体化する
事ができる。従つて現場への搬入作業、オーガー
削孔への建て込み作業は上下両土止材を一体物と
して扱え、また打ち込みに際して深い打ち込みが
可能になり、打ち込み位置や角度の矯正が簡単に
行えて作業能率が向上され、施工精度を高めるこ
とができる。[Effects of the Invention] As described above, according to the downhill construction method of the present invention, when connecting both the upper and lower earthwork members together, the cutoff plan nut and the steel rod are simply screwed together using a screw mechanism. It is possible to easily and quickly integrate the sections of the upper and lower earthen materials without causing any misalignment. Therefore, when transporting to the site and installing into the auger hole, both the upper and lower shoring materials can be treated as one piece, and when driving, it is possible to drive deeply, and the driving position and angle can be easily corrected. Efficiency is improved and construction accuracy can be increased.
打込み終了後の上下両土止材の撤去回収に当た
つては、連結した鋼棒を逆転させて上下両土止材
に打撃を与えることなく、無打撃、低騒音方式
で、しかも即時に上下両土止材の連結を解くこと
ができる。そのため下方側土止材から鋼棒を抜き
取つて同側土止材を地中に打ち残し、上方側土止
材を鋼棒と一緒に地中よりほぼ完全な形で引き抜
き回収できるもので、従来法のように打撃荷重を
与えたり、芯振れを生ずることがなく、簡単容易
に上下土止材の連結を解くことができる。また、
上方側土止材は切断を要せずほぼ完全の形で回収
することができ回収効率、回収コストの改善がは
かれるという優れた効果を発揮するものである。 When removing and recovering both the upper and lower hemming materials after the driving is completed, the connected steel rods are reversed and the upper and lower hemming materials are removed immediately without any impact and with low noise. It is possible to untie the two dome materials. Therefore, the steel rod can be removed from the lower dowel, the same side dowel left in the ground, and the upper dowel can be pulled out of the ground along with the steel rod in its almost complete form and recovered. Unlike conventional methods, the connection between the upper and lower shoring members can be easily uncoupled without applying impact loads or causing core run-out. Also,
The upper earthen material does not require cutting and can be recovered in almost complete form, resulting in an excellent effect of improving recovery efficiency and recovery cost.
第1図は段掘削工事における山留の断面図、第
2A図は本発明に使用するH杭の平面図、第2B
図は同上杭の連接状態を示す正面図、第3A図は
本発明に使用する鋼矢板の平面図、第3B図は同
上矢板の連接状態を示す正面図、第4図はPC鋼
棒の説明図である。
1……H杭、2……フランジ、3,3′……カ
ツプラ・ナツト、4……PC鋼棒、5……ネジ状
リブ、6……鋼矢板、7……フランジ、8……セ
クシヨン。
Figure 1 is a cross-sectional view of the pile in step excavation work, Figure 2A is a plan view of the H pile used in the present invention, and Figure 2B
The figure is a front view showing the connected state of the same pile as above, Fig. 3A is a plan view of the steel sheet pile used in the present invention, Fig. 3B is a front view showing the connected state of the same above pile, and Fig. 4 is an explanation of the PC steel bar. It is a diagram. 1...H pile, 2...Flange, 3, 3'...Cut pla nut, 4...PC steel bar, 5...Threaded rib, 6...Steel sheet pile, 7...Flange, 8...Section .
Claims (1)
て、打込み前の上方側土止材と下方側土止材とに
それぞれカツプラ・ナツトを固着するとともに、
両側面にネジ状リブを形成させた鋼棒を上下対応
する位置のカツプラ・ナツトに螺入して上下両土
止材を一体に連接してからこれらを地中に打込
み、打込み終了後、鋼棒を逆転させて下方側土止
材から鋼棒を抜き取つて同側土止材は地中に打ち
残し、上方側土止材を鋼棒と一緒に地中より引抜
き回収することを特徴とする土止材の打下げ工
法。 2 土止材は鋼杭である特許請求の範囲第1項記
載の打下げ工法。 3 土止材は鋼矢板である特許請求の範囲第1項
記載の打下げ工法。 4 鋼棒は高強度鋼棒である特許請求の範囲第1
項記載の打下げ工法。[Scope of Claims] 1. In a construction method for lowering earth-locking materials to a predetermined depth, a cut-off nut is fixed to each of the upper side earth-stopping material and the lower side earth-locking material before driving, and
A steel rod with threaded ribs formed on both sides is screwed into the cut-off nuts at corresponding positions on the top and bottom to connect the upper and lower shoring materials together, and then these are driven into the ground. The steel rod is pulled out from the lower side dowel by reversing the bar, the same side dowel is left in the ground, and the upper side dowel is pulled out from the ground together with the steel rod and recovered. A construction method for lowering earthen materials. 2. The downhill construction method according to claim 1, wherein the earthen foundation material is a steel pile. 3. The downhill construction method according to claim 1, wherein the earthwork material is a steel sheet pile. 4 Claim 1 in which the steel bar is a high-strength steel bar
The downhill construction method described in section.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17339284A JPS6153915A (en) | 1984-08-22 | 1984-08-22 | Lowering method of earthwork materials |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP17339284A JPS6153915A (en) | 1984-08-22 | 1984-08-22 | Lowering method of earthwork materials |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6153915A JPS6153915A (en) | 1986-03-18 |
| JPH0458526B2 true JPH0458526B2 (en) | 1992-09-17 |
Family
ID=15959550
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP17339284A Granted JPS6153915A (en) | 1984-08-22 | 1984-08-22 | Lowering method of earthwork materials |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6153915A (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0270822A (en) * | 1988-09-06 | 1990-03-09 | Fujita Corp | Temporary support construction method and equipment |
| JP5182251B2 (en) * | 2009-08-10 | 2013-04-17 | 新日鐵住金株式会社 | Steel sheet pile joint structure and steel sheet pile wall structure |
| WO2018030361A1 (en) * | 2016-08-08 | 2018-02-15 | 新日鐵住金株式会社 | Vertical joint structure of steel member |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS54160804U (en) * | 1978-03-22 | 1979-11-10 | ||
| JPS5858327A (en) * | 1981-10-05 | 1983-04-06 | Taisei Corp | How to drive underground piles |
-
1984
- 1984-08-22 JP JP17339284A patent/JPS6153915A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6153915A (en) | 1986-03-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5235748B2 (en) | Wall metal fittings and underground continuous wall construction method | |
| JP5413541B2 (en) | Combination steel sheet pile, underground continuous wall, and reuse method of combination steel sheet pile | |
| KR100986312B1 (en) | Propulsion guide device of steel pipe loop structure | |
| KR101255515B1 (en) | The tunel execution method | |
| JPH0458526B2 (en) | ||
| JP2007132186A (en) | Non-excavation constructing technique for underground structure | |
| JP2011063957A (en) | Method for removing upper portion of pile | |
| KR101255517B1 (en) | The tunel execution method and the using fabric | |
| KR101950084B1 (en) | The Construction Method of Non-excavation tunnel what used easy excavation method of Steel pipe and Deckplate | |
| JP6395416B2 (en) | Construction method of steel continuous retaining wall with lightweight steel sheet pile | |
| JP3116098B2 (en) | Construction method for underground structures | |
| JP3761173B2 (en) | Connecting device for pipes in excavation grooves | |
| US3986568A (en) | Apparatus for making underground passages | |
| JPH0119045Y2 (en) | ||
| JP6276300B2 (en) | Open shield method | |
| JPH031479B2 (en) | ||
| JP2002013144A (en) | Device for removal of continuous wall core pile | |
| KR0149397B1 (en) | Non-welding pole steel sheet pile and construction method | |
| JP4549182B2 (en) | Sabo dam and its construction method | |
| KR100895518B1 (en) | Secondary head cap for pile head reinforcement | |
| JPS63308113A (en) | Pile head cutting method for cast-in-place piles | |
| JP3071252B2 (en) | Excavation method for soft ground tunnel | |
| JP6375334B2 (en) | Road lining method | |
| CN113981990A (en) | Concrete supporting structure with profile steel inserted therein and construction method thereof | |
| JPH07279576A (en) | Horizontal pit execution |