JPH0621830B2 - Pressure measurement method for gas transportation pipe - Google Patents
Pressure measurement method for gas transportation pipeInfo
- Publication number
- JPH0621830B2 JPH0621830B2 JP2661786A JP2661786A JPH0621830B2 JP H0621830 B2 JPH0621830 B2 JP H0621830B2 JP 2661786 A JP2661786 A JP 2661786A JP 2661786 A JP2661786 A JP 2661786A JP H0621830 B2 JPH0621830 B2 JP H0621830B2
- Authority
- JP
- Japan
- Prior art keywords
- pipe
- bag
- pressure
- transport
- bag body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims description 14
- 238000009530 blood pressure measurement Methods 0.000 title description 2
- 238000010276 construction Methods 0.000 claims description 19
- 239000012530 fluid Substances 0.000 claims description 8
- 238000007789 sealing Methods 0.000 claims description 3
- 239000007789 gas Substances 0.000 description 27
- 238000003780 insertion Methods 0.000 description 6
- 230000037431 insertion Effects 0.000 description 6
- 238000009792 diffusion process Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000012856 packing Methods 0.000 description 2
- 239000004925 Acrylic resin Substances 0.000 description 1
- 229920000178 Acrylic resin Polymers 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000696 magnetic material Substances 0.000 description 1
Landscapes
- Measuring Fluid Pressure (AREA)
Description
【発明の詳細な説明】 技術分野 本発明は、都市ガスなどのガスを輸送する輸送管内の圧
力を、工事などに先立つて、測定するための方法に関す
る。Description: TECHNICAL FIELD The present invention relates to a method for measuring the pressure in a transportation pipe for transporting gas such as city gas, prior to construction work or the like.
背景技術 都市ガスを輸送する輸送管の圧力は、工事中において
も、維持されなければならない。従来では、工事前に輸
送管のガスの流れが片押し供給であるが両押し供給であ
るかの確認作業として、この工事個所を挟んでその両側
に合計少なくとも3つの操作孔を形成し、その両端部に
圧力計などを接続し、またもう1つの操作孔から袋体を
輸送管内に挿入して、圧力値の変化を観察している。BACKGROUND ART The pressure of a transportation pipe for transporting city gas must be maintained even during construction. Conventionally, before the construction work, at least three operation holes are formed on both sides of this construction site as a check work to confirm whether the gas flow in the transport pipe is a one-sided supply or a two-sided supply. A pressure gauge or the like is connected to both ends, and a bag is inserted into the transport pipe through another operation hole to observe changes in pressure value.
発明が解決しようとする問題点 このような先行技術では、輸送管に形成される操作孔の
数を低減し、作業性を向上することが望まれる。Problems to be Solved by the Invention In such a prior art, it is desired to reduce the number of operation holes formed in the transport pipe and improve workability.
本発明の目的は、ガス輸送管に形成されるべき操作孔の
数を低減して圧力を測定することができるようにしたガ
ス輸送管の圧力測定方法を提供することである。An object of the present invention is to provide a pressure measuring method for a gas transportation pipe, which is capable of measuring the pressure by reducing the number of operation holes to be formed in the gas transportation pipe.
問題点を解決するための手段 本発明は、ガス輸送管の工事個所を挟んで両側に2つの
操作孔を穿設し、一方の操作孔には圧力計を接続し、他
方の操作孔からはその他方操作孔に関して工事個所寄り
に封止用袋体を入れ、袋体に流体を供給してその袋体が
輸送管を遮断してしまわない程度にふくらませ、前記圧
力計の変化を観察することを特徴とするガス輸送管の圧
力測定方法である。Means for Solving the Problems According to the present invention, two operation holes are formed on both sides of a gas transportation pipe with a construction site interposed therebetween, one operation hole is connected with a pressure gauge, and the other operation hole is provided. Put the sealing bag near the construction site for the other operation hole, supply the fluid to the bag and inflate it so that the bag does not block the transport pipe, and observe the change in the pressure gauge. And a method for measuring the pressure of a gas transportation pipe.
好ましい実施態様は、前記袋体の両側部には、一対の管
体が接続され、各管体を輸送管の管軸方向に沿つて移動
して、袋体を輸送管に挿入、脱出させることを特徴とす
る。In a preferred embodiment, a pair of pipes are connected to both sides of the bag, and the pipes are moved along the pipe axis direction of the transport pipe to insert and remove the bag into the transport pipe. Is characterized by.
他の好ましい実施態様は、前記他方の操作孔にもう1つ
の圧力計を接続し、この圧力計と前記一方の操作孔に接
続された圧力計とにそれぞれ表示された圧力が変化な
く、継続して一定の値を示したとき、袋体にさらに流体
を供給して輸送管を完全に遮断するとともに、前記一方
の操作孔からもうひとつの袋体を入れ、その袋体内に流
体を供給して輸送管を完全に遮断することを特徴とす
る。In another preferred embodiment, another pressure gauge is connected to the other operation hole, and the pressures respectively displayed on this pressure gauge and the pressure gauge connected to the one operation hole do not change and continue. When it shows a certain value, the fluid is further supplied to the bag to completely shut off the transportation pipe, and the other bag is inserted from the one operation hole, and the fluid is supplied to the bag. It is characterized by completely blocking the transportation pipe.
作 用 本発明に従えば、圧力測定のためにガス輸送管の工事個
所を挟んで両側に2つの操作孔を穿設すれば良く、した
がつて作業性が向上される。袋体に流体を供給してその
袋体が輸送管を遮断してしまわない程度にふくらませ、
このとき圧力計の変化を観察するようにしたので、輸送
管によるガスの輸送を遮断することなく圧力測定するこ
とができる。このとき圧力計の変化がなければ輸送管の
両側からガスが輸送される、いわゆる両押し供給である
ことが判り、そのときには前記袋体をさらにふくらませ
て輸送管を遮断し、また圧力計が接続されている操作孔
からも袋体を挿入して輸送管を遮断し、このようにして
輸送管の工事を行なうことができる。前述のように圧力
計の変化を観察したとき、その圧力計によつて測定され
る圧力が低下して変化した時には、前記袋体に関して左
右いずれか一方からのみガスが輸送されている。いわゆ
る片押し供給であることが判る。このときには、工事個
所の両側をバイパス管路で接続してガスの供給を途絶え
ることなく、達成することが可能である。Operation According to the present invention, two operation holes may be provided on both sides of the gas transport pipe for the pressure measurement, so that workability is improved. Supply fluid to the bag and inflate it so that it does not block the transport tube.
At this time, since the change of the pressure gauge is observed, the pressure can be measured without interrupting the gas transportation through the transportation pipe. At this time, if there is no change in the pressure gauge, it can be seen that gas is transported from both sides of the transportation pipe, so-called double pressure supply, at which time the bag is further expanded to shut off the transportation pipe, and the pressure gauge is connected. The bag can also be inserted through the operation hole provided to shut off the transportation pipe, and thus the transportation pipe can be constructed. When the change of the pressure gauge is observed as described above, when the pressure measured by the pressure gauge decreases and changes, gas is transported from only one of the left and right sides of the bag. It turns out that this is so-called one-sided feeding. At this time, both sides of the construction site can be connected by a bypass line to achieve the gas supply without interruption.
実施例 第1図は、本発明の基本的な構成を示す断面図である。
地中に埋設された都市ガスを輸送するガス輸送管1の参
照符Lで示される工事個所において、輸送管1の取換え
作業などを行なうために本発明が好適に実施される。輸
送管1の工事個所Lを挟んで両側には、2つの操作孔
2,3が穿設される。一方の操作孔2には圧力計4であ
るU字状の水柱ゲージが接続され、輸送管1内の圧力が
測定される。他方の操作孔3からは、その他方操作孔3
に関して工事個所L寄りに封止用袋体30が挿入され
る。操作孔3にはまた、U字状の水柱ゲージなどである
圧力計6が接続される。袋体30に流体たとえば圧縮空
気を供給して、その袋体30が輸送管1を遮断してしま
わない程度にふくらませる。このときにおける圧力計
4,6の変化を観察することによつて、輸送管1におけ
るガスの供給が両押しであるか、または片押しであるか
を後述のように判別することができる。Embodiment FIG. 1 is a sectional view showing the basic structure of the present invention.
The present invention is preferably carried out in order to replace the transportation pipe 1 or the like at a construction site indicated by reference symbol L of the gas transportation pipe 1 for transporting city gas buried in the ground. Two operation holes 2 and 3 are formed on both sides of the transport pipe 1 with the construction point L interposed therebetween. A U-shaped water column gauge, which is a pressure gauge 4, is connected to one of the operation holes 2 to measure the pressure in the transportation pipe 1. From the other operation hole 3, the other operation hole 3
Regarding, the sealing bag body 30 is inserted near the construction site L. A pressure gauge 6 such as a U-shaped water column gauge is also connected to the operation hole 3. A fluid such as compressed air is supplied to the bag body 30 to inflate it so that the bag body 30 does not block the transport pipe 1. By observing the changes in the pressure gauges 4 and 6 at this time, it is possible to determine whether the gas supply in the transport pipe 1 is a double push or a single push as described later.
第2図は操作孔3に関連して装着される作業装置7の分
解斜視図であり、第3図はその作業装置7の断面図であ
り、第4図は作業装置7の平面図である。これらの図面
を参照して、作業装置7は、輸送管1の管軸に垂直方向
に延びる取付部材8を有する。この取付部材8には、取
付孔9と取付用切欠き10とが形成される。輸送管1を
外囲するU字ボルト11の一方のねじ部12は、取付孔
9を挿通し、ナット13に螺合する。U字ボルト11の
もう1つのねじ部14は、取付用切欠き10に係合し、
ナツト15に螺合する。このようにして取付部材8は、
輸送管1に固定される。輸送管1に穿設されている操作
孔3には、取付部材8に形成された挿通孔16が対応し
て気密に連結される。取付部材8には、挿通孔16に連
なる直円筒状の基体17が立設される。操作孔3は、磁
性材料から成るプラグ18によつて開閉可能とされ、こ
のプラグ18は基体17に収納されている永久磁石など
を含むチヤツク19によつて保持することができる。チ
ヤツク19は操作棒20の下端部に連結される。操作棒
20の他端部は、基体17の外部において、ハンドル2
1に連結される。操作棒20は、基体17の上部におい
て、バツキン22によつて操作棒20の軸線方向および
周方向に気密に変位可能とされる。基体17の上部に取
付けられた筒23には、蝶ボルト24が螺合し、この蝶
ボルト24を締付けることによつて操作棒20を第3図
の上方に変位して仮想線25で示す状態に保持すること
ができる。2 is an exploded perspective view of the working device 7 mounted in association with the operation hole 3, FIG. 3 is a sectional view of the working device 7, and FIG. 4 is a plan view of the working device 7. . With reference to these drawings, the working device 7 has a mounting member 8 that extends in a direction perpendicular to the pipe axis of the transport pipe 1. A mounting hole 9 and a mounting notch 10 are formed in the mounting member 8. One screw portion 12 of the U-shaped bolt 11 that surrounds the transport pipe 1 is inserted through the mounting hole 9 and screwed into the nut 13. The other threaded portion 14 of the U-shaped bolt 11 engages with the mounting notch 10,
Screw on nut 15. In this way, the mounting member 8
It is fixed to the transport pipe 1. An insertion hole 16 formed in the mounting member 8 is correspondingly air-tightly connected to the operation hole 3 formed in the transport pipe 1. The mounting member 8 is provided with a right cylindrical base 17 that is continuous with the insertion hole 16. The operation hole 3 can be opened and closed by a plug 18 made of a magnetic material, and the plug 18 can be held by a chuck 19 containing a permanent magnet or the like housed in the base body 17. The chuck 19 is connected to the lower end of the operating rod 20. The other end of the operating rod 20 is provided outside the base body 17 with the handle 2
Connected to 1. The operation rod 20 can be airtightly displaced in the axial direction and the circumferential direction of the operation rod 20 by the backing 22 on the upper portion of the base body 17. A butterfly bolt 24 is screwed into a cylinder 23 attached to the upper part of the base body 17, and by tightening the butterfly bolt 24, the operating rod 20 is displaced upward in FIG. Can be held at.
基体17の側壁には、輸送管1の管軸方向に沿つて斜め
上向きに延びる案内筒26,27の基端部が連結され
る。案内筒26,27の遊端部は、閉止部材28,29
によつて閉止される。案内筒26,27内には、可撓性
の封止用袋体30,31が収納される。袋体30に取付
けられている一対の管体32,33は、閉止部材28に
形成された挿通孔34,35を挿通する。閉止部材28
の近傍で案内筒26内に装着されたパツキン36には、
前記管体32,33が挿通して、気密が達成される。管
体32,33は、軸線方向に変位可能であるとともに、
それらの軸線回りに角変位可能である。もう1つの袋体
31にもまた同様にして、管体37,38が連結され
る。この管体37,38は、閉止部材29に形成されて
いる挿通孔39,40を挿通する。管体37,38がそ
の軸線方向に変位可能であり、また周方向に角変位可能
である。パツキン41は気密を達成する。To the side wall of the base body 17, the base end portions of the guide cylinders 26 and 27 extending obliquely upward along the pipe axis direction of the transport pipe 1 are connected. The free ends of the guide tubes 26, 27 are closed by the closing members 28, 29.
Closed by. Flexible guiding bags 30 and 31 are housed in the guide tubes 26 and 27. The pair of tube bodies 32, 33 attached to the bag body 30 are inserted through the insertion holes 34, 35 formed in the closing member 28. Closing member 28
In the packing 36 installed in the guide tube 26 near the
Airtightness is achieved by inserting the tubes 32 and 33. The tubular bodies 32 and 33 are displaceable in the axial direction,
It can be angularly displaced about their axes. The tube bodies 37 and 38 are similarly connected to the other bag body 31. The tubular bodies 37 and 38 are inserted through the insertion holes 39 and 40 formed in the closing member 29. The tubular bodies 37 and 38 are displaceable in the axial direction thereof and angularly displaceable in the circumferential direction. The packing 41 achieves airtightness.
基体17の上部寄りには、管継手42が取付けられる。
管継手42には、それに接続される管継手43を有する
取付筒44が設けられる。取付筒44には上方に臨む管
継手45が取付けられる。放散管46の下端部には、管
継手47が取付けられる。管継手45,47は、いわゆ
るカチツトと呼ばれている管継手であつて、両者の連結
時には、ガスの流過が可能となり、両者の離脱状態で
は、管継手45が閉じた状態となり、取付筒44内のガ
スが外部に放散されてしまうことはなく、気密となつて
いる。管継手45,47の連結および離脱は、単純な操
作によつて行なうことができる。A pipe joint 42 is attached near the upper portion of the base body 17.
The pipe joint 42 is provided with a mounting cylinder 44 having a pipe joint 43 connected thereto. A pipe joint 45 facing upward is attached to the attachment cylinder 44. A pipe joint 47 is attached to the lower end of the diffusion pipe 46. The pipe joints 45, 47 are so-called pipe joints, and when the two are connected, gas can flow through, and when the two are disconnected, the pipe joint 45 is in a closed state and the mounting cylinder The gas in 44 is not diffused to the outside and is airtight. The connection and disconnection of the pipe joints 45 and 47 can be performed by a simple operation.
閉止部材28,29に形成されている挿通孔34,3
5;39,40は、第4図に明らかに示されるように、
取付部材8が輸送管1に取付けられた状態において輸送
管1の管軸の左右に振分けられている。これによつて案
内筒26,27内の袋体30,31を基体17内を経て
挿通孔16および操作孔3から輸送管1内に個別に挿入
する際に、袋体30,31が管体37,38;32,3
3にわずかに接触するが操作不可を回避し、袋体30,
31を円滑に輸送管1内に挿入することができ、また輸
送管1内から脱出させることが容易となる。Insertion holes 34, 3 formed in the closing members 28, 29
5; 39, 40, as clearly shown in FIG.
In the state where the attachment member 8 is attached to the transportation pipe 1, the mounting member 8 is distributed to the left and right of the pipe axis of the transportation pipe 1. Accordingly, when the bags 30 and 31 in the guide tubes 26 and 27 are individually inserted into the transport pipe 1 from the insertion hole 16 and the operation hole 3 through the inside of the base body 17, the bags 30 and 31 are tubular bodies. 37,38; 32,3
3 touches slightly but avoids inoperability,
It is possible to smoothly insert 31 into the transport pipe 1, and it becomes easy to escape from the transport pipe 1.
取付筒44には、U字状の水柱ゲージなどによつて実現
される圧力計6が装着される。A pressure gauge 6 realized by a U-shaped water column gauge or the like is attached to the mounting cylinder 44.
第5図(1)を参照して、管内閉止具57は、基本的に
は、可撓性を有する袋体30と、袋体30内に延びた部
分に透孔66が形成されて可撓性を有する一対の管体3
2,33とを含む。袋体30は、その中に圧縮空気を供
給していない状態では偏平であり、その平面は直角4辺
形となっている。袋体30は、布びきゴムなどから成
る。管体32,33は、袋体30の側部49,50に沿
つて袋体30内で固着されており、これらの管体32,
33は袋体30内と連通している。管体32,33は可
撓性を有し、かつ軸線方向には比較的剛性を有し、した
がつて管体32,33を押込むことによつて袋体30を
輸送管1内に挿入することが可能であり、たとえばアク
リル樹脂などから成る。管体32,33は、カチツトと
呼ばれる管継手51,52によつて空気ポンプ53に接
続される。Referring to FIG. 5 (1), the intra-tube closing device 57 basically has a flexible bag body 30 and a flexible hole in which a through hole 66 is formed in a portion extending into the bag body 30. Pair of tubular bodies 3 having properties
2 and 33 are included. The bag body 30 is flat when no compressed air is supplied therein, and its plane is a quadrangle at right angles. The bag body 30 is made of cloth-rubber or the like. The tube bodies 32 and 33 are fixed inside the bag body 30 along the side portions 49 and 50 of the bag body 30.
33 communicates with the inside of the bag body 30. The tubular bodies 32 and 33 are flexible and relatively rigid in the axial direction, and thus the bag bodies 30 are inserted into the transport pipe 1 by pushing the tubular bodies 32 and 33. It can be made of, for example, acrylic resin. The pipe bodies 32 and 33 are connected to the air pump 53 by pipe joints 51 and 52 called a cut.
袋体30を輸送管1内に挿入するにあたつては、管体3
2,33をそれらの軸線回りにかつ相互に逆方向に巻回
して第5図(2)または第5図(3)の状態とすることがで
きる。このようにすれば案内筒26から輸送管1内に袋
体30を挿入することが円滑となるとともに、袋体30
の損傷が避けられ、また輸送管1から袋体30を脱出さ
せることが容易となる。When inserting the bag body 30 into the transport tube 1, the tube body 3 is used.
2 and 33 can be wound around their axes and in mutually opposite directions to obtain the state of FIG. 5 (2) or FIG. 5 (3). This makes it easy to insert the bag body 30 into the transport pipe 1 from the guide tube 26, and at the same time, the bag body 30
Is prevented, and the bag body 30 can be easily removed from the transport pipe 1.
作業装置7の基体17内で、プラグ18を保持したチヤ
ツク19を第3図の仮想線25で示されるように上昇位
置としておき、そこで袋体30を第5図(2)の状態で案
内筒26から基体17を経て輸送管1内に押込んで挿入
する。これによつて袋体30は操作孔3に関して工事個
所L寄りに位置する。袋体30が輸送管1内に挿入され
た状態は第6図(1)に示されており、その輸送管1の軸
直角断面は簡略化して第6図(2)に示される。管体3
2,33は、第6図(3)の矢符54,55で示されるよ
うにそれらの軸線回りに相互に逆方向に回され、したが
つて袋体30は各管体32,33の少なくとも一方にそ
れぞれ巻付かれている。In the base 17 of the working device 7, the chuck 19 holding the plug 18 is set in the raised position as shown by the phantom line 25 in FIG. 3, and the bag body 30 is guided there in the state of FIG. 5 (2). Then, it is pushed into the transport pipe 1 from 26 through the base body 17 and inserted. As a result, the bag body 30 is located closer to the construction site L with respect to the operation hole 3. The state in which the bag body 30 is inserted into the transportation pipe 1 is shown in FIG. 6 (1), and the cross section perpendicular to the axis of the transportation pipe 1 is simplified and shown in FIG. 6 (2). Tube 3
2, 33 are turned in mutually opposite directions around their axes as indicated by arrows 54, 55 in FIG. 6 (3), so that the bag body 30 has at least the respective tubular bodies 32, 33. Each one is wrapped around.
そこで袋体30を第7図(1)で示されるように広げる。
この状態では、輸送管1の軸直角断面が第7図(2)で示
されているようになつている。前述の第6図に示された
状態にある袋体30を第7図(1)および第7図(2)に示
される状態とするには、管体32,33を前述の矢符5
4,55とは逆方向に第7図(3)の参照符56,57で
示されるように回す。これによつて管体32,33に巻
付かれている袋体30を広げることが可能となる。Therefore, the bag body 30 is unfolded as shown in FIG. 7 (1).
In this state, the cross section perpendicular to the axis of the transport pipe 1 is as shown in FIG. 7 (2). In order to bring the bag body 30 in the state shown in FIG. 6 into the state shown in FIG. 7 (1) and FIG. 7 (2), the pipe bodies 32, 33 are set by the arrow 5 mentioned above.
Rotate in the opposite direction to 4, 55 as indicated by reference numerals 56, 57 in FIG. 7 (3). This allows the bag body 30 wound around the tube bodies 32 and 33 to be spread.
そこで第5図(1)で示される空気ポンプ53によつて管
体32,33を経て袋体30内に圧縮空気を供給する。
袋体30がわずかにふくれた状態は、第8図(1)に示さ
れており、この状態における輸送管1の軸直角断面は第
8図(2)に示されている。袋体30にさらに圧縮空気を
供給することによつて、第8図(3)で示されるように袋
体30がふくらみ、この袋体30が輸送管1を遮断状態
としないうちに圧力計4,6による圧力の観察が後述の
ように行なわれる。Therefore, compressed air is supplied into the bag body 30 via the pipe bodies 32 and 33 by the air pump 53 shown in FIG.
A state in which the bag body 30 is slightly swollen is shown in FIG. 8 (1), and a cross section perpendicular to the axis of the transport pipe 1 in this state is shown in FIG. 8 (2). By further supplying compressed air to the bag body 30, the bag body 30 swells as shown in FIG. 8 (3), and the pressure gauge 4 , 6 is used to observe the pressure as will be described later.
袋体30を充分にふくらませると、第9図に示されるよ
うに輸送管1を全閉状態とすることができる。このこと
はもう1つの袋体31に関しても同様である。When the bag body 30 is fully inflated, the transport tube 1 can be fully closed as shown in FIG. This also applies to the other bag 31.
第10図は本件発明者の実験結果を示す。この第10図
には、第1図の輸送管1内に袋体30を挿入し、第7図
の状態から第8図および第9図に示されるように袋体3
0に圧縮空気を供給したとき、圧力計4または圧力計6
による圧力変化を示してある。輸送管1には、第1図を
右方から150mmH2Oであつて71.8m3/h で都市
ガスが供給される。袋体30に一定流量で圧縮空気を供
給したとき、圧力計4による圧力変化はラインl1で示
されるとおり比較的ゆつくりと低下した。FIG. 10 shows an experimental result of the inventor of the present invention. In FIG. 10, the bag body 30 is inserted into the transportation pipe 1 of FIG. 1, and the bag body 3 is inserted from the state of FIG. 7 as shown in FIGS. 8 and 9.
When compressed air is supplied to 0, pressure gauge 4 or pressure gauge 6
The pressure change due to is shown. The city gas is supplied to the transportation pipe 1 from the right side in FIG. 1 at 150 mmH 2 O at 71.8 m 3 / h. When compressed air was supplied to the bag body 30 at a constant flow rate, the pressure change by the pressure gauge 4 decreased relatively slowly as shown by the line l1.
参考までに述べると、単一の管体の先端に袋体を連結
し、その袋体を輸送管1内に挿入し、この管体に圧縮空
気を一定流量で供給して袋体をふくらませたときにおけ
る圧力計4によつて検出される圧力変化は、ラインl2
で示されているように急激に変化する。単一の管体の先
端に連結されている袋体は、破断可能なテープによつて
折り畳まれた状態で、輸送管1内に挿入され、この袋体
に圧縮空気が供給されることによつて袋体が膨張し、こ
の膨張力によつてテープが破断し、輸送管1内において
袋体が広がる。このような構成によれば、輸送管1内が
短時間で閉塞されることになる。したがつて、圧力計4
あるいは圧力計6によつて輸送管1内の圧力の変化を袋
体の膨張状態とともに観測することが困難である。これ
に対して、本発明に従えば、前述の袋体30に一定の流
量で圧縮空気を供給したとき、圧力計4あるいは圧力計
6によつて観測される圧力変化は、ラインl1で示され
るようにゆるやかであり、したがつて輸送管1を袋体3
0によつて誤つて封止してしまうことがなく、輸送管1
によるガスの輸送を遮断する恐れが確実になくなる。For reference, a bag is connected to the tip of a single pipe, the bag is inserted into the transport pipe 1, and compressed air is supplied to the pipe at a constant flow rate to inflate the bag. At this time, the pressure change detected by the pressure gauge 4 is the line 12
It changes rapidly as shown by. A bag connected to the tip of a single tube is inserted into the transport tube 1 in a state of being folded by a breakable tape, and compressed air is supplied to the bag. Then, the bag body expands, the expansion force causes the tape to break, and the bag body expands in the transport pipe 1. With such a configuration, the inside of the transportation pipe 1 is blocked in a short time. Therefore, pressure gauge 4
Alternatively, it is difficult for the pressure gauge 6 to observe the change in the pressure inside the transport pipe 1 together with the inflated state of the bag body. On the other hand, according to the present invention, when compressed air is supplied to the bag body 30 at a constant flow rate, a pressure change observed by the pressure gauge 4 or the pressure gauge 6 is indicated by a line l1. It is so loose that the transport tube 1 is packed into the bag 3
The transport pipe 1 is prevented from being accidentally sealed by 0.
The risk of interrupting the transportation of gas due to is certainly eliminated.
袋体30を輸送管1内で使用後に再び輸送管1から袋体
30を取出すにあたつては、管体32,33から空気ポ
ンプ53を取外して袋体30内の圧縮空気を外部に放散
する。その後、管体32,33のうちの一方を、その軸
線回りにまわす。これによつて袋体30内に残存してい
る空気が他方の管体33側に流れる。こうして袋体30
内に空気が残存しない状態とすることができる。このよ
うにして袋体30を前記一方の管体32に巻付けた状態
で、管体32,33を引張り、輸送管1内から基体17
を経て案内筒26内に戻すことができる。In removing the bag body 30 from the transport tube 1 again after the bag body 30 has been used in the transport tube 1, the air pump 53 is removed from the tube bodies 32 and 33 to release the compressed air in the bag body 30 to the outside. To do. Then, one of the tubular bodies 32 and 33 is turned around its axis. As a result, the air remaining in the bag body 30 flows toward the other tube body 33 side. Thus the bag 30
It can be in a state where no air remains inside. In this way, with the bag body 30 wrapped around the one tube body 32, the tube bodies 32 and 33 are pulled, and the base body 17 is removed from the inside of the transport tube 1.
It can be returned to the inside of the guide tube 26 via.
上述の実施例では、輸送管1内に袋体30を挿入するに
あたつては、その袋体30は管体32,33にそれぞれ
部分的に巻回されていたけれども,本発明の他の実施例
として、袋体30は管体32,33のいずれか一方に巻
回された状態で、挿入されるようにしてもよい。In the above-described embodiment, when the bag body 30 is inserted into the transport pipe 1, the bag body 30 is partially wound around the pipe bodies 32 and 33, respectively. As an example, the bag body 30 may be inserted while being wound around one of the tube bodies 32 and 33.
第11図を参照して、輸送管1の工事個所Lを切除して
交換する作業の手順を述べる。まず第11図(1)で示さ
れるように輸送管1に操作孔2,3を穿設し、操作孔2
には圧力計4を装着する。操作孔3には、作業装置7を
装着し、操作孔3を予め塞いでいるプラグ18(第3図
参照)をハンドル21の操作によつて取去り、そこで袋
体30と、管体32,33を押込むことによつて輸送管
1内に挿入する。袋体30は、操作孔3に関して工事個
所L寄りに挿入される。袋体30が輸送管1内で最適な
位置に到達したかどうかは、管体32,33に予め表示
した目印によつて外部から知ることができる。袋体30
に圧縮空気が供給されていない状態において、圧力計4
と、作業装置7に取付けられた圧力計6とによつて測定
される圧力を比較し、これらの圧力計4,6による圧力
値が同一であることを確認する。With reference to FIG. 11, a procedure of work for cutting and exchanging the construction site L of the transportation pipe 1 will be described. First, as shown in FIG. 11 (1), the operation holes 2 and 3 are formed in the transport pipe 1, and the operation hole 2
Is equipped with a pressure gauge 4. The work device 7 is attached to the operation hole 3, and the plug 18 (see FIG. 3) that previously closes the operation hole 3 is removed by the operation of the handle 21, where the bag body 30, the tube body 32, Insert 33 into the transport tube 1 by pushing it in. The bag body 30 is inserted near the construction site L with respect to the operation hole 3. Whether or not the bag body 30 has reached the optimum position in the transport tube 1 can be known from the outside by the marks previously displayed on the tube bodies 32 and 33. Bag 30
Pressure gauge is not supplied to the pressure gauge 4
And the pressure measured by the pressure gauge 6 attached to the working device 7 are compared, and it is confirmed that the pressure values by these pressure gauges 4 and 6 are the same.
そこで袋体30を第6図示の状態から第7図示の状態と
し、その後、空気ポンプ53によつて袋体30内に圧縮
空気を供給する。これによつて輸送管1を遮断してしま
わない内に、圧力計4,6の圧力値を観察する。このと
き圧力計4,6のどちらも圧力変化がなく、同一の圧力
値のままであるならば、輸送管1には袋体30に関して
その両側からガスが供給されており、いわゆる両押し供
給であることが判る。このとき袋体30にさらに圧縮空
気を供給して第11図(2)で示すように輸送管1を閉塞
する。同様にして、作業装置7を用いてもう1つの袋体
31を輸送管1内に挿入してふくらませ、輸送管1を第
11図(3)のように閉塞する。作業装置7には、管継手
45,47によつて放散管46を装着する。また同様に
して操作孔2からは、作業装置7と同様な構成を有する
作業装置7aを用いて、袋体30a,31aを輸送管1
内に挿入して輸送管1を遮断する。作業装置7には放散
管46を装着しているので、袋体30,31で閉じられ
た輸送管1内の空間内におけるガスが大気に放散される
とともに、袋体31,31aと輸送管1の管壁との間隙
を経由してくる都市ガスを大気放散することができる。
もう1つの作業装置7aに関しても同様である。こうし
て輸送管1を袋体30,31;30a,31aによつて
遮断した状態で、工事個所Lを切除して交換することな
どが可能となる。Therefore, the bag body 30 is changed from the state shown in FIG. 6 to the state shown in FIG. 7, and thereafter, compressed air is supplied into the bag body 30 by the air pump 53. As a result, the pressure values of the pressure gauges 4 and 6 are observed before the transportation pipe 1 is blocked. At this time, if neither of the pressure gauges 4 and 6 has the same pressure value and the pressure value remains the same, the gas is supplied to the transport tube 1 from both sides of the bag body 30, and so-called double-pressed supply is used. I know there is. At this time, compressed air is further supplied to the bag body 30 to close the transportation pipe 1 as shown in FIG. 11 (2). Similarly, using the working device 7, another bag 31 is inserted into the transportation pipe 1 to inflate it, and the transportation pipe 1 is closed as shown in FIG. 11 (3). The work device 7 is equipped with a diffusion pipe 46 by means of pipe joints 45 and 47. Similarly, using the working device 7a having the same configuration as the working device 7, the bags 30a and 31a are transferred from the operation hole 2 to the transport pipe 1 by using the working device 7a.
It is inserted inside and the transport pipe 1 is shut off. Since the diffusion pipe 46 is attached to the working device 7, the gas in the space inside the transportation pipe 1 closed by the bags 30 and 31 is diffused to the atmosphere, and the bags 31 and 31a and the transportation pipe 1 are also discharged. It is possible to dissipate the city gas that comes through the gap between the pipe wall and the atmosphere.
The same applies to the other working device 7a. In this way, it is possible to excise and replace the construction site L while the transport pipe 1 is blocked by the bags 30, 31; 30a, 31a.
第12図を参照して、工事個所Lの切除交換作業の他の
手順を述べる。作業装置7を用いて輸送管1内に袋体3
0を収納し、輸送管1が遮断されてしまわない程度に袋
体30をふくらますことまでの手順は、前述の第11図
に関連して述べた手順と同様である。このとき圧力計
4,6の圧力値に変化が生じ、両者4,6の圧力値が相
互に異なつてきたことが観察されたときには、輸送管1
には袋体30に関して左右いずれか一方からのみガスが
供給される、いわゆる片押し供給であることが判る。こ
のときには、袋体30を縮小して作業装置7の案内筒2
6内に戻して収納する。そこで輸送管1には第12図
(2)で示されるように操作孔2,3の管軸外方におい
て、連結孔61,62を形成し、バイパス管路63によ
つてこれらの連結孔61,62を接続する。このように
してバイパス管路63を輸送管1に接続した状態で再び
作業装置7によつて袋体30を第12図(3)で示される
ように輸送管1内に挿入してふくらませ、輸送管1を閉
塞する。同様にして袋体31を輸送管1内に挿入して輸
送管1を遮断する。また操作孔2に関して作業装置7a
を装着し、袋体30a,31aによつて輸送管1を遮断
する。そこで工事個所Lを含む輸送管1内のガスを前述
と同様にして放散し、工事個所Lを切除して交換するこ
となどができる。With reference to FIG. 12, another procedure of excision and replacement work of the construction site L will be described. Using the working device 7, the bag 3 is placed inside the transport pipe 1.
The procedure up to storing 0 and inflating the bag body 30 to the extent that the transport tube 1 is not blocked is similar to the procedure described with reference to FIG. 11 above. At this time, the pressure values of the pressure gauges 4 and 6 are changed, and when it is observed that the pressure values of the pressure gauges 4 and 6 are different from each other, the transportation pipe 1
It can be understood that the gas is supplied only from one of the left and right sides of the bag body 30, that is, so-called one-sided supply. At this time, the bag body 30 is reduced and the guide tube 2 of the working device 7 is reduced.
Put back in 6 and store. Therefore, as shown in FIG.
As shown in (2), connecting holes 61 and 62 are formed outside the tube axes of the operation holes 2 and 3, and these connecting holes 61 and 62 are connected by a bypass conduit 63. In this way, with the bypass pipe 63 connected to the transport pipe 1, the working device 7 again inserts the bag body 30 into the transport pipe 1 as shown in FIG. Block the tube 1. Similarly, the bag body 31 is inserted into the transportation pipe 1 to shut off the transportation pipe 1. Further, regarding the operation hole 2, the working device 7a
And the transport tube 1 is shut off by the bags 30a and 31a. Therefore, the gas in the transport pipe 1 including the construction point L can be diffused in the same manner as described above, and the construction point L can be excised and replaced.
本発明は、都市ガスの輸送管に関連して実施されるだけ
でなく、その他のガスを輸送する輸送管に関連して広範
囲に実施することができる。The present invention can be implemented not only in the context of city gas transport pipes, but also in a wide range of contexts with transport pipes for transporting other gases.
効 果 以上のように本発明によれば、輸送管には2つの操作孔
を穿設するだけで、圧力測定を行なうことが可能となる
ので、作業性が向上される。Effect As described above, according to the present invention, the pressure can be measured only by forming the two operation holes in the transport pipe, so that the workability is improved.
第1図は本発明の一実施例を示す断面図、第2図は作業
装置7の分解斜視図、第3図は作業装置7の断面図、第
4図は作業装置7の平面図、第5図は袋体30および管
体32,33などを示す平面図、第6図、第7図および
第8図は袋体30を輸送管1内でふくらます手順を説明
するための図、第9図は袋体30によつて輸送管1を遮
断した状態を示す断面図、第10図は実験結果を示すグ
ラフ、第11図は輸送管1の圧力測定を行なう手順を説
明するための断面図、第12図は輸送管1の圧力測定を
行なう他の手順を説明するための断面図である。 1……輸送管、2,3……操作孔、4,6……圧力計、
7……作業装置、17……基体、26,27……案内
筒、30,30a;31,31a……袋体、32,3
3;37,38……管体、53……空気ポンプ、57…
…管内閉止具1 is a sectional view showing an embodiment of the present invention, FIG. 2 is an exploded perspective view of a working device 7, FIG. 3 is a sectional view of the working device 7, FIG. 4 is a plan view of the working device 7, FIG. FIG. 5 is a plan view showing the bag body 30 and the tube bodies 32, 33, etc., and FIGS. 6, 7, and 8 are views for explaining a procedure for inflating the bag body 30 in the transport pipe 1, 9 FIG. 10 is a cross-sectional view showing a state in which the transport pipe 1 is blocked by the bag body 30, FIG. 10 is a graph showing experimental results, and FIG. 11 is a cross-sectional view for explaining a procedure for measuring the pressure of the transport pipe 1. , FIG. 12 is a sectional view for explaining another procedure for measuring the pressure of the transport pipe 1. 1 ... Transport pipe, 2, 3 ... Operation hole, 4, 6 ... Pressure gauge,
7 ... Working device, 17 ... Base, 26, 27 ... Guide tube, 30, 30a; 31, 31a ... Bag, 32, 3
3; 37, 38 ... Tube, 53 ... Air pump, 57 ...
… In-pipe closure
Claims (3)
の操作孔を穿設し、一方の操作孔には圧力計を接続し、
他方の操作孔からはその他方操作孔に関して工事個所寄
りに封止用袋体を入れ、袋体に流体を供給して、その袋
体が輸送管を遮断してしまわない程度にふくらませ、前
記圧力計の変化を観察することを特徴とするガス輸送管
の圧力測定方法。1. An operation hole is formed on both sides of a gas transportation pipe, sandwiching a construction site, and a pressure gauge is connected to one operation hole.
From the other operation hole, place the sealing bag near the construction site with respect to the other operation hole, supply the fluid to the bag, and inflate it so that the bag does not block the transport pipe. A method for measuring pressure in a gas transport pipe, which comprises observing a change in a meter.
され、各管体を輸送管の管軸方向に沿つて移動して、袋
体を輸送管に挿入、脱出させることを特徴とする特許請
求の範囲第1項記載のガス輸送管の圧力測定方法。2. A pair of pipe bodies are connected to both sides of the bag body, and each pipe body is moved along the pipe axis direction of the transport pipe to insert and remove the bag body into the transport pipe. The pressure measuring method for a gas transportation pipe according to claim 1, wherein
続し、この圧力計と前記一方の操作孔に接続された圧力
計とにそれぞれ表示された圧力が変化なく、継続して一
定の値を示したとき、袋体にさらに流体を供給して輸送
管を完全に遮断するとともに、前記一方の操作孔からも
うひとつの袋体を入れ、その袋体内に流体を供給して輸
送管を完全に遮断することを特徴とする特許請求の範囲
第1項記載のガス油送管の圧力測定方法。3. Another pressure gauge is connected to the other operation hole, and the pressures respectively displayed on this pressure gauge and the pressure gauge connected to the one operation hole do not change and remain constant. Value, the fluid is further supplied to the bag to completely shut off the transport tube, and another bag is inserted from the one operation hole, and the fluid is supplied to the bag to transport the tube. The method for measuring pressure of a gas oil supply pipe according to claim 1, wherein the pressure is completely shut off.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2661786A JPH0621830B2 (en) | 1986-02-07 | 1986-02-07 | Pressure measurement method for gas transportation pipe |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2661786A JPH0621830B2 (en) | 1986-02-07 | 1986-02-07 | Pressure measurement method for gas transportation pipe |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS62184324A JPS62184324A (en) | 1987-08-12 |
| JPH0621830B2 true JPH0621830B2 (en) | 1994-03-23 |
Family
ID=12198442
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2661786A Expired - Lifetime JPH0621830B2 (en) | 1986-02-07 | 1986-02-07 | Pressure measurement method for gas transportation pipe |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0621830B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7433824B2 (en) | 2002-09-04 | 2008-10-07 | Microsoft Corporation | Entropy coding by adapting coding between level and run-length/level modes |
-
1986
- 1986-02-07 JP JP2661786A patent/JPH0621830B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US7433824B2 (en) | 2002-09-04 | 2008-10-07 | Microsoft Corporation | Entropy coding by adapting coding between level and run-length/level modes |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS62184324A (en) | 1987-08-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6446669B1 (en) | Pipe sealing apparatus | |
| US4557139A (en) | Leak detection method and apparatus | |
| US4949744A (en) | Method and device for mounting a body in a conduit containing fluid | |
| US5187343A (en) | Purge block for pipe welding | |
| SE502633C2 (en) | Method and apparatus for blocking fluid in a pressurized conduit | |
| JPH0621830B2 (en) | Pressure measurement method for gas transportation pipe | |
| JPH0325507Y2 (en) | ||
| SE501299C2 (en) | Method for blocking pipelines and apparatus for carrying out the method | |
| US20080251132A1 (en) | Flexible inflatable purge block for high purity welds | |
| GB2224802A (en) | Blocking pipes | |
| US20160052116A1 (en) | Tool and method for safe removal of valves fitted in fluid pipes | |
| EP0787058B1 (en) | Device for use in joining pipes in a butt-welded joint | |
| US10578511B2 (en) | Flexible universal bladder tool for detecting leaks in a closed fluid system | |
| JP2003185084A (en) | Gas shut-off bag, bag installing apparatus and gas pressure measuring method | |
| JPH03177697A (en) | Water cut-off device and bag thereof | |
| JP2781170B2 (en) | Gas bag insertion jig | |
| GB2091430A (en) | Apparatus for pressurising domestic connection pipes | |
| JPH02599B2 (en) | ||
| WO2001033181A1 (en) | Water cutoff tester for grommets | |
| GB2167830A (en) | Pipe sealing device | |
| JPS6337597Y2 (en) | ||
| JPH048995A (en) | Fluid cutoff device | |
| JPH0443798Y2 (en) | ||
| WO2004055425A1 (en) | A method of sealing a pipeline | |
| JPH11125368A (en) | Replacing construction method of gas transporting conduit and pipe end seal device |