Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0472924B2 - - Google Patents
[go: Go Back, main page]

JPH0472924B2 - - Google Patents

Info

Publication number
JPH0472924B2
JPH0472924B2 JP6485886A JP6485886A JPH0472924B2 JP H0472924 B2 JPH0472924 B2 JP H0472924B2 JP 6485886 A JP6485886 A JP 6485886A JP 6485886 A JP6485886 A JP 6485886A JP H0472924 B2 JPH0472924 B2 JP H0472924B2
Authority
JP
Japan
Prior art keywords
floating body
lattice
pipe
shaped floating
pipes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP6485886A
Other languages
Japanese (ja)
Other versions
JPS62225619A (en
Inventor
Yoshinori Yamaguchi
Tadaaki Nomura
Naoki Chinnai
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KINJO GOMU KK
Original Assignee
KINJO GOMU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KINJO GOMU KK filed Critical KINJO GOMU KK
Priority to JP6485886A priority Critical patent/JPS62225619A/en
Publication of JPS62225619A publication Critical patent/JPS62225619A/en
Publication of JPH0472924B2 publication Critical patent/JPH0472924B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は超軟弱地盤上に覆土する工法に関する
ものである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a construction method for covering ultra-soft ground with soil.

(従来の技術) 従来のこの種超軟弱地盤の覆土工法としては、
シートまたはシートとロープネツト等を組み合わ
せたものを地盤上に伸展し、シートまたはロープ
の端部をアンカーで固定してから、シート上に盛
土する方法がある。
(Conventional technology) The conventional soil covering method for this type of ultra-soft ground is as follows:
There is a method in which a sheet or a combination of a sheet and a rope net or the like is stretched out on the ground, the ends of the sheet or rope are fixed with anchors, and then the earth is embanked on top of the sheet.

(発明が解決しようとする問題点) しかしながら上述の方法では載荷時における軟
弱層の膨れ上がり現象によつて盛土層厚が不均一
になりやすく、施工が不安定であるという欠点が
ある。
(Problems to be Solved by the Invention) However, the above-mentioned method has the disadvantage that the thickness of the embankment layer tends to be uneven due to the swelling phenomenon of the soft layer during loading, making the construction unstable.

またシート、またはロープネツト等と浮体とを
結合したものを使用する方法もあるが、現場で浮
体をシート等に結合するのは、足場の悪い軟弱地
盤上では困難であり、また予め浮体をシート等に
固定した場合は、嵩ばるため、運搬および積み込
み、荷卸し等の作業に多くの手数がかかるという
問題点がある。
Another method is to use a sheet or a rope net, etc., connected to the floating body, but it is difficult to connect the floating body to the sheet, etc. on site on soft ground with poor footing. If it is fixed to a container, there is a problem that it is bulky and requires a lot of effort for transportation, loading, unloading, etc.

さらに、浮体を使用したものは、盛土の後にバ
ーチカルドレーン工法等の圧密工法を施す場合
に、浮体の浮力が載荷々重を削減する作用をする
ため、載荷々重が余分に必要となるから不経済で
あるという欠点がある。
Furthermore, when using a floating body to perform a consolidation method such as a vertical drain method after embankment, the buoyancy of the floating body acts to reduce the live load, so extra live weight is required, which is unnecessary. It has the disadvantage of being an economy.

(問題点を解決するための手段) 本発明は上述した従来工法の欠点および問題点
を解決するためなされたもので、各種パイプジヨ
イントと、単位長さのパイプとにより、所望の面
積の格子状浮体を現場で組み立て、この格子状浮
体は、所定の面積毎に内部を連通すると共に、少
くとも1個所のパイプジヨイントに立てた垂直パ
イプにより外部と連通させ、この格子状浮体を現
場で順次拡張して超軟弱地盤上の所望の面積を覆
つてから、この格子状浮体上にシートを展張した
後、そのシート上に順次盛土を行い、圧密工法を
実施する時は前記垂直パイプより格子状浮体の内
部に注水して浮力を消去するようにする。
(Means for Solving the Problems) The present invention has been made to solve the above-mentioned drawbacks and problems of the conventional method. This lattice-shaped floating body is assembled on site, and the inside of this lattice-shaped floating body is communicated with each other in a predetermined area, and the outside is communicated with a vertical pipe installed in at least one pipe joint. After expanding sequentially to cover the desired area on ultra-soft ground, and then spreading the sheet over this lattice-shaped floating body, embankment is performed on the sheet in sequence, and when carrying out the consolidation method, the lattice is Water is injected into the inside of the floating body to eliminate buoyancy.

(作用) 本発明は上述の通りであるからこの超軟弱地盤
の覆土工法によれば、盛土層の厚さをほぼ均一に
保つて施工を安定化すると共に、材料の運搬およ
び積み込み、荷卸し作業を容易にする上に、現地
での作業も容易にし、さらに、圧密工法を実施す
る場合には、簡単に浮体の浮力を消去することが
できる。
(Function) Since the present invention is as described above, according to this earth covering method for ultra-soft ground, the thickness of the embankment layer is kept almost uniform to stabilize the construction, and the transportation, loading, and unloading of materials can be carried out. This not only makes it easier to carry out the work on-site, but also allows the buoyancy of the floating body to be easily eliminated when consolidation methods are implemented.

(実施例) 以下、図面について本発明の実施例を説明す
る。第1図は本発明において使用する各種パイプ
ジヨイントを示すもので、1はこれらのパイプジ
ヨイントによつて連結する単位長さのパイプであ
る。第1図aに示すパイプジヨイントaは、平面
内におて互い直交する4本のパイプ1を接続し
て、すべてのパイプ1の内部を連通させるもので
あり、同図bのパイプジヨイントbは、パイプジ
ヨイントa内の連通孔の一つを閉じたものであ
り、同図cのパイプジヨイントcは、パイプジヨ
イントbのもう一つの連通孔を閉じて、直交する
2本のパイプのみを連通するようにしたものであ
り、さらに同図dのパイプジヨイントdは、パイ
プジヨイントcによつて接続した4本のパイプ1
を含む平面に対して直交する他のパイプ1(点線
で示すもの)をさらに接続すると共に、連通して
いる2本のパイプと連通するようにしたものであ
る。
(Example) Hereinafter, an example of the present invention will be described with reference to the drawings. FIG. 1 shows various pipe joints used in the present invention, and numeral 1 indicates pipes of unit length connected by these pipe joints. The pipe joint a shown in Fig. 1a connects four pipes 1 that are perpendicular to each other in a plane and communicates the insides of all the pipes 1, and the pipe joint a shown in Fig. 1b Pipe joint c in the figure c has one of the communicating holes in pipe joint a closed, and the other communicating hole in pipe joint b is closed, and two orthogonal holes in pipe joint b are closed. Only the pipes are connected to each other, and the pipe joint d in the figure d connects the four pipes 1 connected by the pipe joint c.
Another pipe 1 (indicated by a dotted line) which is perpendicular to the plane including the pipe 1 is further connected to the pipe 1 so as to communicate with the two communicating pipes.

また第1図eに示すパイプジヨイントeは、同
一平面上においてT型に結合される3本のパイプ
1を接続すると共に、各パイプ1の内部を連通さ
せるものであり、同図fのパイプジヨイントf
は、パイプジヨイントeの一つの連通孔を閉じて
直交する2本のパイプ1を連通させるものであ
り、同図gのパイプジヨイントgは、パイプジヨ
イントfによつて接続した3本のパイプ1を含む
平面に対して直交する他のパイプ1(点線で示す
もの)をさらに接続すると共に、連通している2
本のパイプと連通するようにしたものである。
Furthermore, the pipe joint e shown in FIG. joint f
, one communicating hole of pipe joint e is closed to connect two orthogonal pipes 1, and pipe joint g in the figure g connects three pipes connected by pipe joint f. Another pipe 1 (indicated by a dotted line) that is orthogonal to the plane containing the pipe 1 is further connected to the pipe 2 that is in communication with the pipe 1.
It was designed to communicate with the book pipe.

また第1図hのパイプジヨイントhは、同一平
面上で直交する2本のパイプ1を接続すると共
に、連通するエルボ型のジヨイントに、前記した
直交する2本のパイプ1を含む平面に対して直交
する他のパイプ1(点線で示すもの)を、さらに
接続すると共に連通させるようにしたものであ
る。
In addition, the pipe joint h in FIG. Another pipe 1 (indicated by a dotted line) which is perpendicular to the pipe 1 is further connected and communicated with the other pipe 1 (indicated by a dotted line).

上述したパイプ1、および各種パイプジヨイン
トa〜hの素材は、特に限定しないが、硬質塩化
ビニル等の合成樹脂が適している。
The materials of the pipe 1 and the various pipe joints a to h described above are not particularly limited, but synthetic resins such as hard vinyl chloride are suitable.

第2図は本発明工法の実施例を示す平面図で、
第3図はその立断面図である。また第4図は第2
図の部分平面図で第5図a,bは第4図の工程別
の立断面図である。
Figure 2 is a plan view showing an embodiment of the construction method of the present invention.
FIG. 3 is an elevational sectional view thereof. Also, Figure 4 shows the second
In the partial plan view of the figure, FIGS. 5a and 5b are elevational cross-sectional views of each step in FIG. 4.

図中2は在来地盤、または堰堤で、3は超軟弱
地盤である。
In the figure, 2 is the conventional ground or dam, and 3 is the extremely soft ground.

本実施例においては、上述した各種パイプジヨ
イントa〜hと、単位長さのパイプ1を使用し
て、所望の面積、例えば第2図の二点鎖線で区画
した各区画の面積A1内の格子状浮体を現場で組
み立て、この格子状浮体は、所定の面積毎に内部
を連通すると共に、少くとも1個所のパイプジヨ
イントに立てた垂直パイプ4により外部と連通さ
せる。第2図の区画A1内においては、パイプジ
ヨイントh,dに垂直パイプ4を接続してある。
In this example, the various pipe joints a to h described above and the pipe 1 of unit length are used to obtain a desired area, for example, within the area A 1 of each section divided by the two-dot chain line in FIG. A lattice-shaped floating body is assembled on site, and this lattice-shaped floating body communicates with the inside of each predetermined area and with the outside through a vertical pipe 4 erected in at least one pipe joint. In section A1 of FIG. 2, a vertical pipe 4 is connected to pipe joints h and d.

格子状浮体は、多数のパイプ1を各種パイプジ
ヨイントa〜hを介して接続することにより構成
される。このパイプ1とパイプジヨイントa〜h
との接合方法はどのような方法でもよいが、気密
に接合することが必要である。例えば接着剤を使
用して嵌合部を気密に接合すればよい。
The lattice-shaped floating body is constructed by connecting a large number of pipes 1 via various pipe joints a to h. This pipe 1 and pipe joints a~h
Although any method may be used for joining, it is necessary to join them airtightly. For example, the fitting portion may be airtightly joined using an adhesive.

そして上述のような格子状浮体を第2図に示す
ように、区画面積A1から隣接する区画面積A2
A3,A4…と順次拡張して、超軟弱地盤3上の所
望の面積を覆つてから、これら格子状浮体上にシ
ート5(第3,4,5図参照)を展張し、各シー
ト5を紐6(第4図参照)等により連結すると共
に、必要に応じてシート5と格子状浮体とを針金
7(第4図参照)等により連結した後、そのシー
ト5上に順次盛土8を行う。
As shown in Fig. 2, the grid-like floating body as described above is divided from the area A 1 to the area A 2 adjacent to the area A 2 ,
After sequentially expanding A 3 , A 4 , etc. to cover the desired area on the ultra-soft ground 3, spread out the sheets 5 (see Figures 3, 4, and 5) on these lattice-shaped floating bodies. 5 with strings 6 (see Figure 4), and if necessary, the sheet 5 and the grid-like floating body are connected with wires 7 (see Figure 4), etc., and then embankments 8 are sequentially placed on the sheets 5. I do.

なおこの場合、各垂直パイプ4の上端部は蓋9
により土砂が入らないように閉じておく。また第
5図に示すように必要があれば、格子状浮体の端
部にアンカー10を打ち込んで格子状浮体および
シート5を固定しておく。第5図aは盛土を行う
前の状態を示し、第5図bは盛土をしている途中
の状態であり、第3図は盛土が完了した状態を示
すものである。
In this case, the upper end of each vertical pipe 4 has a lid 9.
Keep it closed to prevent dirt from entering. Further, as shown in FIG. 5, if necessary, anchors 10 are driven into the ends of the lattice-shaped floating body to fix the lattice-shaped floating body and the sheet 5. Fig. 5a shows the state before embankment is carried out, Fig. 5b shows the state in the middle of embankment, and Fig. 3 shows the state when embankment is completed.

そして盛土のあと、バーチカルドレーン工法等
によつて圧密工法を実施する時は、各垂直パイプ
4の蓋9を外して、このパイプ4より各格子状浮
体の内部に注水する。この注水能率をよくするに
は、垂直パイプ4を格子状浮体の外側の対角位置
に設け、一方のパイプ4から注水すると共に、他
方のパイプ4から空気を抜くようにするのがよ
い。
After embankment, when performing a consolidation method such as a vertical drain method, the lid 9 of each vertical pipe 4 is removed and water is injected into the inside of each lattice-shaped floating body from this pipe 4. In order to improve this water injection efficiency, it is preferable to provide vertical pipes 4 at diagonal positions on the outside of the lattice-shaped floating body so that water is injected from one pipe 4 and air is removed from the other pipe 4.

上述のようにして格子状浮体内に注水が完了す
れば、格子状浮体の浮力がなくなるので、圧密工
法における載荷々重の効力を削減することはなく
なる。
When the water injection into the lattice-shaped floating body is completed as described above, the buoyancy of the lattice-shaped floating body disappears, so that the effectiveness of the applied load in the consolidation method is no longer reduced.

なお格子状浮体の浮力を大きくするには、パイ
プ1の長さを短くして格子間隔を小さくするか、
パイプ1の径を大きくするか、あるいは、格子状
浮体を複数層形成して上下に重ねてもよい。そし
て浮体の浮力が大きくなれば、それだけ盛土層8
の厚さを増大させることができる。
In order to increase the buoyancy of the lattice-shaped floating body, either shorten the length of the pipe 1 and reduce the lattice spacing, or
The diameter of the pipe 1 may be increased, or a plurality of lattice-like floating bodies may be formed and stacked one above the other. The greater the buoyancy of the floating body, the more the embankment layer 8
The thickness can be increased.

第6図は格子状浮体を3層にわたつて重ねた例
を示すもので、図中前記符号と同一の符号は同等
のものを示す。ただしこの場合、下から2段目
と、3段目の格子状浮体に介装した垂直パイプ4
を接合するためのパイプジヨイントd′は、上下に
それぞれ垂直パイプ4を接続できるものを使用す
るのがよい。
FIG. 6 shows an example in which lattice-shaped floating bodies are stacked in three layers, and in the figure, the same reference numerals as those mentioned above indicate equivalent parts. However, in this case, the vertical pipes 4 interposed between the second and third lattice floating bodies from the bottom
It is preferable to use pipe joints d' for joining the vertical pipes 4 to which the vertical pipes 4 can be connected, respectively.

また第7図〜第9図は、本発明工法における格
子状浮体の各種形成方法を示す平面図で、図中前
記符号と同一の符号を同等のものを示す。なお1
1は在来地盤2と超軟弱地盤3間の水際線であ
る。
7 to 9 are plan views showing various methods of forming lattice-like floating bodies in the construction method of the present invention, and in the figures, the same reference numerals as those described above indicate equivalent parts. Note 1
1 is the water edge between the conventional ground 2 and the ultra-soft ground 3.

第7図は、水搬工法等で造成した地盤3の粘稠
性が比較的大きい場合に適したもので、この場合
は在来地盤または堰堤2上で、実線で示す格子状
浮体12をある程度の大きさに組み立てて後、こ
れを造成地盤3上に押し出し、浮体12上にかけ
渡した足場板13等を利用して、破線14で示す
ように、格子状浮体を順次継ぎ足して拡張する方
法を示すものである。
Fig. 7 is suitable for cases where the ground 3 created by the water conveyance method etc. has a relatively high consistency. After assembling it to a size of It shows.

また第8図および第9図は、水搬工法等で造成
した地盤3の粘稠性がほとんどなく、水のような
場合に適したもので、この場合は在来地盤2上
で、ある程度の大きさに組み立てた格子浮体15
上に足場板13を並べて筏をつくり、この筏を地
盤2上から、挺子棒等を使用して地盤3上へ進水
させ、ついでその隣接部において、同様に組み立
てた格子状浮体15と足場板13からなる筏を地
盤2上から超軟弱地盤3上へ進水させる。
In addition, Figures 8 and 9 show that the ground 3 created by the water conveyance method has almost no consistency and is suitable for cases where there is water. Lattice floating body assembled to size 15
Scaffolding boards 13 are lined up on top to form a raft, and this raft is launched from above ground 2 onto ground 3 using a lever rod, and then adjacent to it, a lattice-shaped floating body 15 assembled in the same manner is launched. A raft consisting of a scaffolding board 13 is launched from the ground 2 onto the ultra-soft ground 3.

上述のようにして第9図に示すように、格子状
浮体15を地盤3上のA、B、C、D、E、F、
G、Hの位置に順に搬送すると共に、各格子状浮
体15間を連結パイプ16によつて連結し、最後
にI、Jの位置にも格子状浮体15を配置して、
すべての浮体15間を連結パイプ16により連結
する。
As described above, as shown in FIG.
While transporting the grid-shaped floating bodies 15 in order to positions G and H, the grid-shaped floating bodies 15 are connected by connecting pipes 16, and finally, the grid-shaped floating bodies 15 are also arranged at positions I and J,
All floating bodies 15 are connected by connecting pipes 16.

すべての格子状浮体の連結が了つて後、地盤3
上の水抜きを実施すれば、浮体は泥土上に敷設さ
れるから、この浮体上にシート5を展張した後、
在来地盤2側から、盛土8を行えばよい。
After all the lattice floating bodies are connected, the ground 3
If the above water is drained, the floating body will be laid on mud, so after spreading the sheet 5 on this floating body,
Embankment 8 may be performed from the conventional ground 2 side.

(発明の効果) 上述のように本発明工法は、パイプ1を各種パ
イプジヨイントa〜hを介して格子状浮体を形成
し、これを超軟弱地盤3上に敷設するものである
から、従来のシートまたはロープネツトを直接超
軟弱地盤上に敷設するものと比較して格子状浮体
の剛性が大であるから、載荷時における地盤の局
部的な膨れ上がり現象が少なくなり、その結果盛
土層厚が均一化して、施工も安定するという効果
が得られる。
(Effects of the Invention) As mentioned above, the construction method of the present invention forms a lattice-like floating body with the pipe 1 through various pipe joints a to h, and this is laid on the ultra-soft ground 3, so it is different from the conventional construction method. The rigidity of the lattice-shaped floating body is greater than that of a sheet or rope net laid directly on ultra-soft ground, so local swelling of the ground during loading is reduced, and as a result, the thickness of the embankment layer is reduced. This results in uniformity and stable construction.

また材料としては、パイプ1、各種パイプジヨ
イントa〜h、およびシート5等をそれぞれ現場
へ持ち込み、現地で組み立てればよいから、材料
の運搬、積み込み、および荷卸し作業が容易にな
る上に、組み立てもパイプ1を各種パイプジヨイ
ントa〜hに接着剤等を介して嵌着すればよいか
ら、組み立て作業も容易になるという効果が得ら
れる。
In addition, since the materials such as pipe 1, various pipe joints a to h, and sheet 5 can be brought to the site and assembled on site, it is easy to transport, load, and unload the materials. For assembly, the pipe 1 may be fitted into the various pipe joints a to h using an adhesive or the like, so that the assembly work is facilitated.

また上述の格子状浮体は浮力の増減も容易にで
きるから、盛土の高さの調整にも容易に対応する
ことができる。
In addition, since the above-mentioned lattice-shaped floating body can easily increase or decrease the buoyancy, it can easily respond to the adjustment of the height of the embankment.

さらに本発明工法の格子状浮体は、所定の面積
毎に内部を連通すると共に、少くとも1個所に立
てた垂直パイプにより外部と連通させたから、た
とえ格子状浮体の一部が何らかの原因で破損して
も、その部分の格子状浮体の浮力が失われるだけ
で、他の部分の格子状浮体の浮力はなくならない
から、格子状浮体全体の浮力が消滅するおそれは
ない。
Furthermore, since the lattice-shaped floating body constructed using the method of the present invention communicates between the inside of each predetermined area and the outside through a vertical pipe erected at at least one location, even if a part of the lattice-shaped floating body is damaged for some reason. However, the buoyancy of the lattice-shaped floating body in that part is only lost, but the buoyancy of other parts of the lattice-shaped floating body does not disappear, so there is no risk that the buoyancy of the entire lattice-shaped floating body will disappear.

そして盛土後に圧密工法を実施する時は、前記
垂直パイプを介して各格子状浮体内に注水するこ
とにより、格子状浮体の浮力を消去することがで
きるから、載荷々重を余分に必要とすることがな
いという効果が得られる。
When implementing the consolidation method after embankment, the buoyancy of the lattice-shaped floating bodies can be eliminated by injecting water into each lattice-shaped floating body through the vertical pipes, so extra loading weight is required. You can get the effect that there is no problem.

【図面の簡単な説明】[Brief explanation of drawings]

第1図a〜hは本発明工法に使用する各種パイ
プジヨイントを示す平断面図、第2図は本発明工
法を示す平面略図、第3図はその立断面図、第4
図は第2図の部分詳細図、第5図a,bはその立
断面図、第6図は他の実施例を示す立断面図、第
7図〜第9図は本発明工法の実施例を示す平面略
図である。 1……パイプ、a〜h……パイプジヨイント、
2……在来地盤、3……超軟弱地盤、4……垂直
パイプ、5……シート、6……紐、7……針金、
8……盛土、9……蓋、10……アンカー、11
……水際線、12……格子状浮体、13……足場
板、15……格子状浮体、16……連結パイプ。
Figures 1 a to h are plan sectional views showing various pipe joints used in the construction method of the present invention, Figure 2 is a schematic plan view showing the construction method of the present invention, Figure 3 is an elevational sectional view thereof, and Figure 4
The figure is a detailed view of a part of FIG. 2, FIGS. 5a and 5b are elevational sectional views thereof, FIG. 6 is an elevational sectional view showing another embodiment, and FIGS. 7 to 9 are examples of the construction method of the present invention. FIG. 1...pipe, a~h...pipe joint,
2... Conventional ground, 3... Super soft ground, 4... Vertical pipe, 5... Sheet, 6... String, 7... Wire,
8... Embankment, 9... Lid, 10... Anchor, 11
...waterline, 12...lattice-shaped floating body, 13...scaffolding board, 15...lattice-shaped floating body, 16...connection pipe.

Claims (1)

【特許請求の範囲】[Claims] 1 各種パイプジヨイントと、単位長さのパイプ
とにより、所望の面積の格子状浮体を現場で組み
立て、この格子状浮体は、所定の面積毎に内部を
連通すると共に、少くとも1個所のパイプジヨイ
ントに立てた垂直パイプにより外部と連通させ、
この格子状浮体を現場で順次拡張して超軟弱地盤
上の所望の面積を覆つてから、この格子状浮体上
にシートを展張した後、そのシート上に順次盛土
を行い、圧密工法を実施する時には前記垂直パイ
プより格子状浮体の内部に注水して浮力を消去す
ることを特徴とする超軟弱地盤の覆土工法。
1 A lattice-shaped floating body with a desired area is assembled on site using various pipe joints and pipes of unit length, and this lattice-shaped floating body has internal communication for each predetermined area and at least one pipe. It communicates with the outside through a vertical pipe installed at the joint.
This lattice-shaped floating body is sequentially expanded on site to cover the desired area on the ultra-soft ground, and then sheets are spread over this lattice-shaped floating body, and then embankment is sequentially performed on the sheet to implement the consolidation method. An earth covering method for ultra-soft ground characterized by sometimes injecting water into the interior of the grid-like floating body from the vertical pipe to eliminate buoyancy.
JP6485886A 1986-03-25 1986-03-25 Soil-covering work for supersoft ground Granted JPS62225619A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6485886A JPS62225619A (en) 1986-03-25 1986-03-25 Soil-covering work for supersoft ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6485886A JPS62225619A (en) 1986-03-25 1986-03-25 Soil-covering work for supersoft ground

Publications (2)

Publication Number Publication Date
JPS62225619A JPS62225619A (en) 1987-10-03
JPH0472924B2 true JPH0472924B2 (en) 1992-11-19

Family

ID=13270294

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6485886A Granted JPS62225619A (en) 1986-03-25 1986-03-25 Soil-covering work for supersoft ground

Country Status (1)

Country Link
JP (1) JPS62225619A (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1009018C2 (en) * 1998-04-28 1999-10-29 Dry Tech Milieutechniek B V Method of stabilizing waterlogged ground uses stacks of rectangular metal boxes
JP5748497B2 (en) * 2011-02-14 2015-07-15 五洋建設株式会社 Rope net for covering soil in soft ground, rod assembly rope net for creating rope net, and laying method of rope net
JP6063752B2 (en) * 2013-01-16 2017-01-18 鹿島建設株式会社 Landfill method

Also Published As

Publication number Publication date
JPS62225619A (en) 1987-10-03

Similar Documents

Publication Publication Date Title
JPH0472924B2 (en)
JPH0941434A (en) Structure of simple water tank
JPH04108916A (en) Construction method for reinforced banking body
JPS6131245B2 (en)
US3478710A (en) Floating dock structure
JP3065066B1 (en) Soil floor structure and method of construction
JP2639877B2 (en) Under-floor storage for double use
KR102824085B1 (en) Retaining wall construction method applied with RC and reinforced earth method
JPS6117636A (en) Fortification of ground bearing capacity using water-absorptive expandible concrete
JP3172701B2 (en) Earthwork frame and construction method
JP2000027150A (en) Pebble-packed basket for engineering works
JPS644928Y2 (en)
JPH04134533U (en) Wave control structure using columnar members
JPS5934608Y2 (en) slope protection frame
JPS59429A (en) Foundation structure and its construction for building on soft ground
JPH065731Y2 (en) Simple fish farm for fish and shellfish
JPH0529213Y2 (en)
JP3141198B2 (en) Gravestone installation structure and gravestone installation method
JPS5849233Y2 (en) Synthetic resin waterway
JPH0310799B2 (en)
JP2825430B2 (en) Manufacturing method of tube embedded block
JPS6062355A (en) Combined constructional concrete block
JPH02164904A (en) Mat for underwater construction
JPH04231512A (en) Civil construction using sheet and sheet joint
JPH0469313B2 (en)