JPH0545377B2 - - Google Patents
Info
- Publication number
- JPH0545377B2 JPH0545377B2 JP60255587A JP25558785A JPH0545377B2 JP H0545377 B2 JPH0545377 B2 JP H0545377B2 JP 60255587 A JP60255587 A JP 60255587A JP 25558785 A JP25558785 A JP 25558785A JP H0545377 B2 JPH0545377 B2 JP H0545377B2
- Authority
- JP
- Japan
- Prior art keywords
- production
- parts
- line
- information
- processing line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004519 manufacturing process Methods 0.000 claims description 90
- 238000012545 processing Methods 0.000 claims description 64
- 238000001514 detection method Methods 0.000 claims description 29
- 239000000047 product Substances 0.000 claims description 27
- 239000011265 semifinished product Substances 0.000 claims description 8
- 238000000034 method Methods 0.000 description 42
- 238000010422 painting Methods 0.000 description 30
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000007726 management method Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 238000007591 painting process Methods 0.000 description 3
- 238000003754 machining Methods 0.000 description 2
- 239000003973 paint Substances 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 239000003086 colorant Substances 0.000 description 1
- 238000010924 continuous production Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000012805 post-processing Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Multi-Process Working Machines And Systems (AREA)
- General Factory Administration (AREA)
- Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
Description
【発明の詳細な説明】
[産業上の利用分野]
この発明は生産指示装置、特に組付けラインと
複数の加工ラインを備えた生産装置において加工
部品の生産を自動的かつタイムリーに行うことに
より加工ラインの平準化生産を行うことのできる
生産指示装置に関する。[Detailed Description of the Invention] [Industrial Application Field] This invention provides a method for automatically and timely producing processed parts in a production instruction device, particularly a production device equipped with an assembly line and a plurality of processing lines. The present invention relates to a production instruction device capable of leveling production on a processing line.
[従来の技術]
工場内における各種の加工あるいは組立て工程
において、各工程で仕掛りワークを正確に管理す
る必要があり、このような物流管理が生産効率に
大きな影響を与えることが知られている。[Conventional technology] In various processing or assembly processes within a factory, it is necessary to accurately manage work in progress at each process, and it is known that such logistics management has a large impact on production efficiency. .
例えば、近年における自動車産業でのカンバン
方式として知られる物流制御方法は工場内におけ
る仕掛り在庫を適正にすると共に、その管理を簡
明にすることに役立つ。 For example, a distribution control method known as the Kanban system in the automobile industry in recent years is useful for optimizing in-process inventory in a factory and simplifying its management.
前述したカンバン方式では、生産の後工程から
前工程に対して順次必要量の製品あるいは部品等
の引渡しを要求して工場内仕掛り在庫を減少させ
ることを目的とし、少品種大量生産においてかつ
多数の工程経路が次第に集約される形態の生産工
程においては極めて有用である。 The above-mentioned Kanban method aims to reduce the in-process inventory in the factory by requesting the delivery of the required amount of products or parts from the post-production process to the pre-production process in order, and it This is extremely useful in production processes where multiple process routes are gradually integrated.
しかしながら、このようなカンバン方式では後
工程での必要な部品を要求する管理に関しては有
用であるが、より詳細な物流情報を有していない
ために途中の製品あるいは部品(以下仕掛りワー
クという)の供給順序に関する配慮が全く成され
ていないという問題があつた。 However, although this type of kanban system is useful for managing required parts in subsequent processes, it does not have more detailed logistics information, so it is difficult to manage products or parts that are still in progress (hereinafter referred to as work-in-progress). There was a problem that no consideration was given to the order in which the products were supplied.
特に、複数の工程を合流させて後工程へ送る合
流部においては、後工程における設備あるいは作
業等の便宜を図るために合流順序が大きな問題と
なり、この合流部での処理によつて後工程におけ
る作業の平準化あるいはロツト化が図られ、多種
大量生産あるいは多品種少量生産などにおいても
このような平準化及びロツト化の効果は全体の生
産能率を著しく改善することができる。 In particular, at the merging section where multiple processes are combined and sent to the subsequent process, the order of merging becomes a big problem in order to facilitate the equipment or work in the subsequent process, and the processing at this juncture makes it difficult for the subsequent process to proceed. Work can be leveled or batched, and the effects of leveling and batching can significantly improve overall production efficiency even in high-mix, high-volume production or high-mix, low-volume production.
一方、同一種類の作業を連続して行うことが工
程の能率を著しく改善する場合もあり、このよう
なときにはロツト化された、すなわち同一種類の
後工程を有する仕掛りワークを連続させることが
必要となる場合があり、合流部ではこのようなロ
ツト化も合わせて考慮する必要がある。 On the other hand, there are cases where performing the same type of work in succession can significantly improve process efficiency, and in such cases it is necessary to serialize in-process work that has the same type of post-processing. In some cases, it is necessary to consider such lot formation at the confluence section.
例えば、自動車の組立て工程において、車体の
塗装を例にとると、同一色の塗装は連続的な作業
によつて迅速に処理することができるが、車体の
色が変わるとその都度塗装工程では塗料の置換を
必要とし、その段取りに大きな労力と時間を要す
ることが理解され、このような段取り時に無駄に
捨てられる塗料が発生し、塗装工程での効率を著
しく低下させる。従つて、このような塗装工程に
対しては同一色の仕掛りワークを連続して流すこ
とが好ましい。 For example, in the car assembly process, when painting the car body, painting the same color can be quickly done by continuous work, but when the color of the car body changes, the paint is applied in the painting process each time. It is understood that it requires a large amount of labor and time to set up, and that paint is wasted during such setup, which significantly reduces the efficiency of the painting process. Therefore, for such a painting process, it is preferable to continuously flow unfinished works of the same color.
第5図には従来のこのような生産指示装置の概
略構成が示されている。 FIG. 5 shows a schematic configuration of such a conventional production instruction device.
この生産指示装置は、多品種混合生産ラインと
しての複数の工程10〜16から成る組付けラインA
と、該組付けラインAの一工程14に同一種類の部
品を加工供給するための少なくとも2本の加工ラ
インB1,B2とを有している。 This production instruction device is an assembly line A consisting of multiple processes 10 to 16 as a multi-product mixed production line.
and at least two processing lines B 1 and B 2 for processing and supplying the same type of parts to one process 14 of the assembly line A.
前記組付けラインAの近傍には、該組付けライ
ンAを通過した半成品品種情報を検出する検出手
段18が設けられており、また、前記加工ライン
B1,B2の近傍には、前記組付けラインAにて検
出された品種情報を各加工ラインB1,B2に付与
し、前記品種情報に基づき加工ラインB1,B2の
生産指示を行う指示手段20−1,20−2が設
けられている。 A detection means 18 is provided near the assembly line A for detecting information on the type of semi-finished products that have passed through the assembly line A.
In the vicinity of B 1 and B 2 , the type information detected on the assembly line A is given to each processing line B 1 and B 2 , and production instructions for the processing lines B 1 and B 2 are given based on the type information. Instructing means 20-1 and 20-2 are provided.
そして、この生産指示装置は、組付けラインA
に対し複数の加工ラインB1,B2から同一種類の
部品を分担して供給する生産方式であり、加工ラ
インB1,B2では一般に組付けラインAに供給す
る部品以外も同種類の部品を生産し、パーツ等と
して他の組付けラインあるいは補給部品倉庫等に
供給する方式をとつている。このときの加工ライ
ン間の生産分担は、通常月に1回行われる月度生
産計画等により決定されていた。 This production instruction device is the assembly line A.
This is a production method in which parts of the same type are distributed and supplied from multiple processing lines B 1 and B 2 , and in general, parts of the same type are supplied to assembly line A in processing lines B 1 and B 2 . The system produces parts and supplies them as parts to other assembly lines or supply parts warehouses. The division of production among the processing lines at this time was determined by a monthly production plan, etc., which is normally carried out once a month.
[発明が解決しようとする問題点]
従来の問題点
しかしながら、組付けラインAを通過する品種
順序は、必ずしも複数の加工ラインB1,B2間の
生産負荷を完全に均一化する条件を満足するとは
限らず、往々にして加工ライン間の生産負荷バラ
ンスが短時間に大きく変動するという問題があつ
た。[Problems to be solved by the invention] Conventional problems However, the order of products passing through assembly line A does not necessarily satisfy the condition of completely equalizing the production load between multiple processing lines B 1 and B 2 . This is not always the case, and there is often a problem that the production load balance between processing lines fluctuates greatly in a short period of time.
このため、組付けラインAへの部品供給が間に
合わず、欠品による組付けラインAの停止という
問題にまで及ぶ場合もあつた。 For this reason, parts could not be supplied to the assembly line A in time, and there were cases where the assembly line A was stopped due to missing parts.
また、組付けラインAで生産する品種の中に
は、加工ラインB1,B2から部品供給する必要が
ない品種も含まれており、こ種の生産不要な品種
情報が加工ラインB1,B2に出力されたとき、従
来は作業者等の判断によりパーツ等の生産に切り
替えていたが、パーツ等の部品に対しても納期が
定めてあるにもかかわらず、生産タイミングを作
業者の勘に頼ることとなり、組付けラインAに流
れる品種順序によつては、パーツ等の部品を生産
するタイミングを逸し欠品となる場合があつた。 In addition, among the products produced on assembly line A, there are products that do not require parts to be supplied from processing lines B 1 and B 2 , and information on products that do not require production of this type is stored on processing lines B 1 and B 2 . In the past, when the output was output to B 2 , the production of parts, etc. was switched at the discretion of the worker, etc., but even though there is a set delivery date for parts, etc., the production timing is determined by the worker. This meant relying on intuition, and depending on the order of the products flowing to assembly line A, there were cases where the timing for producing parts was missed and products were out of stock.
更に、加工ラインB1,B2は多段の連続工程で
あり、作業指示ポイントにおいては前工程の加工
が完了した部品を中間在庫として多数台持ち、作
業指示内容に合致しない部品が前工程から後工程
に搬送されてきた場合には、その部品を中間在庫
置き場に移動し、代りに中間在庫置き場から作業
指示内容に合致する部品を取り出し後工程に投入
していた。 Furthermore, processing lines B 1 and B 2 are multi-stage continuous processes, and at the work instruction point, a large number of parts that have been processed in the previous process are kept as intermediate inventory, and parts that do not match the work instructions are transferred from the previous process to the subsequent process. When a part is transported to a process, it is moved to an intermediate inventory storage area, and instead, a part matching the work instruction is taken out from the intermediate inventory storage area and placed in the subsequent process.
この方式は広い中間在庫スペースを必要とする
と共に、後工程への投入部品の入れ替えに多大な
工数を要するという問題があつた。 This method requires a large intermediate inventory space, and has the problem of requiring a large number of man-hours to replace parts to be input into subsequent processes.
発明の目的
本発明は上記従来の課題に鑑みなされたもの
で、多品種混合生産ラインにおける部品の生産タ
イミングを制御部にて管理指示し、これによつて
全体の生産進行効率を著しく改善することのでき
る改良された生産指示装置の提供を目的とする。Purpose of the Invention The present invention has been made in view of the above-mentioned conventional problems, and it is an object of the present invention to manage and instruct the production timing of parts in a multi-product mixed production line using a control unit, thereby significantly improving the overall production progress efficiency. The purpose of the present invention is to provide an improved production instruction device that can perform the following tasks.
[問題点を解決するための手段及び作用]
この発明に係る生産指示装置は、多種類のワー
クに対する部品の組付けを行う組付けラインと、
この組付けラインに同期して各種ワークに対する
部品を生産して組付けラインに供給するメイン加
工ラインと、このメイン加工ラインと同一種類の
部品であつて、限定された種類のワークに対する
部品を生産して組付けラインに供給するサブ加工
ラインと、を有する多品種混合生産ラインにおけ
る生産指示装置において、前記組付けラインを通
過した半成品品種情報を検出する品種検出手段
と、各加工ラインを通過した加工部品情報を検出
する部品情報検出手段と前記各検出手段からの情
報を受入れて必要な部品生産量を算出し、この部
品生産量からサブ加工ラインにおいて生産可能な
部品についての部品生産量を差引きメイン加工ラ
インにおいて生産すべきメイン加工ライン必要生
産量を算出し、このメイン加工ライン必要生産量
をメイン加工ラインにおける初期の生産能力と比
較し、メイン加工ライン必要生産量がこの初期生
産能力より少ない時にその差の量について部品生
産を指示し、メイン加工ライン必要生産量が当初
生産能力より大きい時にはその超過分ついて次の
生産に繰り越して残りの量についての生産を指示
するとともに、前記品種情報検出手段からの品種
情報の順序に対応させてメイン加工ラインにおけ
る生産順序を決定する制御部と、を備えているも
のである。[Means and effects for solving the problems] The production instruction device according to the present invention includes an assembly line for assembling parts to various types of workpieces;
A main processing line that produces parts for various workpieces in synchronization with this assembly line and supplies them to the assembly line, and a main processing line that produces parts of the same type as this main processing line but for limited types of workpieces. A production instruction device for a multi-product mixed production line having a sub-processing line for supplying semi-finished products to an assembly line; The required parts production amount is calculated by accepting information from a parts information detection means for detecting processed parts information and each of the above-mentioned detection means, and from this parts production amount, the parts production amount of parts that can be produced on the sub-processing line is calculated. Calculate the required production volume of the main processing line to be produced on the main processing line, compare this required production volume of the main processing line with the initial production capacity of the main processing line, and calculate the required production volume of the main processing line from this initial production capacity. When the amount is small, the production of parts is instructed for the amount of difference, and when the required production amount of the main processing line is larger than the initial production capacity, the excess amount is carried over to the next production and production of the remaining amount is instructed, and the product information is The apparatus includes a control section that determines the production order on the main processing line in accordance with the order of product information from the detection means.
以上により、メイン加工ラインとサブ加工ライ
ンの生産分担を適当なものとでき、かつメイン加
工ラインにおける生産順序も制御するため、組付
けラインにて要求する部品と加工ラインから供給
される部品の種類、数量は合つているにもかかわ
らず、組付けラインと加工ラインを流れる順序が
違うことによる部品の順序調整を行うという余分
な工数が不要となり、また、中間在庫の削減を図
ることができる。 As described above, in order to appropriately divide the production between the main processing line and the sub-processing line, and also control the production order on the main processing line, the types of parts required on the assembly line and the parts supplied from the processing line are Even though the quantities are the same, the order of parts flowing through the assembly line and processing line is different, which eliminates the need for extra man-hours for adjusting the order of parts, and it is also possible to reduce intermediate inventory.
[実施例]
以下、図面に基づき本発明の好適な実施例を説
明する。[Examples] Hereinafter, preferred embodiments of the present invention will be described based on the drawings.
第1図には本発明に係る生産指示装置の概略構
成が示されている。 FIG. 1 shows a schematic configuration of a production instruction device according to the present invention.
同図において、この生産指示装置は、多品種混
合生産ラインにおける組付けラインと、この組付
けラインに同期して同一種類の部品を加工生産す
る複数の加工ラインを有している。前記組み付け
ラインAは、実施例では、複数種類の自動車を混
合連続して生産する生産ラインであり、加工ライ
ンは、各車種に対応したカラーバンパを主に生産
するバンパ塗装メインラインMと、パーツ品等を
主に生産するバンパ塗装サブラインSとから成
る。 In the figure, this production instruction device has an assembly line in a multi-product mixed production line, and a plurality of processing lines that process and produce the same type of parts in synchronization with this assembly line. In the embodiment, the assembly line A is a production line that continuously produces a mixture of multiple types of automobiles, and the processing line is a bumper painting main line M that mainly produces color bumpers corresponding to each car model, and a parts production line. This line consists of a bumper painting subline S, which mainly produces products, etc.
以上において、本発明の特徴的なことは、組付
けラインを通過した半成品品種情報を検出する検
出手段と、加工ラインを通過した加工部品情報を
検出する検出手段と、前記各検出手段からの情報
を受入れて複数の各加工ラインの生産能力に応じ
て各加工ラインに生産分担指令を出力すると共
に、各加工ラインの加工順序を前記生産分担指令
に合わせて制御する機能を有する制御部とを備え
ていることである。 As described above, the present invention is characterized by a detection means for detecting information on the type of semi-finished products that have passed through the assembly line, a detection means for detecting information on the processed parts that have passed through the processing line, and information from each of the above-mentioned detection means. and a control unit having a function of receiving the information and outputting a production sharing command to each processing line according to the production capacity of each of the plurality of processing lines, and controlling the processing order of each processing line in accordance with the production sharing command. This is what is happening.
すなわち、前記組付けラインAは、複数の工程
22〜28から成り、この組付けラインAの近傍には
その一工程22を通過した半成品品種情報をキヤツ
チする検出手段30が設けられている。また、バ
ンパ塗装メインラインMの近傍にはその一工程47
を通過した加工部品情報を検出する検出手段32
と、パーツ品等の生産情報を検出するためのパー
ツ品情報検出手段34、及びメインライン作業指
示装置36が設置されており、バンパ塗装サブラ
インSにはサブライン作業指示装置38が設置さ
れている。 That is, the assembly line A has multiple steps.
22 to 28, and a detection means 30 is provided near the assembly line A to catch information on the type of semi-finished products that have passed through one process 22. In addition, near the bumper painting main line M, one of the processes 47
Detection means 32 for detecting processed part information that has passed through
, a parts product information detection means 34 for detecting production information of parts products, etc., and a main line work instruction device 36 are installed, and a subline work instruction device 38 is installed in the bumper painting subline S.
更に、前記各検出手段30,32,34からの
各情報を記憶、演算、処理し、各ラインの作業指
示装置36,38にデータを出力する制御部40
が設けられている。この制御部40は、各種デー
タを入力するための入力回路、そのデータを表示
する表示回路、各種のデータを記憶する記憶回
路、演算回路、及び外部情報の入出力を行う入出
力回路から成り、前記半成品品種情報を検出する
検出手段30から通過車種情報が入力され、ま
た、加工部品情報検出手段32からは通過バンパ
情報が入力され、パーツ品情報検出手段34から
はパーツ品情報が入力される。 Furthermore, a control section 40 stores, calculates, and processes each information from each of the detection means 30, 32, and 34, and outputs data to the work instruction devices 36 and 38 of each line.
is provided. The control unit 40 is composed of an input circuit for inputting various data, a display circuit for displaying the data, a memory circuit for storing various data, an arithmetic circuit, and an input/output circuit for inputting and outputting external information. Passing vehicle model information is input from the detection means 30 for detecting semi-finished product type information, passing bumper information is input from the processed parts information detection means 32, and parts product information is input from the parts product information detection means 34. .
そして、前記3種の検出手段30,32,34
からの情報を入力順に記憶し、通過車種情報の記
憶データ量が予め設定した量に達したら、バンパ
塗装メインラインM及びバンパ塗装サブラインS
にて生産能力に応じた作業指示データの作製が行
われ、その情報がメインライン作業指示装置36
とサブライン作業指示装置38へ生産分担指令と
して出力される。 The three types of detection means 30, 32, 34
When the amount of stored data of passing vehicle type information reaches a preset amount, the bumper painting main line M and the bumper painting subline S are stored.
Work instruction data is created according to the production capacity, and the information is sent to the main line work instruction device 36.
and is output to the subline work instruction device 38 as a production sharing command.
バンパ塗装メインラインMとバンパ塗装サブラ
インSとでは、制御部40からの出力情報を基に
カラーバンパの生産が行われ、組付けラインAの
バンパ組付け工程26へロツト単位で供給される。 In the bumper painting main line M and the bumper painting subline S, colored bumpers are produced based on the output information from the control section 40, and are supplied to the bumper assembly process 26 of the assembly line A in units of lots.
第2図には実施例に基づくプログラムフローチ
ヤートが示されている。 FIG. 2 shows a program flowchart based on the embodiment.
メインプログラム42は、常にステツプ100〜
140に示される一連の処理を行つており、それ以
外には第3図a〜cのパーツ品情報検出手段34
から送信される情報を蓄えるパーツ情報入力プロ
グラム150と、加工部品情報検出手段32から
送信されるバンパ情報を蓄える通過バンパ入力処
理プログラム160と、半成品品種情報検出手段
30から送信される情報を蓄える車種情報入力処
理プログラム170から成るサブプログラムを有
している。 The main program 42 always starts from step 100.
140, and other than that, the parts information detection means 34 shown in FIG. 3 a to c is performed.
a parts information input program 150 that stores information sent from the processing parts information detection means 32; a passing bumper input processing program 160 that stores the bumper information sent from the processed parts information detection means 32; and a vehicle model storage program that stores information sent from the semi-finished product type information detection means 30. It has a subprogram consisting of an information input processing program 170.
すなわち、前記第2図におけるステツプ100の
条件判定処理では、車種情報が一定ロツト替えら
れたか否か、又は情報が一定期間継続して送られ
てこないか等、所定の条件を満足するか否かの判
定を行い条件が満たされればステツプ110へ進む。
ステツプ110のメインライン、サブライン生産分
担処理では、蓄えられた車種情報の中からメイン
ラインM及びサブラインSの生産対象品以外のバ
ンパを抜き取り、残つた車種情報の各々について
バンパ塗装メインラインMで生産するものと、バ
ンパ塗装サブラインSで生産するもの等に振り分
けられる。 That is, in the condition determination process at step 100 in FIG. 2, it is determined whether a predetermined condition is satisfied, such as whether the vehicle model information has been changed in a certain number of lots, or whether information has not been continuously sent for a certain period of time. If the conditions are satisfied, the process proceeds to step 110.
In step 110, main line and subline production sharing processing, bumpers other than those to be produced on main line M and subline S are extracted from the stored vehicle model information, and each of the remaining vehicle model information is produced on bumper painting main line M. These are divided into those produced by the bumper painting subline S, and those produced by the bumper painting subline S.
この結果得られたバンパ塗装メインラインMに
指示される情報に対し、ステツプ120のメインラ
イン作業負荷平準化処理では、メインライン分担
分がメインライン生産能力より少ない場合はパー
ツ品等のデータを追加したり、反対に生産能力を
オーバーする場合には次回の指示データとして保
留する処理を行う。 Based on the information instructed to the bumper painting main line M obtained as a result, in the main line workload leveling process in step 120, if the main line share is less than the main line production capacity, data such as parts etc. is added. Or, conversely, if the production capacity is exceeded, processing is performed to hold the instruction data for the next time.
ステツプ130のメインライン作業指示順序調整
処理では、後述する通過バンパ入力処理プログラ
ム44で得られたバンパの並びとステツプ120の
メインライン作業負荷平準化処理で作成された情
報を比較し、バンパ塗装メインラインMでの並び
換え作業が最小で済むよう、バンパの並びを基準
にメインライン指示情報の並び換えが行われる。 In the main line work order adjustment process in step 130, the bumper arrangement obtained by the passing bumper input processing program 44, which will be described later, is compared with the information created in the main line work load leveling process in step 120, and the main line work order adjustment process for bumper painting is performed. In order to minimize the sorting work on line M, the main line instruction information is sorted based on the bumper arrangement.
そして、ステツプ140の作業指示出力処理にお
いて、メインライン作業指示順序調整処理に至る
ステツプまでに得られたメインライン作業指示情
報をメインライン作業指示装置36に、また、サ
ブライン作業指示情報をサブライン作業指示装置
38に出力する。 Then, in the work instruction output process of step 140, the main line work instruction information obtained up to the steps leading to the main line work instruction order adjustment process is sent to the main line work instruction device 36, and the subline work instruction information is sent to the subline work instruction Output to device 38.
次に、第3図に基づき前記メインプログラム4
2で使われるサブプログラムの処理内容を説明す
る。 Next, based on FIG. 3, the main program 4
The processing contents of the subprogram used in 2 will be explained.
第3図aにおいて、パーツ情報入力処理150
では、塗装メインラインMに設置されたパーツ品
情報検出手段34からの情報を受信し、それがカ
ンバン品であるか再塗装品であるか等を確認した
後、指示毎に情報の格納を行う。このパーツ品情
報検出手段34は、塗装ラインで再塗装品が発生
したりカンバン品が届いたときに、作業者が手で
入力を行うため、ランダムなタイミングで送信さ
れるが、制御部40側からは定期的に読取る動作
が行われる。 In FIG. 3a, parts information input processing 150
Then, after receiving information from the parts product information detection means 34 installed in the painting main line M and confirming whether it is a kanban product or a repainted product, the information is stored for each instruction. . This parts information detection means 34 is transmitted at random timing because the operator inputs it manually when a repainted item occurs on the painting line or when a kanban item arrives. From then on, reading operations are performed periodically.
通過バンパ入力処理160では、バンパが塗装ラ
インの前工程においてある加工部品情報を検出す
る検出手段32の前を通過する度にデジタル値が
制御部40に送信されるが、この情報をデータテ
ーブルを参照して車種情報に変換して格納する処
理が行われる。 In the passing bumper input processing 160, a digital value is sent to the control unit 40 every time the bumper passes in front of the detection means 32 that detects information on a certain processed part in the pre-process of the painting line. Processing is performed to refer to it, convert it into vehicle type information, and store it.
車種情報入力処理170では、自動車組付けライ
ンAに設置した半成品品種情報を検出する検出手
段30から送信される車種情報(カラーナンバー
等を含む)を受信分類し、格納する処理が行われ
る。 In the vehicle type information input process 170, the vehicle type information (including color number, etc.) transmitted from the detection means 30 installed on the automobile assembly line A for detecting semi-finished product type information is received, classified, and stored.
次に本実施例の具体例を、車種がX、Y、Z、
カラーがa、b、cの自動車を組付けラインAで
生産し、バンパ塗装ラインMでは全車種と前記カ
ラーの組み合わせから成る全てのバンパを生産
し、バンパ塗装サブラインSではXaかYaに対応
したバンパ、すなわち同一色のバンパのみ生産す
るよう生産分担した例を基に説明する。 Next, a specific example of this embodiment will be explained in which the vehicle types are X, Y, Z,
Vehicles with colors a, b, and c are produced on assembly line A, bumper painting line M produces all bumpers of all car models and the above color combinations, and bumper painting subline S produces products that correspond to Xa or Ya. The explanation will be based on an example in which production is divided so that only bumpers, that is, bumpers of the same color are produced.
制御部40では、車種(カラーも含む)情報を
一定ロツト蓄えるわけであるが、これによつてバ
ンパ塗装メインラインMとバンパ塗装サブライン
Sとで生産分担量を決定することができ、また塗
装ラインの並びと比較することで、第1図の組付
けラインAのバンパ組付け工程26に供給される一
定ロツト内で要求するバンパと供給されるバンパ
の種類、本数は合つているにもかかわらず、要求
バンパの順序と塗装ライン前工程48を流れるバン
パ順序とが違うために、塗装ラインでは1本1本
順序調整して上塗工程50に流すという余分な工数
を大幅に減らすことが可能となる。 The control unit 40 stores vehicle type (including color) information in a certain lot, and by this, the production share can be determined between the bumper painting main line M and the bumper painting subline S. By comparing the arrangement of bumpers with Since the order of the requested bumpers is different from the order of the bumpers flowing through the pre-process 48 of the painting line, it is possible to significantly reduce the extra man-hours required to adjust the order of each bumper one by one and send them to the top coating process 50 on the painting line. .
以下、第4図に基づきその具体的処理内容を説
明する。 The specific processing contents will be explained below based on FIG. 4.
第4図aに示されるように、制御部40に蓄え
られた車種情報があるロツト(切出しロツト)に
なつたところで処理が開始される。 As shown in FIG. 4a, the process is started when the vehicle type information stored in the control section 40 reaches a certain lot (cutout lot).
第4図bでは、購入品あるいは黒素地バンパ装
着分等の塗装ラインで生産しない車種すなわち
Ydは取去られる。 In Figure 4b, vehicle models that are not produced on the painting line, such as purchased items or those with black base bumpers, are shown.
Yd is removed.
また第4図cに示されるように、フロントバン
パFの他リアバンパRも生産する情報には、その
リアバンパ情報Rも付けて自動車台数単位をバン
パ本数単位として表示する。この実施例において
は、ZaとZcのバンパはフロントバンパFのみで
足り、ZaのリアバンパRとZcのリアバンパRと
は不要の場合である。 Further, as shown in FIG. 4c, information on the production of rear bumpers R in addition to front bumpers F also includes the rear bumper information R, and is displayed in units of the number of automobiles as units of the number of bumpers. In this embodiment, only the front bumper F is sufficient as the bumper for Za and Zc, and the rear bumper R for Za and the rear bumper R for Zc are unnecessary.
第4図bでは、以上により作成された情報をバ
ンパ塗装メインラインMとバンパ塗装サブライン
Sのどちらで生産させるかを、メインラインMの
設定能力とサブライン生産車種とから判定し、バ
ンパ塗装メインラインMとサブラインSとで生産
するものとに分けられる(生産分担)。 In Fig. 4b, it is determined whether the information created above is to be produced on the bumper painting main line M or the bumper painting subline S based on the set capacity of the main line M and the subline production vehicle type, and the bumper painting main line It is divided into those produced by M and subline S (production division).
第4図eでは、前記第4図dにて作成されたメ
インラインMのバンパ情報と、パーツ品情報検出
手段34とから入力された情報、及びバンパ塗装
メインラインMの生産能力とからバンパ塗装メイ
ンラインMに指示すべき情報が作成される(メイ
ンライン負荷平準化)。 In FIG. 4e, bumper painting is performed based on the bumper information of the main line M created in FIG. 4d, information input from the parts information detection means 34, and the production capacity of the bumper painting main line M. Information to be instructed to the main line M is created (main line load leveling).
そして、第4図fでは、前述した第4図eにお
いて作成された情報と、加工部品情報を検出する
検出手段32とから入力された情報の並びを比較
し、バンパ塗装メインラインMに指示する情報の
並び替えを行い、第4図gのように最終的な指示
情報が得られる(メインライン順序調整)。 Then, in FIG. 4f, the information created in FIG. The information is rearranged to obtain the final instruction information as shown in Figure 4g (main line order adjustment).
なお、第4図fからgへ移行するときには、そ
の工程間に設けられた中間在庫置き場を介して、
指示内容に合致する部品、すなわちバンパを取り
出し入れ替えている。 Note that when moving from f to g in Fig. 4, through the intermediate inventory space provided between the steps,
The parts that match the instructions, namely the bumper, are removed and replaced.
以上説明したように、本実施例によれば、加工
ラインにおける供給能力が組付けラインで必要な
量を上回つている場合において、組付けライン以
外へ供給する期限付き部品の生産タイミングを、
制御部40において管理指示することとしている
ため欠品の発生を生じることがない。また、従来
は必要としていた生産順序の大幅な変更を最小限
に押えることができ、大幅な工数削減と中間在庫
の減少につながる。 As explained above, according to this embodiment, when the supply capacity on the processing line exceeds the amount required on the assembly line, the production timing of parts with a deadline to be supplied to other than the assembly line can be changed.
Since the control unit 40 issues management instructions, there will be no shortage of items. In addition, major changes in the production order, which were previously required, can be kept to a minimum, leading to a significant reduction in man-hours and intermediate inventory.
[発明の効果]
この発明は、以上説明した通り、サブ加工ライ
ンにおいて、得られる情報に従つて生産できるバ
ンパを生産し、残りをメイン加工ラインの生産分
としたため、サブ加工ラインにおいて特定種類の
バンパの生産をまとめて行うことができる。この
ため、同一種類のバンパの生産を分担して行う従
来例と比べ、メインライン、サブラインとも生産
を効率的に行うことができる。このため、最大生
産台数を大きく設定でき、生産の大きな変化にも
対応できる。また、中間在庫も少なくてもよくな
る。[Effects of the Invention] As explained above, the present invention allows the sub-processing line to produce bumpers that can be produced according to the information obtained, and the remaining parts to be produced on the main processing line. Bumpers can be produced all at once. Therefore, compared to the conventional example in which the production of the same type of bumper is divided among the two, production can be carried out efficiently on both the main line and the sub-line. Therefore, the maximum number of production units can be set to a large value, and large changes in production can be accommodated. In addition, intermediate inventory can also be reduced.
第1図は本発明に係る生産指示装置の概略構成
説明図、第2図は本実施例における制御プログラ
ムのフローチヤート説明図、第3図a,b,cは
第2図の制御プログラムにおいて使用されるサブ
プログラムの内容を示すフローチヤート説明図、
第4図a〜gは本実施例における具体的処理内容
を示す説明図、第5図は従来の生産指示装置の概
略構成説明図である。
30,32,34……検出手段、40……制御
部、A……組付けライン、M……加工メインライ
ン、S……加工サブライン。
Fig. 1 is a schematic configuration explanatory diagram of a production instruction device according to the present invention, Fig. 2 is a flowchart explanatory diagram of a control program in this embodiment, and Figs. 3 a, b, and c are used in the control program of Fig. 2. A flowchart explanatory diagram showing the contents of the subprogram to be executed,
FIGS. 4a to 4g are explanatory diagrams showing specific processing contents in this embodiment, and FIG. 5 is an explanatory diagram of a schematic configuration of a conventional production instruction apparatus. 30, 32, 34...detection means, 40...control unit, A...assembly line, M...machining main line, S...machining subline.
Claims (1)
組付けラインと、 この組付けラインに同期して各種ワークに対す
る部品を生産して組付けラインに供給するメイン
加工ラインと、 このメイン加工ラインと同一種類の部品であつ
て、限定された種類のワークに対する部品を生産
して組付けラインに供給するサブ加工ラインと、 を有する多品種混合生産ラインにおける生産指示
装置において、 前記組付けラインを通過した半成品品種情報を
検出する品種検出手段と、 各加工ラインを通過した加工部品情報を検出す
る部品情報検出手段と、 前記各検出手段からの情報を受入れて必要な部
品生産量を算出し、この部品生産量からサブ加工
ラインにおいて生産可能な部品についての部品生
産量を差引きメイン加工ラインにおいて生産すべ
きメイン加工ライン必要生産量を算出し、このメ
イン加工ライン必要生産量をメイン加工ラインに
おける初期の生産能力と比較し、メイン加工ライ
ン必要生産量がこの初期生産能力より少ない時に
その差の量について部品生産を指示し、メイン加
工ライン必要生産量が当初生産能力より大きい時
にはその超過分ついて次の生産に繰り越して残り
の量についての生産を指示するとともに、前記品
種情報検出手段からの品種情報の順序に対応させ
てメイン加工ラインにおける生産順序を決定する
制御部と、 を備えてなることを特徴とする生産指示装置。[Claims] 1. An assembly line that assembles parts to various types of workpieces; A main processing line that produces parts for various types of workpieces in synchronization with this assembly line and supplies them to the assembly line; and a sub-processing line that produces parts for limited types of workpieces that are the same as the main processing line and supplies them to the assembly line. A product type detection means for detecting information on the type of semi-finished products that have passed through the assembly line, a parts information detection means for detecting information on the processed parts that have passed through each processing line, and a required part production amount by accepting information from each of the detection means. Calculate the required production volume of the main processing line that should be produced on the main processing line by subtracting the parts production volume of parts that can be produced on the sub-processing line from this parts production volume, and calculate the required production volume of this main processing line. Compare the initial production capacity of the main processing line, and when the required production volume of the main processing line is less than this initial production capacity, instruct parts production based on the amount of difference, and when the required production volume of the main processing line is greater than the initial production capacity. a control unit that carries over the excess amount to the next production and instructs production of the remaining amount, and determines the production order on the main processing line in accordance with the order of the product information from the product information detection means; A production instruction device characterized by:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60255587A JPS62114862A (en) | 1985-11-13 | 1985-11-13 | Production instructing device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60255587A JPS62114862A (en) | 1985-11-13 | 1985-11-13 | Production instructing device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62114862A JPS62114862A (en) | 1987-05-26 |
| JPH0545377B2 true JPH0545377B2 (en) | 1993-07-09 |
Family
ID=17280790
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60255587A Granted JPS62114862A (en) | 1985-11-13 | 1985-11-13 | Production instructing device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS62114862A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2686977B2 (en) * | 1988-07-29 | 1997-12-08 | マツダ株式会社 | Vehicle assembly apparatus and vehicle assembly method |
| JP2932477B2 (en) * | 1988-08-23 | 1999-08-09 | トヨタ自動車株式会社 | Production instruction system |
-
1985
- 1985-11-13 JP JP60255587A patent/JPS62114862A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62114862A (en) | 1987-05-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5402349A (en) | System for forming automatic production line control data | |
| Maxwell et al. | A modeling framework for planning and control of production in discrete parts manufacturing and assembly systems | |
| Suresh et al. | Achieving factory automation through group technology principles | |
| JPH0545377B2 (en) | ||
| Basse et al. | Scalable ramp-up of hybrid manufacturing systems | |
| JP3095281B2 (en) | Multi-product line production support system | |
| JP2732061B2 (en) | Flexible production system | |
| JPH04303204A (en) | production planning system | |
| Chakravarty | Dimensions of manufacturing automation | |
| JP2004094483A (en) | Small part group ordering device and ordering method for product production line following part production line group, and program therefor | |
| JPS6130366A (en) | Control of physical distribution | |
| JP3016814B2 (en) | Processing schedule creation device | |
| JPH0236036A (en) | Indication method for input of work | |
| Lee et al. | Changing role of humans within an integrated automated guided vehicle system | |
| JPS6246302A (en) | Data setting method using crt | |
| JPH09141542A (en) | How to automatically create a machining plan | |
| Black | Design and implementation of lean manufacturing systems and cells | |
| JP2836247B2 (en) | Production line control method for production equipment | |
| EP0488290A1 (en) | Method and apparatus for preparing numerical control data for a numerically controlled machine tool | |
| Dyadichev et al. | Mathematical Model for Traffic Optimization in Flexible Manufacturing Systems | |
| JP2000005981A (en) | Production management device | |
| Lenz | The MAST simulation environment | |
| JP3216024B2 (en) | Control device for numerically controlled machine tools | |
| JPH10147268A (en) | Production instruction system | |
| EP0615179B1 (en) | Numeric controller |