JPH0616976B2 - U-bend pipe finishing equipment - Google Patents
U-bend pipe finishing equipmentInfo
- Publication number
- JPH0616976B2 JPH0616976B2 JP8040288A JP8040288A JPH0616976B2 JP H0616976 B2 JPH0616976 B2 JP H0616976B2 JP 8040288 A JP8040288 A JP 8040288A JP 8040288 A JP8040288 A JP 8040288A JP H0616976 B2 JPH0616976 B2 JP H0616976B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- bend pipe
- pressure resistance
- resistance test
- belt conveyor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Turning (AREA)
- Cleaning In General (AREA)
Description
この発明は化学用、原子力用等の熱交換器等に使用され
るUベンド管の精整処理設備に係り、Uベンド管の熱処
理、耐圧試験、形状修正、管端切断、管端面取および検
査・クリーニングまでの一連の作業をオンラインで行な
う精整処理設備に関するものである。The present invention relates to a U-bend pipe refining treatment facility used for heat exchangers for chemistry, nuclear power, etc., including heat treatment, pressure resistance test, shape correction, pipe end cutting, pipe end chamfering and inspection of U bend pipe. -It relates to a refinement processing facility that performs a series of operations up to cleaning online.
Uベンド管は継目無鋼管あるいは溶接鋼管等を曲げ加工
した後、湾曲部を熱処理し、しかる後空圧および水圧に
よる耐圧試験、管の曲り修正、管端切断、面取りおよび
検査・クリーニングを行なった後梱包して出荷されるの
が一般的である。 これら各作業はそれぞれ独立した処理装置で行なわれて
おり、湾曲部の熱処理は第8図に示すごとく、Uベンド
管(1)を人力で熱処理装置本体(2)とスキッド(3)上に載
置し、通電チャック(4)でクランプして熱処理が施され
る。 また、耐圧試験は第9図に示すごとく、Uベンド管(1)
を人力でスキッド(5)上へ載置し、その中心間距離が調
整可能な1対の空圧および水圧ヘッド(6)に管端部を差
込んで耐圧試験が行なわれる。 Uベンド管の形状修正は、Uベンド管を人力で定盤上に
運んで手作業で行なった後、平行管部の管端所定位置に
切断位置マークし、また管端部の切断はスキッド上にU
ベンド管を置き、ポータブル型高速切断機を使用して手
作業で行なっている。 管端の面取りは、スキッド上に置かれたUベンド管を1
本ずつ引き出し、ポータブル型面取機を使用して手作業
で行なっている。 さらに、Uベンド管のクリーニングおよび検査はUベン
ド管を人力でスキッド上に置いて行ない、クリーニング
および検査終了後は、再び手作業で次工程へ運んでい
る。For the U-bend pipe, after bending a seamless steel pipe or a welded steel pipe, the curved portion was heat-treated, and then a pressure resistance test by air pressure and water pressure, pipe bending correction, pipe end cutting, chamfering and inspection / cleaning were performed. It is generally shipped after being packaged. Each of these operations is carried out by an independent processing device, and the heat treatment of the bending portion is performed by manually placing the U-bend pipe (1) on the heat treatment device main body (2) and skid (3) as shown in FIG. Then, heat treatment is performed by clamping with an electric chuck (4). In addition, the pressure resistance test, as shown in FIG.
Is manually placed on the skid (5), and the pipe end is inserted into a pair of pneumatic and hydraulic heads (6) whose center-to-center distance can be adjusted to perform a pressure resistance test. To correct the shape of the U-bend pipe, manually move the U-bend pipe onto the surface plate manually and then manually mark the cutting position at the pipe end of the parallel pipe section. To U
Bend pipes are placed and the work is done manually using a portable high-speed cutting machine. For chamfering the pipe end, 1 U-bend pipe placed on the skid
The books are pulled out one by one, and the work is done manually using a portable chamfering machine. Further, the U-bend pipe is cleaned and inspected by manually placing the U-bend pipe on the skid, and after completion of the cleaning and inspection, the U-bend pipe is manually carried again to the next step.
上記のごとく、従来のUベンド管の精整処理作業は大半
が手作業による処理であるた、多くの手間と時間がかか
り作業能率が低い上、製品に歪みや疵が発生し易いとい
う欠点がある。 この発明は従来の技術のこのような欠点を解消するため
になされたものであり、Uベンド管の精整処理をオンラ
イン化することによって、作業能率と品質の向上をはか
るUベンド管の精整処理設備を提案しようとするもので
ある。As described above, most of the conventional U-bend pipe finishing work is a manual work, and it takes a lot of time and labor, the work efficiency is low, and the product tends to be distorted or flawed. is there. The present invention has been made in order to solve the above-mentioned drawbacks of the conventional technique, and by bringing the U-bend pipe adjusting process to online, the U-bend pipe adjusting process can be performed to improve work efficiency and quality. It is intended to propose processing equipment.
この発明はUベンド管の熱処理、耐圧試験、形状修正、
管端切断、管端面取り、検査およびクリーニングの各装
置を可及的に自動化するとともに、各装置への材料の搬
入・搬出を自動化したものであり、その要旨は Uベンド管をその平行管部軸長方向と直交する方向へ搬
送するようにした設備であって、上流側から複数のUベ
ンド管を段積状に貯溜するリフター付き台車式ラック装
置、Uベンド管の長さに応じてUベンド管の平行管部軸
長方向に移動可能な熱処理装置本体と移動式スキッドと
を有する湾曲部熱処理装置、昇降式クランプ装置と前後
進可能な耐圧テストヘッドとを有する耐圧試験装置、脱
水乾燥装置、昇降式ベルトコンベアを備えた定盤とクラ
ンプ装置および管端切断装置とを有する管端切断・形状
修正定盤装置、クランプ装置と管端部クランプ機構,バ
イト前後進機構および左右移動機構を備えた面取機本体
とを有する管端面取装置、昇降式スキッドを有する検査
・クリーニング装置を上流側から順次連設し、前記リフ
ター付き台車式ラック装置と耐圧試験装置との間の管搬
送手段に横行起重機を、耐圧試験装置以降の管搬送手段
にベルトコンベアを用いる方式となしたことを特徴とす
るUベンド管の精整処理設備にある。This invention is for heat treatment of U-bend pipe, pressure resistance test, shape correction,
The equipments for pipe end cutting, pipe end chamfering, inspection and cleaning are automated as much as possible, and the loading and unloading of materials to and from each device is automated. Equipment for transporting in a direction orthogonal to the axial direction, and a truck-type rack device with a lifter that stores a plurality of U-bend pipes in a stack form from the upstream side, U depending on the length of the U-bend pipe Curved part heat treatment device having a heat treatment device main body movable in the axial direction of the parallel pipe part of the bend pipe and a movable skid, pressure resistance test device having a lifting clamp device and a pressure resistance test head capable of moving forward and backward, dehydration drying device , A plate end cutting / shape correcting platen device having a platen equipped with a lifting belt conveyor, a clamp device and a pipe end cutting device, a clamp device and a pipe end clamp mechanism, a bite forward / backward moving mechanism and left and right A pipe end chamfering device having a chamfering machine main body equipped with a moving mechanism, and an inspection / cleaning device having an elevating skid are serially connected from the upstream side, and between the trolley type rack device with lifter and the pressure resistance test device. A U-bend pipe adjusting treatment facility is characterized in that a transverse hoist is used as the pipe conveying means and a belt conveyer is used as the pipe conveying means after the pressure resistance test device.
第1図はこの発明に係るUベンド管の精整処理設備と管
の流れを示すブロック図である。 Uベンド管はリフター付き台車式ラック装置から1本ず
つ横行起重機にて吊上げられて湾曲部熱処理装置へ搬入
され、移動式熱処理装置本体と移動式スキッド上に載置
され、直接通電方式により湾曲部が熱処理される。 熱処理後、Uベンド管は再び横行起重機にて吊上げられ
て耐圧試験装置へ搬入される。 耐圧試験装置ではベルトコンベアにてUベンド管を所定
の位置に移動せしめ、昇降式クランプ装置にて固定した
後、耐圧テストヘッドを前進させて試験する。耐圧試験
は空圧テスター、水圧テスターにより行なわれる。 耐圧試験が終わるとテストヘッドを後退させ、クラプ装
置を下降させてUベンド管をベルトコンベア上へ載せ、
脱水乾燥装置へ搬入する。 Uベンド管の脱水乾燥が終了すると、ベルトコンベアに
て管端切断・形状修正定盤装置へ搬入され、該定盤に設
けた昇降式ベルトコンベア上に移載されて定盤上まで搬
送される。しかる後、昇降式ベルトコンベアを下降させ
てUベンド管を定盤上に載置し、形状修正を行なう。 形状修正が終ると、続いて所定の位置でUベンド管をク
ランプ固定した後、管端切断装置により管端を切断す
る。 切断終了後は再び昇降式ベルトコンベアを上昇させて定
盤上のUベンド管をベルトコンベア上に載せて管端面取
り装置へ搬送する。 ベルトコンベアにより送られてきたUベンド管は面取位
置で停止し、クランプ装置にてUベンド管を固定する。
しかる後、前後および左右移動可能な面取機本体が移動
して片方ずつ面取する。 面取り後、Uベンド管はベルトコンベアにて搬送され、
検査・クリーニング装置へ搬入される。搬入されたベル
トコンベア上のUベンド管は、昇降式スキッドにて所定
の高さまで上昇させて検査およびクリーニングを行な
う。 検査・クリーニングが終了すると昇降式スキッドを下降
させてUベンド管をベルトコンベア上へ載置し、次工程
へ送る。FIG. 1 is a block diagram showing a U-bend pipe adjusting processing facility and a pipe flow according to the present invention. U-bend pipes are lifted one by one from a trolley-type rack device with lifter by a traverse hoist and carried into the bending part heat treatment device, placed on the movable heat treatment device body and the movable skid, and the bending part is directly energized. Is heat treated. After the heat treatment, the U bend pipe is again lifted by the traverse hoist and carried into the pressure resistance test device. In the pressure resistance test device, the U-bend pipe is moved to a predetermined position by the belt conveyor, fixed by the elevating type clamp device, and then the pressure resistance test head is advanced to perform the test. The pressure resistance test is performed by a pneumatic tester or a hydraulic tester. When the pressure resistance test is completed, the test head is retracted, the clapping device is lowered, and the U bend pipe is placed on the belt conveyor.
Carry it into the dehydration / drying device. When the dehydration and drying of the U-bend pipe is completed, it is carried into the pipe end cutting / shape correction platen device by the belt conveyor, transferred to the lifting belt conveyor provided on the platen, and conveyed to the platen. . Then, the elevating belt conveyor is lowered to place the U-bend pipe on the surface plate, and the shape is corrected. After the shape correction, the U-bend pipe is clamped and fixed at a predetermined position, and then the pipe end is cut by the pipe end cutting device. After the cutting is completed, the elevating belt conveyor is raised again, the U-bend pipe on the surface plate is placed on the belt conveyor, and the pipe is chamfered to the pipe end chamfering device. The U-bend pipe sent by the belt conveyor stops at the chamfering position, and the U-bend pipe is fixed by the clamp device.
After that, the chamfering machine body that can move back and forth and left and right moves and chamfers one by one. After chamfering, the U-bend pipe is conveyed by a belt conveyor,
Carried to inspection / cleaning equipment. The U-bend pipe on the conveyed belt conveyor is inspected and cleaned by elevating the skid to a predetermined height. When the inspection / cleaning is completed, the lifting skid is lowered, the U-bend pipe is placed on the belt conveyor, and sent to the next process.
第2図〜第7図はこの発明に係る各装置の基本構成例を
示すもので、第2図はこの発明のリフター付き台車式ラ
ック装置を示す概略斜視図、第3図は同上湾曲部熱処理
装置を示す概略斜視図、第4図は同上耐圧試験装置を示
す概略斜視図、第5図は同上管端切断・形状修正定盤装
置を示す概略斜視図、第6図は同上管端面装置を示す概
略斜視図、第7図は同上検査・クリーニング装置を示す
概略斜視図である。 リフター付き台車式ラック装置は第2図に示すごとく、
レール(11)の複数の台車(10)上にUベンド管(1)のピッ
チ間隔に応じてモータにより左右に移動可能な移動式ラ
ック(12)と、該ラックに近接してモータにより昇降可能
に設けたリフター(14)が設置されており、Uベンド管
(1)はラック(12)に段積みして貯溜され、リフター(14)
を上昇させることによって上から順に1本づつ取出せる
構造となっている。 Uベンド管の湾曲部熱処理装置は第3図に示すごとく、
Uベンド管の平行管部の軸長方向に敷設したレール(20)
上にモータ駆動方式の移動式の熱処理装置本体(21)が載
置され、さらに同レール(20)上に複数の移動式スキッド
(22)が載置されている。(23)は通電チャックである。 すなわち、この湾曲部熱処理装置は横行起重機(19)にて
搬送されてくるUベンド管(1)の長さに応じて熱処理装
置本体(21)の位置と、移動式スキッド(22)の材料受け位
置が可変となっている。 横行起重機(19)にて搬送されてきたUベンド管(1)は熱
処理装置本体(21)と移動式スキッド(22)上に載置され、
通電チャック(23)にて湾曲部が熱処理される。 耐圧試験装置は第4図に示すごとく、所望の間隔を隔て
て並設したベルトコンベア(35)、該コンベアに近接して
設置した昇降式クランプ装置(36)、前後動可能な耐圧テ
ストヘッド(37)とから構成され、昇降式クランプ装置(3
6)は開閉式クランプ爪(38)を有し、垂直シリンダー(39)
にて支持されており、耐圧テストヘッド(37)は台板(31)
上に設けた水平シリンダー(32)にて前後動可能に設けら
れている。無論テストヘッド(37)もUベンド管(1)のピ
ッチに応じて間隔を変えられるようになっている。 この耐圧試験装置の入口には該装置のベルトコンベア(3
5)と同一方向に搬入用ベルトコンベア(33)が連設されて
いる。 熱処理装置から搬送されてきたUベンド管(1)はまず搬
入用ベルトコンベア(33)上に載置され、該ベルトコンベ
アにて耐圧試験装置のベルトコンベア(35)上に移載され
て所定の位置に停止せしめ、昇降式クランプ装置(36)に
てクランプ固定した後、水平シリンダー(32)にて耐圧テ
ストヘッド(37)を前進させて耐圧試験を行なう。 耐圧試験が終了すると、耐圧テストヘッド(37)を後退さ
せてUベンド管(1)より離隔し、昇降式クランプ装置(3
6)のクランプ爪(38)を開放すると共にベルトコンベア(3
5)上面より低い位置に下降させてUベンド管(1)をベル
トコンベア(35)上へ載せて次の脱水乾燥装置へ搬送す
る。 脱水乾燥装置ではエアー噴射装置(図示せず)によりU
ベンド管内へエアーを通して管内の水抜きと乾燥を行な
う。 管端切断・形状修正定盤装置は第5図に示すごとく、定
盤(40)に管搬送方向に相平行して設けた溝(41)に昇降式
ベルトコンベア(42)を設置し、この昇降式ベルトコンベ
ア(42)は垂直シリンダー(43)にて支持されて定磐(40)の
上面に出没可能となっている。 定盤(40)の側端部には管切用のクランプ装置(44)が設置
され、このクランプ装置(44)はクランプ爪(45)がラック
ピニオン機構等により開閉可能となっている。 このクランプ装置(44)に近接して設置されている管端切
断装置(46)は、両管端を同時に切断できるように油圧シ
リンダー等により駆動される移動式台車(47)に2台の管
端切断機本体(48)が搭載されている。 耐圧試験装置よりベルトコンベアで送られてきたUベン
ド管(1)は、定盤(40)の面一より上方に突出させている
昇降式ベルトコンベア(42)上に移載され、適当な位置で
該昇降式ベルトコンベア(42)を停止せしめた後、該昇降
式ベルトコンベア(42)を垂直シリンダー(43)にて下降さ
せて定盤(40)上面より下方に埋設させて、Uベンド管を
定盤(40)上に載置する。この定盤(40)上でUベンド管
(1)の形状修正作業を行なう。 形状修正作業を終えると、クランプ装置(44)のクランプ
爪(45)にて材料を固定した状態で、2台の管端切断機本
体(48)を管に近付けて同時に管端部を切断する。 このようにして管の形状修正・管端切断が終了すると、
昇降式ベルトコンベア(42)を再び上昇させて定盤(40)上
のUベンド管(1)を該昇降式ベルトコンベア(42)にて搬
出し、次工定の面取装置間を結ぶ搬送コンベアに移載す
る。 管端面取装置は第6図に示すごとく、相平行するベルト
コンベア(50)と、該ベルトコンベア(50)に近接して設け
たクランプ装置(51)と、面取機本体(52)とから構成さ
れ、クランプ装置(51)はベルトコンベア(50)上の管を位
置決めして固定できるように、機台(53)上に手動もしく
は自動でコンベアベルト(50)に沿って移動可能な機構と
なっており、かつ2個一対の開閉式クランプ爪(54)を備
えている。 また、面取機本体(52)はバイト(59)の回転機構および管
端部クランプ機構を内蔵し、機台(55)上に設置した水平
シリンダー(56)にてベルトコンベア(50)と平行に移動可
能に設けられた可動台(5)上に、水平シリンダー(58)に
て前後進可能に設置されている。すなわち、面取機本体
(52)は前後左右に移動可能となっている。無論、面取機
本体(52)の前後および左右移動機構はここに示すものに
限定されるものではない。 管端切断・形状修正定盤切装置から搬送用コンベア(49)
にて送られてきたUベンド管(1)は面取装置のベルトコ
ンベア(50)上に移載されて面取り位置に停止させ、クラ
ンプ装置(51)にて管の固定と芯合せを行なう。 しかる後、面取機本体(52)を前進させてまず片方の面取
りを行ない、続いて面取機本体(52)をベルトコンベア(5
0)に沿って移動させて他方の面取りを行なう。 面取が終了すると、ベルトコンベア(50)にてUベンド管
(1)を搬出し、次工程の検査・クリーニング装置間を結
ぶ搬送用コンベアに移載する。 検査・クリーニング装置は第7図に示すごとく、作業デ
ッキ(61)に所望の間隔を隔てて並設したベルトコンベア
(62)と、該ベルトコンベア(62)に沿って並設した昇降式
スキッド(63)とから構成され、各昇降式スキッド(63)は
上面にシリンダー(67)駆動の開閉式Vブロック(64)を有
し、垂直シリンダー(65)にて昇降可能に支持されてい
る。 管端面取装置から搬送用コンベア(66)にて搬送されてき
たUベンド管(1)は検査・クリーニング装置のベルトコ
ンベア(62)上に移載されると同時に、検査・クリーニン
グ位置まで搬送して停止させ、しかる後昇降式スキッド
(63)を上昇させてVブロック(64)にて管を受けて、作業
者が検査・クリーニングし易い高さまで上昇させて作業
を行なう。 検査・クリーニング作業が終了すると、昇降式スキッド
(63)を下降してUベンド管(1)を再びベルトコンベア(6
2)上に載置し、次工程(梱包)へ送る。 なお、上記精整処理装置におけるベルトコンベアは多数
列並設されており、また各装置の作動制御は制御盤(図
示せず)にて遠隔操作により行なわれる仕組みとなって
いることはいうまでもない。2 to 7 show an example of the basic configuration of each device according to the present invention. FIG. 2 is a schematic perspective view showing a truck type rack device with a lifter according to the present invention, and FIG. FIG. 4 is a schematic perspective view showing the apparatus, FIG. 4 is a schematic perspective view showing the same pressure resistance testing apparatus, FIG. 5 is a schematic perspective view showing the same pipe end cutting / shape correcting platen apparatus, and FIG. 6 is the same pipe end surface apparatus. FIG. 7 is a schematic perspective view showing the same, and FIG. 7 is a schematic perspective view showing the inspection / cleaning device. As shown in Fig. 2, the trolley-type rack device with lifter is
A movable rack (12) that can be moved left and right by a motor according to the pitch interval of the U-bend pipe (1) on a plurality of carriages (10) on the rail (11), and can be moved up and down by a motor close to the rack. The lifter (14) installed in the
(1) is stacked on the rack (12) and stored, and the lifter (14)
The structure is such that one can be taken out one by one from the top by raising. As shown in FIG. 3, the bending portion heat treatment apparatus for the U-bend pipe is
Rails laid in the axial direction of the parallel pipe part of the U-bend pipe (20)
A motor-driven mobile heat treatment unit body (21) is placed on top of it, and multiple mobile skids are mounted on the same rail (20).
(22) is placed. (23) is an electric chuck. That is, this bending part heat treatment device is arranged such that the position of the heat treatment device main body (21) and the material receiving of the movable skid (22) according to the length of the U-bend pipe (1) conveyed by the transverse hoist (19). The position is variable. The U-bend pipe (1) conveyed by the traverse hoist (19) is placed on the heat treatment apparatus body (21) and the movable skid (22),
The curved portion is heat-treated by the current-carrying chuck (23). As shown in FIG. 4, the pressure resistance test device is a belt conveyor (35) arranged side by side at a desired interval, a lifting clamp device (36) installed close to the conveyor, and a pressure resistance test head that can be moved back and forth ( 37) and a lifting clamp device (3
6) has a retractable clamp claw (38) and a vertical cylinder (39)
The pressure resistant test head (37) is supported by the base plate (31).
It is provided so that it can be moved back and forth by a horizontal cylinder (32) provided above. As a matter of course, the test head (37) can also change its interval according to the pitch of the U-bend pipe (1). At the entrance of this pressure resistance test device, the belt conveyor (3
The carry-in belt conveyor (33) is connected in the same direction as 5). The U-bend pipe (1) conveyed from the heat treatment apparatus is first placed on the carry-in belt conveyor (33), and is transferred onto the belt conveyor (35) of the pressure resistance test apparatus by the belt conveyor and is transferred to the predetermined location. After being stopped at the position and clamped by the lifting clamp device (36), the withstand pressure test head (37) is advanced with the horizontal cylinder (32) to perform the withstand pressure test. When the pressure resistance test is completed, the pressure resistance test head (37) is retracted to separate it from the U bend pipe (1), and the lifting clamp device (3
Release the clamp claw (38) of (6) and remove the belt conveyor (3
5) Lower it to a position lower than the upper surface, place the U-bend pipe (1) on the belt conveyor (35), and convey it to the next dehydration / drying device. In the dehydration / drying device, U is blown by an air injection device (not shown)
Air is passed through the bend pipe to drain and dry the pipe. As shown in FIG. 5, the pipe end cutting / shape correcting platen device has an elevating belt conveyor (42) installed in a groove (41) provided in the platen (40) in parallel with the pipe conveying direction. The elevating belt conveyor (42) is supported by the vertical cylinder (43) so that it can be retracted from the upper surface of the fixed van (40). A clamp device (44) for cutting a pipe is installed at a side end of the surface plate (40), and a clamp claw (45) of the clamp device (44) can be opened and closed by a rack and pinion mechanism or the like. The pipe end cutting device (46) installed close to the clamp device (44) has two pipes on a movable carriage (47) driven by a hydraulic cylinder or the like so that both pipe ends can be cut at the same time. The body of the edge cutter (48) is installed. The U-bend pipe (1) sent from the pressure tester by the belt conveyor is transferred onto the lifting belt conveyor (42) protruding above the flush surface of the surface plate (40) and placed at an appropriate position. After stopping the elevating belt conveyor (42) with, the elevating belt conveyor (42) is lowered by the vertical cylinder (43) to be buried below the upper surface of the surface plate (40), and a U bend pipe Is placed on the surface plate (40). U bend tube on this surface plate (40)
Perform the shape correction work of (1). When the shape modification work is completed, the two pipe end cutting machine bodies (48) are brought close to the pipe while the material is fixed by the clamp claws (45) of the clamp device (44), and the pipe ends are cut at the same time. . In this way, when the shape correction and pipe end cutting of the pipe are completed,
The lifting belt conveyor (42) is raised again, and the U-bend pipe (1) on the surface plate (40) is carried out by the lifting belt conveyor (42), and the chamfering device for the next work is connected. Transfer to a conveyor. As shown in FIG. 6, the pipe end chamfering device comprises a belt conveyor (50) parallel to each other, a clamp device (51) provided in proximity to the belt conveyor (50), and a chamfering machine main body (52). The clamp device (51) is configured to be movable along the conveyor belt (50) manually or automatically on the machine base (53) so that the pipe on the belt conveyor (50) can be positioned and fixed. And is provided with a pair of two open / close type clamp claws (54). In addition, the chamfering machine body (52) has a built-in rotation mechanism for the bite (59) and a pipe end clamp mechanism, and is parallel to the belt conveyor (50) with a horizontal cylinder (56) installed on the machine base (55). A horizontal cylinder (58) is installed on the movable table (5) that is movably mounted on the carriage so that it can move forward and backward. That is, the chamfering machine body
(52) can be moved back and forth and left and right. Of course, the front-back and left-right movement mechanisms of the chamfering machine main body (52) are not limited to those shown here. Pipe end cutting / shape correction Surface plate cutting device to conveyor (49)
The U-bend pipe (1) sent by is transferred onto the belt conveyor (50) of the chamfering device and stopped at the chamfering position, and the clamp device (51) fixes and aligns the pipe. After that, the chamfering machine main body (52) is advanced to first chamfer one side, and then the chamfering machine main body (52) is moved to the belt conveyor (5
Move along (0) and chamfer the other side. When chamfering is completed, the U-bend pipe is installed on the belt conveyor (50).
Unload (1) and transfer it to the conveyor for the connection between the inspection and cleaning devices in the next process. As shown in FIG. 7, the inspection / cleaning device is a belt conveyor which is arranged in parallel on the work deck (61) at a desired interval.
(62) and an elevating skid (63) arranged in parallel along the belt conveyor (62), and each elevating skid (63) has a cylinder (67) driven open / close V block (64) on the upper surface. ), And is supported by a vertical cylinder (65) so that it can be raised and lowered. The U-bend pipe (1) transferred from the pipe end chamfering device by the transfer conveyor (66) is transferred onto the belt conveyor (62) of the inspection / cleaning device and at the same time transferred to the inspection / cleaning position. Stop and then lift skid
(63) is raised and the pipe is received by the V block (64), and the work is performed by raising it to a height at which an operator can easily perform inspection and cleaning. When the inspection and cleaning work is completed, the lifting skid
(63) and lower the U bend pipe (1) to the belt conveyor (6
2) Place on top and send to the next process (packing). It is needless to say that the belt conveyors in the above-mentioned adjustment processing device are arranged in parallel in a large number of rows, and the operation control of each device is carried out by remote control on a control panel (not shown). Absent.
以上説明したごとく、この発明によれば、Uベンド管の
湾曲部の処理から熱検査・クリーニングまでの一連の工
程をオンライン化したことにより、ハンドリング工数を
大幅に削減できる上、高能率にUベンド管を処理でき
る。また、ハンドリング工数の削減により製品の歪みや
疵の発生を減少でき、品質も安定する等の効果を奏す
る。As described above, according to the present invention, since a series of steps from the processing of the curved portion of the U-bend pipe to the thermal inspection / cleaning are brought online, the handling man-hours can be significantly reduced and the U-bend can be highly efficiently performed. Can handle tubes. Further, by reducing the number of handling steps, it is possible to reduce the occurrence of product distortion and flaws, and to stabilize the quality.
第1図はこの発明に係るUベンド管の精整処理設備と管
の流れを示すブロック図である。 第2図は同上リフター付き台車式ラック装置の一例を示
す概略斜視図である。 第3図はこの発明の熱処理装置の一例を示す概略斜視図
である。 第4図は同上耐圧試験装置の一例を示す概略斜視図であ
る。 第5図は同上曲り修正・管切装置の一例を示す概略斜視
図である。 第6図は同上面取装置の一例を示す概略斜視図である。 第7図は同上検査・クリーニング装置の一例を示す概略
斜視図である。 第8図は従来の熱処理装置例を示す概略斜視図である。 第9図は同じく従来の耐圧試験装置例を示す概略斜視図
である。 1……Uベンド管、12……移動ラック 14……リフター、19……横行式起重機 21……熱処理装置本体、22……移動式スキッド 33,35,50,60……ベルトコンベア 37……耐圧テストヘッド、40……定盤 42……昇降式ベルトコンベア 46……管端切断装置、48……管端切断機本体 52……面取機本体、63……昇降式スキッドFIG. 1 is a block diagram showing a U-bend pipe adjusting processing facility and a pipe flow according to the present invention. FIG. 2 is a schematic perspective view showing an example of a truck type rack device with a lifter. FIG. 3 is a schematic perspective view showing an example of the heat treatment apparatus of the present invention. FIG. 4 is a schematic perspective view showing an example of the above withstand voltage test apparatus. FIG. 5 is a schematic perspective view showing an example of the same bending correction / tube cutting device. FIG. 6 is a schematic perspective view showing an example of the same chamfering apparatus. FIG. 7 is a schematic perspective view showing an example of the inspection / cleaning device of the above. FIG. 8 is a schematic perspective view showing an example of a conventional heat treatment apparatus. FIG. 9 is a schematic perspective view showing an example of a conventional pressure resistance testing device. 1 ... U bend pipe, 12 ... moving rack 14 ... lifter, 19 ... transverse hoist 21 ... heat treatment apparatus main body, 22 ... movable skid 33,35,50,60 ... belt conveyor 37 ... Pressure resistant test head, 40 ... Surface plate 42 ... Elevating belt conveyor 46 ... Pipe end cutting device, 48 ... Pipe end cutting machine body 52 ... Chamfering machine body, 63 ... Elevating skid
───────────────────────────────────────────────────── フロントページの続き (72)発明者 平尾 茂 兵庫県尼崎市東向島西之町1番地 住友金 属工業株式会社鋼管製造所内 (72)発明者 滝本 義一 兵庫県尼崎市東向島西之町1番地 住友金 属工業株式会社鋼管製造所内 (56)参考文献 特開 昭60−201843(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Shigeru Hirao 1st Nishinomachi, Higashimukaijima, Amagasaki City, Hyogo Prefecture Sumitomo Metal Industries, Ltd. Steel Pipe Works (72) Yoshiichi Takimoto 1st Nishinocho, Higashimukaijima, Amagasaki City, Hyogo Prefecture Sumitomo Kinzoku Kogyo Co., Ltd. Steel pipe manufacturing plant (56) Reference JP-A-60-201843 (JP, A)
Claims (1)
正、管端切断、管端面取、検査およびクリーニングの各
工程からなり、Uベンド管をその平行管部軸長方向と直
交する方向へ搬送するUベンド管のオンライン精整処理
設備であって、上流側から複数のUベンド管を段積状に
貯溜するリフター付き台車式ラック装置、Uベンド管の
長さに応じてUベンド管の平行管部軸長方向に移動可能
な熱処理装置本体と移動式スキッドとを有する湾曲部熱
処理装置、昇降式クランプ装置と前後進可能な耐圧テス
トヘッドとを有する耐圧試験装置、脱水乾燥装置、昇降
式ベルトコンベアを備えた定盤とクランプ装置および管
端切断装置とを有する管端切断・形状修正定盤装置、ク
ランプ装置と管端部クランプ機構,バイト前後進機構お
よび左右移動機構を備えた面取機本体とを有する管端面
取装置、昇降式スキッドを有する検査・クリーニング装
置を順次連設してなり、前記リフター付き台車式ラック
装置と耐圧試験装置との間の管搬送手段に横行起重機
を、耐圧試験装置以降の管搬送手段にベルトコンベアを
用いる方式となしたことを特徴とするUベンド管の精整
処理設備。1. A process comprising heat treatment, pressure resistance test, shape correction, pipe end cutting, pipe end chamfering, inspection and cleaning of a U-bend pipe, wherein the U-bend pipe is oriented in a direction orthogonal to the axial direction of the parallel pipe portion. An on-line refining treatment facility for U-bend pipes to be transported, which is a truck-type rack device with a lifter that stores a plurality of U-bend pipes in a stack from the upstream side, and a U-bend pipe Curved part heat treatment device having a heat treatment device main body that is movable in the axial direction of the parallel pipe part and a movable skid, pressure resistance test device having a lifting clamp device and a pressure resistance test head that can move forward and backward, a dehydration drying device, and a lifting motion device. A pipe end cutting / shape correcting platen device having a platen equipped with a belt conveyor, a clamp device, and a pipe end cutting device, a clamp device and a pipe end clamp mechanism, a tool forward / backward moving mechanism, and a horizontal moving mechanism A pipe end chamfering device having a chamfering machine main body and an inspection / cleaning device having an elevating skid are sequentially arranged in series, and traverses the pipe conveying means between the dolly rack device with lifter and the pressure resistance test device. A U-bend pipe adjusting processing facility, wherein the hoist is a system that uses a belt conveyor as a pipe conveying means after the pressure resistance test device.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8040288A JPH0616976B2 (en) | 1988-03-31 | 1988-03-31 | U-bend pipe finishing equipment |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8040288A JPH0616976B2 (en) | 1988-03-31 | 1988-03-31 | U-bend pipe finishing equipment |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01252331A JPH01252331A (en) | 1989-10-09 |
| JPH0616976B2 true JPH0616976B2 (en) | 1994-03-09 |
Family
ID=13717296
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8040288A Expired - Fee Related JPH0616976B2 (en) | 1988-03-31 | 1988-03-31 | U-bend pipe finishing equipment |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0616976B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR100667466B1 (en) * | 2005-08-11 | 2007-01-10 | 주식회사 씨티씨 | Brightness nondestructive inspection system of pipe |
| JP4506766B2 (en) * | 2007-02-22 | 2010-07-21 | 住友金属工業株式会社 | U-bend pipe marking method and online finishing equipment |
| CN107263123A (en) * | 2017-08-09 | 2017-10-20 | 盘锦奥德燃气装备制造有限公司 | Voltage regulation batch meter machining production line |
-
1988
- 1988-03-31 JP JP8040288A patent/JPH0616976B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01252331A (en) | 1989-10-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108381196B (en) | Automatic flange processing production line | |
| CN110340671B (en) | Automatic cutting and welding equipment for integrated plates | |
| JPH04220184A (en) | Device for coupling at least 2 sheets with at least 1 welding seam formed by laser beam welding device | |
| CN109551128B (en) | An automated production line for steel frames | |
| CN111653510B (en) | Graphite boat transporting equipment and transporting method | |
| CN110540027A (en) | Intelligent conveying system and method | |
| CN110480401A (en) | A kind of flexible automation processing unit for fork truck gantry mounting support seat processing | |
| CN110091175A (en) | A kind of welded molding machine of square pile end plate bending | |
| JP2866778B2 (en) | Laser processing equipment | |
| EP0314632B1 (en) | Apparatus for handling sheets of glass or other materials and to be used in lines for the cutting and working of said sheets | |
| CN108097825B (en) | Automatic conveying system of stamping production line and its working method | |
| CN116787016A (en) | Unmanned automatic welding system | |
| CN113400019B (en) | Automatic punching shear production line | |
| CN110171710B (en) | Material box feeding device and sorting equipment | |
| JPH0616976B2 (en) | U-bend pipe finishing equipment | |
| CN208005611U (en) | End carriage assembly equipment | |
| JP3735216B2 (en) | Work positioning method | |
| CN113732529A (en) | Laser cutting system and method for special-shaped beam | |
| CN110315484A (en) | End carriage assembly equipment | |
| CN113210744A (en) | Steel plate cutting device and steel plate cutting method thereof | |
| CN214770301U (en) | Stirrup welding production line | |
| CN109910728B (en) | Pneumatic pitch mechanism clamping transport device | |
| CN215709994U (en) | Automatic arrange connection piece equipment | |
| CN210703830U (en) | Flexible automatic processing unit for processing forklift portal support | |
| CN222903215U (en) | An automatic cut-to-length and marking device for rolled pipes |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| LAPS | Cancellation because of no payment of annual fees |