Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0542527B2 - - Google Patents
[go: Go Back, main page]

JPH0542527B2 - - Google Patents

Info

Publication number
JPH0542527B2
JPH0542527B2 JP60284418A JP28441885A JPH0542527B2 JP H0542527 B2 JPH0542527 B2 JP H0542527B2 JP 60284418 A JP60284418 A JP 60284418A JP 28441885 A JP28441885 A JP 28441885A JP H0542527 B2 JPH0542527 B2 JP H0542527B2
Authority
JP
Japan
Prior art keywords
pile
foundation pile
piles
tip
erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP60284418A
Other languages
Japanese (ja)
Other versions
JPS62146322A (en
Inventor
Shigetsugu Namiki
Shinichi Ide
Masanori Harada
Mamoru Sato
Shigenobu Natsume
Yukio Hirai
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP28441885A priority Critical patent/JPS62146322A/en
Publication of JPS62146322A publication Critical patent/JPS62146322A/en
Publication of JPH0542527B2 publication Critical patent/JPH0542527B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 <産業上の利用分野> 本発明はH型鋼や多角形杭等の非円形杭を直接
地中に回転を与えながら建込む、杭体の建込み技
術に関するものである。
[Detailed Description of the Invention] <Industrial Application Field> The present invention relates to a pile construction technique in which non-circular piles such as H-shaped steel or polygonal piles are erected directly into the ground while being rotated. .

<従来の技術> 例えばH型鋼からなる基礎杭を構築する場合、
まず最初に基礎杭を挿入するための孔を穿孔す
る。
<Conventional technology> For example, when constructing a foundation pile made of H-shaped steel,
First, holes are drilled to insert the foundation piles.

次にこの孔内に基礎杭を建込んだ後、基礎杭の
頭部を杭打ち機等で打設して建込みを行つてい
る。
Next, after a foundation pile is erected into this hole, the head of the foundation pile is driven with a pile driver or the like.

<本発明が解決しようとする問題点> 上記した杭の打設技術には次のような問題点が
ある。
<Problems to be Solved by the Present Invention> The above-described pile driving technology has the following problems.

(イ) 孔を開設する工程をまず完了させ、その次に
杭を孔に建込む工程を行う。
(b) The process of opening the hole is completed first, and then the process of erecting the pile into the hole is carried out.

このように、孔の開設工程と杭の建込み工程
とをそれぞれ独立して行わなければならないた
め、工期が長くかかる。
In this way, the hole opening process and the pile erecting process must be performed independently, which takes a long time.

(ロ) オーガを抜き取ると、せつかく基礎杭を建込
むために開設した孔の孔壁が崩壊してしまい、
杭の挿入が不可能となる場合がある。
(b) When the auger was removed, the hole wall of the hole that had been opened to erect the foundation pile collapsed.
Insertion of piles may become impossible.

(ハ) 杭の打設作業の際に、大きな打撃音や振動が
発生するため施工環境が制限される。
(c) During pile driving work, the construction environment is restricted due to the generation of loud impact noise and vibrations.

(ニ) H型鋼からなる杭の一面を同一線上に揃えて
打設することは、杭が回転して打設され易い関
係から面揃えが困難である。
(d) It is difficult to drive the piles made of H-shaped steel so that one side of the piles is aligned on the same line because the piles are likely to rotate and be driven.

(ホ) 使用中の線路の道床に杭を建込む場合の作業
時間は、終電車が通過してから始発電車が通過
するまでの短い時間に限定される。
(e) The work time for erecting piles on the bed of a track in use is limited to the short period from when the last train passes until the first train passes.

しかし、始発電車の通過時間までにオーガに
よる掘削作業が終了しない場合には、このオー
ガを途中から切断できないので、次の回に掘削
をやり直さなければならない。
However, if the excavation work by the auger is not completed by the time the first train passes, the auger cannot be cut halfway, and the excavation must be repeated the next time.

(ヘ) 杭の把持機能と、杭の左右方向の振れ止め機
能を具備する建込み装置を使用してH鋼製の杭
体を建て込む方法が特公昭53−23123号公報に
開示されている。
(f) Japanese Patent Publication No. 53-23123 discloses a method of erecting a pile body made of H steel using a erecting device that has a function of grasping the pile and a function of preventing the pile from swinging in the horizontal direction. .

しかしこの建込み技術にあつては、杭上部の
みでの横振れを規制できても杭体の先端で横振
れを規制できないから、建込みの鉛直度を確保
することが困難である。
However, with this erection technique, even if it is possible to control the lateral deflection only at the top of the pile, it is not possible to control the lateral deflection at the tip of the pile body, so it is difficult to ensure the verticality of the erection.

<本発明の目的> 本発明は以上のような問題点を解決するために
なされたもので、次のような杭体の建込み技術を
提供することを目的とする。
<Object of the present invention> The present invention was made in order to solve the above-mentioned problems, and an object of the present invention is to provide the following pile construction technique.

(イ) 工期を大幅に短縮できる杭体の建込み技術。(b) Pile erection technology that can significantly shorten the construction period.

(ロ) 騒音や振動の発生を防止できる杭体の建込み
技術。
(b) Pile construction technology that can prevent the generation of noise and vibration.

<本発明の構成> 以下、図面を参照しながら本発明の一実施例に
ついて説明する。
<Structure of the present invention> An embodiment of the present invention will be described below with reference to the drawings.

本発明は、先端に掘削刃を設けた杭体に回転力
を与えて直接地中に建込む杭体の建込み技術に関
するものである。
The present invention relates to a technique for erecting a pile body, which is directly erected into the ground by applying rotational force to a pile body provided with a digging blade at the tip.

本実施例ではH型鋼からなる基礎杭1を建込む
場合について説明する。
In this embodiment, a case will be explained in which a foundation pile 1 made of H-shaped steel is erected.

まず基礎杭1について説明する。 First, the foundation pile 1 will be explained.

<イ> 掘削刃(掘削手段) 基礎杭1の先端には掘削手段を装備させる。<A> Drilling blade (excavation means) The tip of the foundation pile 1 is equipped with an excavation means.

掘削手段としては例えば、第2図に示すよう
に基礎杭1の下端のフランジ12を鋭角に切り
落として先鋭に形成する。
As shown in FIG. 2, the excavation means is, for example, formed by cutting off the flange 12 at the lower end of the foundation pile 1 at an acute angle.

そして、先端に形成されたフランジ12に
は、三角形の板体の一辺に鋸状の刃を形成した
掘削刃13を溶接等によつて取り付ける。
A digging blade 13 having a saw-shaped blade formed on one side of a triangular plate is attached to the flange 12 formed at the tip by welding or the like.

本実施例では、2枚の掘削刃13が相互に掘
削範囲を補完し合うように取り付ける場合につ
いて説明する。
In this embodiment, a case will be described in which two excavating blades 13 are attached so as to complement each other's excavating ranges.

すなわち、1枚目の掘削刃13の谷部が通過
して残つた土砂を2枚目の掘削刃13の山部が
通過して削り取るというように、両掘削刃13
の谷部と山部とが相互に補完するように取り付
ける。
That is, the valleys of the first excavating blade 13 pass through and the remaining soil is scraped off by the peaks of the second excavating blade 13, and so on.
Attach so that the troughs and peaks complement each other.

掘削手段としては、その他の掘削装置を採用
することも可能である。
As the excavation means, it is also possible to employ other excavation equipment.

<ロ> 振とめリング 基礎杭1の外周には環状の振止めリング11
を複数外装して取り付ける。
<B> Steady ring There is an annular steady ring 11 on the outer periphery of the foundation pile 1.
Attach multiple exteriors.

最下位の振止めリング11の下面にはビツト
14を突設する。
A bit 14 is provided protruding from the lower surface of the lowest steady ring 11.

<ハ> 水等の流体の吐出手段 基礎杭1上にはベントナイト液4やエアー、
モルタル、各種コンクリート、あるいはこれら
の混合物等の流体を供給するためのホース2を
全長にわたつて取り付ける。
<C> Discharge means for fluid such as water Bentonite liquid 4, air, etc. are placed on the foundation pile 1.
A hose 2 for supplying fluid such as mortar, various types of concrete, or a mixture thereof is attached over the entire length.

ホース2の下端開口は、掘削刃13を取り付
けた基礎杭1の先端部に露出させ、後述するよ
うに基礎杭1の回転掘削時に掘削面に向けてモ
ルタルやソイルコンクリート等の各種の流体を
吐出できるよう構成する。
The lower end opening of the hose 2 is exposed at the tip of the foundation pile 1 to which the excavation blade 13 is attached, and discharges various fluids such as mortar and soil concrete toward the excavation surface during rotary excavation of the foundation pile 1 as described later. Configure it so that it can be done.

なお、吐出液は施工目的に応じて選択する。 Note that the discharge liquid is selected depending on the purpose of construction.

<ニ> 駆動装置 基礎杭1を把持して回転するためには、例え
ばオーガ装置5を使用する。
<d> Driving device In order to grip and rotate the foundation pile 1, for example, an auger device 5 is used.

このオーガ装置5は、回転力を与えながら昇
降する公知の装置である。
This auger device 5 is a known device that moves up and down while applying rotational force.

また、非円形の基礎杭1を把持するためのチ
ヤツク部51は、基礎杭1の形状に合つたもの
を使用する必要がある。
Furthermore, the chuck portion 51 for gripping the non-circular foundation pile 1 needs to be one that matches the shape of the foundation pile 1.

<ホ> 建込み方法 (1) 礎杭の回転掘削 基礎杭1の頭部をオーガ装置5のチヤツク
部51に把持させ、基礎杭1に回転を与え
る。
<E> Erecting method (1) Rotary excavation of the foundation pile The head of the foundation pile 1 is gripped by the chuck part 51 of the auger device 5, and rotation is applied to the foundation pile 1.

このとき、基礎杭1の先端部からベントナ
イト液4を吐出させる。
At this time, the bentonite liquid 4 is discharged from the tip of the foundation pile 1.

基礎杭1は掘削刃13とビツト14によつ
て穿孔が進行する。
The foundation pile 1 is drilled by a drilling blade 13 and a bit 14.

一般に非円形の杭を回転させると横振れを
発生する心配がある。
In general, there is a concern that lateral vibration will occur when non-circular piles are rotated.

本発明では非円形の基礎杭1の外周に振止
めリング11を外装したことによつて横振れ
が規制される。
In the present invention, lateral vibration is regulated by covering the outer periphery of the non-circular foundation pile 1 with the anti-sway ring 11.

従つて、基礎杭1に回転を与えても横振れ
をすることなく真直ぐに建込まれる。
Therefore, even if the foundation pile 1 is rotated, it will be erected straight without causing sideways vibration.

基礎杭1の掘削によつて開設された孔3の
孔壁はベントナイト液4によつて崩壊が防止
される。
The hole wall of the hole 3 opened by excavating the foundation pile 1 is prevented from collapsing by the bentonite liquid 4.

(2) 基礎杭の延長 定寸の基礎杭1を建込み頭部近くまで建込
みしたらH型鋼からなる延長杭15を接続板
16を介して接続して、基礎杭1の建込み作
業を続ける。
(2) Extension of the foundation pile After the specified size foundation pile 1 is erected to the vicinity of the erecting head, the extension pile 15 made of H-beam steel is connected via the connecting plate 16, and the work of erecting the foundation pile 1 is continued. .

従つて、基礎杭1の建込み現場の上方に高
架橋等の障害物が存在する場合であつても、
制限高さ以上の長さの基礎杭1を延長しなが
ら建込むことができる。
Therefore, even if there is an obstacle such as a viaduct above the construction site of the foundation pile 1,
The foundation pile 1 having a length longer than the limit height can be erected while being extended.

(3) 基礎杭の完成 基礎杭1を延長して所定の深さまで建込ん
だらオーガ装置5の運転を停止し、チヤツク
部51から基礎杭1の把持を開放して建込み
作業を終了する。
(3) Completion of the foundation pile After the foundation pile 1 is extended and erected to a predetermined depth, the operation of the auger device 5 is stopped, and the grip on the foundation pile 1 is released from the chuck portion 51 to complete the erection work.

<その他の実施例> 掘進に基礎杭1のねじれを防止するために、基
礎杭1の適所にトラス鉄筋や短板等のスチフナー
17を取り付ける場合もある。
<Other Examples> In order to prevent the foundation pile 1 from twisting during excavation, a stiffener 17 such as a truss reinforcing bar or a short plate may be attached to an appropriate position of the foundation pile 1 in some cases.

このスチフナー17は、基礎杭1の回転抵抗と
ならないように、基礎杭1のフランジ間やリブと
フランズ間等に適宜の間隔で取り付ける。
The stiffeners 17 are installed at appropriate intervals between the flanges of the foundation pile 1, between the ribs and the flanges, etc., so as not to cause rotational resistance to the foundation pile 1.

また、前記基礎杭1の板面に穴を開設し、この
穴を介して流動化した掘削土砂等を透過させるこ
とによつて、基礎杭の回転抵抗を減少させること
も可能である。
Further, it is also possible to reduce the rotational resistance of the foundation pile by providing a hole in the plate surface of the foundation pile 1 and allowing fluidized excavated earth and the like to permeate through the hole.

また、ホース2の途上に着脱式の接続具を介在
すると、建込み終了後に、ホース2を回収して再
使用できる。
Moreover, if a detachable connector is interposed in the middle of the hose 2, the hose 2 can be recovered and reused after the construction is completed.

<本発明の効果> 本発明は以上説明したようになるから、次のよ
うな効果を得ることができる。
<Effects of the Present Invention> Since the present invention is as described above, the following effects can be obtained.

(イ) 従来工法は、プレボーリング工を行つた後に
杭に建込んでいた。
(b) In the conventional construction method, the building was built on piles after pre-boring.

本発明は、このプレボーリング工を不要とし
て杭を直接建込みできる。
The present invention makes it possible to directly erect piles without the need for this pre-boring process.

従つて、オーガの組立、解体に要していた作
業時間が不要となるので工期を大幅に短縮でき
る。
Therefore, the work time required for assembling and disassembling the auger is no longer necessary, so the construction period can be significantly shortened.

(ロ) 杭を回転させて建込むので、従来方法のよう
に打撃音や振動が発生することがない。
(b) Since the piles are erected by rotating them, impact noise and vibrations are not generated as in the conventional method.

従つて、静粛の住宅地における工事にも採用
することができ、騒音公害の心配がまつたくな
い。
Therefore, it can be used for construction work in quiet residential areas, and there is no need to worry about noise pollution.

(ハ) 非円形の杭の一面を揃えて建込みしたいとき
には、杭を自由に回転できるので面揃えが容易
である。
(c) When it is desired to build a building with one side of non-circular piles aligned, it is easy to align the sides because the piles can be rotated freely.

(ニ) H型鋼やボツクス型鋼、非円形の各種の杭の
建込み作業に採用でき、汎用性が広い。
(d) It can be used for erecting H-shaped steel, box-shaped steel, and various types of non-circular piles, making it highly versatile.

(ホ) 鉄道工事において、作業時間内に杭の建込み
が終了しない場合には、電車の走行に影響がな
いように杭を途中から切断して、建込み作業を
中断できる。
(e) In railway construction, if pile erection is not completed within the working time, the piles may be cut midway and the erection work may be interrupted so as not to affect the running of trains.

また、杭を途中で切断しても、杭の建込み作
業を再開する場合にはなんら支障がなく継続し
て建込み作業を行える。
Further, even if the pile is cut midway, the pile erection work can be continued without any hindrance when restarting the pile erection work.

【図面の簡単な説明】[Brief explanation of drawings]

第1図:基礎杭の建込み時の説明図、第2図:
基礎杭の先端部の説明図、第3図:基礎杭の延長
時の説明図。
Figure 1: Explanatory diagram when erecting foundation piles, Figure 2:
Explanatory diagram of the tip of the foundation pile, Figure 3: Explanatory diagram of the extension of the foundation pile.

Claims (1)

【特許請求の範囲】 1 杭先端に掘削手段を備え、杭の長手方向に沿
つて環状の振止めリングを環装した非円形の杭体
を使用し、 前記杭体の先端部から流体を吐出しつつ、 杭体に回転を与えて杭先端部で掘削し、 前記杭体の基端に延長用の杭体を接続し、 振止めリングを介して杭自身で横振れを規制し
ながら所定の深度まで削孔して杭体を建込む、 杭体の建込み方法。
[Claims] 1. A non-circular pile body is provided with an excavation means at the tip of the pile and is surrounded by an annular steadying ring along the longitudinal direction of the pile, and fluid is discharged from the tip of the pile body. At the same time, the pile body is rotated to excavate at the tip of the pile, and an extension pile body is connected to the base end of the pile body, and the pile itself controls lateral vibration through a steadying ring and reaches a predetermined level. A pile installation method that involves drilling a hole to the depth and erecting the pile.
JP28441885A 1985-12-19 1985-12-19 Method and apparatus for driving pile Granted JPS62146322A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP28441885A JPS62146322A (en) 1985-12-19 1985-12-19 Method and apparatus for driving pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28441885A JPS62146322A (en) 1985-12-19 1985-12-19 Method and apparatus for driving pile

Publications (2)

Publication Number Publication Date
JPS62146322A JPS62146322A (en) 1987-06-30
JPH0542527B2 true JPH0542527B2 (en) 1993-06-28

Family

ID=17678297

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28441885A Granted JPS62146322A (en) 1985-12-19 1985-12-19 Method and apparatus for driving pile

Country Status (1)

Country Link
JP (1) JPS62146322A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5323123A (en) * 1976-08-17 1978-03-03 Michio Sawa No signal crossover

Also Published As

Publication number Publication date
JPS62146322A (en) 1987-06-30

Similar Documents

Publication Publication Date Title
JPH07113214B2 (en) Excavation device for underground wall and construction method using the device
JP2942779B1 (en) Underground wall construction method
JPH0542527B2 (en)
JPH0516279Y2 (en)
JPS5827366B2 (en) Head reinforcement pile construction equipment
JP2809559B2 (en) Multi-axis drilling rig
WO1995011349A1 (en) Multi-shaft excavating device
JPS60119816A (en) Formation of continuous pile
JP6729902B1 (en) Construction method of soil cement continuous wall
JPS6325130B2 (en)
JPH0626042A (en) Process of rotationally driving h-shape steel bar and h-shape steel bar used therefor
JPS6235742Y2 (en)
JPH0542528B2 (en)
JPS5820825A (en) Pile formation work and device therefor
JP3676850B2 (en) Steel pile construction method
JPH0941369A (en) Pile modification and reinforcement method
JPS62291324A (en) Method and apparatus for constructing pile
JP2023136911A (en) Pile installation method
JPH03140594A (en) Construction work of water-stopping shaft
JPH0317400A (en) Method and excavator for constructing underground structure
JPH06220841A (en) Construction method of continuous underground wall using steel pipe pile
JPS60164511A (en) Pile pit formation work
JPS6059226A (en) Settlement work of concrete pile
JP3094325B2 (en) Drilling trench widening excavator and its widening excavation method
JPH0213610A (en) Water-stopping and sheeting wall construction method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees