Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH05923B2 - - Google Patents
[go: Go Back, main page]

JPH05923B2 - - Google Patents

Info

Publication number
JPH05923B2
JPH05923B2 JP60140922A JP14092285A JPH05923B2 JP H05923 B2 JPH05923 B2 JP H05923B2 JP 60140922 A JP60140922 A JP 60140922A JP 14092285 A JP14092285 A JP 14092285A JP H05923 B2 JPH05923 B2 JP H05923B2
Authority
JP
Japan
Prior art keywords
floor slab
upper floor
temporary
suspending
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60140922A
Other languages
Japanese (ja)
Other versions
JPS622809A (en
Inventor
Hitoshi Kubota
Masayuki Ono
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Komuten Co Ltd
Original Assignee
Takenaka Komuten Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Komuten Co Ltd filed Critical Takenaka Komuten Co Ltd
Priority to JP60140922A priority Critical patent/JPS622809A/en
Publication of JPS622809A publication Critical patent/JPS622809A/en
Publication of JPH05923B2 publication Critical patent/JPH05923B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Installation Of Indoor Wiring (AREA)

Description

【発明の詳細な説明】 (イ) 発明の技術分野 本発明は、RC造、SRC造等のコンクリート造
建物を建築する際、躯体工事中から仕上工事を終
了するまで継続して天井部分に仮設吊持される照
明装置のような仮設物の吊持方法と吊持装置とに
関する。
[Detailed Description of the Invention] (a) Technical Field of the Invention The present invention provides a method for constructing a concrete building such as RC construction or SRC construction, by continuously installing temporary structures in the ceiling from the construction of the frame until the completion of finishing construction. The present invention relates to a suspending method and a suspending device for a temporary object such as a suspended lighting device.

(ロ) 技術の背景 第9図は仮設物として照明装置を示してあり、
照明装置のうち最も多用されているFケーブル打
込み式照明装置を例示したものである。
(b) Technical background Figure 9 shows a lighting system as a temporary structure.
This is an example of an F cable driving type lighting device, which is the most widely used lighting device.

この例示において、照明装置aは上階床スラブ
bに埋設配線されているFケーブルcを電源とし
ており、このFケーブルcと照明器具aとは露出
電線dを介して接続されている。図示のような二
重天井の場合、Fケーブルcの露出部分eは天井
面fの下面側に突出するまで延設され、この突出
部gにおいて前記露出電線dと接続されている。
In this example, the lighting device a uses an F cable c buried in an upper floor slab b as its power source, and the F cable c and the lighting fixture a are connected via an exposed electric wire d. In the case of a double ceiling as shown, the exposed portion e of the F cable c extends until it projects to the lower surface side of the ceiling surface f, and is connected to the exposed electric wire d at this projecting portion g.

このようなFケーブル打込み式照明装置におい
ては、次のような問題点が指摘されている。
The following problems have been pointed out in such F-cable built-in lighting devices.

即ち、照明装置は天井仕上げ完了後も壁や床
の仕上げ工事に必要であるため、天井全体の仕上
げ工程ではFケーブル貫通部分の仕上げを残して
おき、この照明装置が不要となつたときに、照明
器具a、Fケーブルcの露出部分eを撤去しその
部分を補修して仕上げるという二重手間を余儀な
くされている。一般的に二重天井の場合、f′部を
貼り残しておき照明器具a、Fケーブルcの露出
部分eの撤去後に貼残し部分f′を仕上げる方法
が、また直天井の場合、照明器具a、Fケーブル
cの露出部分eの撤去後上階床スラブbのb′部の
コンクリート斫込み、モルタル補修、サンダーが
け、仕上げといつた方法が行なわれており、これ
等に要する手間が多大なものとなつている。加え
て、Fケーブルcはスラブ配筋完了後コンクリ
ート打設前までの間に配線しなければならないた
め、短時間の集中作業となり、従つて多人数の手
を要すると共に日時が限定されるので望ましい作
業配置ができない。Fケーブルcはスラブ内に
埋設されるので、一回限りの使い捨てとなり不経
済である。照明器具aの高さ方向の設置位置が
固定されているので電球の取替えおよび破損部分
の補修等をする際に脚立が必要となり、保守管理
に多くの労力を要する。
In other words, since the lighting device is necessary for finishing work on walls and floors even after the ceiling is finished, the finishing of the F cable penetration part is left unfinished during the finishing process of the entire ceiling, and when this lighting device is no longer needed, The lighting fixture a and the exposed part e of the F cable c have to be removed, and that part has to be repaired and finished. In general, in the case of a double ceiling, the method is to leave part f' pasted and finish the left part f' after removing exposed part e of lighting fixture a and F cable c, and in the case of a straight ceiling, lighting fixture a , After removing the exposed part e of the F cable c, concrete was poured into part b' of the upper floor slab b, mortar repaired, sanded, and finished, which required a great deal of effort. It has become a thing. In addition, since the F cable c must be wired after the slab reinforcement is completed and before concrete is poured, it is a short and intensive work, which requires the hands of many people and is desirable because the date and time is limited. Unable to arrange work. Since the F cable c is buried in the slab, it is disposable and is uneconomical. Since the installation position of the lighting fixture a in the height direction is fixed, a stepladder is required when replacing the light bulb or repairing a damaged part, and a lot of effort is required for maintenance management.

また、前記照明装置の外に、移動電線(充電状
態で持運び可能なキヤブタイヤケーブル等)に第
9図の照明器具aのような照明器具を等間隔に多
数取り付けたすずらん燈や、移動電線の先に比較
的大形の前照型照明器具を有する移動式投光器
等、露出配線を電源とする照明装置も多く用いら
れている。然しこれ等は、天井工事が進んでくる
と天井からの吊持手段が無くなるため、以後は前
記Fケーブル打込み式照明装置のみに頼ることと
なり、次のような問題点が指摘されている。
In addition to the above-mentioned lighting equipment, there are also lily of the valley lamps, in which a large number of lighting equipment such as lighting equipment a in Figure 9 is attached at equal intervals to a mobile electric wire (such as a cab tire cable that can be carried in a charged state), and a mobile electric wire. Many lighting devices are also used that use exposed wiring as a power source, such as mobile floodlights that have relatively large headlights at the end of electric wires. However, as ceiling construction progresses, these systems lose the means for hanging them from the ceiling, so they must rely solely on the above-mentioned F cable driven lighting system, and the following problems have been pointed out.

即ち、電球が壁面に接近し、熱によつて仕上
げ材が変色したり、また可燃物である場合火災に
つながる虞がある。Fケーブル打込み式照明装
置に頼つた場合、充分な照度の確保が難しいた
め、ある程度以上の照度を必要とする仕上げ工事
職種においては、作業員が個々にハンドランプ、
投光器等の移動式照明装置を携帯し持ち歩くこと
となり、安全上問題のある器具が多数持ち込まれ
ることによる停電、火災、感電等の危険性が大き
い。
That is, if the light bulb comes close to the wall surface, the heat may discolor the finishing material, or if the light bulb is flammable, it may lead to a fire. When relying on F-cable driven lighting equipment, it is difficult to ensure sufficient illuminance, so in finishing work jobs that require a certain level of illuminance, workers individually use hand lamps,
Mobile lighting equipment such as floodlights must be carried around, and many safety-related equipment are brought in, which increases the risk of power outages, fires, electric shocks, etc.

この外、最近の建築工事においては、多種多様
の仮設物が使用されており、前述した天井の追加
工事の省略化が切望されている。
In addition, in recent construction work, a wide variety of temporary structures are being used, and there is a strong desire to eliminate the above-mentioned ceiling addition work.

(ハ) 従来技術と問題点 前述した技術的背景の下に、天井の追加工事の
省略と仮設物が電気関連機器である場合の種々の
不具合の解消を目的として、本出願人は先に特願
昭58−248750号(特開昭60−141963号)を提案し
ている。
(c) Prior art and problems Based on the above-mentioned technical background, the applicant has previously developed a special technology for the purpose of omitting additional work on ceilings and solving various problems when temporary structures are electrical equipment. Application No. 58-248750 (Japanese Unexamined Patent Publication No. 60-141963) is proposed.

この先の提案によると、細線によつて仮設物を
吊持しているため、重量的に対象となる仮設物が
限定されてしまい、多種多様の仮設物が使用され
ている現状に充分対応できないという問題点があ
る。
According to the previous proposal, since the temporary structures are suspended by thin wires, the target temporary structures are limited in terms of weight, and it is not possible to adequately respond to the current situation where a wide variety of temporary structures are used. There is a problem.

(ニ) 発明の目的 本発明は前記本出願人の先の提案を改良してな
されたものであり、その目的は、仮設物の吊持力
を向上することにある。
(d) Purpose of the Invention The present invention has been made by improving the previous proposal of the present applicant, and its purpose is to improve the suspension force of temporary structures.

(ホ) 発明の構成 この目的を達成するため、本発明に係る仮設物
の吊持方法は、建築中にある建物の上階床スラブ
の下面側または該上階床スラブの下面の付設物
に、切断面が線状で仕上面の目地部分や付設物と
の境界線と同化する薄状帯からなる吊持帯を、固
着して垂下させ、この吊持体に対して摺動可能で
ありかつ摩擦力で滑り止めされる結合体を取り付
け、この結合体を介して仮設物を吊持するものと
し、本発明に係る仮設物の吊持装置は、建築中に
ある建物の上階床スラブの下面側または該上階床
スラブの下面側の付設物に固着されて垂下される
吊持体と、この吊持体と仮設物との間に介在する
結合体とを有し、吊持体は、切断面が線状で仕上
面の目地部分や付設物との境界線と同化する薄状
帯からなり、結合体は、吊持体と結合する第一結
合部と、仮設物と結合する第二結合部とからなる
ものである。
(E) Structure of the Invention In order to achieve this object, the method for suspending temporary structures according to the present invention is to suspend a temporary structure from the lower side of an upper floor slab of a building under construction or to an attachment on the lower surface of the upper floor slab. , a suspension strip consisting of a thin band with a linear cut surface that blends with the joints of the finished surface and the boundaries with the attached objects is fixed and suspended, and is slidable with respect to the suspension suspension. The device for suspending a temporary structure according to the present invention is capable of suspending a temporary structure by attaching a coupling body that is prevented from slipping by frictional force, and suspending the temporary structure through this coupling body. It has a suspension body that is fixed to and hangs down from the lower surface side of the floor slab or the attachment on the lower surface side of the upper floor slab, and a joint body that is interposed between the suspension body and the temporary structure, and the suspension body consists of a thin band whose cut surface is linear and blends with the joint part of the finished surface and the boundary line with the attached object, and the connected body is connected to the first connecting part that connects to the suspension body and to the temporary structure. and a second coupling part.

(ヘ) 作用 本発明においては、建築中にある建物の上階床
スラブの下面側または該上階床スラブの下面側の
付設物に固着されて垂下される吊持体に、結合体
を摩擦による滑止め結合または係止結合する。そ
して、結合体には仮設物を取り付ける。また、結
合体は吊持体に対し摺動引下げすることができ
る。
(f) Effect In the present invention, a bonded body is attached to a suspension member fixed to the lower surface of an upper floor slab of a building under construction or attached to the lower surface of the upper floor slab and suspended. Non-slip or locking connection. Then, a temporary structure is attached to the combined body. Furthermore, the combined body can be slid down and down relative to the suspension body.

(ト) 発明の実施例 以下、本発明に係る仮設物の吊持方法および吊
持装置の実施例を第1図〜第7図に基づいて説明
する。
(G) Embodiments of the Invention Hereinafter, embodiments of a method for suspending a temporary structure and a suspension device according to the present invention will be described based on FIGS. 1 to 7.

第1図、第2図に示されるように、上階床スラ
ブ1の下面側にすずらん燈2からなる仮設物が吊
持されており、すずらん燈2は上階床スラブ1の
下面側に埋設されている固定部材3に固着された
吊持体4によつて吊持されている。固定部材3は
凹状断面をなす形状とされており、吊持体4はそ
の凹部3a内の突部3bに上端を固着されてい
る。この固定部材3は上端周囲に形成したフラン
ジ状の突起3cによつて上階床スラブ1に対して
抜止めされており、上階床スラブ1への埋設手段
としては、第3図に示すように型枠工事完了時に
スラブ型枠5に釘6を用いて仮固定してスラブを
打設しておけばよい。この際、吊持体4を捲回し
て固定部材3の凹部3a内へ収納しておけば、ス
ラブ型枠5の脱型により第4図に示すように吊持
体4が垂下することになる。なお、第7図には吊
持体4の上階床スラブ1への他の固着手段を示し
たもので、上階床スラブ1の下面側に付設されて
いる配設配管7に固着してある。即ち、吊持体4
は上階床スラブ1の下面側またはこの下面側の付
設物に直接または間接的に固着されて垂下される
もので、図示実施例の外に他の固着手段を採用し
ても差し支えないものである。
As shown in Figures 1 and 2, a temporary structure consisting of a lily of the valley lamp 2 is suspended on the underside of the upper floor slab 1, and the lily of the valley lamp 2 is buried under the lower side of the upper floor slab 1. It is suspended by a suspension member 4 fixed to a fixed member 3. The fixing member 3 has a concave cross section, and the suspender 4 has its upper end fixed to a protrusion 3b within the concave portion 3a. This fixing member 3 is prevented from being removed from the upper floor slab 1 by a flange-shaped projection 3c formed around the upper end, and as a means of embedding it in the upper floor slab 1, as shown in FIG. When the formwork work is completed, the slab may be temporarily fixed to the slab formwork 5 using nails 6 and then cast. At this time, if the hanging body 4 is rolled up and stored in the recess 3a of the fixing member 3, the hanging body 4 will hang down as shown in FIG. 4 when the slab formwork 5 is removed. . In addition, FIG. 7 shows another means for fixing the suspension member 4 to the upper floor slab 1, in which the suspension member 4 is fixed to the installation pipe 7 attached to the lower surface side of the upper floor slab 1. be. That is, the suspension body 4
is fixed directly or indirectly to the lower surface side of the upper floor slab 1 or to the attachments on this lower surface side and hangs down, and there is no problem in adopting other fixing means in addition to the illustrated embodiment. be.

すずらん燈2は一端に分電盤と接続されるコネ
クタプラグ2aを有する電源線2bと電源線2b
に所定間隔をもつて多数配設された照明器具2c
とからなるもので、上階床スラブ1の下面側から
垂下している吊持体4に吊持されることになる
が、本発明に係る方法においては適当な手段によ
つて吊持体4とすずらん燈2とを結合させる。図
面では本発明に係る装置として、吊持体4とすず
らん燈2との結合手段としての結合体8を示して
ある。
The Suzuranto 2 has a power line 2b and a power line 2b having a connector plug 2a connected to a distribution board at one end.
A large number of lighting fixtures 2c are arranged at predetermined intervals.
The suspension member 4 is suspended from the lower surface side of the upper floor slab 1 in the method according to the present invention. and Suzuranto 2. In the drawing, a combination body 8 is shown as a means for connecting the suspension body 4 and the lily of the valley lamp 2 as a device according to the present invention.

吊持体4は薄状帯であり、前記結合体8は吊持
体の形状に対応して適宜選択されるが、結合体8
の形状としては少なくとも吊持体4と結合する第
一結合部8aと仮設物であるすずらん燈2と結合
する第二結合部8bとを必要とする。第5図には
本発明に係る吊持装置が示されており、結合体8
を板状体とし、第一結合部8aとして複数の切込
みを設け第二結合部8bとしてクリツプ構造を設
けた場合を示してある。この第一結合部8aであ
る切込みに吊持体4である薄状帯を挾み込むこと
により、摩擦力によつて吊持体4と結合体8とが
結合することになる。この結合力は第一結合部8
aとしての複数の切込みへの吊持体4の挾込み数
を調整することにより摩擦力を調整できるもので
あり、また、吊持体4に捲回状態を保形するよう
に付勢しておけば摩擦力を高めることができる。
第二結合部8bであるクリツプ構造に対しては、
すずらん燈2の電源線2bを嵌め込むことによ
り、すずらん燈2と結合体8とを結合することが
できる。なお、この第二結合部8bは第7図に示
すようなフツク構造であつてもよいものである。
The suspension body 4 is a thin strip, and the combination body 8 is appropriately selected depending on the shape of the suspension body.
The shape requires at least a first connecting portion 8a that connects to the hanging support 4 and a second connecting portion 8b that connects to the temporary lily of the valley lamp 2. FIG. 5 shows a suspension device according to the present invention, in which a combined body 8
The figure shows a case in which a plurality of notches are provided as the first joint portion 8a and a clip structure is provided as the second joint portion 8b. By inserting the thin band that is the suspension member 4 into the cut that is the first connection portion 8a, the suspension member 4 and the combination body 8 are coupled by frictional force. This bonding force is the first bonding portion 8
The frictional force can be adjusted by adjusting the number of insertions of the suspension body 4 into the plurality of notches a, and the suspension body 4 is biased to maintain its wound state. By doing so, you can increase the frictional force.
Regarding the clip structure which is the second joint part 8b,
By fitting the power wire 2b of the Lily of the Valley lamp 2, the Lily of the Valley lamp 2 and the combined body 8 can be combined. Incidentally, this second coupling portion 8b may have a hook structure as shown in FIG.

建築工事当初は第1図に示すような吊持状態で
あり、躯体工事から天井壁9の施行に移る際、第
2図に示すように結合体8の吊持体4への結合部
分を降下させる。この降下は、吊持体4と結合体
8との結合が摩擦による滑止め結合または係止結
合であるため、吊持体4に対し結合体8を摺動引
下げするば足りることになる。このとき、第6図
に示すような伸縮式の操作棒10を用いると、脚
立を用いなくても床上で容易に行なうことができ
る。また、この操作棒10は、吊持体4が捲回状
態に付勢されている場合の引延しにも利用するこ
とができる。
At the beginning of the construction work, the structure is suspended as shown in Figure 1, and when moving from frame work to construction of the ceiling wall 9, the connecting part of the joint body 8 to the suspension body 4 is lowered as shown in Figure 2. let For this lowering, since the connection between the suspension body 4 and the coupling body 8 is a friction-based non-slip coupling or locking coupling, it is sufficient to slide the coupling body 8 down with respect to the suspension body 4. At this time, if a telescoping operating rod 10 as shown in FIG. 6 is used, the operation can be easily performed on the floor without using a stepladder. Further, the operating rod 10 can also be used to extend the suspension body 4 when it is urged into a wound state.

このように第2図に示す状態では、天井壁9の
目地部分に吊持体4が位置するようにすれば、天
井壁9のボード材等を特別に加工する必要はな
く、天井壁9の施行後すずらん燈2を必要としな
くなつた場合に吊持体4を切断すれば、吊持体4
の切断面は微少であるため可視的な駄目とならな
い。また、図示していないが上階床スラブ1のみ
の直天井の場合には、前記固定部材3を用いてい
るときには吊持体4の切断の外に目隠しを施すだ
けでよい。また、固定部材3が埋設されている場
合、その大きさが限定されるため、中に収納でき
る長尺体4の長さが限られてしまう。そこで、吹
抜け部等階高の高い部分に適用する場合は、第8
図に示すように両端にフツク11を有する結合具
10を用いて延長する。
In this way, in the state shown in FIG. 2, if the hanging support 4 is positioned at the joint part of the ceiling wall 9, there is no need to specially process the board material etc. of the ceiling wall 9. If you no longer need the Suzuran Tou 2 after installation, you can cut the suspension holder 4.
Since the cut surface is minute, there is no visible damage. Further, although not shown, in the case of a direct ceiling with only the upper floor slab 1, when the fixing member 3 is used, it is only necessary to provide a blindfold in addition to cutting the hanging support 4. Further, when the fixing member 3 is buried, its size is limited, and therefore the length of the elongated body 4 that can be stored inside is limited. Therefore, when applying to areas with high floor heights such as open ceilings, the 8th
As shown in the figure, it is extended using a connector 10 having hooks 11 at both ends.

(チ) 発明の効果 以上のように本発明に係る仮設物の吊持方法
は、二重天井の場合には仮設物を撤去するまでの
間従来のように天井面の一部を貼り残す必要がな
く、目地部分を利用することができるため、天井
面の施工能率が向上し、直天井の場合も含めて補
修の追加工事が不要となる等の施工面での効果
と、仮設物がすずらん燈等の電気関連機器である
場合の種々の不具合解消の効果、即ち本出願人の
先の提案の効果が確保されると共に、吊持体を薄
状帯としたため、単なる細線と比べて仮設物の吊
持力を向上できる効果がある。
(h) Effects of the invention As described above, in the case of a double ceiling, the method for suspending a temporary structure according to the present invention requires that a part of the ceiling surface be left affixed until the temporary structure is removed, as in the past. Since there are no joints and joints can be used, the efficiency of construction on the ceiling surface is improved, and there are construction effects such as eliminating the need for additional repair work even in the case of direct ceilings, and making temporary construction easier. The effect of resolving various problems in electrical equipment such as lights, that is, the effect of the applicant's previous proposal, is ensured, and since the suspension body is made of a thin strip, it is easier to use for temporary construction than with a simple thin wire. It has the effect of improving the hanging power of.

また、本発明に係る仮設物の吊持装置は、吊持
体と吊持物との間に結合体を介在させたため、例
えば摺動引下げのような簡単な手段で仮設吊持物
の吊持高さの調整を行なえる効果があり、前記方
法の効果を得るに極めて有効である。
Further, since the device for suspending a temporary structure according to the present invention has a coupling body interposed between the suspension body and the suspended object, the suspension height of the temporary suspended structure can be adjusted by a simple means such as sliding lowering. This method is extremely effective in achieving the effects of the method described above.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図、第2図は本発明の実施状態の断面図、
第3図は固定部材3の取付例を示す断面図、第4
図は第3図における脱型後の状態を示す断面図、
第5図は結合体の実施例を示す斜視図、第6図は
本発明の操作に使用される用具の斜視図、第7図
は吊持体の固着手段の他の実施例を示す断面図、
第8図は本発明における延長用の結合具を示す正
面図、第9図は本発明の技術的背景を説明する断
面図である。 1……上階床スラブ、2……すずらん燈(仮設
物)、4……吊持体、8……結合体、8a……第
一結合部、8b……第二結合部。
1 and 2 are cross-sectional views of the implementation state of the present invention,
FIG. 3 is a sectional view showing an example of mounting the fixing member 3;
The figure is a sectional view showing the state after demolding in Figure 3,
FIG. 5 is a perspective view showing an embodiment of the combined body, FIG. 6 is a perspective view of a tool used in the operation of the present invention, and FIG. 7 is a sectional view showing another embodiment of the fixing means for the hanging body. ,
FIG. 8 is a front view showing an extension coupling according to the present invention, and FIG. 9 is a sectional view illustrating the technical background of the present invention. 1...Upper floor slab, 2...Lily of the valley light (temporary construction), 4...Hanging body, 8...Connection body, 8a...First connection part, 8b...Second connection part.

Claims (1)

【特許請求の範囲】 1 建築中にある建物の上階床スラブの下面側ま
たは該上階床スラブの下面の付設物に、切断面が
線状で仕上面の目地部分や付設物との境界線と同
化する薄状帯からなる吊持体を、固着して垂下さ
せ、この吊持体に対して摺動可能でありかつ摩擦
力で滑り止めされる結合体を取り付け、この結合
体を介して仮設物を吊持することを特徴とする仮
設物の吊持方法。 2 建築中にある建物の上階床スラブの下面側ま
たは該上階床スラブの下面側の付設物に固着され
て垂下される吊持体と、この吊持体と仮設物との
間に介在する結合体とを有し、 吊持体は、切断面が線状で仕上面の目地部分や
付設物との境界線と同化する薄状帯からなり、結
合体は、吊持体と結合する第一結合部と、仮設物
と結合する第二結合部とからなる ことを特徴とする仮設物の吊持装置。
[Scope of Claims] 1. On the lower surface side of the upper floor slab of a building under construction or on the attachments on the lower surface of the upper floor slab, the cut surface is linear and there are joints on the finished surface and boundaries with the attachments. A hanging body made of a thin strip that blends with the wire is fixed and suspended, and a connecting body that can slide on the hanging body and is prevented from slipping by frictional force is attached to the hanging body. A method for suspending a temporary object, characterized by suspending the temporary object. 2 Hanging bodies that are fixed to and suspended from the lower surface of the upper floor slab of a building under construction or attachments on the lower surface of the upper floor slab, and those that are interposed between this suspending body and temporary structures. The hanging body is made of a thin band whose cut surface is linear and blends with the joint part of the finished surface and the boundary line with the attached object, and the binding body is connected to the hanging body. A device for suspending a temporary object, comprising a first connecting section and a second connecting section that connects to the temporary object.
JP60140922A 1985-06-27 1985-06-27 Method and apparatus for hanging temporary construction Granted JPS622809A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60140922A JPS622809A (en) 1985-06-27 1985-06-27 Method and apparatus for hanging temporary construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60140922A JPS622809A (en) 1985-06-27 1985-06-27 Method and apparatus for hanging temporary construction

Publications (2)

Publication Number Publication Date
JPS622809A JPS622809A (en) 1987-01-08
JPH05923B2 true JPH05923B2 (en) 1993-01-07

Family

ID=15279933

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60140922A Granted JPS622809A (en) 1985-06-27 1985-06-27 Method and apparatus for hanging temporary construction

Country Status (1)

Country Link
JP (1) JPS622809A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS622810A (en) * 1985-06-27 1987-01-08 株式会社竹中工務店 Wiring apparatus for temporary suspension

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH068573B2 (en) * 1983-12-27 1994-02-02 株式会社竹中工務店 Suspension device for temporary suspension
JPS622810A (en) * 1985-06-27 1987-01-08 株式会社竹中工務店 Wiring apparatus for temporary suspension

Also Published As

Publication number Publication date
JPS622809A (en) 1987-01-08

Similar Documents

Publication Publication Date Title
US4323215A (en) Hang-up fixture
JPH05923B2 (en)
JPH068573B2 (en) Suspension device for temporary suspension
JP2954837B2 (en) Mounting method of outer wall plate and parting edge used for this
JPH0710143B2 (en) Method and device for suspending temporary objects
US3848386A (en) Fixture support
US3214127A (en) Hanger for a suspended ceiling
JP2535223Y2 (en) Composite ceiling bar
JPH0743471U (en) Pole for temporary lighting wiring
JP3019813U (en) Branch cable with socket
JPS5843133Y2 (en) fluorescent light fixtures
CN215863085U (en) Double-deck concrete top embedded down lamp fixed component
JP7726098B2 (en) How to temporarily install lighting fixtures
KR200173253Y1 (en) Difuser
JPH07158197A (en) Ceiling frame and ceiling construction method using the same
KR200449713Y1 (en) Electrical wire
JP3062580B2 (en) Ceiling equipment pre-installation method
JPH05924B2 (en)
CN210944374U (en) Use convenient maintenance structure at high-rise building elevator well
AU2016101760A4 (en) Cable Hanger
JPS6118296Y2 (en)
JP3038482U (en) Hanger for grid member of system ceiling
JP2586528Y2 (en) Temporary floor outlet device
JPH0317050Y2 (en)
KR20210145434A (en) Lighting apparatus for preventing fall and construction method for the same