boom
tip
pulley
work box
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP16899988A
Other languages
Japanese (ja)
Other versions
JPH0220763A (en
Inventor
Toshihiro Nakajo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furukawa Co Ltd
Original Assignee
Furukawa Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furukawa Co Ltd filed Critical Furukawa Co Ltd
Priority to JP16899988A priority Critical patent/JPH0220763A/en
Publication of JPH0220763A publication Critical patent/JPH0220763A/en
Publication of JPH0463181B2 publication Critical patent/JPH0463181B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は多段伸縮ブームの先端に作業箱が取付
けられた高所作業車の作業箱の平衡装置に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a work box balancing device for an aerial work vehicle in which a work box is attached to the tip of a multi-stage telescopic boom.

(従来の技術) 従来の高所作業箱の平衡装置は油圧シリンダ作
動方式と索条作動方式のものがあり、索条作動方
式のものは油圧シリンダ作動方式のものに比較し
て装置の製作コストが安価であるという利点があ
る。
(Prior art) Conventional balancing devices for high-altitude work boxes come in two types: hydraulic cylinder actuation type and rope actuation type. It has the advantage of being inexpensive.

索条作動方式による作業箱平衡装置として、実
開昭39−35604号公報および実公昭50−27121号公
報に記載されているように、索条および滑車を介
してブーム装置の起伏および各ブームの伸縮にか
かわらずブーム装置の先端部に設けた作業台が常
に水平位置を保持するように構成されたものが従
来既知である。前者の実公昭39−35604号公報に
記載のものは、第2、第3ブームを同時に且つ同
速度で伸縮しなければ索条体の緊定を行なうこと
ができないため通常の3段伸縮ブームの如く油圧
シリンダにより第2、第3ブームを順次に伸縮作
動するブーム構造には実際上適用できない。これ
に反し、後者の実公昭50−27121号公報に記載の
ものは、第2ブームおよび第3ブームが如何なる
伸縮順序を採つた場合においても、索条体を常に
緊定し得るよう構成されている。
As described in Japanese Utility Model Publication No. 39-35604 and Japanese Utility Model Publication No. 50-27121, a work box balancing device using a cable operation system is capable of raising and lowering the boom device and controlling each boom via cables and pulleys. It is known in the prior art that a workbench provided at the tip of a boom device is configured to always maintain a horizontal position regardless of expansion and contraction. The former, described in Japanese Utility Model Publication No. 39-35604, is different from a normal three-stage telescopic boom because the cable cannot be tightened unless the second and third booms are extended and contracted simultaneously and at the same speed. In practice, this method cannot be applied to a boom structure in which the second and third booms are sequentially extended and retracted by a hydraulic cylinder. On the other hand, the latter described in Japanese Utility Model Publication No. 50-27121 is constructed so that the cable body can always be tightened no matter what order of extension and contraction of the second and third booms. There is.

(発明が解決しようとする課題) しかしながら、後者の作業箱平衡装置は、ブー
ム段数と同数の索条と、これと同数の動滑車を必
要とするため構造が複雑となり、索条を張設する
場合に動滑車の位置の調整、索条の張り具合の調
整等、作業現場でのメンテナンスが非常に面倒で
あり、多大の時間を必要とする問題がある。さら
にまた、4段ブーム以上の多段ブームには適用で
きず、さらに、作業箱の反時計方向への回動が自
由であるため、クレーンブームの起伏作動の停止
等を急激に行なつた場合等に作業箱は反時計方向
に回動する危険がある。また、梯子付多段ブーム
には、動滑車類の取付が構成上複雑化することか
らコスト的にも実用でないという問題がある。
(Problem to be solved by the invention) However, the latter work box balancing device requires the same number of cables as the number of boom stages and the same number of movable pulleys, so the structure is complicated, and the cables need to be stretched. In some cases, there is a problem in that maintenance at the work site, such as adjusting the position of the movable pulley and the tension of the cable, is extremely troublesome and requires a large amount of time. Furthermore, it cannot be applied to multi-stage booms with four or more stages, and furthermore, since the work box can freely rotate counterclockwise, it cannot be applied to cases where the crane boom's hoisting operation is abruptly stopped, etc. There is a danger that the work box will rotate counterclockwise. Further, the ladder-equipped multi-stage boom has the problem that it is not practical in terms of cost because the mounting of movable pulleys is complicated in structure.

本発明の目的は、多段ブームの各段ブームが順
次伸縮、同時伸縮または順次および同時に混合伸
縮など如何なる伸縮順序を採つた場合において
も、作業箱の平衡取り行ない得る装置を提供しよ
うとするものである。
An object of the present invention is to provide a device that can balance a work box even when each stage boom of a multi-stage boom adopts any order of expansion and contraction, such as sequential expansion and contraction, simultaneous expansion and contraction, or sequential and simultaneous mixed expansion and contraction. be.

また、本発明の他の目的は、多段ブームの段数
に関係なしに、基端ブームから先端ブームまで連
続した索条を用いて先端ブームの先端に作業箱
を、転倒させることなく、安全に平衡保持するこ
とを可能とし、これにより複数の索条を中継する
ための動滑車を不要とし、索条の掛回構造が簡単
で作業性に優れた作業箱平衡位置を提供しようと
するものである。
Another object of the present invention is to safely balance a work box at the tip of the tip boom by using a continuous cable from the base boom to the tip boom, regardless of the number of stages of the multi-stage boom. This eliminates the need for movable pulleys for relaying multiple cables, and provides a work box equilibrium position with a simple cable hanging structure and excellent workability. .

(課題を解決するための手段) 本発明によれば、旋回フレームに基端ブームの
基端部が伏仰可能に枢支され、基端ブーム内に中
間ブームが伸縮自在に嵌挿され、中間ブーム内に
先端ブームが伸縮自在に嵌挿され、基端ブームの
背部に延在された基端梯子の前後両脚が基端ブー
ムの両端部に固着され、中間ブームの背部に延在
された中間梯子の前脚が中間ブームの先端部に固
着され、先端ブームの背部に延在された先端梯子
の前脚が先端ブームの先端部に固着され、先端ブ
ームの先端部に高所梯子箱が水平枢支軸により回
転自在に枢支され、基端ブームの枢支軸上の滑車
と、基端梯子の先端部の滑車と、中間梯子の後端
部及び先端部の滑車と、先端梯子の後端部及び先
端部の滑車と、作業箱回動用水平枢支軸上の滑車
と作業箱上の支持端末滑車に1本の懸吊索条並び
に1本の安全索条がそれぞれ掛回され、各索条の
両端が旋回フレーム上に止着されていることを特
徴とする。
(Means for Solving the Problems) According to the present invention, the base end of the base boom is pivotally supported on the revolving frame so that it can move upwardly and downwardly, and the intermediate boom is telescopically inserted into the base boom. The tip boom is telescopically inserted into the boom, the front and rear legs of the base ladder extending to the back of the base boom are fixed to both ends of the base boom, and the intermediate ladder extending to the back of the intermediate boom is fixed to both ends of the base boom. The front leg of the ladder is fixed to the tip of the intermediate boom, the front leg of the tip ladder extending to the back of the tip boom is fixed to the tip of the tip boom, and the high-altitude ladder box is horizontally supported at the tip of the tip boom. A pulley on the pivot shaft of the proximal boom, a pulley at the distal end of the proximal ladder, a pulley at the rear end and distal end of the intermediate ladder, and a rear end of the distal ladder. One suspension rope and one safety rope are respectively routed around the pulley at the tip, the pulley on the horizontal pivot shaft for rotating the work box, and the support end pulley on the work box. It is characterized in that both ends are fixed on the rotating frame.

また、本発明によれば、旋回フレームに基端部
を回動自在に枢支した基端ブーム内に中間ブーム
が伸縮自在に嵌挿され、中間ブーム内に先端ブー
ムが伸縮自在に嵌挿された多段伸縮ブームを具
え、前記先端ブームの先端部に作業箱が回動用水
平枢支軸により取付けられた高所作業箱の平衡装
置において、枢支軸上の滑車、基端ブーム先端部
内側の滑車、中間ブーム後端部及び先端部内側の
滑車、先端ブーム後端部及び先端部の滑車、作業
箱回動用水平枢支軸上の滑車および作業箱を支持
する端末滑車を具え、これらの滑車に1本の懸吊
索条並びに1本の安全索条がそれぞれほぼ平行に
掛回され、旋回フレーム適所に両索条端末が止着
されていることを特徴とする。
Further, according to the present invention, the intermediate boom is telescopically inserted into the base end boom whose base end is rotatably supported on the revolving frame, and the distal end boom is telescopically inserted into the intermediate boom. In a balancing device for an aerial work box, which is equipped with a multi-stage telescopic boom, and a work box is attached to the tip of the tip boom by a horizontal pivot shaft for rotation, a pulley on the pivot shaft and a pulley on the inside of the tip of the proximal boom are used. A pulley, a pulley on the inside of the rear end and tip of the intermediate boom, a pulley on the rear end and tip of the tip boom, a pulley on a horizontal pivot shaft for rotating the work box, and a terminal pulley for supporting the work box, and these pulleys One suspension cable and one safety cable are respectively wound approximately parallel to each other, and the ends of both cables are fixed at appropriate positions on the revolving frame.

(作用) 本発明によれば、1本の懸吊索条6と1本の安
全索条7とを旋回フレーム上の基端ブーム伏仰用
水平枢支軸上の滑車から作業箱上の支持端末滑車
に各段ブーム上の滑車を経て通して、各索条の両
端を旋回フレーム上に止着したことによつて、旋
回フレーム1に枢支された基端ブーム2を起伏シ
リンダ12の押上げによりブーム仰起作動した場
合、第6図に示す懸吊索条径路により旋回フレー
ム1上の止着金具13,14に再端が固定された
懸吊索条6はブーム仰起作動とともに第2図に示
すように滑車111および112より巻き解され
ることにより弛むことになる。その弛み相当量を
滑車111,231,281,391,381,
471,481および501を経由して端末滑車
521に移行して懸吊索条6を等緊張させつつ作
動箱5の垂直状態を保持しながら懸垂平衡機能を
作用する。
(Function) According to the present invention, one suspension rope 6 and one safety rope 7 are supported on a work box from a pulley on a horizontal pivot shaft for prone/elevated booms on a revolving frame. By passing the end pulley through the pulley on each stage boom and fixing both ends of each cable on the revolving frame, the proximal boom 2, which is pivotally supported on the revolving frame 1, can be pushed by the luffing cylinder 12. When the boom is raised by raising the boom, the suspension cable 6 whose ends are fixed to the fastening fittings 13 and 14 on the revolving frame 1 by the suspension cable route shown in FIG. As shown in FIG. 2, it is loosened by being unwound by pulleys 111 and 112. The equivalent amount of slack is determined by pulleys 111, 231, 281, 391, 381,
471, 481, and 501 to the terminal pulley 521, and performs a suspension balance function while maintaining the vertical state of the operating box 5 while equally tensioning the suspension rope 6.

他方、作業箱5が垂直状態より反転(反時計回
り)するのを防止するための安全索条7はブーム
仰起作動するとともに第2図に示すように滑車1
13,114により巻き取られることとなり、そ
の巻き取られた相当量を各滑車113,233,
283,393,383,473,483および
503を経由して端末滑車533に移行し、安全
索条7は作業箱5の垂直状態位置より反転(反時
計回り)しないように反転阻止機能を作用する。
On the other hand, the safety rope 7 for preventing the work box 5 from being inverted (counterclockwise) from the vertical position operates to raise the boom, and the pulley 1 as shown in FIG.
13, 114, and the equivalent amount of the wound is transferred to each pulley 113, 233,
283, 393, 383, 473, 483 and 503 to the terminal pulley 533, and the safety cable 7 acts as a reversal prevention function to prevent the work box 5 from reversing (counterclockwise) from its vertical position. .

上記は、ブーム格納水平状態(第1図)よりブ
ーム格納仰起時(第2図)における作業箱の平衡
機能について説明したが、第2図の状態より第1
図に示す状態に移行するブーム倒伏作動時につい
ては、前記の説明の懸吊索条6の作動(各滑車−
索条の作動)は逆となる。また安全索条7の作動
(各滑車−索条の作動)についても逆となり、懸
吊索条6の平衡機能が妨げることなく平衡状態を
追従する。
The above explained the balance function of the work box when the boom is stored in the horizontal state (Fig. 1) and when the boom is retracted and raised (Fig. 2).
When the boom is lowered to the state shown in the figure, the operation of the suspension rope 6 (each pulley -
actuation of the cables) is reversed. The operation of the safety rope 7 (the operation of each pulley-rope) is also reversed, and the equilibrium function of the suspension rope 6 follows the equilibrium state without being disturbed.

次に、第2図に示すブーム仰起状態から第3図
に示すように各段ブームが伸長する際における作
業箱5の平衡機能について説明する。
Next, a description will be given of the balancing function of the work box 5 when each stage boom is extended from the boom raised state shown in FIG. 2 as shown in FIG. 3.

この場合の懸吊索条6の機能について先ず説明
すると基端ブーム2より中間ブーム3が伸長した
場合は、第2図の滑車391と281の間隔より
第3図の滑車391と281の間隔が短縮間隔と
なつたことによりその余剰量の懸吊索条6は端末
滑車521に移行する。次に、中間ブーム3より
先端ブーム4が伸長した場合、第2図の滑車47
1と381の間隔より第3図の滑車471と38
1の間隔が小となることから、その余剰量の懸吊
索条6は端末滑車521に移行する。即ち、余剰
懸吊索条としての総和伸長量となり、各滑車39
1,381,471,481,501を経由して
端末滑車521に至る。その反面、端末滑車52
1を折返し点として回帰する側の懸吊索条6は基
端ブーム2より中間ブーム3が伸長した場合、ま
た、それに加えて中間ブーム3より先端ブーム4
が伸長した場合、第2図の滑車232と491の
間隔は第3図の滑車232と491の間隔にまで
拡張されることとなるが、前述した余剰懸吊索条
の総和伸長量を滑車521を介してその間隔に等
張移行され、第2図に示すように作業箱5は垂直
状態を保持し、ブーム伸長作動とは関係なく平衡
状態を持続する。
First, to explain the function of the suspension rope 6 in this case, when the intermediate boom 3 is extended from the proximal boom 2, the distance between the pulleys 391 and 281 in FIG. 3 is smaller than the distance between the pulleys 391 and 281 in FIG. Due to the shortened interval, the surplus suspension rope 6 is transferred to the terminal pulley 521. Next, when the tip boom 4 is extended more than the intermediate boom 3, the pulley 47 in FIG.
From the distance between 1 and 381, pulleys 471 and 38 in Figure 3
1 becomes smaller, the surplus suspension cable 6 is transferred to the terminal pulley 521. In other words, it is the total amount of extension as the surplus suspension cable, and each pulley 39
It reaches the terminal pulley 521 via 1,381,471,481,501. On the other hand, the terminal pulley 52
When the intermediate boom 3 is extended from the proximal boom 2, the suspension rope 6 on the side returning from the turning point 1 is extended from the intermediate boom 3 to the tip boom 4.
If the pulleys 232 and 491 in FIG. 2 are extended, the distance between the pulleys 232 and 491 in FIG. 2 will be expanded to the distance between the pulleys 232 and 491 in FIG. 2, the work box 5 maintains a vertical position and maintains an equilibrium state regardless of the boom extension operation.

他方の、安全索条7は、基端ブーム2より中間
ブーム3が伸長した場合、第2図の滑車393と
283の間隔より第3図の滑車393と283の
間隔が短縮間隔となることにより、その余剰量の
安全索条7は端末滑車533に移行する。次に中
間ブーム3より先端ブーム4が伸長した場合、第
2図の滑車473と383の間隔より第3図の滑
車473と383の間隔が小となることから、そ
の余剰量の安全索条7は端末滑車533に移行す
る。即ち、余剰安全索条としての総和伸長量とな
り、各滑車393,383,473,483およ
び503を経由して端末滑車533に至る。
On the other hand, when the intermediate boom 3 is extended from the proximal boom 2, the safety cable 7 has a shorter distance between the pulleys 393 and 283 in FIG. 3 than the distance between the pulleys 393 and 283 in FIG. , the surplus safety rope 7 is transferred to the terminal pulley 533. Next, when the tip boom 4 extends more than the intermediate boom 3, the distance between the pulleys 473 and 383 in FIG. 3 becomes smaller than the distance between the pulleys 473 and 383 in FIG. transfers to the terminal pulley 533. That is, it becomes the total amount of extension as a surplus safety cable, and reaches the terminal pulley 533 via each pulley 393, 383, 473, 483, and 503.

その反面、端末滑車533を折返し点として回
帰する側の安全索条7は基端ブーム2より中間ブ
ームが伸長した場合、また、それに加えて中間ブ
ーム3より先端ブーム4が伸長した場合、第2図
の滑車234と493との間隔は第3図の滑車2
34と493との間隔にまで拡張されることとな
るが、前述した余剰安全索条の総和伸長量を端末
滑車533を介してその間隔に等張移行され、第
2図に示すように作業箱6は垂直状態を保持し、
ブーム伸長作動とは関係なく平衡機能を妨げるこ
となく平衡状態を追従する。
On the other hand, the safety rope 7 on the side returning from the terminal pulley 533 as a turning point will be connected to the second The distance between pulleys 234 and 493 in the figure is the same as pulley 2 in Figure 3.
34 and 493, the total amount of extension of the surplus safety cables mentioned above is isotonicly transferred to that interval via the terminal pulley 533, and the work box is expanded as shown in FIG. 6 maintains vertical state,
The equilibrium state is followed without interfering with the equilibrium function, regardless of the boom extension operation.

以上は第2図の状態より第3図に示すように、
各段ブームが伸長した場合の平衡機能について説
明したが、第3図の状態より第2図に示す状態に
移行するブームが縮小時については、上述した説
明の懸吊索条6の作動(各滑車−索条の作動)は
逆となる。また安全索条7の作動(各滑車−索条
の作動)についても逆となり、懸吊索条の平衡機
能を妨げることなく平衡状態を追従する。
From the state shown in Fig. 2, as shown in Fig. 3,
Although the balance function when each stage boom is extended has been explained, when the boom is retracted, shifting from the state shown in Fig. 3 to the state shown in Fig. 2, the operation of the suspension rope 6 (each The pulley-cord action) is reversed. Furthermore, the operation of the safety rope 7 (the operation of each pulley-rope) is also reversed, and the equilibrium state is followed without interfering with the equilibrium function of the suspension rope.

(実施例) 第1〜6図は本発明の第1実施例を示す。図示
の例では、旋回フレーム1の上端部に枢支軸11
により基端ブーム2の基端部21が伏仰可能に枢
着され、基端ブーム2の基端下部突起22と旋回
フレーム1との間に起伏シリンダ12が既知のよ
うに連結され、起伏シリンダ12の伸縮作動によ
り基端ブーム2が第1図に示す水平位置から第2
図に示す仰起位置に作動されるように構成されて
いる。
(Embodiment) Figures 1 to 6 show a first embodiment of the present invention. In the illustrated example, a pivot shaft 11 is attached to the upper end of the rotating frame 1.
The proximal end 21 of the proximal boom 2 is pivotably mounted so as to be able to rise and fall, and the luffing cylinder 12 is connected in a known manner between the proximal lower projection 22 of the proximal boom 2 and the swing frame 1, and the luffing cylinder 12, the proximal boom 2 moves from the horizontal position shown in FIG. 1 to the second position.
It is configured to be operated into the upright position shown in the figure.

基端ブーム2内には中間ブーム3が伸縮自在に
嵌挿され、中間ブーム3内に先端ブーム4が伸縮
自在に嵌挿されている。
An intermediate boom 3 is telescopically inserted into the proximal boom 2, and a distal end boom 4 is telescopically inserted into the intermediate boom 3.

これらの各段のブーム2,3,4には、梯子2
4,34,44がそれぞれ取付けられ、第1図に
示すように、基端梯子24はその前後両脚26,
27が基端ブーム2の両端部に固着されて基端ブ
ーム2の上面25に沿つて延長して設けられ、中
間梯子34は基端梯子24の上方にローラ341
(第4図参照)を介して平行に延長して長さ方向
に移動可能に設けられ、前脚36が中間ブーム3
の前端部に固着され、後脚37はその下端掛合部
371が梯子24の下面に摺動自在に係合され、
先端梯子44は中間梯子34の上方にローラ44
1(第4図参照)を介して長さ方向に移動可能に
平行に延長して設けられ、前脚46が先端ブーム
4の前端部に固着され、後脚47は中間梯子34
に摺動自在に係合されている。
A ladder 2 is attached to each of these booms 2, 3, and 4.
4, 34, and 44 are respectively attached, and as shown in FIG.
27 are fixed to both ends of the proximal boom 2 and extend along the upper surface 25 of the proximal boom 2, and the intermediate ladder 34 has rollers 341 above the proximal ladder 24.
(see Fig. 4), the front leg 36 is provided so as to be movable in the length direction by extending parallel to the middle boom 3 (see Fig. 4).
The lower end engaging portion 371 of the rear leg 37 is slidably engaged with the lower surface of the ladder 24.
The tip ladder 44 has a roller 44 above the intermediate ladder 34.
1 (see FIG. 4), the front leg 46 is fixed to the front end of the tip boom 4, and the rear leg 47 is attached to the intermediate ladder 34.
is slidably engaged with.

第4図に示すように、旋回フレーム1の上端の
枢支軸11上に4個の滑車111,112,11
3,114が回転自在に旋回フレーム1の両側に
2個づつ取付けられている。旋回フレーム1の上
端に枢支軸11により枢着された基端ブーム2上
にはその基端部21上の左右の基端水平枢支軸2
3上に4個の案内滑車231,232,233,
234が回転自在に設けられている。基端ブーム
2の上方に固定の基端梯子24および中間ブーム
3と一体に伸縮し得る中間梯子34の最前端の水
平横軸28および38にそれぞれ2個の滑車28
1,283および381,383が取付けられ、
中間ブーム3上の中間梯子34および先端ブーム
4上の先端梯子44の基端部に垂直軸39および
49により滑車391,393および471,4
73がそれぞれ回転自在に取付けられている。さ
らに、第5図に示すように、先端梯子44の前脚
46に設けた上下水平軸48および49上にそれ
ぞれ滑車481,483および491,493が
設けられている。
As shown in FIG. 4, four pulleys 111, 112, 11 are mounted on the pivot shaft 11 at the upper end of the revolving frame
3 and 114 are rotatably attached to each side of the revolving frame 1. On the base end boom 2 which is pivotally attached to the upper end of the swing frame 1 by a pivot shaft 11, there are left and right base end horizontal pivot shafts 2 on the base end portion 21 thereof.
4 guide pulleys 231, 232, 233 on 3,
234 is rotatably provided. Two pulleys 28 are installed on the horizontal horizontal shafts 28 and 38 at the frontmost end of the base ladder 24 fixed above the base boom 2 and the intermediate ladder 34 that can extend and retract together with the intermediate boom 3.
1,283 and 381,383 are installed,
Pulleys 391, 393 and 471, 4 are connected by vertical shafts 39 and 49 to the proximal ends of the intermediate ladder 34 on the intermediate boom 3 and the tip ladder 44 on the tip boom 4.
73 are each rotatably attached. Further, as shown in FIG. 5, pulleys 481, 483 and 491, 493 are provided on the vertical horizontal shafts 48 and 49 provided on the front leg 46 of the tip ladder 44, respectively.

第5図に示すように、先端ブーム4の先端に作
業箱5が水平枢支軸50により枢着され、水平枢
支軸50上に4個の滑車501,502,503
および504が取付けられている。水平枢支軸5
0が設けられた側の作業箱側壁51上に滑車50
1〜504より下方位置で水平枢支軸52上に滑
車521が設けらて、滑車501〜504より上
方位置で水平枢支軸53上に滑車533が設けら
れている。
As shown in FIG. 5, a work box 5 is pivotally attached to the tip of the tip boom 4 by a horizontal pivot shaft 50, and four pulleys 501, 502, 503 are mounted on the horizontal pivot shaft 50.
and 504 are installed. Horizontal pivot shaft 5
A pulley 50 is mounted on the side wall 51 of the work box on the side where the
A pulley 521 is provided on the horizontal pivot shaft 52 at a position below the pulleys 1 to 504, and a pulley 533 is provided on the horizontal pivot shaft 53 at a position above the pulleys 501 to 504.

次に、上述したようにブームおよびその梯子上
および作業箱上に滑車が配設された図示の作業箱
平衡装置における作業懸吊索条6および安全索条
7の経路につき説明する。
Next, the routes of the work suspension ropes 6 and the safety ropes 7 in the illustrated work box balancing device in which pulleys are arranged on the boom and its ladder and on the work box as described above will be explained.

作業箱懸吊索条6は第1図および第7図に示す
ように、旋回フレーム1上に水平枢支軸11上の
滑車111から基端ブーム2の基端部21上の滑
車231、基端梯子24の前端水平軸28上の滑
車281、中間梯子34上の前後滑車381,3
91、先端梯子44上の後端滑車471、先端梯
子44の前脚46上の上方滑車481を順次に経
て作業箱5上の水平枢支軸50上の滑車501の
上側から側壁51上の521の下側に通され、さ
らに滑車502の上側を経て、先端梯子44上の
前端脚46の下方滑車491から基端ブーム2の
基端部の滑車232を経て、枢支軸11上の滑車
112に通され、両索条端61,62は、第4図
に示すように、旋回フレーム1上の下側止め金具
13に策固定片14および緊締ナツト15により
固定されている。
As shown in FIGS. 1 and 7, the work box suspension rope 6 is connected to the revolving frame 1 from the pulley 111 on the horizontal pivot shaft 11 to the pulley 231 on the base end 21 of the base end boom 2, to the base. Pulley 281 on the front end horizontal shaft 28 of the end ladder 24, front and rear pulleys 381, 3 on the intermediate ladder 34
91, the rear end pulley 471 on the tip ladder 44, the upper pulley 481 on the front leg 46 of the tip ladder 44, and then from the upper side of the pulley 501 on the horizontal pivot shaft 50 on the work box 5 to the 521 on the side wall 51. It passes through the lower side, passes above the pulley 502, from the lower pulley 491 of the front leg 46 on the tip ladder 44, passes through the pulley 232 at the base end of the base boom 2, and then connects to the pulley 112 on the pivot shaft 11. As shown in FIG. 4, both cable ends 61 and 62 are fixed to a lower stopper 13 on the rotating frame 1 by means of a fixing piece 14 and a tightening nut 15.

他方、作業箱安全索条7は、第1図および第7
図に示すように、旋回フレーム1上に水平枢支軸
11の滑車113から基端ブーム2の基端部21
上の滑車233、基端梯子24の前端水平軸28
上の滑車283、中間梯子34上の前後滑車38
3,393、先端梯子44上の後端滑車473、
先端梯子44の前脚46上の上方滑車483を順
次に経て作業箱5上の水平枢支軸50上の滑車5
03の下側から上方滑車533の上側、滑車50
4の下側、滑車493の上側に順次通され、基端
ブーム2の基端部21の滑車234を経て水平枢
支軸軸11上の滑車114に通され、両索条端7
1,72は第4図に示すように旋回フレーム1上
の上側止め金具16に策固定片14および緊締ナ
ツト15により固定されている。
On the other hand, the work box safety rope 7 is
As shown in the figure, from the pulley 113 of the horizontal pivot shaft 11 on the swing frame 1 to the proximal end 21 of the proximal boom 2
Upper pulley 233, front end horizontal shaft 28 of proximal ladder 24
Upper pulley 283, front and rear pulleys 38 on intermediate ladder 34
3,393, rear end pulley 473 on top ladder 44,
The pulley 5 on the horizontal pivot shaft 50 on the work box 5 sequentially passes through the upper pulley 483 on the front leg 46 of the tip ladder 44.
From the lower side of 03 to the upper side of the upper pulley 533, the pulley 50
4 and the upper side of the pulley 493, passed through the pulley 234 on the proximal end 21 of the proximal boom 2, and the pulley 114 on the horizontal pivot shaft 11.
1 and 72 are fixed to an upper stopper 16 on the rotating frame 1 by means of a fixing piece 14 and a tightening nut 15, as shown in FIG.

第8図は本発明の他の実施例を示す。図示の実
施例は、従来の多段ブームに本発明による平衡装
置を適用したもので旋回フレーム1の上端に基端
ブーム伏仰枢支軸11により基端ブーム2が枢支
され、基端ブーム2に中間ブーム31,32,3
3および先端ブーム4がそれぞれ油圧シリンダ装
置81,82,83,84を介して伸縮可能に嵌
挿され、先端ブームの先端部に作業箱5が回動用
水平枢支軸50により枢支されている。
FIG. 8 shows another embodiment of the invention. In the illustrated embodiment, the balancing device according to the present invention is applied to a conventional multi-stage boom. Intermediate boom 31, 32, 3
3 and a tip boom 4 are each fitted in an extendable manner via hydraulic cylinder devices 81, 82, 83, and 84, and a work box 5 is pivotally supported at the tip of the tip boom by a horizontal pivot shaft 50 for rotation. .

図示の例においては、基端ブーム伏仰枢支軸1
1上の滑車111〜114、基端ブーム2の基端
内側および先端部内側の滑車201,202,2
03、中間ブーム3の後端部及び先端部内側の滑
車311,312,321,322,331,3
32、先端ブーム4の後端部及び先端部の滑車4
01,402,403、作業箱回動用水平枢軸5
0上の滑車501〜504および作業箱5を支持
する端末滑車521,533を具え、これらの滑
車に1本の懸吊索条6並びに1本の安全索条7が
それぞぞれほぼ平行に掛回され、旋回フレームの
1止の止め金具13,16に適所に両索条端末6
1,2;71,72が止着されている。
In the illustrated example, the proximal boom prone pivot shaft 1
Pulleys 111 to 114 on 1, pulleys 201, 202, 2 on the inner side of the proximal end and the inner side of the distal end of the proximal end boom 2
03, pulleys 311, 312, 321, 322, 331, 3 inside the rear end and tip of the intermediate boom 3
32, pulley 4 at the rear end and tip of the tip boom 4
01,402,403, Horizontal pivot for rotating work box 5
0 and terminal pulleys 521 and 533 that support the work box 5, and one suspension rope 6 and one safety rope 7 are respectively hung approximately parallel to these pulleys. The two cable ends 6 are rotated and placed in place on the single stop fittings 13 and 16 of the revolving frame.
1, 2; 71, 72 are fixed.

本例によれば、上述したように滑車群をブーム
内に配設内蔵することにより、高所作業専用多段
ブームの伸縮および伏仰作動に際して索条により
作業箱の平衡状態を確保できる。さらに伸縮ブー
ムの伸長縮小により、作業箱付属の端末滑車は索
条により連動回転することから、その回転数を検
知して、実ブーム長検出器91(回転数をブーム
長さ数値に変換する)等を作業箱5上の遠隔操作
盤92の近傍に装備できる。これによりオペレー
タは実高所作業時の実ブーム長さの確認ができ、
したがつて、高所作業の安全性を向上させること
ができる。
According to this example, by arranging and incorporating the pulley group in the boom as described above, the balanced state of the work box can be ensured by the cable when the multi-stage boom dedicated to high-altitude work is extended/contracted and operated prone. Furthermore, as the telescopic boom extends and contracts, the terminal pulley attached to the work box rotates in conjunction with the cable, so the rotation speed is detected by the actual boom length detector 91 (which converts the rotation speed into a boom length value). etc. can be installed near the remote control panel 92 on the work box 5. This allows operators to check the actual boom length when working at heights.
Therefore, the safety of working at height can be improved.

(発明の効果) 本発明によれば、多段ブームの段数に関係な
く、基端ブームから先端ブームを経て作業箱まで
1本の懸吊索条で懸吊平衡機能を確実に発揮する
ことができ、従来の平衡装置のように、動滑車を
利用していないため、索条の掛回し構造が簡単
で、ブームの順次及び同時伸縮または順次、同時
の混合伸縮など如何なる伸縮作動ブームにも適用
可能であり、さらに懸吊索条とほぼ平衡に掛回し
た1本の安全索条を設けることにより作業箱が反
時計方向に回動できないよう確保することができ
る。
(Effects of the Invention) According to the present invention, regardless of the number of stages of a multi-stage boom, a single suspension rope from the base boom to the tip boom to the work box can reliably perform the suspension balancing function. Unlike conventional balancing devices, it does not use a movable pulley, so the cable hanging structure is simple, and it can be applied to any type of telescoping boom, such as sequential and simultaneous boom extension or sequential and simultaneous simultaneous extension and contraction. Furthermore, by providing one safety cable that is wound approximately in equilibrium with the suspension cable, it is possible to ensure that the work box cannot be rotated counterclockwise.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明による平衡装置の側面図、第2
図はブーム仰起位置で示す装置の側面図、第3図
はブーム伸長状態で示す装置の側面図、第4図は
第1図の矢Aの方向に見た部分端面図、第5図は
第1図の矢Bの方向に見た部分平面図、第6図は
懸垂索条および安全索条の径路を示す概略線図、
第7図は第1図に示す装置を車輌に取付けて示す
側面図、第8図は本発明の他の実施例を示す側面
図である。 1……旋回フレーム、2……基端ブーム、3…
…中間ブーム、4……先端ブーム、5……作業
箱、6……懸吊索条、7……安全索条、11……
基端ブーム伏仰枢支軸、12……起伏シリンダ
ー、24,34,44……梯子、50……作業箱
回動枢支軸、111〜114,231〜234,
281,283,381,383,391,39
3,471,473,481,483,491,
493,501〜504……滑車、521,53
3……支持端末滑車。
FIG. 1 is a side view of the balancing device according to the invention, FIG.
3 is a side view of the device shown in the boom extended position; FIG. 4 is a partial end view taken in the direction of arrow A in FIG. 1; and FIG. 5 is a side view of the device shown in the boom extended position. A partial plan view taken in the direction of arrow B in FIG. 1; FIG. 6 is a schematic diagram showing the routes of suspension cables and safety cables;
FIG. 7 is a side view showing the device shown in FIG. 1 attached to a vehicle, and FIG. 8 is a side view showing another embodiment of the present invention. 1... Swivel frame, 2... Proximal boom, 3...
...Middle boom, 4...Tip boom, 5...Work box, 6...Suspension cable, 7...Safety cable, 11...
Base end boom prone/elevate pivot shaft, 12... Luffing cylinder, 24, 34, 44... Ladder, 50... Work box rotation pivot shaft, 111-114, 231-234,
281, 283, 381, 383, 391, 39
3,471,473,481,483,491,
493,501-504...pulley, 521,53
3...Support terminal pulley.

Claims (1)

【特許請求の範囲】 1 旋回フレームに基端ブームの基端部が伏仰可
能に枢支され、基端ブームの内に中間ブームが伸
縮自在に嵌挿され、中間ブーム内に先端ブームが
伸縮自在に嵌挿され、基端ブームの背部に延在さ
れた基端梯子の前後両脚が基端ブームの両端部に
固着され、中間ブームの背部に延在された中間梯
子の前脚が中間ブームの先端部に固着され、先端
ブームの背部に延在された先端梯子の前脚が先端
ブームの先端部に固着され、先端ブームの先端部
に高所作業箱が水平枢支軸により回動自在に枢支
され、基端ブームの枢支軸上の滑車と、基端梯子
の先端部の滑車と、中間梯子の後端部及び先端部
の滑車と、先端梯子の後端部及び先端部の滑車
と、作業箱回動用水平枢支軸上の滑車と、作業箱
上の支持端末滑車に1本の懸吊索条並びに1本の
安全索条がそれぞれ掛回され、各牽条の両端が旋
回フレーム上に止着されていることを特徴とする
高所作業箱の平衡装置。 2 旋回フレームに基端部を回動自在に枢支した
基端ブーム内に中間ブームが伸縮自在に嵌挿さ
れ、中間ブーム内に先端ブームが伸縮自在に嵌挿
された多段伸縮ブームを具え、前記先端ブームの
先端部に作業箱が回動用水平枢支軸により取付け
られた高所作業箱の平衡装置において、枢支軸上
の滑車、基端ブーム先端部内側の滑車、中間ブー
ム後端部及び先端部内側の滑車、先端ブーム後端
部及び先端部の滑車、作業箱回動用水平枢支軸上
の滑車および作業箱を支持する端末滑車を具え、
これらの滑車に1本の懸吊索条並びに1本の安全
索条がそれぞれほぼ平行に掛回され、旋回フレー
ム適所に両索条端末が止着されていることを特徴
とする高所作業箱の平衡装置。
[Scope of Claims] 1. The base end of the base boom is pivotally supported on the revolving frame so that it can rise and fall, the intermediate boom is telescopically inserted into the base boom, and the tip boom is telescopically inserted into the intermediate boom. The front and rear legs of the base ladder, which is freely inserted and extends to the back of the base boom, are fixed to both ends of the base boom, and the front legs of the intermediate ladder, which extends to the back of the intermediate boom, are fixed to both ends of the base boom. The front legs of the tip ladder are fixed to the tip and extend to the back of the tip boom, and the aerial work box is rotatably pivoted on the tip of the tip boom by a horizontal pivot shaft. A pulley on the pivot shaft of the base boom, a pulley at the tip of the base ladder, a pulley at the rear end and tip of the intermediate ladder, and a pulley at the rear and tip of the tip ladder. , one suspension rope and one safety rope are respectively routed around the pulley on the horizontal pivot shaft for rotating the work box and the support terminal pulley on the work box, and both ends of each rope are attached to the rotating frame. A balancing device for an elevated work box, characterized in that the device is fixed to the top of the box. 2. A multi-stage telescopic boom in which an intermediate boom is telescopically inserted into a base boom whose base end is rotatably supported on a revolving frame, and a tip boom is telescopically inserted into the intermediate boom, In the balancing device for an elevated work box in which a work box is attached to the tip of the tip boom by a horizontal pivot shaft for rotation, a pulley on the pivot shaft, a pulley inside the tip of the proximal boom, and a rear end of the intermediate boom. and a pulley on the inside of the tip, a pulley on the rear end and tip of the tip boom, a pulley on a horizontal pivot shaft for rotating the work box, and a terminal pulley for supporting the work box,
A high-altitude work box characterized in that one suspension cable and one safety cable are each wound approximately parallel to these pulleys, and both cable ends are fixed to appropriate positions on the revolving frame. balance device.
JP16899988A 1988-07-08 1988-07-08 Balancer for altitude working box Granted JPH0220763A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP16899988A JPH0220763A (en) 1988-07-08 1988-07-08 Balancer for altitude working box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP16899988A JPH0220763A (en) 1988-07-08 1988-07-08 Balancer for altitude working box

Publications (2)

Publication Number Publication Date
JPH0220763A JPH0220763A (en) 1990-01-24
JPH0463181B2 true JPH0463181B2 (en) 1992-10-09

Family

ID=15878474

Family Applications (1)

Application Number Title Priority Date Filing Date
JP16899988A Granted JPH0220763A (en) 1988-07-08 1988-07-08 Balancer for altitude working box

Country Status (1)

Country Link
JP (1) JPH0220763A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1994018761A1 (en) * 1993-02-05 1994-08-18 Kabushiki Kaisha Toshiba Wireless telephone

Also Published As

Publication number Publication date
JPH0220763A (en) 1990-01-24

Similar Documents

Publication Publication Date Title
US2420903A (en) Scaffold
US4064999A (en) Adjustable building panel scaffold
RU2271330C2 (en) Crane with multifunctional boom
CN106553968A (en) It is a kind of can on-load luffing lifting arm elevator apparatus
JPH0463181B2 (en)
CN106542444A (en) A kind of moment of flexure reduction structure set up in tower body revolution
JP4226683B2 (en) Roughing jib back tension device
CN209455817U (en) A kind of lift cable pay-off rack
CN206667048U (en) A kind of bridge inspection vehicle
JP2702052B2 (en) Windbreak equipment for cargo handling equipment
KR20150073627A (en) Expansion and contraction structure of aerial ladder device
JPH0240076Y2 (en)
JPS6117993Y2 (en)
JP4848094B2 (en) Roughing jib equipment for self-propelled crane
JPS597949Y2 (en) Scaffolding equipment for tower-like structures, etc.
SU840006A1 (en) Crane
JPH0743366Y2 (en) Mobile safety net erection device
JPH0218060Y2 (en)
JPS6361277B2 (en)
JPH0419925Y2 (en)
JPS60320B2 (en) Aerial work equipment
RU1770248C (en) Hoist
JPS5935839B2 (en) Work platform automatic balancing device for aerial work vehicles
JPH0630337U (en) Stand for tunnel construction work
JPH0428697A (en) Lift for construction