- JPH0543451B2 JPH0543451B2 JP59116397A JP11639784A JPH0543451B2 JP H0543451 B2 JPH0543451 B2 JP H0543451B2 JP 59116397 A JP59116397 A JP 59116397A JP 11639784 A JP11639784 A JP 11639784A JP H0543451 B2 JPH0543451 B2 JP H0543451B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- production
- pace
- station
- production progress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Program-control systems
- G05B19/02—Program-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
Description
【発明の詳細な説明】
〔発明の利用分野〕
本発明は、多くの種類の製品を複数の作業ステ
ーシヨンを経て生産するシステムの制御に係り、
特に、生産変動に即応して対策をたてることに好
適な生産進行制御方法に関する。DETAILED DESCRIPTION OF THE INVENTION [Field of Application of the Invention] The present invention relates to the control of a system that produces many types of products through a plurality of work stations.
In particular, it relates to a production progress control method suitable for taking countermeasures in immediate response to production fluctuations.
従来の方法は、例えば特公昭56−46619号公報
に記載されているようにマイクロコンピユータを
利用して、入力の標準ピツチタイムデータや作業
実績データをもとに演算を行ない、作業時間,実
績出来高,標準ピツチタイム等を選択的に出力、
表示することで、生産管理の測定を行なう装置が
知られている。しかしながら、このような装置は
測定できる項目が消化作業量等の進度状況に関す
るデータに限られているし、データを算出したも
のを表示するだけで、各工程間に変動する生産情
報(設備の故障や特急作業の割込など)を即座に
日程計画に反映するものではなかつた。
In the conventional method, for example, as described in Japanese Patent Publication No. 56-46619, a microcomputer is used to perform calculations based on input standard pitch time data and work performance data, and calculate work time and actual work output. , Selectively output standard pitch time, etc.
A device is known that performs measurement for production control by displaying information. However, the items that can be measured with such devices are limited to data related to the progress status such as the amount of digestion work, and they only display the calculated data, so they cannot measure production information that changes between each process (failure of equipment). (e.g., emergency work interruptions, etc.) were not immediately reflected in the schedule plan.
本発明の目的は、上記した従来の問題点を解決
し、変動する生産情報を収集した後に、この生産
変動に見合つた対策を即座にかつ経済的にたてる
ことのできる生産進行制御方法を提供することに
ある。
The purpose of the present invention is to solve the above-mentioned conventional problems and provide a production progress control method that can immediately and economically take measures commensurate with production fluctuations after collecting fluctuating production information. It's about doing.
本発明では、実績収集により生産変動を把握
し、目標値との検査により実績値をコード化し、
予め対策を検討してテーブルとしてもたせておい
たものを参照し、工程内で処理できる変動に対し
ては、その工程内だけの情報にとどめ、他工程の
作業順序に影響を与えたり、作業の要求をする場
合にはそれぞれの工程へ情報を送ることにより、
生産変動に応じた対応をとるようにしたものであ
る。
In the present invention, production fluctuations are grasped by collecting actual results, and actual values are coded by checking with target values.
Consider countermeasures in advance and refer to the table that you have prepared. For fluctuations that can be handled within a process, limit the information to only that process, and avoid any changes that may affect the work order of other processes or When making a request, by sending information to each process,
The system is designed to respond to changes in production.
以下、本発明の実施例を図に従つて説明する。 Embodiments of the present invention will be described below with reference to the drawings.
第1図は、本発明を実施する際の装置例を示す
システム構成図である。第1図において、1は制
御装置、2は入力装置、3は作業指示装置で、各
作業ステーシヨンに対応して設置されるものであ
る。また、9は上位計算機で、これらの作業ステ
ーシヨンの各装置を管理、統括制御するものであ
る。そして、入力装置2と作業指示装置3は制御
装置1と信号線8でつながれており、また、各々
制御装置1と上位計算機9はトランシーバケーブ
ル7とトランシーバ6を介して、終端抵抗5を持
つ通信回線4により連結される構成をとつてい
る。本機器構成は、工程毎に制御装置1をもつて
おり、分散自津型計算機システムである。1の制
御装置で処理される実績データの内容は、実績内
容フラグ(作業着手、完了、停止、回復、ワーク
到着等)、ロツト番号、入力時点の時刻であり、
作業指示装置3にて出力される内容は、各工程へ
の指示(前工程への督促、生産準備の督促、作業
順序の変更情報)である。これらの点について
は、本出願人が先に出願した特願昭59−3431号
(昭和59年1月13日出願)に詳述されている。 FIG. 1 is a system configuration diagram showing an example of an apparatus for implementing the present invention. In FIG. 1, 1 is a control device, 2 is an input device, and 3 is a work instruction device, which are installed corresponding to each work station. Further, 9 is a host computer that manages and centrally controls each device of these work stations. The input device 2 and the work instruction device 3 are connected to the control device 1 by a signal line 8, and the control device 1 and the host computer 9 are connected to each other via a transceiver cable 7 and a transceiver 6 for communication with a terminal resistor 5. The configuration is such that they are connected by a line 4. This equipment configuration has a control device 1 for each process, and is a distributed computer system. The contents of the performance data processed by the control device 1 are the performance content flag (work start, completion, stop, recovery, work arrival, etc.), lot number, and time at the time of input.
The contents outputted by the work instruction device 3 are instructions to each process (responses to the previous process, reminders for production preparation, information on changing the work order). These points are detailed in Japanese Patent Application No. 1983-3431 (filed on January 13, 1982), which was previously filed by the present applicant.
第2図に、第1図における制御装置1を主とす
る機能構成図を示す。第4図が、その動作を説明
するためのフローチヤート図である。 FIG. 2 shows a functional configuration diagram mainly including the control device 1 in FIG. 1. FIG. 4 is a flowchart for explaining the operation.
第2図において、制御装置1はマイクロコンピ
ユータなどを応用したもので、11はRAMで、
上位計算機9で計画された生産日程計画の当該作
業ステーシヨンに関する生産日程計画データを記
憶する機能11−aと、上位計算機9で生産日程
計画をもとに計算された目標ペース(作業待ち時
間、消化作業量、作業完成の予定日数に対する時
間ずれ)を記憶する機能11−bと、当該作業ス
テーシヨンに関する作業の実績データを記憶する
機能11−cをもつ。12はROMで、ここに
は、予め実績データから当該作業ステーシヨンの
生産進行ペースを算出するペース算出プログラム
12−aと、ペースをコードで表わすためのコー
ド変換プログラム12−bと、ユーザにより設定
されたコードに対する対策のテーブル(デンジヨ
ンテーブル第3図)12−cと、コードとテーブ
ルを比較し対策を選ぶ判定プログラム12−d
と、当該作業ステーシヨン内での作業順序(生産
日程計画データとして与えられている)を変更す
るプログラム12−bとが格納されている。13
は通信制御部で、各作業ステーシヨンの制御装置
1や上位計算機9とデータ通信するためのデータ
受信機能13−aとデータ送信機能13−bをも
つている。そして、これらのRAM11,RAM
12、通信制御部13はバスを介して図示されて
いない中央処理装置に接続され、第4図に示すフ
ローに従つて処理される。 In Fig. 2, the control device 1 is a device using a microcomputer, etc., and 11 is a RAM.
A function 11-a that stores production schedule data related to the work station in the production schedule planned by the host computer 9, and a function 11-a that stores the production schedule data for the relevant work station in the production schedule planned by the host computer 9; It has a function 11-b for storing the amount of work and time deviation relative to the scheduled number of days for completing the work), and a function 11-c for storing work performance data regarding the work station. Reference numeral 12 denotes a ROM, which includes a pace calculation program 12-a that calculates the production progress pace of the work station from actual performance data, a code conversion program 12-b that expresses the pace in code, and a program that is set by the user in advance. A table of countermeasures for the code (Danger table Fig. 3) 12-c and a judgment program 12-d that compares the code and the table and selects a countermeasure.
and a program 12-b for changing the work order (given as production schedule data) within the work station. 13
is a communication control section, which has a data receiving function 13-a and a data transmitting function 13-b for data communication with the control device 1 and host computer 9 of each work station. And these RAM11, RAM
12. The communication control unit 13 is connected to a central processing unit (not shown) via a bus, and is processed according to the flow shown in FIG.
第3図に、第2図におけるデシジヨンテーブル
12−cの概念図を示す。コードは−1、0、1
の3つの値で、生産ペースを示す作業待ち時間Q
と消化作業量Uと作業完成の予定日数に対する時
間のずれDをそれぞれコード化するため33=27通
りある。また、ベースに異常が発生したときの対
策として、作業順序を決定するデイスパツチング
ルールや他の作業ステーシヨンへの督促や作業順
序変更などの依頼などを決めておく。デシジヨン
テーブルとは、この27通りのコードの組合せにつ
いて、各対策の有無を表わすものである。 FIG. 3 shows a conceptual diagram of the decision table 12-c in FIG. 2. The code is -1, 0, 1
The work waiting time Q, which indicates the production pace, is a three-value value.
There are 3 3 = 27 ways to code the amount of work to be completed U and the time difference D relative to the scheduled number of days for completing the work. In addition, as a countermeasure for when an abnormality occurs in the base, dispatching rules for determining the work order, reminders to other work stations, requests to change the work order, etc. are determined. The decision table represents the presence or absence of each measure for these 27 code combinations.
次に第4図のフローチヤートに基いて、第2図
の機能の動作を説明する。 Next, the operation of the functions shown in FIG. 2 will be explained based on the flowchart shown in FIG.
まず、作業完了や設備の故障など実績データに
変動があると動作がスタートし、実績をとり込む
(100)。次に、RAM11に記憶されている日程
計画データと実績データとから、ROM12に格
納されたベース算出プログラムに従つて実績ペー
スQ、U、Dを計算する。 First, when there is a change in performance data such as work completion or equipment failure, the operation starts and the performance is captured (100). Next, the actual paces Q, U, and D are calculated from the schedule data and actual data stored in the RAM 11 according to the base calculation program stored in the ROM 12.
) 作業待ち時間Q:作業待ちジヨブの当該作
業ステーシヨンに対する総作業工数
Q=l
〓i=1
STi (1)
ただし、Jiをi(i=1〜l)番目の作業待
ちジヨブとし、bは作業待ちジヨブ件数、STi
は作業待ちジヨブJiの当該作業ステーシヨンの
作業工数(作業分数)である。) Work waiting time Q: Total number of man-hours for the work waiting job for the relevant work station Q = l 〓 i=1 ST i (1) However, J i is the i (i = 1 to l)-th work waiting job, and b is the number of jobs waiting to be worked on, ST i
is the number of work steps (number of work minutes) at the work station of job J i waiting for work.
) 消化作業量U:当該作業ステーシヨンにお
いて、目標ベースが設定された時点から、完了
した総作業工数
U=n
〓j=1
STj)/t (2)
ただし、Jjをj(j=1〜m)番目の作業完
了ジヨブとし、mは作業完了ジヨブ件数STjは
作業完了ジヨブJjの当該作業ステーシヨンの作
業工数(作業分数)、tはジヨブJnの作業完了
時刻(目標ベースの設定時刻を0として)であ
る。) Amount of work consumed U: Total number of work man-hours completed at the relevant work station from the time the target base was set U= n 〓 j=1 ST j )/t (2) However, J j is changed to j (j=1 ~m)-th work completed job, m is the number of completed jobs ST j is the number of man-hours (work minutes) of the corresponding work station of the completed job J j , and t is the work completion time of job J n (target-based setting). (assuming the time is 0).
) 作業完成の予定日数に対する時間ずれD:
当該ステーシヨンにおいて、ある一定時間にお
いて完了したジヨブの予定日程と完了日程との
ずれの平均値
ただし、Jkをk(k=1〜n)番目の作業完
了ジヨブとし、nは作業完了ジヨブ件数、tkは
作業完了ジヨブJkの作業完了時刻、tdは作業完
了ジヨブJkの予定作業完了時刻でる。) Time lag D relative to the scheduled number of days for work completion:
The average value of the deviation between the scheduled and completion dates of jobs completed within a certain period of time at the relevant station. Here, J k is the k (k = 1 to n) job that has completed work, n is the number of jobs that have completed work, t k is the work completion time of job J k that has completed work, and t d is the schedule of job J k that has completed work. The work completion time is displayed.
以上の3つを計算し、これを実績ベース(Q、
U、Dの3つでとらえる)とする(200)。 Calculate the above three things and use this on an actual basis (Q,
U and D) (200).
次に、コード交換プログラム12−bに従つて
予め、上位システムより与えられた日程計画デー
タに基づき算出した目標ベースと、前述のように
計算した実績ベースとを比較し、コード化する。
目標ベースを表わす成分Q,U,Dにはそれぞれ
幅をもたせており、目標値と実績値を比べて実績
値の方が小さければベースに負の異常が発生した
として−1を、実績値の方が大きければ正の異常
が発生したとして1を、目標ベースを満たしてい
れば正常と判断して0を各コードとして設定し、
コード化により当該ステーシヨンの生産状況を把
握することとする(300)。 Next, according to the code exchange program 12-b, the target base calculated in advance based on the schedule data given from the host system is compared with the actual base calculated as described above, and the results are coded.
The components Q, U, and D representing the target base each have a range, and when the target value and the actual value are compared and the actual value is smaller, it is assumed that a negative abnormality has occurred in the base, and -1 is set for the actual value. If it is larger, it is assumed that a positive abnormality has occurred and is set as 1, and if it satisfies the target base, it is judged as normal and 0 is set as each code.
The production status of the station will be understood by coding (300).
そして、次に、判定プログラム12−dにより
Q,U,Dの3つのコードをデシジヨンテーブル
12−cと比較して対策を選ぶ。例えば、第3図
に示すように(Q、U、D)=(0、0、1)なら
ば、納期に遅れが発生していると判断し、対策テ
ーブルではデイスパツチングルールを納期を最優
先するものに換える指示Aと、前工程の作業ステ
ーシヨンに対して作業を早く送るよう督促をかけ
る指示cが、また、例えば(Q、U、D)=(−
1、0、0)ならば、作業待ちの状態と判断し、
対策テーブルでは前工程の作業ステーシヨンに対
して作業を早く送るよう督促をかける指示Bが与
えられている。そこで、デイスパツチングルール
を変える指示Aを選択すれば、当該作業ステーシ
ヨン内の対象作業についてそのデイスパツチング
ルールによる作業順序の決定を行なう。ここで、
作業順序に変更があれば、生産日程計画データに
変更がおこるので前後の工程の作業ステーシヨン
情報を送信する。また、他工程の作業ステーシヨ
ンに対して督促や準備督促の指示B,Cを選択す
れば、その工程に対して情報を送信する(400)。 Then, the determination program 12-d compares the three codes Q, U, and D with the decision table 12-c to select a countermeasure. For example, as shown in Figure 3, if (Q, U, D) = (0, 0, 1), it is determined that the delivery date is delayed, and the dispatching rule is set to the maximum delivery date in the countermeasure table. The instruction A to change to the priority one and the instruction c to urge the work station in the previous process to send the work early are also, for example, (Q, U, D) = (-
1, 0, 0), it is determined that it is waiting for work,
In the countermeasure table, instruction B is given to urge the work station in the previous process to send work quickly. Therefore, if the instruction A to change the dispatching rule is selected, the work order of the target work in the work station is determined according to the dispatching rule. here,
If there is a change in the work order, the production schedule data will be changed, so the work station information for the previous and subsequent processes is transmitted. Furthermore, if instructions B and C for reminder or preparation reminder are selected for the work station of another process, information is transmitted to that process (400).
続いて、入力装置2などから実績データの入力
があれば処理を繰り返すし、なければ処理を終わ
る(500)。 Next, if performance data is input from the input device 2 or the like, the process is repeated, and if not, the process ends (500).
なお、上述の実施例では分散自津型計算機シス
テムについて説明したが、他の実現形態として、
第5図も一例として考えられる。第5図におい
て、機器構成は第1図と同じであるが、各制御装
置1と上位計算機9とを通信回線4で集中型に連
結している。第1図の機器構成では各制御装置1
がそれぞれ独立に送受信することができるが、第
5図の機器構成では各制御装置1どうしが送受信
するときには、必ず上位計算機9を介するという
違いがある。 In addition, although the above-mentioned example explained a distributed computer system, as another implementation form,
FIG. 5 can also be considered as an example. In FIG. 5, the equipment configuration is the same as that in FIG. 1, but each control device 1 and a host computer 9 are connected via a communication line 4 in a centralized manner. In the equipment configuration shown in Figure 1, each control device 1
However, in the equipment configuration shown in FIG. 5, when the control devices 1 transmit and receive data to each other, the host computer 9 is always used.
本発明によれば、各工程で作業完了のたびに実
績を収集することにより、生産変動すなわち目標
値に対するずれが検出でき、それをコード化して
とらえることにより、デシジヨンテーブルとの対
応がとり易く即応性に優れている。これにより各
工程間に変動する生産情報(設備の故障や特急作
業の割込みなど)を即時に日程計画に反映できる
という効果がある。
According to the present invention, production fluctuations, that is, deviations from target values, can be detected by collecting actual results each time work is completed in each process, and by capturing them in code, it is easy to correspond with the decision table. Excellent responsiveness. This has the effect that production information that fluctuates between each process (equipment failures, emergency work interruptions, etc.) can be immediately reflected in the schedule plan.
第1図は、各工程設置の計算機による分散自律
型計算機システム構成図、第2図は、本発明の一
実施例の制御装置の機能構成図、第3図はデシジ
ヨンテーブルの概念図、第4図は、第2図の内部
に格納されたプログラムのフローチヤート図、第
5図は、分散型のシステム構成の他の実施例図で
ある。
1…制御装置、2…入力装置、3…作業表示
(出力)装置、4…通信回線、5…終端抵抗、6
…トランシーバ、7…トランシーバケーブル、8
…信号線、9…上位計算機、11…RAM、12
…ROM、13…通信制御部。
FIG. 1 is a configuration diagram of a distributed autonomous computer system using computers installed in each process, FIG. 2 is a functional configuration diagram of a control device according to an embodiment of the present invention, and FIG. 3 is a conceptual diagram of a decision table. FIG. 4 is a flowchart of the program stored in FIG. 2, and FIG. 5 is a diagram of another embodiment of the distributed system configuration. DESCRIPTION OF SYMBOLS 1...Control device, 2...Input device, 3...Work display (output) device, 4...Communication line, 5...Terminal resistor, 6
...Transceiver, 7...Transceiver cable, 8
...Signal line, 9...Upper computer, 11...RAM, 12
...ROM, 13...communication control section.
Claims (1)
ステーシヨンを経ながら順次作業が付加されて製
品が完成される生産システムにおいて、 該作業ステーシヨンで得られた実績データと生
産日程計画データとから、生産進行をペースとし
て表現し、目標ペースとの比較により、異常発生
状況に応じて、該異常発生状況別に予め検討して
決めておいた対策に基づいて、該作業ステーシヨ
ン内で処理できる異常に対しては、該ステーシヨ
ン内の情報に留め、他の作業ステーシヨンへ作業
要求をする場合には、それぞれの作業ステーシヨ
ンへ情報を送ることにより、それぞれの作業ステ
ーシヨンが独立に生産システムの生産異常に対応
していくことを特徴とする生産進行制御方法。 2 前記の生産進行を表わすペースをコード化し
て生産進行状況をパターン化し、各パターンに対
して対策をテーブルの形に持たせたことを特徴と
する特許請求の範囲第1項記載の生産進行制御方
法。[Scope of Claims] 1. In a production system in which each of many types of products undergoes work at a plurality of work stations to complete the product, performance data and production schedules obtained at the work stations are provided. From the planning data, the production progress is expressed as a pace, and by comparing it with the target pace, depending on the abnormality occurrence situation, the production progress is expressed as a pace. For abnormalities that can be handled, the information is kept within the station, and when requesting work to other work stations, the information is sent to each work station so that each work station can independently manage the production system. A production progress control method characterized by responding to production abnormalities. 2. Production progress control according to claim 1, characterized in that the pace representing the production progress is coded to pattern the production progress, and countermeasures for each pattern are provided in the form of a table. Method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP59116397A JPS60263656A (en) | 1984-06-08 | 1984-06-08 | Control method of production progress |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP59116397A JPS60263656A (en) | 1984-06-08 | 1984-06-08 | Control method of production progress |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS60263656A JPS60263656A (en) | 1985-12-27 |
| JPH0543451B2 true JPH0543451B2 (en) | 1993-07-01 |
Family
ID=14686028
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP59116397A Granted JPS60263656A (en) | 1984-06-08 | 1984-06-08 | Control method of production progress |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS60263656A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US4866628A (en) * | 1987-12-18 | 1989-09-12 | International Business Machines Corp. | Automated production dispatch system with feedback control |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5719811A (en) * | 1980-07-11 | 1982-02-02 | Hitachi Ltd | Work proceeding-state controlling system |
| JPS57164364A (en) * | 1981-03-31 | 1982-10-08 | Fujitsu Ltd | Managing device for result of production |
-
1984
- 1984-06-08 JP JP59116397A patent/JPS60263656A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS60263656A (en) | 1985-12-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0107191B1 (en) | Method and apparatus for coordination among distributed subsystems | |
| US4648023A (en) | Method for resource allocation for the manufacture of a product | |
| CN112085597A (en) | Loan processing method and system | |
| JP4502414B2 (en) | Production management information output device and production management information output method | |
| JP2000176799A (en) | Production and manufacturing planning system | |
| US6353769B1 (en) | Method for allocating lot priority by ranking lots as a function of budget queue time in a manufacturing control system | |
| US7486997B2 (en) | Safety condition setting support device, program product and device control method for obtaining safety condition for safety network | |
| EP1006468B1 (en) | A method of and device for collecting and combining FA information | |
| JPH0543451B2 (en) | ||
| CN114742540A (en) | Intelligent manufacturing management system | |
| JPH03251351A (en) | Production progress management device | |
| JP2796409B2 (en) | Schedule management method and device | |
| CN117891856B (en) | Intelligent production data management method and system based on big data | |
| CN117488228B (en) | Pressure control method, device and equipment for air knife | |
| CN119250459A (en) | A vertical transportation control and management system for high-rise building construction | |
| CN118586787A (en) | A full-process intelligent control and evaluation system for dry bulk cargo terminals | |
| JPH06303B2 (en) | Job shop scheduling method using distributed processing system | |
| CN111882239A (en) | Project quality control system for engineering construction | |
| CN117436625A (en) | Production schedule management method, system, equipment and medium | |
| CN117726137A (en) | Automatic scheduling method, computer equipment and storage medium | |
| JPH0543450B2 (en) | ||
| JPH04347769A (en) | Process management device | |
| JPH05225207A (en) | Computer display production control board | |
| JPH028860B2 (en) | ||
| CN114240386A (en) | Risk point management system and method based on quality control |