Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH06104453B2 - Railroad crossing control device - Google Patents
[go: Go Back, main page]

JPH06104453B2 - Railroad crossing control device - Google Patents

Railroad crossing control device

Info

Publication number
JPH06104453B2
JPH06104453B2 JP61061752A JP6175286A JPH06104453B2 JP H06104453 B2 JPH06104453 B2 JP H06104453B2 JP 61061752 A JP61061752 A JP 61061752A JP 6175286 A JP6175286 A JP 6175286A JP H06104453 B2 JPH06104453 B2 JP H06104453B2
Authority
JP
Japan
Prior art keywords
time
railroad crossing
train
signal
speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP61061752A
Other languages
Japanese (ja)
Other versions
JPS62218263A (en
Inventor
壽 河村
山本  正宣
喜雄 笹島
直樹 天水
敏男 加藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Signal Co Ltd
Original Assignee
Nippon Signal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Signal Co Ltd filed Critical Nippon Signal Co Ltd
Priority to JP61061752A priority Critical patent/JPH06104453B2/en
Publication of JPS62218263A publication Critical patent/JPS62218263A/en
Publication of JPH06104453B2 publication Critical patent/JPH06104453B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Description

【発明の詳細な説明】 産業上の利用分野 本発明は、踏切制御装置に関し、閉塞信号機の現示信号
を監視し、当該現示信号に応じて踏切警報開始の遅延制
御を行なうことにより、列車運行の高速度化により、列
車速度が低下した場合でも、適切な踏切開扉時間を確保
し、踏切における交通渋滞を解消させるようにしたもの
である。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a railroad crossing control device, which monitors a signal indicating a blockage signal and performs delay control for starting a railroad crossing alarm in accordance with the signal to indicate a train. Even if the train speed decreases due to the high speed operation, an appropriate railroad crossing door time is secured and traffic congestion at the railroad crossing is eliminated.

従来の技術 第7図は従来の踏切制御を示す図で、1は軌道、2は軌
道1上を矢印方向に走行する列車、3は踏切である。軌
道1には適当な距離で閉塞区間1T〜4Tが設定されてい
て、各閉塞区間1T〜4Tの前方閉塞境界に閉塞信号機S1
S4が設けられている。
2. Description of the Related Art FIG. 7 is a diagram showing a conventional level crossing control, where 1 is a track, 2 is a train running on the track 1 in the direction of the arrow, and 3 is a level crossing. Blocks 1T to 4T are set on the track 1 at appropriate distances, and blockers S 1 to 4T are located at the front block boundaries of the blocks 1T to 4T.
S 4 is provided.

踏切3の警報時分の設定に当っては、従来は、列車2が
その区間の最高速度を意味するG現示で走行するときに
要する時間を標準警報時分として、この時間以上の警報
時分が確保できる距離に警報開始点Aを設定し、列車2
がこの警報開始点Aを通過したときに、踏切を閉扉させ
ていた。警報開始点Aは、列車種別によっては差異はあ
るが、同一種の列車に対しては、固定された位置にあ
る。なお、警報開始点Aを閉塞境界に設定するので、標
準警報時分より実際の警報時分が長くなるのが普通であ
る。
Conventionally, when setting the alarm time of the railroad crossing 3, the time required for the train 2 to travel at G indication, which means the maximum speed of the section, is set as the standard alarm time, and the alarm time longer than this time is set. Set the alarm start point A to a distance where you can secure minutes, and train 2
Had closed the railroad crossing when he passed this alarm start point A. The alarm starting point A is at a fixed position for the same type of train, although there are differences depending on the train type. Since the alarm start point A is set at the closed boundary, the actual alarm time is usually longer than the standard alarm time.

発明が解決しようとする問題点 しかし、ラッシュ時等に列車運行密度が高度化し、先行
列車との車間距離が充分に確保できなくなると、続行列
車に対する閉塞信号機S1〜S4の現示が、YGまたはY等の
下位現示となり、列車速度が大幅に低下する。この場
合、警報開始点Aは固定であるから、列車速度の低下に
伴ない、列車が警報開始点Aから踏切3に到達するのに
要する時間が長くなり、それに応じて警報時分が延びて
ゆく。このため、ラッシュ時等には、踏切3を開扉する
機会が失われてしまい、踏切3で著しい交通渋滞を招い
てしまうという問題があった。
Problems to be Solved by the Invention However, when the train operation density becomes high at the time of rush hour, and the inter-vehicle distance with the preceding train cannot be sufficiently secured, the indication of the blockage signal S 1 to S 4 for the continuing train, The train speed is significantly reduced due to the lower rank such as YG or Y. In this case, since the alarm start point A is fixed, the time required for the train to reach the railroad crossing 3 from the alarm start point A increases as the train speed decreases, and the alarm time increases accordingly. go. For this reason, there is a problem that the opportunity to open the railroad crossing 3 is lost during a rush hour and the like, which causes significant traffic congestion at the railroad crossing 3.

問題点を解決するための手段 上述する従来の問題点を解決するため、本発明は、踏切
制御区間と、論理部と含み、踏切に接近する列車に対し
て適切な警報時間を与えるべく踏切警報時分を制御する
踏切制御装置であって、 前記踏切制御区間は、前記踏切から前記列車を見て前記
踏切の前方に設定され、複数の閉塞区間を含んでおり、 前記閉塞区間のそれぞれは、閉塞信号機を有し、前記閉
塞信号機が個別の現示信号を与えられるようになってお
り、 前記論理部は、前記閉塞信号機の前記現示信号を監視
し、前記現示信号に応じて踏切までに要する時間を想定
し、その時間と、最高速の現示のときの標準時間との時
間差を割り出し、その時間差だけ、踏切警報開始の遅延
制御を行なう。
Means for Solving the Problems In order to solve the above-mentioned conventional problems, the present invention includes a railroad crossing control section and a logic unit, and provides a railroad crossing warning to give an appropriate warning time to a train approaching the railroad crossing. A railroad crossing control device for controlling time and minutes, wherein the railroad crossing control section is set in front of the railroad crossing when the train is viewed from the railroad crossing, and includes a plurality of closed sections, each of the closed sections. Having a block signal, the block signal is adapted to be given an individual display signal, the logic unit monitors the display signal of the block signal, until the railroad crossing according to the display signal. The time difference between that time and the standard time at the time of the highest speed display is calculated, and the delay control for starting the level crossing alarm is performed by this time difference.

作用 本発明に係る踏切制御装置においては、踏切制御区間を
構成する閉塞区間に列車が接近したとき、当該閉塞区間
に備えられた閉塞信号機の現示信号を監視し、閉塞信号
機の現示が最高許容速度に対応するG現示より下位のY
G、Y或いはYY現示の場合、これらの現示に対応する速
度で踏切までに要する時間を想定し、その時間と、G現
示の時の標準時間との間の時間差を割出し、その時間差
だけ、警報開始点を遅延させることにより、列車速度の
低下に拘わらず、踏切の閉扉時間を一定化するものであ
る。
Effect In the railroad crossing control device according to the present invention, when the train approaches the closed section that constitutes the crossing control section, the display signal of the closed signal provided in the closed section is monitored, and the display of the closed signal is the highest. Y lower than G indication corresponding to the allowable speed
In the case of G, Y, or YY display, the time required to take the railroad crossing at the speed corresponding to these displays is assumed, and the time difference between that time and the standard time at the time of G display is calculated and the By delaying the alarm start point by the time difference, the closing time of the railroad crossing is made constant regardless of the decrease in train speed.

本発明においては、閉塞信号機の現示が列車速度に対応
していることが前提となるが、現行の列車運行システム
においては、スピードシグナル化により、現示毎に対応
する速度が規定されている。また、列車側に車上速度照
査付の自動列車制御装置を備え、当該閉塞区間の現示に
対応する速度を超過しないような速度制限が加えられて
いる場合も多い。従って、閉塞信号機の現示を速度に対
応させて、踏切警報開始点を制御させても問題はない。
In the present invention, it is premised that the indication of the block signal corresponds to the train speed, but in the current train operation system, the speed corresponding to each indication is defined by speed signalization. . Further, there are many cases where an automatic train control device with on-board speed check is provided on the train side and a speed limit is imposed so as not to exceed the speed corresponding to the indication of the blocked section. Therefore, there is no problem in controlling the crossing warning start point by making the indication of the blockage signal correspond to the speed.

実施例 第1図は本発明に係る踏切制御装置の軌道構成を示す図
で、踏切3の前方において軌道1に沿って設定された閉
塞区間1T〜4Tの内、閉塞区間2T〜4Tを踏切制御区間と
し、この閉塞区間2T〜4Tに列車2が接近した時に踏切制
御を行なうようになっている。説明の簡単化のため、こ
こでは、閉塞区間2Tに列車2が接近したときの踏切制御
を例にとって説明することとする。
First Embodiment FIG. 1 is a diagram showing a track configuration of a railroad crossing control device according to the present invention. In the blockage sections 1T to 4T set along the track 1 in front of the railroad crossing 3, the crossing section 2T to 4T is controlled. As a section, when the train 2 approaches this closed section 2T-4T, level crossing control is performed. For simplification of the explanation, here, the level crossing control when the train 2 approaches the closed section 2T will be described as an example.

第2図(A)は閉塞信号機の信号制御リレー回路、第2
図(B)は本発明に係る踏切制御装置の回路図である。
S21〜S24は閉塞区間2Tと閉塞区間1Tとの閉塞境界に備え
られた閉塞信号機S2の信号制御リレー、S21-1〜S24-1
びS22-2〜S24-2は信号制御リレーS21〜S24の接点であ
る。信号制御リレーS21は閉塞信号機S2の現示が最高許
容速度を示すG現示となったときに扛上し、それより下
位のYG、Y、YY及びR現示では落下するリレー、信号制
御リレーS22はYG現示となった時に扛上し、それより下
位のY、YY及びR現示では落下するリレー、信号制御リ
レーS23はY現示となった時に扛上しYY及びR現示では
落下するリレー、信号制御リレーS24はYY現示となった
時に扛上しR現示では落下するリレーであり、これらは
下位優先回路を構成するように接続されている。従っ
て、信号制御リレーS21〜S24の扛上、落下は閉塞信号機
S2の現示信号に対応している。
FIG. 2 (A) is a signal control relay circuit of the block signal, the second
FIG. 1B is a circuit diagram of the railroad crossing control device according to the present invention.
S 21 to S 24 are closed traffic S 2 of the signal control relay provided in the closed boundary between block section 1T and block section 2T, S 21-1 ~S 24-1 and S 22-2 to S 24-2 is a contact signal control relay S 21 to S 24. Signal control relay S 21 is jacked when current-occlusion traffic S 2 becomes the maximum permissible shows the rate G Gen示it from lower YG, Y, relay falling in YY and R current-signal The control relay S 22 is lifted when the YG indication is given, and falls in the Y, YY and R indications lower than that, and the signal control relay S 23 is raised when the Y indication is given and YY and The relays that fall in the R indication and the signal control relays S 24 are relays that rise when they become the YY indication and fall in the R indication, and these are connected so as to form a lower priority circuit. Thus, jack up the signal control relay S 21 to S 24, the fall occlusion traffic
Corresponds to the S 2 signal .

4は閉塞区間2Tに備えられた閉塞信号機S2の信号制御リ
レーS21〜S24の接点S21-1〜S24-1の扛上、落下として与
えられる現示信号を監視し、当該現示信号に応じた遅延
時間を設定する論理部である。例えば信号制御リレーS
21〜S24が扛上しG現示信号が入力されたときにa秒の
遅延時間を制定し、信号制御リレーS22〜S24が扛上しYG
現示信号が入力されたときはb秒(b>a)の遅延時間
を制定し、信号制御リレーS23、S24が扛上しY現示信号
が入力されたときはc秒(c>b)の遅延時間を設定
し、信号制御リレーS24が扛上しYY現示信号が入力され
たときはd秒(d>c)の遅延時間を設定するものであ
る。これらの遅延時間a〜dは、当該現示内の許容速度
で進行した場合でも、踏切3に対しては略同じ到達時間
となるように設定する。現示と列車速度と間には対応関
係があるから、これが可能である。
Reference numeral 4 is a signal control relay S 21 to S 24 of the block signal S 2 provided in the block section 2T, monitors contacts S 21-1 to S 24-1 of the signal control relays S 2 to S 24-1 , and monitors the display signal given as a fall. It is a logic unit that sets a delay time according to the indicating signal. For example, signal control relay S
When 21 ~ S 24 are lifted and G indication signal is input, a delay time of a second is established, and signal control relays S 22 ~ S 24 are lifted and YG
When a display signal is input, a delay time of b seconds (b> a) is established, and when signal control relays S 23 and S 24 are activated and a Y display signal is input, c seconds (c> c) The delay time of b) is set, and the delay time of d seconds (d> c) is set when the signal control relay S 24 is raised and the YY display signal is input. These delay times a to d are set so that the arrival times at the railroad crossing 3 are substantially the same even when the vehicle advances at the allowable speed within the display. This is possible because there is a correspondence between the manifest and the train speed.

XRは論理部4によって設定された遅延時間a〜dで駆動
される遅延出力リレーである。
XR is a delay output relay driven by delay times a to d set by the logic unit 4.

2TR1、2TR2は閉塞区間2Tに列車2が進入したときに落下
する軌道リレー2TRの接点、3TR1は閉塞区間3Tに備えら
れた軌道リレー3TRの接点、4TR1は閉塞区間4Tに備えら
れた軌道リレー4TRの接点、XR1は遅延出力リレーXRの接
点、Rは踏切警報リレーである。
2TR 1 and 2TR 2 are contact points of a track relay 2TR that drops when the train 2 enters the closed section 2T, 3TR 1 is a contact point of a track relay 3TR provided in the closed section 3T, and 4TR 1 is provided in the closed section 4T. Orbit relay 4TR contact, XR 1 is the delayed output relay XR contact, and R is the railroad crossing alarm relay.

列車2が踏切制御区間たる閉塞区間2Tより前の閉塞区間
を走行している間は、閉塞区間2T〜4Tの軌道リレーの接
点2TR2、3TR1及び4TR1が閉じている。従って、踏切警報
リレーRが扛上し、踏切警報信号は出力されず、踏切3
が開扉状態にある。また、閉塞区間2Tの軌道リレーの接
点2TR1が閉じているため、論理部4からの遅延時間出力
はなく、遅延出力リレーXRは落下状態にあり、その接点
XR1は開いた状態にある。
While the train 2 is traveling in front of the block sections from the block section 2T serving crossing control section, it is closed contact 2TR 2, 3TR 1 and 4TR 1 track relay block section 2T~4T. Therefore, the railroad crossing warning relay R is lifted, the railroad crossing warning signal is not output, and the railroad crossing 3
Is open. In addition, since the contact 2TR 1 of the orbital relay in the closed section 2T is closed, there is no delay time output from the logic unit 4, and the delay output relay XR is in the falling state.
XR 1 is open.

列車2が閉塞区間2Tに進入すると、軌道リレー2TRの接
点2TR1が開いて、それをキッカケとして、論理部4から
閉塞信号機S2の現示に対応した遅延時間信号が出力さ
れ、遅延出力リレーXRがその遅延時間だけ扛上し、接点
XR1がその間閉じる。このため、警報リレーRに対して
は、軌道リレーの接点2TR2に代って接点XR1を通して電
源が供給され、踏切警報リレーRが保持動作をし、警報
出力が遅延される。この場合、論理部4から出力される
遅延時間は、閉塞信号機S2の現示信号に対応したものと
なる。例えば、閉塞信号機S2がG現示であるときはa
秒、YG現示のときはb秒、Y現示の時はc秒、YY現示の
ときはd秒の遅延時間が設定され、遅延出力リレーXRは
遅延時間a〜dだけ扛上する。結局、遅延出力リレーXR
の接点XR1は、列車2が閉塞区間2Tに進入して軌道リレ
ー2TRの接点2TR1が開いた時から、遅延時間a〜dだけ
閉じ、警報リレーRの落下が遅延時間a〜dだけ遅れ、
踏切警報信号出力も遅延時間a〜dだけ遅延されること
となる。この結果、踏切3に対する関係では、閉塞信号
機S2の現示の違いに拘わらず、略一定の踏切閉扉時間が
期待できる。
When the train 2 enters the closed section 2T, the contact 2TR 1 of the track relay 2TR opens, and the delay time signal corresponding to the indication of the closed signal S 2 is output from the logic unit 4 using it as a trigger, and the delayed output relay The XR has increased its delay time,
XR 1 closes in the meantime. For this reason, power is supplied to the alarm relay R through the contact XR 1 instead of the contact 2TR 2 of the track relay, the level crossing alarm relay R performs a holding operation, and the alarm output is delayed. In this case, the delay time output from the logic unit 4 becomes to correspond to the current示信No. occlusion traffic S 2. For example, when the block signal S 2 is G indication, a
The delay time is set to seconds, b seconds for YG display, c seconds for Y display, and d seconds for YY display, and delay output relay XR increases delay times a to d. After all, delayed output relay XR
Contact XR 1 is closed by delay time a to d after train 2 enters closed section 2T and contact 2TR 1 of track relay 2TR is opened, and fall of alarm relay R is delayed by delay time a to d ,
The crossing warning signal output is also delayed by the delay times a to d. As a result, the relationship crossing 3, regardless of the difference in current-occlusion traffic S 2, can be expected substantially constant level crossing closing time.

なお、列車2が閉塞区間2T内に入って軌動リレーの接点
2TR2が開く時点が、遅延出力リレーXRの接点XR1が閉じ
るより前であると、踏切警報リレーRが瞬間的に落下す
ることが考えられる。このような問題点の解決手段とし
ては、例えば、列車2が閉塞区間2Tより一つまえの閉塞
区間1Tを走行しているときに、その軌道リレー1TRの接
点1TR1を利用して遅延出力リレーXRを予め扛上させて接
点XR1を閉じておき、閉塞区間2Tの軌道リレー2TRの接点
2TR2が開いた場合でも、踏切警報リレーRが落下しない
ように保持し、次に閉塞区間2Tに列車が入ったとき、軌
道リレー2TRの接点2TR1を利用して遅延時間を設定する
ような構成が考えられる。
When the train 2 enters the closed section 2T, the contact point of the track relay
If the point at which 2TR 2 opens is before the point at which the contact XR 1 of the delayed output relay XR closes, the level crossing alarm relay R may be momentarily dropped. As a means for solving such a problem, for example, when the train 2 is traveling in the closed section 1T one block ahead of the closed section 2T, the delay output relay is utilized by using the contact 1TR 1 of the track relay 1TR. XR is lifted in advance and contact XR 1 is closed, and contact of track relay 2TR in closed section 2T
Even if the 2TR 2 is opened, the railroad crossing alarm relay R is held so as not to fall, and when the train next enters the closed section 2T, the delay time is set by using the contact 2TR 1 of the track relay 2TR. Possible configurations.

第3図は現示対応速度で走行する場合の列車速度と警報
時分との関係を示す図である。図において、、、
、は閉塞区間1Tの閉塞信号機S1がG、YG、Y、YY現
示であるとき、それに対応した速度で警報を開始した場
合の、速度と警報時分との関係を示している。図中、t
G、tYG、tY、tYYは、標準警報時分t0=41秒をオーバし
た無駄な警報時分である。従来の踏切制御では、この無
駄な警報時分の発生を余儀なくされていた。本発明で
は、論理部4及び警報遅延出力リレーXRによってtG、tY
G、tY、tYYだけの遅延出力を出し、警報開始をこの時間
だけ遅延制御することができるので、常に警報時分の適
正化が実現される。
FIG. 3 is a diagram showing the relationship between the train speed and the alarm time when traveling at the indicated speed. In the figure,
, Shows the relationship between the speed and the alarm time when the alarm is started at the speed corresponding to the G, YG, Y, YY indication of the occlusion signal S 1 in the occlusion section 1T. In the figure, t
G, tYG, tY, and tYY are useless alarm time and minutes that exceed the standard alarm time t 0 = 41 seconds. In the conventional level crossing control, this wasteful alarm time is inevitably generated. In the present invention, tG, tY are controlled by the logic unit 4 and the alarm delay output relay XR.
Since the delayed output of G, tY, and tYY can be output and the alarm start can be delayed and controlled by this time, the optimization of the alarm time can always be realized.

上記実施例では、例えばYG現示のときは最高許容速度75
km/h、Y現示のときは最高許容速度45km/hのように、現
示に対応した最高許容速度で走行することを前提とし
て、遅延制御を行なうものであるが、実際の列車運転に
おいては、各現示の最高許容速度より低い速度で走行す
るのが普通である。このため、実際の走行速度が現示対
応の最高許容速度から低下するにつれて、遅延制御によ
る警報時分の適正化の効果が少なくなって行く。このよ
うな問題点を解決する手段として、列車速度情報を遅延
時間設定条件の一つに加え、列車速度が低下したとき
は、それに応じて遅延時間を延ばすように制御する。第
4図〜第5図はその一実施例を示す図である。
In the above embodiment, for example, in the case of YG display, the maximum allowable speed is 75
In the case of actual train operation, the delay control is performed on the premise that the vehicle travels at the maximum permissible speed corresponding to the display, such as the maximum permissible speed of 45 km / h at the time of km / h and Y display. Usually run at speeds below the maximum allowed speed for each indication. Therefore, as the actual traveling speed decreases from the maximum permissible speed corresponding to the actual indication, the effect of optimizing the warning time by the delay control becomes smaller. As a means for solving such a problem, train speed information is added to one of the delay time setting conditions, and when the train speed decreases, the delay time is controlled to be extended accordingly. 4 to 5 are views showing an embodiment thereof.

第4図では、踏切制御区間2T〜4Tより前の閉塞区間1Tを
速度検出区間とし、閉塞区間長lを通過するのに要する
時間から、列車2の速度を検出するようになっている。
閉塞区間1Tの列車通過時間は、第5図に示すように、閉
塞区間1Tの軌道リレー1TRの接点1TR1及び次の閉塞区間2
Tの軌道リレー2TRの接点2TR1の接点条件から割出すこと
ができる。
In FIG. 4, the closed section 1T before the level crossing control sections 2T to 4T is set as the speed detection section, and the speed of the train 2 is detected from the time required to pass the closed section length l.
As shown in FIG. 5, the train transit time of the closed section 1T is as follows: the contact point 1TR 1 of the track relay 1TR of the closed section 1T and the next closed section 2
It can be calculated from the contact condition of the contact 2TR 1 of the track relay 2TR of T.

また、踏切制御区間2T〜4T内においては、先行列車が当
該区間に進入してから、当該列車が到達するまでの時間
を監視することにより、先行列車の位置と列車運行パタ
ーンから、当該列車の運転速度を想定し、その速度に見
合った遅延制御を行なうことにより、現示対応の最高許
容速度以下で走行する列車に対しても踏切警報時分の適
正化を図ることができる。先行列車の位置は、各閉塞区
間2T〜4Tの軌道リレー2TR〜4TRの接点2TR1〜4TR1の条件
を論理部4に入力(第5図参照)することによって判定
できる。
In addition, within the railroad crossing control section 2T to 4T, by monitoring the time from when the preceding train enters the section until the train arrives, the position of the preceding train and the train operation pattern indicate that the train By assuming an operating speed and performing delay control commensurate with the speed, it is possible to optimize the railroad crossing warning time even for a train running at or below the maximum permissible speed corresponding to the actual indication. The position of the preceding train can be determined by inputting the conditions of the contacts 2TR 1 to 4TR 1 of the track relays 2TR to 4TR of each closed section 2T to 4T to the logic unit 4 (see FIG. 5).

第6図は列車速度と警報時分との関係を示す図である。
図において、、、、は閉塞区間1Tの閉塞信号機
S1がG、YG、Y、YY現示であるとき、それに対応した最
高許容速度で走行した場合の警報時分の関係を示し、
′はYG現示においてその最高許容速度以下の速度で走
行した場合の警報時分を、また、′はY現示において
その最高許容速度より低い速度で走行した場合の警報時
分を示している。
FIG. 6 is a diagram showing the relationship between train speed and alarm time.
In the figure ,,, are blockage signals of block section 1T
When S 1 is G, YG, Y, YY display, it shows the relationship between alarm time and time when traveling at the maximum allowable speed corresponding to it.
′ Indicates the alarm time when the vehicle travels at a speed lower than the maximum allowable speed in the YG display, and ‘indicates the alarm time when the vehicle travels at a speed lower than the maximum allowable speed in the Y display. .

、、、の場合には、現示対応の最高許容速度で
走行しているので、第1図〜第3図で説明した遅延制御
により、無駄な警報時分が発生していない。
In the cases of ,,, and, since the vehicle is traveling at the maximum permissible speed corresponding to the indication, no unnecessary alarm time is generated by the delay control described in FIGS. 1 to 3.

′、′の場合には走行速度が低下するので無駄な警
報時分t′YG、t′Yが発生する。これは第1図〜第3
図に示した実施例では対応できない時間である。この実
施例の場合には、列車速度を検出し、それに対応して、
遅延時間をt′YG、t′Yだけ延長するものであって、
速度低下の場合にも常に警報時分の適正化が可能であ
る。
In the case of ',', since the traveling speed is reduced, useless alarm time t'YG, t'Y is generated. This is shown in Figs.
This is a time that cannot be dealt with in the embodiment shown in the figure. In the case of this embodiment, the train speed is detected and correspondingly,
The delay time is extended by t'YG, t'Y,
Even when the speed decreases, the alarm time can always be optimized.

しかも、この実施例の場合には、既に存在する軌道リレ
ーの接点条件を利用して速度を検出するものであるの
で、既存の設備を利用した簡便な方法で速度を検出でき
る。
Moreover, in the case of this embodiment, since the speed is detected by utilizing the contact condition of the existing orbital relay, the speed can be detected by a simple method using the existing equipment.

発明の効果 以上述べたように、本発明に係る踏切制御装置は、閉塞
信号機の現示信号を監視し、当該現示信号に応じて踏切
警報開始の遅延制御を行なうようにしたから、列車運行
の高密度化により、列車速度が低下した場合でも、適切
な踏切開扉時間を確保し、踏切における交通渋滞を解消
させることができる。しかも、閉塞信号機や軌道リレー
等の既存設備を、変更を殆ど加えることなく、そのまま
利用して構成できるので、実施が容易であり、実用性に
富む踏切制御装置を提供することができる。
Effects of the Invention As described above, the railroad crossing control device according to the present invention monitors the signal indicating the blockage signal and delays the start of the railroad crossing warning in accordance with the signal indicating the signal. Due to the higher density, even when the train speed decreases, it is possible to secure an appropriate time for the railroad crossing and to eliminate traffic congestion at the railroad crossing. Moreover, the existing equipment such as the block signal and the orbital relay can be used as they are with almost no change, so that it is possible to provide a railroad crossing control device that is easy to implement and highly practical.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明に係る踏切制御装置の軌道構成を示す
図、第2図(A)は閉塞信号機の信号制御リレー回路、
第2図(B)は本発明に係る踏切制御装置の回路図、第
3図は現示対応速度で走行する場合の列車速度と警報時
分との関係を示す図、第4図は本発明に係る踏切制御装
置の別の軌道構成を示す図、第5図は同じくその踏切制
御装置の回路図、第6図は現示対応の最高速度以下で走
行する場合の列車速度と警報時分との関係を示す図、第
7図は従来の踏切制御を示す図である。 1……軌道、2……列車 3……踏切、4……論理部 S1〜S4……閉塞信号機 S21〜S24……閉塞信号機の信号制御リレー XR……遅延出力リレー R……踏切警報リレー
FIG. 1 is a diagram showing a track configuration of a railroad crossing control device according to the present invention, FIG. 2 (A) is a signal control relay circuit of a block signal,
FIG. 2 (B) is a circuit diagram of the railroad crossing control device according to the present invention, FIG. 3 is a diagram showing the relationship between train speed and alarm time when traveling at the indicated speed, and FIG. 4 is the present invention. FIG. 5 is a diagram showing another track configuration of the railroad crossing control device according to FIG. 5, FIG. 5 is a circuit diagram of the railroad crossing control device, and FIG. 6 is a train speed and an alarm time when traveling at a speed lower than the maximum speed corresponding to the present indication. FIG. 7 is a diagram showing the relationship of the above, and FIG. 7 is a diagram showing conventional crossing control. 1 ... Track, 2 ... Train 3 ... Level crossing, 4 ... Logical section S 1 to S 4 ...... Block signal S 21 to S 24 ...... Signal control relay for block signal XR ...... Delayed output relay R ...... Railroad crossing alarm relay

フロントページの続き (72)発明者 加藤 敏男 埼玉県北足立郡伊奈町寿2の272 (56)参考文献 実開 昭61−38269(JP,U) 特公 昭34−802(JP,B1) 特公 昭35−15104(JP,B1) 実公 昭39−11505(JP,Y1)Front Page Continuation (72) Inventor Toshio Kato 2-2, Ina-cho, Kita-Adachi-gun, Saitama 272 (56) Bibliography Sho 61-38269 (JP, U) JP 34-802 (JP, B1) Special Official 35-15104 (JP, B1) Actual Official 39-11505 (JP, Y1)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】踏切制御区間と、論理部(4)と含み、踏
切に接近する列車に対して適切な警報時間を与えるべく
踏切警報時分を制御する踏切制御装置であって、 前記踏切制御区間は、前記踏切(3)から前記列車を見
て前記踏切(3)の前方に設定され、複数の閉塞区間
(2T〜4T)を含んでおり、 前記閉塞区間(2T〜4T)のそれぞれは、閉塞信号機(S2
〜S4)を有し、前記閉塞信号機(S2〜S4)が個別の現示
信号を与えられるようになっており、 前記論理部(4)は、前記閉塞信号機(S2〜S4)の前記
現示信号を監視し、前記現示信号に応じて踏切までに要
する時間を想定し、その時間と、最高速の現示のときの
標準時間との時間差を割り出し、その時間差だけ、踏切
警報開始の遅延制御を行なう 踏切制御装置。
1. A railroad crossing control device, comprising a railroad crossing control section and a logic unit (4), for controlling a railroad crossing alarm time and duration so as to give an appropriate alarm time to a train approaching the railroad crossing. The section is set in front of the railroad crossing (3) when the train is viewed from the railroad crossing (3), and includes a plurality of closed sections (2T to 4T), and each of the closed sections (2T to 4T) is , Block signal (S 2
To S 4) has, the closure traffic (S 2 to S 4) are adapted to be given a No. individual current示信, the logic unit (4), the closure traffic (S 2 to S 4 ) Monitoring the display signal, and assuming the time required to take the railroad crossing in accordance with the display signal, determine the time difference between the time and the standard time at the time of the fastest display, only the time difference, A level crossing control device that controls the delay of the level crossing alarm start.
【請求項2】前記論理部(4)は、列車速度情報が入力
され、前記列車速度情報を遅延制御条件の一つとする 特許請求の範囲第1項に記載の踏切制御装置。
2. The railroad crossing control device according to claim 1, wherein the logic unit (4) receives train speed information and sets the train speed information as one of delay control conditions.
JP61061752A 1986-03-19 1986-03-19 Railroad crossing control device Expired - Fee Related JPH06104453B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61061752A JPH06104453B2 (en) 1986-03-19 1986-03-19 Railroad crossing control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61061752A JPH06104453B2 (en) 1986-03-19 1986-03-19 Railroad crossing control device

Publications (2)

Publication Number Publication Date
JPS62218263A JPS62218263A (en) 1987-09-25
JPH06104453B2 true JPH06104453B2 (en) 1994-12-21

Family

ID=13180205

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61061752A Expired - Fee Related JPH06104453B2 (en) 1986-03-19 1986-03-19 Railroad crossing control device

Country Status (1)

Country Link
JP (1) JPH06104453B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0714100Y2 (en) * 1988-01-20 1995-04-05 東日本旅客鉄道株式会社 Railroad crossing control device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6138269U (en) * 1984-08-11 1986-03-10 日本信号株式会社 Level crossing control device

Also Published As

Publication number Publication date
JPS62218263A (en) 1987-09-25

Similar Documents

Publication Publication Date Title
US4433324A (en) Device to promote the movement of buses by allocation of priority of crossing of an intersection controlled by traffic lights
US3109157A (en) Directional traffic control system
JPH06104453B2 (en) Railroad crossing control device
US3258744A (en) Vehicle traffic control system
JPH11192950A (en) Railroad crossing control device
JP2868250B2 (en) Level crossing alarm control device
JPH0562110B2 (en)
JP3346499B2 (en) Railroad crossing control device
JP3167426B2 (en) Train route control device
US1944723A (en) Control for traffic signal systems
JP2573221B2 (en) Railroad crossing control device
US3035246A (en) Highway signalling system
JP2752636B2 (en) Railroad crossing control device
US2030532A (en) Apparatus for the control of highway crossing signals
JPH0717198B2 (en) Railroad crossing control device
US2089819A (en) Railway traffic controlling apparatus
US2133171A (en) Controlling apparatus for highway crossing signals
JP2733061B2 (en) Railroad crossing control device
US2106681A (en) Highway crossing signaling system
US2297683A (en) Traffic actuated control apparatus
US2088079A (en) Railway signaling
US1824185A (en) Railway traffic controlling system
JPH09272437A (en) Onboard device
US2035169A (en) Apparatus for the control of highway crossing signals
US2124046A (en) Controlling apparatus for highway crossing signals

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees