JPH0522010B2 - - Google Patents
Info
- Publication number
- JPH0522010B2 JPH0522010B2 JP62087391A JP8739187A JPH0522010B2 JP H0522010 B2 JPH0522010 B2 JP H0522010B2 JP 62087391 A JP62087391 A JP 62087391A JP 8739187 A JP8739187 A JP 8739187A JP H0522010 B2 JPH0522010 B2 JP H0522010B2
- Authority
- JP
- Japan
- Prior art keywords
- slope
- pine
- waterway
- wire mesh
- rolled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 235000008331 Pinus X rigitaeda Nutrition 0.000 claims description 45
- 235000011613 Pinus brutia Nutrition 0.000 claims description 45
- 241000018646 Pinus brutia Species 0.000 claims description 45
- 238000010276 construction Methods 0.000 claims description 26
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 24
- 238000004140 cleaning Methods 0.000 claims description 23
- 239000004570 mortar (masonry) Substances 0.000 claims description 22
- 239000000853 adhesive Substances 0.000 claims description 21
- 230000001070 adhesive effect Effects 0.000 claims description 21
- 101100495256 Caenorhabditis elegans mat-3 gene Proteins 0.000 claims description 15
- 239000000835 fiber Substances 0.000 claims description 14
- 238000000034 method Methods 0.000 claims description 14
- 229920003002 synthetic resin Polymers 0.000 claims description 11
- 239000000057 synthetic resin Substances 0.000 claims description 11
- 244000060011 Cocos nucifera Species 0.000 claims description 5
- 235000013162 Cocos nucifera Nutrition 0.000 claims description 5
- 238000000465 moulding Methods 0.000 claims description 4
- 238000007493 shaping process Methods 0.000 claims description 3
- 239000011435 rock Substances 0.000 description 6
- 238000005507 spraying Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000035699 permeability Effects 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 239000002344 surface layer Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 239000007788 liquid Substances 0.000 description 2
- 238000002156 mixing Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 244000025254 Cannabis sativa Species 0.000 description 1
- 244000042324 Trifolium repens Species 0.000 description 1
- 235000013540 Trifolium repens var repens Nutrition 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003337 fertilizer Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000009428 plumbing Methods 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000005413 snowmelt Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Cultivation Of Plants (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【発明の詳細な説明】
(産業上の利用分野)
本発明は、法面緑化工、法面覆網工等の法面保
護工法における法面水路工法及びその装置に関
し、山腹斜面の法面に形成される自然の「みずみ
ち」部分に対する水路保護対対処するために開発
したのである。Detailed Description of the Invention (Field of Industrial Application) The present invention relates to a slope canal construction method and its device in slope protection methods such as slope greening work and slope covering work, etc. It was developed to protect waterways in the natural ``waterways'' that are formed.
(従来の技術)
周知のように降雨流水、自然湧水、融雪水等が
集まつて当該山腹斜面の軟弱な部分や流れやすい
窪み等を帯状に流れながら自然の「みずみち」が
形成される。この「みずみち」は、山腹斜面、特
に崩落法面や人工法面において流水量の変化に応
じて次第に侵蝕しながら拡大し、それに伴つて落
石、崩土等の防災上の危険性や植生の流出等の問
題を起こし易い。(Prior art) As is well known, natural "waterways" are formed when rainwater, natural spring water, snowmelt water, etc. gather and flow in a belt-like manner through the soft parts of the mountainside slope and the depressions where water flows easily. . These "waterways" gradually erode and expand in response to changes in water flow on mountain slopes, especially collapsed slopes and artificial slopes. It is easy to cause problems such as leakage.
その為、従来、この流れを強制的に集排水する
為に、コンクリート水路、コルゲート水路、栗石
モルタル水路、パイプ水路、モルタル又はプラス
チツク樋、蛇籠埋込等の種々の山腹水路を施工す
ることで対処している。 Therefore, in order to collect and drain this flow forcibly, conventional methods have been used to construct various mountainside channels such as concrete channels, corrugated channels, mortar channels, pipe channels, mortar or plastic gutters, and embedded gabions. are doing.
(発明が解決しようとする問題点)
ところが、問題となる「みずみち」は、概ね崩
壊地、急傾斜地等に多く、然も、屈折や凹凸があ
つて直線的な形状が少ない為、その施工資材、作
業機材の搬入や重機による床堀り、埋め込み等の
施工性に難点の生じ易いものとなつている。(Problem to be solved by the invention) However, the problematic "waterways" are generally found on collapsed lands, steep slopes, etc., and there are few straight shapes with bends and unevenness, so it is difficult to construct them. Difficulties are likely to arise in construction work such as bringing in materials and work equipment, digging the floor using heavy machinery, and embedding.
また、折角施工した此等の水路構造物の下面、
側面に対する対応がなされない為、数年の間に当
該水路構造物の下面や側面が侵蝕され、ついには
水路構造物が浮き上がつた形状となつたり、水を
集中的に流す本来の目的を果たせなくなつたり、
ひいては構造物自体の崩壊にもつながる虞れが生
ずる場所さえでてきている。 In addition, the bottom surface of these waterway structures, which were constructed with great effort,
Because no measures were taken to deal with the sides, the bottom and sides of the canal structure eroded over the course of several years, and eventually the canal structure took on a floating shape and lost its original purpose of concentrating water flow. I can't fulfill my dreams,
There are even places where there is a risk that the structure itself may collapse.
(問題点を解決するための手段)
そこで、本発明では、山腹斜面の植生が可能な
施工対象法面に対する法面緑化工や、山腹斜面が
大小様々な岩石で覆われ、植生より落石防止を主
眼とする施工対象法面に対する法面覆網工で対処
することに着眼し、先ず、第1には、此種の清掃
法面1A乃至植生法面1Bに、法面金網8又は絡
合繊維製の法面マツト7と法面金網8を敷設し、
それをアンカー9で打ち込み固定し、その上から
接着モルタル10を吹き付けてなる法面保護工法
において、方面の整形水路2Aに絡合繊維製の水
路マツト3を敷設し、その上に透水管部材5を設
置し、当該透水管部材5を水路マツト3と法面金
網8又は法面マツト7との間に挟着してなる法面
水路工法を、また、第2には、清掃法面1A乃至
植生法面1Bに、法面金網8又は法面金網8と絡
合繊維製の法面マツト7を、アンカー9と接着モ
ルタル10で固定してなる法面保護装置におい
て、法面の整形水路2Aに識設した水路マツト3
と清掃法面1A乃至植生法面1Bに敷設した法面
金網8との間に、透水管部材5をアンカー9と接
着モルタル10とで挟着固定してなる山腹水路装
置を、従前の各種問題点を解決するための技術手
段として提供したのである。(Means for Solving the Problems) Therefore, the present invention provides slope greening work for the target slope where vegetation is possible on the mountainside slope, and where the mountainside slope is covered with rocks of various sizes and which prevents rockfall from being covered by vegetation. Focusing on dealing with slope covering work for the slope to be constructed, firstly, we will apply slope wire mesh 8 or entangled fibers to these types of cleaning slopes 1A to vegetated slopes 1B. Lay the slope mats 7 and slope wire mesh 8 made of
In the slope protection method in which the anchors 9 are driven in and fixed, and adhesive mortar 10 is sprayed from above, a waterway mat 3 made of entangled fibers is laid in the shaped waterway 2A in the direction, and a permeable pipe member 5 is placed on it. and the permeable pipe member 5 is sandwiched between the canal mat 3 and the slope wire mesh 8 or the slope mat 7. In a slope protection device formed by fixing slope wire mesh 8 or slope wire mesh 8 and slope mat 7 made of entangled fibers to vegetation slope 1B with anchors 9 and adhesive mortar 10, slope shaping waterway 2A Waterway Matsuto 3 constructed in
A mountainside waterway device in which a permeable pipe member 5 is clamped and fixed between an anchor 9 and an adhesive mortar 10 between a slope wire mesh 8 laid on a cleaning slope 1A or a vegetated slope 1B has been developed to solve various problems in the past. It was provided as a technical means to solve the problem.
実施例 1
先ず、第1図と第2図に示す本発明に係る法面
水路工法の第1実施例を、山腹斜面の植生が可能
な対象法面に対する法面緑化工に組み込んで施工
する場合について説明する。Example 1 First, when the first example of the slope waterway construction method according to the present invention shown in FIGS. 1 and 2 is incorporated into slope greening work for a target slope where vegetation can grow on a mountainside slope. I will explain about it.
(1) 第1工程 法面の清掃工
先ず、施工前の法面1における法頭(法面頭
部)と称するかぶり部分を切り取り、また、浮
き石や雑木、流木等の各種夾雑物を清掃除去し
て清掃法面1Aに整形すると共に、山腹斜面に
形成されている自然の「みずみち」2とその周
辺部を、極力自然の「みずみち」状態を損なわ
ないようにして当該「みずみち」幅を必要に応
じて広げたり、床掘りして比較的浅い受け樋状
の水路断面の整形水路2Aに整形した上で、此
等の夾雑物を含む残土処理をする。(1) First step: Slope cleaning work First, the covered part called the head of the slope (slope head) on the slope 1 before construction is cut off, and various foreign objects such as floating stones, miscellaneous trees, and driftwood are cleaned. In addition to removing and reshaping the cleaning slope 1A, the natural "mizumichi" 2 formed on the mountainside slope and its surrounding area are cleaned by doing as much as possible to preserve the natural "mizumichi" condition. After widening the width as necessary or digging the floor to form a shaped waterway 2A with a relatively shallow gutter-like cross section, the remaining soil containing such impurities is disposed of.
(2) 第2工程 水路マツトの張設工
次に、ロール状に巻いた絡合繊維製のヤシマ
ツト3(以下、水路マツトという)を、前記の
整形水路2Aと、当該整形水路2Aから左右両
側部の清掃法面1Aにかけて1メートル以上の
幅を広げて張り出して敷設し、法面の整形水路
2Aの頭頂部から地面にかけて馴染ませなが
ら、アンカー4を打設して固定する。(2) Second step: Tightening of waterway pine Next, the palm pine 3 made of entangled fibers wound into a roll (hereinafter referred to as waterway pine) is attached to the shaped waterway 2A and both left and right sides from the shaped waterway 2A. The cleaning method is laid over a slope 1A with a width of 1 meter or more and spread out, and anchors 4 are driven and fixed while spreading from the top of the slope shaped waterway 2A to the ground.
この時、水路マツト3としては、整形水路2
Aが比較的軟質土の場合には、マツト厚が平均
10ミリ程度の比較的厚く形成されたものを、ま
た、整形水路2Aが比較的硬質土の場合には、
マツト厚が平均3ミリ程度の比較的薄く形成さ
れたものを採択して使用する。 At this time, as the waterway mat 3, the shaped waterway 2
If A is relatively soft soil, the average pine thickness
If the shaped waterway 2A is made of relatively hard soil,
A relatively thin mat with an average thickness of about 3 mm is selected and used.
(3) 第3工程 透水管部材の配管工
次に、透水機能を帯有する長尺の透水管部材
5を下記に示すような簡便な手法で成型して、
水路マツト3の上に必要本数だけ設置して配管
構成する。(3) Third step Plumber of water permeable pipe members Next, a long water permeable pipe member 5 having a water permeable function is molded using a simple method as shown below.
A necessary number of pipes are installed on the waterway mat 3 to form a piping structure.
この透水管部材5の簡便な成型例を示せば、
透水性のあるロール状のヤシマツトや合成樹脂
製の網マツトを一旦巻き戻しながら、今度はそ
れと直交する長手方向に再びロール状に巻き込
みながら管体形状に形成する手法で成型せしめ
たり、或は、これと同様な手法で、先ず、管体
の外殻部材5Aを構成するロール状のヤシマツ
ト又は合成樹脂製の網マツトを下方へ巻き戻
し、その外殻部材5Aの内側に管体芯部材5B
を構成するロール状の金網又はヤシマツトを巻
き戻しながら、それを今度はそれと直交する長
手方向に再びロール状に巻き込み形成して管体
芯部材5Bを成型し、更に、この管体芯部材5
Bの回りに外殻部材5Aを構成するヤシマツト
又は合成樹脂製の網マツトを、それと直交する
長手方向にロール状に巻き込み構成すること
で、透水性を具有する長尺の管体形状を呈する
透水管部材5に成型される。 A simple molding example of this permeable pipe member 5 is shown below.
A water-permeable rolled palm pine or a synthetic resin net pine is once rolled back and then rolled again in the longitudinal direction perpendicular to the rolled palm pine to form it into a tube shape, or Using a method similar to this, first, roll-shaped palm pine or synthetic resin mesh mat constituting the outer shell member 5A of the tube is rolled back downward, and the tube core member 5B is placed inside the outer shell member 5A.
While unwinding the rolled wire mesh or palm pine constituting the tube core member 5B, this tube core member 5B is formed by rolling it into a roll again in the longitudinal direction perpendicular to the wire mesh or palm pine.
By winding the coconut pine or synthetic resin mesh pine constituting the outer shell member 5A around B in a roll shape in the longitudinal direction perpendicular to the outer shell member 5A, a water-permeable material having a long tubular shape with water permeability is formed. It is molded into a tube member 5.
無論、この透水管部材5として、可撓性を具
有する合成樹脂製の長尺管体に所要大の排水孔
を多数個穿設した透水機能を有する暗渠排水管
で対処することもできる。 Of course, the water permeable pipe member 5 may be an underdrain drain pipe having a water permeability function, which is a long pipe body made of flexible synthetic resin and having a plurality of drainage holes of the required size.
(4) 第4工程 法面の植生工(種子吹付工)
次に、水路マツト3の左右両側部の張り出し
部分を含む清掃法面1Aに対して、草の種子
(品種としては、ケンタツキー・31・F、ウイ
ーピング・ラブ・G、クリーピング・レツド・
F、ホワイトクローバー等)6と、緑色又は青
色に着色した繊維屑と、粘着剤としての糊と肥
料等からなる混合液を、種子吹付機により噴射
して吹き付ける。このとき、混合液中に含ませ
た繊維屑を緑色又は青色に着色した訳は、種子
6の吹き付け状況とその完了状況がカラー写真
等で判るようにするためである。(4) Fourth step Slope vegetation work (seed spraying work) Next, grass seeds (the variety is Kentucky 31・F, Weeping Love ・G, Creeping Red・
F., white clover, etc.) 6, fiber waste colored green or blue, glue as an adhesive, fertilizer, etc., is sprayed using a seed sprayer. At this time, the reason why the fiber waste contained in the liquid mixture is colored green or blue is to enable the spraying status of the seeds 6 and its completion status to be seen in a color photograph or the like.
(5) 第5工程 法面マツトの張設工
次に、ロール状に巻いた絡合繊維製のヤシマ
ツト7(以下、法面マツトという)を、植生法
面1Bの法頭から法面下方へ向かつて巻き戻
し、当該植生法面1Bと水路マツト3の左右両
側部の張り出し部分と透水管部材5の上に馴染
ませながら敷設する。(5) Fifth step: Slope pine tensioning Next, roll-shaped palm pine 7 made of entangled fibers (hereinafter referred to as slope pine) is placed from the slope head of the vegetation slope 1B to the bottom of the slope. Roll it back and lay it on the vegetation slope 1B, the overhanging portions on both the right and left sides of the waterway mat 3, and the permeable pipe member 5 while blending it.
この法面マツト7としては、マツト厚が平均
3ミリ程度のヤシマツトが採択されて使用さ
れ、必要に応じてアンカーを打ち込んで仮止め
する。 As this slope pine 7, a palm pine with an average thickness of about 3 mm is selected and used, and anchors are driven into it to temporarily fix it as necessary.
尚、植生法面1B上に比較的大きく露出する
岩石がある場合には、その部分には法面マツト
7を覆わないで切り欠き露出状態の侭で対処す
ることとしている。 Incidentally, if there is a relatively large exposed rock on the vegetation slope 1B, that part is not covered with the slope pine 7 but is dealt with by leaving it in a notched exposed state.
(6) 第6工程 法面金網の張設工
次に、ロール状に巻いた亀甲状又は菱形の法
面金網8を、前記の法面マツト7の上に、法頭
から法面下方へ向かつて馴染ませながら敷設
し、更に、隣接する法面金網8の相互間を結束
線で固定する。この場合は、露出岩石の部分に
も法面金網8が馴染ませながら被着される。(6) Sixth step: Laying slope wire mesh Next, roll the hexagonal or diamond-shaped slope wire mesh 8 onto the slope pine 7 from the head of the slope toward the bottom of the slope. The slope wire meshes 8 are laid while being blended together, and then the adjacent slope wire meshes 8 are fixed with binding wires. In this case, the slope wire mesh 8 is applied to the exposed rock portion while blending it in.
(7) 第7工程 アンカーの打設工
次に、長短のアンカー釘やコンクリート釘等
のアンカー9を打ち込んで、植生法面1Bに法
面金網8と法面マツト7を固定すると共に、透
水管部材5をその下部に敷設した水路マツト3
と、その上部に被着した法面マツト7と法面金
網8との間に挟着固定すべく打ち込む。(7) Seventh step: Driving anchors Next, anchors 9 such as long and short anchor nails or concrete nails are driven in to fix the slope wire mesh 8 and slope pine 7 to the vegetation slope 1B, and the permeable pipe Waterway mat 3 with member 5 laid at its bottom
Then, it is driven in so as to be clamped and fixed between the slope mat 7 and the slope wire mesh 8 which are attached to the upper part of the slope mat 7.
(8) 第8工程 接着モルタルの吹付工
最後に、セメント材と混合液で調製した接着
モルタル10を、モルタル吹付機を使用して、
法面金網8と法面マツト7の部分にはまぶしな
がら吹き付け、また、アンカー9の頭部や露出
岩石に被着した法面金網8の部分、更に、水路
マツト3の直上部に該当する法面金網8や法面
マツト7の部分には、重点的に吹き付けて接着
固定する。(8) Eighth step Adhesive mortar spraying process Finally, adhesive mortar 10 prepared from cement material and mixed liquid is applied using a mortar spraying machine.
Spray the slope wire mesh 8 and the slope pine 7 while sprinkling, and also apply the method to the part of the slope wire mesh 8 that is attached to the head of the anchor 9 or the exposed rock, and also to the area directly above the channel pine 3. The parts of the wire mesh 8 and the slope mat 7 are sprayed intensively and fixed with adhesive.
以上の第1工程〜第8工程の施工順序で法面緑
化工法における水路工法がなされる。 The waterway construction method in the slope greening construction method is performed in the construction order of the above first to eighth steps.
(変形例)
尚、前記の場合には、第4工程の清掃法面1A
の植生工を第2工程の水路マツト3の張設工と第
3工程の透水管部材5の配管工の後に施工した
が、当該清掃法面1Aの植生工を第1工程の法面
清掃工の後に施工することもできる。(Modification) In the above case, the cleaning slope 1A of the fourth step
The vegetation work on the cleaning slope 1A was carried out after the second process of laying the waterway pine 3 and the third process of plumbing the permeable pipe member 5, but the vegetation work on the cleaning slope 1A was carried out after the first process of cleaning the slope. It can also be constructed after.
この場合の施工順序は、第1工程が法面清掃
工、第2工程が清掃法面1Aの植生工、第3工程
が水路マツト3の張設工、第4工程が透水管部材
5の配管工、第5工程が法面マツト7の張設工、
第6工程が法面金網8の張設工、第7工程がアン
カー9の打設工、最後に接着モルタル10の吹付
工の順序で法面緑化工がなされる。 In this case, the construction order is as follows: the first step is slope cleaning, the second step is vegetation work on the cleaning slope 1A, the third step is installation of waterway pine 3, and the fourth step is piping of permeable pipe member 5. The fifth step is the installation of slope pine 7.
The slope greening work is carried out in the following order: the sixth step is the installation of the slope wire mesh 8, the seventh step is the casting of the anchors 9, and finally the spraying of the adhesive mortar 10.
これにて、植生法面1Bに、法面金網8と絡合
繊維製の法面マツト7を、アンカー9と接着モル
タル10で固定してなる法面保護装置において、
法面の整形水路2Aに敷設した水路マツト3と植
生法面1Bに敷設した法面金網8との間に、透水
管部材5をアンカー9と接着モルタル10で挟着
固定してなる法面水路装置が構成される。 With this, in the slope protection device formed by fixing the slope wire mesh 8 and the slope mat 7 made of entangled fibers to the vegetation slope 1B with the anchors 9 and adhesive mortar 10,
A slope waterway is formed by clamping and fixing a permeable pipe member 5 between a waterway pine 3 laid on a slope shaped waterway 2A and a slope wire mesh 8 laid on a vegetated slope 1B with anchors 9 and adhesive mortar 10. The device is configured.
実施例 2
次に、第3図と第4図に示す本発明に係る法面
水路工法の第2実施例を、山腹斜面が大小様々な
岩石で覆われ、植生より落石防止を主眼とする対
象法面に対する法面覆網工に組み込んで施工する
場合について説明する。Example 2 Next, a second example of the slope waterway construction method according to the present invention shown in FIGS. 3 and 4 will be described for a mountainside slope covered with rocks of various sizes and for which prevention of rock fall is the main objective rather than vegetation. We will explain the case where it is installed by incorporating it into the slope covering work for the slope.
この場合の施工順序は、先ず、第1工程として
法面清掃工が、第2工程として水路マツト3の張
設工が、第3工程として透水管部材5の配管工
が、第4工程として法面金網8の張設工が、第5
工程としてアンカー9の打設工が、第6工程とし
て接着モルタル10の吹付工が施工される。 In this case, the construction order is as follows: the first step is the slope cleaning work, the second step is the laying of the canal mat 3, the third step is the plumber of the permeable pipe member 5, and the fourth step is the construction work. The 5th worker who installed the wire mesh 8
As a step, the anchor 9 is cast, and as a sixth step, the adhesive mortar 10 is sprayed.
無論、この場合にも、できるだけ法面緑化の為
に、第1工程の法面清掃工の後、或は、第4工程
の法面網の張設工や第5工程のアンカー打設工の
前後いずれかの段階で、第1実施例のように清掃
法面1Aの植生工を実施することもできる。 Of course, in this case as well, in order to green the slope as much as possible, it is necessary to carry out the work after the slope cleaning work in the first step, or after the slope netting work in the fourth step or the anchor driving work in the fifth step. It is also possible to carry out vegetation work on the cleaning slope 1A as in the first embodiment either before or after the cleaning.
これにて、清掃法面1A乃至植生法面1Bに、
法面金網8をアンカー9と接着モルタル10で固
定してなる法面保護装置において、法面の整数水
路2Aに敷設した水路マツト3と清掃法面1A乃
至植生法面1Bに敷設した法面金網8との間に、
透水管部材5をアンカー9と接着モルタル10と
で挟着固定してなる法面水路装置が構成される。 With this, from the cleaning slope 1A to the vegetation slope 1B,
In a slope protection device in which slope wire mesh 8 is fixed with anchors 9 and adhesive mortar 10, waterway mats 3 laid on integral number channels 2A of the slope and slope wire meshes laid on cleaning slope 1A to vegetation slope 1B are used. Between 8 and
A slope waterway device is constructed by sandwiching and fixing the permeable pipe member 5 between an anchor 9 and an adhesive mortar 10.
(発明の効果)
本発明は、前記のように、先ず、第1には、清
掃法面1A乃至植生法面1Bに、法面金網8又は
絡合繊維製の法面マツト7と法面金網8を敷設
し、それをアンカー9で打ち込み固定し、その上
から接着モルタル10を吹き付けてなる法面保護
工法において、法面の整形水路2Aに絡合繊維製
の水路マツト3を敷設し、その上に透水管部材5
を設置配管し、当該透水管部材5を水路マツト3
と法面金網8又は法面マツト7との間に挟着して
なる法面水路工法を、また、第2には、清掃法面
1A乃至植生法面1Bに、法面金網8又は法面金
網8と絡合繊維製の法面マツト7を、アンカー9
と接着モルタル10で固定してなる法面保護装置
において、法面の整形水路2Aに敷設した水路マ
ツト3と清掃法面1A乃至植生法面1Bに敷設し
た法面金網8との間に、透水管部材5をアンカー
9と接着モルタル10とで挟着固定してなる法面
水路装置としたのである。(Effects of the Invention) As described above, the present invention first provides slope wire mesh 8 or slope mat 7 made of entangled fibers and slope wire mesh to cleaning slope 1A to vegetation slope 1B. In the slope protection method, which involves laying a waterway mat 8, driving it in place with anchors 9, and spraying adhesive mortar 10 on top of it, a waterway mat 3 made of entangled fibers is laid on the shaped waterway 2A on the slope. Water permeable pipe member 5 on top
Install and pipe the permeable pipe member 5 to the waterway mat 3.
and slope wire mesh 8 or slope pine 7, and secondly, slope wire mesh 8 or slope pine is sandwiched between cleaning slope 1A to vegetation slope 1B. A wire mesh 8 and a slope mat 7 made of entangled fibers are attached to an anchor 9.
In the slope protection device which is fixed with adhesive mortar 10, water permeability is provided between the channel mat 3 laid in the shaping channel 2A of the slope and the slope wire mesh 8 laid on the cleaning slope 1A to the vegetation slope 1B. The slope waterway device is made by clamping and fixing the pipe member 5 between the anchor 9 and the adhesive mortar 10.
従つて、この法面水路工法及びその装置は、法
面緑化工や法面覆網工に一体的に組み込んだ施工
順序で実施でき、その施工性や施工コストに優れ
た法面保護手段としての存在価値は頗る大きい。 Therefore, this slope canal construction method and its equipment can be implemented in the construction sequence integrated with slope greening work or slope covering work, and are effective as a slope protection method with excellent workability and construction cost. The value of existence is enormous.
殊に、透水管部材5をその下部の水路マツト3
とその上部の法面マツト7と法面金網8(第1実
施例の場合)又は法面金網8(第2実施例の場
合)との間に挟着固定し、その上、この水路構造
物をアンカー9と接着モルタル10で比較的強固
に保持しているので、先ず、比較的少量の水は、
この透水管部材5を主体とする水路構造物におけ
る表層部の法面金網8や法面マツト7を伝つて分
散して比較的緩やかに下方へ流れ、また、比較的
大量の水の場合には、その大半が水路構造物の堅
い表層部を速い速度で流れ、この表層部を通過し
た浸透水の殆どは、透水管部材5やその下部の水
路マツト3を伝つて下方へ流れ落ちる。 In particular, the permeable pipe member 5 is
and the upper slope pine 7 and the slope wire mesh 8 (in the case of the first embodiment) or the slope wire mesh 8 (in the case of the second embodiment), and in addition, this waterway structure is held relatively firmly by anchors 9 and adhesive mortar 10, so first, a relatively small amount of water
In the waterway structure mainly composed of this water permeable pipe member 5, the water flows relatively gently downward through the slope wire mesh 8 and slope pine 7 on the surface layer, and is dispersed and flows relatively gently downward. Most of the water flows at a high speed through the hard surface layer of the waterway structure, and most of the permeated water that has passed through the surface layer flows downward through the permeable pipe member 5 and the waterway mat 3 below it.
それが為、流量の多少に拘わらず、水路マツト
3裏面の整形水路2Aを侵食することがない。 Therefore, regardless of the amount of flow, the shaped water channel 2A on the back surface of the water channel mat 3 will not be eroded.
また、施工に際して、本工法では、自然の「み
ずみち」に沿つてできるだけ原形を保持して施工
するようにしており、その為、法面工事が大掛か
りなものにならず、法面保護工事が比較的容易且
つ効果的に実施できる。 In addition, during construction, this construction method maintains the original shape as much as possible along the natural "waterways", which prevents the slope work from being a large-scale work and allows slope protection work to be carried out. It can be implemented relatively easily and effectively.
その上、この水路構造物やその周辺部に緑化の
要素があれば、それを阻害することなく施工する
ことができる等の諸効果を齎す。 Moreover, if there is an element of greening in the waterway structure or its surrounding area, it brings about various effects such as being able to construct it without disturbing it.
第1図は法面緑化工に組み込んでなる法面水路
工法を、その工程順に分解して描出した施工図、
第2図はその断面構造を示す概要図、第3図は法
面覆網工に組み込んでなる法面水路工法を、その
工程順に分解して描出した施工図、第4図はその
断面構造を示す概要図である。
符号表、1……施工前の法面、1A……清掃法
面、1B……植生法面、2……自然の「みずみ
ち」、2A……整形水路、3……水路マツト、4,
9……アンカー、5……透水管部材、5A……外
殻部材、5B……管体芯部材、6……種子、7…
…法面マツト、8……法面金網、10……接着モ
ルタル。
Figure 1 is a construction drawing depicting the slope waterway construction method, which is incorporated into slope greening work, broken down in the order of its steps.
Figure 2 is a schematic diagram showing its cross-sectional structure, Figure 3 is a construction drawing depicting the slope waterway construction method incorporated in slope covering net work, broken down in the order of steps, and Figure 4 shows its cross-sectional structure. FIG. Code list, 1...Slope before construction, 1A...Cleaned slope, 1B...Vegetation slope, 2...Natural "water path", 2A...Small waterway, 3...Waterway pine, 4,
9... Anchor, 5... Permeable pipe member, 5A... Outer shell member, 5B... Tube core member, 6... Seed, 7...
...Slope pine, 8...Slope wire mesh, 10...Adhesive mortar.
Claims (1)
8又は絡合繊維製の法面マツト7と法面金網8を
敷設し、それをアンカー9で打ち込み固定し、そ
の上から接着モルタル10を吹き付けてなる法面
保護工法において、法面の整形水路2Aに絡合繊
維製の水路マツト3を敷設し、その上に透水管部
材5を設置し、当該透水管部材5を水路マツト3
と法面金網8又は法面マツト7との間に挟着した
ことを特徴とする法面水路工法。 2 特許請求の範囲第1項に記載の法面保護工法
において、透水管部材5を、ロール状のヤシマツ
トや合成樹脂製の網マツトを一旦巻き戻しなが
ら、今度はそれと直交する長手方向に再びロール
状に巻き込みながら管体形状に成型してなる法面
水路工法。 3 特許請求の範囲第1項に記載の法面保護工法
において、透水管部材5を、先ず、管体の外殻部
材5Aを構成するロール状のヤシマツト又は合成
樹脂製の網マツトを巻き戻し、その内側に管体芯
部材5Bを構成するロール状の金網又はヤシマツ
トを巻き戻しながら、それを今度はそれと直交す
る長手方向に再びロール状に巻き込み形成して管
体芯部材5Bを成型し、更に、この管体芯部材5
Bの回りに外殻部材5Aのヤシマツト又は合成樹
脂製の網マツトを、それと直交する長手方向にロ
ール状に巻き込みながら管体形状に成型してなる
法面水路工法。 4 特許請求の範囲第1項に記載の法面保護工法
において、透水管部材5を、可撓性を具有する合
成樹脂製の長尺管体に所要大の排水孔を多数個穿
設した排水管としてなる法面水路工法。 5 清掃法面1A乃至植生法面1Bに、法面金網
8又は法面金網8と絡合繊維製の法面マツト7
を、アンカー9と接着モルタル10で固定してな
る法面保護装置において、法面の整形水路2Aに
敷設した水路マツト3と清掃法面1A乃至植生法
面1Bに敷設した法面金網8との間に、透水管部
材5をアンカー9と接着モルタル10とで挟着固
定したことを特徴とする法面水路装置。 6 特許請求の範囲第5項に記載の法面保護装置
において、透水管部材5を、ロール状のヤシマツ
トや合成樹脂製の網マツトを長手方向に管体形状
に成型したものとする法面水路装置。 7 特許請求の範囲第5項に記載の法面保護装置
において、透水管部材5を、ロール状のヤシマツ
ト又は合成樹脂製の網マツトを長手方向に管体形
状に成型してなる外殻部材5Aと、その外殻部材
5Aの内側にロール状の金網又はヤシマツトを包
み込み長手方向に成型してなる芯部材5Bとで構
成してなる法面水路装置。 8 特許請求の範囲第5項に記載の法面保護装置
において、透水管部材5を、可撓性を具有する合
成樹脂製の長尺管体に所要大の排水孔を多数個穿
設した排水管としてなる法面水路装置。[Claims] 1. A slope wire mesh 8 or a slope mat 7 made of entangled fibers and a slope wire mesh 8 are laid on the cleaning slope 1A to the vegetation slope 1B, and anchors 9 are driven into the slope wire mesh 8 to secure the slope wire mesh 8. In a slope protection method in which adhesive mortar 10 is sprayed on the slope surface, a waterway mat 3 made of entangled fibers is laid in the shaped waterway 2A on the slope, a permeable pipe member 5 is installed on top of the waterway mat 3, and the permeable pipe member 5 to waterway pine 3
and slope wire mesh 8 or slope pine 7. 2 In the slope protection construction method described in claim 1, the permeable pipe member 5 is rolled once again in the longitudinal direction orthogonal to the roll-shaped palm pine or synthetic resin net mat while unwinding it. A slope waterway construction method in which the water is rolled into a pipe shape and formed into a pipe shape. 3. In the slope protection method described in claim 1, the water permeable pipe member 5 is prepared by first unwinding the rolled palm pine or synthetic resin mesh pine constituting the outer shell member 5A of the pipe body; While unwinding the rolled wire mesh or palm pine constituting the tube core member 5B inside the tube core member 5B, this time it is rolled again into a roll shape in the longitudinal direction perpendicular to it to form the tube core member 5B, and then , this tube core member 5
A slope waterway construction method in which the coconut pine or synthetic resin mesh pine of the outer shell member 5A is rolled around B in the longitudinal direction perpendicular to the outer shell member 5A and formed into a pipe shape. 4. In the slope protection construction method described in claim 1, the permeable pipe member 5 is a drainage pipe in which a plurality of drainage holes of a required size are bored in a long flexible synthetic resin pipe. A slope waterway construction method that serves as a pipe. 5 Slope wire mesh 8 or slope wire mesh 8 and slope mat 7 made of entangled fibers are installed on the cleaning slope 1A to the vegetation slope 1B.
In the slope protection device, which is fixed with anchors 9 and adhesive mortar 10, the waterway mat 3 laid on the shaping waterway 2A of the slope and the slope wire mesh 8 laid on the cleaning slope 1A to the vegetation slope 1B are combined. A slope waterway device characterized in that a permeable pipe member 5 is sandwiched and fixed between an anchor 9 and an adhesive mortar 10. 6. In the slope protection device according to claim 5, the water permeable pipe member 5 is a slope waterway in which the permeable pipe member 5 is formed by molding rolled coconut pine or synthetic resin net pine into a tube shape in the longitudinal direction. Device. 7 In the slope protection device according to claim 5, the water permeable pipe member 5 is an outer shell member 5A formed by molding rolled coconut pine or synthetic resin net pine into a tube shape in the longitudinal direction. and a core member 5B formed by wrapping a rolled wire mesh or coconut pine inside the outer shell member 5A and molding it in the longitudinal direction. 8. In the slope protection device according to claim 5, the water permeable pipe member 5 is a drainage pipe in which a plurality of drainage holes of a required size are bored in a long pipe body made of a flexible synthetic resin. A slope waterway device that serves as a pipe.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62087391A JPS63251524A (en) | 1987-04-09 | 1987-04-09 | Method and apparatus for water channel work on hillside |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP62087391A JPS63251524A (en) | 1987-04-09 | 1987-04-09 | Method and apparatus for water channel work on hillside |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63251524A JPS63251524A (en) | 1988-10-19 |
| JPH0522010B2 true JPH0522010B2 (en) | 1993-03-26 |
Family
ID=13913584
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP62087391A Granted JPS63251524A (en) | 1987-04-09 | 1987-04-09 | Method and apparatus for water channel work on hillside |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS63251524A (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0819679B2 (en) * | 1990-10-03 | 1996-02-28 | ロック建設株式会社 | Sloping ground surface protection structure |
| JP2824561B2 (en) * | 1994-11-18 | 1998-11-11 | 富士見グリーンエンジニアリング株式会社 | Construction method and greening method of stepped retaining wall |
| KR20040021920A (en) * | 2002-09-06 | 2004-03-11 | 김성수 | Shotcrete construct structure of incline surface |
| JP2024073761A (en) * | 2022-11-18 | 2024-05-30 | 日特建設株式会社 | Resin spraying method |
-
1987
- 1987-04-09 JP JP62087391A patent/JPS63251524A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63251524A (en) | 1988-10-19 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2013044222A (en) | Ground slope corrosion prevention method of grating crib bottom | |
| CN114164844B (en) | Construction method of square grid type organic material slope protection structure | |
| JP3755806B2 (en) | Revetment block and slope method using it | |
| JPH0522010B2 (en) | ||
| JP2000319846A (en) | Vegetation planting method for existing surface | |
| KR100805934B1 (en) | Greening structure for protection of shore and slope and construction method | |
| RU2318096C1 (en) | Method for slope erosion protection structure erection | |
| JPH03206212A (en) | Construction method of earth support in tubular pile and tubular pile | |
| JP2002146797A (en) | Structure for water collecting/draining gutter | |
| JP2852879B2 (en) | River covering block and concrete covering block revetment | |
| JPH01271521A (en) | Construction method for vegetation slope frame | |
| CN118686118B (en) | A slope protection structure and method for reducing soil and water loss on slopes | |
| JPS6037333A (en) | Prevention of degradation of sloped ground | |
| JPS6232290B2 (en) | ||
| JP3413381B2 (en) | Greening basic construction net and greening basic construction method using this net | |
| JP2008136442A (en) | Water supply apparatus, plant protection method using the same, and water supply method to block pavement frame | |
| KR100352888B1 (en) | Method for treating gushing water from rock slope by spraying and sticking seed fertilizing soil | |
| JP2000166386A (en) | Mat for preventing growth of plant, and a cylindrical body | |
| JP4184987B2 (en) | Drainage devices in designated areas such as golf courses, parks or sports facilities | |
| JP3003250U (en) | Slope surface erosion prevention facility | |
| JPH0141761Y2 (en) | ||
| JP3493494B2 (en) | Vegetation canal structure | |
| JPH07238523A (en) | Permeable vegetation revetment | |
| JP3485547B2 (en) | Partition material | |
| JPS6030723A (en) | Greens-planting work for slope |