JPH06100079B2 - Tunnel excavation method - Google Patents
Tunnel excavation methodInfo
- Publication number
- JPH06100079B2 JPH06100079B2 JP63249023A JP24902388A JPH06100079B2 JP H06100079 B2 JPH06100079 B2 JP H06100079B2 JP 63249023 A JP63249023 A JP 63249023A JP 24902388 A JP24902388 A JP 24902388A JP H06100079 B2 JPH06100079 B2 JP H06100079B2
- Authority
- JP
- Japan
- Prior art keywords
- tunnel
- concrete
- arch
- face
- earth auger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は土被りの浅い未固結地山におけるトンネルの掘
削工法に係るものである。DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a method for excavating a tunnel in an unconsolidated mountain where a soil cover is shallow.
(従来の技術) 山岳トンネル工法(NATN工法)はその適用領域が拡大す
るにつれて、地山強度の小さい都市部でも施工される例
が増加している。(Prior Art) As the area of application of the mountain tunnel method (NATN method) expands, the number of cases where it is constructed in urban areas with low natural strength is increasing.
この場合、切羽の安定性が低いためにトンネルを小さく
分割したり、また地山構造物への影響、即ち地表沈下を
小さく抑えるために各種の補助工法を用いながら施工し
ている。In this case, because the stability of the face is low, the tunnel is divided into small parts, and various auxiliary construction methods are used to suppress the influence on the ground structure, that is, the subsidence.
この補助工法として従来から利用されている技術に、フ
オアパイリング工法がある。A technique conventionally used as this auxiliary method is a fore piling method.
この工法は切羽から10〜30゜の角度で、長さ2〜3m程度
の鉄筋、ロツクボルト、あるいは単管パイプを適当な間
隔で削孔して打ち込む工法である。なお必要に応じて地
盤補強剤の注入工法が併用されることがある。This method is a method in which a reinforcing rod, a rock bolt, or a single pipe having a length of about 2 to 3 m is drilled at an appropriate interval at an angle of 10 to 30 ° from the face and driven. If necessary, a ground reinforcement injection method may be used in combination.
(発明が解決しようとする課題) 前記従来のフオアパイリング工法では、トンネル横断方
向の連続性がないため、特に、粘着性の低い地山や、極
度に弱い地山では効果が薄い。(Problems to be Solved by the Invention) In the conventional fore piling method, since there is no continuity in the tunnel crossing direction, the effect is small particularly in a ground with low tackiness or an extremely weak ground.
また注入式のものは注入材料の地山浸透性、安全性の面
で難点がある。In addition, the injection type has a problem in terms of permeability of the injection material and safety.
本発明は前記従来技術の有する問題点に鑑みて提案され
たもので、その目的とする処は、トンネル掘削時におけ
る地表沈下の抑止、及び切羽の安定性が向上されるトン
ネル掘削工法を提供する点にある。The present invention has been proposed in view of the above problems of the prior art, and an object thereof is to provide a tunnel excavation method in which ground subsidence is suppressed during tunnel excavation and the stability of the face is improved. In point.
(課題を解決するための手段) 前記の目的を達成するため、本発明に係るトンネル掘削
方法によれば、切羽におけるトンネルのアーチ部周辺
に、アースオーガーによつて、トンネル横断方向及び縦
断方向に亘つて延びるスリツトを先行のコンクリートア
ーチシエルに重合して掘削したのち、同スリツトから前
記アースオーガーを引き抜きながら、同スリツト内に速
硬性コンクリートを打設し、以下前記の工程をトンネル
のアーチ部周辺に順次行つて、トンネルのアーチ部周辺
に、トンネル横断方向及び縦断方向に亘つて連続して延
びる薄肉コンクリートアーチシエルによるプレライニン
グを施工したのち、切羽の掘削を行うものである。(Means for Solving the Problems) In order to achieve the above object, according to the tunnel excavation method of the present invention, in the vicinity of the arch portion of the tunnel in the face of the face, an earth auger is provided in the tunnel transverse direction and the longitudinal direction. After excavating a slit extending over the concrete arch shell of the preceding concrete, while pulling out the earth auger from the slit, a quick-hardening concrete is placed in the slit, and the following steps are performed around the tunnel arch part. After that, pre-lining is performed around the arch part of the tunnel with thin-walled concrete arch shells extending continuously in the transverse direction and longitudinal direction of the tunnel, and then the face is excavated.
(作用) 本発明によれば前記したように、切羽におけるトンネル
のアーチ部周辺にアースオーガーによつて、トンネル横
断方向とトンネル縦断方向との両方向に亘つて延びるス
リツトを先行のコンクリートアーチシエルに重合して掘
削したのち、同スリツトより前記アースオーガーを後退
させながら、同スリツト内の速硬性コンクリートを打設
し、以下前記工程を反復してトンネルアーチ部周辺に、
コンクリートアーチシエルによるライニングを施工して
トンネル前方地山を補強し、トンネルの掘削による地表
面沈下を抑制し、切羽の安定性を向上するものである。(Operation) According to the present invention, as described above, the slit extending around both the tunnel transverse direction and the tunnel longitudinal direction is superposed on the preceding concrete arch shell by the earth auger around the arch portion of the tunnel in the face. After excavating, while retreating the earth auger from the slit, place a quick-hardening concrete in the slit, and repeat the following steps in the tunnel arch area,
A concrete arch shell lining is used to reinforce the ground in front of the tunnel, suppress subsidence due to excavation of the tunnel, and improve the stability of the face.
(実施例) 以下本発明を図示の実施例について説明する。(Examples) The present invention will be described below with reference to illustrated examples.
(A)はトンネル孔(B)内に配置された掘削機で、走
行クローラ(1)に載架された車体(2)に旋回自在
に、且つ上下方向に回動自在に装架されたブーム(3)
に、互いに平行な複数のアースオーガー(4)が同アー
スオーガー支持部材(4a)上に進退動自在に支持され
(第1図参照)、同各アースオーガー(4)の中空回転
軸にはコンクリート供送管(5)が接続され、同回転軸
の先端に設けたノズルよりコンクリートが注入されるよ
うに構成されている。(A) is an excavator arranged in a tunnel hole (B), and is a boom mounted on a vehicle body (2) mounted on a traveling crawler (1) so as to be rotatable and vertically rotatable. (3)
, A plurality of ground augers (4) parallel to each other are movably supported on the ground auger support member (4a) (see FIG. 1), and the hollow rotary shaft of each ground auger (4) has concrete The delivery pipe (5) is connected, and concrete is poured from a nozzle provided at the tip of the rotary shaft.
なお前記アースオーガー(4)は例えばアースオーガー
支持部材(4a)の両端に装架された駆動輪と従動輪との
間に架渡された無端帯に取付けられ、同無端帯を循環移
動することによって、アースオーガー(4)が進退動さ
れるように構成されている。The earth auger (4) is attached to, for example, an endless belt that is bridged between a driving wheel and a driven wheel that are mounted on both ends of the earth auger support member (4a), and the earth auger (4) must circulate and move. The earth auger (4) is configured to be moved back and forth.
而して前記アースオーガー(4)を駆動回転するととも
にアースオーガー案内部材(4a)上に沿つて前進せし
め、先行のコンクリートアーチシエル(D)の縦断方向
先端部が重合して連続するように切羽前方地山にスリツ
ト(6)を掘削し(第2図参照)、掘削が終了するとア
ースオーガー(4)を後退させスリツト(6)より引抜
きながら、同スリツト(6)に速硬性のコンクリート
(7)を注入する(第2図参照)。図中(C)はコンク
リート供給車である。Then, the earth auger (4) is driven and rotated, and is advanced along the earth auger guide member (4a), so that the front end portion of the preceding concrete arch shell (D) in the longitudinal direction is superposed and continuous with the cutting face. A slit (6) is excavated in the front ground (see Fig. 2), and when the excavation is completed, the earth auger (4) is retracted and pulled out from the slit (6), while the fast-setting concrete (7) is attached to the slit (6). ) Is injected (see FIG. 2). In the figure, (C) is a concrete supply vehicle.
而して、前記ブーム(3)を旋回並に傾動させて、前記
の工程をトンネルのアーチ部周辺に順次行ない、同アー
チ部周辺にトンネルの横断方向、及び縦断方向に亘つて
先行のコンクリートアーチシエル(D)に重合して連続
して設けられた、スリツトに前記コンクリートが注入充
填された薄肉コンクリートアーチシエル(D)を施工す
る。Then, the boom (3) is tilted in a swinging manner and the above steps are sequentially performed around the arch portion of the tunnel, and the preceding concrete arch is extended around the arch portion in the transverse direction and the longitudinal direction of the tunnel. A thin concrete arch shell (D) in which the above-mentioned concrete is poured and filled into the slit is continuously provided by being superposed on the shell (D).
第7図はこのコンクリートアーチシエル(D)の施工順
序を示し、所定間隔毎に施工された相隣るシエル部
(d)に、その中間に施工されるシエル部(d′)端部
が一部オーバーラツプするように施工される(第8図参
照)。FIG. 7 shows the order of construction of this concrete arch shell (D). One end of the shell portion (d '), which is to be installed in the middle, is adjacent to the adjacent shell portions (d) that have been installed at predetermined intervals. They are constructed so that they overlap each other (see FIG. 8).
かくして切羽におけるトンネルのアーチ部周辺に、トン
ネルの横断方向及び縦断方向に亘つて連続して延び、且
つ先行する薄肉のコンクリートアーチシエル(D)の先
端部下面に、その後端部が一部重合する薄肉のコンクリ
ートアーチシエル(D)によるプレイライニングを施工
したのち、切羽の1スパン分の掘削を行なう。Thus, around the arch portion of the tunnel at the face, the trailing end portion is partially overlapped with the lower end portion of the leading end of the preceding thin-walled concrete arch shell (D) continuously extending in the transverse and longitudinal directions of the tunnel. After constructing the playlining with a thin concrete arch shell (D), excavation for one span of the face is performed.
この掘削はバツクホウ(E)による機械掘削を主体とす
るが、上半側壁部は、一部人力によつて掘削される。更
に前記プレライニングの内側には鋼製支保工が設置され
るが、プレライニングがトンネル軸方向に傾斜している
ので、曲率の異なる2種類の鋼製支保工(8a)(8b)が
交互に建込まれる。しかるのち吹付けコンクリート
(9)が被覆される。この際、同吹付けコンクリート
(9)は防水シート施工の関係上、支保工内側縁まで施
工される(第3図参照)。This excavation is mainly mechanical excavation using a backhoe (E), but the upper half side wall is partially excavated by human power. In addition, steel supports are installed inside the pre-lining, but since the pre-lining is inclined in the tunnel axis direction, two types of steel supports (8a) and (8b) with different curvatures alternate. Be built. After that, sprayed concrete (9) is coated. At this time, the sprayed concrete (9) is applied up to the inner edge of the supporting work due to the waterproof sheet (see FIG. 3).
次いで第4図に示すように更に1スパンの掘削を行な
い、しかるのち前記同様にして次のスパンのプレイライ
ニングを行なう(第5図参照)。Next, as shown in FIG. 4, excavation for one span is further carried out, and thereafter, prelining of the next span is performed in the same manner as described above (see FIG. 5).
以下前記工程を反復してトンネルを掘進するものであ
る。Hereinafter, the above steps are repeated to excavate a tunnel.
なお第9図及び第10図は前記掘削機(A)におけるアー
スオーガー(4)のガイド支保工を示し、前記アースオ
ーガー支持部材(4a)を支承するアーチ型ガイド部材
(10)が、トンネル穴両側壁下部においてトンネル軸方
向に亘つて配設されたブラケツト(11)上に移動自在に
搭載され、掘削の進行に伴って前記ガイド部材(10)が
トンネル軸方向に移動するとともに、同部材(10)に沿
つてアースオーガー支持部材(4a)が移動するように構
成されている。9 and 10 show the guide support work of the earth auger (4) in the excavator (A), and the arch-shaped guide member (10) supporting the earth auger support member (4a) is a tunnel hole. The guide member (10) is movably mounted on a bracket (11) arranged in the lower part of both sidewalls along the tunnel axis direction, and the guide member (10) moves in the tunnel axis direction as the excavation progresses, and the member ( The earth auger support member (4a) is configured to move along 10).
このように図示の実施例に示す方法によれば、トンネル
アーチ部周辺にトンネル横断方向及び縦断方向に亘つて
連続した薄肉のコンクリートアーチシエル(D)による
プレイライニングが構築されることによつて、トンネル
掘削に伴う地表面の沈下が抑制され、切羽の安定性が向
上され、トンネルの掘削が安全、確実に行なわれる。As described above, according to the method shown in the illustrated embodiment, the play lining is constructed by the thin concrete arch shell (D) that is continuous around the tunnel arch portion in the tunnel crossing direction and the longitudinal direction. Subsidence of the ground surface due to tunnel excavation is suppressed, the stability of the face is improved, and tunnel excavation is performed safely and reliably.
また前記掘削機(A)は同機に装架された互いに平行な
複数のアースオーガー(4)によつて切羽の平滑な掘削
が行なわれ、応力の集中が小さく、支保工の軽減が図ら
れる。Further, in the excavator (A), a plurality of ground augers (4) mounted on the excavator (A) are parallel to each other and the face is excavated smoothly, so that stress concentration is small and supporting work is reduced.
更に前記掘削機(A)の使用の仕方によつて、任意断面
のトンネル施工が可能となる。Furthermore, depending on the method of using the excavator (A), tunnel construction with an arbitrary cross section becomes possible.
なお第6図に示すように、本方法によつて施工されたト
ネルアーチ部周辺のプレイライニング施工範囲を除くト
ンネル両側壁部は、吹付コンクリート(F)による一次
覆工が行なわれる。As shown in FIG. 6, both side wall portions of the tunnel except for the play lining construction area around the tonel arch portion constructed by this method are subjected to primary lining with shotcrete (F).
(発明の効果) 本発明によれば前記したように、切羽におけるトンネル
のアーチ部周辺に、アースオーガーによつてトンネル横
断方向及び縦断方向に亘つて延びるスリツトを先行のコ
ンクリートアーチシエルに重合して加削したのち、同ス
リツトよりアースオーガーを引き抜きながら、同スリツ
ト内に速硬性コンクリートを打設し、前記の工程を反復
して、トンネル横断方向及び縦断方向に亘つて連続して
延びる薄肉のコンクリートアーチシエルからなるプレイ
ライニングを構築することによつて、同シエルによつて
切羽前方地山を補強して、トンネル掘削による地表面の
沈下を抑制し、この状態で安全且つ確実にトンネルを掘
削するものである。特に前記スリツト切削後、直ちに速
硬性コンクリートが充填されるので、掘削後の地山開放
時間が短かく、トンネル周方向とトンネル軸方向の三軸
状態が継続されることによつて、地山の変位が小さく、
地表沈下抑制効果が発揮される。(Effects of the Invention) According to the present invention, as described above, a slit extending over the tunnel transverse direction and the longitudinal direction is superposed on the preceding concrete arch shell by an earth auger around the arch portion of the tunnel in the face. After machining, while pulling out the earth auger from the slit, place a quick-hardening concrete in the slit and repeat the above process to continuously extend the thin wall concrete in the tunnel crossing direction and the longitudinal direction. By constructing the play lining consisting of arch shells, the shells will be used to reinforce the ground in front of the face, and to prevent subsidence of the ground surface due to tunnel excavation, and to excavate the tunnel safely and reliably in this state. It is a thing. In particular, since the quick-hardening concrete is immediately filled after the slit cutting, the rock-opening time after excavation is short, and the triaxial state of the tunnel circumferential direction and the tunnel axis direction is continued, so that Small displacement,
The surface subsidence suppression effect is exhibited.
またトンネル掘削作業が前述のように予め施工されたト
ンネルアーチ部の横断方向及び縦断方向に重合して延び
る薄肉のコンクリートアーチシエルの中で行なわれるの
で、切羽の安定性が高く、安定性が確保される。In addition, the tunnel excavation work is carried out in the thin-walled concrete arch shell that overlaps and extends in the transverse and longitudinal directions of the tunnel arch part that was previously constructed, so the stability of the face is high and the stability is secured. To be done.
更にこのように切羽の安定性が向上することによつて、
大断面のトンネル掘削が可能となり、工期が縮減され、
工費が節減される。Furthermore, by improving the stability of the face like this,
It enables tunnel excavation of large cross section, shortening the construction period,
Construction costs are reduced.
第1図乃至第5図は本発明に係るトンネル掘削工法の一
実施例の工程を示す縦断側面図、第6図は第1図の縦断
正面図、第7図は薄肉のコンクリートアーチシエルの施
工順序を示す説明図、第8図は第7図の部分VIIIの詳細
図、第9図は掘削機のアースオーガー支持部材のガイド
支保工を示す縦断側面図、第10図はその縦断正面図であ
る。 (A)……掘削機、(D)……コンクリートアーチシエ
ル、(4)……アースオーガー、(6)……スリツト、
(7)……コンクリート。1 to 5 are vertical side views showing steps of an embodiment of a tunnel excavation method according to the present invention, FIG. 6 is a vertical front view of FIG. 1, and FIG. 7 is construction of a thin concrete arch shell. Fig. 8 is an explanatory view showing the order, Fig. 8 is a detailed view of the part VIII in Fig. 7, Fig. 9 is a vertical sectional side view showing the guide support work of the earth auger support member of the excavator, and Fig. 10 is a vertical sectional front view thereof. is there. (A) ... Excavator, (D) ... Concrete arch shell, (4) ... Earth auger, (6) ... Slit,
(7) …… Concrete.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 上 博一 東京都渋谷区千駄ケ谷4丁目6番15号 フ ジタ工業株式会社内 (72)発明者 三村 洋一 東京都渋谷区千駄ケ谷4丁目6番15号 フ ジタ工業株式会社内 審査官 結田 純次 (56)参考文献 特開 昭60−19897(JP,A) 特開 昭58−110797(JP,A) 特開 昭56−9595(JP,A) ─────────────────────────────────────────────────── ─── Continued Front Page (72) Inventor Hirokazu Kami 4-6-15 Sendagaya, Shibuya-ku, Tokyo Within Fujita Industry Co., Ltd. (72) Yoichi Mimura 4-6-115 Sendagaya, Shibuya-ku, Tokyo Fujita Industry Co., Ltd. Examiner Junji Yuda (56) Reference JP-A-60-19897 (JP, A) JP-A-58-110797 (JP, A) JP-A-56-9595 (JP, A)
Claims (1)
アースオーガーによつて、トンネル横断方向及び縦断方
向に亘つて延びるスリツトを先行のコンクリートアーチ
シエルに重合して掘削したのち、同スリツトから前記ア
ースオーガーを引き抜きながら、同スリツト内に速硬性
コンクリートを打設し、以下前記の工程をトンネルのア
ーチ部周辺に順次行つて、トンネルのアーチ部周辺に、
トンネル横断方向及び縦断方向に亘つて連続して延びる
薄肉コンクリートアーチシエルによるプレライニングを
施工したのち、切羽の掘削を行うことを特徴とするトン
ネル掘削工法。1. Around the arch part of the tunnel in the face,
With the earth auger, the slit extending in the tunnel crossing direction and the longitudinal direction is superposed on the preceding concrete arch shell and excavated. The following steps are sequentially performed around the arch part of the tunnel.
A tunnel excavation method characterized by excavating a face after performing pre-lining with thin-walled concrete arch shells that extend continuously across the tunnel and in the longitudinal direction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63249023A JPH06100079B2 (en) | 1988-10-04 | 1988-10-04 | Tunnel excavation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63249023A JPH06100079B2 (en) | 1988-10-04 | 1988-10-04 | Tunnel excavation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02101297A JPH02101297A (en) | 1990-04-13 |
| JPH06100079B2 true JPH06100079B2 (en) | 1994-12-12 |
Family
ID=17186860
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63249023A Expired - Lifetime JPH06100079B2 (en) | 1988-10-04 | 1988-10-04 | Tunnel excavation method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH06100079B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5945075B2 (en) * | 1981-12-22 | 1984-11-02 | 鉄建建設株式会社 | Tunnel excavation method that precedes the primary lining |
| JPS6019897A (en) * | 1983-07-11 | 1985-02-01 | 株式会社奥村組 | Thin wall coating method and apparatus of tunnel |
-
1988
- 1988-10-04 JP JP63249023A patent/JPH06100079B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02101297A (en) | 1990-04-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0407934B1 (en) | Method for executing monolithic continuous straights or circular structural walls and a machine for realizing such a method | |
| JPH07113214B2 (en) | Excavation device for underground wall and construction method using the device | |
| JP3824114B2 (en) | Whale bone method for large section tunnel | |
| JPH035600A (en) | Method and device for constructing branch and connection part of shield tunnel and its segment | |
| JPH04343995A (en) | Middle part covering structure of juxtaposed tunnels | |
| JP2833482B2 (en) | Steel lining structure of tunnel | |
| JP3863320B2 (en) | Tunnel receiving method | |
| JPH06100079B2 (en) | Tunnel excavation method | |
| JPH02200917A (en) | Landslide suppressing well cylinder and its building method | |
| JP3895881B2 (en) | Shield tunnel connection method | |
| JPH0464697A (en) | Construction of tunneling space | |
| JP3512012B2 (en) | How to excavate | |
| JPH09119131A (en) | Construction method of column row type underground continuous wall and guide plate structure of multishaft auger machine used therefor | |
| JPH07208068A (en) | Tunnel expansion, contraction, merging and branching methods | |
| JPH09111754A (en) | Parent pile water stop wall construction method | |
| JPH02112595A (en) | Construction equipment for reinforcing the ground in front of the tunnel face | |
| JPH02282517A (en) | Underground continuous wall excavation and device therefor | |
| JP2966173B2 (en) | Tunnel excavation ground reinforcement method | |
| JPH03140597A (en) | Construction work of underground structure | |
| JPS58213996A (en) | Shield excavator, excavating section thereof can freely be changed | |
| JP4034481B2 (en) | Horizontal shaft construction method and horizontal shaft construction device | |
| JPH04347297A (en) | Ground reinforcement method | |
| JP4191537B2 (en) | Shield machine | |
| JPH04115095A (en) | Underground excavator | |
| JPH04327694A (en) | Curve propulsive timbering method and curve propulsive machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071212 Year of fee payment: 13 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081212 Year of fee payment: 14 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081212 Year of fee payment: 14 |