Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0547684B2 - - Google Patents
[go: Go Back, main page]

JPH0547684B2 - - Google Patents

Info

Publication number
JPH0547684B2
JPH0547684B2 JP14576885A JP14576885A JPH0547684B2 JP H0547684 B2 JPH0547684 B2 JP H0547684B2 JP 14576885 A JP14576885 A JP 14576885A JP 14576885 A JP14576885 A JP 14576885A JP H0547684 B2 JPH0547684 B2 JP H0547684B2
Authority
JP
Japan
Prior art keywords
panels
panel
frame
vertical
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP14576885A
Other languages
Japanese (ja)
Other versions
JPS6210323A (en
Inventor
Teruo Abe
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP14576885A priority Critical patent/JPS6210323A/en
Publication of JPS6210323A publication Critical patent/JPS6210323A/en
Publication of JPH0547684B2 publication Critical patent/JPH0547684B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、連続地中壁パネルの打継部におけ
る接続工法およびこれに用いられる掘削機に関す
る。
DETAILED DESCRIPTION OF THE INVENTION <<Industrial Application Field>> The present invention relates to a method for connecting continuous underground wall panels at joints, and an excavator used therefor.

《従来の技術》 連続地中壁を建物の杭や、土留用の地下壁とし
て利用することはよく知られている。このよう
に、地中連続壁に水平力を負担させる場合には、
パネル相互を何らかの方法で締結するか、地下構
造体と一体化しなければならない。
<<Prior Art>> It is well known that continuous underground walls are used as piles for buildings and underground walls for retaining earth. In this way, when applying horizontal force to the diaphragm wall,
The panels must be fastened together in some way or integrated into the underground structure.

パネル相互を締結する方法として、従来では、
例えば特開昭56−111718号公報に示すように、中
間地盤を残して間欠的に掘削された縦孔内にコン
クリートをそれぞれ打設することによりパネルを
構築し、構築されたパネル間の中間地盤を掘削し
つつパネルの接合面を掘削し、しかる後中間縦孔
にコンクリートを打設する工法がある。また、他
の工法としては、例えば特開昭59−145823号公報
に示すように、先行パネルと後行パネル間の打継
面に挿入されたロツキングボツクスを抜き取つて
パネル間にジヨイントキー孔を形成し、該キー孔
の両パネル打継面を切削した後に、キー孔内にコ
ンクリートを打設することによつて打継ぐ方法も
ある。
Conventionally, as a method to connect panels to each other,
For example, as shown in Japanese Patent Application Laid-Open No. 56-111718, panels are constructed by pouring concrete into vertical holes that are intermittently excavated, leaving intermediate ground, and the intermediate ground between the constructed panels is There is a method of excavating the joint surface of the panels while excavating the hole, and then pouring concrete into the intermediate vertical hole. In addition, as another construction method, for example, as shown in Japanese Patent Application Laid-Open No. 59-145823, a locking box inserted in the joint surface between the leading panel and the trailing panel is removed and a joint key hole is made between the panels. There is also a method of joining by forming the key hole, cutting the joining surfaces of both panels at the key hole, and then pouring concrete into the key hole.

《発明が解決しようとする問題点》 これらのいずれの工法にあつても、パネル間の
打継部は鉛直に打継がれているため、連続地中壁
に水平力が加わつた場合には、各パネルがその打
継面で相対的な滑りを生じやすく、水平力を負担
させるという意味では強度的に不十分であつた。
[Problems to be solved by the invention] In any of these construction methods, the joints between panels are vertically joined, so if a horizontal force is applied to a continuous underground wall, Each panel was prone to relative slippage at its joint surfaces, and was insufficient in strength to bear horizontal forces.

この発明は、以上の問題点に鑑みなされたもの
で、その目的とするところは、連続地中壁を構成
するパネルの打継部の構造をより強固にし、しか
も機械的に能率良く安価に施工できることを目的
とする。
This invention was made in view of the above-mentioned problems, and its purpose is to strengthen the structure of the joints of panels that make up continuous underground walls, and to achieve mechanically efficient and inexpensive construction. Aim to do what you can.

《問題点を解決するための手段》 前記の目的を達成するため、この発明は、地中
に構築された隣り合うパネル間に縦孔を形成し、
両パネルの接合面にそれぞれた縦方向に沿つて間
欠的に複数のダボ孔を切削加工し、しかる後該縦
孔内にコンクリートを打設してパネル間を打継ぐ
方法およびこの方法に用いられる掘削機を提供す
るものである。
<<Means for Solving the Problems>> In order to achieve the above object, the present invention forms vertical holes between adjacent panels constructed underground,
A method of connecting panels by cutting a plurality of dowel holes intermittently along each vertical direction on the joining surfaces of both panels, and then pouring concrete into the vertical holes, and a method used in this method. The company provides excavators.

《実施例》 以下この発明の好適な実施例を図面を参照にし
て詳細に説明する。
<<Example>> Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

第1図a,b乃至第4図a,bは、この発明工
法の第1実施例を示す。
Figures 1a and 1b to 4a and 4b show a first embodiment of the inventive construction method.

この実施例は、中間地盤を残して間欠的に掘削
された縦孔内にコンクリートをそれぞれ打設する
ことによつて間欠的に地中にパネルを構築し、構
築されたパネル間の中間地盤を掘削して接合面を
露出し、この中間孔内にコンクリートを打設する
ことによつて各パネル間を打継いでいく工法に適
用したものである。
In this example, panels are constructed intermittently underground by placing concrete in vertical holes that are intermittently excavated, leaving an intermediate ground, and the intermediate ground between the constructed panels is This method is applied to a construction method that connects each panel by excavating to expose the joint surface and pouring concrete into the intermediate hole.

まず、第1図a,bにおいて、連続地中壁の1
エレメントを構成する各パネル1は、中間地盤2
を残して間欠的に掘削された縦孔A内にコンクリ
ートをそれぞれ打設することによつて間欠的に構
築されたものである。
First, in Figure 1 a and b, one of the continuous underground walls
Each panel 1 constituting an element has an intermediate ground 2
It was constructed intermittently by pouring concrete into each vertical hole A, which was intermittently excavated with the remaining holes remaining.

中間地盤2は、第2図a,bに示すように、こ
の発明に係るハイドロフレーズ掘削機3により掘
削される。
The intermediate ground 2 is excavated by a hydrophrase excavator 3 according to the present invention, as shown in FIGS. 2a and 2b.

ハイドロフレーズ掘削機3はフレーム301
と、フレーム301の先端部に突出した一対のカ
ツタードラム302と、フレーム301の両側部
に突出しパネル1の接合面に当接してフレーム3
01を支持する複数の位置修正用アーム303と
から概略構成されている。そして、このハイドロ
フレーズ掘削機3を降下させつつカツタードラム
302を回転させることにより中間地盤2は掘削
され、中間縦孔4が形成される。また、この堀削
作業と同時にカツタードラム302が各パネルの
接合面1aを浅く切削する。
Hydrophrase excavator 3 has frame 301
A pair of cutter drums 302 protrude from the tip of the frame 301, and a pair of cutter drums 302 protrude from both sides of the frame 301 and abut against the joining surface of the panel 1.
01, and a plurality of position correction arms 303 that support the position correction arm 303. By rotating the cutter drum 302 while lowering the hydrophrase excavator 3, the intermediate ground 2 is excavated and the intermediate vertical hole 4 is formed. Further, at the same time as this excavation work, the cutter drum 302 shallowly cuts the joint surface 1a of each panel.

掘削機3が孔底部につき、中間縦孔4の掘削作
業を終了した後は、一旦掘削機3を引き上げ、中
間縦孔4内の土砂を除去した後に、第3図a,b
に示すように、掘削機3を再び中間縦孔4内に配
置し、降下させつつ間欠的にカツタードラム30
2を水平方向に拡げることにより、各パネル1の
接合面1aに縦方向に間欠的に半円形のダボ孔1
bが対向形成される。
After the excavator 3 reaches the bottom of the hole and finishes excavating the intermediate vertical hole 4, the excavator 3 is pulled up once and the earth and sand in the intermediate vertical hole 4 is removed, and then
As shown in FIG.
2 in the horizontal direction, semicircular dowel holes 1 are formed intermittently in the vertical direction on the joint surface 1a of each panel 1.
b are formed facing each other.

ダボ孔1bの切削加工後に、第4図a,bに示
すように、中間縦孔4内にコンクリートを打設
し、縦孔内に打継ぎ用のパネル部5を形成する。
このパネル部5の両側部には切削加工されたダボ
孔1bの形状に応じたダボ5aが縦方向に間欠的
に形成されることになる。
After cutting the dowel holes 1b, as shown in FIGS. 4a and 4b, concrete is placed in the intermediate vertical hole 4, and a panel part 5 for pouring is formed in the vertical hole.
Dowels 5a corresponding to the shape of the cut dowel holes 1b are intermittently formed in the longitudinal direction on both sides of the panel portion 5.

第5図は以上のように構成された連続地中壁1
0の1面側を掘削し、これに地下構造物11を組
付けた状態を示す断面図である。このように、地
下構造物11を組付けた場合には、連続地中壁1
0には水平力が負担されるが、この場合、各パネ
ル1,5間の接合部分はダボとダボ孔の係合によ
つているで、第4図bに示すように、水平力が加
わつた場合に、ダボ5aとダボ孔1bとの間に矢
印に示すような上下に剪断応力が加わるが、この
部分における剪断耐力により各パネル1,5間に
は大きな水平耐力がもたらされることになり、構
造的機能を十分に満足することができる。
Figure 5 shows the continuous underground wall 1 constructed as above.
FIG. 2 is a sectional view showing a state in which one side of the tunnel 0 is excavated and an underground structure 11 is assembled thereto. In this way, when the underground structure 11 is assembled, the continuous underground wall 1
In this case, the joint between each panel 1 and 5 is due to the engagement between the dowel and the dowel hole, and the horizontal force is applied to the panel 0, as shown in Figure 4b. In this case, shear stress is applied vertically between the dowel 5a and the dowel hole 1b as shown by the arrow, but the shear strength in this area results in a large horizontal strength between each panel 1 and 5. , the structural functions can be fully satisfied.

次に、第6図乃至第10図は、この発明工法の
第2の実施例を示すものである。
Next, FIGS. 6 to 10 show a second embodiment of the construction method of this invention.

この実施例は、先行パネルに後行パネルを打継
ぐことによつて、連続的に構築されるパネル間の
打継面に挿入されたロツキングボツクスを抜き取
り、パネル間にジヨイントキー孔を形成し、該キ
ー孔にコンクリートを打設することによつて打継
ぐ工法に適用したものである。
In this embodiment, by joining a trailing panel to a preceding panel, a locking box inserted in the joint surface between panels that are constructed continuously is removed, and a joint key hole is formed between the panels. This method is applied to a construction method that involves pouring concrete into the key hole.

まず第6図においては、掘削された縦孔内に予
めロツキングボツクス21を打継側に挿入し、コ
ンクリートを打設することによつて先行パネル2
0を形成する。
First, in FIG. 6, the locking box 21 is inserted in advance into the excavated vertical hole on the splicing side, and concrete is poured into the preceding panel 2.
form 0.

その後、先行パネル20の打継側に縦孔を掘削
し、前記先行パネル20に設けたロツキングボツ
クス21に突合わせるようにして、他のロツキン
グボツクス23を配置し、次いで縦孔内にコンク
リートを打設すれば、第7図に示すように、ロツ
キングボツクス21,23同士が突き合された状
態で先行パネル20と後行パネル22が一体的に
接合される。次いで、ロツキングボツクス21,
23を引き抜けば、第8図に示すように、先行パ
ネル20と後行パネル22との打継面に、縦方向
に沿うジヨイントキー孔25が形成される。
Thereafter, a vertical hole is drilled on the joining side of the preceding panel 20, another locking box 23 is placed so as to butt against the locking box 21 provided on the preceding panel 20, and then concrete is placed in the vertical hole. When the locking boxes 21 and 23 are butted against each other, the leading panel 20 and the trailing panel 22 are integrally joined, as shown in FIG. 7. Next, Locking Box 21,
23, a joint key hole 25 extending in the vertical direction is formed in the joint surface of the leading panel 20 and trailing panel 22, as shown in FIG.

このキー孔25の地中壁形成方向に沿つて対向
する接合面20a,22aを前述のハイドロフレ
ーズ掘削機3を用いて切削し、そのカツタードラ
ム3bを適宜間隔をおいて水平移動させて切削加
工することにより、第9図に示すように、キー孔
25には縦方向に複数のダボ孔20b,22bが
間欠的に形成される。
The opposing joint surfaces 20a and 22a of the key hole 25 along the direction of underground wall formation are cut using the hydrophrase excavator 3 described above, and the cutter drum 3b is moved horizontally at appropriate intervals for cutting. As a result, as shown in FIG. 9, a plurality of dowel holes 20b and 22b are intermittently formed in the key hole 25 in the vertical direction.

その後、キー孔25内にコンクリートを打設す
れば、第10図に示すようにキー孔25内にダボ
26aを有する打継ぎパネル26が形成される。
以上の作業を繰返すことにより、キージヨイント
による結合効果に加え、ダボ効果により水平耐力
を向上した連続地中壁パネルを得られることにな
る。
Thereafter, by pouring concrete into the key hole 25, a pouring panel 26 having dowels 26a in the key hole 25 is formed as shown in FIG.
By repeating the above steps, you will be able to obtain a continuous underground wall panel that has improved horizontal strength due to the dowel effect in addition to the bonding effect of the key joint.

次に、以上の工法に用いられる前述の掘削機2
の具体的構成を第11図乃至第13図を用いて説
明する。
Next, the above-mentioned excavator 2 used in the above construction method
The specific configuration will be explained using FIGS. 11 to 13.

図において、上述のフレーム301はトラス状
に組まれたガイドプレート部301aおよびガイ
ドプレート部301aの下部に設けられた拡巾用
フレーム部301bとからなつている。そしてガ
イドプレート部301aの上下端両側部には上述
のアーム303が設けられている。各アーム30
3はフレーム301の位置修正と荷重の一部を支
える機能を備え、油圧シリンダなどにより左右に
突出する。また各アーム303の突出端には前記
パネル面に当接するパツド303aを有してお
り、各アーム303の突出量を制御することでフ
レーム301は縦孔内に鉛直かつ縦孔との間に所
定の間隙を保つて配置される。
In the figure, the above-mentioned frame 301 is composed of a guide plate section 301a assembled in a truss shape and a widening frame section 301b provided below the guide plate section 301a. The above-mentioned arms 303 are provided on both sides of the upper and lower ends of the guide plate portion 301a. 30 each arm
3 has the function of correcting the position of the frame 301 and supporting part of the load, and protrudes to the left and right using a hydraulic cylinder or the like. Furthermore, the protruding end of each arm 303 has a pad 303a that comes into contact with the panel surface, and by controlling the amount of protrusion of each arm 303, the frame 301 is placed vertically within the vertical hole and at a predetermined distance between the vertical hole and the vertical hole. They are placed with a gap between them.

またガイドプレート部301の上部には、縦方
向に沿つて高さ位置調整用シリンダ304が配置
され、このシリンダ304の調整により上下位置
の微調整が行なわれるようになつている。
Further, a height position adjusting cylinder 304 is arranged in the upper part of the guide plate part 301 along the vertical direction, and fine adjustment of the vertical position can be performed by adjusting this cylinder 304.

前記拡巾用フレーム301bの底板部の左右に
は、それぞれピン305aを介して左右揺動可能
に支承されたブラケツト305が設けられてい
る。また、底板部中央の下面にはフレーム301
a,301bを上下に貫通した揚泥管310が突
出している。
Brackets 305 are provided on the left and right sides of the bottom plate portion of the width expanding frame 301b, respectively, and are supported via pins 305a so as to be swingable from side to side. In addition, a frame 301 is installed on the lower surface of the center of the bottom plate.
A mud pumping pipe 310 that penetrates vertically through a and 301b protrudes.

上述のカツタードラム302は、各ブラケツト
305の下部に回転自在に支持されている。カツ
タードラム302内には図示しない油圧モータが
組込まれ、フレーム301a,301b内を上下
に貫通して配置された油圧ホース306の群の一
部を、前記ブラケツト305を通じて油圧モータ
に配管している。
The cutter drum 302 described above is rotatably supported under each bracket 305. A hydraulic motor (not shown) is built into the cutter drum 302, and a part of a group of hydraulic hoses 306 arranged vertically through the frames 301a and 301b is connected to the hydraulic motor through the bracket 305.

また前記ブラケツト305の揺動端には、角度
位置調整用油圧シリンダー307のプランジヤー
308の先端がピン309aを介して接続され、
ブラケツト305を支持している。
Further, the tip of the plunger 308 of the angular position adjustment hydraulic cylinder 307 is connected to the swinging end of the bracket 305 via a pin 309a.
The bracket 305 is supported.

前記シリンダー307の他端部には、フレーム
301bの内部のほぼ中央部にピン309bによ
り揺動可能に支持されており、上述の油圧ホース
306を通じて駆動されるようになつている。
The other end of the cylinder 307 is swingably supported by a pin 309b approximately at the center inside the frame 301b, and is driven through the above-mentioned hydraulic hose 306.

そして、第12図の左側に示すように、プラン
ジヤー308が突出すると、ブラケツト305は
ピン305aを基点に矢印方向に揺動し、この結
果カツタードラム302の外周はフレーム301
bの外周に突出する。
Then, as shown on the left side of FIG. 12, when the plunger 308 protrudes, the bracket 305 swings in the direction of the arrow about the pin 305a, and as a result, the outer periphery of the cutter drum 302 is aligned with the frame 301.
It protrudes to the outer periphery of b.

従つて、各カツタードラム302は、地上部か
らのリモートコントロールにより左右突出量を制
御されつつ回転駆動されることになり、フレーム
301の上下移動に応じて壁面に対する均一な切
削加工や、間欠的なダボ穴の切削加工を行うこと
ができる。
Therefore, each cutter drum 302 is rotationally driven while its left and right protrusion is controlled by remote control from the ground, and uniform cutting on the wall surface and intermittent doweling are performed in accordance with the vertical movement of the frame 301. Can perform hole cutting.

《発明の効果》 以上各実施例により詳細に説明したように、こ
の発明工法では、ダボ孔とダボの結合により従来
のパネル間の打継ぎ構造に比べて水平耐力が大幅
に向上する。
<<Effects of the Invention>> As explained in detail in each of the embodiments above, in the construction method of the present invention, the horizontal yield strength is significantly improved compared to the conventional splicing structure between panels due to the connection of the dowel holes and dowels.

また、この発明工法では、従来の工法に加えて
パネルの接合面にこの発明による掘削機を用いた
機械的手段によりそれぞれダボ孔加工を施すだけ
でよいため、能率良く安価に施工できる。
Furthermore, in addition to the conventional construction method, the construction method of the present invention only needs to machine dowel holes on the joining surfaces of the panels by mechanical means using the excavator according to the invention, so construction can be carried out efficiently and at low cost.

【図面の簡単な説明】[Brief explanation of drawings]

第1図a,b乃至第4図a,bはこの発明工法
の第1の実施例を示すもので、各図aは水平断面
図、各図bは縦断面図、第5図は実施例によつて
得た連続地中壁パネルに地下構造体を組合わせた
状態を示す正断面図、第6図乃至第10図はこの
発明工法の第2実施例を示すもので、第6図乃至
第9図は水平断面図、第10図は縦断面図、第1
1図は掘削機の具体的構成を示す正面図、第12
図は掘削機の下部の部分正面図、第13図は同側
面図である。 1,20……先行パネル、1a,20a,22
a……接合面、1b,20b,22b……ダボ
孔、2……中間地盤、3……掘削機、4……中間
縦孔、5,26……打継ぎパネル、5a,26a
……ダボ、10……連続地中壁、22……後行パ
ネル、21,23……ロツキングボツクス、25
……キー孔、A……縦孔、301……フレーム、
302……カツタードラム、303……位置修正
修正用アーム、305……ブラケツト、307…
…角度調整用油圧シリンダー。
Figures 1a, b to 4a, b show the first embodiment of the invention method, where each figure a is a horizontal cross-sectional view, each figure b is a vertical cross-sectional view, and Figure 5 is an embodiment. Figures 6 to 10 are front cross-sectional views showing the state in which the underground structure is combined with the continuous underground wall panel obtained by the method, and Figures 6 to 10 show the second embodiment of the construction method of this invention. Figure 9 is a horizontal sectional view, Figure 10 is a vertical sectional view,
Figure 1 is a front view showing the specific configuration of the excavator;
The figure is a partial front view of the lower part of the excavator, and FIG. 13 is a side view of the same. 1, 20...preceding panel, 1a, 20a, 22
a... Joint surface, 1b, 20b, 22b... Dowel hole, 2... Intermediate ground, 3... Excavator, 4... Intermediate vertical hole, 5, 26... Connection panel, 5a, 26a
... Dowel, 10 ... Continuous underground wall, 22 ... Trailing panel, 21, 23 ... Locking box, 25
...Key hole, A...Vertical hole, 301...Frame,
302...Cutter drum, 303...Arm for position correction, 305...Bracket, 307...
...Hydraulic cylinder for angle adjustment.

Claims (1)

【特許請求の範囲】 1 地中に構築された隣り合うパネル間に縦孔を
形成し、両パネルの接合面にそれぞれ縦方向に沿
つて間欠的に複数のダボ孔を切削加工し、しかる
後該縦孔内にコンクリートを打設してパネル間を
打継ぐことを特徴とする連続地中壁パネルの接続
工法。 2 前記各パネルは、中間地盤を残して間欠的に
掘削された縦孔内にコンクリートをそれぞれ打設
することにより構築されるものであつて、構築さ
れたパネル間の中間地盤を掘削して各パネルの接
合面を露出し、しかる後各パネルの接合面に縦方
向に沿つて間欠的に複数のダボ孔を切削加工する
ことを特徴とする特許請求の範囲第1項記載の連
続地中壁パネルの接続工法。 3 前記各パネルは先行パネルに後行パネルを打
継ぐことによつて連続的に構築されるものであつ
て、パネル間の打継面に挿入されたロツキングボ
ツクスを抜き取つてパネル間にジヨイントキー孔
を形成し、しかる後該キー孔内の両パネルの接合
面に縦方向に沿つて間欠的に複数のダボ孔を切削
加工することを特徴とする特許請求の範囲第1項
記載の連続地中壁パネルの接続工法。 4 パネル間に形成された縦孔内に昇降可能に吊
下されるフレームと、該フレームの上下両側部に
それぞれ配置され、かつ左右に突出して縦孔の左
右壁面に当接し、縦孔とフレーム間の隙間を調整
する位置修正アームと、フレームの下端にあつて
左右に揺動可能に支承された一対のブラケツト
と、各ブラケツトの下部に回転自在に支持され、
かつブラケツトの傾きに応じて切削面をフレーム
の両側に突出するカツタードラムと、一端を前記
ブラケツトの揺動端に結合し、他端をフレーム側
に結合したブラケツトの傾斜角度調整用シリンダ
ーとを備えた連続地中壁パネルの接続工法用掘削
機。
[Scope of Claims] 1. Vertical holes are formed between adjacent panels built underground, and a plurality of dowel holes are intermittently cut along the vertical direction on the joint surfaces of both panels, and then A method for connecting continuous underground wall panels, characterized by pouring concrete into the vertical holes to connect the panels. 2. Each of the panels is constructed by pouring concrete into vertical holes that are intermittently excavated, leaving an intermediate ground, and each panel is constructed by excavating the intermediate ground between constructed panels. The continuous underground wall according to claim 1, wherein the joint surfaces of the panels are exposed, and then a plurality of dowel holes are intermittently cut along the vertical direction on the joint surfaces of each panel. Panel connection method. 3. Each of the aforementioned panels is constructed continuously by joining the preceding panel to the succeeding panel, and the locking box inserted in the joint surface between the panels is removed and a joint key is inserted between the panels. The continuous fabric according to claim 1, characterized in that a hole is formed, and then a plurality of dowel holes are intermittently cut along the longitudinal direction on the joint surface of both panels in the key hole. Connection method for middle wall panels. 4 A frame that is vertically suspended in a vertical hole formed between panels, and a frame that is placed on both the upper and lower sides of the frame, and that protrudes left and right and comes into contact with the left and right walls of the vertical hole. A position correction arm that adjusts the gap between the two, a pair of brackets that are supported at the bottom end of the frame so that they can swing from side to side, and a pair of brackets that are rotatably supported at the bottom of each bracket.
and a cutter drum whose cutting surface protrudes to both sides of the frame according to the inclination of the bracket, and a cylinder for adjusting the inclination angle of the bracket whose one end is connected to the swinging end of the bracket and the other end is connected to the frame side. Excavator for connecting continuous underground wall panels.
JP14576885A 1985-07-04 1985-07-04 Connecting work of continuous underground wall panel and excavator therefor Granted JPS6210323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP14576885A JPS6210323A (en) 1985-07-04 1985-07-04 Connecting work of continuous underground wall panel and excavator therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP14576885A JPS6210323A (en) 1985-07-04 1985-07-04 Connecting work of continuous underground wall panel and excavator therefor

Publications (2)

Publication Number Publication Date
JPS6210323A JPS6210323A (en) 1987-01-19
JPH0547684B2 true JPH0547684B2 (en) 1993-07-19

Family

ID=15392711

Family Applications (1)

Application Number Title Priority Date Filing Date
JP14576885A Granted JPS6210323A (en) 1985-07-04 1985-07-04 Connecting work of continuous underground wall panel and excavator therefor

Country Status (1)

Country Link
JP (1) JPS6210323A (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0714472Y2 (en) * 1988-08-29 1995-04-10 株式会社大林組 Ground excavator
JP2933471B2 (en) * 1993-09-01 1999-08-16 日本電気株式会社 Monitoring device
JP4736941B2 (en) * 2006-05-12 2011-07-27 株式会社豊田自動織機 Design device
JP6314566B2 (en) * 2014-03-18 2018-04-25 株式会社大林組 Excavation method
JP6596952B2 (en) * 2015-06-11 2019-10-30 株式会社大林組 Eyebreaking device
JP6866140B2 (en) * 2016-12-08 2021-04-28 株式会社竹中工務店 Molding method of uneven part for ground improvement body

Also Published As

Publication number Publication date
JPS6210323A (en) 1987-01-19

Similar Documents

Publication Publication Date Title
JPH0547684B2 (en)
JP3931034B2 (en) Construction method using steel pipe pile as column
CN214034246U (en) Assembled concrete prefabricated component
JP2002242302A (en) Beam-column joint structure of building steel frame and joint method
JP2985828B2 (en) Connection method of columnar prefab rebar
JP2002138486A (en) Head rigidly-coupling member for landslide suppressing combined pile group composed of steel pipe
KR102110080B1 (en) H-type steel wall And Open cut method for constructing an underground structure using H-type steel wall
JPH03286029A (en) Steel underground wall and its construction
JPS6026724A (en) Integration work of steel-framed building structure and composite underground beam
CN209099518U (en) A prefabricated steel-concrete composite shear wall splicing device
JPH09279609A (en) Building method of precast reinforced concrete-made underground structure
KR20180137687A (en) A method of constructing an underground wall structure using an earth retaining wall and an underground wall structure
JPH0721196B2 (en) Reverse construction method of underground structure
JPH03199528A (en) Steel frame foundation of construction
JP2001164559A (en) Construction method of continuous underground wall guide wall making use of l-type precast member
JPS63312415A (en) Connection work of continuous underground wall and excavator therefor
JPH03169911A (en) Construction of underground steel wall
JP3549373B2 (en) Joining structure and joining method of steel members
JP2853019B2 (en) Precast concrete foundation block and foundation formation method
JP3690670B2 (en) Underground continuous wall construction method
JPS607397Y2 (en) Joint structure of concrete sheet piles
JPH0419082Y2 (en)
JP2779050B2 (en) Method of forming the basic structure
JPH0476123A (en) Constructing method for underground structure
JP3725005B2 (en) Flat panel and its construction method

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees