Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0518979B2 - - Google Patents
[go: Go Back, main page]

JPH0518979B2 - - Google Patents

Info

Publication number
JPH0518979B2
JPH0518979B2 JP62074508A JP7450887A JPH0518979B2 JP H0518979 B2 JPH0518979 B2 JP H0518979B2 JP 62074508 A JP62074508 A JP 62074508A JP 7450887 A JP7450887 A JP 7450887A JP H0518979 B2 JPH0518979 B2 JP H0518979B2
Authority
JP
Japan
Prior art keywords
column
steel
columns
beams
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62074508A
Other languages
Japanese (ja)
Other versions
JPS63241234A (en
Inventor
Hiroyoshi Nakahata
Kazutoshi Kikukawa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Construction Co Ltd
Original Assignee
Mitsubishi Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Construction Co Ltd filed Critical Mitsubishi Construction Co Ltd
Priority to JP7450887A priority Critical patent/JPS63241234A/en
Publication of JPS63241234A publication Critical patent/JPS63241234A/en
Publication of JPH0518979B2 publication Critical patent/JPH0518979B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は鉄骨鉄筋コンクリート構造における柱
梁の仕口構法に係るものである。
DETAILED DESCRIPTION OF THE INVENTION (Field of Industrial Application) The present invention relates to a column-beam joint construction method in a steel reinforced concrete structure.

(従来の技術) 従来の鉄骨鉄筋コンクリート構造においては、
鉄骨柱間に鉄骨梁を接合し、鉄骨柱の外周、及び
鉄骨梁の全長に亘つて夫々柱鉄筋並に梁鉄筋を配
筋したのち、柱コンクリート及び梁コンクリート
を打設していた。
(Conventional technology) In conventional steel reinforced concrete structures,
After joining steel beams between steel columns and placing column and beam reinforcement around the outer periphery of the steel columns and along the entire length of the steel beams, column concrete and beam concrete were poured.

(発明が解決しようとする問題点) このように前記従来の工法では柱、梁共にコン
クリートが打設されるので、構造物の重量が重く
なり、基礎の設計上不利になり、またコンクリー
ト、鉄筋、型枠等の資材量が大で多大の手間を要
し、コストが嵩むという問題点があつた。
(Problems to be Solved by the Invention) As described above, in the conventional construction method, concrete is poured for both columns and beams, which increases the weight of the structure, which is disadvantageous in terms of foundation design. However, there were problems in that the amount of materials such as formwork was large, requiring a lot of time and effort, and increasing costs.

(問題点を解決するための手段) 本発明はこのような問題点を解決するために提
案されたもので、相隣る鉄骨柱間にスタツドボル
トが植立されたH型鋼等鉄骨梁を接合したのち、
前記鉄骨柱の外周に柱鉄筋を配筋するとともに、
同鉄骨柱に接続する前記鉄骨梁の端部及び柱頭に
跨つて梁補強鉄筋を配設し、次いで柱及び梁端部
の型枠を組立て、柱下部並びに同梁端部と前記柱
頭部とに跨つてコンクリートを打設して、剛性の
高いキヤピタル部を構築するとともに、同キヤピ
タル部の自由端縁を柱梁の接合中心部よりスパン
の中央部側に偏倚して位置せしめることを特徴と
する柱梁の仕口構法に係るものである。
(Means for Solving the Problems) The present invention was proposed to solve the above problems, and is a method for joining steel beams such as H-beams with stud bolts installed between adjacent steel columns. After that,
Column reinforcing bars are arranged around the outer periphery of the steel column, and
Beam reinforcing reinforcing bars are installed across the end and the column head of the steel beam connected to the steel column, and then the formwork for the column and beam end is assembled, and the column bottom, the beam end, and the column head are assembled. A highly rigid capital section is constructed by pouring concrete across the span, and the free edge of the capital section is positioned offset toward the center of the span from the center of the joint between the columns and beams. This relates to the Shiguchi construction method for columns and beams.

(作用) このように本発明は所定位置に建込まれた鉄骨
柱間に、スタツドボルトが植立された鉄骨梁を接
合し、しかるのちに鉄骨柱外周に柱鉄筋を配筋
し、且つ梁外周にはその全長に亘つて補強鉄筋を
配筋することなく、鉄骨柱に接続する梁端部と柱
頭部とに跨つて補強鉄筋を配筋し、しかるのち同
補強鉄筋によつて補強された鉄骨梁端部と柱頭部
とに跨つてコンクリートを打設することによつ
て、剛性の高いキヤピタル部を構築するものであ
る。
(Function) In this way, the present invention connects steel beams with stud bolts between steel columns erected at predetermined positions, and then arranges column reinforcing bars around the outer periphery of the steel columns. Instead of arranging reinforcing reinforcing bars along the entire length of the outer periphery, reinforcing reinforcing bars were arranged across the end of the beam that connects to the steel column and the column head, and then reinforced with the reinforcing reinforcing bars. A highly rigid capital section is constructed by pouring concrete across the ends of the steel beams and the column heads.

従つて前記鉄骨鉄筋コンクリート柱と鉄骨梁と
は剛性の高いキヤピタル部を介して一体に接合さ
れ、また鉄骨梁に植立されたスタツドボルトによ
つて剪断耐力が増大されることと相倹つて、柱梁
の応力伝達が確実に行なわれる。
Therefore, the steel reinforced concrete column and the steel beam are integrally connected through a highly rigid capital part, and the shear strength is increased by the stud bolts installed in the steel beam. Stress transmission through the beam is ensured.

また本発明においては柱梁接合部に剛性の高い
キヤピタル部を構成するとともに、同キヤピタル
部の自由端縁を柱、梁の接合中心部よりスパンの
中央部側に偏倚して位置せしめたことによつて架
構のイールドポイントが第2図に示すようにキヤ
ピタル部の自由端縁部x−xに位置し、鉄骨梁の
有効長さはその両端キヤピタル部間の長さlとな
り、従来の柱を鉄骨鉄筋コンクリート、梁を鉄骨
構造とした構造における鉄骨梁の有効長さLに比
して短かくなり、撓みが減少されるものである。
In addition, in the present invention, a highly rigid capital portion is constructed at the column-beam joint, and the free edge of the capital portion is positioned offset toward the center of the span from the center of the joint between the column and beam. Therefore, the yield point of the frame is located at the free end edge x-x of the capital section as shown in Figure 2, and the effective length of the steel beam is the length l between the capital sections at both ends, which is different from the conventional column. It is shorter than the effective length L of a steel beam in a structure where the beam is a steel frame reinforced concrete structure, and the deflection is reduced.

(発明の効果) このように本発明によれば鉄骨梁は鉄骨柱に接
続する端部のみ配筋、コンクリート打設が行なわ
れるので、従来の柱、梁とも鉄骨鉄筋コンクリー
ト造とした場合に比べて鉄骨梁中央部のコンクリ
ート、鉄筋、型枠等の資材量が節減され、手間が
省力化され、またコンクリート、鉄筋量の節減に
よつて建造物の重量が軽減され、基礎の設計上有
利になる。
(Effects of the Invention) According to the present invention, reinforcing and concrete pouring are performed only at the end of the steel beam that connects to the steel column, so compared to the conventional case where both the column and the beam are made of steel reinforced concrete. The amount of materials such as concrete, reinforcing bars, formwork, etc. in the center of the steel beam is reduced, saving labor and time.The reduction in the amount of concrete and reinforcing bars also reduces the weight of the building, which is advantageous in designing the foundation. .

更に本発明によれば剛性の高いキヤピタル部を
構成するとともに、同キヤピタル部の自由端縁を
柱梁の接合中心部よりスパン中央部側に偏倚して
位置せしめたことによつて、鉄骨梁の有効長さ
を、柱が鉄骨鉄筋コンクリート、梁が鉄骨梁より
構成された従来の架構における鉄骨梁の有効長さ
よりより短かくすることによつて、鉄骨梁の撓み
を減少せしめ、経済的な設計を可能ならしめるも
のである。
Furthermore, according to the present invention, a highly rigid capital section is constructed, and the free edge of the capital section is shifted toward the center of the span from the joint center of the column and beam. By making the effective length shorter than the effective length of the steel beams in conventional frames where the columns are made of steel reinforced concrete and the beams are made of steel beams, the deflection of the steel beams can be reduced and an economical design can be achieved. It makes it seem possible.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

所定位置に建込まれたH型鋼等の鉄骨柱A間
に、スタツドボルト1が植立されたH型鋼等の鉄
骨梁Bを接合し、(第1図参照)次いで鉄骨柱A
の外周に柱主筋2及び同柱主筋2を囲繞する帯筋
3を配筋するとともに、鉄骨梁Bの端部及び柱頭
部に跨つて梁上端筋4、梁下端筋4′及び両者を
囲繞する肋筋5を配筋し、(第2図参照)次いで
柱型枠6及び梁端部型枠7並に床型枠(図示せ
ず)を組立て、(第3図参照)次いで柱コンクリ
ート8及び梁端部コンクリート9並に床コンクリ
ート10を打設する。かくして構築された断面積
が大で剛性の高いキヤピタル部11を介して、柱
梁を一体に接合する。(第4図、第5図及び第6
図参照)なお図中Cは小梁である。
A steel beam B such as an H-shaped steel with stud bolts 1 is connected between the steel columns A such as an H-shaped steel built in a predetermined position (see Fig. 1).
The column main reinforcement 2 and the band reinforcement 3 surrounding the column main reinforcement 2 are arranged around the outer circumference of the column, and the beam top reinforcement 4, the beam bottom reinforcement 4', and both are surrounded over the end of the steel beam B and the column head. The reinforcing bars 5 are arranged (see Figure 2), then the column formwork 6, the beam end formwork 7, and the floor formwork (not shown) are assembled (see Figure 3), and then the column concrete 8 and Floor concrete 10 is poured along with beam end concrete 9. The columns and beams are integrally joined via the thus constructed capital portion 11 having a large cross-sectional area and high rigidity. (Figures 4, 5 and 6
(See figure) C in the figure is a small beam.

前記実施例によれば、鉄骨梁Bは鉄骨柱Aに接
続する端部のみに梁上端筋4、梁下端筋4′及び
肋筋5が配筋され、床コンクリート10が打設さ
れるので、鉄骨梁Bの中央部のコンクリート、鉄
筋、型枠等の資材量が節減され、手間が省力化さ
れ、またコンクリート、鉄筋量の節減によつて、
構造物の重量が軽減され、設計上有利になる。
According to the above embodiment, the beam top reinforcement 4, the beam bottom reinforcement 4', and the cost reinforcement 5 are arranged only at the end of the steel beam B connected to the steel column A, and the floor concrete 10 is placed. The amount of materials such as concrete, reinforcing bars, formwork, etc. in the center of steel beam B is reduced, labor is saved, and by reducing the amount of concrete and reinforcing bars,
The weight of the structure is reduced, which provides design advantages.

更に前記実施例によれば、鉄骨柱Aと鉄骨梁B
とが剛性の高いキヤピタル部11を介して一体に
接合され、鉄骨梁Bにスタツドボルト1が植立さ
れ、剪断耐力が向上されたことと相俟つて、柱梁
の応力の伝達が確実に行なわれ、また鉄骨梁Bの
有効長さについて、説明すると、前記キヤピタル
部の自由端縁を柱梁の接合中心部よりスパンの中
央部側に偏倚せしめることによつて、柱梁接合部
のイールドポイントが前記キヤピタル部の自由端
縁部x−xに移行し、鉄骨梁Bの有効長さが相対
するキヤピタル部11,11間の長さlとなり、
従来の前記柱を鉄骨鉄筋コンクリート梁を鉄骨構
造とした場合における鉄骨梁より短かくなり、撓
みが小さくなる。
Further, according to the embodiment, the steel column A and the steel beam B
The columns are integrally joined via the highly rigid capital section 11, and the stud bolts 1 are installed on the steel beam B, which improves shear strength and ensures reliable transmission of stress between the columns and beams. In addition, to explain the effective length of the steel beam B, by biasing the free edge of the capital section toward the center of the span from the center of the column-beam joint, the yield point of the column-beam joint can be increased. moves to the free end edge x-x of the capital section, and the effective length of the steel beam B becomes the length l between the opposing capital sections 11, 11,
The columns are shorter than conventional steel beams when the steel reinforced concrete beams are used as steel frame structures, and the deflection is reduced.

このように前記実施例によれば、従来よりも軽
量で、大スパンの架構が可能となつて、経済的に
も構造的にも有利な構造物を構築することができ
る。
As described above, according to the above embodiment, it is possible to construct a frame that is lighter in weight and has a larger span than the conventional structure, and it is possible to construct a structure that is advantageous both economically and structurally.

第7図及び第8図は本発明の他の実施例を示
し、キヤピタル部11を8角形の平面形状に構し
て、柱梁仕口部の剛性をより増大せしめるもので
ある。
FIGS. 7 and 8 show another embodiment of the present invention, in which the capital section 11 is arranged in an octagonal planar shape to further increase the rigidity of the column-beam joint.

図中前記実施例と均等部分には同一符号が附さ
れている。
In the figure, parts equivalent to those of the above embodiment are given the same reference numerals.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図乃至第4図は本発明に係る柱梁の仕口構
法の一実施例の工程を示す側面図、第5図は同施
工法によつて構成された柱梁の仕口部を示す平面
図、第6図は同仕口部を有する構造物の部分斜面
図、第7図は本発明に係る構法の他の実施例によ
つて構成された柱梁の仕口部の横断平面図、第8
図は同仕口部を有する構造物の部分斜面図であ
る。 A……鉄骨柱、B……鉄骨梁、1……スタツド
ボルト、2……柱主筋、3……帯筋、4……梁上
端筋、4′……梁下端筋、5……肋筋、6……柱
型枠、7……梁端部型枠、8……柱コンクリー
ト、9……梁端部コンクリート、11……キヤピ
タル部。
Figures 1 to 4 are side views showing the steps of an embodiment of the joint construction method for columns and beams according to the present invention, and Figure 5 shows the joint section of the columns and beams constructed by the same construction method. A plan view, FIG. 6 is a partial slope view of a structure having the same joint, and FIG. 7 is a cross-sectional plan view of the joint of a column and beam constructed according to another embodiment of the construction method according to the present invention. , 8th
The figure is a partial perspective view of a structure having the same joint section. A... Steel column, B... Steel beam, 1... Stud bolt, 2... Column main reinforcement, 3... Stir reins, 4... Beam top end reinforcement, 4'... Beam bottom end reinforcement, 5... Cost reinforcement , 6... Column formwork, 7... Beam end formwork, 8... Column concrete, 9... Beam end concrete, 11... Capital section.

Claims (1)

【特許請求の範囲】[Claims] 1 相隣る鉄骨柱間にスタツドボルトが植立され
たH型鋼等鉄骨梁を接合したのち、前記鉄骨柱の
外周に柱鉄筋を配筋するとともに、同鉄骨柱に接
続する前記鉄骨梁の端部及び柱頭に跨つて梁補強
鉄筋を配設し、次いで柱及び梁端部の型枠を組立
て、柱下部並びに同梁端部と前記柱頭部とに跨つ
てコンクリートを打設して剛性の高いキヤピタル
部を構築するとともに、同キヤピタル部の自由端
縁を柱梁の接合中心部よりスパンの中央部側に偏
倚して位置せしめることを特徴とする柱梁の仕口
構法。
1. After joining steel beams such as H-shaped steel with stud bolts installed between adjacent steel columns, column reinforcing bars are arranged around the outer periphery of the steel columns, and the ends of the steel beams connected to the steel columns are Beam reinforcing reinforcing bars are placed across the column and the column head, then the formwork for the column and beam end is assembled, and concrete is poured across the column bottom, the beam end, and the column head to ensure high rigidity. A column-beam joint construction method characterized by constructing a capital section and locating the free edge of the capital section toward the center of the span from the center of the joint between the columns and beams.
JP7450887A 1987-03-30 1987-03-30 Joint method of pillar and beam Granted JPS63241234A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP7450887A JPS63241234A (en) 1987-03-30 1987-03-30 Joint method of pillar and beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP7450887A JPS63241234A (en) 1987-03-30 1987-03-30 Joint method of pillar and beam

Publications (2)

Publication Number Publication Date
JPS63241234A JPS63241234A (en) 1988-10-06
JPH0518979B2 true JPH0518979B2 (en) 1993-03-15

Family

ID=13549334

Family Applications (1)

Application Number Title Priority Date Filing Date
JP7450887A Granted JPS63241234A (en) 1987-03-30 1987-03-30 Joint method of pillar and beam

Country Status (1)

Country Link
JP (1) JPS63241234A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57140450A (en) * 1981-02-25 1982-08-31 Kajima Corp Enclosure structure of construction

Also Published As

Publication number Publication date
JPS63241234A (en) 1988-10-06

Similar Documents

Publication Publication Date Title
JP4363747B2 (en) Method of joining PCa beam members at column beam joints and PCa beam members therefor
KR100648376B1 (en) Joining structure of assembled steel reinforcement concrete column and horizontal member and construction method
JPH0518979B2 (en)
JPH0348977B2 (en)
JP2955964B2 (en) Precast reinforced concrete beam-column jointing equipment
JP2522708B2 (en) Reinforcing bar tip assembly beam with formwork and reinforcing bar tip assembly method with formwork
JP2805668B2 (en) Precast reinforced concrete beam-column jointing equipment
JPH04181Y2 (en)
JP2637271B2 (en) Column / beam joint structure
JP3403228B2 (en) Composite structure of joint between reinforced concrete column and steel beam
JPH079921Y2 (en) Joint structure between reinforced concrete column and steel beam
JP3284391B2 (en) Reinforced concrete frame and construction method
JP2506294Y2 (en) Structure of column / beam connection
JPH0448136B2 (en)
JPH07119499B2 (en) Synthetic flash
JPH0746652Y2 (en) Precast Steel Reinforced Concrete Beam
JPH044091Y2 (en)
JP3433496B2 (en) Precast concrete girder
JPS6347201Y2 (en)
JPH0123614B2 (en)
JP2758203B2 (en) Connection method between columns and steel beams
JPH0518981B2 (en)
JP2518568Y2 (en) Connection structure of steel beams to concrete columns
JP2723011B2 (en) Construction method of steel frame reinforced concrete structure
JPS63241233A (en) Joint method of pillar and beam