JPH0514168B2 JP31106986A JP31106986A JPH0514168B2 JP H0514168 B2 JPH0514168 B2 JP H0514168B2 JP 31106986 A JP31106986 A JP 31106986A JP 31106986 A JP31106986 A JP 31106986A JP H0514168 B2 JPH0514168 B2 JP H0514168B2
Authority
JP
Japan
Prior art keywords
flow rate
signal
cutoff
gas flow
shutoff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP31106986A
Other languages
Japanese (ja)
Other versions
JPS63172098A (en
Inventor
Hiroo Iwabuchi
Takashi Uno
Hiroaki Tanaka
Takayoshi Rachi
Yoshiki Yamazaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Panasonic Holdings Corp
Original Assignee
Tokyo Gas Co Ltd
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd, Matsushita Electric Industrial Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP61311069A priority Critical patent/JPS63172098A/en
Publication of JPS63172098A publication Critical patent/JPS63172098A/en
Publication of JPH0514168B2 publication Critical patent/JPH0514168B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Pipeline Systems (AREA)
  • Regulation And Control Of Combustion (AREA)
  • Feeding And Controlling Fuel (AREA)
  • Selective Calling Equipment (AREA)
  • Measuring Volume Flow (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 本発明は異常時にガス流路を自動的に遮断する
と共に遠隔制御によつてもガス流路を遮断できる
遮断機能付ガスメータ監視装置に関する。
DETAILED DESCRIPTION OF THE INVENTION Field of Industrial Application The present invention relates to a gas meter monitoring device with a shutoff function that can automatically shut off a gas flow path in the event of an abnormality and can also shut off the gas flow path by remote control.

従来の技術 従来、ガスメータの単位時間当りのガス流量の
状態を監視して流量の異常増加や器具の消し忘れ
(流量に変動のないまま長時間経過)等で異常と
評価した場合や、ガス供給事業者のセンタ(以下
単にセンタと記す)から通信回線を介して遮断指
令を発信した場合にガス流路を遮断するガス遮断
装置があり、異常流量で遮断した場合は使用者側
で遮断弁を復帰できる(異常が継続しているとき
は再度遮断される)が、災害時や空き家等のため
にセンタから強制的に遮断した場合にはセンタか
ら遮断解除指令が発信されない限り使用者側では
復帰できないかまたは復帰してもすぐに遮断する
ようにしたガス遮断装置がある。
Conventional technology Conventionally, when a gas meter monitors the gas flow rate per unit time and determines that there is an abnormality due to an abnormal increase in the flow rate or forgetting to turn off the appliance (a long period of time has passed without any fluctuation in the flow rate), There is a gas cutoff device that cuts off the gas flow path when a cutoff command is sent from the operator's center (hereinafter referred to simply as the center) via a communication line.If the gas flow path is cut off due to an abnormal flow rate, the user must operate the cutoff valve. It can be restored (it will be shut off again if the abnormality continues), but if it is forcibly shut off from the center due to a disaster or an empty house, the user will be unable to restore it unless the center issues a command to cancel the shutoff. There is a gas cutoff device that shuts off the gas immediately if it is not possible or even if it is restored.

発明が解決しようとする問題点 しかしながらこのような従来のガス遮断装置で
は、センタより遮断指令を発信した場合に、実際
に遮断したかどうかについてはセンタ側で確認す
ることができないため、何らかの障害が発生して
センタから遮断指令を発信したにもかかわらず実
際には遮断されていないことがあつてもセンタ側
でそれを知らずにそのまま遮断ができたものとし
て放置される恐れがあつた。
Problems to be Solved by the Invention However, with such conventional gas shut-off devices, when a shut-off command is issued from the center, it is impossible for the center to confirm whether the shut-off has actually occurred. Even if a problem occurs and a shutdown command is sent from the center, but the shutdown has not actually been performed, there is a risk that the center will not be aware of this and will continue to assume that the shutdown has been completed.

本発明はかかる従来の問題を解決するもので、
ガスメータの遮断の有無状態をセンタでも確認で
きるようにした装置を提供することを目的とす
る。
The present invention solves such conventional problems,
It is an object of the present invention to provide a device that allows a center to confirm whether or not a gas meter is shut off.

