Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0564795B2 - - Google Patents
[go: Go Back, main page]

JPH0564795B2 - - Google Patents

Info

Publication number
JPH0564795B2
JPH0564795B2 JP60111836A JP11183685A JPH0564795B2 JP H0564795 B2 JPH0564795 B2 JP H0564795B2 JP 60111836 A JP60111836 A JP 60111836A JP 11183685 A JP11183685 A JP 11183685A JP H0564795 B2 JPH0564795 B2 JP H0564795B2
Authority
JP
Japan
Prior art keywords
training
trainer
actual
simulator
training simulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP60111836A
Other languages
Japanese (ja)
Other versions
JPS61270779A (en
Inventor
Keisuke Tanaka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP11183685A priority Critical patent/JPS61270779A/en
Publication of JPS61270779A publication Critical patent/JPS61270779A/en
Publication of JPH0564795B2 publication Critical patent/JPH0564795B2/ja
Granted legal-status Critical Current

Links

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、電力系統の給電運用や発電プラン
ト等の運用に従事する運転員の平常時及び緊急時
の運用技能を向上する目的に使用される訓練用シ
ミユレータに関するものである。
[Detailed Description of the Invention] [Field of Industrial Application] This invention is used for the purpose of improving the operational skills of operators engaged in power supply operation of electric power systems and operation of power generation plants, etc. in normal times and in emergency situations. This paper relates to a training simulator.

〔従来の技術〕[Conventional technology]

第3図は、例えば3電技報Vol.54、No.12、1980
に示された従来の訓練用シミユレータを示すシス
テム構成図であり、図において、1は中央演算処
理装置(CPU)、2はこのCPU1に接続されたト
レーナ(訓練を実行し、被訓練者(以下、トレー
ニと称す)の訓練内容を監視し、訓練終了後、教
育指導する人)用指令台で、トレーナ用電話2a
が設けられている。3はCPU1に接続されたト
レーニ(被訓練者)用指令台で、トレーニ用電話
3aが設けられている。4は系統監視盤である。
5は事故内容、異常状態等を出力する出力タイプ
ライタ、6はCPU1に接続された訓練実行内容
等を出力するラインプリンタ、7はCPU1に接
続された訓練初期状態、各種トレーナ用データ、
各種トレーニ用データを格納する固定デイスク装
置である。
Figure 3 shows, for example, 3Den Giho Vol.54, No.12, 1980.
1 is a system configuration diagram showing the conventional training simulator shown in FIG. Trainer telephone 2a is used at the command desk for the person who supervises the training content of the trainee (referred to as the trainer) and provides educational guidance after the training is completed.
is provided. 3 is a command console for a trainee (trainee) connected to the CPU 1, and is provided with a telephone 3a for the trainee. 4 is a system monitoring board.
5 is an output typewriter that outputs accident details, abnormal conditions, etc., 6 is a line printer connected to CPU 1 that outputs training execution details, etc., 7 is an initial state of training, various data for trainers, connected to CPU 1,
This is a fixed disk device that stores various data for trainees.

次に動作について説明する。従来の訓練用シミ
ユレータの動作内容を第4図のフローチヤートに
示す。トレーナはトレーナ用指令台2を用いるこ
とにより、訓練実行用の系統、プラント等の初期
状態を設定(第4図、ステツプ5−1、5−2)
する。この初期状態はデイスク装置7に格納され
る。次にトレーナはトレーナ用指令台2を用いる
ことにより、訓練実行中にCPU1より発生させ
る事故状態、異常状態のシーケンスを作成(第4
図、ステツプ5−3、5−4)する。これらのシ
ーケンスもデイスク装置7に格納される。
Next, the operation will be explained. The operation of the conventional training simulator is shown in the flowchart of FIG. By using the trainer command desk 2, the trainer sets the initial state of the system, plant, etc. for training execution (Fig. 4, steps 5-1 and 5-2).
do. This initial state is stored in the disk device 7. Next, the trainer uses the trainer command console 2 to create a sequence of accident states and abnormal states to be generated by the CPU 1 during training execution (4th
Figure 5, steps 5-3 and 5-4). These sequences are also stored in the disk device 7.

以上の設定が完了すると、トレーナはトレーニ
をトレーニ用指令台3に着座させ、訓練の実行を
開始する。訓練実行中、トレーニは、トレーニ用
指令台3及び系統監視盤4を有効に活用すること
により、事故状態・異常状態を解消するような各
種操作を、トレーニ用指令台3、トレーニ用電話
3aを用いて実行する。トレーナは訓練の実行内
容を見守るとともに、トレーニが電話で要求する
系統復旧用操作を、変電所員、発電所員等の立場
に立つて実行(第4図、ステツプ5−5、5−
6)する。上記のような操作をトレーニ及びトレ
ーナが実行し、系統が復旧した場合、トレーナは
訓練実行を停止し、訓練を終了したい場合は、ト
レーナ用指令台2より「訓練終了」(第4図、ス
テツプ5−7、5−8)を指示する。
When the above settings are completed, the trainer seats the trainee on the trainee command table 3 and starts executing the training. During the training, the trainees can perform various operations to eliminate accidents and abnormal conditions by effectively utilizing the trainee command console 3 and the system monitoring panel 4. Execute using The trainer monitors the content of the training and performs the grid restoration operations requested by the trainee over the phone from the standpoint of substation staff, power plant staff, etc. (Figure 4, Steps 5-5 and 5-
6) Do. If the trainee and the trainer perform the above operations and the system is restored, the trainer will stop the training execution, and if the trainer wants to end the training, select "End training" from the trainer command console 2 (see step 4 in Figure 4). 5-7, 5-8).

また、トレーニに事故対応の処置方法に関する
適切なアドバイスを指示するために上記訓練内容
を再現したい場合、トレーナ用指令台2より「訓
練再現」(第4図、ステツプ5−9、5−10)を
指示する。
If you wish to reproduce the above training contents in order to instruct the trainees with appropriate advice on how to respond to an accident, you can select "Reproduce training" from the trainer command console 2 (Figure 4, Steps 5-9 and 5-10). instruct.

再現終了後、トレーナが再々訓練を実行させた
い場合は、「訓練実行」を指示し、訓練を終了さ
せたい場合は、「訓練終了」を指示する。
After the completion of the reproduction, if the trainer wants to perform the training again, he/she instructs "execute training", and if he/she wants to end the training, he/she instructs "end training".

〔発明が解決しようとする問題点〕[Problem that the invention seeks to solve]

従来の訓練用シミユレータは以上のように構成
されているので、系統の初期状態や運用状態を設
定する場合、トレーナが全て入力設定しなければ
ならないし、実運用システムの運用状態や実系統
状態に合つた設定をする場合、トレーナが測定デ
ータ、運用資料をもとに、このような状態を調整
制定することが必要で、実運用状態に合わせる調
整時間を多く必要とし、高精度な調整が困難であ
るなどの問題点があつた。
Conventional training simulators are configured as described above, so when setting the initial state and operating state of the system, the trainer must input and set everything, and the operating state and actual system state of the actual system must be set. In order to make appropriate settings, it is necessary for the trainer to adjust and establish such conditions based on measurement data and operational data, which requires a lot of time to adjust to match the actual operating conditions, and makes highly accurate adjustment difficult. There were problems such as:

この発明は上記のような問題点を解消するため
になされたもので、実系統の運用状態を伝送装置
から直接訓練用シミユレータに取り込むことによ
り、現時点の実系統状態を初期状態として、訓練
を実行することを可能とし、これらの状態を設定
する時間、労力を極力消力化した訓練用シミユレ
ータを得ることを目的とする。
This invention was made to solve the above-mentioned problems. By importing the operational status of the actual system directly from the transmission device into the training simulator, training can be carried out using the current actual system status as the initial state. The purpose of the present invention is to provide a training simulator that can minimize the time and effort required to set these conditions.

〔問題点を解決するための手段〕[Means for solving problems]

この発明に係る訓練用シミユレータは、従来の
訓練用シミユレータを実運用システムの伝送装置
に接続することにより、実運用システムより電力
系統の状態や各種設備の運用状態のデータを取込
み、訓練の各種運用状態のデータを自動設定でき
るようにしたものである。
The training simulator according to the present invention connects a conventional training simulator to the transmission device of the actual operation system, thereby capturing data on the state of the electric power system and the operation status of various equipment from the actual operation system, and allowing various training operations to be performed. This allows automatic setting of status data.

〔作用〕[Effect]

この発明における訓練用シミユレータは、実運
用システムの伝送装置に接続されたことにより電
力系統の運用状態や各種設備の運用状態のデータ
が実運用システムにより入力され、トレーナは訓
練目的にかなつた特徴的な時点を見はからつて訓
練の各種運用状態のデータを自動設定する。
The training simulator of the present invention is connected to the transmission equipment of the actual operation system, so that data on the operational status of the power system and the operation status of various equipment is inputted by the actual operation system, and the trainer can use the characteristic information that meets the training purpose. The system automatically sets data for various operational conditions during training based on specific points in time.

〔実施例〕〔Example〕

以下、この発明の一実施例を前記第4図同一部
分に同一符号を付した第3図について説明する。
第1図において、8は実運用システムの伝送装置
(CDTテレコンなど)で、この伝送装置8には訓
練用シミユレータのPCU1と実運用システムの
中央演算処理装置CPU9が接続されている。1
0は実運用システムの運用上必要となる設定デー
タプログラムを格納する固定デイスク装置、11
はCPU9及び固定デイスク装置10に接続され
た実運用システムにより監視制御を行う給電所員
用の指令台で、給電所員用電話11aが設けられ
ている。12は指令台11と同様給電所員用の指
令台で、給電所員用電話12aが設けられてい
る。13は実運用システムで用いられる系統監視
盤、14は実運用システムにおける事故内容、異
常状態等を出力する出力タイプライタ、15は実
運用システム用のラインプリンタ装置である。
Hereinafter, an embodiment of the present invention will be described with reference to FIG. 3, in which the same parts as in FIG. 4 are denoted by the same reference numerals.
In FIG. 1, reference numeral 8 denotes a transmission device (CDT teleconverter, etc.) of the actual operation system, and to this transmission device 8 are connected the PCU 1 of the training simulator and the central processing unit CPU 9 of the actual operation system. 1
0 is a fixed disk device that stores configuration data programs necessary for the operation of the actual system; 11
1 is a command desk for the power supply station staff who performs monitoring and control by the actual operation system connected to the CPU 9 and the fixed disk device 10, and is equipped with a telephone 11a for the power supply station staff. Reference numeral 12 denotes a command console for the power supply station staff, similar to the command console 11, and is provided with a telephone 12a for the power supply station staff. Reference numeral 13 is a system monitoring panel used in the actual operation system, 14 is an output typewriter for outputting details of accidents, abnormal conditions, etc. in the actual operation system, and 15 is a line printer device for the actual operation system.

次に動作について説明する。この発明による訓
練用シミユレータの動作内容を第2図のフローチ
ヤートに示す。トレーナは、まず、トレーナ用指
令台2を用いることにより、訓練実行で必要とな
る事故シーケンス(事故内容を示す機器、リレー
の状態変化)をあらかじめ作成(第2図、ステツ
プ2−1、2−2)しておく。トレーナは、現在
運用中の系統状態を見ながら、訓練を実行するた
めに適切な時点で「訓練実行」(第2図、ステツ
プ2−3)を指示する。これにより、シミユレー
タは実運用システムの伝送装置8よりオンライン
データ(機器のオンオフ状態、変圧器のタツプ位
置など)を取り込み(第2図、ステツプ2−4)、
訓練用シミユレータの中央演算処理装置(CPU)
1の主メモリ及び固定デイスク装置7に書き込
む。シミユレータはこの初期値データをもとに、
現在時点からの訓練を開始する。以下訓練実行
(第2図、ステツプ2−5)、訓練再現(第2図、
ステツプ2−6、2−7)、訓練終了(第2図、
ステツプ2−8、2−9)の動作内容は、前記第
3図、第4図に示した従来の訓練用シミユレータ
の動作内容と同様である。
Next, the operation will be explained. The operation of the training simulator according to the present invention is shown in the flowchart of FIG. First, the trainer uses the trainer command desk 2 to create in advance the accident sequence (changes in the status of equipment and relays that indicate the details of the accident) required for the training (Fig. 2, Steps 2-1 and 2-). 2) Keep it. The trainer instructs "execution of training" (FIG. 2, step 2-3) at an appropriate time to carry out the training while checking the system status currently in operation. As a result, the simulator takes in online data (on/off status of equipment, tap position of transformer, etc.) from the transmission device 8 of the actual operation system (Fig. 2, Step 2-4).
Central processing unit (CPU) of training simulator
1 main memory and fixed disk device 7. Based on this initial value data, the simulator
Start training from the current point. The following training execution (Fig. 2, Step 2-5), training reproduction (Fig. 2, Step 2-5),
Steps 2-6, 2-7), training completion (Fig. 2,
The operations of steps 2-8 and 2-9) are similar to those of the conventional training simulator shown in FIGS. 3 and 4.

また、上記実施例は電力系統の給電所又は制御
所を対象とした訓練用シミユレータについて説明
したが、火力発電所のプラント制御用システムの
訓練用シミユレータであつてもよく、上記実施例
と同様の効果を奏する。
Further, although the above embodiment describes a training simulator for a power supply station or control center of an electric power system, it may also be a training simulator for a plant control system of a thermal power plant, and the same as the above embodiment may be used. be effective.

〔発明の効果〕〔Effect of the invention〕

以上のように、この発明によれば、訓練用シミ
ユレータを実運用システムの伝送装置に接続し、
訓練実行に必要となる系統初期状態及び運用初期
状態のデータを実運用システムの伝送装置から取
り込むように構成したので、実際に運用している
状態と同一の状態を同一時刻に訓練することがで
き、臨場感に富む訓練が可能となる。また、トレ
ーナが訓練初期状態を設定する労力が軽減され
る。さらに、実運用システムの待機系で訓練用シ
ミユレータを構成するシステムに比べて、実運用
システムに処理スピードや信頼性を損なうような
影響を与えないという効果がある。
As described above, according to the present invention, a training simulator is connected to a transmission device of an actual operational system,
Since the system is configured to import data on the system initial state and initial operation state required for training from the transmission equipment of the actual operating system, training can be conducted in the same state as the actual operating state at the same time. , it becomes possible to conduct training with a rich sense of reality. Furthermore, the effort required by the trainer to set the training initial state is reduced. Furthermore, compared to a system in which a training simulator is configured as a standby system of an actual operational system, this system has the advantage that it does not adversely affect the processing speed or reliability of the actual operational system.

【図面の簡単な説明】[Brief explanation of drawings]

第1図はこの発明の一実施例による訓練用シミ
ユレータの構成図、第2図はこの発明による訓練
用シミユレータの動作内容を示すフローチヤート
図、第3図は従来の訓練用シミユレータの構成
図、第4図は従来の訓練用シミユレータの動作内
容を示すフローチヤート図である。 1は中央演算処理装置、2は教育指導者用指令
台、3は被訓練者用指令台、4は系統監視盤、7
は固定デイスク装置、8は伝送装置。
FIG. 1 is a block diagram of a training simulator according to an embodiment of the present invention, FIG. 2 is a flowchart showing the operation contents of the training simulator according to the present invention, and FIG. 3 is a block diagram of a conventional training simulator. FIG. 4 is a flowchart showing the operation contents of a conventional training simulator. 1 is a central processing unit, 2 is a command board for educational instructors, 3 is a command board for trainees, 4 is a system monitoring panel, 7
8 is a fixed disk device, and 8 is a transmission device.

Claims (1)

【特許請求の範囲】[Claims] 1 教育指導者用指令台と、被訓練者用指令台
と、系統監視盤と、各種データを格納する固定デ
イスク装置と、これ等と接続した中央演算処理装
置とを有する訓練用シミユレータにおいて、前記
中央演算処理装置を実運用システムの伝送装置に
接続して取り込んだ該実運用システムの任意時点
の運用状態を再訓練用に前記固定デイスク装置に
格納するとともに、訓練用初期状態として自動設
定し、この運用状態から予め設定された事故シー
ケンスを繰り返し実行することを特徴とする訓練
用シミユレータ。
1. In a training simulator that includes a command board for educational instructors, a command board for trainees, a system monitoring panel, a fixed disk device for storing various data, and a central processing unit connected to these, the above-mentioned storing the operating state of the actual operating system at any point in time, which is captured by connecting the central processing unit to the transmission device of the actual operating system, in the fixed disk device for retraining, and automatically setting it as an initial state for training; A training simulator characterized by repeatedly executing a preset accident sequence from this operational state.
JP11183685A 1985-05-24 1985-05-24 Training simulator Granted JPS61270779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11183685A JPS61270779A (en) 1985-05-24 1985-05-24 Training simulator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11183685A JPS61270779A (en) 1985-05-24 1985-05-24 Training simulator

Publications (2)

Publication Number Publication Date
JPS61270779A JPS61270779A (en) 1986-12-01
JPH0564795B2 true JPH0564795B2 (en) 1993-09-16

Family

ID=14571388

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11183685A Granted JPS61270779A (en) 1985-05-24 1985-05-24 Training simulator

Country Status (1)

Country Link
JP (1) JPS61270779A (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59214072A (en) * 1983-05-20 1984-12-03 株式会社東芝 Plant simulator

Also Published As

Publication number Publication date
JPS61270779A (en) 1986-12-01

Similar Documents

Publication Publication Date Title
CN102646344B (en) All-teacher-controlled fast-interactive classroom teaching system and using method thereof
JPH0258631B2 (en)
CN115602018A (en) An on-site operating system and method for power facilities based on virtual interaction
CN110211445A (en) A kind of distribution network load turns to apply training system for control
JPH0564795B2 (en)
JPH05316652A (en) Power system training simulator
JP2831309B2 (en) Disability measures skill training system
JP2000181336A (en) Method of evaluating training result on operation training simulator
JP2868247B2 (en) Simulator device
JPH0426882A (en) Operator training simulator device
CN220085516U (en) Intelligent substation simulation training system
JP2006350681A (en) Operation procedure support system for plant monitoring control device
JPS5917576A (en) Plant simulator
JPS6186778A (en) Training apparatus
JP2886445B2 (en) System monitoring and control equipment
JPS5848089A (en) Driving training simulator
JPH0528543B2 (en)
JPH06231109A (en) System for supporing operation of real machine plant
JPS60239790A (en) Training apparatus
JPS62213459A (en) Input control system
JPS60239789A (en) Comprehensive training apparatus
CN120260380A (en) A 64D semi-automatic block circuit fault handling training system
Semmel et al. System Documentation Manual.
JPS61134780A (en) Comprehensive training apparatus
JPH0515063A (en) Power system operating training simulator

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees