JPH0512978B2 - - Google Patents
Info
- Publication number
- JPH0512978B2 JPH0512978B2 JP62017319A JP1731987A JPH0512978B2 JP H0512978 B2 JPH0512978 B2 JP H0512978B2 JP 62017319 A JP62017319 A JP 62017319A JP 1731987 A JP1731987 A JP 1731987A JP H0512978 B2 JPH0512978 B2 JP H0512978B2
- Authority
- JP
- Japan
- Prior art keywords
- water
- air
- collection device
- resin
- water collection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01J—CHEMICAL OR PHYSICAL PROCESSES, e.g. CATALYSIS OR COLLOID CHEMISTRY; THEIR RELEVANT APPARATUS
- B01J49/00—Regeneration or reactivation of ion-exchangers; Apparatus therefor
- B01J49/60—Cleaning or rinsing ion-exchange beds
Landscapes
- Chemical & Material Sciences (AREA)
- Organic Chemistry (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Treatment Of Water By Ion Exchange (AREA)
- Filtration Of Liquid (AREA)
- Feeding, Discharge, Calcimining, Fusing, And Gas-Generation Devices (AREA)
Description
〔産業上の利用分野〕
本発明は、原水を充填層内に通水することによ
り充填層内に捕捉された鉄酸化物等のけん濁物を
除去する方法に関するものである。
〔従来の技術及びその問題点〕
充填層、特にイオン交換樹脂の充填層に通水す
ることにより水を精製する方法において、充填層
内に捕捉された比重の大きい酸化鉄等のクラツド
を除去する方法として種々の方法が提案されてい
る。
例えば発電用ボイラの復水脱塩装置において
は、イオン交換樹脂を充填した脱塩塔に一定時間
通水した後イオン交換樹脂を再生塔に移送した後
逆洗することによりけん濁物(クラツド)を除去
することが行なわれている。
以下図面に基いて従来法を説明する。
第2図は通常行われているクラツドの除去方法
を示すための概略図であつて、符号1は再生塔、
2は沈静した状態のイオン交換樹脂層、3はスク
ラビング状態のイオン交換樹脂層、4は逆洗状態
のイオン交換樹脂層、5は下部集水装置、6は上
部集水装置、7,8,9,10は空気又は水を導
入又は排出するための配管、11,12,13,
14は前記配管上に設けた弁を示し、()はド
レン工程、()は空気スクラビング工程、()
は逆洗工程を示す。又A,A′は空気、Bは逆洗
水を示す。
以下、第2図に基いて説明するが、第2図の
(),()については説明上必要な部分にのみ
符号を付した。
第2図に示す方法においては、イオン交換樹脂
(以下単に樹脂という)を再生塔1に移送した後、
管7の弁11及び管9の弁13を開き管9より空
気Aを圧入して樹脂層2の上部のある位置L1に
水面が達するまで管7を通じて水をドレンし(第
2図)、ついで弁11及び弁13を閉じ弁12
及び弁14を開いて上部集水装置6を経て管10
から排気しながら管8から下部集水装置5より樹
脂層の下部に空気A′を導入して樹脂のスクラビ
ングを行つた後(第2図)、弁12を閉じ弁1
1を開いて管7より下部集水装置を経て逆洗水B
を樹脂層の下部に導入し、上部集水装置6を経て
管10より逆洗廃水を排出しながら樹脂の逆洗を
行う(第2図)。この方法においてはクラツド
除去率をあげるために3回程度前記工程(ドレン
――空気スクラビング――逆洗)がくり返される。
この方法では、(1)逆洗水の流速に制限があり
(max15m/h程度)、かつ再生塔上部の集水装
置から逆洗水を排出するためクラツドの分離(排
出)に要する時間が長いこと、(2)逆洗水の流速に
制限があるため重質のクラツドは塔上部まで運搬
されにくいこと、(3)逆洗後再度空気スクラビング
を行なうため水をドレンする必要がありこの分だ
け廃液量が多くなること等の欠点がある。
第3図は、重質のクラツドを除去するために改
良された方法を説明するための概略図であつて、
装置自体及び符号は第2図に示したものと同一で
あり、符号はこの改良方法を説明するのに必要な
符号のみに記入した。第3図において()はド
レン工程、()は空気スクラビング工程、()
は急速ドレン工程、()は水張り工程を示す。
第3図において()のドレン工程は第2図に
説明したのと同じであるが、()の空気スクラ
ビング工程において一定の時間空気スクラビング
を行つた後、下部から導入される空気Aによる樹
脂層の展開中に弁12及び弁14を閉じ管8から
樹脂層3への空気A′の導入を止めると同時に、
弁11及び弁13を急開することにより管9より
空気Aを圧入して管7を通して一気に排水するも
のである(第3図の急速ドレン工程)。ついで
弁11を閉じ弁13、弁14を開き管10から水
をL1の高さまで補給した後(第3図の水張り
工程)空気スクラビング工程に戻る。この方法は
重質のクラツド除去に有効であるが1回当りの排
水量が少なく(第3図中L1とL0の差の分しか排
水できない)、従つて空気スクラビング、急速ド
レン及び水張りの()〜()の工程を10〜30
回程度くり返す必要があり工程が複雑である。
第4図は、第2図に示す方法を改良し、逆洗後
中間集水装置より排水するようにした方法を説明
するためのもので、符号1〜14は第2図で示し
た符号と同じ意味を有し、符号15は中間集水装
置、16はその配管、17は弁を示し、()は
ドレン工程、()は空気スクラビング工程、
()は逆洗工程、()は中間集水装置からのド
レン工程を示す。
第4図に示す方法において、()のドレン工
程と()の空気スクラビング工程は第2図に示
す方法と同じであるが、()の逆洗工程におい
て管7から導入される逆洗水BをL2の高さまで
導入した後、弁11及び14を閉じ、弁13及び
17を開き管9から空気を圧入して中間集水装置
から上に存在する逆洗水を中間集水装置15及び
ドレン抜出し管16から排水するようにしたもの
である。この方法は、第2図に示す方法よりはク
ラツドの分離に要する時間が短縮され廃液量も少
なくてすむが、重質クラツドの除去は第3図に示
す方法程十分ではない。
〔発明の目的〕
本発明の目的は、上記従来法の欠点を改善し、
分離時間が短かくてすみ、かつ廃液量の少ない重
質クラツドの分離方法を提供することにある。
〔発明の構成〕
本発明は、充填層の下部より空気と水とを同時
に導入しつつスクラビングを行いながら、(1)該ス
クラビングにより展開している充填層の表層に設
けられた充填材を通過させず、けん濁物、及び微
細化した充填材のみを通過させる構造を有する中
間集水装置から排水を行ないかつ該中間集水装置
の上部から排気を行なう工程と、(2)前記中間集水
装置から排水と、排気を行う工程との両工程をく
り返し行うことを特徴とする充填層のけん濁物及
び微細化した充填材の除去方法である。
本発明者等は前に述べたような従来法の欠点を
改良するため、粒径の大きい、重質のクラツドす
なわち沈降速度の大きいクラツドに対しても有効
であり、かつ分離時間も短かく廃液量も少なくて
すむクラツドの除去方法を鋭意研究した結果本発
明をなすにいたつたものである。
本発明の方法を第1図に基いて説明する。
第1図において符号は第4図に示した符号と同
一の符号は同じ意味を有し、Sは空気A′と共に
導入されるスルージング水を示す。
第1図の()のドレン工程においては、水を
中間集水装置15のレベル(L1)までドレンす
る。
ついで本発明の()及び()の空気−水ス
クラビング工程を繰り返し実施する。本発明は、
空気A′とスルージング水Sとを同時に下部集水
装置5から導入しながら中間集水装置15より弁
17及び管16を通じて空気及び/又は水を排出
することを基本的な特長としており、沈降速度の
大きい重質のクラツドを空気A′とスルージング
水Sの高流速の上向き流によつて樹脂層下部から
中間集水装置15に運搬し管16を通して除去す
るものである。
第1図に示す空気−水スクラビング工程()
において、弁14、弁17は開となつており、排
水は中間集水装置15から管16を経て行なわ
れ、排気は弁14が開となつているため管16か
らは行なわれず、塔上部の管10を経て行なわれ
る。
空気水スクラビング工程()においては、弁
14を閉とし、弁17を開とされているため、塔
上部からの排気は行なわれず、水と空気の流れは
中間集水装置15に集中し、管16を経て系外に
同時に排出される。
水のみを用いる通常の逆洗においては中間集水
装置15から排水する場合樹脂が中間集水装置に
堆積したクラツドの排出がしにくくなつてしま
う。
しかし水と空気を同時に導入してスクラビング
を行う本発明の工程()の場合は樹脂層、特に
その表層が激しくゆれ動いているため、一度中間
集水装置に樹脂が堆積してもこの堆積した樹脂層
はすぐこわれ、常に中間集水装置は排水及び排気
する“面”が更新されるので、クラツド排出上何
ら問題のないことが実験の結果確かめられた。
下部集水装置からの空気A′の流速は通常エア
スクラビングに用いられているLV50〜100m/時
でよく、スルージング水Sの流速は通常逆洗水B
で用いられるLV6〜15m/時よりは若干小さい
LV4〜10m/時が好ましい。本発明方法において
はクラツドの運搬除去はスルージング水Sのみに
よつて行われるのでなく空気によつても行われて
おりスルージング水Sの流速は従来の逆洗水B程
大きくする必要はない。
本発明は空気−水スクラビング工程()と
()を交互に行うものでありその時間は下記例
の如く()の工程を長時間行うのがよい。
空気−水スクラビング工程():1〜5分
〃 ():0.5〜2分
1例として中間集水装置15としてスリツト巾
200〜400μmのワイヤースクリーンを用いスクリ
ーンの開口面積を充分に大きくすることにより工
程()、()がスムーズに行われることを確認
した。工程()は大気開放状態となつておりス
クラビング時の樹脂表層の位置は第5図に示す如
く中間集水装置15の上面近くの位置aに維持さ
れ、スクラビングによるかくはんにより中間集水
装置15の表面が常に更新されていく。
これは大気開放状態であり、かつ中間集水装置
の面に排水時の抵抗が若干あるためその樹脂表層
の位置が第5図aの如くなるものである。
これに対し工程()では弁14が閉となり管
16から排気も行われるため塔内が加圧状態とな
りスクラビング時の樹脂表層の位置は第5図の位
置bに示す如く中間集水装置15の管中央部付近
以下になる。
本発明においては工程()だけでも、クラツ
ドの除去作用の中で(1)クラツドの樹脂からのはく
り作用、(2)中間集水装置15までへの運搬作用は
充分である。しかしもう1つの重要な作用である
中間集水装置15からの排出作用については工程
()のみでは充分でない。1例として本発明で
用いられるワイヤースクリーンの場合第6図に示
す如くなつており、スリツト18の巾より小さい
クラツド又は微細化した樹脂はこのスリツトをス
ムーズに通過し排出される。又スリツト18の巾
より充分大きいものはスクラビング時のかくはん
効果によりスリツト面をふさぐことなく流動化し
ている。しかし、スリツト巾に近い大きさのクラ
ツド又は微細化した樹脂は、排出面であるこのス
リツトにひつかかり排出されにくく、かつ排出面
をふさぎこんでいく。それ故工程()を長時間
行なうと第5図に示す位置aをこえて徐々にスク
ラビング時の樹脂表層が上昇していく。このよう
な工程()の欠点を工程()は解決するもの
である。工程()は排水・排気を管16からの
み行い、塔内を1〜2Kgf/cm2の加圧状態とする
ことにより前述したスリツト18をふさぎこんで
いるスリツト巾に近い大きさのクラツド、微細化
した樹脂を加圧により強制的に排出してしまう作
用を有している。
この排出作用は極く短時間で達成されてしまう
ため工程()は0.5〜2分程度で十分である。
第6図中矢印19はクラツド又は微細化した樹
脂、及び水、空気の流れる方向を示し、符号20
は中間集水装置15であるワイヤースクリーンを
形成しているロツドであり形状は第6図に示す如
く三角形若しくはそれに近いものである。このよ
うな形状は、クラツド、微細化した樹脂の排出に
効果的である。
ワイヤスクリーンの管外側のスリツト18より
管内側のスリツト21の巾が大きいため前述の工
程()による管外側のスリツト18にひつかか
り、スリツト18をふさいでいるスリツト18の
巾に近い径を有するクラツド、微細化した樹脂の
強制的除去がスムーズに行われるのである。
1例であるが第6図に示すような機能をもつも
のが本発明を実施するのに好ましい。
工程()をなくし工程()のみを行なうこ
とは第5図に示す如く樹脂表層の位置bが中間集
水装置15の中央部付近以下になり中間集水装置
の管全面がクラツドの排出にいかされないので得
策ではない。このように本発明は工程()のみ
又は工程()のみを行う時のお互いの欠点を、
〔工程()→工程()〕をくり返すことにより
効果的にクラツド、微細化した樹脂の除去を達成
しうるものである。
以下、本発明を、第1図に基いて詳細に説明す
る。
先づ、()のドレン工程により再生塔1の水
位を中間集水装置15の位置(L1)とする。こ
の操作は、弁13,17を開とし管9から1〜2
Kgf/cm2の加圧空気Aを圧入することにより行な
われる。
また、中間集水装置15と樹脂2の表面との距
離は、次の()、()の工程に好適となるよ
う、樹脂層2の高さの15〜30%の値となるように
するのが好ましい。
ついで弁13を閉とし、管8より空気A′を、
管7よりスルージング水を導入し、管10より排
気しながら中間集水装置15を経由し管16より
排水を行なう第()工程に移る。
第()工程における空気とスルージング水の
流量は次のとおりである。
空気:LV50〜120m/時
圧力1〜2Kgf/cm2
スルージング水:LV4〜10m/時
このような操作は、混合床の混合操作の一部と
して、或いは第2図に示す従来法の()工程の
空気のみによるスクラビング操作の前に、極く短
時間LV2〜3m/時のスルージング水を導入して
行われることがあるが、本発明の工程()はこ
れらの操作を応用し、操作時間を長くすると共に
スルージング水の流速を大としたものである。
樹脂層が比重の大きいカチオン樹脂で構成され
ている場合には、スルージング水のLV6〜10m/
時、空気のLV70〜100m/時とするのが適当であ
る。
比重の小さいアニオン樹脂の場合はスルージン
グ水のLV4〜8m/時、空気のLV70〜100m/時
とするのが適当である。工程()は2〜5分程
度でよいがクラツドが樹脂に強く固着しているよ
うな場合は工程()の前にスルージング水Sの
導入を止め空気のみを導入する従来法第2図の
()の工程を行うのも一案である。スルージン
グ水Sの導入を停止すると樹脂層3の水量が少な
くなり、樹脂層3の樹脂スラリー濃度が大きくな
つて樹脂同志のこすり合いが増しクラツドが剥離
しやすくなるからである。
ついで工程()に移る。
弁17を開としたまゝで、弁14を閉とするこ
とにより排気も中間集水装置15を径由して管1
6から行なわれる。
空気A′、スルージング水Sの流量等の設定値
は工程()と同じでよい。このようにすると空
気A′の圧力1〜2Kgf/cm2が再生塔1内にもか
かり樹脂層3の表層の位置は第5図のbで示す如
く低下する。本工程はスリツト18にひつかかり
排水をじやましているスリツト18の巾に近い大
きさを有するクラツド、微細樹脂を強制的に排出
するものであり0.5分〜2分、通常は1分程度行
なえばよい。
そして再度〔工程()→工程()〕を繰り
返す。繰り返し回数は下記表−1に示す設定値の
場合5〜15回程度で十分である。
[Industrial Application Field] The present invention relates to a method for removing suspended substances such as iron oxides trapped in a packed bed by passing raw water through the packed bed. [Prior art and its problems] In a method of purifying water by passing water through a packed bed, especially a packed bed of ion exchange resin, cruds such as iron oxide with a high specific gravity trapped in the packed bed are removed. Various methods have been proposed. For example, in a condensate desalination equipment for a power generation boiler, water is passed through a demineralization tower filled with ion exchange resin for a certain period of time, and then the ion exchange resin is transferred to a regeneration tower and then backwashed to remove suspended matter (cruds). is being removed. The conventional method will be explained below based on the drawings. FIG. 2 is a schematic diagram showing a commonly used crud removal method, in which reference numeral 1 indicates a regeneration tower;
2 is an ion exchange resin layer in a settled state, 3 is an ion exchange resin layer in a scrubbed state, 4 is an ion exchange resin layer in a backwash state, 5 is a lower water collection device, 6 is an upper water collection device, 7, 8, 9, 10 are pipes for introducing or discharging air or water, 11, 12, 13,
14 indicates a valve provided on the pipe, () indicates a draining process, () indicates an air scrubbing process, ()
indicates the backwashing process. Also, A and A' indicate air, and B indicates backwash water. The following description will be made based on FIG. 2, and only the parts () and () in FIG. 2 that are necessary for the explanation are given the reference numerals. In the method shown in FIG. 2, after the ion exchange resin (hereinafter simply referred to as resin) is transferred to the regeneration tower 1,
Open the valve 11 of the pipe 7 and the valve 13 of the pipe 9, pressurize the air A from the pipe 9, and drain the water through the pipe 7 until the water surface reaches the position L1 at the top of the resin layer 2 (Fig. 2). Then, valve 11 and valve 13 are closed, and valve 12 is closed.
and open the valve 14 to allow the pipe 10 to pass through the upper water collection device 6.
After scrubbing the resin by introducing air A' into the lower part of the resin layer from the lower water collection device 5 through the pipe 8 while exhausting air from the pipe 8 (Fig. 2), the valve 12 is closed and the valve 1
1 is opened and backwash water B flows from pipe 7 through the lower water collection device.
is introduced into the lower part of the resin layer, and the resin is backwashed while the backwash wastewater is discharged from the pipe 10 via the upper water collection device 6 (FIG. 2). In this method, the above steps (draining - air scrubbing - backwashing) are repeated about three times to increase the crud removal rate. In this method, (1) there is a limit to the flow rate of backwash water (maximum 15 m/h), and the time required to separate (discharge) the crud is long because the backwash water is discharged from the water collection device at the top of the regeneration tower; (2) Due to the limited flow rate of backwash water, it is difficult for heavy crud to be transported to the top of the tower, and (3) After backwashing, air scrubbing is performed again, so water must be drained. There are disadvantages such as increased amount of waste liquid. FIG. 3 is a schematic diagram illustrating an improved method for removing heavy crud;
The apparatus itself and the symbols are the same as those shown in FIG. 2, and only the symbols necessary to explain this improved method have been written. In Figure 3, () is the drain process, () is the air scrubbing process, ()
indicates a rapid draining process, and () indicates a water filling process. In Fig. 3, the draining process in parentheses is the same as that explained in Fig. 2, but after performing air scrubbing for a certain period of time in the air scrubbing process in parentheses, the resin layer is formed by air A introduced from the bottom. During the development, the valves 12 and 14 are closed, and at the same time, the introduction of air A' from the pipe 8 to the resin layer 3 is stopped.
By rapidly opening the valves 11 and 13, air A is forced into the pipe 9 and drained all at once through the pipe 7 (rapid drain step in Fig. 3). Then, after closing the valve 11 and opening the valves 13 and 14 to replenish water from the pipe 10 to the height of L1 (water filling step in FIG. 3), the process returns to the air scrubbing step. Although this method is effective in removing heavy crud, the amount of drainage per operation is small (only the difference between L 1 and L 0 in Figure 3 can be drained), and therefore air scrubbing, rapid draining, and water filling ( ) to () steps 10 to 30
The process is complicated as it needs to be repeated several times. Figure 4 is for explaining a method that improves the method shown in Figure 2 and drains water from an intermediate water collection device after backwashing. Reference numerals 1 to 14 are the same as those in Figure 2. They have the same meaning, 15 is an intermediate water collection device, 16 is its piping, 17 is a valve, () is a drain process, () is an air scrubbing process,
() indicates the backwashing process, and () indicates the draining process from the intermediate water collection device. In the method shown in FIG. 4, the drain step () and the air scrubbing step () are the same as the method shown in FIG. After introducing the water to the height of L2 , valves 11 and 14 are closed, valves 13 and 17 are opened, and air is forced in from pipe 9, and the backwash water existing above is transferred from the intermediate water collection device to the intermediate water collection device 15 and The water is drained from a drain pipe 16. Although this method requires less time and waste liquid to separate the crud than the method shown in FIG. 2, the removal of heavy crud is not as sufficient as the method shown in FIG. [Object of the invention] The object of the present invention is to improve the drawbacks of the above conventional method,
It is an object of the present invention to provide a method for separating heavy crusts which requires a short separation time and produces a small amount of waste liquid. [Structure of the Invention] The present invention provides a method of scrubbing while simultaneously introducing air and water from the lower part of the packed bed, and (1) passing through the filler provided on the surface layer of the packed bed that is expanded by the scrubbing. (2) discharging water from an intermediate water collection device having a structure that allows only suspended matter and finely divided filler to pass through without letting the water pass through the intermediate water collection device, and exhausting air from the upper part of the intermediate water collection device; This is a method for removing suspended matter and finely divided filler from a packed bed, which is characterized by repeatedly carrying out both the steps of draining water from the device and exhausting the device. In order to improve the drawbacks of the conventional method as described above, the present inventors have developed a method that is effective even for heavy crusts with large particle sizes, that is, crusts that have a high sedimentation rate, and that requires a short separation time and is effective for waste liquid. The present invention was developed as a result of intensive research into a method for removing crud that requires only a small amount of crud. The method of the present invention will be explained based on FIG. In FIG. 1, the same symbols as those shown in FIG. 4 have the same meaning, and S indicates sluicing water introduced together with air A'. In the drain step shown in parentheses in FIG. 1, water is drained to the level (L 1 ) of the intermediate water collection device 15. The air-water scrubbing steps () and () of the present invention are then repeated. The present invention
Its basic feature is to simultaneously introduce air A' and sluicing water S from the lower water collection device 5 while discharging the air and/or water from the intermediate water collection device 15 through the valve 17 and pipe 16. Heavy crud with a high velocity is conveyed from the lower part of the resin layer to the intermediate water collecting device 15 by the upward flow of air A' and sluicing water S at high velocity, and is removed through the pipe 16. Air-water scrubbing process () shown in Figure 1
In this case, valves 14 and 17 are open, and drainage is carried out from the intermediate water collection device 15 through pipe 16. Since valve 14 is open, exhaust is not carried out from pipe 16, but is discharged from the upper part of the tower. This is done via tube 10. In the air-water scrubbing step (), the valve 14 is closed and the valve 17 is opened, so that exhaust is not carried out from the upper part of the tower, and the flow of water and air is concentrated in the intermediate water collection device 15, and the pipes are 16 and are simultaneously discharged out of the system. In normal backwashing using only water, when draining water from the intermediate water collection device 15, it becomes difficult to drain the resin deposited on the intermediate water collection device. However, in the case of the process (2) of the present invention, in which water and air are simultaneously introduced for scrubbing, the resin layer, especially its surface layer, is shaken violently, so even if the resin is deposited in the intermediate water collection device, the deposited As the resin layer breaks down easily and the "surface" of the intermediate water collection device for drainage and exhaust is constantly renewed, it was confirmed through experiments that there was no problem in draining the crud. The flow rate of air A' from the lower water collection device may be LV50 to 100 m/hour, which is normally used for air scrubbing, and the flow rate of sluicing water S is usually backwash water B.
Slightly smaller than the LV6~15m/hour used in
LV4-10m/hour is preferred. In the method of the present invention, the transport and removal of crud is carried out not only by sluicing water S but also by air, and the flow rate of sluicing water S does not need to be as high as that of conventional backwash water B. . In the present invention, the air-water scrubbing steps () and () are performed alternately, and it is preferable to perform the step () for a long time as shown in the example below. Air-water scrubbing process (): 1 to 5 minutes 〃 (): 0.5 to 2 minutes As an example, the intermediate water collection device 15 has a slit width
It was confirmed that steps () and () could be carried out smoothly by using a wire screen of 200 to 400 μm and making the opening area of the screen sufficiently large. Step () is open to the atmosphere, and the position of the resin surface layer during scrubbing is maintained at position a near the top surface of the intermediate water collecting device 15 as shown in FIG. The surface is constantly updated. Since this is open to the atmosphere and there is some resistance on the surface of the intermediate water collection device during drainage, the position of the resin surface layer is as shown in FIG. 5a. On the other hand, in step (), the valve 14 is closed and exhaust is also performed from the pipe 16, so the inside of the tower is pressurized, and the position of the resin surface layer during scrubbing is at the intermediate water collection device 15 as shown in position b in Fig. 5. It will be below the center of the pipe. In the present invention, step () alone is sufficient to perform (1) peeling off the crud from the resin, and (2) transporting the crud to the intermediate water collecting device 15, among the crud removal actions. However, for another important function, the discharge function from the intermediate water collecting device 15, step () alone is not sufficient. As an example, the wire screen used in the present invention is as shown in FIG. 6, and the crud or fine resin smaller than the width of the slit 18 passes smoothly through the slit and is discharged. Also, if the material is sufficiently larger than the width of the slit 18, it will be fluidized without blocking the slit surface due to the agitation effect during scrubbing. However, the cladding or fine resin having a size close to the slit width gets caught in the slit, which is the discharge surface, and is difficult to be discharged, and also blocks the discharge surface. Therefore, if step () is carried out for a long time, the surface layer of the resin during scrubbing gradually rises beyond position a shown in FIG. Process () solves these drawbacks of Process (). In step (), drainage and exhaust are carried out only through the pipe 16, and the inside of the column is pressurized to 1 to 2 Kgf/cm 2 to form fine cladding with a size close to the width of the slit that closes the slit 18 mentioned above. It has the effect of forcibly discharging the hardened resin by applying pressure. Since this discharge action is achieved in a very short time, it is sufficient to complete step () for about 0.5 to 2 minutes. In FIG. 6, an arrow 19 indicates the flow direction of the cladding or finely divided resin, water, and air, and the reference numeral 20
The rods forming the wire screen which is the intermediate water collection device 15 are triangular in shape or similar in shape as shown in FIG. Such a shape is effective for discharging crud and fine resin. Since the width of the slits 21 on the inside of the tube of the wire screen is larger than the width of the slits 18 on the outside of the tube, a cladding having a diameter close to the width of the slit 18 that is caught in the slit 18 on the outside of the tube and blocks the slit 18 in the above-mentioned step (2) is formed. , the forcible removal of the finely divided resin is carried out smoothly. As an example, a device having functions as shown in FIG. 6 is preferable for implementing the present invention. By eliminating step () and performing only step (), the position b of the resin surface layer will be below the center of the intermediate water collection device 15, as shown in Fig. 5, and the entire surface of the pipe of the intermediate water collection device will not be used for draining the crud. It's not a good idea because it won't happen. In this way, the present invention eliminates the drawbacks of performing only step () or only step ().
By repeating [Step ()→Step ()], it is possible to effectively remove crud and fine resin. Hereinafter, the present invention will be explained in detail based on FIG. First, the water level in the regeneration tower 1 is brought to the position (L 1 ) of the intermediate water collection device 15 through the drain step (). This operation is performed by opening the valves 13 and 17 and connecting the pipes 9 to 1 to 2.
This is done by injecting pressurized air A at kgf/cm 2 . In addition, the distance between the intermediate water collecting device 15 and the surface of the resin 2 should be set to a value of 15 to 30% of the height of the resin layer 2 so as to be suitable for the following steps () and (). is preferable. Then, the valve 13 is closed and air A' is introduced from the pipe 8.
The process moves on to step (2) in which sluicing water is introduced through the pipe 7, exhausted through the pipe 10, and drained through the pipe 16 via the intermediate water collecting device 15. The flow rates of air and sluicing water in step () are as follows. Air: LV50~120m/hour Pressure 1~2Kgf/ cm2 Slewing water: LV4~10m/hour Such operations can be carried out as part of the mixing operation in the mixed bed, or by the conventional method () shown in Figure 2. Before the scrubbing operation using only air in the process, sluicing water is sometimes introduced for a very short time at LV 2 to 3 m/hour, but the process () of the present invention applies these operations and The time is increased and the flow rate of the sluicing water is increased. If the resin layer is composed of a cationic resin with a high specific gravity, the sluicing water should be LV6~10m/
It is appropriate to set the air LV to 70 to 100 m/hour. In the case of anionic resins with low specific gravity, it is appropriate to set the LV of sluicing water to 4 to 8 m/hour and the LV of air to 70 to 100 m/hour. Step () may take about 2 to 5 minutes, but if the crud is strongly adhered to the resin, the conventional method shown in Figure 2 involves stopping the introduction of sluicing water S and introducing only air before step (). One idea is to perform the steps in parentheses. This is because when the introduction of sluicing water S is stopped, the amount of water in the resin layer 3 decreases, and the resin slurry concentration in the resin layer 3 increases, which increases the rubbing of the resins against each other and makes it easier for the crud to peel off. Next, move on to process (). By keeping the valve 17 open and closing the valve 14, the exhaust air is also routed through the intermediate water collecting device 15 to the pipe 1.
It will be held from 6 onwards. The set values for the flow rates of air A', sluicing water S, etc. may be the same as in step (). In this way, a pressure of 1 to 2 Kgf/cm 2 of air A' is applied to the inside of the regeneration tower 1, and the position of the surface layer of the resin layer 3 is lowered as shown by b in FIG. This process forcibly discharges the fine resin and the crud, which has a size close to the width of the slit 18 and is caught in the slit 18 and prevents drainage, and takes about 0.5 to 2 minutes, usually about 1 minute. good. Then, repeat [process () → process ()] again. The number of repetitions is approximately 5 to 15 times in the case of the setting values shown in Table 1 below.
【表】
本発明に用いる中間集水装置は第6図に示すよ
うなワイヤースクリーンタイプのものが好ましい
が同様な機能を有するものであれば何れを用いて
もよい。
つぎに実施例並びに比較例を示す。
比較例
火力発電所の通常運転時に連続30日間通水した
脱塩塔から1600φ×4000mmHのカチオン再生塔に
カチオン交換樹脂2600とアニオン交換樹脂1400
を移送し、アニオン交換樹脂をアニオン再生塔
に移送した後、カチオン交換樹脂はカチオン再生
塔で、アニオン交換樹脂はアニオン再生塔
(1200φ×2800mmH)で従来法に従つて次の条件で
クラツドの除去を行なつた。
従来法1(第2図に示す方法)
工程() 5分
工程() 空気LV100m/時 15分
工程() 逆洗水:
カチオン再生塔LV15m/時 30分
アニオン再生塔LV8m/時 30分
工程()()()の繰り返し回数4回
従来法2(第3図に示す方法)
工程() 5分
1回目 2回目以降
工程() 空気LV100m/時
15分 3分
工程() 2分 2分
工程() 3分 3分
工程()()()の繰り返し回数 15回
従来法3(第4図に示す方法)
工程() 5分
1回目 2回目以降
工程() 空気LV100m/時
15分 10分
工程() 逆洗水:
カチオン再生塔LV15m/時 6分 6分
アニオン再生塔LV8m/時 6分 6分
工程() 5分 5分
工程()、()、()の繰り返し回数 4回
以上の結果を表−2に示す。
実施例 1
比較例と同様に通常運転時に連続30日間通水し
た同一の脱塩塔の樹脂を用い、クラツド除去を行
つた。用いたカチオン再生塔、アニオン再生塔は
比較例と同一サイズである。塔内装品は本発明用
に改造した。
使用した中間集水装置は次のとおりであつた。
カチオン再生塔:300μmのスリツトを有するワ
イヤースクリーンスリツト開口面
積793m2
アニオン再生塔:300μmのスリツトを有するワ
イヤースクリーンスリツト開口面
積440m2
カチオン再生塔、アニオン再生塔共下記の条件
で工程()、()を行なつた。
工程()空気:LV100/時
スルージング水:LV8m/時 3
分
工程() 上に同じ 1分
結果を表−2に示す。
なお、表−3において、脱塩塔への移送時Fe
濃度とは、カチオン再生塔、アニオン再生塔でク
ラツドを除去し、両樹脂を再生した後、樹脂混合
槽で混合し、脱塩塔に移送する時の樹脂中に含ま
れる平均鉄濃度である。[Table] The intermediate water collection device used in the present invention is preferably a wire screen type as shown in FIG. 6, but any device having the same function may be used. Next, Examples and Comparative Examples will be shown. Comparative example: Cation exchange resin 2600 and anion exchange resin 1400 were transferred from a desalination tower through which water was passed for 30 consecutive days during normal operation of a thermal power plant to a 1600φ x 4000mm H cation regeneration tower.
After transferring the anion exchange resin to the anion regeneration tower, the cation exchange resin is used in the cation regeneration tower, and the anion exchange resin is used in the anion regeneration tower (1200 φ x 2800 mm H ) under the following conditions according to the conventional method. I did the removal. Conventional method 1 (method shown in Figure 2) Process () 5 minutes Process () Air LV 100 m/hour 15 minutes Process () Backwash water: Cation regeneration tower LV 15 m/hour 30 minutes Anion regeneration tower LV 8 m/hour 30 minutes Process ( ) () Repeat 4 times Conventional method 2 (method shown in Figure 3) Process () 5 minutes 1st time 2nd and subsequent times Process () Air LV100m/hour 15 minutes 3 minutes Process () 2 minutes 2 minutes Process () 3 minutes 3 minutes Number of repetitions of process () () () 15 times Conventional method 3 (method shown in Figure 4) Process () 5 minutes 1st time 2nd time onwards Process () Air LV100m/hour 15 minutes 10 minutes Process () Backwash water: Cation regeneration tower LV15m/hour 6 minutes 6 minutes Anion regeneration tower LV8m/hour 6 minutes 6 minutes Process () 5 minutes 5 minutes Number of repetitions of steps (), (), () 4 times or more The results are shown in Table-2. Example 1 Similar to the comparative example, crud removal was carried out using the same resin from the same demineralization tower through which water was passed for 30 consecutive days during normal operation. The cation regeneration tower and anion regeneration tower used were the same size as in the comparative example. The interior parts of the tower were modified for use in the present invention. The intermediate water collection device used was as follows. Cation regeneration tower: Wire screen slit opening area with 300 μm slits 793 m 2 Anion regeneration tower: Wire screen slit opening area with 300 μm slits 440 m 2 Both the cation regeneration tower and anion regeneration tower are processed under the following conditions (), (). Process () Air: LV100/hour Slewing water: LV8m/hour 3
Minutes Process () Same as above 1 minute The results are shown in Table-2. In addition, in Table 3, Fe
The concentration is the average iron concentration contained in the resin when the cladding is removed in the cation regeneration tower and the anion regeneration tower and both resins are regenerated, then mixed in the resin mixing tank and transferred to the desalination tower.
上記表−2からわかるように、本発明方法は従
来法に比し、洗浄時間、洗浄廃水量、使用空気量
のいずれにおいても優れており、産業に貢献する
ところ大である。
As can be seen from Table 2 above, the method of the present invention is superior to the conventional method in terms of cleaning time, amount of cleaning waste water, and amount of air used, making it a great contribution to industry.
第1図は本発明の工程を示す工程図、第2図、
第3図及び第4図は夫々異なる従来法を示す工程
図、第5図は、本発明で用いる中間集水装置にお
けるスクラビング時の樹脂表層の位置を示す図、
第6図は本発明で用いる中間集水装置の1例を示
す図である。
1…再生塔、2…樹脂層、5…下部集水装置、
6…上部集水装置、15…中間集水装置、A,
A′…空気、S…スルージング水。
FIG. 1 is a process diagram showing the steps of the present invention, FIG.
3 and 4 are process diagrams showing different conventional methods, and FIG. 5 is a diagram showing the position of the resin surface layer during scrubbing in the intermediate water collection device used in the present invention,
FIG. 6 is a diagram showing an example of an intermediate water collection device used in the present invention. 1... Regeneration tower, 2... Resin layer, 5... Lower water collection device,
6...Upper water collection device, 15...Intermediate water collection device, A,
A'...Air, S...Throughing water.
Claims (1)
ることにより充填層のスクラビングを行ないなが
ら(1)該スクラビングにより展開している充填層の
表層に設けられた充填材を通過させず、けん濁物
及び微細化した充填材のみを通過させる構造を有
する中間集水装置から排水を行ない、且つ該中間
集水装置の上部から排気を行なう工程と、(2)前記
中間集水装置から排水と排気を行なう工程との両
工程を繰り返し行なうことを特徴とする充填層中
のけん濁物及び微細化した充填材を除去する方
法。1 While scrubbing the packed bed by simultaneously introducing air and water from the bottom of the packed bed, (1) the scrubbing does not allow the filling material provided on the surface layer of the packed bed to pass through, and the suspension is a step of draining water from an intermediate water collection device having a structure that allows only substances and finely divided filler to pass through, and exhausting air from the upper part of the intermediate water collection device; (2) draining and exhausting from the intermediate water collection device; 1. A method for removing suspended matter and finely divided filler in a packed bed, the method comprising repeatedly carrying out both steps.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62017319A JPS63190631A (en) | 1987-01-29 | 1987-01-29 | Method for removing suspension of packed layer |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62017319A JPS63190631A (en) | 1987-01-29 | 1987-01-29 | Method for removing suspension of packed layer |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63190631A JPS63190631A (en) | 1988-08-08 |
| JPH0512978B2 true JPH0512978B2 (en) | 1993-02-19 |
Family
ID=11940704
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP62017319A Granted JPS63190631A (en) | 1987-01-29 | 1987-01-29 | Method for removing suspension of packed layer |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63190631A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2010016410A1 (en) * | 2008-08-08 | 2010-02-11 | オルガノ株式会社 | Composite filtration and desalination equipment |
-
1987
- 1987-01-29 JP JP62017319A patent/JPS63190631A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63190631A (en) | 1988-08-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3455819A (en) | Method for scrubbing ion exchange resins | |
| US2773829A (en) | Process and apparatus for subsurface washing | |
| DE2702972C3 (en) | Method for cleaning a filter bed | |
| JPS59500047A (en) | A method for purifying suspensions, in particular those resulting from processing steps in the wood processing industry. | |
| JPH0512978B2 (en) | ||
| JPH09215942A (en) | Ion exchange resin particle separation device and method | |
| JPH0659412B2 (en) | Separation and transfer method of ion exchange resin | |
| JPS595015B2 (en) | How to clean ion exchange resin | |
| US5269936A (en) | Process for treating ion exchange resin | |
| JPS58180239A (en) | Regeneration of ion exchange substance | |
| US4719010A (en) | Apparatus for rinsing a fixed bed ion exchanger | |
| US4219414A (en) | Method for fluid purification and deionization | |
| JPH0478344B2 (en) | ||
| JPS60132691A (en) | Removal of suspended substance in packed bed | |
| JPS59309A (en) | Method and apparatus for washing filter apparatus | |
| JPS5946105A (en) | Method and device for removing solid from liquid containing suspended solid | |
| JPH0957116A (en) | Countercurrent regeneration ion exchange device and its regeneration method | |
| JPS60114345A (en) | Washing method of ion exchange resin bed | |
| JPH0677687B2 (en) | Regeneration method of ion exchange resin | |
| JP3496280B2 (en) | Filtration device | |
| JPS6219898B2 (en) | ||
| JPS6059013B2 (en) | How to regenerate mixed ion exchange resin | |
| DE3205452C1 (en) | Device for in situ washing of a packing usable for biological waste water treatment | |
| JPS59199048A (en) | Regeneration of mixed bed ion exchange resin | |
| JPH0767533B2 (en) | Ion exchange resin cleaning device |