JPH0623514B2 - Construction method of reinforced steel frame composite building frame - Google Patents
Construction method of reinforced steel frame composite building frameInfo
- Publication number
- JPH0623514B2 JPH0623514B2 JP60047653A JP4765385A JPH0623514B2 JP H0623514 B2 JPH0623514 B2 JP H0623514B2 JP 60047653 A JP60047653 A JP 60047653A JP 4765385 A JP4765385 A JP 4765385A JP H0623514 B2 JPH0623514 B2 JP H0623514B2
- Authority
- JP
- Japan
- Prior art keywords
- steel
- reinforced
- floor
- reinforcing bar
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Joining Of Building Structures In Genera (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] この発明は、柱を鉄筋コンクリート造り、かつ梁を鉄骨
造りとする鉄筋鉄骨複合化の建築骨組みの施工方法に関
するものである。Description: TECHNICAL FIELD The present invention relates to a method of constructing a reinforced steel composite building frame in which columns are made of reinforced concrete and beams are made of steel frame.
[従来の技術] 従来、この種の建築骨組みの施工方法としては、まず基
礎部の基礎柱,地中梁を構築するために地盤を掘削して
根切を行なって、これら基礎柱,地中梁を構築した後
に、最下階の床を構築し、それから最下階の床面上に鉄
筋柱を立設してコンクリートを打設し、その柱のコンク
リートに充分な強度が出てから、その柱の頂部や側部等
に予め設けておいたアンカーボルトや鉄骨仕口に鉄骨の
梁を取り付ける方法によって、各階の鉄筋コンクリート
の柱と鉄骨の梁を組立施工し、これを下層階から上層階
に向けて1〜2層階分ずつ継ぎ足すようにして建築骨組
みを施工していた。[Prior Art] Conventionally, as a construction method of this kind of building frame, first, the foundation pillar of the foundation portion, the ground is excavated and root cutting is performed to construct the underground beam, and the foundation pillar and the underground After constructing the beams, build the floor of the bottom floor, and then erected a reinforced column on the floor surface of the bottom floor and cast concrete, after the concrete of that column has sufficient strength, Assemble the reinforced concrete columns and steel beams on each floor by the method of attaching steel beams to the anchor bolts and steel connections that were previously provided on the tops and sides of the columns, and then assemble them from the lower floors to the upper floors. The building frame was constructed by adding one to two floors toward each other.
[発明が解決しようとする問題点] ところが、このような従来の施工方法は、1層階分ずつ
の段階的な施工であるために工期が長くなるという問題
があった。また、2層階分以上の柱の鉄筋の組立・接合
作業は高所作業となるため、その施工性,安全性に問題
があるとされていた。しかも、最下階の床を構築した後
に、その上階の柱,梁の施工を行なうため、建物の建築
面積が大きい場合には、その全面積をカバーするために
特別大規模な揚重設備が必要となり、また通常の揚重機
によってもカバーできるようにするためには建物を平面
的に区切って施工していく必要があった。[Problems to be Solved by the Invention] However, such a conventional construction method has a problem that the construction period is extended because the construction is performed step by step for each one floor. Further, since the work of assembling and joining the reinforcing bars of the columns of two or more floors is a high place work, it is said that there is a problem in workability and safety. Moreover, since the floors on the lowermost floor are constructed and then the pillars and beams on the upper floors are constructed, if the building has a large construction area, a special large-scale lifting facility is required to cover the entire area. Was required, and it was necessary to construct the building by dividing it in a plane so that it could be covered by an ordinary lifting machine.
この発明は、このような従来の問題を解決するものであ
り、本出願人が新たに開発した鉄筋鉄骨複合柱と柱の下
側鉄筋組を使用する。The present invention solves such a conventional problem, and uses the reinforced steel frame composite column and the lower reinforcing rod set of the column newly developed by the present applicant.
[問題点を解決するための手段] この発明による鉄筋鉄骨複合化の建築骨組みの施工方法
は、柱を鉄筋コンクリート造り、かつ梁を鉄骨造りとす
る鉄筋鉄骨複合化の建築骨組みの施工方法において、地
中の基礎に、その基礎から整地レベルの若干上方に至る
長さの柱の下側鉄筋組を建てて、その下側鉄筋組にコン
クリートを打設して柱の下側鉄筋コンクリートの上端部
を整地レベルより上方に突出するように構築し、それか
ら整地レベルまで土を埋め戻し、その後、最下階の床の
構築前に、埋め戻した地盤上を自走可能な自走式クレー
ンによって、複数階分にわたる長さの柱の鉄筋かごに予
め複数階分の鉄骨梁接合用の仕口構成体が取り付けられ
た鉄筋鉄骨複合柱を吊り下げて前記下側鉄筋組の上方に
位置させ、そしてその鉄筋鉄骨複合柱の下端を下側鉄筋
組の上端に接合し、それから複数本建てた鉄筋鉄骨複合
柱の仕口構成体の相互間に各階毎の鉄骨梁を掛け渡して
接合することを特徴とする。[Means for Solving Problems] A method of constructing a reinforced steel frame composite building frame according to the present invention is a method of constructing a reinforced steel frame composite building frame, wherein columns are made of reinforced concrete and beams are made of steel. On the inside foundation, construct the lower rebar group of the column from the foundation to slightly above the leveling level, and place concrete on the lower rebar group to level the upper end of the lower reinforced concrete column. It is constructed so that it projects above the level, then backfills the soil to the leveling level, and then, before building the floor of the lowest floor, it is a self-propelled crane capable of self-propelled on the backfilled ground Reinforced steel composite column in which a joint structure for joining steel beams of multiple floors is attached in advance to a reinforced concrete car of a column having a length of one minute, and the composite steel column is hung above the lower reinforcing bar set, and the reinforcing bar Steel composite pillar It is characterized in that the lower end is joined to the upper end of the lower rebar group, and then the steel beams of each floor are hung and joined between the joint constituents of a plurality of reinforced steel composite columns.
[作用] この発明による鉄筋鉄筋複合化の建築骨組みの施工方法
は、鉄筋コンクリート造りの柱を成すために、所定の長
さを有するユニット化された柱の下側鉄筋組と、複数階
分にわたる長さの柱の鉄筋かごに予め複数階分の鉄骨梁
接合用の仕口構成体が取り付けられてユニット化された
鉄筋鉄骨複合柱を使用し、一方、鉄骨造りの梁を成すた
めに、鉄筋鉄骨複合柱の仕口構成体相互間に掛け渡され
る各階毎の鉄骨を使用するものであり、これらの柱と梁
の施工を関連的に行うと共に、その施工中に、最下階の
床を構築する前に、柱の基礎から整地レベルまでの土の
埋め戻しを行ない、埋め戻した地盤上において自走式ク
レーンによって、前記柱と梁の組立施工を行なう。[Operation] The construction method of the building frame of the composite structure of the reinforcing bar and the reinforcing member according to the present invention is, in order to form a pillar made of reinforced concrete, a lower reinforcing bar structure of a unitized pillar having a predetermined length and a length over a plurality of floors. We use a reinforced steel composite column that is a unitized structure in which the joint structure for joining the steel beams of multiple floors is attached in advance to the steel cage of the Sano pillar, while the steel reinforced steel frame is used to form the steel frame beam. It uses steel frames for each floor that are bridged between the joint components of the composite columns, and the columns and beams are related to each other, and the floor on the bottom floor is constructed during the construction. Before doing so, the soil is backfilled from the foundation of the pillar to the leveling level, and the pillar and beam are assembled by a self-propelled crane on the backfilled ground.
[実施例] 以下、この発明の実施例を図面に基づいて説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.
まず、この工法において使用する鉄筋鉄骨複合柱と柱の
下側鉄筋組について説明する。First, the reinforced steel composite column and the lower reinforcing bar assembly of the column used in this method will be described.
鉄筋鉄骨複合柱は、第1図(f) 中にて符号1を付して表
すように、複数階分に相当する長さの鉄筋コンクリート
の柱の鉄筋かご2に、その複数階分の仕口構成体3が取
り付けられた構成となっている。この鉄筋鉄骨複合柱1
は、予め地上にて架台や吊り治具を使用して精度良く先
組みされたものである。The reinforced steel composite column is shown in Fig. 1 (f) by the reference numeral 1, and the reinforced concrete basket 2 of the reinforced concrete column having the length corresponding to the multiple floors is connected to the multiple floors. The structure 3 is attached. This reinforced steel composite column 1
Is pre-assembled on the ground in advance using a stand or a hanging jig with high accuracy.
本実施例においてこの鉄筋鉄骨複合柱1は、3層階分の
仕口構成体3が取り付けられていて、これらの仕口構成
体3のそれぞれに、2階、3階、屋上の鉄骨梁が接合さ
れるようになっている。仕口構成体3は、第4図ないし
第6図に表すように、鉄骨梁の端部に相当する梁鉄骨部
4と、枠状の型枠兼用プレート部5とによって構成され
ている。図示するものは、4つの鉄骨梁が十字状に接合
されるようになっている。すなわち、梁鉄骨部4は、十
字状の上部と下部の水平プレート4a、4bの間に十字状
の垂直プレート4cを有する形状であり、一方、型枠兼
用プレート部5は断面L字状の4つの鋼板の組み合わせ
によって全体として十字状を成し、そして梁鉄骨部4の
中央寄りの部分を囲むものである。梁鉄骨部4における
上部の水平プレート4aの中央には、第6図に表すよう
に垂直プレート4cの肉厚分よりも大きい1つの空気孔
4dが形成されている。したがって、この空気孔4dは、
水平プレート4aの下側における垂直プレート4aの4箇
所のコーナー部分にまたがって位置する。In the present embodiment, the reinforced steel composite column 1 is provided with the three-story floor joint structure bodies 3, and each of these joint structure bodies 3 has a second floor, a third floor, and a rooftop steel beam. It is supposed to be joined. As shown in FIGS. 4 to 6, the joint structure 3 is composed of a beam steel frame portion 4 corresponding to the end of the steel beam and a frame-shaped plate / combination plate portion 5. In the illustrated structure, four steel beams are joined in a cross shape. That is, the beam steel frame portion 4 has a shape having a cross-shaped vertical plate 4c between the cross-shaped upper and lower horizontal plates 4a and 4b, while the formwork / plate portion 5 has an L-shaped cross section. The combination of two steel plates forms a cross shape as a whole, and surrounds a portion of the beam steel frame portion 4 near the center. At the center of the upper horizontal plate 4a in the beam steel part 4, one air hole 4d larger than the thickness of the vertical plate 4c is formed as shown in FIG. Therefore, this air hole 4d is
It is located across four corners of the vertical plate 4a below the horizontal plate 4a.
鉄筋かご2は、多数の鉄筋の組み合わせによって3層階
分の3つの仕口構成体3を所定の間隔をおいて接続し、
これによってユニット化した鉄筋鉄骨複合化柱1を構成
する。すなわち、鉄筋かご2は、3つの仕口構成体3の
それぞれの上下の水平プレート4a、4bを連続して貫く
8本のネジ鉄筋2aと、3つの仕口構成体3のそれぞれ
の型枠兼用プレート部5の内側コーナーを連続して貫通
する4本のコーナー鉄筋(異形鉄筋)2bと、各仕口構
成体3毎の上下の水平プレート4a,4bを貫通する4本
ずつの計12本のシャー鉄筋2cを有している。したが
って、8本のネジ鉄筋2aと、4本のコーナー鉄筋2bは
それぞれ3層階分に渡る一連の長いものとなっており、
また計12本のシャー鉄筋2cは、それぞれ対応する仕
口構成体3の上下の水平プレート4a,4bの間隔よりも
若干長いものとなっている。そして、ネジ鉄筋2aとシ
ャー鉄筋2cのそれぞれにねじ合って各仕口構成体3を
上下から挾む定着ナット2dを締め付けることによっ
て、各仕口構成体3を連結している。また、鉄筋かご2
はその全長に渡って多数のフープ筋2eを有する。この
フープ筋2eは仕口構成体3の内部においても備えられ
ており、またネジ鉄筋2aとコーナー鉄筋2bとによって
四角柱状に囲まれた内部の適所には、これらの鉄筋2
a、2bの内方への座屈を防止する座屈防止枠(図示せ
ず)が備えられている。また、鉄筋かご2の下側にはプ
レート2fが取り付けられている。Reinforcing bar cage 2 is a combination of a large number of reinforcing bars, which connects three joint structure members 3 for three layers at a predetermined interval,
As a result, the unitized reinforced steel composite column 1 is configured. That is, the rebar cage 2 also serves as eight screw rebars 2a that continuously pass through the upper and lower horizontal plates 4a and 4b of the three joint structure bodies 3 and also as the formwork of each of the three joint structure bodies 3. Four corner rebars (deformed bars) 2b continuously penetrating the inner corners of the plate portion 5 and four penetrating four upper and lower horizontal plates 4a, 4b of each joint structure body 12 in total. It has shear rebar 2c. Therefore, each of the 8 screw rebars 2a and the 4 corner rebars 2b is a long series extending over 3 stories.
Further, the twelve shear reinforcing bars 2c in total are slightly longer than the intervals between the upper and lower horizontal plates 4a, 4b of the corresponding port forming body 3. Then, the respective joint structure bodies 3 are connected by screwing onto the screw reinforcing bars 2a and the shear reinforcing bar 2c and tightening the fixing nuts 2d which sandwich the respective joint structure bodies 3 from above and below. Also, rebar basket 2
Has a large number of hoop muscles 2e over its entire length. The hoop reinforcement 2e is also provided inside the joint structure 3, and the reinforcement reinforcement 2e is provided at a proper position inside the rectangular columnar shape by the screw reinforcement 2a and the corner reinforcement 2b.
A buckling prevention frame (not shown) for preventing inward buckling of a and 2b is provided. A plate 2f is attached to the lower side of the reinforcing bar cage 2.
一方、柱の下側鉄筋組は、第1図(b)中にて符号6を付
して表すように、下端のベースプレート6aと上端のテ
ンプレート6bとの間に多数の鉄筋が組み合わされて成
り、鉄筋コンクリートの柱の地中部分に当たるユニット
化した鉄筋かごを構成している。この下側鉄筋組6は、
予め地上にて架台や吊り治具を使用して精度良く先組み
されたものであり、地中の基礎Gから整地レベルLの若
干上方に至る長さに設定されている。また、組み合わさ
れている鉄筋は、前述した鉄筋鉄骨複合柱1の鉄筋かご
2における計8本のネジ鉄筋2aと、計4本のコーナー
鉄筋2bと、多数のフープ筋2eと同様のものであり(図
において同一符号を付す)、鉄筋鉄骨複合柱1との接合
によって鉄筋が連続するようになっている。本実施例の
場合、下側鉄筋組6の中間部分のフープ筋2eは、現場
に運び込まれる前の時点では定位置に固定されておら
ず、建築骨組みの施工段階において地中梁用の鉄筋と組
み合わされたときに初めて定位置に固定される。On the other hand, the lower rebar assembly of the pillar is composed of a large number of rebars assembled between the base plate 6a at the lower end and the template 6b at the upper end, as indicated by reference numeral 6 in FIG. 1 (b). , It constitutes a unitized reinforced cage that hits the underground part of a reinforced concrete column. This lower rebar assembly 6
It is preliminarily assembled on the ground in advance by using a mount or a hanging jig, and is set to a length from the foundation G in the ground to slightly above the leveling level L. In addition, the rebars that are combined are the same as the total of eight screw rebars 2a, four corner rebars 2b, and a large number of hoop rebars 2e in the rebar cage 2 of the rebar-steel composite column 1 described above. (Indicated by the same reference numerals in the figure), the reinforcing bars are connected by joining with the reinforcing steel-frame composite columns 1. In the case of the present embodiment, the hoop reinforcements 2e in the middle portion of the lower reinforcing bar assembly 6 are not fixed in place before they are brought to the site, and are used as underground reinforcing steel bars during the construction stage of the building frame. It will only be locked in place when assembled.
次に、上記のような構成の鉄筋鉄骨複合柱1と柱の下側
鉄筋組6を使用しての実際の建築骨組みの施工方法をそ
の工程の順序にしたがって説明する。Next, an actual construction method of a building frame using the reinforced steel frame composite column 1 and the column lower side reinforcing bar set 6 having the above-described configurations will be described in the order of the steps.
まず、第1図(a)に表すように、柱を建てる位置を深く
掘って柱の下側鉄筋組6の建込み用の根切りを行い、そ
して捨てコンクリートC1を打つ。その際、捨てコンク
リートC1の四隅に4つのフック7を埋め込む。柱が建
てられる中央部分における捨てコンクリートC1は、1
25mm程度に比較的厚く打たれる。First, as shown in FIG. 1 (a), the position where the pillar is to be built is deeply dug, root cutting for building the lower reinforcing bar assembly 6 of the pillar is performed, and then discarded concrete C 1 is cast. At that time, four hooks 7 are embedded in the four corners of the discarded concrete C 1 . The discarded concrete C 1 in the central part where the pillar is built is 1
It is struck relatively thickly to about 25 mm.
その後、捨てコンクリートC1上にて柱の芯の墨だしを
行い、その墨に合わせて4本の樹脂アンカー8を打つ
(第7図参照)。このアンカー8は、捨てコンクリート
C1が比較的厚いために確実に固定される。それから、
第1図(b)に表すように、前述した柱の下側鉄筋組6を
立てた状態で吊り込み、その下端のベースプレート6a
の四隅の穴にアンカー8を嵌める。それから、ベースプ
レート6aを上下から挾むようにアンカー8にねじ付け
られたナット9を締め付ける。このようにして、下側鉄
筋組6の下端の位置決めが一義的に精度良く、かつ速や
かに行なわれる。それから、下側鉄筋組6の上端のテン
プレート6bの四隅とフック7との間のそれぞれに、チ
ェーン10とターンバックル11と鉄筋フック12を連
ねて掛け渡し、その計4本のターンバックル11を調整
して下側鉄筋組6の建て入れ直しをする。After that, the cores of the pillars are marked on the discarded concrete C 1 and four resin anchors 8 are struck according to the marks (see FIG. 7). This anchor 8 is securely fixed because the discarded concrete C 1 is relatively thick. then,
As shown in FIG. 1 (b), the lower reinforcing bar assembly 6 of the above-mentioned pillar is hung in a standing state, and the base plate 6a at the lower end thereof
Insert the anchors 8 into the holes at the four corners. Then, the nut 9 screwed to the anchor 8 is tightened so as to sandwich the base plate 6a from above and below. In this way, the lower end of the lower reinforcing bar assembly 6 is uniquely accurately and promptly positioned. Then, the chain 10 and the turnbuckle 11 and the reinforcing bar hook 12 are chained over the four corners of the template 6b at the upper end of the lower reinforcing bar set 6 and the hook 7, respectively, and the four turnbuckles 11 in total are adjusted. Then, rebuild the lower rebar assembly 6.
その後、第1図(c)に表すようにフーチング配筋とラス
型枠13の取り付けを行い、コンクリートC2を打って
フーチングをする。Then, as shown in FIG. 1 (c), the footing reinforcement and the lath form 13 are attached, and concrete C 2 is hit to perform footing.
その後、4本のターンバックル11を再び調整して、下
側鉄筋組6の2度目の建て入れ直しをする。それから、
第1図(d)に表すようにフーチングの天端まで土を埋め
戻す。その際、水締めをおこなう。そして、同図に表す
ように下側鉄筋組6に交差するように地中梁配筋と、地
中配筋のラス型枠の取り付けを行ってから、コンクリー
トを打って鉄筋コンクリートの地中梁14を成す。本実
施例の場合は、地中梁配筋の際に、下側鉄筋組6の中間
部分のフープ筋2eが初めて定位置に固定される。After that, the four turnbuckles 11 are adjusted again, and the lower reinforcing bar set 6 is rebuilt for the second time. then,
As shown in Fig. 1 (d), backfill the soil to the top of the footing. At that time, tighten the water. Then, as shown in the same figure, after installing the underground beam reinforcement and the lath form of the underground reinforcement so as to intersect the lower reinforcing bar set 6, concrete is struck and the underground beam 14 of reinforced concrete is struck. To make. In the case of the present embodiment, the hoop reinforcement 2e in the middle portion of the lower reinforcing bar set 6 is fixed in place for the first time when the underground beam reinforcement is performed.
その後、チェーン10とターシバックル11を撤去して
から整地レベルLまで土を埋め戻し、そして柱型枠をセ
ットしてから柱の立ち上がり部分のコンクリート打ちを
行う。この結果、第1図(e)に表すように鉄筋コンクリ
ートの地中梁14と、鉄筋コンクリートの柱の基礎側が
施工されたことになる。その柱の基礎側は、下側鉄筋組
6が地中の基礎Gから整地レベルLの若干上方に至る長
さであることから、その立ち上がり部分が整地レベルL
の若干上方に位置することになる。After that, the chain 10 and the tassi buckle 11 are removed, the soil is backfilled to the leveling level L, the pillar formwork is set, and then the rising portion of the pillar is concrete-cast. As a result, as shown in FIG. 1 (e), the underground beam 14 of reinforced concrete and the foundation side of the column of reinforced concrete were constructed. On the foundation side of the column, since the lower reinforcing bar set 6 has a length from the foundation G in the ground to slightly above the ground level L, the rising portion thereof is at the ground level L.
Will be located slightly above.
その後、第1図(f)に表すように、前述した鉄筋鉄骨複
合柱1、つまり鉄筋かご2に3階分の3つの仕口構成体
3を取り付けたユニットを立てた状態で吊り込んで下側
鉄筋組6の上方に位置させる。この吊り込みには、現場
内に入って作業する通常規模のトラッククレーンなどを
用いることが可能である。これは、この時点における現
場が埋め戻し整地されていて、その整地レベルL上には
柱の基礎側の立ち上がり部分が存在するだけであって、
トラッククレーンなどの移動の支障とはならないからで
ある。この点において、下側鉄筋組6の長さを地中の基
礎Gから整地レベルLの若干上方に至る長さとしたこと
の有効性がある。鉄筋鉄骨複合柱1の吊り込みに前後し
て、下側鉄筋組6の上端の鉄筋2a,2bの総てにスリー
ブジョイント15を嵌め合わせると共に、鉄筋鉄骨複合
柱1の建て入れ直し用のワイヤー16を張る。本実施例
の場合は、2階用の仕口構成体3と、隣に施工した他の
柱の基礎側との間に計4本のワイヤー16が張られて、
それぞれのワイヤー16にターンバックル17が備えら
れている。Then, as shown in FIG. 1 (f), the reinforced steel frame composite pillar 1 described above, that is, the reinforcing bar cage 2 is hung in a state in which the unit in which the three joint structure bodies 3 for the three floors are attached is erected. It is located above the side reinforcing bar set 6. For this hoisting, it is possible to use a normal-sized truck crane or the like that works by entering the site. This is because the site at this point is backfilled, and there is only a rising part on the foundation side of the pillar on the leveling level L.
This is because it does not hinder the movement of a truck crane or the like. In this respect, it is effective to set the length of the lower reinforcing bar set 6 to a length from the foundation G in the ground to slightly above the ground level L. Before and after the suspension of the reinforced steel composite column 1, the sleeve joint 15 is fitted to all of the upper reinforcing bars 2a and 2b of the lower reinforcing bar set 6, and the wire 16 for re-installing the reinforced steel composite column 1 is installed. Stretch. In the case of the present embodiment, a total of four wires 16 are stretched between the second-floor joint structure 3 and the foundation side of the other adjacent column,
Each wire 16 is provided with a turnbuckle 17.
その後、下側鉄筋組6側の四隅に位置するスリーブジョ
イント15、つまりコーナー鉄筋2bの上端側のスリー
ブジョイント15を所定量引き上げて、そのスリーブジ
ョイント15の上側部分を対応する鉄筋鉄骨複合柱1側
のコーナー鉄筋2bの下端に嵌め合わせる。それから、
各ワイヤー16毎の計4本のターンバックル17を調整
して鉄筋鉄骨複合柱1の建て直しを行い、そして所定の
精度がでた後、四隅のスリーブジョイント15を圧着す
る。この圧着を行う圧着機は、例えば鉄筋鉄骨複合柱1
にセットした吊り治具に取り付けておき、またその四隅
のスリーブジョイント15の圧着は対角位置のものから
順に行う。After that, the sleeve joints 15 located at the four corners of the lower reinforcing bar assembly 6 side, that is, the sleeve joints 15 on the upper ends of the corner reinforcing bars 2b are pulled up by a predetermined amount, and the upper portion of the sleeve joints 15 is connected to the corresponding reinforcing steel composite column 1 side. Fit it to the lower end of the corner reinforcing bar 2b. then,
A total of four turnbuckles 17 for each wire 16 are adjusted to rebuild the reinforced steel frame composite pillar 1, and after the predetermined accuracy is obtained, the sleeve joints 15 at the four corners are crimped. The crimping machine for this crimping is, for example, a reinforced steel composite column 1
The sleeve joints 15 are attached to the hanging jigs set in step 1, and the sleeve joints 15 at the four corners are crimped in order from diagonal positions.
その後、鉄筋鉄骨複合柱1の玉掛けを外す。それから、
残りのスリーブジョイント15、つまり下側鉄筋組6と
鉄筋鉄骨複合柱1のそれぞれのネジ鉄筋2a同士の接続
用の計8つのスリーブジョイント15を圧着する。この
圧着も対角位置のものから順に行う。それから、スリー
ブジョイント15のジョイント部分に所定のピッチでフ
ープ筋2eを取り付ける。このようにして鉄筋鉄骨複合
柱1を搬入して組み付けることにより、1階から屋上に
至る柱の鉄筋と3層階分の仕口が一挙にできあがる。Then, remove the sling of the reinforced steel composite column 1. then,
The remaining sleeve joints 15, that is, a total of eight sleeve joints 15 for connecting the lower reinforcing bar assembly 6 and the respective screw reinforcing bars 2a of the reinforcing steel composite column 1 are crimped. This pressure bonding is also performed in order from the diagonal position. Then, the hoop muscles 2e are attached to the joint portion of the sleeve joint 15 at a predetermined pitch. By loading and assembling the reinforced steel composite column 1 in this manner, the reinforcing rods of the columns from the first floor to the roof and the joints for the three floors are completed at once.
その後、第1図(g)に表すように、隣り合う鉄筋鉄骨複
合柱1の仕口構成体3の相互間に、2階、3階、屋上の
鉄筋の梁18をクレーンを利用して掛け渡して取り付け
る。その際、ターンバックル17を緩めて梁18の掛け
渡しを容易なものとする。それから、2階、3階、屋上
分のデッキプレートを仮置きし、そして2階の梁18か
ら張ったワイヤーによって建て入れ直しを行ってからそ
れぞれの接合部のボルトを本締めする。それから、デッ
キプレート貼りと梁18上のスタッド打ちを行う。Then, as shown in FIG. 1 (g), the beams 18 of the second and third floors and the rooftop reinforced steel bar 18 are hung between the joint structures 3 of the adjacent reinforced steel composite columns 1 using a crane. Pass and attach. At that time, the turnbuckle 17 is loosened so that the beam 18 can be easily bridged. Then, the deck plates for the second floor, the third floor, and the rooftop are temporarily placed, and the wires stretched from the beam 18 on the second floor are used for re-installation, and then the bolts at the respective joints are fully tightened. Then, the deck plate is attached and the studs on the beam 18 are driven.
その後、1階から順次上階へと、通常の鉄筋鉄骨コンク
リート造りの建物と同様の施工法でコンクリートを打設
する。例えば、まず1階部分の鉄筋鉄骨複合柱1に型枠
をセットすると共に、2階のスラブ配筋とメッシュ敷き
を行い、それからその2階のスラブと1階部分の鉄筋鉄
骨複合柱1にコンクリートを打設する。次に、同様にし
て、3階のスラブと2階部分の鉄筋鉄骨複合柱1にコン
クリートを打設し、そして屋上部分のスラブにコンクリ
ートを打設してから、3階部分の鉄筋鉄骨複合柱1にコ
ンクリートを打設する。このような施工法においては、
2階のスラブと1階部分の鉄筋鉄骨複合柱1のコンクリ
ート打設を同時に行い、また3階のスラブと2階部分の
鉄筋鉄骨複合柱1のコンクリート打設を同時に行うこと
が可能である。After that, concrete is poured from the first floor to the upper floors in the same construction method as a normal reinforced steel concrete building. For example, first set the formwork on the reinforced steel composite pillar 1 on the first floor, perform the slab reinforcement and mesh laying on the second floor, and then concrete on the slab on the second floor and the reinforced steel composite pillar 1 on the first floor. To place. Next, in the same manner, concrete is placed on the slab on the third floor and the reinforced steel composite columns 1 on the second floor, and concrete is placed on the slab on the rooftop, and then the reinforced steel composite columns on the third floor are placed. Pour concrete into 1. In such a construction method,
It is possible to simultaneously perform the concrete pouring of the slab on the second floor and the reinforced steel composite column 1 on the first floor, and the concrete slab on the third floor and the concrete reinforced steel composite column 1 of the second floor at the same time.
ところで、鉄筋鉄骨複合柱1の仕口構成体3内にコンク
リートが打設される際には、水平プレート4aの下側に
おける垂直プレート4aの4箇所のコーナー部分に留ど
まる空気が1つの空気孔4bから逃げる。したがって、
その1つの空気孔4bは4つの空気孔としての役を果た
すことになる。このことは、空気孔を成形する上におい
てきわめて有利となる。By the way, when concrete is placed in the joint structure 3 of the reinforced steel frame composite pillar 1, the air that remains at the four corners of the vertical plate 4a below the horizontal plate 4a is one air. Escape from hole 4b. Therefore,
The one air hole 4b serves as four air holes. This is extremely advantageous in forming the air holes.
また、仕口構成体3のプレート部5は枠型を兼ねて内部
のコンクリートを拘束し、そしてそのまま鉄筋コンクリ
ートの柱の一部を成す。したがって、仕口部分に関して
は型枠が不要である。そして、このように仕口部分の周
部を鋼材のプレート部5によって拘束させた結果、その
部分の充填コンクリートの許容圧縮応力度を設計基準強
度の5〜10倍に設定することが可能となる。このこと
と併せて、シャー鉄筋2cが仕口構成体3をナット締め
によって部分的に補強しているため、仕口部分に対して
は要求に応えるに充分な強度が与えられる。また、床に
デッキプレートを採用しているため、合板による梁型
枠、床型枠および型枠支持材の組み立て、解体が不要で
ある。Further, the plate portion 5 of the joint structure 3 also serves as a frame shape and restrains the concrete inside, and forms a part of the column of reinforced concrete as it is. Therefore, no mold is required for the joint portion. Then, as a result of constraining the peripheral portion of the joint portion by the steel plate portion 5 in this manner, it becomes possible to set the allowable compressive stress degree of the filled concrete in that portion to 5 to 10 times the design standard strength. . In addition to this, the shear reinforcement 2c partially reinforces the joint structure 3 by tightening nuts, so that the joint portion is given sufficient strength to meet the demand. Further, since the deck plate is adopted for the floor, it is not necessary to assemble and disassemble the beam form, the floor form and the form support material by plywood.
なお、鉄筋鉄骨複合柱1に備える仕口構成体3の数は、
何等上記実施例に特定されず任意である。また、上記実
施例では、1つの仕口に4本の梁を接合するために仕口
構成体3を十字状としているが、仕口への梁の接合数、
および接合形態などに応じてその仕口構成体3の形状を
適宜変更できることは勿論である。In addition, the number of the joint structure 3 provided in the reinforced steel frame composite pillar 1 is
It is arbitrary and is not specified in the above embodiment. Further, in the above-mentioned embodiment, the joint structure 3 has a cross shape in order to join four beams to one joint, but the number of joints of the beam to the joint is
It is needless to say that the shape of the joint structure 3 can be appropriately changed according to the joining form and the like.
[発明の効果] 以上説明したように、この発明による鉄筋鉄骨複合化の
建築骨組みの施工方法は、鉄筋コンクリート造りの柱を
成すために、地中の基礎から整地レベルの若干上方に至
る長さのユニット化された柱の下側鉄筋組と、複数階分
にわたる長さの柱の鉄筋かごに予め複数階分の鉄骨梁接
合用の仕口構成体が取り付けられてユニット化された鉄
筋鉄骨複合柱とを使用して、基礎に建てた前者の下側鉄
筋組の上に後者の鉄筋鉄骨複合柱を接合するから、その
鉄筋鉄骨複合柱を搬入して建てた時に、複数階分に渡る
柱の鉄筋と複数階分の仕口が一挙にできあがる。このこ
とと併せて、下側鉄筋組と鉄筋鉄骨複合柱を先組みして
ユニット化しているため、工期の大幅な短縮を図ること
ができる。また、それらの下側鉄筋組と鉄筋鉄骨複合柱
を予め地上にて精度良く組み立てることができるため、
その施工性が優れかつその作業の安全性を確保すること
ができる。[Effects of the Invention] As described above, the method for constructing a reinforced-steel composite building structure according to the present invention forms a pillar made of reinforced concrete, so that the length from the foundation in the ground to a little above the leveling level can be achieved. Unitized reinforced steel composite column in which the lower reinforced steel set of the unitized column and the reinforcing bar cage of the column that spans multiple stories are pre-installed with the joint structure for joining the steel beam of multiple stories Using and, the latter reinforced steel composite column is joined to the former lower reinforced steel set built on the foundation, so when the reinforced steel composite column is carried in and built, Reinforcing bars and connections for multiple floors are completed at once. In addition to this, the lower reinforced steel frame set and the reinforced steel frame composite column are first assembled into a unit, so that the construction period can be significantly shortened. Also, since the lower rebar group and the rebar-steel composite columns can be assembled in advance on the ground with high accuracy,
The workability is excellent and the safety of the work can be secured.
また、基礎から整地レベルの若干上方に至る長さの柱の
下側鉄筋組を建ててコンクリートを打設し、柱の下側鉄
筋コンクリートの上端部を整地レベルより上方に突出す
るように構築したので、その後整地レベルまで土を埋め
戻してから前記柱の下側鉄筋コンクリートの上端に鉄骨
鉄筋複合柱を接合するに際して、その接合作業を埋め戻
した地盤上で行なうことができ、従来のようにこの接合
作業を上階の梁の上方における高所で行なう必要がない
ので、施工性,安全性を向上させることができる。In addition, since the lower reinforced concrete set of the pillar with a length slightly above the ground level is built and concrete is placed, the upper end of the lower reinforced concrete pillar is constructed to project above the ground level. After that, when filling the soil to the leveling level and then joining the steel-reinforced composite column to the upper end of the lower reinforced concrete of the column, the joining work can be performed on the backfilled ground, and this joining can be done as in the past. Since it is not necessary to perform the work at a high place above the beams on the upper floor, workability and safety can be improved.
また、最下階の床を構築する前に、基礎から整地レベル
までの土の埋め戻しを行ない、埋め戻した地盤上を自走
可能な、例えばトラッククレーン等、通常規模の自走式
クレーンを、鉄筋鉄骨複合柱を接合する現場内に乗り入
れ、このクレーンを自走させて柱,梁を組立施工するよ
うにした。このため柱,梁を組立施工するために、従来
のように特別大型規模の定置式揚重設備を必要とせず、
しかも通常の自走式クレーンによって、施工すべき建物
を平面的に区切って分割施工することなく施工区域全域
の柱,梁を一気に施工することができるので、揚重設備
および施工のコストダウンを図ることができる。また、
埋め戻しした地盤上に組み立て材料などの運搬車両等の
直接乗り入れが可能となるので、組立作業現場の近くで
の揚重と組立作業とを同一作業員で行なうことができ、
これらにかかわる人手も少なくてすみ、これにより組み
立て材料の搬入組み立てが容易となるとともに労務費の
コストダウンをも図ることができ、加えて一層の工期短
縮を図ることができる。In addition, before constructing the floor on the lowest floor, backfill of soil from the foundation to the leveling level is performed, and a self-propelled crane of a normal scale such as a truck crane capable of self-propelled on the backfilled ground is used. We got into the site where the reinforced steel frame composite columns were joined and made this crane self-propelled to assemble the columns and beams. For this reason, in order to assemble the pillars and beams, there is no need for special large-scale stationary lifting equipment,
Moreover, with the usual self-propelled crane, it is possible to construct the pillars and beams in the entire construction area at once without dividing the building to be constructed in a plane and dividing it, thus reducing the cost of lifting equipment and construction. be able to. Also,
Since it is possible to directly enter a transportation vehicle such as an assembly material on the backfilled ground, the same worker can perform lifting and assembly work near the assembly work site,
The number of workers involved in these operations can be reduced, which makes it easier to carry in and assemble the assembly materials, reduce labor costs, and further shorten the construction period.
図面はこの発明の一実施例を表し、第1図(a)〜(g)はこ
の発明の施工方法をその工程順にしたがって表す説明
図、第2図は下側鉄筋組のベースプレートの平面図、第
3図は第1図(b)の状態における平面図、第4図は仕口
構成体の斜視図、第5図は仕口構成体の横断面図、第6
図は仕口構成体の平面図、第7図は下側鉄筋組の下端の
接合部の説明図である。 1……鉄筋鉄骨複合柱、2……鉄筋かご、 3……仕口構成体、6……下側鉄筋組 G……基礎、L……整地レベル。Drawing shows one example of this invention, Drawing 1 (a)-(g) is an explanatory view showing the construction method of this invention according to the order of the process, and Drawing 2 is a top view of the base plate of a lower side reinforcement set, FIG. 3 is a plan view in the state of FIG. 1 (b), FIG. 4 is a perspective view of the joint structure, FIG. 5 is a cross sectional view of the joint structure, and FIG.
FIG. 7 is a plan view of the joint structure, and FIG. 7 is an explanatory view of the joint portion at the lower end of the lower reinforcing bar assembly. 1 ... Reinforced steel composite column, 2 ... Reinforcing cage, 3 ... Connection structure, 6 ... Lower rebar assembly G ... Foundation, L ... Leveling level.
───────────────────────────────────────────────────── フロントページの続き (72)発明者 貝原 義美 東京都中央区京橋二丁目16番1号 清水建 設株式会社内 (72)発明者 洲之内 康高 東京都中央区京橋二丁目16番1号 清水建 設株式会社内 (72)発明者 山本 秀明 東京都中央区京橋二丁目16番1号 清水建 設株式会社内 (56)参考文献 実開 昭57−163903(JP,U) 特公 昭45−13904(JP,B1) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Yoshimi Kaihara 2-16-1 Kyobashi, Chuo-ku, Tokyo Within Shimizu Construction Co., Ltd. (72) Inventor Yasutaka Sunonouchi 2-1-1-16 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hideaki Yamamoto 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (56) Bibliography 57-163903 (JP, U) JPB 45 -13904 (JP, B1)
Claims (1)
造りとする鉄筋鉄骨複合化の建築骨組みの施工方法にお
いて、地中の基礎に、その基礎から整地レベルの若干上
方に至る長さの柱の下側鉄筋組を建てて、その下側鉄筋
組にコンクリートを打設して柱の下側鉄筋コンクリート
の上端部を整地レベルより上方に突出するように構築
し、それから整地レベルまで土を埋め戻し、その後、最
下階の床の構築前に、埋め戻した地盤上を自走可能な自
走式クレーンによって、複数階分にわたる長さの柱の鉄
筋かごに予め複数階分の鉄骨梁接合用の仕口構成体が取
り付けられた鉄筋鉄骨複合柱を吊り下げて前記下側鉄筋
組の上方に位置させ、そしてその鉄筋鉄骨複合柱の下端
を下側鉄筋組の上端に接合し、それから複数本建てた鉄
筋鉄骨複合柱の仕口構成体の相互間に各階毎の鉄骨梁を
掛け渡して接合することを特徴とする鉄筋鉄骨複合化の
建築骨組みの施工方法。1. A method of constructing a composite structure of reinforced steel frames, wherein the columns are made of reinforced concrete and the beams are made of steel. Build a lower reinforced concrete set, pour concrete into the lower reinforced concrete set so that the upper end of the lower reinforced concrete column projects above the leveling level, then backfill the soil to the leveling level, After that, before constructing the floor on the bottom floor, a self-propelled crane that can self-propelled on the backfilled ground was used to join the steel beams for multiple floors to the reinforcing bar cage of the pillars of multiple lengths in advance. The reinforced steel composite column to which the joint structure is attached is suspended and positioned above the lower reinforcing bar set, and the lower end of the reinforcing bar composite column is joined to the upper end of the lower reinforcing bar set, and then a plurality of buildings Reinforced steel composite column joint Method of constructing architectural framework rebar steel composite, characterized in that joining spanned the steel beam of each floor therebetween adult.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60047653A JPH0623514B2 (en) | 1985-03-11 | 1985-03-11 | Construction method of reinforced steel frame composite building frame |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP60047653A JPH0623514B2 (en) | 1985-03-11 | 1985-03-11 | Construction method of reinforced steel frame composite building frame |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS61207765A JPS61207765A (en) | 1986-09-16 |
| JPH0623514B2 true JPH0623514B2 (en) | 1994-03-30 |
Family
ID=12781209
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP60047653A Expired - Lifetime JPH0623514B2 (en) | 1985-03-11 | 1985-03-11 | Construction method of reinforced steel frame composite building frame |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0623514B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5523421B2 (en) * | 2011-10-14 | 2014-06-18 | 株式会社国元商会 | Template position correction tool |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6133793Y2 (en) * | 1981-04-07 | 1986-10-02 |
-
1985
- 1985-03-11 JP JP60047653A patent/JPH0623514B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPS61207765A (en) | 1986-09-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH09209451A (en) | Joint construction of up and down columns with beam and joint method | |
| JPS6314937A (en) | Reinforced steel composite column | |
| KR20070023274A (en) | PC compound construction method of underground parking lot and PC column-beam connection structure of Janspan PC beam | |
| JPH0623514B2 (en) | Construction method of reinforced steel frame composite building frame | |
| JP2000160687A (en) | Construction method of mixed structure and precast concrete column | |
| JP2600531B2 (en) | Foundation structure for steel column and its construction method | |
| JP3586121B2 (en) | Mixed structure of reinforced concrete column and steel beam and its construction method | |
| JPH0881918A (en) | Pipe and construction method thereof | |
| JP2614000B2 (en) | Basics of steel frame | |
| JP2763488B2 (en) | Prefabricated pillar and inverted ramen prefabricated construction method | |
| JP2967452B2 (en) | Building construction methods and lightweight floor slabs | |
| JPH0749681B2 (en) | Steel frame / reinforced concrete composite construction method | |
| JPH01214641A (en) | Construction of steel-pipe precast concrete pole | |
| JPH07103620B2 (en) | Construction method for steel structure | |
| JP2578671B2 (en) | Column and beam construction method | |
| JPH01121424A (en) | Pc frame device for multistoried building | |
| JPH04161628A (en) | Building method using reinforced concrete column and steel beam | |
| JPS6217233A (en) | Foundation base column | |
| JPH1181694A (en) | Seismic retrofitting of structures | |
| JPH05125761A (en) | Constructing method of composite structure | |
| JP2003166286A (en) | Building skeleton construction method | |
| JPH0782817A (en) | Building wall structure and construction method | |
| JPH02282538A (en) | Construction method of reinforced concrete-made building frame | |
| JPH06257166A (en) | Foundation structure for unit building | |
| JPH05112947A (en) | Execution method of foundation |