Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0554551B2 - - Google Patents
[go: Go Back, main page]

JPH0554551B2 - - Google Patents

Info

Publication number
JPH0554551B2
JPH0554551B2 JP3244286A JP3244286A JPH0554551B2 JP H0554551 B2 JPH0554551 B2 JP H0554551B2 JP 3244286 A JP3244286 A JP 3244286A JP 3244286 A JP3244286 A JP 3244286A JP H0554551 B2 JPH0554551 B2 JP H0554551B2
Authority
JP
Japan
Prior art keywords
scaffolding
movable
lifting
along
hanger rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3244286A
Other languages
Japanese (ja)
Other versions
JPS62189253A (en
Inventor
Shigeo Nakai
Junko Pponda
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YONEYAMA KOGYO KK
Original Assignee
YONEYAMA KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YONEYAMA KOGYO KK filed Critical YONEYAMA KOGYO KK
Priority to JP3244286A priority Critical patent/JPS62189253A/en
Priority to US07/014,922 priority patent/US4848516A/en
Priority to DE19873745011 priority patent/DE3745011A1/de
Priority to DE19873704598 priority patent/DE3704598A1/en
Priority to GB8703615A priority patent/GB2186537B/en
Publication of JPS62189253A publication Critical patent/JPS62189253A/en
Publication of JPH0554551B2 publication Critical patent/JPH0554551B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

【発明の詳細な説明】 [産業上の利用分雅] この発明は移動足場装置に関し、さらに詳しく
は、橋梁、高架道路の床裏面、大型建築物例え
ば、体育館などの補修,塗装などで代表されるメ
ンテナンス作業に適した移動足場装置に関する。
[Detailed Description of the Invention] [Industrial Applications] The present invention relates to a mobile scaffolding device, and more specifically, it is used for repairing and painting bridges, the underside of elevated roads, large buildings such as gymnasiums, etc. This invention relates to a mobile scaffolding device suitable for maintenance work.

[従来の技術] 橋梁などで代表される構築物のメンテナンス作
業には足場が必要であつて、陸上の比較的低い場
所では高所作業車などや、地上から組上げたパイ
プ製の足場を用いることで解決できるが、地上高
が数十メートルにもなる橋梁などでは、通常の足
場装置では機能せず、橋梁に対して取付けられた
足場装置が必要になる。
[Conventional technology] Scaffolding is required for maintenance work on structures such as bridges, and in relatively low places on land, it is possible to use aerial work vehicles or pipe scaffolding assembled from the ground. Although this problem can be solved, for bridges with a height of several tens of meters above the ground, normal scaffolding equipment will not work and a scaffolding equipment attached to the bridge will be required.

このような必要性から地上のきわめて高い橋梁
などのために種々の移動形式の作業足場装置が提
案されている。
In response to this need, various types of mobile scaffolding devices have been proposed for bridges that are extremely high above the ground.

しかし、高速道路の流入地点や、流出地点のよ
うに幅員が変化する場所では梁材の幅員寸法も変
化しているので、足場装置の移動が不可能にな
り、長い梁全部にわたつてメンテナンス作業を行
うことができない問題が残されたままになつてい
る。
However, in places where the width of the beam changes, such as the inflow point or outflow point of an expressway, the width dimensions of the beams also change, making it impossible to move the scaffolding equipment and requiring maintenance work to cover all of the long beams. The problem of not being able to do so remains.

このような問題点を解決するものとして特許第
1222171号(特公昭58−57564号公報)を先行技術
として挙げることができる。
Patent No. 1 is proposed to solve these problems.
No. 1222171 (Japanese Patent Publication No. 58-57564) can be cited as prior art.

この先行技術によれば、橋梁の長さ方向が沿つ
て足場装置を移動できて、連続したメンテナンス
作業が可能であり、幅員変化にも応じられるよう
になつている。
According to this prior art, the scaffolding device can be moved along the length of the bridge, allowing continuous maintenance work and responding to changes in bridge width.

[発明が解決しようとする問題点] 上述のように移動足場装置は応じられる幅員変
化に限界があつて、一般の橋梁作業に用いるに
は、使用対象が少なく、幅員変化の小さい橋梁に
対して使用できるにすぎない。
[Problems to be Solved by the Invention] As mentioned above, the mobile scaffolding device has a limit to the width changes that it can accommodate, and when used for general bridge work, it is difficult to use it for bridges where there are few objects and the width changes are small. It can only be used.

また、橋梁に対して橋梁が斜交状態で支持され
ている場合では、第7図に示されている図示格子
線領域に対しては実際の作業ができない場合が生
じる。
Furthermore, if the bridge is supported obliquely to the bridge, it may not be possible to perform actual work on the illustrated grid line area shown in FIG.

さらにまた、ランプウエイのように橋梁に折曲
げられたような状態の高さ方向の変化がある場合
には足場装置の移動を円滑に行うことができな
い。
Furthermore, if there is a change in the height direction when the scaffolding device is bent on a bridge like a rampway, the scaffolding device cannot be moved smoothly.

[問題点を解決するための手段] そこで、この発明は橋梁などの幅方向の変化、
さらには、曲線橋梁,橋脚との斜交交差の橋梁な
どに対しても全領域にわたつて移動足場装置が機
能するようにしようとするもので、そのために、
構築物に沿つて取付けられるハンガーレールと、
このハンガーレールに装備された可動吊持機と、
この可動吊持機によつて吊持された作業足場とを
備える移動足場装置において、可動吊持機に対し
て水平面に沿つて回転できる状態で連結されてい
る第2吊持機と、この第2吊持機によつて支持さ
れている梁材と、この梁材に両端部が係止されて
いる足場板とを備え、前記第2吊持機は梁材に設
けたガイドレール部を狭持する転動輪をもち、ハ
ンガレールと交差する方向に移動可能であり、前
記梁材は可動吊持機間の幅方向の間隔より長く、
その上辺に前記転動輪により挟持されるガイドレ
ール部をもち、前記足場板はその長さ方向が構築
物の長さ方向に沿つていて、平面視上直交する2
方向と、両方向の中間方向に移動できるように構
成したことを特徴とするものである。
[Means for solving the problem] Therefore, this invention solves the problem of changing the width of a bridge, etc.
Furthermore, the aim is to enable the mobile scaffolding device to function over the entire area, including curved bridges and bridges with diagonal intersections with piers.
A hanger rail installed along the structure,
A movable lifting machine equipped on this hanger rail,
In a mobile scaffolding device including a work scaffold suspended by this movable lifting machine, a second lifting machine is connected to the movable lifting machine so as to be able to rotate along a horizontal plane; A beam supported by a second hoist, and a scaffolding board having both ends secured to the beam, and the second hoist is configured to narrow a guide rail section provided on the beam. The beam member is longer than the widthwise interval between the movable hoisting machines, and is movable in a direction intersecting the hanger rail.
The scaffold board has a guide rail portion on its upper side that is held between the rolling wheels, and the length direction of the scaffold board is along the length direction of the structure, and the scaffold board has two parts perpendicular to each other in a plan view.
It is characterized by being configured to be able to move in both directions and in an intermediate direction between the two directions.

[実施例] 以下、この発明の実施例を添付した第1図ない
し、第6図によつて説明する。先ず、第1図はこ
の発明の移動足場装置を架設した橋梁の下から見
た斜面図で、符号1は道路を形成する床版、符号
2は橋梁材をそれぞれ示し、橋梁材2は上下両端
に左右(幅)方向に張出したリブ2Aをもつてい
る。
[Embodiments] Hereinafter, embodiments of the present invention will be explained with reference to FIGS. 1 to 6 attached hereto. First of all, Fig. 1 is a slope view seen from below of a bridge on which the mobile scaffolding device of the present invention has been erected, in which reference numeral 1 indicates the deck slab forming the road, and reference numeral 2 indicates the bridge material. It has ribs 2A extending in the left-right (width) direction.

そして、このリブ2Aに橋梁材2の長さ方向に
沿つて移動足場装置の移動をガイドするハンガー
レールが万力12によつて取付けられており、こ
のハンガーレール11は逆T型の断面形状をした
もので、下面には波形のラツク状歯11aが長さ
方向に沿つて固定されている。
A hanger rail that guides the movement of the mobile scaffolding device along the length direction of the bridge material 2 is attached to this rib 2A with a vise 12, and this hanger rail 11 has an inverted T-shaped cross section. A wavy hook-shaped tooth 11a is fixed to the lower surface along the length direction.

このハンガーレール11には複数の吊持機20
が移動自在に搭載される。この吊持機20は箱型
のケーシング21に前記ハンガーレール11上に
載る車輪22がその内側の空間に軸22aを介し
て取付けられており、車輪22のもつフランジが
ハンガーレール11の側縁に沿つている。この車
輪22の下側の空間中には前記ラツク状歯11a
に噛合うピニオン輪23が軸23aによりケーシ
ング21に取付けられており、ハンガーレール1
1のラツク状歯11aに噛合つており、長さ方向
の吊持機20のうち少なくとも1つには、ピニオ
ン輪23の軸23aに設けた歯車24に対してケ
ーシング21に設けたクランクハンドル25の軸
25aの歯車が噛合い、これによりトルクを伝達
できるようになつている。
This hanger rail 11 has a plurality of lifting machines 20.
is mounted in a movable manner. This hoisting machine 20 has a box-shaped casing 21 with wheels 22 mounted on the hanger rail 11 attached through a shaft 22a in the space inside the box-shaped casing 21, and the flange of the wheel 22 is attached to the side edge of the hanger rail 11. It's along. The rack-shaped teeth 11a are provided in the space below the wheel 22.
A pinion wheel 23 that meshes with the hanger rail 1 is attached to the casing 21 by a shaft 23a.
At least one of the longitudinal lifting devices 20 has a crank handle 25 provided on the casing 21 with respect to a gear 24 provided on the shaft 23a of the pinion ring 23. The gears on the shaft 25a mesh with each other so that torque can be transmitted.

ケーシング21の側面にはラツク状歯11aの
幅方向に沿つて窓孔26が穿設されており、この
窓孔26中にロツクピン27を挿入するとラツク
状歯11aに係止状態を保持できるようになつて
いる。
A window hole 26 is bored in the side surface of the casing 21 along the width direction of the rack-shaped tooth 11a, and when a lock pin 27 is inserted into this window hole 26, it can be held locked to the rack-shaped tooth 11a. It's summery.

このような吊持機20の下端部には、第2吊持
機30がスラストベアリング31を介して吊持ア
ーム32により吊持されており、吊持アーム32
が箱型をしたケーシング33を吊持している。こ
のケーシング33には、ピニオン輪34,挟持ロ
ーラ35がその軸34a,35aが前記軸22
a,23a,25aと直交する方向に沿つて配置
され、ピニオン輪34は後述する梁材としてのト
ラス梁に設けたガイドレールのラツク状歯に噛合
い、挟持ローラ35はそのガイドレールの下面に
当つて第2吊持機30を構成している。
A second lifting device 30 is suspended from the lower end of such a lifting device 20 by a lifting arm 32 via a thrust bearing 31.
suspends a box-shaped casing 33. This casing 33 has a pinion wheel 34 and a nipping roller 35 whose shafts 34a and 35a are connected to the shaft 22.
a, 23a, and 25a, the pinion wheel 34 meshes with the rack-shaped teeth of a guide rail provided on a truss beam as a beam material, which will be described later, and the clamping roller 35 is placed on the lower surface of the guide rail. This constitutes a second lifting machine 30.

この第2吊持機30はそのピニオン輪34がト
ラス梁40の上辺に形成したT型断面のガイドレ
ール41のラツク状歯42に噛合い、ガイドレー
ル41のウエフ41aに相当する部分の下端から
挟持ローラ35が当たり、ピニオン輪34との間
で挟持状態を保持している。
This second hoisting machine 30 has its pinion wheel 34 meshing with the rack-shaped teeth 42 of a guide rail 41 with a T-shaped cross section formed on the upper side of the truss beam 40, and from the lower end of the portion of the guide rail 41 corresponding to the wafer 41a. The pinching roller 35 abuts on it and maintains the pinched state between it and the pinion wheel 34 .

このトラス梁40の下辺材43は丸形パイプで
形成されていて、この下辺材43に足場板50の
端部が係止される。
The lower sap member 43 of this truss beam 40 is formed of a round pipe, and the end portion of the scaffold board 50 is locked to this lower sap member 43.

前記ケーシング33の側面には窓孔36が穿け
てあつて、この窓孔36にロツクピン37を挿入
するとラツク状歯42を捉えて係止状態を保持で
きるようになつている。
A window hole 36 is bored in the side surface of the casing 33, and when a lock pin 37 is inserted into the window hole 36, it can catch the rack-shaped teeth 42 and maintain the locked state.

上述のような吊持機20,第2吊持機30は、
橋梁材2の長さ方向に沿つて略等間隔に配置さ
れ、長さ方向に沿つた吊持機20間はタイロツド
28で連結されていて、しかも、橋梁材2の両側
に配置された幅方向両側の第2吊持機30,30
間にトラス梁40が支持される。このトラス梁4
0の長さは吊持機20,20の幅方向間隔より長
くなつていて、後述する足場デツキにオーバーハ
ング部を形成できるようになつている。
The hoisting machine 20 and the second hoisting machine 30 as described above are
The lifting machines 20 are arranged at approximately equal intervals along the length direction of the bridge material 2, and the lengthwise lifting machines 20 are connected by tie rods 28. Second lifting machines 30, 30 on both sides
A truss beam 40 is supported between them. This truss beam 4
The length of 0 is longer than the widthwise interval between the hoisting machines 20, 20, so that an overhang part can be formed on the scaffolding deck, which will be described later.

そして、トラス梁40間に足場板51が架設さ
れるのであつて、両端に設けた略半円の係止フツ
ク52が下辺材43を捉えるようになつていて、
足場板51を敷つめることでフラツトな足場デツ
キ50が構成される。
A scaffolding board 51 is installed between the truss beams 40, and approximately semicircular locking hooks 52 provided at both ends are adapted to catch the lower sap material 43,
A flat scaffolding deck 50 is constructed by laying the scaffolding boards 51 together.

このとき、左右幅方向の吊持機20,20の間
隔よりトラス梁40の全長は長くなつており、足
場デツキ50は幅方向に橋梁材2の幅より突出し
た部分、言換えると、幅方向にオーバハング部H
が形成される。足場デツキの周囲に相当する四隈
と、長さ方向の中間部にはパイプ製の支柱53が
建てられ、橋梁材2の側面に対するメンテナンス
作業に適した2段足場デツキなどに利用する。
At this time, the total length of the truss beam 40 is longer than the interval between the hoisting machines 20, 20 in the left and right width directions, and the scaffolding deck 50 has a portion that protrudes from the width of the bridge material 2 in the width direction, in other words, Overhang part H
is formed. A pipe support 53 is built in the four corners corresponding to the periphery of the scaffolding deck and in the middle part in the length direction, and is used for a two-tiered scaffolding deck suitable for maintenance work on the sides of the bridge material 2.

前記トラス梁40は継足しが可能な構成であつ
て、第3図に示すように両端面部には、端面板4
4が固定されており、左右両端面部は対称形であ
つて、一端の端面板44の一側縁には切欠45が
形成され、この切欠45と向合つて固定ボルト4
6が植設されている。さらに、端面板44には端
側面から突出した受止板47が固定されており、
この受止板47にはボルト孔47aが穿けてあつ
て、下辺材43の端面にはパイプ状の継手48が
突出し、他のトラス梁40の下辺材43中に嵌入
できるようになつている。
The truss beam 40 has a structure that can be supplemented, and as shown in FIG.
4 is fixed, and both left and right end surfaces are symmetrical, and a notch 45 is formed on one side edge of the end plate 44 at one end, and a fixing bolt 4 is inserted opposite to this notch 45.
6 has been planted. Furthermore, a receiving plate 47 protruding from the end side surface is fixed to the end plate 44,
A bolt hole 47a is bored in this receiving plate 47, and a pipe-shaped joint 48 protrudes from the end face of the lower sap member 43 so that it can be fitted into the lower sap member 43 of another truss beam 40.

また、他端の端面板44には、その切欠45は
対向する切欠45と開口の向きが逆であつて、受
止板47と重なり合う受止板49が固定され、ボ
ルト孔47a,49aにボルトを通して結合でき
るようになつている。
Further, a receiving plate 49 is fixed to the end plate 44 at the other end, the opening direction of which is opposite to that of the opposing notch 45, and which overlaps the receiving plate 47. It is now possible to connect through

次に、この発明による移動足場装置の移動作業
について説明する。先ず、橋梁材2のリブ2Aに
沿つて適当な間隔で万力12を介してハンガーレ
ール11を吊持する。このとき、ハンガーレール
11,11の幅方向間隔は一定である必要はな
く、橋梁材2の形状に沿つて配置される。このハ
ンガーレール11,11に吊持機20,第2吊持
機30を介してトラス梁40が吊持され、トラス
梁40間に足場板51が架設されて足場デツキ5
0が構成される。
Next, the moving operation of the mobile scaffolding device according to the present invention will be explained. First, the hanger rail 11 is suspended along the rib 2A of the bridge material 2 with a vise 12 at appropriate intervals. At this time, the interval in the width direction of the hanger rails 11, 11 does not need to be constant, and is arranged along the shape of the bridge material 2. A truss beam 40 is suspended from the hanger rails 11, 11 via a hoisting machine 20 and a second hoisting machine 30, and a scaffolding board 51 is constructed between the truss beams 40, so that the scaffolding deck 5
0 is configured.

そして、足場デツキ50をハンガーレール11
に沿つて移動させる場合には、左右の吊持機20
のうち1つに設けたクランクハンドル25を回わ
すことで歯車24を介してピニオン輪23が駆動
され、ラツク状歯23に噛合いながら吊持機20
が移動することで、タイロツド28で連結された
吊持機20は共に移動し、足場デツキ50が送ら
れる。
Then, the scaffolding deck 50 is attached to the hanger rail 11.
When moving along the left and right lifting machines 20
By rotating the crank handle 25 provided on one of the pinion wheels 23, the pinion wheel 23 is driven via the gear 24, and the lifting machine 20 is engaged with the rack teeth 23.
By moving, the lifting machine 20 connected by the tie rod 28 moves together, and the scaffolding deck 50 is sent.

この移動に当つて、橋梁材2が平面視上曲線を
描いているとき、また、橋梁材2の幅員寸法が拡
幅,縮幅している場合には、左右幅方向の吊持機
20、ならびに、第2吊持機30の間隔は変化す
るが、ガイドレール41のラツク状歯42に沿つ
て第2吊持機30が移動することでその変化を吸
収し、足場デツキ50は移動できる。
During this movement, when the bridge material 2 is drawing a curved line in plan view, or when the width dimension of the bridge material 2 is widening or contracting, the lifting machine 20 in the left and right width direction, Although the interval between the second hoisting machines 30 changes, the change is absorbed by the second hoisting machines 30 moving along the rack-shaped teeth 42 of the guide rail 41, and the scaffolding deck 50 can move.

とくに、第6図に示した橋脚Pと、橋梁Bとが
斜交交差する場合には、曲線内側の吊持機20に
ロツクを掛けて(ロツクピン27を窓孔26に挿
入してラツク状歯11aと係合する)、曲線外側
の吊持機20だけに移動送りを加える。足場デツ
キ50はその長さ方向と斜交する方向に移動し、
他の橋脚Pに接近させ得る。
In particular, when the pier P and the bridge B shown in FIG. 11a), the movement feed is applied only to the hoists 20 on the outside of the curve. The scaffolding deck 50 moves in a direction oblique to its length direction,
It can be brought close to other piers P.

図示実施例では、足場デツキ50の移動方向中
間部で足場板51が継足されているものを示した
が、この実施例では、中折れ変化が可能となつ
て、平坦部分から傾斜部分への移動(または、そ
の逆移動)に都合がよい。
In the illustrated embodiment, the scaffolding board 51 is attached to the intermediate part of the scaffolding deck 50 in the moving direction, but in this embodiment, it is possible to bend the scaffolding board 51 in the middle and change from a flat part to an inclined part. Convenient for movement (or vice versa).

なお、吊持機20の1つにクランクハンドルに
よる駆動機構を設けたものを示したが、その1つ
はどの吊持機であつてもよい。
Although one of the lifting machines 20 is shown as having a drive mechanism using a crank handle, it may be any lifting machine.

丸型の梁材にあつては、リブがないのでハンガ
ーレールはチエンにより吊持される。
In the case of round beams, there are no ribs, so the hanger rail is suspended by a chain.

[発明の効果] 以上の説明から明らかなように、この発明の移
動足場装置は次のような効果を期待することがで
きる。
[Effects of the Invention] As is clear from the above description, the following effects can be expected from the mobile scaffolding device of the present invention.

(a) 橋梁などの構築物の長さ方向に沿つて移動で
きるばかりか、構築物の幅員の変化にも追従で
き、平面視上曲線を描いた移動も可能である。
(a) It is not only possible to move along the length of a structure such as a bridge, but also to follow changes in the width of the structure, and it is also possible to move in a curved line when viewed from above.

(b) 構築物の長さ方向と斜交する方向にも移動で
きるので、構築物のどの部分にも移動でき、メ
ンテナンスを施すことができる。
(b) Since it can also be moved in a direction oblique to the length direction of the structure, it can be moved to any part of the structure and maintenance can be performed.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図はこの発明の移動足場装置の全体斜視
図、第2図は第1図部拡大断面図、第3図はト
ラス梁の一部拡大斜面図、第4図は同概略正面
図、第5図は足場デツキの一部斜面図、第6図は
作業態様の説明斜面図、第7図は従来の移動足場
装置による作業状態を示す説明図である。 11…ハンガーレール、11a…ラツク状歯、
20…吊持機、21…ケーシング、22…車輪、
22a…軸、23…ピニオン輪、23a…軸、2
4…歯車、25…クランクハンドル、28…ロツ
クピン、30…第2吊持機、31…スラストベア
リング、32…吊持アーム、33…ケーシング、
34…ピニオン輪、35…挟持ローラ、34a,
35a…軸、40…トラス梁、41…ガイドレー
ル、42…ラツク状歯、43…下辺材、50…足
場デツキ、51…足場板、52…係止フツク、5
3…支柱。
Fig. 1 is an overall perspective view of the mobile scaffolding device of the present invention, Fig. 2 is an enlarged sectional view of the part in Fig. 1, Fig. 3 is a partially enlarged slope view of the truss beam, Fig. 4 is a schematic front view of the same, and Fig. 4 is a schematic front view of the same. FIG. 5 is a partially sloped view of the scaffolding deck, FIG. 6 is a sloped view illustrating a working mode, and FIG. 7 is an explanatory view showing a working state by a conventional mobile scaffolding device. 11...Hanger rail, 11a...Rack-shaped teeth,
20... Lifting machine, 21... Casing, 22... Wheels,
22a...shaft, 23...pinion wheel, 23a...shaft, 2
4... Gear, 25... Crank handle, 28... Lock pin, 30... Second lifting machine, 31... Thrust bearing, 32... Lifting arm, 33... Casing,
34...pinion wheel, 35...pinching roller, 34a,
35a... Axis, 40... Truss beam, 41... Guide rail, 42... Rack tooth, 43... Lower sapwood, 50... Scaffolding deck, 51... Scaffolding board, 52... Locking hook, 5
3... Prop.

Claims (1)

【特許請求の範囲】 1 構築物に沿つて取付けられるハンガーレール
と、このハンガーレールに装備された可動吊持機
と、この可動吊持機によつて吊持された作業足場
とを備える移動足場装置において、 可動吊持機に対して水平面に沿つて回転できる
状態で連結されている第2吊持機と、この第2吊
持機によつて支持されている梁材と、この梁材に
両端部が係止されている足場板とを備え、前記第
2吊持機は梁材に設けたガイドレール部を挟持す
る転動輪をもち、ハンガレールと交差する方向に
移動可能であり、前記梁材は可動吊持機間の幅方
向の間隔より長く、その上辺に前記転動輪により
挟持されるガイドレール部をもち、前記足場板は
その長さ方向が構築物の長さ方向に沿つていて、
平面視上直交する2方向と、両方向の中間方向に
移動できるように構成したことを特徴とする移動
足場装置。
[Claims] 1. A mobile scaffolding device comprising a hanger rail attached along a structure, a movable lifting device equipped on the hanger rail, and a work scaffold suspended by the movable lifting device. , a second hoisting machine connected to the movable hoisting machine so as to be able to rotate along a horizontal plane, a beam supported by the second hoisting machine, and a beam with both ends attached to the beam. the second lifting machine has a rolling wheel that clamps a guide rail part provided on the beam material, and is movable in a direction intersecting the hanger rail; is longer than the interval in the width direction between the movable lifting machines, and has a guide rail part on its upper side that is held by the rolling wheels, and the length direction of the scaffold board is along the length direction of the structure,
A mobile scaffolding device characterized in that it is configured to be movable in two directions perpendicular to each other in a plan view and in an intermediate direction between the two directions.
JP3244286A 1986-02-17 1986-02-17 Moving scaffold apparatus Granted JPS62189253A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP3244286A JPS62189253A (en) 1986-02-17 1986-02-17 Moving scaffold apparatus
US07/014,922 US4848516A (en) 1986-02-17 1987-02-13 Movable scaffold
DE19873745011 DE3745011A1 (en) 1986-02-17 1987-02-13
DE19873704598 DE3704598A1 (en) 1986-02-17 1987-02-13 MOVING SCAFFOLDING
GB8703615A GB2186537B (en) 1986-02-17 1987-02-17 Movable scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3244286A JPS62189253A (en) 1986-02-17 1986-02-17 Moving scaffold apparatus

Publications (2)

Publication Number Publication Date
JPS62189253A JPS62189253A (en) 1987-08-19
JPH0554551B2 true JPH0554551B2 (en) 1993-08-12

Family

ID=12359074

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3244286A Granted JPS62189253A (en) 1986-02-17 1986-02-17 Moving scaffold apparatus

Country Status (1)

Country Link
JP (1) JPS62189253A (en)

Also Published As

Publication number Publication date
JPS62189253A (en) 1987-08-19

Similar Documents

Publication Publication Date Title
JP3699270B2 (en) Mobile scaffold equipment
JPH0554551B2 (en)
JPH0572501B2 (en)
JPH0711182B2 (en) Mobile scaffolding equipment
JP3606528B2 (en) Mobile suspension scaffold device
JPS6332061A (en) Moving scaffold apparatus
JPH0633679B2 (en) Mobile scaffolding equipment
JP3179710B2 (en) Structural slide erection method and its work system
JPS61113909A (en) Apparatus for constructing high structure
JPH0428886Y2 (en)
JPS6254752B2 (en)
SU1504296A1 (en) Device for securing rail to crane-supporting girder
JPH09177310A (en) Movable scaffolding lift
JPH0726503Y2 (en) Buffer joint between truss rails
JPS5829388B2 (en) Approach work equipment for railroad tracks, etc.
JPS63165646A (en) Stop apparatus for moving scaffold apparatus
JPH0235946Y2 (en)
JPH0516348Y2 (en)
JPS5851565B2 (en) Viaduct construction method
JPH0545724B2 (en)
JPH0475971B2 (en)
JPH0215946Y2 (en)
JPS588827Y2 (en) Health gondola
JPS621910A (en) Working vehicle for repairing bridge and its construction
JPH0529723B2 (en)

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term