JPH0527744B2 JP60223972A JP22397285A JPH0527744B2 JP H0527744 B2 JPH0527744 B2 JP H0527744B2 JP 60223972 A JP60223972 A JP 60223972A JP 22397285 A JP22397285 A JP 22397285A JP H0527744 B2 JPH0527744 B2 JP H0527744B2
Authority
JP
Japan
Prior art keywords
building
work
construction
floor
floors
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60223972A
Other languages
Japanese (ja)
Other versions
JPS6282175A (en
Inventor
Minoru Niwa
Masao Myaguchi
Toshimasa Okazaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP60223972A priority Critical patent/JPS6282175A/en
Publication of JPS6282175A publication Critical patent/JPS6282175A/en
Publication of JPH0527744B2 publication Critical patent/JPH0527744B2/ja
Granted legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/62Hybrid vehicles

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は現存建物を稼働させつつ高層化建替
えする工法に関する。
DETAILED DESCRIPTION OF THE INVENTION "Field of Industrial Application" This invention relates to a construction method for rebuilding an existing building into a high-rise building while keeping it in operation.

「従来の技術」 都市の再開発等に於ける老朽化したビルの高層
化建替え工事に際しては、現存建物の取りこわし
が伴なう。
"Conventional Technology" When rebuilding aging buildings into high-rise buildings in urban redevelopment projects, etc., the existing buildings must be demolished.

「発明が解決しようとする問題点」 しかるに、都市の再開発等に於いて生じる老朽
化したビルの高層化建替え工事では、テナント業
者の営業補償、工事中の移転先の確保など工事そ
のものよりも、工事着工前の事前準備が複雑でか
つ、非常に困難な作業が強いられており、現在入
居中のテナントを一時移動させたいが、それに応
じないため再開発工事が不可能なケースがある。
``Problems that inventions aim to solve'' However, when rebuilding aging buildings into high-rise buildings that occur during urban redevelopment, etc., issues such as business compensation for tenants and securing a new location during construction are more important than the construction itself. However, the preliminary preparations before the start of construction are complicated and require extremely difficult work, and there are cases where redevelopment work is impossible because the current tenants do not agree to move temporarily. .

この傾向は都市の付加価値の高いオフイス街、
あるいは商業地域になればなるほど、また構築物
が大規模になるほど、テナント業者が多く、か
つ、折衝部署が多く、困難な作業が山積し、ビル
のオーナーがビルの高層化建替えを計画してもで
きないでいる例が数多く見られる。
This trend is reflected in high value-added office areas in cities,
Alternatively, the larger the area becomes, or the larger the structure, the more tenants there are, and the more negotiation departments there are, the more difficult the work becomes. There are many examples where this is not possible.

「問題点を解決するための手段」、「作用」 本発明は叙上の事情に鑑みなされたもので、そ
の要旨とするところは、稼働中の1又は複数を1
まとめに捉えた既存建物の平面内に既存建物の一
部を貫通して高層化建替え構築建物用基礎及び当
該構築部建物のコアー部を既存建物屋上より所定
上部まで突出させて構築し、既存建物屋上には養
生架台及び地上階工事の作業基地としての強固な
スラブの作業構台を組み立てたうえ該コアー部の
鉄骨にジヤツキを介して下降可能に接続し、コア
ー部の鉄骨の建増しを行なうと共に該作業構台上
に吊り構造の吊りフレーム並びに地上各階の梁・
床を先行施工し、当該吊りフレーム並びに各階の
梁・床のリフトアツプ定着と外・内装工事の施工
で、作業構台上部階の仕上げ竣工をなしてテナン
トの移転を行ない、しかる後、作業構台下部の既
存建物の一部若しくは全部の解体をし、作業構台
をリフトダウンさせ、上記の先行施工の梁・床の
リフトダウン定着と外・内装工事をして下部階の
構築をするとして、テナント業者の他所への移転
を伴なうことなくして老朽化したビルの高層化建
替えを可能とした点にある。
"Means for Solving Problems" and "Operation" The present invention was made in view of the above circumstances, and its gist is to
The foundation for the high-rise reconstruction building will be constructed by penetrating a part of the existing building within the plan of the existing building as determined in the summary, and the core part of the building will protrude from the roof of the existing building to a predetermined level. A strong slab work gantry will be assembled on the roof of the building to serve as a work base for the work on the ground floor and a curing frame, and will be connected to the steel frame of the core section via jacks so that it can be lowered, and the steel frame of the core section will be added. At the same time, there is a suspension frame on the work platform, and beams and beams on each floor above the ground.
The floor will be constructed in advance, and the suspension frame and the beams and floors on each floor will be lifted up and fixed, and the exterior and interior work will be completed.The upper floor of the work gantry will be completed and tenants will be relocated. The tenant contractor's plan is to demolish part or all of the existing building, lift down the work platform, fix the lift-down of the beams and floors that were previously constructed, and perform exterior and interior work to construct the lower floor. The key point is that it has made it possible to rebuild aging buildings into high-rise buildings without having to relocate them to another location.

「実施例」 以下、これを図に基づいて詳細に説明する。第
1図〜第7図は本発明を中庭のある8階建てのビ
ルについて実施した場合の施工順序を示し、第8
図は当該ビルの20階高層化建替え計画図を示す。
"Example" This will be described in detail below based on the drawings. Figures 1 to 7 show the construction order when the present invention is applied to an eight-story building with a courtyard;
The figure shows a 20-story high-rise reconstruction plan for the building.

第8図に於いて、図中1は高層化建替え計画の
4個の中庭を有する稼働中の既存建物で、仮想線
2で示されるのが、高層化建替え計画になる建物
である。
In FIG. 8, 1 is an existing building in operation with four courtyards that is planned for high-rise reconstruction, and the virtual line 2 is the building that is planned for high-rise reconstruction.

図中3は該既存建物を支えている松杭を示す。 3 in the figure shows the pine piles supporting the existing building.

次いで、該建物2の施工順序を第1図〜第7図
で説明する。
Next, the construction order of the building 2 will be explained with reference to FIGS. 1 to 7.

「第1図」 建物1の屋上を養生4し、屋上にジブクレーン
5を設置する。次にコアー部6の鉄骨工事を屋上
養生構台レベルまで施工後、コアー部6にタワー
クレーン7を設置する。
"Figure 1" The roof of building 1 is cured 4 and a jib crane 5 is installed on the roof. Next, after the steel frame work of the core part 6 is completed up to the roof curing gantry level, a tower crane 7 is installed in the core part 6.

尚、ここに云うコアー部6とは新築部を稼働さ
せるのに必要な設備、動線、避難、構造機能を具
備したものをいう。
The core section 6 referred to here refers to a section that is equipped with the equipment, flow lines, evacuation, and structural functions necessary to operate the newly built section.

「第2図」 稼働中の建物1の屋上に養生を兼ねた作業構台
8を構築する。この作業構台8はコアー部6の鉄
骨にジヤツキを介して接続され、下降が可能であ
る。
``Figure 2'' A work platform 8 is constructed on the roof of the building 1 which is in operation and also serves as a protection. This work platform 8 is connected to the steel frame of the core section 6 via jacks and can be lowered.

「第3図」 作業構台8にはいかなる落下物にも耐えうる強
固なスラブを構築し、超安全工事の養生架台及び
地上階工事の作業基地とする。しかして、作業構
台8は下方の既存建物1の安全防護のための保護
構台、資材置場、工事管理基地となり、これを介
しての施工が本発明の特徴である。かかる安全養
生の構築完了後、コアー部6の鉄骨を2節建て、
タワークレーン7をクライミングし、上層階工事
の準備を整える。
"Figure 3" A strong slab that can withstand any falling objects will be built on the work platform 8, and will serve as a curing platform for ultra-safe construction and a work base for ground floor construction. Thus, the work platform 8 serves as a protective platform, material storage area, and construction management base for the safety protection of the existing building 1 below, and construction via this is a feature of the present invention. After completing the construction of such safety protection, two sections of the steel frame for the core section 6 will be erected.
Climb tower crane 7 and prepare for upper floor construction.

「第4図」 地上階は総てコアーからの吊り構造となつてい
るため、各階の梁・床9を作業構台8上に先行さ
せて施工し、図示例の場合では中間9階分の吊り
フレーム10をその上に構築する。
"Figure 4" Since all the ground floors have a suspension structure from the core, the beams and floors 9 of each floor are constructed on the work platform 8 in advance, and in the example shown, the suspension of the middle 9 floors is carried out. Build frame 10 thereon.

「第5図」 中間9階分の吊りフレーム10を所定の高さま
でリフトアツプし、定着させる。
``Figure 5'' The hanging frames 10 for the middle nine floors are lifted up to a predetermined height and fixed.

定着後、これを作業構台として上層階の梁・床
9′工事を先行し、その上部に最上部の吊りフレ
ーム10′を構築し、最上階にリフトアツプする。
After settling, this will be used as a work platform to proceed with the construction of the beams and floors 9' on the upper floor, and the uppermost hanging frame 10' will be constructed on top of it and lifted up to the top floor.

その後、上部階を順次リフトアツプ定着後、
外・内装工事を施工する。
After that, after lifting and fixing the upper floors one by one,
Perform exterior and interior construction.

かかる区画施工は建物規模に応じて合理的に計
画すればよい。
Such zoning construction can be planned rationally according to the building scale.

「第6図」 屋上階工事完了後、タワークレーン7を解体
し、上層階を仕上げ竣工させる。次いで、図示例
では既存建物1の4F〜9F部分のテナントを新築
上層階へ移転させ、1F〜3Fのテナントは営業を
継続し、4Fを5F〜9F解体用の養生階とし、9F〜
5Fまで解体する。
"Figure 6" After the roof floor construction is completed, tower crane 7 will be dismantled and the upper floor will be completed. Next, in the illustrated example, the tenants on the 4th to 9th floors of the existing building 1 are relocated to the newly built upper floors, the tenants on the 1st to 3rd floors continue to operate, the 4th floor is used as a curing floor for demolition on the 5th to 9th floors, and the 9th to 9th floors are relocated.
Demolish up to 5F.

尚、建物によつては、既存建物1の全階を解体
する場合もある。
Note that, depending on the building, all floors of the existing building 1 may be demolished.

「第7図」 5Fまで解体後、あらかじめ施工されていた作
業構台8をリフトダウンさせながら下部7階を竣
工させる。下部7階竣工後、1〜3階のテナント
を上部階へ移転させる。その後、1F〜3Fを解体
して下層階3フロアを竣工させる。作業構台8は
解体撤去する。
``Figure 7'' After dismantling up to the 5th floor, the lower 7th floor will be completed while lifting down the work platform 8 that had been constructed in advance. After the construction of the lower 7th floor is completed, the tenants on the 1st to 3rd floors will be relocated to the upper floors. After that, the first to third floors will be demolished and the lower three floors will be completed. Work platform 8 will be dismantled and removed.

しかして、テナント業者の移転を伴なうことな
く、現存建物を稼働させつつ、高層化建替えする
ことが可能である。
Therefore, it is possible to rebuild the existing building into a high-rise building while keeping it in operation without requiring the relocation of tenants.

上述例は建物敷地内に中庭がある場合である
が、中庭が無い場合の本発明の実施は第9図に示
される。
Although the above example is a case where there is a courtyard within the building site, the implementation of the present invention in the case where there is no courtyard is shown in FIG.

すなわち、現存建物1の破線で示した部分11
のテナントのみ移転を行ない、この部のみを先行
して解体して施工スペースを確保する。
In other words, the part 11 of the existing building 1 indicated by the broken line
Only these tenants will be relocated, and only this section will be demolished in advance to secure construction space.

すると、この部分11は前述の中庭と同じこと
となり、本発明の実施が出来ることとなる。
Then, this portion 11 becomes the same as the aforementioned courtyard, and the present invention can be implemented.

又、第10図に示す本発明の実施例は複数のビ
ルを一つにまとめる再開発の場合で、この場合で
は、現存ビル1,……間の道路12が上述の中庭
に該当することとなるので、道路12の破線で示
した部分13,……を施工スペースとしてコアー
を先行して構築するとすれば構築が可能となる。
Furthermore, the embodiment of the present invention shown in FIG. 10 is for redevelopment where a plurality of buildings are combined into one, and in this case, the road 12 between the existing buildings 1, . . . corresponds to the above-mentioned courtyard. Therefore, construction is possible if the core is constructed in advance by using the portions 13, .

本発明は、その他、基礎構築部の施工スペース
さえ確保できれば、現状の建物を残し営業を続け
ながら、上部に新築工事を進め、建物を更新する
事が可能である。
In addition, with the present invention, as long as the construction space for the foundation construction section can be secured, it is possible to renew the building by continuing to operate the building while leaving the current building in its current state and proceeding with new construction work on the upper part.

尚、本発明の実施で必要とする施工技術の一つ
として、中庭等の作業スペースで現存の地下室及
び耐圧盤を、くり抜き新築建物を支える支持杭の
構築があるが、支持杭の施工技術としては、数多
くの技術が現存しており、技術的に十分対応でき
る。
In addition, one of the construction techniques required to carry out the present invention is to hollow out existing basements and pressure plates in work spaces such as courtyards and construct support piles to support newly constructed buildings. A large number of existing technologies exist, and it is technically possible to cope with this problem.

「発明の効果」 以上の如く、本発明工法によるならば、現存建
物の稼働を止めることなく、ビルの高層化建替え
が出来ることとなり、移転による顧客離れを恐れ
るテナントの危惧も解決され、建替え計画の促進
に大いに寄与することが出来る。
"Effects of the Invention" As described above, according to the construction method of the present invention, buildings can be rebuilt to become taller without stopping the operation of the existing building, and the concerns of tenants who are afraid of losing customers due to relocation are resolved, and the This can greatly contribute to the promotion of replacement plans.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図〜第7図は本発明工法の施工手順図、第
8図は本発明による高層化建替え計画図、第9、
第10図は本発明の異なる条件下での施工要領説
明図である。 1……既存建物、2……建物、3……松杭、4
……養生、5……ジブクレーン、6……コアー
部、7……タワークレーン、8……作業構台、9
……梁・床、10……吊りフレーム、11……現
存建物の破線で示した部分、12……道路、13
……道路の破線で示した部分。
Figures 1 to 7 are construction procedure diagrams of the construction method of the present invention, Figure 8 is a high-rise reconstruction plan diagram according to the present invention, Figure 9,
FIG. 10 is an explanatory diagram of the construction procedure of the present invention under different conditions. 1... Existing building, 2... Building, 3... Pine pile, 4
...Curing, 5...Jib crane, 6...Core section, 7...Tower crane, 8...Work gantry, 9
... Beams/floors, 10... Hanging frames, 11... Parts of existing buildings indicated by broken lines, 12... Roads, 13
...The part of the road indicated by the broken line.

Claims (1)

【特許請求の範囲】[Claims] 1 稼働中の1又は複数を1まとめに捉えた既存
建物の平面内に既存建物の一部を貫通して高層化
建替え構築建物用基礎及び当該構築部建物のコア
ー部を既存建物屋上より所定上部まで突出させて
構築し、既存建物屋上には養生架台及び地上階工
事の作業基地としての強固なスラブの作業構台を
組み立てたうえ該コアー部の鉄骨にジヤツキを介
して下降可能に接続し、コアー部の鉄骨の建増し
を行なうと共に該作業構台上に吊り構造の吊りフ
レーム並びに地上各階の梁・床を先行施工し、当
該吊りフレーム並びに各階の梁・床のリフトアツ
プ定着と外・内装工事の施工で、作業構台上部階
の仕上げ竣工をなしてテナントの移転を行ない、
しかる後、作業構台下部の既存建物の一部若しく
は全部の解体をし、作業構台をリフトダウンさ
せ、上記の先行施工の梁・床のリフトダウン定着
と外・内装工事をして下部階の構築をするとして
なることを特徴とする現存建物を稼働させつつ高
層化建替えする工法。
1 Penetrating a part of the existing building within the plane of one or more existing buildings in operation, and installing the foundation for the high-rise reconstruction building and the core part of the building concerned from the roof of the existing building. It is constructed so that it protrudes to the top, and a curing frame and a strong slab work gantry as a work base for ground floor construction are assembled on the roof of the existing building, and it is connected to the steel frame of the core section via jacks so that it can be lowered. In addition to adding to the steel frame of the core, we also constructed the suspension frame of the suspension structure on the work platform, as well as the beams and floors for each floor above ground. During construction, the upper floor of the work gantry was completed and tenants were relocated.
After that, part or all of the existing building at the bottom of the work gantry will be demolished, the work gantry will be lifted down, and the beams and floors that were previously constructed will be lifted down and fixed, and the exterior and interior work will be carried out to construct the lower floor. A construction method that involves rebuilding an existing building into a high-rise building while keeping it in operation.
JP60223972A 1985-10-08 1985-10-08 Construction method for height increasing rebuilding while existing building is operated Granted JPS6282175A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60223972A JPS6282175A (en) 1985-10-08 1985-10-08 Construction method for height increasing rebuilding while existing building is operated

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60223972A JPS6282175A (en) 1985-10-08 1985-10-08 Construction method for height increasing rebuilding while existing building is operated

Publications (2)

Publication Number Publication Date
JPS6282175A JPS6282175A (en) 1987-04-15
JPH0527744B2 true JPH0527744B2 (en) 1993-04-22

Family

ID=16806563

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60223972A Granted JPS6282175A (en) 1985-10-08 1985-10-08 Construction method for height increasing rebuilding while existing building is operated

Country Status (1)

Country Link
JP (1) JPS6282175A (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0230854A (en) * 1988-07-18 1990-02-01 Shimizu Corp Method for reconstructing multistoried building
JP4600182B2 (en) * 2005-06-28 2010-12-15 株式会社大林組 Upper floor expansion method for existing buildings
JP4684027B2 (en) * 2005-07-04 2011-05-18 株式会社竹中工務店 Construction method that expands / newly builds / extends / renovates while operating an existing building
JP5409095B2 (en) * 2009-04-17 2014-02-05 大成建設株式会社 Building construction method

Also Published As

Publication number Publication date
JPS6282175A (en) 1987-04-15

Similar Documents

Publication Publication Date Title
CN106894639A (en) The hanging reverse construction method of installation of steel construction under a kind of
CN112900692A (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN108360685A (en) Monoblock type jack-up construction method
JPH0527744B2 (en)
JP2979039B2 (en) Large space building construction equipment
CN111172902A (en) Construction method for quickly dismantling box girder bridge without support
JPH1061193A (en) Method of building steel frame structure and device therefor
CN109736589B (en) A kind of construction method of lattice column force transmission member
JP2000297476A (en) How to build a dome structure
CN111395540A (en) A kind of jacking construction method and device for cast-in-place concrete structure building
JPH04161565A (en) Construction of large space building
JPH08270081A (en) Construction method of frame structure
JPH0967824A (en) Double slab construction method
CN218562585U (en) Land-saving construction temporary building platform
JP3328790B2 (en) High-rise building assembly method
CN111058476A (en) Beam lowering construction method of underground structure in reverse construction method
JPH0742179A (en) Modified inversion placing construction method
CN120312000A (en) Construction method of structural system replacement for protected buildings
JP2696486B2 (en) Building construction method
JP2751988B2 (en) Building construction equipment
KR20250061106A (en) Construction Method and Apparatus for Elevator Mechanical Room Frames on the Roof Floor, such as Offices and Apartments, Using Steel Structures
KR20250054214A (en) Construction Method and Apparatus for Elevator Mechanical Room Frames on the Roof Floor, such as Offices and Apartments, Using Steel Structures
JPH08218628A (en) Construction of roof for cylindrical structure
JP2761528B2 (en) How to build structures
JPH06101348A (en) How to build a tower