JPH05321223A - Provisionally installed landing bridge and its method of construction - Google Patents
Provisionally installed landing bridge and its method of constructionInfo
- Publication number
- JPH05321223A JPH05321223A JP17876992A JP17876992A JPH05321223A JP H05321223 A JPH05321223 A JP H05321223A JP 17876992 A JP17876992 A JP 17876992A JP 17876992 A JP17876992 A JP 17876992A JP H05321223 A JPH05321223 A JP H05321223A
- Authority
- JP
- Japan
- Prior art keywords
- ground
- girder
- base
- bases
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims description 4
- 238000010276 construction Methods 0.000 title abstract description 17
- 239000000463 material Substances 0.000 claims description 21
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 16
- 238000002347 injection Methods 0.000 description 8
- 239000007924 injection Substances 0.000 description 8
- 229910000831 Steel Inorganic materials 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000005266 casting Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
- Revetment (AREA)
Abstract
Description
【0001】[0001]
【産業上の利用分野】本発明は河川、海等に設置する仮
桟橋の機構と施工方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mechanism and a construction method for a temporary jetty installed in a river, the sea or the like.
【0002】[0002]
【従来の技術】仮桟橋は河川、海、湖などへの構造物の
築造の際の作業機進入、資材運搬あるいは作業場所確保
のため、一時的に構築されている。図12はこの仮桟橋
の従来構造を示し、振動あるいは打設等の方法により水
底に立設された支柱90と支柱90間を相互に連結する
水平連結部材91と、これらの水平連結部材91間に掛
け渡されたブレース材92とを備えている。また支柱9
0の上端部間にはH鋼などの下桁材93を掛け渡すと共
に、この下桁材93の上部に、同桁材93と直交する上
桁材94を取り付け、この上桁材94上に覆工板95が
敷設されている。このような仮桟橋の構築は、支柱90
を振動、打設等により水底の地盤に打ち込み、水平連結
部材91で支柱90を連結した後、ブレース材92で固
定し、さらに下桁材93、上桁材94を順に取付け、上
桁材94上に覆工板95を敷設することにより行われ
る。2. Description of the Related Art Temporary piers are temporarily constructed for the purpose of approaching work machines, transporting materials, or securing a work place when constructing structures such as rivers, seas, and lakes. FIG. 12 shows a conventional structure of this temporary pier. A horizontal connecting member 91 for connecting the pillars 90 standing upright on the bottom of the water by a method such as vibration or driving, and the pillars 90 to each other, and between the horizontal connecting members 91. And a brace member 92 that is stretched over the. Support 9
A lower girder material 93 such as H steel is bridged between the upper end portions of 0, and an upper girder material 94 orthogonal to the same girder material 93 is attached to the upper part of the lower girder material 93. A lining plate 95 is laid. The construction of such a temporary pier is supported by the support 90
Is struck into the ground at the bottom of the water by vibration, setting, etc., the columns 90 are connected by the horizontal connecting members 91, then fixed by the brace members 92, and the lower girder material 93 and the upper girder material 94 are attached in this order. This is done by laying a lining plate 95 on top.
【0003】[0003]
【発明が解決しようとする課題】従来の仮桟橋では構築
の際に騒音や振動が発生する上に、水平連結部材91、
ブレース材92、下桁材93などの各部材を連結するた
め多大の手間と長期間を要していた。また、構築の際に
は支柱90の天端高の不揃いやスパン方向、桁方向の不
揃いが生じ易く、その修正のための作業も必要となって
いた。本発明は上記事情を考慮してなされたものであ
り、構築が簡単であり、しかも不揃いが生じにくく短時
間で組立施工が可能な、仮桟橋及びその施工方法を提供
することを目的とする。In the conventional temporary pier, noise and vibration are generated at the time of construction, and the horizontal connecting member 91,
It takes a lot of time and labor to connect the respective members such as the brace member 92 and the lower girder member 93. In addition, during the construction, unevenness of the top height of the columns 90 and unevenness in the span direction and the girder direction are likely to occur, and work for correcting them is also required. The present invention has been made in view of the above circumstances, and an object of the present invention is to provide a temporary pier and a construction method thereof, which is easy to construct, and which is less likely to cause irregularities and can be assembled and assembled in a short time.
【0004】[0004]
【課題を解決するための手段】上記目的を達成するた
め、本発明の仮桟橋は、支柱の上端に桁材を固定した基
台を地盤上に複数設置し、前記桁材の上面には覆工板を
設けると共に、前記支柱の下端にスクリューを取付けた
ことを特徴とする。また、本発明では、支柱下端から地
盤に向かってジェット水を噴射する噴射手段を備えた構
成とすることもできる。本発明の仮桟橋の施工方法は、
複数の基台をクレーン等で吊り上げて順次所定場所に配
置した後、支柱下端のスクリューまたはジェット水の噴
射で地盤の調整を行いつつ所定間隔を保持して設置し、
その後、基台の下桁材の間に上桁材を掛け渡し、次いで
前記上桁材の上に覆工板を敷設することを特徴とする。In order to achieve the above object, in the temporary pier of the present invention, a plurality of bases having girder members fixed to the upper ends of columns are installed on the ground, and the girder members are covered on the upper surface. A work plate is provided, and a screw is attached to the lower end of the column. Further, in the present invention, it is possible to adopt a configuration including a jetting unit that jets jet water from the lower end of the support column toward the ground. The construction method of the temporary pier of the present invention is
After hoisting a plurality of bases with a crane etc. and arranging them in a predetermined place in sequence, install them while maintaining a predetermined interval while adjusting the ground with screws at the bottom of the support or jetting jet water,
After that, an upper girder material is bridged between the lower girder materials of the base, and then a lining plate is laid on the upper girder material.
【0005】[0005]
【作用】上記構成では、基台を施工現場に据え付けるこ
とにより、支柱下端に構成したスクリューの回転により
地盤を掻きならし水底の地盤に喰い込んで下地の不陸調
整を行うため、安定した設置ができる。このため振動、
打設などの作業を行うことなく、簡単で迅速に施工する
ことができる。また、噴射手段がジェット水を噴射する
ことにより、下地の調整を行うことができる。[Operation] With the above configuration, by installing the base on the construction site, the ground is scraped by the rotation of the screw configured at the lower end of the support, and the ground is adjusted to the ground at the bottom of the water to adjust the unevenness of the ground. You can Because of this, vibration,
It can be installed easily and quickly without performing work such as casting. Further, the jetting means jets the jet water to adjust the base.
【0006】[0006]
【実施例】図1ないし図3は本発明の仮桟橋の第1実施
例を示し、鋼材が三角形状に組み付けられた左右一対の
支柱2と、支柱2の上端部に掛け渡し状に取付けられた
H鋼からなる下桁材3とにより基台1が構成されてい
る。図2中、符号4は支柱2の下部を連結する連結部材
である。この支柱2の下端部には支持板5が取付けら
れ、この支持板5に調整手段としてのスクリュー6が回
転可能に取付けられている。スクリュー6は、その軸6
aが水平方向となるように支持板5のブラケット7に取
付けられており、これにより水平面内で回転可能となっ
ている。このような基台1は予め工場内で組立られ、そ
の後施工現場に運搬される。1 to 3 show a first embodiment of a temporary pier according to the present invention, in which a pair of left and right support columns 2 in which steel materials are assembled in a triangular shape and a straddle-like structure are attached to the upper ends of the support columns 2. The base 1 is composed of the lower girder material 3 made of H steel. In FIG. 2, reference numeral 4 is a connecting member that connects the lower portions of the columns 2. A support plate 5 is attached to the lower end of the column 2, and a screw 6 as an adjusting means is rotatably attached to the support plate 5. The screw 6 has its shaft 6
It is attached to the bracket 7 of the support plate 5 so that a is in the horizontal direction, so that it can rotate in the horizontal plane. Such a base 1 is preassembled in a factory and then transported to a construction site.
【0007】次に、本実施例の仮桟橋の施工方法につい
て説明する。基台1を施工現場に運搬した後、クレーン
等で吊り上げて所定場所に据え付ける。この据え付けの
際には、スクリュー6が駆動装置により回転し地盤表面
を掻きならし基台1の重量により水底の地盤に喰い込
み、下地の調整を行う。このため安定した設置状態とな
り、支柱2を地盤に打設する必要がなくなる。このよう
にして基台1を所定間隔で複数設置した後、隣接する基
台1同士の上端の下桁材3の間に上桁材9を掛け渡し、
その後、上桁材9の上に覆工板10を敷設することによ
り図3の状態となり、施工が完了する。従って、騒音や
振動の原因となる支柱の打ち込みが不要となるため、低
騒音環境での構築ができる。また、施工が基台1の据え
付けおよび上桁材9、覆工板10の取り付けだけで完了
するため作業が簡単となり、短期間で容易に構築するこ
とができる。しかも、基台1の据え付けの際に、スクリ
ュー6によって地盤の不陸調整を行うため高さ方向の不
揃いも生じにくく、さらには基台1の位置調整が簡単な
ため、桁方向、スパン方向の不揃いも生じることがなく
正確な構築が可能となっている。Next, a method of constructing the temporary jetty of this embodiment will be described. After transporting the base 1 to the construction site, lift it with a crane or the like and install it at a predetermined place. At the time of this installation, the screw 6 is rotated by a driving device to scrape the ground surface, and the weight of the base 1 digs into the ground at the bottom of the water to adjust the ground. For this reason, a stable installation state is achieved, and it is not necessary to drive the support pillar 2 into the ground. After installing a plurality of bases 1 at predetermined intervals in this way, the upper girder material 9 is bridged between the lower girder materials 3 at the upper ends of the adjacent bases 1.
After that, by laying the lining plate 10 on the upper girder material 9, the state shown in FIG. 3 is obtained, and the construction is completed. Therefore, it is not necessary to drive the pillars that cause noise and vibration, so that the construction can be performed in a low noise environment. Moreover, since the construction is completed only by installing the base 1 and attaching the upper girder material 9 and the lining plate 10, the work is simplified and can be easily constructed in a short period of time. Moreover, when the base 1 is installed, unevenness in the height direction is unlikely to occur because the ground 6 is adjusted by the screw 6, and furthermore, the position adjustment of the base 1 is easy, so that the girder direction and the span direction can be adjusted. Accurate construction is possible without causing misalignment.
【0008】図4および図5は基台1の他例をそれぞれ
示し、図4では支柱2が門型に組み付けられ、図5では
門型に組み付けられた支柱2間がブレース材11により
連結されている。また、図5では下桁材3の直交方向に
上桁材9を取り付けて基台1を構成している。このよう
な各基台においても、支柱2の下端部にスクリュー6を
設けることにより下地調整ができるため、簡単で確実に
仮桟橋を構築することができる。4 and 5 show other examples of the base 1, respectively. In FIG. 4, the support columns 2 are assembled in a gate shape, and in FIG. 5, the support columns 2 assembled in a gate shape are connected by a brace member 11. ing. Further, in FIG. 5, the upper girder member 9 is attached in the direction orthogonal to the lower girder member 3 to form the base 1. Even in each of these bases, the provision of the screw 6 at the lower end of the support column 2 allows the adjustment of the groundwork, so that the temporary pier can be constructed easily and reliably.
【0009】図6および図7は本発明の仮桟橋の第2実
施例を示し、複数の噴射穴12が長手方向に形成されて
いる。また、噴射穴12に連結する通水管(図示省略)
が設けられており、この通水管がホースを介してポンプ
などの噴射源(いずれも図示省略)に接続している。こ
れらの噴射穴12、通水管、噴射源はジェット水を噴射
する噴射手段を構成するものである。この噴射手段は、
上述のように基台1を現場に据え付けて噴射穴12から
地盤内にジェット水13が噴射する。そして、このジェ
ット水13により、下地の不陸調整を確実に行うことが
できるため、安定した設置が可能となるメリットがあ
る。6 and 7 show a second embodiment of the temporary jetty of the present invention, in which a plurality of injection holes 12 are formed in the longitudinal direction. Further, a water pipe (not shown) connected to the injection hole 12
Is provided, and this water pipe is connected to an injection source such as a pump (both not shown) via a hose. The injection hole 12, the water pipe, and the injection source constitute an injection unit that injects jet water. This injection means
As described above, the base 1 is installed on the site, and the jet water 13 is jetted from the jet holes 12 into the ground. Since the jet water 13 can surely adjust the unevenness of the base, there is an advantage that a stable installation can be performed.
【0010】図8は本発明の仮桟橋の第3実施例を示
し、三角形状のアッパー部材21と、アッパー部材21
の下部が摺動自在に挿入されたロア部材22とにより支
柱2が構成され、さらにアッパー部材21の上端部に下
桁材3が取付けられている。これにより支柱2の高さ調
整が可能な構造となっている。また、左右のロア部材2
2を独立して伸縮可能な構成としておけば、各々の基台
の傾斜地での水平調整が容易に行える。図9および図1
0はこの高さ調整機構の他例を示し、支柱2の上部に垂
直部材23が鉛直状に設けられ、この垂直部材23にス
ライダ24が摺動自在に挿入され、スライダ24の上端
部に下桁材3が取り付けられている。これらのアッパー
部材21およびスライダ24の上下移動は、それぞれの
内部に流体圧シリンダを設けてその作動で行ってもよ
く、またはクレーン等で吊り上げて高さを調整し、調整
後にはこれらをボルト、ピンなどで固定する。このよう
に支柱2を伸縮可能な構造とすることにより、傾斜した
水底へ基台を設置する際も各基台の高さを揃え、覆工板
の高さ調整及び水平調整を容易に行うことができる。FIG. 8 shows a third embodiment of the temporary pier of the present invention, which has a triangular upper member 21 and an upper member 21.
The column 2 is composed of the lower member 22 into which the lower part of the above is slidably inserted, and the lower girder member 3 is attached to the upper end of the upper member 21. As a result, the height of the column 2 can be adjusted. Also, the left and right lower members 2
If 2 is configured to be able to expand and contract independently, horizontal adjustment on each sloping ground of each base can be easily performed. 9 and 1
Reference numeral 0 indicates another example of this height adjusting mechanism, in which a vertical member 23 is vertically provided on the upper part of the support column 2, a slider 24 is slidably inserted into the vertical member 23, and a slider 24 is attached to the upper end portion of the slider 24. The beam member 3 is attached. The vertical movement of the upper member 21 and the slider 24 may be performed by operating a fluid pressure cylinder provided inside each, or may be lifted by a crane or the like to adjust the height, and after adjustment, these are bolted, Secure with pins. By making the strut 2 expandable and contractable in this manner, the heights of the bases are made uniform even when the bases are installed on an inclined water bottom, and the height and level of the lining plate can be easily adjusted. You can
【0011】図11は桁材側で高さ調整を行う他例を示
す。支柱2間に掛け渡された下桁材3の上部に調整桁材
25が設けられている。この調整桁材25はジャッキ2
6を介してその両端部が下桁材3に支承されており、い
づれかのジャッキ26を伸縮駆動することにより、調整
桁材25の高さが調整される。このため基台1の据え付
けの際に、高さが不揃いとなっていても、調整桁材25
の高さ調整により簡単に修正することができ、均一の高
さの仮桟橋を構築することができる。FIG. 11 shows another example in which the height is adjusted on the girder side. An adjusting girder member 25 is provided on the upper part of the lower girder member 3 bridged between the columns 2. This adjustment girder material 25 is a jack 2
Both ends of the adjustment girder member 3 are supported by the lower girder member 3 via 6, and the height of the adjusting girder member 25 is adjusted by driving the jacks 26 to extend and contract. Therefore, when the base 1 is installed, even if the heights are not uniform, the adjustment girder member 25
It can be easily adjusted by adjusting the height of the pier, and a temporary pier with a uniform height can be constructed.
【0012】[0012]
【発明の効果】本発明は、桁材と支柱を組み立てた基台
を据え付けることにより、スクリューまたはジェット噴
射で地盤の不陸調整を行うため、簡単な作業で、安定し
た設置が可能な仮桟橋とすることができ、その構築時に
も騒音、振動の発生を抑制することができる。According to the present invention, since the ground is adjusted by a screw or jet injection by installing a base on which a girder material and columns are assembled, a temporary pier which can be stably installed by a simple operation. Therefore, it is possible to suppress the generation of noise and vibration even during the construction.
【図1】本発明の第1実施例の全体斜視図。FIG. 1 is an overall perspective view of a first embodiment of the present invention.
【図2】第1実施例の基台の側面図。FIG. 2 is a side view of the base of the first embodiment.
【図3】第1実施例の構築状態を示す側面図。FIG. 3 is a side view showing a construction state of the first embodiment.
【図4】基台の他例の側面図。FIG. 4 is a side view of another example of the base.
【図5】基台の他例の側面図。FIG. 5 is a side view of another example of the base.
【図6】第2実施例の一部切欠き側面図。FIG. 6 is a partially cutaway side view of the second embodiment.
【図7】第2実施例の一部切欠き側面図。FIG. 7 is a partially cutaway side view of the second embodiment.
【図8】第3実施例の一部切欠き側面図。FIG. 8 is a partially cutaway side view of the third embodiment.
【図9】高さ調整機構の他例の一部切欠き側面図。FIG. 9 is a partially cutaway side view of another example of the height adjusting mechanism.
【図10】高さ調整機構の他例の一部切欠き正面図。FIG. 10 is a partially cutaway front view of another example of the height adjusting mechanism.
【図11】高さ調整機構の他例の説明図。FIG. 11 is an explanatory view of another example of the height adjusting mechanism.
【図12】従来の仮桟橋の斜視図。FIG. 12 is a perspective view of a conventional temporary pier.
1 基台 2 支柱 3 下桁材 6 スクリュー 9 下桁材 10 覆工板 13 ジェット水 1 Base 2 Support 3 Lower girder 6 Screw 9 Lower girder 10 Lining plate 13 Jet water
Claims (4)
上に複数設置し、前記桁材の上面には覆工板を設けると
共に、前記支柱の下端に地盤の不陸の調整手段を取付け
た仮桟橋。1. A plurality of bases having girder members fixed to the upper ends of the columns are installed on the ground, a lining plate is provided on the upper surface of the girders, and ground unevenness adjusting means is provided at the lower ends of the columns. Temporary pier with attached.
がら地盤に喰い込むスクリューとしたことを特徴とする
請求項1記載の仮桟橋。2. The temporary pier according to claim 1, wherein the ground unevenness adjusting means is a screw that bites into the ground while rotating.
かってジェット水を噴射する噴射手段としたことを特徴
とする請求項1記載の仮桟橋。3. The temporary pier according to claim 1, wherein the ground unevenness adjusting means is a jetting means for jetting jet water toward the ground.
次所定場所に配置した後、支柱下端の調整手段で地盤の
調整を行いつつ所定間隔を保持して設置し、その後、基
台の下桁材の間に上桁材を掛け渡し、次いで前記上桁材
の上に覆工板を敷設する仮桟橋の施工方法。4. A plurality of bases are hoisted by a crane or the like and sequentially arranged at predetermined places, and then the grounds are adjusted by adjusting means at the lower ends of the columns while being installed at predetermined intervals. A method for constructing a temporary pier, in which an upper girder material is bridged between girder materials and then a lining plate is laid on the upper girder material.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4178769A JPH0786210B2 (en) | 1992-05-26 | 1992-05-26 | Temporary pier and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP4178769A JPH0786210B2 (en) | 1992-05-26 | 1992-05-26 | Temporary pier and its construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH05321223A true JPH05321223A (en) | 1993-12-07 |
| JPH0786210B2 JPH0786210B2 (en) | 1995-09-20 |
Family
ID=16054302
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP4178769A Expired - Lifetime JPH0786210B2 (en) | 1992-05-26 | 1992-05-26 | Temporary pier and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0786210B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007231593A (en) * | 2006-02-28 | 2007-09-13 | Yoshisuke Kamiya | Bridge |
-
1992
- 1992-05-26 JP JP4178769A patent/JPH0786210B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007231593A (en) * | 2006-02-28 | 2007-09-13 | Yoshisuke Kamiya | Bridge |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0786210B2 (en) | 1995-09-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108951963A (en) | The construction method of assembled wall | |
| CA2391170A1 (en) | Methods and apparatus for forming concrete structures | |
| CN116335149B (en) | A construction method for small-scale ultra-deep foundation pits using a pre-installed steel support system | |
| JP3850785B2 (en) | Caisson laying method using main foundation pile | |
| JP2001348888A (en) | Method and device for constructing underwater foundation structure | |
| JP4359909B2 (en) | Form raising control method in slip form method | |
| JPH05321223A (en) | Provisionally installed landing bridge and its method of construction | |
| JP2515208B2 (en) | Temporary pier and its construction method | |
| CN117266220A (en) | Prefabricated wharf pile top construction method | |
| JP3903548B2 (en) | Hanging scaffold | |
| JP2020002550A (en) | Installation structure of concrete panel on embankment slope | |
| JPH0455118Y2 (en) | ||
| CN223305023U (en) | Prestressed shoring device for applying prestress to enclosure structure in foundation pit | |
| JP2876182B2 (en) | Joint foundation for temporary shutter | |
| JP6870905B2 (en) | Artificial ground and its construction method | |
| CN119663825B (en) | Construction method and construction platform for step-by-step bored pile | |
| JP2004169318A (en) | Construction method of viaduct pier | |
| JPS6340609Y2 (en) | ||
| RU2783828C1 (en) | Device for strengthening earth structures | |
| CN119121960A (en) | Prestressed top support device in foundation pit and method for applying prestress | |
| JP2917328B2 (en) | How to build a new building that can operate existing structures | |
| CN216074755U (en) | Pin-connected panel supports frock suitable for bridge construction usefulness | |
| KR200375169Y1 (en) | Apparatus of constructing temporary bridge | |
| KR200357965Y1 (en) | Caisson Installed Support Means | |
| JP3660657B2 (en) | Construction method of viaduct |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19960312 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100920 Year of fee payment: 15 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120920 Year of fee payment: 17 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120920 Year of fee payment: 17 |