JPH0619369B2 - Contact probe pin assembly device - Google Patents
Contact probe pin assembly deviceInfo
- Publication number
- JPH0619369B2 JPH0619369B2 JP60159534A JP15953485A JPH0619369B2 JP H0619369 B2 JPH0619369 B2 JP H0619369B2 JP 60159534 A JP60159534 A JP 60159534A JP 15953485 A JP15953485 A JP 15953485A JP H0619369 B2 JPH0619369 B2 JP H0619369B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- lower jig
- plunger
- contact probe
- caulking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 239000000523 sample Substances 0.000 title claims description 25
- 238000003825 pressing Methods 0.000 description 6
- 238000007689 inspection Methods 0.000 description 5
- 238000002788 crimping Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 239000000758 substrate Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
Landscapes
- Measuring Leads Or Probes (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
- Automatic Assembly (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、所謂、ボードテスター等と称される配線基板
検査装置に用いられるコンタクトプローブピンの組立装
置に関するものである。Description: TECHNICAL FIELD The present invention relates to a contact probe pin assembling apparatus used in a wiring board inspecting apparatus such as a so-called board tester.
配線基板検査装置は、所定の配線パターンが形成された
基板に電子部品を実装し、その裏面をはんだ付けして完
成した配線基板の導通検査等を行なう装置である。The wiring board inspection apparatus is an apparatus that mounts electronic components on a board on which a predetermined wiring pattern is formed, and solders the back surface of the electronic component to conduct a continuity inspection of the completed wiring board.
この配線基板検査装置の動作原理は、基板裏面の導通部
の少なくとも2点に検査信号を与えて、その導通状態を
調べることにより、基板上に構成された回路の良否を検
査できるようにしたものである。The operating principle of this wiring board inspection apparatus is to provide an inspection signal to at least two points of the conductive portion on the back surface of the board to check the conduction state, thereby making it possible to inspect the quality of the circuit formed on the board. Is.
ここで、上述した基板裏面の導通部に検査信号を与える
手段として用いるのがコンタクトプローブピンであり、
その構成の一例を第3図に示す。Here, it is a contact probe pin that is used as a means for giving an inspection signal to the conductive portion on the back surface of the substrate,
An example of the structure is shown in FIG.
第3図において、1は一端部に絞り部1aが形成された
コンタクトプローブピンの外筒を構成するパイプであ
り、このパイプ1の内部には他端側の開口部1cからボ
ール2が挿入され、ボール2は絞り部1aで落下が防止
されている。更に、スプリング3が挿入されると共に、
一端側に基板の導通部と接触する頭部4aが、他端側に
スプリング3と当接する当接部4bが形成され、中央部
4cが当接部4bより小径に加工されたプランジャ4が
挿入されている。そして、プランジャ4の当接部4bが
スプリング3を押圧した状態でパイプ1にかしめ部1b
にてかしめが施され、このかしめ部1bにより、プラン
ジャ4は当接部4bと中央部4cの段差で係止されてス
プリング3による付勢力によるプランジャ4の抜け出し
が防止されている。In FIG. 3, reference numeral 1 denotes a pipe which constitutes an outer cylinder of a contact probe pin having a narrowed portion 1a formed at one end thereof, and a ball 2 is inserted into the pipe 1 through an opening 1c on the other end side. The balls 2 are prevented from falling by the throttle portion 1a. Furthermore, with the spring 3 inserted,
A head portion 4a that comes into contact with the conductive portion of the substrate is formed at one end side, and a contact portion 4b that comes into contact with the spring 3 is formed at the other end side, and a plunger 4 whose central portion 4c is processed to have a smaller diameter than the contact portion 4b is inserted. Has been done. Then, with the contact portion 4b of the plunger 4 pressing the spring 3, the caulking portion 1b of the pipe 1 is crimped.
The plunger 4 is locked at a step between the contact portion 4b and the central portion 4c by the crimped portion 1b, and the plunger 4 is prevented from coming off due to the biasing force of the spring 3.
従来、コンタクトプローブピンの組立手段としては旋盤
が用いられていた。即ち、旋盤のチャックにパイプ1を
把持させ、ボール2、スプリング3及びプランジャ4を
順に挿入してプランジャ4を押圧した状態で、パイプ1
を回転し、かしめ部1bをバイトでヘラ絞りして形成
し、全体を組立てるようにしていた。Conventionally, a lathe has been used as an assembly means for contact probe pins. That is, the pipe 1 is held by the chuck of the lathe, the ball 2, the spring 3 and the plunger 4 are inserted in order and the plunger 4 is pressed,
Was rotated and the caulked portion 1b was formed by squeezing with a cutting tool, and the whole was assembled.
上述した旋盤を用いた従来のコンタクトプローブピンの
組立手段にあっては、組立てられたコンタクトプロー
ブピンの長さのバラツキが大きかった。作業が手作業
によるもので容易でなく生産性が悪い、等の不具合があ
った。In the conventional means for assembling the contact probe pin using the lathe described above, there is a large variation in the length of the assembled contact probe pin. There was a problem that the work was manual and not easy and the productivity was poor.
即ち、コンタクトプローブピンは上述したように配線
基板検査装置に用いられるものであり、ここで重要なの
は、基板裏面の導通部とプランジャ4の頭部4aとの確
実な接触である。従って第3図に示すコンタクトプロー
ブピンの全長Lが一定であること、つまり、かしめ部1
bが定位置に形成されていることが、プランジャ4の圧
縮量及び導通部の押圧力の一定化につながるものであ
る。That is, the contact probe pin is used in the wiring board inspecting apparatus as described above, and what is important here is reliable contact between the conductive portion on the back surface of the substrate and the head 4a of the plunger 4. Therefore, the total length L of the contact probe pin shown in FIG. 3 is constant, that is, the caulking portion 1
The fact that b is formed at a fixed position leads to a constant amount of compression of the plunger 4 and a constant pressing force of the conducting portion.
しかし乍ら、旋盤によるヘラ絞りでは、チャックによる
パイプ1の把持や、把持後のパイプ1に挿入されたプラ
ンジャ4の支持は、人手による操作及び調整によるもの
であるため、バイトとの相対位置がばらついてしまう場
合があり、かしめ部1bの位置にバラツキが生じて、品
質の不安定化、歩留りの低下を招いていた。However, in the case of a spatula squeezing by a lathe, gripping of the pipe 1 by the chuck and support of the plunger 4 inserted into the pipe 1 after gripping are performed by manual operation and adjustment. In some cases, the positions of the caulking portion 1b vary, which causes instability in quality and a decrease in yield.
上述したようにパイプ1の把持及びプランジャ4の支
持のための操作及び調整は人手によりなされているの
で、通常、全長Lが数cm程度の微細部品からなる部品の
取扱いは、細かな作業であって熟練を要する等、作業が
容易でなく生産能率も低いという不具合があった。As described above, since the operation and adjustment for gripping the pipe 1 and supporting the plunger 4 are performed manually, normally, handling of a fine component having a total length L of several cm is a fine work. There is a problem that the work is not easy and the production efficiency is low, such as requiring skill.
本発明は上記事情に基づいてなされたもので、その目的
は、品質の安定したコンタクトプローブピンが能率よく
容易に組立てられるコンタクトプローブピンの組立装置
を得ることにある。The present invention has been made based on the above circumstances, and an object of the present invention is to obtain a contact probe pin assembling apparatus capable of efficiently and easily assembling contact probe pins of stable quality.
〔問題点を解決するための手段及びその作用〕 上記目的を達成するために、本発明によるコンタクトプ
ローブピンの組立装置にあっては、下部治具に備えられ
たチャックにより、スプリング及びプランジャを組付け
たパイプの一端側を把持して回転させ、チャックに対向
して上部治具に備えられた押エ部材により、上記下部治
具に取付けられ上記パイプに組付けられたプランジャの
頭部を押圧して支持すると共に上記パイプと共に回転せ
しめ、パイプに直交する方向に進退可能なかしめ装置に
備えられかしめ工具を、上記下部治具に取付けられたパ
イプの所定の絞り部に接触させてかしめを施すようにし
たことを特徴としている。[Means for Solving Problems and Its Action] In order to achieve the above object, in the contact probe pin assembling apparatus according to the present invention, a spring and a plunger are assembled by a chuck provided on a lower jig. Hold and rotate one end of the attached pipe, and press the head of the plunger attached to the lower jig and assembled to the pipe by the pressing member provided on the upper jig facing the chuck. And swivel together with the pipe, and the caulking device provided in the caulking device capable of advancing and retracting in the direction orthogonal to the pipe is brought into contact with a predetermined narrowed portion of the pipe attached to the lower jig to perform the caulking. It is characterized by doing so.
以下、本発明に係るコンタクトプローブピンの組立装置
を第1図〜第2図に示す一実施例に基づいて説明する。Hereinafter, a device for assembling a contact probe pin according to the present invention will be described based on an embodiment shown in FIGS. 1 and 2.
第1図は本実施例の組立装置における上部治具、下部治
具及びかしめ装置を示す構成図であり、第2図は本実施
例の組立装置の全体を上方から見た構成図である。FIG. 1 is a configuration diagram showing an upper jig, a lower jig and a caulking device in the assembling apparatus of this embodiment, and FIG. 2 is a configuration diagram of the entire assembling apparatus of this embodiment seen from above.
第2図において11は組立作業がなされるインデックス
テーブルであり、このインデックステーブル11は6分
割の割出回転をおこなって第1〜第6のステーションS
T1〜ST6の間を割出回転すると共に、各ステーショ
ンの位置には詳細は後述する下部治具21が夫々設けら
れており、図示しない間欠駆動装置により反時計方向に
割出回転するようになっている。上記インデックステー
ブル11上の第1〜第6のステーションST1〜ST6
は、後述する作業テーブル12と対応してパイプ供給ス
テーションST1、ボール供給ステーションST2、ス
プリング供給ステーションST3、プランジャ供給ステ
ーションST4、かしめステーションST5、搬出ステ
ーションST6がそれぞれ割付けられており、インデッ
クステーブル11に設けられた下部治具21が第1ステ
ーションST1から第6ステーションST6へと順次割
出されるに従って部品が供給され、組立が進行するよう
に構成されている。In FIG. 2, reference numeral 11 denotes an index table on which an assembling work is performed. The index table 11 performs indexing rotation of 6 divisions, and the 1st to 6th stations S.
A lower jig 21 whose details will be described later is provided at the position of each station while performing index rotation between T1 and ST6, and index rotation is performed counterclockwise by an intermittent drive device (not shown). ing. First to sixth stations ST1 to ST6 on the index table 11
Are assigned to a pipe supply station ST1, a ball supply station ST2, a spring supply station ST3, a plunger supply station ST4, a caulking station ST5, and a carry-out station ST6 in correspondence with a work table 12 to be described later. As the lower jig 21 thus obtained is sequentially indexed from the first station ST1 to the sixth station ST6, the parts are supplied and the assembly proceeds.
下部治具21は第1図に示されており、インデックステ
ーブル11にボールベアリング22を介して軸体23が
回転可能に設けられており、この軸体23の上端部には
歯車24が固定されている。軸体23は中空となってい
て、上端部にはパイプ1を把持するコレットチャック2
5と、このコレットチャック25を開閉するチャックス
リーブ26とが嵌入しており、コレットチャック25
は、軸体23を下方から貫通して挿入されたボルト27
によって軸体23に固定され、一方、チャックスリーブ
26はスプリング28の付勢力で上方に付勢されてコレ
ットチャック25を常時閉じるように作用している。The lower jig 21 is shown in FIG. 1. A shaft 23 is rotatably provided on the index table 11 via a ball bearing 22, and a gear 24 is fixed to the upper end of the shaft 23. ing. The shaft body 23 is hollow, and the upper end portion of the collet chuck 2 holds the pipe 1.
5 and a chuck sleeve 26 for opening and closing the collet chuck 25 are fitted in the collet chuck 25.
Is a bolt 27 inserted through the shaft body 23 from below.
The chuck sleeve 26 is urged upward by the urging force of the spring 28 so as to constantly close the collet chuck 25.
第2図において、12はインデックステーブル11の外
周に同心状に配置された作業テーブルであり、この作業
テーブル12上又はその外周に、インデックステーブル
11の第1〜第6のステーションST1〜ST6にそれ
ぞれ対応してパイプ供給装置13、ボール供給装置1
4、スプリング供給装置15、プランジャ供給装置1
6、かしめ装置17、搬出装置18が配置されている。
また、かしめステーションST5を除く各ステーション
には図示しない自動供給ユニットがそれぞれ設けられて
おり、部品を把持して下部治具21に供給し、又は完成
品を下部治具21から搬出できるようになっている。In FIG. 2, reference numeral 12 is a work table concentrically arranged on the outer circumference of the index table 11. On the work table 12 or on the outer circumference thereof, the first to sixth stations ST1 to ST6 of the index table 11 are respectively provided. Correspondingly, the pipe supply device 13 and the ball supply device 1
4, spring supply device 15, plunger supply device 1
6, a caulking device 17, and a carry-out device 18 are arranged.
Further, each station other than the caulking station ST5 is provided with an automatic supply unit (not shown) so that parts can be gripped and supplied to the lower jig 21 or a finished product can be carried out from the lower jig 21. ing.
パイプ供給装置13は、第3図に示すような一端部に絞
り部1aが形成されたパイプ1を整列供給するパーツフ
ィーダ31と、このパーツフィーダ31から整列供給さ
れたパイプ1の開口部1cを検出し、供給方向に絞り部
1a側が配向しているものはそのまま、供給方向に開口
部1cが配向しているものは反転して送出する方向検出
装置32と、この方向検出装置32により正しく配向さ
れたパイプ1を作業テーブル12上に供給するパイプシ
ュート33と、作業テーブル12上に設けられパイプシ
ュート33から供給されたパイプ1を自動供給ユニット
への供給位置に供給するエスケープメント34とを有し
ており、図示しない自動供給ユニットによりパイプ1の
開口部1cを上方に向けてインデックステーブル11の
下部治具21に供給するようになっている。The pipe supply device 13 includes a parts feeder 31 for supplying the pipes 1 having a narrowed portion 1a formed at one end as shown in FIG. 3, and an opening 1c for the pipes 1 supplied by the parts feeder 31. A direction detection device 32 that detects and detects the orientation of the narrowed portion 1a side in the supply direction as it is, and inverts and outputs the orientation of the opening portion 1c that is oriented in the supply direction. A pipe chute 33 for supplying the supplied pipe 1 onto the work table 12, and an escapement 34 provided on the work table 12 for supplying the pipe 1 supplied from the pipe chute 33 to a supply position to the automatic supply unit. The opening 1c of the pipe 1 is directed upward to the lower jig 21 of the index table 11 by an automatic supply unit (not shown). It has become way.
ボール供給装置14は、パーツフィーダにより所定の位
置に供給されたボール2を図示しない自動供給ユニット
により、下部治具21に把持されたパイプ1の開口部1
cに挿入するようになっている。The ball supply device 14 includes the opening 1 of the pipe 1 held by the lower jig 21 by the automatic supply unit (not shown) for the ball 2 supplied to the predetermined position by the parts feeder.
It is designed to be inserted into c.
スプリング供給装置15は、パーツフィーダ35及びシ
ュート36により移送されたスプリング3を図示しない
自動供給ユニットにより把持し、下部治具21に把持さ
れたボール2挿入済のパイプ1の開口部1cに挿入する
ようになっている。The spring supply device 15 grips the spring 3 transferred by the parts feeder 35 and the chute 36 by an unillustrated automatic supply unit and inserts the ball 2 gripped by the lower jig 21 into the opening 1c of the pipe 1 into which the ball 2 has been inserted. It is like this.
プランジャ供給装置16は、パーツフィーダ37及びシ
ュート38により移送されたプランジャ4の頭部4a
を、図示しない自動供給ユニットで把持し、その当接部
4bを下部治具21に把持されてボール2及びスプリン
グ3が挿入済パイプ1の開口部1cに挿入するようにな
っている。The plunger supply device 16 includes the head 4 a of the plunger 4 transferred by the parts feeder 37 and the chute 38.
Is held by an automatic supply unit (not shown), and the contact portion 4b is held by the lower jig 21 so that the ball 2 and the spring 3 are inserted into the opening 1c of the inserted pipe 1.
かしめ装置17は、上部治具20とともに第5ステーシ
ョンST5に配置され、その詳細は第1図に示す如くで
ある。このステーションでは、これまでのステーション
でボール2、スプリング3及びプランジャ4が順番に挿
入されたパイプ1に対し、上部治具20が下降してプラ
ンジャ4の頭部4aをプランジャ4がパイプ1内に所定
の深さまで挿入されるように押圧し、下部治具21のコ
レットチャック25を回転すると共にかしめ装置17に
備えられたかしめ工具をパイプ1の所定部位に接触させ
てかしめ部1bを形成してプランジャ4の抜出し防止用
のかしめを施すようになっている。The caulking device 17 is arranged in the fifth station ST5 together with the upper jig 20, and its details are as shown in FIG. In this station, the upper jig 20 is lowered to move the head 4a of the plunger 4 into the pipe 1 with respect to the pipe 1 in which the ball 2, the spring 3 and the plunger 4 are sequentially inserted in the previous station. By pressing so as to be inserted to a predetermined depth, the collet chuck 25 of the lower jig 21 is rotated, and a caulking tool provided in the caulking device 17 is brought into contact with a predetermined portion of the pipe 1 to form the caulking portion 1b. The plunger 4 is crimped to prevent it from being pulled out.
第1図において上部治具20は、下部治具21のコレッ
トチャック25に対向して設けられ、上下動可能な軸4
1の下端部に取付けられており、治具本体42にボール
ベアリング43を介して設けられ、プランジャ4の頭部
4aを押圧する回転押エ部材44と、この回転押エ部材
44の先端部外周に配設されプランジャ4の頭部4aを
位置決めする位置決めリング45とから構成されてい
る。In FIG. 1, the upper jig 20 is provided so as to face the collet chuck 25 of the lower jig 21, and can move vertically.
1 is attached to the lower end of the rotary body 1, is provided on the jig body 42 via a ball bearing 43, and presses the head 4a of the plunger 4, and the outer circumference of the tip of the rotary press member 44. And a positioning ring 45 for positioning the head 4a of the plunger 4.
かしめ装置17はスライドベース51上に配置されたス
ライダ52と、このスライダ52に取付けられたかしめ
工具53とにより主要部が構成され、スライダ52はカ
ムレバー54の軸55を中心とする回動運動により図示
矢印A方向に摺動するものであり、56はスライダ52
と共にかしめ工具53を後退する方向に付勢する引張ば
ねである。The caulking device 17 is mainly composed of a slider 52 arranged on a slide base 51 and a caulking tool 53 attached to the slider 52, and the slider 52 is rotated by a pivotal movement about a shaft 55 of a cam lever 54. The slider 52 slides in the direction of arrow A in the figure, and the reference numeral 56 designates a slider 52.
At the same time, the tension spring urges the caulking tool 53 in the backward direction.
また、第1図において57は本体58に設けられたモー
タであり、このモータ57の駆動はプーリ59、タイミ
ングベルト60、及びプーリ61を介して歯車62を回
転可能としている。この歯車62は支持アーム63の先
端に回転自在に取付けられており、かしめステーション
ST5にきた下部治具21の歯車24と噛合する。上記
支持アーム63は支軸64を中心として回動可能であ
り、かつ紙面垂直方向にばね(図示せず)で付勢されつ
つストッパ(図示せず)に当接して定位置を保持してい
る。かかる構造は、回転移動してきた歯車24と支持ア
ーム63に取付けられた歯車62とが噛合する際、支持
アーム63がばね(図示せず)の付勢力に抗して若干回
動して衝撃を緩和し、歯車24、62が滑らかに噛合す
るためのものである。Further, in FIG. 1, reference numeral 57 is a motor provided in the main body 58, and the drive of this motor 57 can rotate the gear 62 via the pulley 59, the timing belt 60, and the pulley 61. The gear 62 is rotatably attached to the tip of the support arm 63 and meshes with the gear 24 of the lower jig 21 which has come to the crimping station ST5. The support arm 63 is rotatable about a support shaft 64, and is held in a fixed position by being abutted against a stopper (not shown) while being urged by a spring (not shown) in a direction perpendicular to the paper surface. . With this structure, when the gear 24 that has been rotationally moved and the gear 62 attached to the support arm 63 mesh with each other, the support arm 63 slightly rotates against the urging force of a spring (not shown) to generate an impact. It is for the purpose of relaxation and the gears 24 and 62 mesh smoothly.
次に上記の如く構成された本実施例の動作を、第3図に
示すコンタクトプローブピンに適用した場合について説
明する。Next, a case where the operation of the present embodiment configured as described above is applied to the contact probe pin shown in FIG. 3 will be described.
パイプ供給ステーションST1では、パイプ供給装置1
3により開口部1cを上向きにして供給されたパイプ1
が図示しない自動供給ユニットにより把持して持上げら
れる。この自動供給ユニットは下降する際に下部治具2
1のチャックスリーブ26を押圧し、これによりコレッ
トチャック25を開き、その中にパイプ1を挿入し、そ
の後チャックスリーブ26の押圧を解除する。パイプ1
はその絞り部1aがボルト27の端部に当接し定位置に
設定された状態で保持される。そして、インデックステ
ーブル11は60゜回転する。この回転により下部治具
21に把持されたパイプ1は、ボール供給ステーション
ST2に移行される。In the pipe supply station ST1, the pipe supply device 1
Pipe 1 supplied with the opening 1c facing upward by 3
Is gripped and lifted by an automatic supply unit (not shown). When this automatic supply unit descends, the lower jig 2
The chuck sleeve 26 of No. 1 is pressed to open the collet chuck 25, the pipe 1 is inserted into the collet chuck 25, and then the pressing of the chuck sleeve 26 is released. Pipe 1
The squeezed portion 1a is held in a state where the squeezed portion 1a abuts the end of the bolt 27 and is set at a fixed position. Then, the index table 11 rotates 60 °. The pipe 1 held by the lower jig 21 by this rotation is transferred to the ball supply station ST2.
ボール供給ステーションST2ではボール供給装置14
により供給されたボール2が図示しない自動供給ユニッ
トによりパイプ1に挿入される。そしてインデックステ
ーブル11は更に60゜回転し、下部治具21はスプリ
ング供給ステーションST3に移行される。スプリング
供給ステーションST3ではスプリング供給装置15に
より供給されたスプリング3が図示しない自動供給ユニ
ットにより把持され、パイプ1に挿入される。そして、
インデックステーブル11は60゜回転し、下部治具2
1はプランジャ供給ステーションST4に移行される。At the ball supply station ST2, the ball supply device 14
The balls 2 supplied by the above are inserted into the pipe 1 by an automatic supply unit (not shown). Then, the index table 11 is further rotated by 60 °, and the lower jig 21 is moved to the spring supply station ST3. At the spring supply station ST3, the spring 3 supplied by the spring supply device 15 is gripped by an automatic supply unit (not shown) and inserted into the pipe 1. And
The index table 11 rotates 60 ° and the lower jig 2
1 is transferred to the plunger supply station ST4.
プランジャ供給ステーションST4ではプランジャ供給
装置16により頭部4aを上向きにして供給されたプラ
ンジャ4が図示しない自動供給ユニットにより把持さ
れ、その当接部4b側がパイプ1に挿入される。そし
て、インデックステーブル11は60゜回転し、下部治
具21はかしめステーションST5に移行される。At the plunger supply station ST4, the plunger 4 supplied by the plunger supply device 16 with the head 4a facing upward is gripped by an automatic supply unit (not shown), and the contact portion 4b side is inserted into the pipe 1. Then, the index table 11 is rotated by 60 °, and the lower jig 21 is moved to the crimping station ST5.
かしめステーションST5では第1図に示される如くの
動作がなされる。即ち、軸41に取付けられた上部治具
20が、下部治具21に把持されたパイプ1等の上方に
位置し、回転押エ部材44がプランジャ4の頭部4aを
押圧しつつ下降し、パイプ1の絞り部1aからプランジ
ャ4の頭部4aまでの全長がLとなる位置で停止する。
また、歯車62は下部治具21の歯車24に噛合する。
これにより、モータ57の回転が、プーリ59、タイミ
ングベルト60、プーリ61を介して歯車62から下部
治具21の歯車24に伝達され、この歯車24と一体的
に構成された軸体23を回転し、その結果、パイプ1を
回転させる。そして、かしめ装置17のスライダ52と
ともにかしめ工具53が前進してパイプ1に対してかし
め作業を行ない、パイプ1の所定の位置にかしめ部1b
を形成することによってコンタクトプローブピンの組立
が完了する。その後、スライダ52は後退し、モータ5
7は停止し、上部治具20が上昇する。そして、インデ
ックステーブル11は60゜回転し、これにより歯車2
4が歯車62から離脱すると共に下部治具21が搬出ス
テーションST6に移行される。The caulking station ST5 operates as shown in FIG. That is, the upper jig 20 attached to the shaft 41 is located above the pipe 1 or the like held by the lower jig 21, and the rotary pushing member 44 moves down while pressing the head 4a of the plunger 4. It stops at a position where the total length from the throttle portion 1a of the pipe 1 to the head portion 4a of the plunger 4 is L.
Further, the gear 62 meshes with the gear 24 of the lower jig 21.
As a result, the rotation of the motor 57 is transmitted from the gear 62 to the gear 24 of the lower jig 21 via the pulley 59, the timing belt 60, and the pulley 61, and the shaft 23 integrally formed with the gear 24 is rotated. As a result, the pipe 1 is rotated. Then, the caulking tool 53 moves forward together with the slider 52 of the caulking device 17 to perform the caulking work on the pipe 1, and the caulking portion 1b at a predetermined position of the pipe 1.
The assembly of the contact probe pins is completed by forming the. After that, the slider 52 retracts and the motor 5
7 stops and the upper jig 20 rises. Then, the index table 11 rotates 60 °, which causes the gear 2 to rotate.
4 is disengaged from the gear 62, and the lower jig 21 is moved to the carry-out station ST6.
搬出ステーションST6では図示しない自動供給装置に
より下部治具21のチャックスリーブ26を再び押圧し
てコレットチャック25を開き、完成したコンタクトプ
ローブピンを把持して、搬出装置18に取出す。At the carry-out station ST6, the chuck sleeve 26 of the lower jig 21 is pressed again by an unillustrated automatic feeder to open the collet chuck 25, hold the completed contact probe pin, and take it out to the carry-out device 18.
以上述べた本実施例によれば以下に列挙する如くの作用
効果を奏する。According to this embodiment described above, the following operational effects are obtained.
インデックステーブル11を用い、これに作業ステー
ションを割付けし、流れ作業により順次コンタクトプロ
ーブピンが組立て可能となり、量産が可能となるととも
に作業効率の向上が図られる。The index table 11 is used, a work station is allocated to the index table 11, and contact probe pins can be sequentially assembled by a flow work, which enables mass production and improves work efficiency.
かしめステーションST5では下部治具21及び上部
治具20を用い、この下部治具21及び上部治具20に
よりパイプ1の定位置保持及び一定長の設定が可能であ
り、よって、プランジャ4の寸法及び品質が安定して完
成品の品質向上により寄与するものである。In the crimping station ST5, the lower jig 21 and the upper jig 20 are used, and the lower jig 21 and the upper jig 20 can hold the pipe 1 at a fixed position and set a fixed length. The quality is stable and contributes to the quality improvement of the finished product.
本発明は上記実施例のコンタクトプローブピンに限定さ
れるものではなく、例えば、第4図に示すように端部に
円弧部rが形成されたかしめ工具70を用い、パイプ1
の開口部に絞り込み成形を施し、これにてかしめ部を形
成してもよい。The present invention is not limited to the contact probe pin of the above-described embodiment. For example, as shown in FIG. 4, a caulking tool 70 having an arc portion r at its end is used and the pipe 1
The opening may be narrowed down to form a caulked portion.
この他に本発明はその要旨を逸脱しない範囲で種々変形
できるものである。Besides this, the present invention can be variously modified without departing from the gist thereof.
以上述べたように本発明によるコンタクトプローブピン
の組立装置によれば、品質の安定したコンタクトプロー
ブピンが連続して大量に組立可能となり、且つ組立作業
は自動化されて容易となる等、微細部品の組立にあって
は極めて大なる効果を奏するものである。As described above, according to the contact probe pin assembling apparatus of the present invention, it is possible to continuously assemble a large quantity of contact probe pins of stable quality, and the assembly work is automated and easy. In the assembling, it has an extremely great effect.
第1図及び第2図は本発明によるコンタクトプローブピ
ンの組立装置の一実施例を示し、第1図はかしめ装置及
び上部治具及び下部治具の詳細を示す一部断面にした正
面図、第2図は本装置の全体構造を示す平面図、第3図
は本発明が適用されるコンタクトプローブピンの一例を
拡大して示す断面図、第4図は本発明の他の形状のコン
タクトプローブピンのためのかしめ用工具を示す断面図
である。 11……インデックステーブル、 12……作業台、13……パイプ供給装置、 14……ボール供給装置、 15……スプリング供給装置、 16……プランジャ供給装置、 17……かしめ装置、20……上部治具、 21……下部治具、53、70……かしめ工具。1 and 2 show an embodiment of a contact probe pin assembling apparatus according to the present invention, and FIG. 1 is a partially sectional front view showing details of a caulking apparatus and an upper jig and a lower jig, 2 is a plan view showing the overall structure of the present apparatus, FIG. 3 is an enlarged sectional view showing an example of a contact probe pin to which the present invention is applied, and FIG. 4 is a contact probe having another shape of the present invention. It is sectional drawing which shows the crimping tool for a pin. 11 ... Index table, 12 ... Workbench, 13 ... Pipe supply device, 14 ... Ball supply device, 15 ... Spring supply device, 16 ... Plunger supply device, 17 ... Caulking device, 20 ... Top part Jig, 21 ... Lower jig, 53, 70 ... Caulking tool.
Claims (1)
ングで突出方向に付勢してなるコンタクトプローブピン
を組立てる組立装置であって、パイプの一端側を把持す
ると共にその軸中心に回転可能なチャックを有する下部
治具と、この下部治具に対向して設けられ、下部治具に
把持された上記パイプに組付けられたプランジャの頭部
をスプリングの付勢力に抗して押圧支持すると共にその
軸中心に回転可能な押エ部材を有する上部治具と、上記
下部治具に把持されたパイプの所定部位に接触して上記
プランジャの抜出防止のかしめを施すかしめ工具を有
し、パイプに直交する方向に進退可能なかしめ装置とを
具備したことを特徴とするコンタクトプローブピンの組
立装置。1. An assembly device for assembling a contact probe pin, comprising a plunger inserted in a pipe and urged by a spring in a projecting direction, the chuck being capable of gripping one end of the pipe and rotating about the axis thereof. And a lower jig having a lower jig and a head of a plunger assembled to the lower jig, which is assembled to the lower jig, is pressed and supported against the biasing force of a spring. The pipe has an upper jig having a rotatable pushing member around the shaft and a caulking tool that comes into contact with a predetermined portion of the pipe gripped by the lower jig and performs caulking to prevent the plunger from being pulled out. An apparatus for assembling a contact probe pin, comprising: a caulking device capable of advancing and retracting in a direction orthogonal to each other.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60159534A JPH0619369B2 (en) | 1985-07-19 | 1985-07-19 | Contact probe pin assembly device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60159534A JPH0619369B2 (en) | 1985-07-19 | 1985-07-19 | Contact probe pin assembly device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS6221075A JPS6221075A (en) | 1987-01-29 |
| JPH0619369B2 true JPH0619369B2 (en) | 1994-03-16 |
Family
ID=15695867
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60159534A Expired - Lifetime JPH0619369B2 (en) | 1985-07-19 | 1985-07-19 | Contact probe pin assembly device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0619369B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR102149699B1 (en) * | 2017-03-31 | 2020-08-31 | 주식회사 오킨스전자 | Device for probe pin using laser welding, method for assembling probe pin using laser welding, and system for electro-optical welding therefor |
| CN111896777A (en) * | 2020-06-24 | 2020-11-06 | 渭南高新区木王科技有限公司 | Test probe group device tool |
| CN113020454A (en) * | 2021-03-04 | 2021-06-25 | 渭南高新区木王科技有限公司 | Probe riveting machine |
| CN114227252B (en) * | 2022-01-06 | 2025-02-11 | 珠海市晋德方智能科技有限公司 | A fully automatic production line for probes |
| CN114778905B (en) * | 2022-04-12 | 2026-03-03 | 渭南木王智能科技股份有限公司 | Clamp spring machine for high-current three-needle test probe |
| CN116652580B (en) * | 2023-06-06 | 2026-02-27 | 苏州迪克微电子有限公司 | A gate structure for ATE spring probe pre-assembly |
-
1985
- 1985-07-19 JP JP60159534A patent/JPH0619369B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS6221075A (en) | 1987-01-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA1127775A (en) | Component inserting apparatus | |
| GB1268059A (en) | Improvements relating to apparatus for mounting semiconductor chips | |
| JPH0619369B2 (en) | Contact probe pin assembly device | |
| JP2007118128A (en) | Automatic screw tightening device | |
| JPS643613B2 (en) | ||
| US3636624A (en) | Method and apparatus for inserting lead components into circuit boards | |
| CN212822829U (en) | A slider processing fixture | |
| USRE28119E (en) | Le roy busler | |
| JPH0135791Y2 (en) | ||
| US6776060B2 (en) | Electronic component sucking device and electronic component testing apparatus having the same | |
| JPS5968936A (en) | Pellet bonding method | |
| US3698062A (en) | Apparatus for winding elongated material on an electrical component | |
| JPH0622689Y2 (en) | Chip adsorption pin structure | |
| JPS6217999Y2 (en) | ||
| JPS6217998Y2 (en) | ||
| CN220838336U (en) | Welding platform for connecting wire machining | |
| JPH0147920B2 (en) | ||
| CN217019210U (en) | Portable hand welding fixture | |
| JPS634379Y2 (en) | ||
| CN223588754U (en) | Electromagnetic part assembling equipment | |
| JPS5875788A (en) | Automatic connector inserting device | |
| JP3176773B2 (en) | Residual material processing device in electronic component insertion machine | |
| JPS6343915B2 (en) | ||
| JPS58186992A (en) | Method of soldering lead terminal to printed board | |
| JPH0211369Y2 (en) |