問題点を解決するための手段 上記問題点を解決するために本発明の遮断機能
付ガスメータ監視装置は、ガス流量の異常を判定
したときガス流路を遮断する遮断弁に遮断信号を
送出する遮断制御部と、遮断弁を開操作して復帰
したときの信号を入力して前記遮断制御部へ信号
を返す遮断弁復帰信号入力部と、前記遮断制御部
から遮断の有無状態を入力し遮断の有無信号を発
生する遮断有無信号発生部と、前記遮断有無信号
発生部からの遮断有無信号を通信回路に送出する
と共に通信回線からの遮断信号を前記遮断制御部
に送出する伝送インターフエイス部とから構成し
たものである。
Means for Solving the Problems In order to solve the above problems, the gas meter monitoring device with a shutoff function of the present invention provides a shutoff function that sends a shutoff signal to a shutoff valve that shuts off the gas flow path when an abnormality in the gas flow rate is determined. a control section, a shutoff valve return signal input section that inputs a signal when the shutoff valve is opened and returns to the shutoff control section and returns the signal to the shutoff control section; a cutoff presence/absence signal generating section that generates a presence/absence signal; and a transmission interface section that sends a cutoff signal from the cutoff presence/absence signal generation section to the communication circuit and a cutoff signal from the communication line to the cutoff control section. It is composed of

作 用 本発明は上記した構成によつて、ガス流量の異
常発生時やセンタから通信回線および伝送インタ
ーフエイス部を介して遮断信号が送出されてきた
ときには遮断制御部より遮断弁に遮断信号を送出
し、遮断弁復帰時には逆に遮断弁より遮断弁復帰
信号入力部を介して遮断制御部に信号が返される
から遮断制御部では常に遮断の有無状態を把握し
ており、遮断有無信号発生部および伝送インター
フエイス部を介して通信回線に遮断有無信号を送
出することができる。したがつて、センタ側では
センタから強制的に遮断させたときの実際の遮断
弁の動作状態を確認でき、万一遮断が実行されて
いなかつた場合には再度遮断指令を送出する等の
対処が可能となるものである。
According to the above-described configuration, the present invention allows the shutoff control section to send a shutoff signal to the shutoff valve when an abnormality occurs in the gas flow rate or when a shutoff signal is sent from the center via the communication line and transmission interface section. However, when the shutoff valve returns, a signal is returned from the shutoff valve to the shutoff control unit via the shutoff valve return signal input unit, so the shutoff control unit always knows whether there is a shutoff or not. A disconnection signal can be sent to the communication line via the transmission interface section. Therefore, the center side can check the actual operating state of the shutoff valve when it is forcibly shut off from the center, and if by any chance the shutoff is not executed, countermeasures such as sending a shutoff command again can be taken. It is possible.

実施例 以下、本発明の実施例を添付図面にもとづいて
説明する。
Embodiments Hereinafter, embodiments of the present invention will be described based on the accompanying drawings.

第1図において、1はガスメータから流量信号
を入力する流量センサ入力部、2は流量センサ入
入部1からの信号を入力して単位時間当りのガス
流量を算出する単位時間当りガス流量算出手段、
3は単位時間当りガス流量算出手段2が算出した
単位時間当りのガス流量の状態を監視して流量の
異常増加や同一流量での長時間経過(器具の消し
忘れ)等のガス流量の異常を判定するガス流量異
常判定部、4はガス流量異常判定部3がガス流量
の異常を判定したときガス流路を遮断する遮断弁
に遮断信号を送出する遮断制御部、5は遮断弁を
開操作して復帰したときの信号を入力して遮断制
御部4へ信号を返す遮断弁復帰信号入力部、6は
遮断制御部4から遮断の有無状態を入力し遮断の
有無信号を発生する遮断有無信号発生部、7は遮
断有無信号発生部6からの遮断有無信号を通信回
線に送出すると共にセンタ側から通信回線を介し
て送られてくる遮断信号を遮断制御部4に送出す
る伝送インターフエイス部で、遮断有無信号発生
部6からの遮断有無信号を通信用の電文に構成さ
せる電文構成部8とこの電文構成部8で構成され
た電文を通信回線へ送出させるための送信インタ
ーフエイス部9およびセンタ側から通信回線を介
して送られてくる電文形式の遮断信号を受信する
ための受信インターフエイス部10とその電文を
解読して遮断制御部4に遮断信号を送出する電文
解読部11で構成されている。
In FIG. 1, 1 is a flow rate sensor input section that inputs a flow rate signal from a gas meter; 2 is a gas flow rate calculation unit per unit time that inputs a signal from the flow sensor input section 1 and calculates a gas flow rate per unit time;
3 monitors the state of the gas flow rate per unit time calculated by the gas flow rate per unit time calculation means 2 to detect abnormalities in the gas flow rate such as an abnormal increase in the flow rate or a long period of time at the same flow rate (forgetting to turn off the appliance). A gas flow rate abnormality determining unit 4 determines that the gas flow rate is abnormal, a cutoff control unit 4 sends a cutoff signal to a cutoff valve that shuts off the gas flow path when the gas flow rate abnormality determination unit 3 determines that the gas flow rate is abnormal, and 5 operates to open the cutoff valve. A shutoff valve return signal input section inputs a signal when the circuit returns to normal and returns the signal to the shutoff control section 4, and 6 is a shutoff presence/absence signal that inputs the state of shutoff from the shutoff control section 4 and generates a shutoff presence/absence signal. The generation unit 7 is a transmission interface unit that sends the shutdown signal from the shutdown signal generation unit 6 to the communication line, and also sends the shutdown signal sent from the center side via the communication line to the shutdown control unit 4. , a message composing section 8 that configures the interruption/non-existence signal from the interruption/presence signal generation section 6 into a message for communication, a transmission interface section 9 and a center for transmitting the message constituted by the message composing section 8 to a communication line. It is composed of a reception interface section 10 for receiving a cutoff signal in the form of a message sent from the side via a communication line, and a message decoding section 11 for decoding the message and sending a cutoff signal to the cutoff control section 4. ing.

上記構成において、ガスメータからの流量信号
は流量センサ入力部1を介して単位時間当りガス
流量算出手段2に入力され単位時間当りのガス流
量が算出される。そしてガス流量異常判定部3で
はこの算出された単位時間当りのガス流量の値そ
のものやその時間的経過を監視して異常に大きな
流量や流量の異常増加、あるいは同一流量での長
時間経過等があつた場合には異常と判断して遮断
制御部4を介して遮断弁に遮断信号を送出しガス
流路を遮断する。また、大地震・火災等の緊急事
態が発生した場合や空き家等でガスが使用されて
いない場合などにはセンタから通信回線を介して
電文形式の遮断信号を送出することができ、この
遮断信号は受信インターフエイス部10を介して
電文解読部11で解読され、さらに遮断制御部4
を介して遮断弁に送出されてガス流路を遮断す
る。さらに、ガスメータ側で遮断弁を開操作して
復帰するとその復帰信号が遮断弁復帰信号入力部
5を介して遮断制御部4に入力されるが、ガス流
量の異常で遮断した場合はそのまま復帰が受け付
けられ(但し、異常が継続しているときは遮断制
御部4から再度遮断弁に遮断信号が送出される)、
センタから通信回線を介して遮断した場合は遮断
制御部4でこのことを記憶していて復帰信号が入
力されると再度遮断信号が送出される(復帰は無
効となる)。遮断制御部4で記憶されているセン
タからの遮断指令はセンタから遮断解除指令があ
ればその記憶が解除される(メータ側での復帰が
可能となる)。したがつて、遮断弁の状態は常に
遮断制御部4で把握されていて、これを遮断有無
信号発生部6に送つて遮断有無信号を発生させ、
さらに電文構成部8で電文に構成して送信インタ
ーフエイス部9および通信回線を介してセンタに
送出することができる。
In the above configuration, the flow rate signal from the gas meter is inputted to the gas flow rate per unit time calculation means 2 via the flow rate sensor input section 1, and the gas flow rate per unit time is calculated. Then, the gas flow rate abnormality determination unit 3 monitors the value of the calculated gas flow rate per unit time and its time course, and detects abnormally large flow rates, abnormal increases in flow rates, or long-time elapsed at the same flow rate. If this happens, it is determined that there is an abnormality and a shutoff signal is sent to the shutoff valve via the shutoff control unit 4 to shut off the gas flow path. In addition, in the event of an emergency such as a major earthquake or fire, or when gas is not being used in a vacant house, etc., the center can send a telegraphic cutoff signal via a communication line. is decoded by the message decoding unit 11 via the reception interface unit 10, and then sent to the cutoff control unit 4.
is sent to the shutoff valve via the gas flow path to shut off the gas flow path. Furthermore, when the shutoff valve is reset by opening the shutoff valve on the gas meter side, the return signal is input to the shutoff control section 4 via the shutoff valve return signal input section 5, but if the shutoff is due to an abnormality in the gas flow rate, the return is not performed as is. is accepted (however, if the abnormality continues, the shutoff signal is sent from the shutoff control unit 4 to the shutoff valve again),
When the power is cut off from the center via the communication line, the cutoff control unit 4 remembers this and sends out the cutoff signal again when a return signal is input (the return becomes invalid). The cutoff command from the center stored in the cutoff control unit 4 is cleared if there is a cutoff release command from the center (return can be made on the meter side). Therefore, the state of the shutoff valve is always grasped by the shutoff control section 4, and this is sent to the shutoff presence/absence signal generation section 6 to generate a shutoff presence/absence signal.
Furthermore, the message can be configured into a message by the message composition section 8 and sent to the center via the transmission interface section 9 and the communication line.

このように本実施例によれば、遮断弁の遮断有
無状態をセンタ側でいつでも監視できるようにな
つているので、センタより遮断指令を与えた場合
には実際に遮断弁が動作したかどうかについての
確認ができ、万一電話回線やその他途中の経路で
何らかの障害が発生して実際に遮断されないよう
なことがあつても再度遮断指令を送出する等の処
置がとれ、少なくとも遮断されていないのを知ら
ずにそのまま放置するような事態は避けることが
できる。
In this way, according to this embodiment, the center side can monitor the shutoff status of the shutoff valve at any time, so when a shutoff command is given from the center, it is possible to check whether the shutoff valve has actually operated or not. In the unlikely event that a failure occurs in the telephone line or other route and the line is not actually cut off, you can take measures such as sending a cut-off command again, and at least make sure that the line is not cut off. It is possible to avoid situations where you leave things as they are without knowing about them.

次に本発明の他の実施例を第2図を用いて説明
する。第2図において前記実施例と相違する点は
流量センサ入力部1からの信号を入力してガス流
量の積算値を算出・記憶するガス流量積算値算
出・記憶手段12を設け、このガス流量積算値算
出・記憶手段12が記憶しているガス流量積算値
を電文構成部8へ入力させる構成としたことにあ
り、この構成によればガス流量積算値も電文構成
部8で通信用の電文に構成し送信インターフエイ
ス部9を介して通信回線へ送出することができる
から、ガス遮断監視機能と遠隔検針機能の両機能
を流量センサ入力部1や伝送インターフエイス部
7が共用できるなどにより経済的なシステム構成
で達成することができる。
Next, another embodiment of the present invention will be described using FIG. 2. The difference in FIG. 2 from the embodiment described above is that a gas flow rate integrated value calculation/storage means 12 is provided which inputs the signal from the flow rate sensor input section 1 and calculates and stores the integrated value of the gas flow rate. The integrated gas flow rate value stored in the value calculation/storage means 12 is configured to be input into the message composition section 8. According to this structure, the integrated gas flow rate value is also input into the message composition section 8 for communication. Since it can be configured and sent to the communication line via the transmission interface section 9, it is economical because both the gas cutoff monitoring function and the remote meter reading function can be shared by the flow rate sensor input section 1 and the transmission interface section 7. This can be achieved with a simple system configuration.

なお、第2図において、第1図と同一のブロツ
クには第一番号を付している。
In FIG. 2, blocks that are the same as those in FIG. 1 are given the first number.

発明の効果 以上のように本発明の遮断機能付ガスメータ監
視装置によれば次の効果が得られる。
Effects of the Invention As described above, the gas meter monitoring device with a shutoff function of the present invention provides the following effects.

遮断弁の開閉状態を伝送インターフエイス部を
介して通信回線へ送出できるので、センタ側から
遮断指令を与えたときに遮断弁の動作状態を確認
でき、より確実な遮断制御を行うことができるよ
うになる。
Since the open/close status of the shutoff valve can be sent to the communication line via the transmission interface, the operating status of the shutoff valve can be confirmed when a shutoff command is given from the center side, making it possible to perform more reliable shutoff control. become.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明の第1の実施例における遮断機
能付ガスメータ監視装置のブロツク図、第2図は
本発明の他の実施例における遮断機能付ガスメー
タ監視装置のブロツク図である。 1……流量センサ入力部、2……単位時間当り
ガス流量算出手段、3……ガス流量異常判定部、
4……遮断制御部、5……遮断弁復帰信号入力
部、6……遮断有無信号発生部、7……伝送イン
ターフエイス部。
FIG. 1 is a block diagram of a gas meter monitoring device with a shutoff function according to a first embodiment of the present invention, and FIG. 2 is a block diagram of a gas meter monitoring device with a shutoff function according to another embodiment of the present invention. 1...Flow rate sensor input section, 2...Gas flow rate calculation means per unit time, 3...Gas flow rate abnormality determination section,
4... Shutoff control section, 5... Shutoff valve return signal input section, 6... Shutoff presence/absence signal generation section, 7... Transmission interface section.

Claims (1)

【特許請求の範囲】[Claims] 1 ガスメータから流量信号を入力する流量セン
サ入力部と、前記流量センサ入力部からの信号を
入力して単位時間当りのガス流量を算出する単位
時間当りガス流量算出手段と、前記単位時間当り
ガス流量算出手段が算出した単位時間当りのガス
流量の状態を監視しガス流量の異常を判定するガ
ス流量異常判定部と、前記ガス流量異常判定部が
ガス流量の異常を判定したときガス流量を遮断す
る遮断弁に遮断信号を送出する遮断制御部と、前
記遮断弁を開操作して復帰したときの信号を入力
して前記遮断制御部へ信号を返す遮断弁復帰信号
入力部と、前記遮断制御部から遮断の有無状態を
入力し遮断の有無信号を発生する遮断有無信号発
生部と、前記遮断有無信号発生部からの遮断有無
信号を通信回線に送出すると共に通信回線からの
遮断信号を前記遮断制御部に送出する伝送インタ
ーフエイス部とからなる遮断機能付ガスメータ監
視装置。
1. A flow rate sensor input section that inputs a flow rate signal from a gas meter, a gas flow rate calculation unit per unit time that calculates a gas flow rate per unit time by inputting a signal from the flow rate sensor input section, and a gas flow rate abnormality determination unit that monitors the state of the gas flow rate per unit time calculated by the calculation means and determines whether the gas flow rate is abnormal; and a gas flow rate abnormality determination unit that shuts off the gas flow rate when the gas flow rate abnormality determination unit determines that the gas flow rate is abnormal. a shutoff control section that sends a shutoff signal to the shutoff valve; a shutoff valve return signal input section that inputs a signal when the shutoff valve is opened and returned and returns the signal to the shutoff control section; and the shutoff control section a cutoff presence/absence signal generation section that inputs a cutoff presence/absence status from a block and generates a cutoff presence/absence signal; and a cutoff presence/absence signal generation section that sends a cutoff presence/absence signal from the cutoff presence/absence signal generation section to a communication line, and transmits a cutoff signal from the communication line to the cutoff control; A gas meter monitoring device with a cutoff function, consisting of a transmission interface section that sends data to the gas meter.
JP61311069A 1986-12-29 1986-12-29 Gas meter monitoring device with cut-off function Granted JPS63172098A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61311069A JPS63172098A (en) 1986-12-29 1986-12-29 Gas meter monitoring device with cut-off function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61311069A JPS63172098A (en) 1986-12-29 1986-12-29 Gas meter monitoring device with cut-off function

Publications (2)

Publication Number Publication Date
JPS63172098A JPS63172098A (en) 1988-07-15
JPH0514168B2 true JPH0514168B2 (en) 1993-02-24

Family

ID=18012739

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61311069A Granted JPS63172098A (en) 1986-12-29 1986-12-29 Gas meter monitoring device with cut-off function

Country Status (1)

Country Link
JP (1) JPS63172098A (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2785459B2 (en) * 1990-07-18 1998-08-13 松下電器産業株式会社 Gas supply equipment abnormality detector
JP3773955B2 (en) * 1995-05-19 2006-05-10 松下電器産業株式会社 Gas safety management system

Also Published As

Publication number Publication date
JPS63172098A (en) 1988-07-15

Similar Documents

Publication Publication Date Title
JPWO1996036853A1 (en) Gas Safety Management System
KR102443058B1 (en) gas monitoring system
JPH0514168B2 (en)
US7436291B2 (en) Protection of devices in a redundant configuration
JPH0514167B2 (en)
JP5005425B2 (en) Control device return system
JP4679334B2 (en) Wide area alarm monitoring system
JP2006163681A (en) Abnormal response method and program
JP7226733B2 (en) SECURITY CENTER AND CONTROL METHOD OF SECURITY CENTER
KR20180093496A (en) Fire fighting system and control method for duplicating fire detection
JPS61239762A (en) Remote supervisory equipment
JPH098929A (en) Tele control system
JP7675327B2 (en) Security devices and systems
KR20030063847A (en) Duplex control apparatus for micro control of diesel dispersion control system remote terminal equipment
KR20060115513A (en) HDL terminal with power monitoring method and power monitoring function
JP2017220851A (en) Computer
JPH10271042A (en) Switching method of radio
JPH0678961B2 (en) Gas leak inspection system
JPS5912657A (en) Transmission line protecting system of multidrop type information transmission system
JPS6312602Y2 (en)
JP2025123586A (en) Data diode and pulse control method
JPH0520027Y2 (en)
KR20210106727A (en) Apparatus and system for monitoring of fire alarm control panel
JPS63197197A (en) Load control system
JPH08106367A (en) Data display device

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term