JPH0545726B2 - - Google Patents
Info
- Publication number
- JPH0545726B2 JPH0545726B2 JP59142367A JP14236784A JPH0545726B2 JP H0545726 B2 JPH0545726 B2 JP H0545726B2 JP 59142367 A JP59142367 A JP 59142367A JP 14236784 A JP14236784 A JP 14236784A JP H0545726 B2 JPH0545726 B2 JP H0545726B2
- Authority
- JP
- Japan
- Prior art keywords
- foundation
- hollow structure
- concrete
- reinforcement
- setting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/44—Foundations for machines, engines or ordnance
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Foundations (AREA)
Description
【発明の詳細な説明】
〔発明の利用分野〕
本発明は、機器やタンクを鉄筋コンクリート製
の基礎に対して基礎ボルトを介して取り付ける為
に、前記基礎ボルトを基礎に設定施工する方法
と、その方法において利用する施工具に関するも
のである。[Detailed Description of the Invention] [Field of Application of the Invention] The present invention provides a method for setting and constructing foundation bolts on a foundation made of reinforced concrete in order to attach equipment or tanks to a foundation made of reinforced concrete through the foundation bolts, and a method for installing the foundation bolts on the foundation. This relates to the application tool used in the method.
現状の原子力発電所は、巨大な一品生産的なプ
ラントで、建設工事は、膨大な物量と労働力を投
入して進められている。
Current nuclear power plants are huge, single-product plants, and construction work is proceeding with the input of enormous quantities of materials and labor.
一方、原子力発電所の建設工事は、諸般の電力
事情から、大巾な工期短縮とコスト低減が要求さ
れている。現在種々の検討がなされているが、工
法を改善することにより工期短縮をはかることが
一つの大きなアプローチとなつてきている。又、
この工法改善には機械側工法改善と建築側工法改
善の二つに分けることができる。 On the other hand, construction work for nuclear power plants is required to significantly shorten the construction period and reduce costs due to various power situations. Various studies are currently being conducted, and one major approach is to shorten the construction period by improving construction methods. or,
This construction method improvement can be divided into two types: mechanical construction method improvement and architectural construction method improvement.
工法改善のうち、本発明で示される工法は、機
械側、建築側共に工程短縮等に有効な手段となつ
ている。 Among construction method improvements, the construction method shown in the present invention has become an effective means for shortening the process on both the machinery and construction sides.
基礎ボルトの使用数量は、1100MWクラスの原
子力発電設備において約20000本に上り、是非と
も工期短縮工法の推進を図り、建設工期短縮、コ
スト低減を進めてゆく必要がある。 Approximately 20,000 foundation bolts are used in a 1,100 MW class nuclear power generation facility, and it is necessary to promote construction methods that shorten the construction period and reduce costs.
本発明に関する従来技術を第1図から第7図に
示す。第1図,第2図は基礎ボルト用穴あけモル
タル設定法と呼ばれる施工法である。 Prior art related to the present invention is shown in FIGS. 1 to 7. Figures 1 and 2 show a construction method called the drilling mortar setting method for foundation bolts.
これは、コンクリート打設時に、基礎ボルト穴
あけ用木枠1などによつて基礎ボルト設定位置へ
のコンクリート流入を防いで穴の確保を行い、機
器据付時にこの穴の中に基礎ボルト7とモルタル
8を設定する施工法である。 When pouring concrete, a wooden frame 1 for foundation bolt drilling is used to prevent concrete from flowing into the foundation bolt setting position to secure the hole, and when installing equipment, the foundation bolt 7 and mortar 8 are inserted into the hole. This is a construction method that sets the
本施工法は、基礎ボルト7の引抜き抵抗が期待
できないため、周期振動の多い回転機器の据付な
どには、あまり用いられず、一般に静止機器にし
か用いられていない。 This construction method cannot be expected to have a high pull-out resistance of the foundation bolts 7, so it is not often used for installation of rotating equipment with many periodic vibrations, and is generally used only for stationary equipment.
本施工法の手順を以下に説明する。 The steps of this construction method are explained below.
まず、基礎ボルト設定位置の芯出しを行な
う。 First, center the foundation bolt setting positions.
木枠1を利用して、基礎ボツクスの設定を行
なう。本木枠1としては、一般に釘を用いるこ
とにより組立てられた、“ます”状の箱が用い
られる。 Use wooden frame 1 to set up the basic box. As the main wooden frame 1, a "masu"-shaped box generally assembled using nails is used.
面2の高さまで基礎コンクリートを打設す
る。尚、面2付近のコンクリートは、品質不良
のコンクリートであるゆえ、この面を面3ま
で、たがね等を用いてチツピングする。チツピ
ング代(面2と面3の高さの差)は約25mmであ
る。 Pour foundation concrete up to the height of surface 2. Since the concrete near surface 2 is of poor quality, this surface is chipped up to surface 3 using a chisel or the like. The chipping allowance (difference in height between surface 2 and surface 3) is approximately 25 mm.
本枠1を解体撤去する。 Dismantle and remove main frame 1.
モルタルブロツク4、パツカー5を用いて機
器据付基準面を設定し、機器据付基準面取りを
行なう。 A device installation reference surface is set using a mortar block 4 and a packer 5, and the device installation reference surface is chamfered.
機器、タンク等の基礎板6を基礎ボルト7と
一体にして、吊込み設定する。 A foundation plate 6 for equipment, tanks, etc. is integrated with foundation bolts 7 and suspended.
機器タンク等の基礎面までモルタル8を注入
して仕上げる。 Finish by pouring mortar 8 up to the foundation surface of equipment tanks, etc.
第3図,第4図は基礎ボルト直理法と呼ばれる
施工法である。 Figures 3 and 4 show a construction method called the foundation bolt direct method.
これは、コンクリート基礎打設時に、直接コン
クリート内に基礎ボルト用パイプスリーブ9によ
り基礎ボルト10を埋込む施工方法である。 This is a construction method in which foundation bolts 10 are directly embedded in concrete using pipe sleeves 9 for foundation bolts when pouring concrete foundations.
設定に当たつては、基礎ボルト設定の容易さ、
設定精度の維持、基礎ボルト設定時の固定などの
ために、基礎ボルト設定用フレーム(以下テンプ
レートと略す)11により固定し、基礎コンクリ
ート打設に備える。 When setting, the ease of setting the foundation bolts,
In order to maintain setting accuracy and fix the foundation bolts during setting, they are fixed using a foundation bolt setting frame (hereinafter referred to as template) 11 in preparation for foundation concrete pouring.
本施工法の手順を以下に説明する。 The steps of this construction method are explained below.
基礎ボルト10の設定位置の芯出しを行な
う。 The set position of the foundation bolt 10 is centered.
テンプレート11上に、機器、タンク等の基
礎面のボルト穴位置と合致した位置に穴をあ
け、そこにスリーブ9と基礎ボルト10との一
体化物をあらかじめ取り付けて吊り下げて所定
の位置に吊込み設定する。 A hole is drilled on the template 11 at a position that matches the bolt hole position on the foundation surface of equipment, tanks, etc., and an integrated body of the sleeve 9 and the foundation bolt 10 is attached in advance to the hole and suspended in a predetermined position. Set.
面12の高さまで基礎コンクリートの打設を
行なう。面12付近のコンクリートは品質不良
のコンクリートであるゆえ、この面を面13ま
でチツピングする。チツピング代は、約25mmで
ある。 The foundation concrete is placed up to the height of surface 12. Since the concrete near surface 12 is of poor quality, this surface is chipped up to surface 13. The chipping allowance is approximately 25mm.
基礎コンクリート上部に突出しているパイプ
スリーブ9を任意の長さだけ切断し、さらにテ
ンプレート11を解体撤去する。 The pipe sleeve 9 protruding above the foundation concrete is cut to an arbitrary length, and the template 11 is further dismantled and removed.
モルタルブロツク4とパツカー5を用いて機
器据付基礎面を設定し、機器据付基礎面取りを
行なう。 The equipment installation foundation surface is set using mortar block 4 and packer 5, and the equipment installation foundation is chamfered.
機器、タンクの基礎14を吊込み設定する。 The foundation 14 of the equipment and tank is suspended and set.
機器、タンクの基礎面までモルタル8を注入
して仕上げる。 Finish by pouring mortar 8 to the base of the equipment and tank.
前述した従来工法である、基礎ボルト用穴あけ
モルタル設定法と、基礎ボルト直埋法の欠点を、
以下本文および第5図から第6図を用いて各々説
明する。 The drawbacks of the conventional construction methods mentioned above, the drilling mortar setting method for foundation bolts and the direct burying method of foundation bolts, are as follows:
Each will be explained below using the main text and FIGS. 5 to 6.
まず第1に、基礎ボルト用穴あけモルタル設定
法の欠点をあげる。本施工法は、直方体の穴部に
モルタルを注入するため、水セメント比によつて
は打つたモルタルに収縮が発生し、コンクリート
面とモルタル面との間にすき間が発生することに
より、コンクリートとモルタル間の一体化付着力
が低下し、基礎ボルトの引抜き抵抗が低下すると
いう本質的欠点をもつている。 First of all, there are drawbacks to the drilling mortar setting method for foundation bolts. In this construction method, mortar is injected into the hole of the rectangular parallelepiped, so depending on the water-cement ratio, the mortar may shrink, creating a gap between the concrete surface and the mortar surface. This has the essential disadvantage that the bonding force between the mortar is reduced and the pull-out resistance of the foundation bolt is reduced.
さらに第6図に示すごとく、木枠1と建築側基
礎鉄筋コンクリートの配筋17に干渉した際、配
筋を途中で切断して、補強筋15を入れたりチエ
ーンブロツク16を用いて配筋を曲げるなどの対
策を立てて、木枠1を所定の位置に設定しなけれ
ばならず、建築側が多大な工数を要していた。 Furthermore, as shown in Fig. 6, when the wooden frame 1 interferes with the reinforcement 17 of the reinforced concrete foundation on the building side, the reinforcement is cut in the middle and reinforcing bars 15 are inserted, or the chain block 16 is used to bend the reinforcement. The construction side had to take measures such as these to set the wooden frame 1 in a predetermined position, which required a large amount of man-hours on the construction side.
また、本木枠1部は、配筋より上部に顔を出し
た状態で、針金等によつて配筋へ固定していたた
め、作業員が踏みつけたり、コンクリートの流入
圧力およびコンクリート撹拌用バイプレーターの
圧力により、木枠1が変形したり、位置ずれした
りして、その修復作業に機械側が、多大な工数を
要していた。 In addition, one part of the main wooden frame was fixed to the reinforcement with wire etc. with its face sticking out above the reinforcement, so it could be stepped on by workers, and the inflow pressure of concrete could be affected. Due to the pressure, the wooden frame 1 is deformed or displaced, and repair work requires a large amount of man-hours on the machine side.
次に基礎ボルト直埋法の欠点を述べる。 Next, we will discuss the disadvantages of the direct burying method of foundation bolts.
本施工法は、基礎ボルト設定用として、機器、
タンク等の基礎面と穴の位置、寸法が同一の仮設
設備であるテンプレート11を必要とするという
構造上、本質的欠点をもつている。そのため、テ
ンプレートの製作、据付、解体、撤去に多大な工
数を要していた。 This construction method uses equipment,
It has an essential structural disadvantage in that it requires a template 11, which is a temporary facility whose holes have the same position and size as the foundation surface of the tank or the like. Therefore, a large number of man-hours were required to manufacture, install, dismantle, and remove the template.
さらに、第7図に示すように、スリーブ9と建
築側配筋17が干渉した際には、配筋17を途中
で切断し、補強筋15を入れたり、チエーンブロ
ツク16を用いて配筋を曲げたりしてテンプレー
ト11と同時にスリーブ9を吊りおろして設定を
行なわねばならず、建築側が多大の工数を要して
いた。 Furthermore, as shown in FIG. 7, when the sleeve 9 and the construction reinforcement 17 interfere, the reinforcement 17 may be cut in the middle and reinforcing bars 15 inserted, or the chain block 16 may be used to improve the reinforcement. The sleeve 9 had to be bent and lowered at the same time as the template 11 for setting, which required a large amount of man-hours on the construction side.
また、本スリーブ9部は、鋼製であるゆえ、本
スリーブ部を固定する際には、さし筋を用いて、
スリーブ9部と配筋を溶接しなければならず、溶
接機等の溶接設備を配筋の林立した現場に搬入設
置する必要があり、機械側が多大な工数(溶接機
の搬入、設置、養生、溶接技術者の確保等)を要
すると同時に作業環境が悪いため、安全上問題に
なつていた。又、この直埋工法においては、基礎
ボルト10の抜け止めには、スリーブ9に対して
基礎ボルト10とナツト等による機械的結合を行
うことにたよることが大である。この為、基礎ボ
ルト10をスリーブ9に機械的に一体化する手
間、多数有する基礎ボルトごとに行わねばならず
手間がかかる。この機械的結合を行わないと、ス
リーブ9内面がストレートである故、スリーブ9
内にモルタルを流入したとしても基礎ボルトはモ
ルタールごと抜けやすくなる。 In addition, since the 9th part of this sleeve is made of steel, when fixing this sleeve part, use a thread.
It is necessary to weld the 9 parts of the sleeve and the reinforcement, and it is necessary to bring welding equipment such as a welding machine to the site where there is a lot of reinforcement, and it requires a lot of man-hours on the machine side (delivery of the welding machine, installation, curing, etc.) At the same time, the work environment was poor, which caused safety issues. Further, in this direct burial method, in order to prevent the foundation bolt 10 from coming off, it is largely dependent on mechanically connecting the foundation bolt 10 to the sleeve 9 with a nut or the like. For this reason, it is time-consuming to mechanically integrate the foundation bolt 10 into the sleeve 9, which must be done for each of the many foundation bolts. If this mechanical connection is not performed, the inner surface of the sleeve 9 is straight, so the sleeve 9
Even if mortar flows inside, the foundation bolts will easily come out along with the mortar.
本発明の目的は、手間がかからずにしかも基礎
ボルトの抜けにくい基礎ボルトの設定施工方法及
びその方法に使用する施工具を提供することにあ
る。
SUMMARY OF THE INVENTION An object of the present invention is to provide a method for setting and constructing foundation bolts that does not require much effort and does not easily come off, and a construction tool for use in the method.
本発明は、方法にあつては、鉄筋コンクリート
製の基礎に内外面に凹凸を有する有底中空構造物
を用いて基礎ボルトを設定する施工方法におい
て、前記鉄筋コンクリートの下配筋より上で、前
記鉄筋コンクリートの上配筋を、その上配筋と前
記中空構造物とが干渉する場合には、前記中空構
造物の上部に通して配筋し、前記下配筋と上配筋
との間に上蓋を施した前記中空構造物を前記基礎
ボルトの設定位置に合わせて装備し、しかる後に
コンクリートを前記上配筋と前記中空構造物とが
埋設する高さにまで打設し、その後に前記上配筋
よりも上に存在する前記コンクリートの表層部を
取り除いて、前記中空構造物の上蓋を取り除き、
その後に前記基礎ボルトを前記中空構造物内に差
し入れ、固化材で前記中空構造物と前記基礎ボル
トとを一体化することを特徴とした基礎ボルトの
設定施工方法であつて、この方法に利用できる基
礎ボルトの設定施工具としての発明は、鉄筋コン
クリートのコンクリートに埋設され、基礎ボルト
を前記コンクリート側へ一体に固定設置する内外
面に凹凸を有する有底中空構造物において、前記
有底中空構造物は、上部に蓋および前記鉄筋コン
クリートの上配筋の通される連結用穴を備え、前
記蓋は前記有底中空構造物の側面に対して分断用
の切込み溝を介して一体化してあることを特徴と
した基礎ボルトの設定施工具で有る。
The present invention relates to a construction method in which a foundation bolt is set using a bottomed hollow structure having unevenness on the inner and outer surfaces on a reinforced concrete foundation, in which the reinforced concrete If the upper reinforcement interferes with the hollow structure, the upper reinforcement is arranged through the upper part of the hollow structure, and an upper cover is placed between the lower reinforcement and the upper reinforcement. The hollow structure that has been applied is installed in accordance with the set position of the foundation bolt, and then concrete is poured to a height where the upper reinforcement and the hollow structure are buried, and then the upper reinforcement is installed. removing the surface layer of the concrete that exists above and removing the top cover of the hollow structure;
A foundation bolt setting construction method characterized in that the foundation bolt is then inserted into the hollow structure and the hollow structure and the foundation bolt are integrated with a solidifying material, and the method can be used for this method. The invention as a setting tool for foundation bolts is a hollow structure with a bottom that is buried in reinforced concrete and has unevenness on the inner and outer surfaces of which the foundation bolt is integrally fixed to the concrete side, wherein the hollow structure with a bottom is , the upper part is provided with a lid and a connecting hole through which the upper reinforcement of the reinforced concrete passes, and the lid is integrated with the side surface of the bottomed hollow structure through a dividing groove. This is a foundation bolt setting tool.
以下に本発明の実施例を第8図から第11図ま
での各図に基づいて説明する。
Embodiments of the present invention will be described below with reference to FIGS. 8 to 11.
本発明の一実施例による基礎ボルトの設定施工
具は、第8図から第9図に示す如くである。 A foundation bolt setting tool according to an embodiment of the present invention is shown in FIGS. 8 to 9.
第8図、第9図において、基本的には円筒状で
あり、その筒部外周側面には、内側から突き出た
凸部21が形成される。この為、外側面は第9図
に示す如く、凸部21と凹部22との連続面とな
る。又、内側は外側とは逆の配列で凸部23と凹
部24との連続面となる。このようなものは、コ
ルゲート管と称されている。この筒状物の下面は
底板25で閉鎖されている。この筒状物の上端に
は、第8図、第9図の如く配筋との連結に供する
連結用の穴26が複数個あけられている。この穴
26よりも低い位置にはふた27が配置される。
このふた27は、分断用の切欠き溝28を介して
筒状物と一体に備わる。 In FIGS. 8 and 9, it is basically cylindrical, and a convex portion 21 protruding from the inside is formed on the outer peripheral side surface of the cylindrical portion. Therefore, the outer surface becomes a continuous surface of the convex portion 21 and the concave portion 22, as shown in FIG. Further, the inner side is a continuous surface with convex portions 23 and recessed portions 24 arranged in the opposite manner to the outer side. Such a pipe is called a corrugated pipe. The lower surface of this cylindrical body is closed with a bottom plate 25. At the upper end of this cylindrical body, a plurality of connecting holes 26 are bored for connecting with the reinforcing bars, as shown in FIGS. 8 and 9. A lid 27 is arranged at a position lower than this hole 26.
This lid 27 is provided integrally with the cylindrical object via a cutout groove 28 for separation.
したがつて、このような設定施工具は、側方か
らのコンクリート液の打設圧力等に対して凹凸2
1,22,23,24がリブ補強的効果を生じて
抗力が大きくなるとともに中空な密閉構造物とな
る。 Therefore, such a setting tool is not suitable for unevenness due to the pressure of pouring concrete liquid from the side.
1, 22, 23, and 24 produce a rib-reinforcing effect, increasing the resistance and forming a hollow sealed structure.
次に前述の設定施工具を利用した基礎ボルトの
鉄筋コンクリート製基礎への設定施工手順を説明
する。 Next, the procedure for setting foundation bolts on a reinforced concrete foundation using the above-mentioned setting tool will be explained.
(1) 基礎となる鉄筋コンクリートを成す上下両配
筋31,32の内、先に下配筋31を所定の位
置で縦横に設置する。(1) Of the upper and lower reinforcements 31 and 32 that make up the reinforced concrete that serves as the foundation, the lower reinforcements 31 are installed vertically and horizontally at predetermined positions first.
(2) 次に、ふた27の付けられたままの設定施工
具を下配筋の上に基礎ボルト33の設定位置に
合せて仮置きする。(2) Next, temporarily place the setting tool with the lid 27 still attached on the lower reinforcement at the setting position of the foundation bolt 33.
(3) その後に、上配筋32を設定施工具の上方に
おいて縦黄に配置し、その配置に際して、上配
筋32が設定施工具と交差する場合には、上配
筋32を大きく曲げたり分断すること無く上配
筋32を設定施工具の第8図、第9図に示す穴
26に第10図の様に通す。(3) After that, arrange the upper reinforcement 32 vertically above the setting tool, and when placing it, if the upper reinforcement 32 intersects with the setting tool, bend the upper reinforcement 32 greatly. The upper reinforcement 32 is passed through the hole 26 shown in FIGS. 8 and 9 of the setting tool as shown in FIG. 10 without cutting it.
(4) 次に、穴26に掛け通した針筋34を上配筋
32にゆわえて基礎ボルト33の設定位置から
設定施工具がずれないようにする。必要に応じ
て設定施工具の下部にまきつけた針金を下配筋
31にゆわえて固定を確実にする。(4) Next, the needle reinforcement 34 passed through the hole 26 is placed on the upper reinforcement 32 to prevent the setting tool from shifting from the setting position of the foundation bolt 33. If necessary, a wire wrapped around the lower part of the setting tool is attached to the lower reinforcement 31 to ensure fixation.
(5) その後に、コンクリート35を第10図に示
す面36まで打設する。この打設時にはふた2
7がコンクリート35の設定施工具内への流入
をふせいでいる。(5) After that, concrete 35 is poured up to the surface 36 shown in Fig. 10. At the time of this pouring, cover 2
7 prevents the concrete 35 from flowing into the setting tool.
(6) 次に、面36付近のコンクリートは不良であ
る故、コンクリートの表層部を上配筋32が見
える程度までチツピング作業する。このチツピ
ングの深さは約25mm〜50mm程度となるようにコ
ンクリート打設量は適整されることが望まし
い。(6) Next, since the concrete near the surface 36 is defective, the surface layer of the concrete is chipped to the extent that the upper reinforcement 32 is visible. It is desirable that the amount of concrete placed is adjusted appropriately so that the depth of this chipping is approximately 25 mm to 50 mm.
(7) 前述のチツピング作業時に使用する電動ハン
マによる衝撃でふた27を溝28をさかいにし
て分断して開口部を得る。この分断は溝28が
あらかじめ切り込まれているから前述の衝撃で
容易に分断され得る。(7) The lid 27 is divided across the groove 28 by the impact of the electric hammer used during the above-mentioned chipping operation to obtain an opening. Since the groove 28 is cut in advance, this division can be easily performed by the aforementioned impact.
(8) 次に、モルタルブロツク4とパツカー5とを
利用して基礎面取りを行う。(8) Next, chamfer the foundation using mortar block 4 and packer 5.
(9) その後に、機器、タンク等の基礎板6に基礎
ボルト33を取り付けた一体化物を吊り降し
て、基礎ボルト33を開口された設定施工具内
に差し込み降す。(9) After that, the integrated product with the foundation bolts 33 attached to the foundation plate 6 of equipment, tanks, etc. is suspended, and the foundation bolts 33 are inserted into the opened setting tool.
(10) 次に、第11図の如く基礎板6の面までモル
タル8を注入し、そのモルタル8の一部を設定
施工具内にも注入させる。(10) Next, as shown in FIG. 11, mortar 8 is poured up to the surface of the base plate 6, and a part of the mortar 8 is also poured into the setting tool.
以上で作業を終了する。 This completes the work.
本実施例では、設定施工具をコルゲート管を利
用して作つたが、単なる円筒物から凸部を形成し
て、結果として、その凸部と、凸部が生じること
で相対的に凹部が内外側面に生じ得るように加工
して作つても良い。 In this example, the setting tool was made using a corrugated pipe, but the convex part was formed from a simple cylindrical object, and as a result, the convex part and the concave part were relatively inside and outside due to the convex part. It may be made by processing so that it can occur on the side.
本実施例によれば、基礎ボルトの設定施工具が
ふた付きの構造であるから、コンクリートを打設
する際には、設定施工手順の(5)の様にそのコンク
リートで設定施工具を埋設するようにして打設
し、その打設に際して打設力で設定施工具がずれ
たり設定施工具内にコンクリートが越流する気が
ね無く基礎工事が迅速に進められる。さらには、
設定施工手順の(6)のチツピング作業も上配筋32
から設定工具が大きく突き出ることが無いからそ
の作業の邪魔にならず作業が容易と成る。その
上、上配筋32の下方に設定施工具を配置するか
ら、作業者にふみ付けられて位置ずれを起した
り、あるいは変形したりすることない。又、上配
筋32を分断したり曲げたり、あるいは補強筋を
追設したりせずにすむので作業工程が短縮する。
直埋工法にくらべて、基礎ボルトの埋込金物(ス
リーブ)への機械的結合作業を必要としないので
作業工程が短縮できる上に、モルタル設定法にく
らべて凹凸による引抜き力の強化が成される故、
引抜き抗力の大きな基礎が手間なく作れる。さら
には、解体、撤去すべき仮設物の利用をなくせる
ので、さらに作業工程は短縮できる。 According to this embodiment, since the foundation bolt setting tool has a structure with a lid, when pouring concrete, the setting tool is buried in the concrete as in (5) of the setting construction procedure. In this way, the foundation work can proceed quickly without worrying that the setting tool will shift due to the pouring force or that concrete will overflow into the setting tool. Furthermore,
The chipping work in (6) of the setting construction procedure is also performed using upper reinforcement 32.
Since the setting tool does not protrude too much, it does not get in the way of the work and the work is made easier. Moreover, since the setting tool is placed below the upper reinforcement 32, it will not be touched by an operator, causing misalignment or deformation. Furthermore, there is no need to divide or bend the upper reinforcement 32 or add reinforcing bars, so the work process is shortened.
Compared to the direct embedding method, it does not require mechanical connection of the foundation bolts to the embedded hardware (sleeve), so the work process can be shortened, and compared to the mortar setting method, the pull-out force due to the unevenness is strengthened. Therefore,
A foundation with high pulling resistance can be created easily. Furthermore, since the use of temporary structures that need to be dismantled and removed can be eliminated, the work process can be further shortened.
以上の如く、本発明によれば、手間なく引抜き
抵抗力の大きな基礎ボルトの施工が達成できると
いう効果が得られる。
As described above, according to the present invention, it is possible to construct foundation bolts with high pull-out resistance without any effort.
第1図は従来のモルタル設定法によるコンクリ
ート打設後の基礎を示す縦断面図、第2図は第1
図に示した方法による基礎完成後の縦断面図、第
3図は従来の直理法によるコンクリート打設後の
基礎を示す縦断面図、第4図は第2図に示した方
法による基礎完成後の縦断面図、第5図は完成し
た基礎と機器との取合い関係を示した要部断面
図、第6図は従来のモルタル設定法による基礎の
配筋と木枠との関係を第5図A部を例にとつて示
した平面図、第7図は同じく従来の直埋法による
場合の平面図、第8図は本発明の一実施例の方法
に使用される設定施工具の上面図、第9図は第8
図のA−A矢視断面図、第10図は本発明の一実
施例による方法によりコンクリートの打設後の基
礎を示した縦断面図、第11図は本発明の一実施
例によつて作られた基礎の縦断面である。
8……モルタル(固化材)、21,23……凸
部、22,24……凹部、25……底板、26…
…穴、27……ふた、28……溝、31……下配
筋、32……上配筋、33……基礎ボルト、34
……針金、35……コンクリート。
Figure 1 is a vertical cross-sectional view showing the foundation after concrete is placed using the conventional mortar setting method, and Figure 2 is
Figure 3 is a vertical cross-sectional view of the foundation after the foundation is completed using the method shown in Figure 3. Figure 4 is a vertical cross-sectional view of the foundation after concrete is poured using the conventional direct method. Figure 4 is a vertical cross-sectional view of the foundation completed using the method shown in Figure 2. Figure 5 is a cross-sectional view of the main parts showing the relationship between the completed foundation and equipment, and Figure 6 is a vertical cross-sectional view of the foundation using the conventional mortar setting method and the relationship between the wooden frame and the foundation. A plan view showing part A as an example, FIG. 7 is a plan view of the conventional direct burying method, and FIG. 8 is a top view of a setting tool used in the method of one embodiment of the present invention. , Figure 9 is the 8th
10 is a longitudinal sectional view showing a foundation after concrete is poured by a method according to an embodiment of the present invention, and FIG. 11 is a sectional view taken along the line A-A in the figure. This is a vertical section of the foundation that was created. 8... Mortar (solidifying material), 21, 23... Convex portion, 22, 24... Concave portion, 25... Bottom plate, 26...
... Hole, 27 ... Lid, 28 ... Groove, 31 ... Lower reinforcement, 32 ... Upper reinforcement, 33 ... Foundation bolt, 34
...Wire, 35...Concrete.
Claims (1)
有する有底中空構造物を用いて基礎ボルトを設定
する施工方法において、前記鉄筋コンクリートの
下配筋より上で、前記鉄筋コンクリートの上配筋
を、その上配筋と前記中空構造物とが干渉する場
合には、前記中空構造物の上部に通して配筋し、
前記下配筋と上配筋との間に上蓋を施した前記中
空構造物を前記基礎ボルトの設定位置に合わせて
装備し、しかる後にコンクリートを前記上配筋と
前記中空構造物とが埋設する高さにまで打設し、
その後に前記上配筋よりも上に存在する前記コン
クリートの表層部を取り除いて、前記中空構造物
の上蓋を取り除き、その後に前記基礎ボルトを前
記中空構造物内に差し入れ、固化材で前記中空構
造物と前記基礎ボルトとを一体化することを特徴
とした基礎ボルトの設定施工方法。 2 鉄筋コンクリートのコンクリートに埋設さ
れ、基礎ボルトを前記コンクリート側へ一体に固
定設置する内外面に凹凸を有する有底中空構造物
において、前記有底中空構造物は、上部に蓋およ
び前記鉄筋コンクリートの上配筋の通される連結
用穴を備え、前記蓋は前記有底中空構造物の側面
に対して分断用の切込み溝を介して一体化して備
わることを特徴とした基礎ボルトの設定施工具。[Scope of Claims] 1. In a construction method in which foundation bolts are set using a bottomed hollow structure having unevenness on the inner and outer surfaces on a reinforced concrete foundation, above the lower reinforcement of the reinforced concrete, the upper reinforcement of the reinforced concrete If the reinforcing bars interfere with the hollow structure, the reinforcing bars are arranged through the upper part of the hollow structure,
The hollow structure with an upper cover provided between the lower reinforcement and the upper reinforcement is installed in accordance with the set position of the foundation bolt, and then concrete is buried between the upper reinforcement and the hollow structure. Pour to a height,
Thereafter, the surface layer of the concrete above the upper reinforcement is removed, the top cover of the hollow structure is removed, the foundation bolts are inserted into the hollow structure, and a solidifying material is applied to the hollow structure. A method for setting and constructing a foundation bolt, characterized by integrating an object and the foundation bolt. 2. In a hollow structure with a bottom that is buried in reinforced concrete and has irregularities on its inner and outer surfaces, the foundation bolts are integrally fixed to the concrete side, the hollow structure with a bottom has a lid on the upper part and a lid on the top of the reinforced concrete. 1. A foundation bolt setting tool, comprising a connection hole through which a thread is passed, and wherein the lid is integrated with a side surface of the bottomed hollow structure via a dividing groove.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14236784A JPS6121233A (en) | 1984-07-11 | 1984-07-11 | Foundation bolt setting construction method and construction tools |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP14236784A JPS6121233A (en) | 1984-07-11 | 1984-07-11 | Foundation bolt setting construction method and construction tools |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6121233A JPS6121233A (en) | 1986-01-29 |
| JPH0545726B2 true JPH0545726B2 (en) | 1993-07-12 |
Family
ID=15313733
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP14236784A Granted JPS6121233A (en) | 1984-07-11 | 1984-07-11 | Foundation bolt setting construction method and construction tools |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS6121233A (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR2634683B1 (en) * | 1988-07-28 | 1990-10-05 | Electricite De France | METHOD OF FORMING EMPTY SPACES IN A CONCRETE MASSIF AND APPLICATION TO THE SEALING OF ROTATING MACHINES |
| CN116464094A (en) * | 2023-02-08 | 2023-07-21 | 浙江省三建建设集团有限公司 | A detachable concrete anchor bolt positioning device and construction method |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5025069U (en) * | 1973-06-29 | 1975-03-22 | ||
| JPS54106006U (en) * | 1978-01-11 | 1979-07-26 |
-
1984
- 1984-07-11 JP JP14236784A patent/JPS6121233A/en active Granted
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6121233A (en) | 1986-01-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP1123443B1 (en) | Method for manufacturing a ground slab field and a ground slab field | |
| JPH07217226A (en) | Reinforcement method for reinforced concrete floor slabs | |
| JPH0545726B2 (en) | ||
| JPS5916621B2 (en) | How to build side walls of underground tanks | |
| CN214144646U (en) | Laminated slab cantilever frame pre-embedding device, building component finished product and cantilever frame structure | |
| JP3849234B2 (en) | Reinforced concrete underground outer wall construction method | |
| JPH06316939A (en) | Positioning jig for construction work, and construction of building therewith | |
| JPH0371537B2 (en) | ||
| JPS59192145A (en) | Fixing of iron pillar | |
| JPH0315605Y2 (en) | ||
| US20250101741A1 (en) | Three-point supporting anchor integrated liner, long anchor integrated liner, and machine installation method | |
| CN112458908A (en) | Construction method for steel hoops of pier anti-seismic facility in two-step accurate-in-place mode | |
| KR102644085B1 (en) | Steel outer casing molding jig coated with lining for drilling clearance | |
| JPH0841897A (en) | Foundation for building and construction method therefor | |
| JP2978714B2 (en) | Mounting method of PC formwork in driving formwork method | |
| JPH1150466A (en) | Forming method of column leg part form and member for sheathing connection of the column leg form | |
| JPH01137032A (en) | Method of lap joint construction of main reinforcement in post and beam joining section | |
| JPS62244923A (en) | Anchor bolt-driven precast concrete block and driving of anchor bolt | |
| JPH08100432A (en) | Footing device | |
| JPS61254727A (en) | Connection of steel panel concrete member | |
| JP2024153409A (en) | Long anchor integrated liner | |
| JPH0376929A (en) | Steel-framed foundation | |
| JP2507676Y2 (en) | Concrete cloth foundation assembly member positioning jig | |
| JP2914205B2 (en) | Installation method of handrail wall or lumbar wall | |
| JPH0665931A (en) | Steel base fixing method for steel column by after-construction ancor bolts |