JPH0475337B2 - - Google Patents
Info
- Publication number
- JPH0475337B2 JPH0475337B2 JP59227233A JP22723384A JPH0475337B2 JP H0475337 B2 JPH0475337 B2 JP H0475337B2 JP 59227233 A JP59227233 A JP 59227233A JP 22723384 A JP22723384 A JP 22723384A JP H0475337 B2 JPH0475337 B2 JP H0475337B2
- Authority
- JP
- Japan
- Prior art keywords
- stage
- gondola
- exterior wall
- suspended
- wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Working Measures On Existing Buildindgs (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、建築物の外壁の新規工事、改修工事
等に利用される2段吊り足場による外壁工事方法
に関する。DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to an exterior wall construction method using two-tier suspended scaffolding, which is used for new construction, repair work, etc. of the exterior wall of a building.
(従来の技術)
都市部においては、土地の有効利用のために、
敷地一杯に建物を建てることが多い。その場合、
建物周囲に足場を建てるスペースがなく、隣地上
空を借用してブラケツトを外壁面から張り出した
状態に設け、その上に枠組足場を組むのが一般的
であるが、ブラケツトの組立て、解体に危険を伴
う場合が多く、また枠組足場はコスト的に高く付
くので、建築物の構造、グレードによつては過剰
設備となる場合もある。(Conventional technology) In urban areas, for effective use of land,
Buildings are often built on entire lots. In that case,
If there is no space to erect scaffolding around the building, it is common practice to borrow space above the ground and install brackets overhanging the exterior wall surface, and then erect a frame scaffold on top of the brackets. In addition, frame scaffolding is expensive, so depending on the structure and grade of the building, it may be over-equipped.
上記の問題を解決するために、現状では、第5
図イ,ロに示す吊り足場が実用化されている。こ
の吊り足場は、2本のワイヤーaによつて吊り下
げられるもので、各々の吊下げワイヤーaには、
昇降駆動用ウインチbが付いており、ネツト状の
養生シートcは、前記ワイヤーaに取り付けられ
ている。 In order to solve the above problem, currently the fifth
The suspended scaffolds shown in Figures A and B have been put into practical use. This hanging scaffold is suspended by two wires a, and each hanging wire a has a
A winch b for lifting and lowering is attached, and a net-shaped curing sheet c is attached to the wire a.
しかし乍ら、この吊り足場を使用しても、各吊
下げワイヤーaにウインチbが付いているため、
コスト面での利点が小さく、また吊下げワイヤー
aに養生シートcを張つているため、強風時には
非常に不安定であり、安全性の面でも問題があつ
た。 However, even if this suspended scaffolding is used, each hanging wire a has a winch b attached to it, so
The advantage in terms of cost was small, and since the curing sheet c was stretched over the hanging wire a, it was extremely unstable in strong winds, and there was also a problem in terms of safety.
また、外装版の取付け等、外壁工事の内容によ
つては、各階の上下2箇所で同時に作業すること
が望ましく、この場合には、吊り足場が上下2段
に配置されることになる。 Furthermore, depending on the nature of the exterior wall work, such as the installation of exterior panels, it is desirable to work simultaneously at two locations, one above and one above on each floor, and in this case, suspended scaffolds will be placed in two stages, one above and one below.
この種の2段吊り足場による外壁工事方法は、
既に、特開昭58−143065号公報によつて提案され
ている。 This type of exterior wall construction method using two-tier suspended scaffolding is as follows:
This has already been proposed in Japanese Unexamined Patent Publication No. 143065/1983.
この方法は、建築物の外壁面とほぼ同幅の作業
兼落下防止用ゴンドラを当該ゴンドラ又は屋上に
設けたウインチにより昇降駆動自在に吊り下げ、
このゴンドラの吊下げワイヤーに養生シートを取
り付け、前記ゴンドラの上方位置には、昇降駆動
用ウインチが装備された幅狭の作業ゴンドラを吊
り下げ、これら両ゴンドラを足場にして外装版の
取付け等を行なうものである。 This method involves suspending a work/fall prevention gondola, which is approximately the same width as the exterior wall of the building, using the gondola or a winch installed on the roof so that it can be driven up and down.
A curing sheet is attached to the hanging wire of this gondola, and a narrow working gondola equipped with a lifting winch is suspended above the gondola, and these two gondolas are used as scaffolding to attach the exterior plate, etc. It is something to do.
しかし、この方法においても、上下2段のゴン
ドラを夫々に専用のウインチによつて昇降駆動し
ているため、コスト面で不利であり、且つ、強風
時の安定性に欠ける等、第5図イ,ロで示した従
来技術と同様の欠点を有している。 However, even with this method, the upper and lower gondolas are each driven up and down by dedicated winches, which is disadvantageous in terms of cost and lacks stability in strong winds, as shown in Figure 5. This method has the same drawbacks as the prior art shown in , b.
(発明が解決しようとする問題点)
本発明は、上述した従来欠点に鑑み、ウインチ
の台数を減少してコストダウンを達成すると共
に、強風時における吊り足場の安定性を増し、安
全性を向上せんとするものである。(Problems to be Solved by the Invention) In view of the above-mentioned conventional drawbacks, the present invention reduces the number of winches to achieve cost reduction, as well as increases the stability of the suspended scaffolding in strong winds and improves safety. This is what I am trying to do.
(問題点を解決するための手段)
本発明による2段吊り足場による外壁工事方法
は、建築物の外壁面に沿わせて複数台のステージ
を外壁面のほぼ全幅にわたり連続して位置する状
態に吊り下げ、これらステージの上方位置には、
ステージに比して幅狭で且つ昇降駆動用ウインチ
が装備されたゴンドラを吊り下げ、前記ステージ
よりも外側に養生シートを、ステージの吊下げワ
イヤーとは別に設けられたワイヤーに取り付けて
設け、前記ゴンドラ及びステージを足場にして或
る階の外壁工事を行なつた後、ステージを前記ゴ
ンドラにて上階へと吊り上げることによつて、上
述した目的を達成したものである。(Means for Solving the Problems) The method for constructing an exterior wall using two-tier suspended scaffolding according to the present invention involves arranging a plurality of stages continuously along the exterior wall of a building over almost the entire width of the exterior wall. Suspended, these are positioned above the stage.
A gondola, which is narrower than the stage and equipped with a winch for driving up and down, is suspended, and a curing sheet is provided outside the stage by attaching it to a wire provided separately from the stage suspension wire. The above-mentioned purpose is achieved by using the gondola and stage as scaffolding to perform exterior wall work on a certain floor, and then hoisting the stage to the upper floor using the gondola.
(作用)
上記の構成によれば、外壁面のほぼ全幅にわた
り連続して位置するステージが、外壁工事の作業
足場の他、落下防止用の棚、ゴンドラを横方向に
位置変更する際の通路等としての役目を果たす。
養生シートが受ける風圧はステージの吊下げワイ
ヤーと分離されたワイヤーによつて支えられるた
め、ステージの揺れが抑制される。そして、或る
階での外壁工事が済んだら、ステージをゴンドラ
にて上階へと吊り上げるため、ゴンドラに装備さ
れた昇降駆動用ウインチがステージの吊上げに利
用されることになる。(Function) According to the above configuration, the stage that is continuously located over almost the entire width of the exterior wall surface can be used as a work scaffold for exterior wall construction, a shelf to prevent falling, a passageway when changing the position of the gondola laterally, etc. fulfill its role as
The wind pressure applied to the curing sheet is supported by a wire that is separate from the stage's suspension wire, so the shaking of the stage is suppressed. After the exterior wall work on a certain floor is completed, the stage will be hoisted up to the upper floor by a gondola, so a lift drive winch installed on the gondola will be used to hoist the stage.
(実施例)
本発明の一実施例を図面に基づいて説明する
と、第1図は本発明の2段吊り足場による外壁工
事方法の概要を示す斜視図、第2図はその縦断側
面図、第3図は吊下げ装置の斜視図、第4図はそ
の一部切欠正面図である。(Example) An example of the present invention will be described based on the drawings. Figure 1 is a perspective view showing an outline of the method for constructing an exterior wall using two-tier suspended scaffolding of the present invention, Figure 2 is a vertical side view thereof, and Figure 2 is a vertical side view of the method. 3 is a perspective view of the hanging device, and FIG. 4 is a partially cutaway front view thereof.
図において、1はカーテンウオール工法による
建築物であつて、その屋上には吊下げ装置2が設
置されている。吊下げ装置2は、H鋼製の吊元用
張出しビーム3、該ビーム3の後端に分解可能に
ボルト4連結されたH鋼製の後部支柱5、ビーム
3の長手方向中間部に分解可能にボルト6連結さ
れた中間部支柱7、前記ビーム3の外壁面よりも
張り出した部分間に架設されて、ビーム3の上部
フランジを貫通するUボルト8とこれに螺合する
ナツトにより固定された鋼製角パイプ9……等に
より構成されている。 In the figure, 1 is a building constructed using the curtain wall construction method, and a hanging device 2 is installed on the roof of the building. The hanging device 2 consists of an overhanging beam 3 made of H steel for hanging, a rear column 5 made of H steel that is connected to the rear end of the beam 3 with a bolt 4 that can be disassembled, and a longitudinally intermediate portion of the beam 3 that can be disassembled. An intermediate support 7 is connected with bolts 6 to the beam 3, and is installed between the parts of the beam 3 that protrude from the outer wall surface, and is fixed by a U-bolt 8 passing through the upper flange of the beam 3 and a nut screwed thereto. It is composed of a steel square pipe 9, etc.
後部支柱5の下端部は屋上スラブ10の所定位
置に予め設置された埋込みアンカーボルト11と
これに螺合するナツト12により固定され、中間
部支柱6の下端部はパラペツト13の上面に設置
したホールインアンカー(又は予め設置した埋込
みアンカーボルト)11′によつて固定されてい
る。 The lower end of the rear column 5 is fixed by an embedded anchor bolt 11 installed in advance at a predetermined position on the roof slab 10 and a nut 12 screwed into the bolt, and the lower end of the intermediate column 6 is fixed by a hole installed on the upper surface of the parapet 13. It is fixed by an in-anchor (or a pre-installed embedded anchor bolt) 11'.
また、中間部支柱7には、パラペツト13の高
さが変つても、ビーム3をほぼ水平に設置できる
ように、上下複数段にボルト孔14……が設けら
れている。より詳細に説明すると、中間部支柱7
は、パラペツト13の上面に載置する基板7a、
その上面に所定間隔をあけて立設した一対のチヤ
ンネル材7b,7c、両者7aと7b,7cとに
溶接にて固着した補強板7d……によつて構成さ
れ、両チヤンネル材7b,7cに前記ボルト孔1
4……を穿設してある。一方、ビーム3の中間部
には、下端部に鋼製の丸パイプ15が架設され溶
接にて固着された一対のプレート16a,16b
が溶接にて固着されている。そして、ビーム3を
両チヤンネル材7b,7c間に、前記プレート1
6a,16bがチヤンネル材7b,7cの相対向
する内側面と密着又は近接した状態に配置すると
共に、所望位置のボルト孔14……と前記丸パイ
プ15とにわたつて前記ボルト6を挿通し、これ
にナツトを螺着してある。これは、ボルト6に曲
げモーメントが加わらないように工夫したもので
ある。 Further, the intermediate support 7 is provided with bolt holes 14 in a plurality of upper and lower stages so that the beam 3 can be installed almost horizontally even if the height of the parapet 13 changes. To explain in more detail, the intermediate support 7
is a substrate 7a placed on the upper surface of the parapet 13;
It consists of a pair of channel materials 7b, 7c standing upright on the upper surface with a predetermined interval, and a reinforcing plate 7d fixed to both 7a, 7b, 7c by welding. Said bolt hole 1
4... is drilled. On the other hand, in the middle part of the beam 3, a pair of plates 16a and 16b are fixed by welding, and a steel round pipe 15 is installed at the lower end.
is fixed by welding. Then, the beam 3 is placed between the channel members 7b and 7c, and the plate 1
6a, 16b are placed in close contact with or close to the opposing inner surfaces of the channel members 7b, 7c, and the bolt 6 is inserted across the bolt hole 14 at a desired position and the round pipe 15, Natsu is screwed onto this. This is designed to prevent bending moment from being applied to the bolt 6.
前記吊下げ装置2には、前記ビーム3の先端部
に養生シート取付け用ワイヤー17を垂下させる
と共に、ビーム3の先端近傍部と外壁面近傍部と
に夫々ステージ吊下げワイヤー18……を垂下さ
せ、前記角パイプ9には、ゴンドラ吊下げワイヤ
ー19……を吊下げ位置変更可能な状態に垂下さ
せる。 In the suspension device 2, a curing sheet attachment wire 17 is suspended from the tip of the beam 3, and stage suspension wires 18 are suspended from the vicinity of the tip of the beam 3 and the vicinity of the outer wall surface, respectively. A gondola hanging wire 19 is suspended from the square pipe 9 so that the hanging position can be changed.
この状態で、昇降駆動用ウインチ20が装備さ
れた可搬式ゴンドラ21を前記ワイヤー19……
により吊り下げた後、ビームとアルミ製の板材と
によつて組立てられたステージ22を前記ワイヤ
ー18……により吊り下げる。これらのステージ
22……は、建築物外壁面のほぼ全幅にわたり連
続して位置する状態に吊り下げられる。 In this state, the portable gondola 21 equipped with the lifting drive winch 20 is connected to the wire 19...
After being suspended by the wires 18, the stage 22 assembled from the beam and aluminum plates is suspended by the wires 18. These stages 22... are suspended so as to be continuously positioned over almost the entire width of the outer wall surface of the building.
尚、各ステージ22の左右幅(外壁面に沿つた
方向での幅)が約5m、前後幅(外壁面に垂直な
方向での幅)が約1.2mであり、自重が約150Kgで
ある。ゴンドラ21は、図示の通り、前後左右と
も、各ステージ22よりも幅狭で、自重約240Kg、
積載荷重約300Kgである。 Each stage 22 has a horizontal width (width in the direction along the outer wall surface) of about 5 m, a longitudinal width (width in the direction perpendicular to the outer wall surface) of about 1.2 m, and a dead weight of about 150 kg. As shown in the diagram, the gondola 21 is narrower than each stage 22 in both the front, rear, left, and right, and has a weight of approximately 240 kg.
The load capacity is approximately 300Kg.
全ステージ22……の吊下げ後、養生シート固
定用ビーム23……をステージ22……よりも下
方の梁24に取り付け、これに前記ワイヤー17
……の下端を固定する。 After suspending all the stages 22..., the curing sheet fixing beam 23... is attached to the beam 24 below the stage 22..., and the wire 17 is attached to this.
Fix the bottom end of...
しかる後、前記ゴンドラ21を頂部まで上昇さ
せて、前記ビーム3……の先端部に布単管25を
クランプにて取り付け、これにネツト状の養生シ
ート26の端縁を固定し、養生シート26を垂下
させる。次いで、ゴンドラ21を下昇させつつ、
養生シート26を前記ワイヤー17……に結束
し、2段吊り足場の架設及び養生シート張設を完
了するのである。 After that, the gondola 21 is raised to the top, the single cloth tube 25 is attached to the tip of the beam 3 with a clamp, the edge of the net-shaped curing sheet 26 is fixed to this, and the curing sheet 26 is fixed. hang down. Next, while lowering gondola 21,
The curing sheet 26 is tied to the wires 17, and the erection of the two-tier suspended scaffold and the tensioning of the curing sheet are completed.
そして、ゴンドラ21及びステージ22……を
足場にして、ステージ22……が位置する階の外
壁工事(例えば、外装版Wの取付け、外装補修
等)を行なつた後、ステージ22とゴンドラ21
とをワイヤー27……で連結し、ゴンドラ21に
装備された前記ウインチ20を稼動して、各ステ
ージ22をゴンドラ21にて上階へと吊り上げ、
吊り足場の盛替えを行なうのである。 Then, using the gondola 21 and stage 22... as scaffolding, work on the exterior wall of the floor where stage 22... is located (for example, installation of exterior version W, exterior repair, etc.) is performed, and then stage 22 and gondola 22...
are connected by a wire 27..., the winch 20 equipped on the gondola 21 is operated, and each stage 22 is lifted to the upper floor by the gondola 21,
The suspended scaffolding will be replaced.
尚、ステージ22……は、本来の作業足場の
他、落下防止用の棚、ゴンドラ21を横方向に位
置変更する際の通路としての役目を果たす。 The stage 22 serves not only as a work platform but also as a shelf to prevent falls and a passageway for laterally changing the position of the gondola 21.
(発明の効果)
本発明は、上述した構成よりなり、ステージを
ゴンドラにて上階へと吊り上げるため、ゴンドラ
に装備されている昇降駆動用ウインチがステージ
上昇用のウインチとして利用されることになり、
ステージを吊り上げるための専用のウインチが不
要なため、ウインチの台数の減少によるコストダ
ウンが可能である。(Effects of the Invention) The present invention has the above-mentioned configuration, and since the stage is lifted to the upper floor by the gondola, the winch for driving up and down that is equipped on the gondola is used as a winch for lifting the stage. ,
Since there is no need for a dedicated winch to lift the stage, costs can be reduced by reducing the number of winches.
殊に、本発明によれば、ステージよりも外側に
養生シートをステージの吊下げワイヤーとは別に
設けられたワイヤーに取り付けて設けてあるの
で、養生シートを着脱しなくても、ゴンドラによ
るステージの昇降を行え、しかも、養生シートが
受ける風圧がステージの吊下げワイヤーとは別の
ワイヤーによつて支えられるため、強風時におけ
るステージの安定性が良く、安全性を向上し得
る。 In particular, according to the present invention, the curing sheet is provided outside the stage and is attached to a wire provided separately from the stage suspension wire, so that the gondola can move the stage without attaching or removing the curing sheet. Since the stage can be raised and lowered, and the wind pressure applied to the curing sheet is supported by a wire different from the stage suspension wire, the stage is stable in strong winds and safety can be improved.
第1図乃至第4図は本発明の一実施例を示し、
第1図は全体の概略斜視図、第2図は縦断側面
図、第3図は吊下げ装置の斜視図、第4図は同装
置の一部切欠正面図である。第5図イ,ロは従来
例を示す概略側面図と概略平面図である。
1……建築物、17……養生シート取付け用ワ
イヤー、18……ステージ吊下げワイヤー、20
……昇降駆動用ウインチ、21……ゴンドラ、2
2……ステージ、26……養生シート。
1 to 4 show an embodiment of the present invention,
FIG. 1 is a schematic perspective view of the entire device, FIG. 2 is a longitudinal side view, FIG. 3 is a perspective view of the hanging device, and FIG. 4 is a partially cutaway front view of the device. FIGS. 5A and 5B are a schematic side view and a schematic plan view showing a conventional example. 1... Building, 17... Wire for attaching curing sheet, 18... Stage hanging wire, 20
... Lifting drive winch, 21 ... Gondola, 2
2... Stage, 26... Curing sheet.
Claims (1)
を外壁面のほぼ全幅にわたり連続して位置する状
態に吊り下げ、これらステージの上方位置には、
ステージに比して幅狭で且つ昇降駆動用ウインチ
が装備されたゴンドラを吊り下げ、前記ステージ
よりも外側に養生シートを、ステージの吊下げワ
イヤーとは別に設けられたワイヤーに取り付けて
設け、前記ゴンドラ及びステージを足場にして或
る階の外壁工事を行なつた後、ステージを前記ゴ
ンドラにて上階へと吊り上げることを特徴とする
2段吊り足場による外壁工事方法。1 Multiple stages are suspended along the exterior wall of the building so that they are located continuously over almost the entire width of the exterior wall, and above these stages,
A gondola, which is narrower than the stage and equipped with a winch for driving up and down, is suspended, and a curing sheet is provided outside the stage by attaching it to a wire provided separately from the stage suspension wire. A method for constructing an exterior wall using a two-stage hanging scaffold, which comprises performing exterior wall construction on a certain floor using a gondola and a stage as scaffolding, and then hoisting the stage to an upper floor using the gondola.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22723384A JPS61106867A (en) | 1984-10-29 | 1984-10-29 | Construction of outer wall by two-stage suspension scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22723384A JPS61106867A (en) | 1984-10-29 | 1984-10-29 | Construction of outer wall by two-stage suspension scaffold |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS61106867A JPS61106867A (en) | 1986-05-24 |
| JPH0475337B2 true JPH0475337B2 (en) | 1992-11-30 |
Family
ID=16857593
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22723384A Granted JPS61106867A (en) | 1984-10-29 | 1984-10-29 | Construction of outer wall by two-stage suspension scaffold |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS61106867A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011153479A (en) * | 2010-01-28 | 2011-08-11 | Taisei Corp | Method for repairing exterior wall |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2548651B2 (en) * | 1991-12-13 | 1996-10-30 | アワーブレーン環境設計株式会社 | Continuous suspended scaffolding, building wall cleaning method, building wall cleaning device and wire rope defect detection device for suspended scaffolding |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6136457A (en) * | 1984-07-30 | 1986-02-21 | 日綜産業株式会社 | Lifting and fixing of scaffold stage |
-
1984
- 1984-10-29 JP JP22723384A patent/JPS61106867A/en active Granted
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2011153479A (en) * | 2010-01-28 | 2011-08-11 | Taisei Corp | Method for repairing exterior wall |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS61106867A (en) | 1986-05-24 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9701520B2 (en) | Hoisting platform system | |
| WO2023208250A1 (en) | Curtain wall construction platform | |
| KR100665718B1 (en) | Reinforcement device for tower crane wall support | |
| JPH07292986A (en) | Long span roof construction equipment and construction method | |
| US3292313A (en) | Tensile system of building construction | |
| JP3950800B2 (en) | Suspension scaffold | |
| JP3049300B2 (en) | Construction method of beam truss in building with overhead traveling crane | |
| JPH0475337B2 (en) | ||
| JPH0571225A (en) | Temporarily set roof of complete weather type | |
| JP3072214B2 (en) | Temporary shed | |
| JP3532161B2 (en) | Tower construction machine and tower construction method | |
| JP3241896B2 (en) | Steel frame stair hang down method | |
| JP2585174B2 (en) | How to fix scaffolding for temporary tents | |
| JP2552986Y2 (en) | Lifting piece for lifting temporary tent | |
| JPH1088786A (en) | Scaffold for columnar structure | |
| JP2871468B2 (en) | How to build a building | |
| JP3100574B2 (en) | Suspended scaffold and its erection method | |
| CN222612819U (en) | Hanging bracket device for wallboard installation | |
| CN223048416U (en) | Rotatable hanging basket structure | |
| JPH01322064A (en) | Scaffold erection method for construction work performing temporary general grounding using scaffolding steel pipe | |
| CN114370152B (en) | Suspension type operation platform for elevator shaft construction | |
| JP2876991B2 (en) | Steel frame method for high-rise buildings | |
| JP2779258B2 (en) | Roof lift-up method | |
| JP3124152B2 (en) | Collapse prevention frame | |
| JP3002054U (en) | Tower crane with multiple main columns as tower mast |