JPH0619130B2 - Method of constructing artificial land underwater - Google Patents
Method of constructing artificial land underwaterInfo
- Publication number
- JPH0619130B2 JPH0619130B2 JP60295137A JP29513785A JPH0619130B2 JP H0619130 B2 JPH0619130 B2 JP H0619130B2 JP 60295137 A JP60295137 A JP 60295137A JP 29513785 A JP29513785 A JP 29513785A JP H0619130 B2 JPH0619130 B2 JP H0619130B2
- Authority
- JP
- Japan
- Prior art keywords
- sand
- earth
- cloth
- embankment
- artificial land
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 11
- 239000004744 fabric Substances 0.000 claims description 58
- 239000004576 sand Substances 0.000 claims description 35
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 26
- 238000009415 formwork Methods 0.000 claims description 22
- 238000010276 construction Methods 0.000 claims description 16
- 239000000463 material Substances 0.000 claims description 10
- 239000000945 filler Substances 0.000 claims description 5
- 230000002787 reinforcement Effects 0.000 claims description 3
- 230000004931 aggregating effect Effects 0.000 claims description 2
- 239000002759 woven fabric Substances 0.000 claims description 2
- 238000005086 pumping Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 description 5
- 239000013049 sediment Substances 0.000 description 4
- 230000000717 retained effect Effects 0.000 description 2
- -1 sheet pile Substances 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 229920003002 synthetic resin Polymers 0.000 description 2
- 239000000057 synthetic resin Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000000701 coagulant Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Landscapes
- Revetment (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) この発明は水中に人工土地を造築することを目的とし
た、水中における人工土地造築方法に関する。Description: TECHNICAL FIELD The present invention relates to a method for constructing an artificial land underwater for the purpose of constructing an artificial land underwater.
(従来の技術) 従来海岸等の埋立てに際しては、所定の位置へ矢板等を
植設して締切工事を行った後、外側から締切囲内へサン
ドポンプで土砂を送り込み、土地を造成していた。(Prior art) Conventionally, when reclaiming a coast, etc., a sheet pile or the like was planted at a predetermined position to perform a deadline, and then sand was pumped from the outside into the deadline by a sand pump to create land. .
(発明が解決しようとする課題) 従来技術によれば水中土地の造築に際しては、先づ外囲
を構築する為に、鋼、矢板又はコンクリートシートパイ
ルなどを外囲位置に密接打設しなければならなかったの
で、打設工事に多大の工費、労力および日数を必要とす
るのみならず、浚渫船を出し入れするには、出入口設備
を完備しなければならず、矢板等を自立させる為には、
水深に比例した打込み深さを必要とし、かつ地盤が耐え
得るものでなければならないなど、幾多の問題点があっ
た。(Problems to be Solved by the Invention) According to the prior art, when constructing an underwater land, steel, sheet pile, concrete sheet pile, or the like must be closely cast in the surrounding position in order to construct the surrounding structure first. Since it had to be carried out, not only a great deal of construction cost, labor and days were required for the construction work, but also in order to get the dredging ship in and out, it was necessary to complete the entrance and exit facilities, and in order to make the sheet pile etc. self-supporting. ,
There were a number of problems, such as that the driving depth was required in proportion to the water depth and that the ground had to withstand.
(課題を解決する為の手段) 然るにこの発明は矢板等に代えて布型枠を用い、布型枠
内に充填物を充填することによって逐次締切りしたもの
で、比較的簡単容易に広範囲の締切りが可能であり、前
記問題点を解決したものである。(Means for Solving the Problems) However, according to the present invention, a cloth form is used in place of the sheet pile, and the cloth form is sequentially filled with a filling material. It is possible to solve the above problems.
即ちこの発明は、人工土地造築予定位置の外囲に所定間
隔で対向設置した織布の下端部を互いに連結してなり、
かつ対向布に所定間隔で引張材を固定してなる布型枠を
浮子を連結して縦設し、前記布型枠内へ充填物を送入し
て当該型枠の下端部を水底に定着させる。ついで前記型
枠で囲まれた地域の内側へ土砂を送り込んでこれを水中
へ盛り上げる。前記土砂の盛り上げにつれて、盛土砂の
斜面を形成し、前記布型枠内に充填物を入れつつ、布型
枠を繰り出して前記盛土砂の斜面に近付ける。盛土砂を
所定の高さまで盛土すると共に、前記盛土砂の斜面上
を、充填物を充填した前記布型枠で被覆し、前記盛土砂
の外面を補強することを特徴とした水中における人工土
地造築方法である。前記において、盛土砂に際し斜面に
アンカーを設けて布型枠の傾斜を変えると、安息角より
も著しい大きい角度で斜面を形成することができる。ま
た土砂の盛上げに際して凝集材を混入すれば、盛土基礎
を一層堅固にすることができる。また布型枠の布は、例
えば合成樹脂繊維によって織成した布を用い、織目は適
宜定める。然して型枠にする為には、所定間隔(例えば
30cm)に二枚の布を並設し、各対向布間に所定間隔で
引張材を設け、土砂等を充填した際に並設した布間が過
度に開かないようにしてある。また充填材を入れつつ布
型枠を繰り出すと、布型枠の下端側が水底に沿って定置
されるので、布型枠の下端側は自然に定着されることな
る。また土砂の盛土に際し形成される斜面には、前記充
填物を入れた布型枠を被覆すれば、きわめて堅固に補強
できると共に、必要に応じ、前記被覆布型枠上へコンク
リートブロックを敷設すれば、一層堅固に補強される。That is, the present invention is formed by connecting the lower end portions of the woven fabrics facing each other at a predetermined interval to the outer periphery of the artificial land construction planned position,
In addition, a cloth form made by fixing tension members to the opposite cloth at a predetermined interval is vertically installed by connecting a float, and the filling material is fed into the cloth form to fix the lower end of the form to the bottom of the water. Let Then, the earth and sand are sent to the inside of the area surrounded by the formwork, and the earth and sand are piled up in the water. As the earth and sand are piled up, a slope of the embankment is formed, and the cloth form is fed out to approach the slope of the embankment while putting the filling material in the cloth form. While embankment the embankment to a predetermined height, the slope of the embankment is covered with the cloth form filled with a filler, the artificial surface construction in water characterized by reinforcing the outer surface of the embankment It is a construction method. In the above, if an anchor is provided on the slope to change the slope of the cloth form when the embankment is sanded, the slope can be formed at an angle significantly larger than the angle of repose. In addition, the embankment foundation can be made even more solid by incorporating an aggregating material during the embankment of the earth and sand. The cloth of the cloth form frame is, for example, a cloth woven of synthetic resin fibers, and the texture is appropriately determined. However, in order to form a formwork, two cloths are arranged side by side at a predetermined interval (for example, 30 cm), tension materials are provided at a predetermined interval between each opposing cloth, and the space between the cloths arranged side by side when filling with sand or the like Does not open too much. Further, when the cloth form is unrolled while the filler is put in, the lower end side of the cloth form frame is placed along the water bottom, so that the lower end side of the cloth form frame is naturally fixed. In addition, the slope formed during the embankment of earth and sand can be extremely firmly reinforced by covering with a cloth formwork containing the filler, and if necessary, a concrete block can be laid on the covering cloth formwork. , More reinforced.
前記布型枠への充填物としては、土砂、砂利又はコンク
リートなどが考えられる。また盛土は土砂をサンドポプ
で放出し、或いは搬送船を使用して採取地から必要箇所
に運ぶのである。通常布型枠は環状に配設して外囲を構
成し、又は海岸等へ弧状に外囲を作り、或いは海岸と、
沖合の島との間を結びその中間へ土砂を盛り上げるな
ど、従来矢板等の締切で知られている工事に代えて用い
ることができる。The filling material for the cloth formwork may be earth, sand, gravel, concrete, or the like. In addition, the embankment releases sand and sand with a sand pop, or uses a carrier ship to carry it from the collection site to the required place. Usually the cloth formwork is arranged in an annular shape to form an outer circumference, or an outer circumference is formed in an arc shape to the coast, or with the coast,
It can be used in place of the work conventionally known for deadlines such as sheet piles, such as connecting offshore islands and raising soil in the middle.
(作用) この発明は、布型枠を用いたので、型枠を水底に定着
し、又は盛土の斜面に被覆する際には、単に布を繰り出
し、必要な充填材を充填し、又は浮子を移動するのみで
所定の位置に布型枠が設置される。また布型枠の上端部
は浮子によって支持されている為に、浮子から切り放し
たり、又は重錘を連結して、型枠上端部を水中へ沈下さ
せることができる。(Operation) Since the present invention uses the cloth form, when fixing the form to the bottom of the water or covering the slope of the embankment, simply unwind the cloth, fill the necessary filler, or float the float. The cloth form is installed at a predetermined position only by moving. Further, since the upper end of the cloth formwork is supported by the float, the upper end of the formwork can be submerged in water by being cut off from the float or by connecting a weight.
(実施例) 人工土地造築予定位置を中心にして、その外側へ多数の
浮子1、1aを連結して布型枠2の一側を支持させる。
布型枠2には、合成樹脂製の織布3、3aを所定間隔
(例えば30cm)に対向させると共に、一定間隔毎に引
張材13を定着して、過度の膨化を阻止している。前記
織布3、3aの上端部は必要長さ宛巻軸4、4aに巻き
込まれており、必要に応じて巻き出すようにしてある。
前記のようにして布型枠2、2aを予定水域へ敷設した
ならば、先づ布型枠2、2a内へ浚渫船5からホース6
で土砂14を水と共に布型枠2、2a内へ圧送する。布
型枠2、2a内へ入った土砂水の水は布目から外部へ排
出されるので、結局土砂14だけ第2図のように布型枠
2、2aの下方へ溜る。そこで浮子1、1aを若干移動
すると共に、布型枠2、2aを必要長さだけ繰り出し、
その下端土砂部を水底7上へ定置する。このようにし
て、外囲が保定されたならば、浚渫船5からのホース6
端を第3図のように左右布型枠2、2aの中央部に位置
させ、土砂水を移送すれば、土砂8は第3図のように盛
り上げられる。前記のようにして、土砂盛りの外側下部
が前記布型枠2、2aの定着部に達したならば、布型枠
2、2aにも土砂水を供給すると共に、布型枠2、2a
若保を繰り出し乍ら、若保近接させて、土砂の詰った部
分を土砂盛斜面上へ被覆する。前記操作を繰り返して、
第4図のようにほぼ予定高さに達したならば、前記土砂
入り布型枠2、2aの上部へコンクリートブロック9を
敷設し、必要に応じ護岸ブロック10を構築し、更に土
砂を盛り上げて人工土地11を完成する。(Example) A large number of floats 1 and 1a are connected to the outer side of the planned artificial land construction position to support one side of the cloth form frame 2.
Woven cloths 3 and 3a made of synthetic resin are opposed to the cloth form frame 2 at a predetermined interval (for example, 30 cm), and tension members 13 are fixed at regular intervals to prevent excessive expansion. The upper ends of the woven cloths 3 and 3a are wound around the required length winding shafts 4 and 4a, and are unwound as necessary.
After the cloth formwork 2 or 2a has been laid in the planned water area as described above, the dredger 5 and the hose 6 are first put into the cloth formwork 2 or 2a.
The sand 14 is pumped together with water into the cloth molds 2 and 2a. Since the water of the earth and sand water that has entered the cloth form frames 2 and 2a is discharged to the outside from the cloth, only the earth and sand 14 accumulate below the cloth form frames 2 and 2a as shown in FIG. Therefore, while moving the floats 1 and 1a slightly, the cloth molds 2 and 2a are extended by a required length,
The bottom sediment is placed on the water bottom 7. In this way, the hose 6 from the dredging vessel 5 will be retained once the envelope has been retained.
As shown in FIG. 3, the ends are located in the central portions of the left and right cloth molds 2 and 2a, and the sediment water is transferred, so that the sediment 8 is heaped up as shown in FIG. As described above, when the lower part of the earth and sand heap reaches the fixing portion of the cloth molds 2, 2a, the sand mold water is supplied to the cloth molds 2, 2a as well as the cloth molds 2, 2a.
When Wakaho is extended, it is brought close to Wakaho, and the portion where the earth and sand are clogged is covered on the slope of earth and sand. Repeat the above operation,
As shown in FIG. 4, when the planned height is reached, a concrete block 9 is laid on top of the soil-filled cloth formwork 2, 2a, a revetment block 10 is constructed if necessary, and the earth and sand are further raised. Complete the artificial land 11.
前記において、第3図中鎖線図示のように、布型枠の一
部へアンカー12を設置し、その被覆角度を急にするこ
ともできる。また土砂中へ凝集材又はセメントモルタル
を注入して土砂の固結化を促進することもできる。前記
実施例においては、浚渫船からホースで土砂を移送した
が、土砂の搬送船を使用し、水上輸送することもでき
る。また砂利等をコンベア(フロート支持)で予定位置
まで運ぶこともできる。このような場合に浮子を沈降す
れば容易に水路ができる。即ちこの発明の方法は、人工
島の造築又は水中築堤その他必要な面積と高さに建造物
を構築する際の人工土地造築に用いることができる。In the above, as shown by the chain line in FIG. 3, it is possible to install the anchor 12 on a part of the cloth form and make the covering angle steep. It is also possible to inject a coagulant or cement mortar into the earth and sand to accelerate the solidification of the earth and sand. In the above-mentioned embodiment, although the earth and sand were transferred from the dredging ship by the hose, it is also possible to use water for transporting the earth and sand for water transfer. It is also possible to carry gravel etc. to a planned position by a conveyor (float support). In such a case, if the float is settled, a water channel can be easily formed. That is, the method of the present invention can be used for artificial island construction or underwater embankment construction or other artificial land construction when constructing a building on a required area and height.
(発明の効果) 即ちこの発明は、布型枠を使用して水中へ外囲を構築
し、外囲内へ土砂等を放出して人工土地としたので、外
囲の構築が簡単容易で比較的短時間に長大な構築ができ
るなどの諸効果がある。また布型枠であるから、定着お
よび移動がきわめて容易であり、造築終期には布型枠を
そのまま補強被覆になし得るなどの実用上諸効果もあ
る。また、布型枠に所定間隔で引張材を固定したので、
布型枠が必要以上に開かず、少ない充填物量で、所望の
外囲の構築及び斜面の補強ができる効果がある。また盛
土の斜面の形成に従って、布型枠に充填物を入れつつ斜
面に近付け、所定の高さまで盛土した後に布型枠で斜面
を被覆するので、盛土砂の斜面を強固に補強できる効果
がある。また、布型枠は浮子を連結して人工地造築予定
位置の外周に縦設するので、予定位置を周りに知らせ、
注意を喚起できるので、安全な工事ができる効果があ
る。(Effect of the invention) That is, according to the present invention, since the outer envelope is constructed in water using the cloth formwork and the earth and sand are discharged into the outer enclosure to make the artificial land, the outer envelope can be constructed easily and relatively easily. There are various effects, such as being able to construct a large-scale in a short time. Further, since it is a cloth form, fixing and movement are extremely easy, and there are various practical effects such that the cloth form can be directly used as a reinforcement coating at the end of construction. Also, since the tension members are fixed to the cloth formwork at predetermined intervals,
There is an effect that the cloth formwork does not open more than necessary and the desired enclosure can be constructed and the slope can be reinforced with a small amount of filling. Further, according to the formation of the slope of the embankment, the filling is put in the cloth formwork to bring it close to the slope, and the slope is covered with the cloth formwork after embankment to a predetermined height, so that the slope of the embankment can be strongly reinforced. . Also, since the cloth formwork is connected vertically to the float and installed vertically on the outer periphery of the artificial ground construction planned position, inform the planned position to the surroundings,
Since it can call attention, it has the effect of enabling safe construction.
次にこの発明の方法は、高度の技術を必要としないの
で、従来技術を習得している作業者ならば、容易かつ急
速に熟練技術者となって作業に従事することができる。Next, since the method of the present invention does not require a high level of skill, an operator who has mastered conventional techniques can easily and rapidly become a skilled engineer to engage in work.
第1図はこの発明の実施例における外囲構築の平面図、
第2図乃至第5図はこの発明の施工順序を示す図で、第
2図は布型枠設置の側面図、第3図は土砂盛開始の側面
図、第4図は土砂盛斜面に補強を施した側面図、第5図
は人工土地完成時の側面図、第6図はこの発明の布型枠
の支持状態を示す一部拡大側面図、第7図は同じく布型
枠の一部拡大斜視図、第8図は同じく布型枠に土砂を充
填した際の一部拡大斜視図である。 1、1a……浮子、2、2a……布型枠 4、4a……巻軸、5……浚渫船 7……水底、8……土砂 9……コンクリートブロックFIG. 1 is a plan view of an enclosure construction in an embodiment of the present invention,
2 to 5 are views showing the order of construction of the present invention, FIG. 2 is a side view of cloth formwork installation, FIG. 3 is a side view of starting sand embankment, and FIG. 4 is reinforcement on a slope of earth embankment. Fig. 5 is a side view after the construction, Fig. 5 is a side view when the artificial land is completed, Fig. 6 is a partially enlarged side view showing the support state of the cloth formwork of the present invention, and Fig. 7 is the same part An enlarged perspective view and FIG. 8 are partially enlarged perspective views when the cloth form is filled with earth and sand. 1, 1a ... Float, 2, 2a ... Fabric form 4, 4a ... Reel, 5 ... Dredger 7 ... Water bottom, 8 ... Sediment 9 ... Concrete block
Claims (7)
対向設置した織布の下端部を互いに連結してなり、かつ
対向布に所定間隔で引張材を固定してなる布型枠を浮子
を連結して縦設し、前記布型枠内へ充填物を送入して当
該型枠の下端部を水底に定着させる。ついで前記型枠で
囲まれた地域の内側へ土砂を送り込んでこれを水中へ盛
り上げる。前記土砂の盛り上げにつれて、盛土砂の斜面
を形成し、前記布型枠内に充填物を入れつつ、布型枠を
繰り出して前記盛土砂の斜面に近付ける。盛土砂を所定
の高さまで盛土すると共に、前記盛土砂の斜面上を、充
填物を充填した前記布型枠で被覆し、前記盛土砂の外面
を補強することを特徴とした水中における人工土地増築
方法1. A cloth form made by connecting lower ends of woven fabrics facing each other at a predetermined interval to an outer periphery of a planned construction site of artificial land, and fixing tension members to the facing fabric at a predetermined interval. Is connected vertically with a float, and the filler is fed into the cloth mold to fix the lower end of the mold to the bottom of the water. Then, the earth and sand are sent to the inside of the area surrounded by the formwork, and the earth and sand are piled up in the water. As the earth and sand are piled up, a slope of the embankment is formed, and the cloth form is fed out to approach the slope of the embankment while putting the filling material in the cloth form. Along with embankment up to a predetermined height, the slope of the embankment is covered with the cloth form filled with a filling material to reinforce the outer surface of the embankment to construct an artificial land underwater. Method
て、安息角以上の急傾斜とした特許請求の範囲第1項記
載の水中における人工土地造築方法2. The method for constructing artificial land in water according to claim 1, wherein the slope is formed by setting an anchor on the formwork to make a steep slope of a repose angle or more.
許請求の範囲第1項記載の水中における人工土地造築方
法3. A method for constructing artificial land in water according to claim 1, wherein an aggregating material is mixed when raising the earth and sand.
にコンクリートブロックを敷設した特許請求の範囲第1
項記載の水中における人工土地造築方法4. The outer surface reinforcement is characterized in that a concrete block is laid on a covering in which a mold is filled with earth and sand.
Method for constructing artificial land in water described in paragraph
た特許請求の範囲第1項記載の水中における人工土地造
築方法5. The method for constructing artificial land in water according to claim 1, wherein the filling material is earth, sand, gravel or concrete.
よる圧送又は運搬船による輸送とした特許請求の範囲第
1項記載の水中における人工土地造築方法6. The method for constructing artificial land in water according to claim 1, wherein the transfer of the earth and sand for heaping up is carried out by pumping by a sand pump or by a carrier ship.
請求の範囲第1項記載の水中における人工土地造築方法7. The method for constructing artificial land in water according to claim 1, wherein the cloth formwork is installed in an annular shape or a surrounding shape.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60295137A JPH0619130B2 (en) | 1985-12-26 | 1985-12-26 | Method of constructing artificial land underwater |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60295137A JPH0619130B2 (en) | 1985-12-26 | 1985-12-26 | Method of constructing artificial land underwater |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62153407A JPS62153407A (en) | 1987-07-08 |
| JPH0619130B2 true JPH0619130B2 (en) | 1994-03-16 |
Family
ID=17816756
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60295137A Expired - Fee Related JPH0619130B2 (en) | 1985-12-26 | 1985-12-26 | Method of constructing artificial land underwater |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0619130B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5950809B2 (en) * | 1980-10-07 | 1984-12-11 | 三井建設株式会社 | Artificial islands and their construction methods |
| JPS57104707A (en) * | 1980-12-16 | 1982-06-29 | Hitachi Zosen Corp | Treatment of sludge |
-
1985
- 1985-12-26 JP JP60295137A patent/JPH0619130B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62153407A (en) | 1987-07-08 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US3726950A (en) | Method for producing sub-aqueous and other cast-in-place concrete structures in situ | |
| US1421857A (en) | Method of constructing subaqueous concrete structures | |
| CN103233444A (en) | Underwater riprap foundation bed and side slope erosion resisting structure and construction method thereof | |
| CN111119219B (en) | Reinforced foundation tire membrane structure and construction method thereof | |
| CN107938594A (en) | Deep water mixing dike construction method | |
| CN110295602A (en) | A kind of underwater concrete pouring technique | |
| US5024557A (en) | Method and apparatus for constructing an offshore hollow column | |
| JPH0619130B2 (en) | Method of constructing artificial land underwater | |
| JP3209503B2 (en) | Water intake / discharge equipment underwater construction method | |
| JP3288137B2 (en) | Artificial island construction method | |
| JP3209502B2 (en) | Water intake / discharge equipment underwater construction method | |
| JPH07292648A (en) | Artificial island construction method | |
| JPS59150810A (en) | Coastal structure with caisson and its construction | |
| CN113430989A (en) | Lifting construction method for sea pond | |
| JP2571931B2 (en) | Earth covering method using lightweight material | |
| US5118222A (en) | Method and apparatus for constructing seawalls and docks | |
| JP2868339B2 (en) | Lightweight embankment and embankment creation method | |
| JPH0323689B2 (en) | ||
| JPH06116956A (en) | Construction method of underwater structure | |
| JPH0376926A (en) | steep embankment | |
| KR20260000532U (en) | Submarine mortarboard partition | |
| JPH10183653A (en) | Embankment culvert | |
| JP2506050B2 (en) | Construction method of asphalt mastic layer | |
| CN117513197A (en) | A box culvert diversion construction method | |
| Cuthbert et al. | THE THAMES-LEE WATER MAIN. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |