JPH0518997B2 - - Google Patents
Info
- Publication number
- JPH0518997B2 JPH0518997B2 JP23928787A JP23928787A JPH0518997B2 JP H0518997 B2 JPH0518997 B2 JP H0518997B2 JP 23928787 A JP23928787 A JP 23928787A JP 23928787 A JP23928787 A JP 23928787A JP H0518997 B2 JPH0518997 B2 JP H0518997B2
- Authority
- JP
- Japan
- Prior art keywords
- tube
- pipe
- propulsion device
- feed
- shaft
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Chain Conveyers (AREA)
- Intermediate Stations On Conveyors (AREA)
- Specific Conveyance Elements (AREA)
- Feeding Of Articles To Conveyors (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Earth Drilling (AREA)
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は管の推進装置に係り、特に地中に挿入
すべき管、例えば電線並びに電話線埋設用鋼管、
水道管、ガス管等の小口経管を地中に埋設する
際、横孔を掘削する推進装置に管を自動的に供給
し、また、推進装置から管を自動的に回収する管
の自動供給・回収装置に関する。[Detailed Description of the Invention] [Field of Industrial Application] The present invention relates to a pipe propulsion device, and in particular to a pipe to be inserted underground, such as a steel pipe for burying electric wires and telephone lines.
When burying small-mouth pipes such as water pipes and gas pipes underground, the pipe is automatically supplied to the propulsion device that excavates the horizontal hole, and the pipe is automatically recovered from the propulsion device.・Regarding recovery equipment.
従来、横孔掘削用推進装置への管の供給及び推
進装置からの管の回収は立坑内の作業者により行
われるか推進装置を立坑上に引き上げて行われて
いた。例えば、特開昭61−17690号公報では管を
立坑上で連結する方法が開示されている。この方
法は、まず、管を地中に押送後地上からの操作で
推進装置から管を離脱する。次に、推進装置を立
坑上に引き上げて新たな管を推進装置に取り付け
る。次いで、この推進装置を立坑内の所定の位置
まで降下させ、新たな管は埋設されている管と連
結され推進装置により地中に押送される。この操
作が繰返されて管の埋設が行われる。
Conventionally, the supply of pipes to the propulsion device for horizontal hole excavation and the recovery of the pipes from the propulsion device have been carried out by workers inside the shaft or by raising the propulsion device above the shaft. For example, Japanese Patent Application Laid-Open No. 17690/1983 discloses a method of connecting pipes on a shaft. In this method, the tube is first pushed underground and then removed from the propulsion device by an operation from the ground. Next, the propulsion device is pulled up the shaft and a new tube is attached to the propulsion device. Next, this propulsion device is lowered to a predetermined position within the shaft, and the new pipe is connected to the buried pipe and pushed underground by the propulsion device. This operation is repeated to bury the pipe.
前記管の供給または回収方法は、推進装置を立
坑上に引き上げてから推進装置に管を取り付けて
いる。また、管の回収も同様に、推進装置が立坑
に引き上げられてから推進装置と管とを離脱して
いる。この方法は狭い立坑内で推進装置と管との
取付け、離脱を行うことと比較すると立坑は推進
装置が入るだけのスペースでよく狭い場所でも小
さな立坑で済み、作業者が立坑内に入らなくても
よいので、経済性安全性にもすぐれている。しか
しながら、推進装置を立坑上に引き上げ、再度、
立坑内に降下させる必要があり作業効率が悪いと
いう問題がある。
The method for supplying or recovering the tube is to raise the propulsion device onto a shaft and then attach the tube to the propulsion device. Similarly, when recovering the tube, the propulsion device is pulled up into the shaft and then the propulsion device and the tube are separated. Compared to attaching and detaching the propulsion device and pipes in a narrow shaft, this method requires only enough space for the propulsion device to fit into the shaft, and a small shaft can be used even in a narrow space, and workers do not have to enter the shaft. It is also very economical and safe. However, the propulsion device was pulled up the shaft and again.
There is a problem that the work efficiency is low because it needs to be lowered into the shaft.
本発明はこのような事情に鑑みてなされたもの
で、推進装置を立坑内に配置した状態で管の供給
または回収を自動的に行う管の自動供給・回収装
置を提供することを目的としている。 The present invention has been made in view of the above circumstances, and an object of the present invention is to provide an automatic pipe supply/recovery device that automatically supplies or collects pipes with a propulsion device placed in a shaft. .
本発明に係る管の自動供給・回収装置は、前記
目的を達成するために、地中に管を押送する管の
推進装置に管を供給し、また、推進装置から管を
回収する管の自動供給・回収装置に於いて、ポス
トの上下端のスプロケツトを介してポストを周回
するチエーンに所定間隔で管の受け部が設けられ
た管の昇降部と、管の昇降部の下部位置の管の受
け渡し位置と推進装置のスピンドルの軸線位置と
の間で管を移送する管の搬送部と、から成ること
を特徴としている。
In order to achieve the above-mentioned object, the automatic pipe supply/recovery device according to the present invention supplies a pipe to a pipe propulsion device that pushes the pipe underground, and also provides an automatic pipe supply/recovery device that collects the pipe from the propulsion device. In the supply/recovery device, there is a tube elevating section in which tube receiving sections are provided at predetermined intervals on a chain that goes around the post via sprockets at the upper and lower ends of the post, and a tube elevating section at a lower position of the tube elevating section. It is characterized by comprising a tube conveying section that transfers the tube between the delivery position and the axial position of the spindle of the propulsion device.
横孔掘削時、まず、周知の推進装置を地上で遠
隔操作し管を地中に押送した後、推進装置の油圧
チヤツクで取り付けられた親ロツドを逆転させる
と共に後退させ、ネジ接続されているこの管と親
ロツドとを離脱する。更に、親ロツドはこの管と
親ロツドとの間に新たな管をセツトできる間隔が
生じるまで後退する。次に、管の自動供給・回収
装置を操作し、新たな管を下降させる。管の下降
は、管の搬送部のアームに設けられているクラン
プがこの推進管を把持することができる位置で停
止する。次いで、この位置に停止した管をクラン
プで把持し、アームを回動することにより、管は
地中に押送された管と推進装置の親ロツドとの間
にセツトされる。最後に親ロツドを正転させると
共に前進させることにより、地中に押送された
管、新たな管及び親ロツドは、一体的に連結され
新たな管は地中に押送される。
When drilling a horizontal hole, first, a well-known propulsion device is remotely operated on the ground to push the pipe into the ground, and then the hydraulic chuck of the propulsion device reverses and retreats the attached parent rod, and the screw-connected Separate the tube and parent rod. Furthermore, the parent rod is retracted until there is a gap between this tube and the parent rod that allows a new tube to be set. Next, operate the automatic tube supply/recovery device to lower a new tube. The descent of the tube is stopped at a position where the clamp provided on the arm of the tube conveyor can grip this propelling tube. Next, by gripping the tube stopped at this position with a clamp and rotating the arm, the tube is set between the tube that has been pushed underground and the parent rod of the propulsion device. Finally, by rotating the parent rod forward and moving it forward, the tube that was pushed underground, the new tube, and the parent rod are integrally connected, and the new tube is pushed underground.
また、管の回収時、まず推進装置の親ロツドを
油圧チヤツクから外し、押送された管を油圧チヤ
ツクで把持する。この油圧チヤツクを正転させる
と共に後退させることにより、管は地中から引き
抜かれる。引き抜かれた管はまだ埋設されている
管から離される。次に、管の搬送部のアームのク
ランプが、引き抜かれた管を把持できる位置まで
アームを回動する。クランプに把持された管は、
アームを回転部方向に回動することにより、受け
部に支持される。次いで、管の昇降部の回転駆動
源によりチエーンを上昇させることにより受け部
に支持された管は、上昇し竪坑上に運搬される。 When recovering the tube, the main rod of the propulsion device is first removed from the hydraulic chuck, and the pushed tube is gripped by the hydraulic chuck. By rotating this hydraulic chuck forward and backward, the pipe is pulled out of the ground. The withdrawn tube is separated from the tube that is still buried. Next, the clamp on the arm of the tube transport section rotates the arm to a position where it can grip the pulled tube. The tube held in the clamp is
By rotating the arm in the direction of the rotating section, the arm is supported by the receiving section. Next, by raising the chain by the rotational drive source of the tube elevating section, the tube supported by the receiving section is lifted and transported onto the shaft.
このように、本発明に管の自動供給・回収装置
は、推進装置を竪坑上に引き上げることなく管の
供給・回収を自動的に行うことができる。これに
より、作業効率の向上を図ることができる。 As described above, the automatic pipe supply/recovery device according to the present invention can automatically supply/recover pipes without raising the propulsion device above the shaft. Thereby, it is possible to improve work efficiency.
以下添付図面に従つて本発明に係る管の自動供
給・回収装置の好ましい実施例を詳説する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Preferred embodiments of the automatic pipe supply/recovery device according to the present invention will be described in detail below with reference to the accompanying drawings.
第1図及び第2図は本発明に係る管の自動供
給・回収装置が示されている。推進装置29は、
ベース64、ベース64に沿つて移動するフイー
ド54、フイード54に配設された油圧チヤツク
80を有している。更に、推進装置29は、油圧
チヤツク80に締めつけられた親ロツド68、ス
ピンドル82、スピンドル82に取り付けられた
ウオータスイベル78、ベース64の端部に設け
られた油圧ホルダ70を有している。また、竪坑
上にウオータスイベル78を経て高圧水を送るポ
ンプ76がタンク74の近傍に配設されている。
更に、推進装置29の後方に配置されたセオドラ
イトとカメラから成る管の偏位測定装置84が配
置され、竪坑上に偏位測定装置84とケーブルで
連結されているモニター86が配置されている。 1 and 2 show an automatic pipe supply/recovery device according to the present invention. The propulsion device 29 is
It has a base 64, a feed 54 that moves along the base 64, and a hydraulic chuck 80 disposed on the feed 54. Further, the propulsion device 29 includes a parent rod 68 fastened to a hydraulic chuck 80, a spindle 82, a water swivel 78 attached to the spindle 82, and a hydraulic holder 70 provided at the end of the base 64. Further, a pump 76 that sends high-pressure water onto the shaft through a water swivel 78 is arranged near the tank 74.
Further, a tube deflection measuring device 84 consisting of a theodolite and a camera is disposed behind the propulsion device 29, and a monitor 86 connected to the deflection measuring device 84 by a cable is disposed above the shaft.
これにより、推進装置29は、フイード54を
前進させると共にスピンドル82の正転により親
ロツド68を正転させ、管を地中に押送すること
ができる。また、掘削終了後、チヤツク80で地
中に押送された管を締めつけ、チヤツク80を正
転させると共にフイード54を後退させることに
より地中に押送された管を引き抜くことができ
る。 As a result, the propulsion device 29 can advance the feed 54 and rotate the parent rod 68 in the normal direction by normal rotation of the spindle 82, thereby pushing the pipe underground. Further, after the excavation is completed, the chuck 80 tightens the pipe that has been pushed underground, and by rotating the chuck 80 in the normal direction and retracting the feed 54, the pipe that has been pushed underground can be pulled out.
また、本発明の管の自動供給・回収装置10
は、管の昇降部6と管の搬送部8とに大別され
る。先ず昇降部6について説明すると、昇降部6
はポスト12の上下に平行に配置された回転自在
な一対のシヤフト14,14を有する。シヤフト
14はモータ15の回転がシヤフト14に伝達さ
れるように連結されている。4つのスプロケツト
16が一対のシヤフト14,14の両端部にシヤ
フトの軸線に対して直角に取り付けられている。
第1図に示すように、右側のスプロケツト16,
16に無端状のチエーン18が張設され、左側の
スプロケツト16,16にもチエーン18が張設
されている。2つのチエーン18,18には管2
0を支持する複数の受け部22がヒンジ24を介
して所定の間隔で取り付けられている。 Moreover, the automatic pipe supply/recovery device 10 of the present invention
is roughly divided into a tube lifting section 6 and a tube conveying section 8. First, the elevating section 6 will be explained.
has a pair of rotatable shafts 14, 14 arranged in parallel above and below the post 12. The shaft 14 is connected so that the rotation of the motor 15 is transmitted to the shaft 14. Four sprockets 16 are mounted at opposite ends of the pair of shafts 14, 14 at right angles to the axis of the shafts.
As shown in Figure 1, the right sprocket 16,
An endless chain 18 is stretched between the sprockets 16 and 16, and a chain 18 is also stretched between the sprockets 16 and 16 on the left side. The two chains 18, 18 have pipe 2
A plurality of receiving portions 22 supporting 0 are attached via hinges 24 at predetermined intervals.
これにより、第2図に示すように、スプロケツ
ト16を反時計方向に回転させると、チエーン1
8と共に受け部22は下降する。スプロケツト1
6を時計方向に回転させると、チエーン18と共
に受け部22は上昇する。 As a result, as shown in FIG. 2, when the sprocket 16 is rotated counterclockwise, the chain 1
8, the receiving portion 22 descends. Sprocket 1
6 is rotated clockwise, the receiving portion 22 rises together with the chain 18.
また、受け部22はヒンジ24を介してチエー
ン18に取り付けられている。これにより、受け
部22が推進装置に位置するとき、受け部22の
凹部は上方を向いている。また、受け部22が反
対側に位置するとき、受け部22の自重によりヒ
ンジ24はポスト12側に折畳まれる。 Further, the receiving portion 22 is attached to the chain 18 via a hinge 24. Thereby, when the receiving part 22 is located in the propulsion device, the recessed part of the receiving part 22 faces upward. Further, when the receiving portion 22 is located on the opposite side, the hinge 24 is folded toward the post 12 due to the weight of the receiving portion 22.
また、第1図に示すように左側のチエーン18
に取り付けられた受け部22の下部にロツド50
の一端部を取り付け、その他端部にプレート52
を取り付ける。プレート52に管20の一端を当
接することにより、管20をブラケツト22に支
持するとき、正確な位置に支持でき、また斜めに
管を配設する等管の自動送り装置10を傾けて配
置したとき、管20の落下を防止する。 Also, as shown in Figure 1, the left chain 18
A rod 50 is attached to the lower part of the receiving part 22 attached to the
Attach one end of the plate 52 to the other end.
Attach. By bringing one end of the tube 20 into contact with the plate 52, when the tube 20 is supported on the bracket 22, it can be supported in an accurate position, and the automatic tube feeding device 10 can be arranged at an angle. At this time, the tube 20 is prevented from falling.
次に搬送部8について説明する。第2、第3、
第4図に示すように、搬送部8のアーム26はそ
の下端部がピン28を介して推進装置29の下部
に枢支されている。アーム26を回転させるシリ
ンダ32は、シリンダ部がピン34を介してアー
ム26に枢支され、ロツド部がピン36を介して
推進装置29に枢支されることにより、アーム2
6と推進装置29の側部に取り付けられている。
アーム26の中央部にストツパ72が設けられて
いる。これにより、アーム26はピン28を支点
として回動され、ストツパ72と推進装置29の
側部とが干渉する位置で管20は親ロツド68と
同軸上に配置される。アーム26の上端部には管
20を把持するクランプ30が設けられている。
クランプ30は固定爪38と回動爪40とで構成
されている。回動爪40はピン42によりアーム
26の上端部に枢支されている。回動爪40を回
動させるシリンダ44は、シリンダ部がピン46
にアーム26の中央部に枢支され、ロツド部がピ
ン48により回動爪40に枢支されることによ
り、アーム26と回動爪40とに取り付けられて
いる。これにより、回動爪40はピン42を支点
として回動される。 Next, the transport section 8 will be explained. 2nd, 3rd,
As shown in FIG. 4, the lower end of the arm 26 of the transport section 8 is pivotally supported at the lower part of the propulsion device 29 via a pin 28. The cylinder 32 that rotates the arm 26 has a cylinder portion pivoted to the arm 26 via a pin 34 and a rod portion pivoted to the propulsion device 29 via the pin 36.
6 and the side of the propulsion device 29.
A stopper 72 is provided at the center of the arm 26. As a result, the arm 26 is rotated about the pin 28, and the tube 20 is placed coaxially with the parent rod 68 at a position where the stopper 72 and the side of the propulsion device 29 interfere. A clamp 30 for gripping the tube 20 is provided at the upper end of the arm 26.
The clamp 30 is composed of a fixed claw 38 and a rotating claw 40. The rotating pawl 40 is pivotally supported on the upper end of the arm 26 by a pin 42. The cylinder 44 that rotates the rotating claw 40 has a cylinder portion with a pin 46.
The rod portion is attached to the arm 26 and the rotating pawl 40 by being pivotally supported to the rotating pawl 40 by a pin 48. As a result, the rotating claw 40 is rotated about the pin 42 as a fulcrum.
また、推進管の自動送り装置10の昇降部6に
は図示しないセンサーが設けられている。このセ
ンサーは受け部22の管20をクランプ30に把
持できる位置、即ち、クランプ30の管20を受
け部22に移動できる位置を表示する。更に、推
進装置29のフイード54の適正な位置を検知す
る4つのリミツトスイツチ56,58,60,6
2が推進装置29のベース64に取り付けられて
いる。フイード54にはリミツトスイツチ56,
58,60,62を作動させるための突起66が
設けられている。リミツトスイツチ56は推進管
20の地中への押送の終了を、リミツトスイツチ
58は埋設された管20と推進装置29の親ロツ
ド68とが離脱された位置を示す。また、リミツ
トスイツチ60は管20と親ロツド68とが連結
された位置を、リミツトスイツチ62はフイード
54の後退が終了した位置を示す。 Further, a sensor (not shown) is provided in the elevating section 6 of the automatic propulsion tube feeding device 10. This sensor indicates the position of the receiving part 22 where the tube 20 can be gripped by the clamp 30, that is, the position of the clamp 30 where the pipe 20 can be moved to the receiving part 22. Furthermore, four limit switches 56, 58, 60, 6 detect the proper position of the feed 54 of the propulsion device 29.
2 is attached to the base 64 of the propulsion device 29. The feed 54 has a limit switch 56,
A protrusion 66 is provided for actuating 58, 60, 62. The limit switch 56 indicates the end of pushing the propulsion tube 20 underground, and the limit switch 58 indicates the position where the buried tube 20 and the parent rod 68 of the propulsion device 29 have been separated. Further, the limit switch 60 indicates the position where the tube 20 and the parent rod 68 are connected, and the limit switch 62 indicates the position where the feed 54 has finished retracting.
前記の如く構成された本発明による管の自動供
給・回収装置の作用を第5図及び第6図のフロー
チヤートに従つて説明する。 The operation of the automatic pipe supply/recovery apparatus according to the present invention constructed as described above will be explained with reference to the flowcharts of FIGS. 5 and 6.
掘削時、先ず、推進装置29を操作し、親ロツ
ド68と連結されている管20Aをリミツトスイ
ツチ56が作動するまで押送し、管20Aの後端
部を油圧ホルダ70で締め付ける。 During excavation, first, the propulsion device 29 is operated to push the pipe 20A connected to the parent rod 68 until the limit switch 56 is activated, and the rear end of the pipe 20A is tightened with the hydraulic holder 70.
次に、第5図のフローチヤートに示すように、
スピンドル82を逆転すると共にフイード54を
後退し(88)、リミツトスイツチ58が作動す
るまで後退させると、管20Aと親ロツド68と
の連結は離脱状態となる(90)。この位置で、
スピンドル80の回転を停止する(92)。更に、
フイード54を後退させ(94)リミツトスイツ
チ62が作動した時(96)、フイード54の後
退を終了する(98)。次に、管の自動供給・回
収装置10の管の昇降部6を操作し、受け部2
2,22に支持されている管20Bを降下させ
(100)、図示しないセンサーが作動した時(1
02)、管20Bの降下を停止する(104)。こ
の管20Bは、管の搬送部8の操作により、アー
ム26の上端部に設けられたクランプ30で把持
される(106)。クランプ30は、アーム26
の回動により推進装置29の方向へ移動され、ス
トツパ72により所定位置にセツトされる(10
8)。これにより、管20Bは親ロツド68と同
軸に配置される。次いで、スピンドル80を正転
させると共にフイード54をリミツトスイツチ6
0が作動するまで前進110させ、管20A,2
0B及び親ロツド68を連結させる(112)。
この連結後、クランプ30の回動爪40を開き管
20Bの把持を開放する(114)。クランプ3
0はアーム26の回動により自動供給・回収装置
10の受け部22,22に支持されている新たな
管20を把持する位置に再度配置される(11
6)。次に、ポンプ76を作動し(118)、タン
ク74からウオータスイべル78を経て管20
A,20Bへ送水する。次いで、油圧ホルダ70
による管20Aの締め付けを解除し(120)、
親ロツド68を正転すると共にフイード54を前
進させ掘削を開始する(122)。リミツトスイ
ツチ56が作動した時、掘削を終了すべく(12
4)フイード54の前進を停止する(126)。
これにより、管20Bの押送を終了し、スピンド
ル82の回転も停止させる(128)。同時に、
ポンプ76の作動を停止し(130)、油圧ホル
ダ70で管20Bを締め付ける(132)。以上
の工程を順次繰り返すことにより、横孔が掘削さ
れる。 Next, as shown in the flowchart of Figure 5,
When the spindle 82 is reversed and the feed 54 is retracted (88) until the limit switch 58 is activated, the connection between the tube 20A and the parent rod 68 is disconnected (90). At this position,
Rotation of the spindle 80 is stopped (92). Furthermore,
When the feed 54 is retracted (94) and the limit switch 62 is activated (96), the retraction of the feed 54 is completed (98). Next, operate the tube lifting section 6 of the automatic tube supply/recovery device 10, and
2, 22 is lowered (100), and when a sensor (not shown) is activated (100),
02), the descent of the tube 20B is stopped (104). This tube 20B is gripped by the clamp 30 provided at the upper end of the arm 26 by operating the tube conveying section 8 (106). The clamp 30 is attached to the arm 26
is moved in the direction of the propulsion device 29 by the rotation of , and is set at a predetermined position by the stopper 72 (10
8). This places the tube 20B coaxially with the parent rod 68. Next, the spindle 80 is rotated in the normal direction, and the feed 54 is turned on by the limit switch 6.
The tubes 20A, 2 are moved forward 110 until the
0B and parent rod 68 are connected (112).
After this connection, the rotating claw 40 of the clamp 30 is opened to release the grip on the tube 20B (114). Clamp 3
0 is repositioned by the rotation of the arm 26 to a position where it grips a new tube 20 supported by the receiving parts 22, 22 of the automatic supply/recovery device 10 (11
6). Next, the pump 76 is activated (118), and the pipe 20 is pumped from the tank 74 through the water swivel 78.
Water is sent to A and 20B. Next, the hydraulic holder 70
to release the tightening of the pipe 20A (120),
The parent rod 68 is rotated forward and the feed 54 is advanced to start excavation (122). When the limit switch 56 is activated, the excavation is terminated (12
4) Stop advancing the feed 54 (126).
This ends the feeding of the tube 20B and also stops the rotation of the spindle 82 (128). at the same time,
The operation of the pump 76 is stopped (130), and the pipe 20B is tightened with the hydraulic holder 70 (132). A horizontal hole is excavated by sequentially repeating the above steps.
地中に押送された管の回収は、推進装置29を
操作し、最後の管20を押送すべくフイード54
を前進させ、回収開始位置で、停止させる。次に
管20と親ロツド68をスピンドル82を後退さ
せることにより離脱し、停止させる。この状態で
油圧チヤツク80を開きウオータスイベル78及
び親ロツド68を油圧チヤツク80から外す。以
上で回収の準備が完了する。回収は第6図のフロ
ーチヤートに示すように推進装置29を操作しフ
イールド54を、リミツトスイツチ56が作動す
るまで前進させ、停止させる。次に油圧チヤツク
80で管20の後端部を締め付け(140)、ロ
ツドホルダ70の締め付けを解除する(142)。
次いで、スピンドル82を正転させると共にフイ
ード54を後退させる(144)。第1の図示し
ないリミツトスイツチが作動した時(146)、
フイード54の後退を停止させ(148)、スピ
ンドル82の正転を停止する(150)。第1の
リミツトスイツチは、引き抜かれた管とその1本
前に埋設されている管との連結の切放し作業を開
始する位置を示す。次に、埋設されている管を油
圧ホルダ70で締め付け(152)、スピンドル
82を逆転させると共にフイード54を第2の図
示しないリミツトスイツチが作動するまで後退さ
せる(154)。第2のリミツトスイツチは引き
抜かれた管と埋設されている管とが切り抜きされ
る位置を示す(156)。この位置で、フイード
54の後退を停止し(158)、更に、スピンド
ル82の逆転を停止する(160)。次に、管の
搬送部8を操作することにより、アーム26をセ
ツト(162)、空のクランプ30で、吹き抜か
れた管を把持する(164)。次いで、油圧チヤ
ツク80を引き抜かれた管の締め付けから開放し
(166)、油圧チヤツク80がこの推進管から外
れるまでフイード54を後退させる(168)。
このとき、第3の図示しないリミツトスイツチが
作動する。フイード54がこの位置まで後退した
とき(170)、フイード54を停止し(17
2)、クランプ30に把持された管をアーム26
の回動により(174)昇降部6の受け部22へ
載せ回動爪40を回動し管の把持を開放する(1
76)最後に、管の昇降部6を操作することによ
り、管20を上昇させ(180)管20を竪坑上
に運搬する。この位置で図示しないセンサーが作
動し、管20の上昇を停止する(184)。 To recover the pipes that have been pushed underground, the propulsion device 29 is operated and the feed 54 is operated to push the last pipe 20.
Move forward and stop at the collection start position. The tube 20 and parent rod 68 are then separated and stopped by retracting the spindle 82. In this state, open the hydraulic chuck 80 and remove the water swivel 78 and the parent rod 68 from the hydraulic chuck 80. The preparation for collection is now complete. For recovery, as shown in the flowchart of FIG. 6, the propulsion device 29 is operated to advance the field 54 until the limit switch 56 is activated and then stopped. Next, the rear end of the tube 20 is tightened with the hydraulic chuck 80 (140), and the tightening of the rod holder 70 is released (142).
Next, the spindle 82 is rotated forward and the feed 54 is moved backward (144). When a first limit switch (not shown) is activated (146),
The backward movement of the feed 54 is stopped (148), and the normal rotation of the spindle 82 is stopped (150). The first limit switch indicates the position at which the disconnection operation between the pulled out pipe and the buried pipe immediately before it starts. Next, the buried pipe is tightened with the hydraulic holder 70 (152), the spindle 82 is reversed, and the feed 54 is retracted until a second limit switch (not shown) is activated (154). A second limit switch indicates the location where the extracted tube and the buried tube are cut out (156). At this position, the retraction of the feed 54 is stopped (158), and further the reversal of the spindle 82 is stopped (160). Next, by operating the tube conveying section 8, the arm 26 is set (162), and the blown tube is gripped with the empty clamp 30 (164). The hydraulic chuck 80 is then released from the tightening of the withdrawn tube (166) and the feed 54 is retracted until the hydraulic chuck 80 is disengaged from the propulsion tube (168).
At this time, a third limit switch (not shown) is activated. When the feed 54 has retreated to this position (170), the feed 54 is stopped (170).
2), move the tube held by the clamp 30 to the arm 26
By the rotation of (174), the tube is placed on the receiving part 22 of the elevating part 6, and the rotating claw 40 is rotated to release the grip on the tube (174).
76) Finally, by operating the tube lifting section 6, the tube 20 is raised (180) and the tube 20 is conveyed onto the shaft. At this position, a sensor (not shown) is activated to stop the tube 20 from rising (184).
このように、本発明の管の自動供給・回収装置
10は推進装置29を竪坑11内に配置したま
ま、管20の供給または回収を自動的に行うこと
ができる。 In this way, the automatic pipe supply/recovery device 10 of the present invention can automatically supply or collect the pipes 20 while the propulsion device 29 is placed in the shaft 11.
以上説明したように本発明に係る管の自動供
給・回収装置によれば、推進装置を竪坑内に配置
した状態のまま、竪坑上から管を自動的に推進装
置に供給できる。更に、横孔掘削終了後、埋設さ
れた管を自動的に回収することができる。これに
より、横孔掘削の作業効率を向上させることがで
きる。
As explained above, according to the automatic tube supply/recovery device according to the present invention, the tube can be automatically supplied to the propulsion device from above the shaft while the propulsion device is placed in the shaft. Furthermore, after the horizontal hole excavation is completed, the buried pipe can be automatically recovered. Thereby, the working efficiency of horizontal hole excavation can be improved.
第1図は本発明に係る管の自動供給・回収装置
が推進装置と共に竪坑内に配置された状態を示す
側面図、第2図は本発明に係る管の自動供給・回
収装置が推進装置と共に竪坑内に配置された状態
を示す正面図、第3図は管の自動供給・回収装置
のクランプとアームの正面図、第4図は管の自動
供給・回収装置のクランプとアームの側面図、第
5図は管の自動供給・回収装置の掘削時のフロー
チヤート、第6図は管の自動供給・回収装置の管
回収時のフローチヤートである。
6……管の昇降部、8……管の搬送部、10…
…管の自動供給・回収装置、12……ポスト、1
6……スプロケツト、18……チエーン、22…
…受け部。
Fig. 1 is a side view showing the automatic pipe supply/recovery device according to the present invention arranged in a shaft together with the propulsion device, and Fig. 2 shows the automatic pipe supply/recovery device according to the present invention together with the propulsion device. Figure 3 is a front view of the clamp and arm of the automatic pipe supply/recovery device, Figure 4 is a side view of the clamp and arm of the automatic pipe supply/recovery device, FIG. 5 is a flowchart of the automatic pipe supply/recovery device during excavation, and FIG. 6 is a flowchart of the automatic pipe supply/recovery device during pipe recovery. 6... Pipe lifting section, 8... Pipe conveying section, 10...
...Automatic pipe supply/recovery device, 12...Post, 1
6...Sprocket, 18...Chain, 22...
...Receiving part.
Claims (1)
なフイードを有し、該フイードの移動で押送・引
抜き位置に配置された管を地中に押送、又は、地
中から引抜き可能な推進装置と、 前記縦穴内に立設されたポストを有し、該ポス
トの上下端に軸支されたスプロケツトを介してポ
ストを周回するチエーンに所定間隔をおいて管の
受け部が設けられ、該受け部を管の受渡し位置に
停止可能な昇降装置と、 前記推進装置のベースに枢支連結されて前記昇
降装置の受渡し位置と前記推進装置の押送・引抜
き位置との間を移動可能な搬送装置であつて、前
記受渡し位置で昇降装置から受領した管を前記推
進装置の押送・引抜き位置に供給し、又は前記推
進装置の押送・引抜き位置で地中から引き抜かれ
た管を受領して前記受渡し位置の前記昇降装置の
受け部に回収する搬送装置と、 から成ることを特徴とする管の自動供給・回収装
置。[Scope of Claims] 1. It has a feed that is movable along a base disposed in a vertical hole, and by the movement of the feed, a pipe placed at a pushing/extracting position is pushed underground or a propulsion device that can be pulled out from the shaft, and a post that is installed upright in the vertical hole, and a chain that goes around the post via a sprocket that is pivotally supported at the upper and lower ends of the post, and a pipe receiving portion that is placed at a predetermined interval in the chain that goes around the post. is provided with a lifting device that can stop the receiving portion at a pipe delivery position; and a lifting device that is pivotally connected to the base of the propulsion device to move between the delivery position of the lifting device and the pushing/extraction position of the propulsion device. A movable conveying device, which supplies the pipe received from the lifting device at the delivery position to the pushing/extracting position of the propulsion device, or the pipe pulled out from underground at the pushing/extracting position of the propulsion device. An automatic pipe supply/recovery device comprising: a transfer device that receives and collects the pipes to a receiving portion of the lifting device at the delivery position.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23928787A JPS6480698A (en) | 1987-09-24 | 1987-09-24 | Automatic supply and recovery device for pipe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP23928787A JPS6480698A (en) | 1987-09-24 | 1987-09-24 | Automatic supply and recovery device for pipe |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6480698A JPS6480698A (en) | 1989-03-27 |
| JPH0518997B2 true JPH0518997B2 (en) | 1993-03-15 |
Family
ID=17042495
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP23928787A Granted JPS6480698A (en) | 1987-09-24 | 1987-09-24 | Automatic supply and recovery device for pipe |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6480698A (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE19608980C2 (en) * | 1996-03-08 | 1998-05-07 | Tracto Technik | Device for drilling in the ground |
| JP4906555B2 (en) * | 2007-03-27 | 2012-03-28 | 三菱電機株式会社 | Sirocco fan and air conditioner |
| CN108974915B (en) * | 2018-07-13 | 2020-09-01 | 安徽派日特智能装备有限公司 | Automatic robot feeding and discharging device for lathe machining of automobile cylinder sleeve |
-
1987
- 1987-09-24 JP JP23928787A patent/JPS6480698A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6480698A (en) | 1989-03-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7992646B2 (en) | Horizontal offline stand building system | |
| US5711382A (en) | Automated oil rig servicing system | |
| US4475604A (en) | Mobile machine for subterranean installation of piping and the like | |
| US3835940A (en) | Earth drilling apparatus and method | |
| US4084385A (en) | Pile handing methods | |
| US3780883A (en) | Pipe handling system for use in well drilling | |
| US5232269A (en) | Launch vehicle for continuous mining apparatus | |
| US6360830B1 (en) | Blocking system for a directional drilling machine | |
| CN111594033B (en) | Raise drilling rig with automatic loading and unloading of drill pipe | |
| GB2219613A (en) | Oil well rig with pipe handling apparatus | |
| CN115467630B (en) | An automated system for handling tubing strings during pressurized operations in oil and gas wells. | |
| US6374928B1 (en) | Method of blocking a pocket of a multi-pocket feed member for a directional drilling machine | |
| US6474932B1 (en) | Rod loader with transfer member raised and lowered in concert with rod lift | |
| US3918536A (en) | Auger section handling apparatus | |
| JPS6122716B2 (en) | ||
| JPH0518997B2 (en) | ||
| JPH0996196A (en) | Rock bolt construction equipment for tunnels | |
| AU644257B2 (en) | Launch vehicle for continuous mining apparatus | |
| CN116816403A (en) | Automatic anchor drilling machine and drill carriage | |
| CN114382426A (en) | Well drilling and repairing machine and continuous tripping method thereof | |
| JP3611288B2 (en) | Electa device, support assembling method and tunnel excavator | |
| US3983949A (en) | Auger section positioning means | |
| JP2585932B2 (en) | Pipe supply and recovery equipment | |
| JP2596662B2 (en) | Drilling rig | |
| JPH0441755B2 (en) |