JPH0627287B2 - Hot rolling method that prevents surface cracking of billets - Google Patents
[go: Go Back, main page]

JPH0627287B2 - Hot rolling method that prevents surface cracking of billets - Google Patents

Hot rolling method that prevents surface cracking of billets

Info

Publication number
JPH0627287B2
JPH0627287B2 JP61045820A JP4582086A JPH0627287B2 JP H0627287 B2 JPH0627287 B2 JP H0627287B2 JP 61045820 A JP61045820 A JP 61045820A JP 4582086 A JP4582086 A JP 4582086A JP H0627287 B2 JPH0627287 B2 JP H0627287B2
Authority
JP
Japan
Prior art keywords
holding
rolling
slab
temperature
cracking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61045820A
Other languages
Japanese (ja)
Other versions
JPS62203606A (en
Inventor
裕 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Sumitomo Metal Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Industries Ltd filed Critical Sumitomo Metal Industries Ltd
Priority to JP61045820A priority Critical patent/JPH0627287B2/en
Publication of JPS62203606A publication Critical patent/JPS62203606A/en
Publication of JPH0627287B2 publication Critical patent/JPH0627287B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Continuous Casting (AREA)
  • Heat Treatment Of Steel (AREA)
  • Metal Rolling (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、アルミキルド鋼、アルミセミキルド鋼または
アルミシリコンキルド鋼等自動車用鋼板、一般建築用鋼
板、造船用鋼板、機械構造用鋼板等に供される炭素鋼な
らびにNb、V等を含有する低合金鋼の熱間圧延時の表面
割れを防止した熱間圧延法に関するものであり、特にそ
れらの鋼の連続鋳造直後の鋳片をただちに熱間圧延する
か、また連続鋳造後そのまま鋳片を保温炉あるいは加熱
炉等に装入してから熱間圧延を行うプロセスにおいて、
熱間圧延時に鋼片の表面に割れの発生するのを防止する
方法に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention is applied to steel plates for automobiles such as aluminum killed steel, aluminum semi-killed steel or aluminum silicon killed steel, steel plates for general construction, steel plates for shipbuilding, and steel plates for machine structures. The present invention relates to a hot rolling method in which surface cracks of carbon steels and low alloy steels containing Nb, V, etc., which are contained in hot rolling are prevented during hot rolling, and in particular, slabs immediately after continuous casting of those steels are immediately heated. In the process of hot rolling or hot rolling after continuous casting or charging the slab into a heat insulation furnace or a heating furnace after continuous casting,
The present invention relates to a method for preventing cracks from being generated on the surface of a steel slab during hot rolling.

(従来の技術) すでに当業界において良く知られているように、凝固の
ままの鋳片を途中加熱することなく、その保有熱を利用
してそのまま直接熱間圧延すること(以下、単に“直接
圧延”という)あるいは未だ Ar1変態点以上の表面温度
を有する鋳片を一旦加熱炉、保温炉等に装入してから熱
間圧延すること(以下、単に“直送圧延”という)は省
エネルギーの観点から最も望ましい操業形態であるが、
その実現に当っては鋳片表面性状あるいは設備レイアウ
トなどに関する問題が種々存在していた。しかし近年に
至り、それらに対する技術改善が進むにつれ、直接圧延
あるいは直送圧延に関する検討が活発となってきた。
(Prior Art) As is well known in the art, directly hot-rolling a slab that has been solidified without directly heating it by using its heat (hereinafter referred to as “direct It is energy-saving to temporarily charge a slab having a surface temperature higher than the Ar 1 transformation point into a heating furnace or a heat-retaining furnace and then hot-roll it (hereinafter simply referred to as “direct rolling”). From the point of view, the most desirable form of operation,
In realizing this, there were various problems regarding the surface property of the slab or the layout of equipment. However, in recent years, as the technical improvement for them has progressed, studies on direct rolling or direct feed rolling have become active.

その結果、直接圧延あるいは直送圧延においては、従来
法、すなわち連続鋳造後、一旦 Ar1変態点以下、室温近
くまで冷却後再加熱して圧延する方法にみられる冶金学
的現象とは異った現象が多く見出された。特に、直接熱
間圧延する際には材料の熱間加工性が著しく低下するこ
と、つまり従来法においては何ら問題とならなかったよ
うな鋼種においても直接圧延あるいは直送圧延において
は熱間圧延時に鋼片表面に割れの発生することが判明し
た。
As a result, in direct rolling or direct rolling, it was different from the metallurgical phenomenon found in the conventional method, that is, the method in which after continuous casting, the material was once cooled to below the Ar 1 transformation point and cooled to near room temperature and then reheated and rolled. Many phenomena were found. In particular, the hot workability of the material is significantly reduced during direct hot rolling, that is, even in the case of steel grades that did not cause any problems in the conventional method, during hot rolling during direct rolling or direct feed rolling. It was found that cracking occurred on one surface.

一般に、鋼の熱間加工性は、オーステナイト粒径(以
下、“γ粒径”という)と硫化物、炭窒化物などの析出
状態とから影響を強く受け、γ粒径が微細なほど、また
γ粒界への硫化物、炭窒化物などの析出が少ないほど、
熱間加工性は向上する。
In general, the hot workability of steel is strongly affected by the austenite grain size (hereinafter referred to as “γ grain size”) and the precipitation state of sulfides, carbonitrides, etc. The less precipitation of sulfides, carbonitrides, etc. at the γ grain boundaries,
Hot workability is improved.

そして従来法においては、材料に冷却再加熱を繰り返す
ことでγ(オーステナイト)α(フェライト)変態を
経験させて、γ粒を微細化し、かつ析出物の多くを粒内
に固定してγ粒界への析出量を少なくすることにより熱
間加工性を向上させていた。
In the conventional method, the material is repeatedly cooled and reheated to experience the γ (austenite) α (ferrite) transformation, and the γ grains are refined, and most of the precipitates are fixed within the grains to form the γ grain boundary. The hot workability was improved by reducing the amount of precipitation in the.

これに対し、直接圧延法あるいは直送圧延法の場合に
は、鋳片のもつ保有熱を最大限に利用することからγ→
α変態を経ずに圧延するのでγ粒径は非常に大きく、か
つγ粒界への析出も多く、したがって、熱間加工性は低
下することとなる。このような熱履歴が熱間圧延時の割
れの原因とされるのである。
On the other hand, in the case of the direct rolling method or the direct feed rolling method, the retained heat of the slab is utilized to the maximum.
Since the rolling is performed without undergoing the α transformation, the γ grain size is very large and a large amount of precipitation occurs at the γ grain boundary, so that the hot workability is deteriorated. Such heat history is a cause of cracking during hot rolling.

このような直接圧延あるいは直送圧延にみられる熱間圧
延時の割れの発生防止に関しては、既にいくつかの提案
がなされているが、これらに共通する考え方は特開昭55
−84201 号あるいは特開昭55−84203 号に代表されるよ
うに、凝固後の鋳片の冷却速度を遅くするか、冷却途中
で所定温度に一定時間以上、例えば10分間超保定して、
析出物の形態変化ないし粗大化を図り、γ粒界における
析出物の析出間距離を大きくすることにより割れを防止
しようとするものである。
Several proposals have already been made to prevent the occurrence of cracks during hot rolling in such direct rolling or direct feed rolling, but the common idea to these is JP-A-55.
-84201 or Japanese Patent Laid-Open No. 55-84203, slow the cooling rate of the slab after solidification, or keep it at a predetermined temperature during cooling for a certain time or more, for example, for 10 minutes or more,
It is intended to prevent cracks by changing the form or coarsening of the precipitates and increasing the distance between the precipitates at the γ grain boundaries.

なお、「Metallurgical Transactions A」Vol.6A、Sep.
(1975) pp.1727 〜1735においては「低炭素鋼の熱間延
性におよぼす熱履歴および組成の影響」に関し、溶融・
凝固に引き続く冷却過程で、自然放冷される場合、1200
〜800 ℃の温度域で熱間延性が低下すること、そしてこ
の対策として等温保持が有効であることを述べている。
以上のことは上記文献にかぎらず前述の特開昭55−8420
1 号にも述べられている事実であり、両者とも割れ防止
に必要な保定(等温保持)時間は10分間超としている。
In addition, `` Metallurgical Transactions A '' Vol.6A, Sep.
(1975) pp. 1727 to 1735, regarding the "effect of thermal history and composition on the hot ductility of low carbon steel,"
1200 if naturally cooled in the cooling process following solidification
It states that the hot ductility decreases in the temperature range of ~ 800 ℃, and that isothermal holding is effective as a countermeasure.
The above is not limited to the above-mentioned documents, but the above-mentioned JP-A-55-8420.
This is also the case described in No. 1, and both have a retention (isothermal holding) time of more than 10 minutes required to prevent cracking.

(発明が解決しようとする問題点) 本発明が解決せんとする問題点は、従来技術である保定
あるいは徐冷に要する時間、すなわち例えば特開昭55−
84201 号に開示される保持に必要な10分超という時間を
さらに短縮せんとするものである。確かに前記従来技術
以前に行われていた数時間という加熱時間に比べれば10
分間を越える程度という時間は画期的であり、これによ
る省エネルギー効果は非常に大きい。にもかかわらず本
発明が、この時間をさらに短縮せんとするのは次のよう
な理由による。
(Problems to be Solved by the Invention) The problem to be solved by the present invention is the time required for retaining or gradual cooling, which is a conventional technique, that is, for example, JP-A-55-
It is intended to further reduce the time required for holding of more than 10 minutes disclosed in 84201. Certainly, compared with the heating time of several hours that was performed before the above-mentioned prior art, 10
The time exceeding minutes is epoch-making, and the energy saving effect by this is very large. Nevertheless, the present invention intends to further reduce this time for the following reason.

すなわち、造塊−分塊法にかわる方法として登場した連
続鋳造も最近では円熟期に入り、次の開発テーマとして
薄鋳片の連続鋳造法の開発が業界の重要課題となってお
り、近い将来に実現の見透しが得られる段階となってい
る。そしてこの開発課題の中には単に薄い鋳片を鋳造す
るだけでなく、該鋳片を極力高温のまま、直ちに圧延機
に結び付けようとの思想も含まれている。この場合鋳造
機と圧延機の接続方法として、両者を同一ラインで、す
なわち鋳片を圧延機手前で切断することなく圧延機に送
り込む方法(直結型)および一旦鋳片を切断して、たと
えばコイル状にした後に圧延機に送り込む方法(非直結
型)の2 通りが考えられている。まず、直結型の場合、
圧延時の割れを防止するため、鋳造機から出た鋳片を10
分間を超えた時間保定しようとすると、一般に薄鋳片の
鋳造速度は10m/min を越える高速となるため、鋳造機と
圧延機の間で100mを超す、保定のための設備が必要とな
る。このことは建屋を含めた設備全体の長大化を意味
し、設備投資費用の面だけでなく、薄鋳片製造目的の一
つである設備簡素化の点からも、その実現を危うくする
ものである。このことは非直結型の場合でも同様であ
る。また、非直結型の考え方は、このように圧延機の能
力に比べ鋳造機の能力が小さいため、一台の圧延機で数
台の鋳造機から出てくる鋳片をまかなうというものであ
る。この場合にあっても、数台の鋳造機から次々と送り
出されてくる鋳片を保定するために必要な保定炉等の設
備は保持時間の短縮により著しく簡素化できることは明
白である。
In other words, continuous casting, which has emerged as an alternative to the ingot-casting method, has recently entered the maturity stage, and the development of continuous casting of thin slabs has become an important issue in the industry as the next development theme, and in the near future. It is at the stage where the perspective of realization is obtained. This development task includes not only the idea of casting a thin slab but also the idea of immediately connecting the slab to a rolling mill while keeping the slab at a temperature as high as possible. In this case, as a method of connecting the casting machine and the rolling mill, the casting line and the rolling mill can be connected to each other on the same line, that is, by feeding the slab into the rolling mill without cutting it before the rolling mill (direct connection type) or by cutting the slab once, Two methods are considered: a method of forming into a shape and then sending it to the rolling mill (non-direct connection type). First, in the case of direct connection type,
In order to prevent cracks during rolling, 10
When attempting to hold for more than a minute, the casting speed of thin slab generally becomes a high speed exceeding 10 m / min, and therefore a holding facility of more than 100 m is required between the casting machine and the rolling mill. This means that the entire facility including the building will be lengthened, and it will jeopardize its realization not only in terms of capital investment costs, but also in terms of facility simplification, which is one of the purposes of thin slab production. is there. This also applies to the non-direct connection type. In addition, the non-direct-coupling type idea is that the casting machine has a smaller capacity than the rolling machine as described above, and therefore one rolling machine can cover the slabs coming out from several casting machines. Even in this case, it is obvious that the equipment such as a holding furnace required to hold the cast pieces successively sent from several casting machines can be remarkably simplified by shortening the holding time.

さらに以上のことは単に薄鋳片製造用を対象としたもの
だけでなく、現状の連続鋳造機を、直送圧延あるいは直
接圧延を目的として改造あるいは新設する場合において
も同様である。
Further, the above is not limited to the case of producing thin slabs, but is also applicable to the case where the current continuous casting machine is modified or newly installed for the purpose of direct feed rolling or direct rolling.

以上のように、本発明は省エネルギーはもちろんのこ
と、今後ますます拡大が予想される直送圧延もしくは直
接圧延における鋼片表面割れ対策に必要な設備投資の簡
素化を目的としたものである。
As described above, the present invention aims at not only energy saving but also simplification of the capital investment necessary for the countermeasures against the surface crack of the billet in the straight-forward rolling or the direct rolling which is expected to further expand in the future.

(問題点を解決するための手段) ところで、本発明者は同様に直送圧延あるいは直接圧延
時の割れを防止するため、各種基礎検討を行ってきた
が、その結果、このような熱間加工性の評価においては
圧延条件の考慮が非常に重要なこと、すなわち従来のよ
うなねじり試験あるいは引張試験法では、定量的な評価
が困難なばかりではなく、このような評価法にたよるか
ぎり、十分な割れ対策を確立することは難しいことを知
った。そこで先の従来技術、すなわち割れ対策としての
保定あるいは徐冷法についても実験室的な直圧実験によ
る基礎検討を行なった結果、目的である保定時間の短縮
に必要な技術課題に関し重要な知見が得られ本発明を成
すに至ったものである。
(Means for Solving Problems) By the way, the present inventor has also conducted various basic studies in order to prevent cracking during direct feed rolling or direct rolling. As a result, the hot workability It is very important to consider the rolling conditions in the evaluation of the above, that is, it is not only difficult to quantitatively evaluate with the conventional torsion test or tensile test method, but as long as it depends on such an evaluation method, it is sufficient. I found it difficult to establish a countermeasure against cracking. Therefore, as a result of conducting a basic study by a laboratory direct pressure experiment on the previous conventional technology, that is, the retention or gradual cooling method as a countermeasure against cracking, we obtained important knowledge about the technical issues required to shorten the retention time, which is the purpose. The present invention has been accomplished.

その検討の第一はいかなる形で保持を行うかである。当
然のことながら鋳片は鋳造機から出た時点では非常に高
温である。そして、圧延が開始されるまでには、その用
途、目的等により異なるが、数100 ℃冷却される。した
がって、この間のどの温度域で、どのような熱履歴で保
持を行うことがより有利であるかが重要な検討課題であ
る。
The first consideration is the form of holding. Naturally, the slab is very hot when it leaves the casting machine. By the time the rolling is started, it is cooled by several hundreds of degrees Celsius, though it depends on the use and purpose. Therefore, it is an important subject to consider in which temperature range and during which heat history it is more advantageous to perform holding.

以上の項目について調査すべく、実験室的な直圧実験に
よる基礎検討を行なった。主な実験条件としては、 JIS
・SPHC相当の厚さ40mm×幅200mm ×長さ300mm の鋳片を
用い、850mm φ・2Hi ミルにより40→20→10→5mm のパ
ス・スケジュールのもとで検討を行なった。
In order to investigate the above items, a basic examination was conducted by a laboratory direct pressure experiment. The main experimental conditions are JIS
・ Using a slab of thickness 40 mm × width 200 mm × length 300 mm, which is equivalent to SPHC, an examination was conducted with a pass schedule of 40 → 20 → 10 → 5 mm using an 850 mm φ ・ 2Hi mill.

第1図は保持後直ちに圧延を開始した時の保持条件と割
れ発生有無の関係を示したものであるが、この場合950
℃以上の温度範囲で、2 分以上の保持を行うことにより
割れは防止できることが判明した。一方、実操業におい
ては製品々質等の観点から圧延開始温度は自ずと決定さ
れること、さらに保持から圧延間での鋳片搬送には所定
の時間が必要であり、その間での鋳片の冷却を考える
と、第1図の如き条件を実操業において満たすことは困
難である。
Figure 1 shows the relationship between the holding conditions and the occurrence of cracks when rolling is started immediately after holding. In this case, 950
It was found that cracking can be prevented by holding for 2 minutes or more in the temperature range of ℃ or more. On the other hand, in actual operation, the rolling start temperature is naturally determined from the viewpoint of product quality, etc., and a predetermined time is required to convey the slab between holding and rolling, and the slab is cooled during that period. Considering the above, it is difficult to satisfy the conditions shown in FIG. 1 in actual operation.

そこで、次に、圧延開始温度を1000℃一定(但し1000℃
以下の保持では、保持後直ちに圧延開始)とした場合に
ついて検討を行なった。第2図のように、圧延開始温度
より高い温度で保持する場合、保持後空冷し、所定の圧
延開始温度まで冷却するわけであるが、このような熱履
歴の場合、保持温度が高い程、割れ防止に必要な保持時
間は長くなることが明らかとなった。
Therefore, next, the rolling start temperature is fixed at 1000 ° C (however, 1000 ° C
In the following holding, the case where rolling was started immediately after holding was examined. As shown in FIG. 2, in the case of holding at a temperature higher than the rolling start temperature, it is air-cooled after holding and cooled to a predetermined rolling start temperature. In the case of such a heat history, the higher the holding temperature, It became clear that the holding time required to prevent cracking was long.

以上の結果は、保持後鋳片が空冷されるような場合、そ
の冷却過程で再び熱間加工性を低下させるような現象が
生じていることを推定させる。
The above results presume that, when the cast slab is air-cooled after being held, a phenomenon that deteriorates the hot workability occurs again in the cooling process.

そこで、この点を解明すべく、次のような検討を行なっ
た すなわち、1200〜950 ℃の任意の温度で2 分間の保持を
行い、その後一旦鋳片を空冷してから圧延を行うに際
し、保持から圧延開始までの空冷時間を種々変化させ、
割れとの関係を調査した。その結果、第3図に示すよう
に保持温度により2 つのタイプに分かれることが判明し
た。
Therefore, in order to clarify this point, the following study was conducted, that is, holding at an arbitrary temperature of 1200 to 950 ° C for 2 minutes, then air-cooling the slab once and then rolling. By changing the air cooling time from the start to rolling
The relationship with cracks was investigated. As a result, it was found that there are two types depending on the holding temperature, as shown in Fig. 3.

タイプIは保持後短時間の空冷で熱間加工性が低下する
ものであり、タイプIIはこれに対し保持後しばらく空冷
しても熱間加工性が低下しないものである。本調査の結
果、保持温度が1050〜950 ℃の範囲ではタイプIIの傾向
を示し、より高い温度で保持を行うとタイプIの傾向と
なることが判明した。
In Type I, hot workability is deteriorated by air cooling for a short time after holding, whereas in Type II, hot workability is not deteriorated by air cooling for a while after holding. As a result of this investigation, it was found that the tendency of type II was exhibited in the holding temperature range of 1050 to 950 ° C., and the tendency of type I was exhibited when holding was performed at a higher temperature.

このことは保持による硫化物の形態変化ないし粗大化は
すみやかに進行するため、その状態で圧延すれば割れは
発生しないが保持後空冷されるような場合、保持開始ま
で、および保持中に析出しきらない硫化物が、冷却過程
で再び熱間加工性を低下させるような形態でγ粒界に析
出するため割れが発生しやすいことを示している。しか
も保持温度が高いほど、保持開始までに析出する硫化物
は少ないため、その後の冷却に伴う熱間加工性の低下を
防止するためには、保持時間をより長くする必要があ
る。これに対し、1050℃以下まで冷却して保持を行う場
合、硫化物の析出は保持の時点でほぼ完了しているた
め、この段階で保持を行うことにより、前述の如く硫化
物の形態変化ないし粗大化により熱間加工性は向上し、
しかもその後空冷しても、もはや新たな硫化物の析出は
生じないため熱間加工性が再び低下することはない。
This means that morphology change or coarsening of sulfide due to holding progresses promptly, so if rolling is performed in that state, cracking does not occur, but if it is air cooled after holding, it precipitates before and during holding. It is shown that cracks are likely to occur because unsaturated sulfide precipitates in the γ grain boundary in a form that deteriorates hot workability again in the cooling process. Moreover, the higher the holding temperature is, the less sulfides are precipitated before the start of holding. Therefore, in order to prevent deterioration of hot workability due to subsequent cooling, it is necessary to lengthen the holding time. On the other hand, when the material is cooled to 1050 ° C or less and held, the sulfide precipitation is almost completed at the holding time. Hot workability is improved by coarsening,
Moreover, even if it is subsequently air-cooled, the precipitation of new sulfide no longer occurs, and therefore the hot workability does not deteriorate again.

したがって、タイプIIの傾向を示す条件すなわち一旦10
50℃以下に冷却して保持を行うことにより、保持後鋳片
が冷却過程を経る場合でも、従来法に比べ著しく短時間
の保持で割れが防止できる。
Therefore, the condition showing the tendency of type II, that is, once
By holding at a temperature of 50 ° C. or lower for holding, even if the cast piece undergoes a cooling process after holding, cracking can be prevented by holding for a significantly shorter time than in the conventional method.

なお、第1図の条件では1200℃以上の温度で保持を行っ
ても割れは発生しないのに対し、第2図の条件では保持
温度が1200℃より高い場合、割れが発生している。これ
は割れの原因となる硫化物の析出開始温度が1200℃であ
り、第2図の条件の場合、1200℃より高い温度域でいく
ら保持を行ってみても、いまだ硫化物が析出していない
ため、その意味がなく、その後の冷却過程で硫化物の析
出が生じるためである。これに対し第1図のように保持
後直ちに圧延する場合、1200℃以上では、保持としての
意味はないものの、割れの原因となる硫化物も析出して
いないため、割れは発生しない。そこで第3図のタイプ
IIのように、一旦1050℃以下に冷却した後保持を行う場
合について、同様に保持温度の有効範囲について調査を
行った。第4図は一旦鋳片を1050℃以下に冷却後、最高
1300℃までの各温度で、各々10分および30分の保持を行
った後、1100まで空冷して圧延を行った時の割れ発生状
況を示したものである。本調査結果より、1300℃で10分
までの保持では割れは発生しないが、1300℃で30分間保
持を行った場合割れが発生することが判明した。これは
1300℃で30分保持した場合、一旦析出した硫化物が、保
持中に再固溶し、その後の冷却過程でγ粒界に再析出す
るためである。以上のことから一旦硫化物の析出をほぼ
完了させた後、保持を行うことにより従来法に比べ短時
間の保持で割れは防止できるものの、保持温度の選定に
際しては、硫化物を再固溶させないような配慮が必要で
ある。すなわち一旦鋳片を1050℃以下に冷却し、さらに
保持時間を10分以内とすることにより、従来法に比べ保
持温度の有効範囲、とくに上限を1300℃まで拡大するこ
とができる。そしてこのことは保持から圧延間での搬送
に伴う鋳片の冷却を考えた場合、その搬送時間、いいか
えれば搬送方法に融通性を与えるという点で、実操業面
での意義は大である。なお、このような場合でも保持の
下限温度については、第1図および第2図の結果と同様
950 ℃である。
Under the conditions shown in FIG. 1, cracking does not occur even if held at a temperature of 1200 ° C. or higher, whereas under the conditions shown in FIG. 2, cracking occurs when the holding temperature is higher than 1200 ° C. This is because the initiation temperature of sulfide precipitation, which causes cracking, is 1200 ° C, and in the case of the conditions shown in Fig. 2, no sulfide has precipitated yet, no matter how much the temperature is kept higher than 1200 ° C. Therefore, this is meaningless, and sulfides are precipitated in the subsequent cooling process. On the other hand, in the case of rolling immediately after holding as shown in FIG. 1, at 1200 ° C. or higher, there is no meaning for holding, but cracks do not occur because no sulfide that causes cracks is deposited. Therefore, the type shown in Fig. 3
In the case of holding after cooling to 1050 ° C. or less as in II, the effective range of the holding temperature was similarly investigated. Fig. 4 shows the maximum after the slab has been cooled below 1050 ℃
The figure shows the state of cracking when the material was held for 10 minutes and 30 minutes at each temperature up to 1300 ° C., then air-cooled to 1100 and rolled. From the results of this investigation, it was found that cracks do not occur when held at 1300 ° C for up to 10 minutes, but cracks occur when held at 1300 ° C for 30 minutes. this is
This is because the sulfide that has been once precipitated re-dissolves during holding at 1300 ° C. for 30 minutes and then re-precipitates at the γ grain boundary during the subsequent cooling process. Based on the above, cracking can be prevented by holding for a shorter time compared to the conventional method by holding once after almost complete precipitation of sulfide, but do not re-dissolve sulfide when selecting the holding temperature. Such consideration is necessary. That is, once the slab is cooled to 1050 ° C or lower and the holding time is set to 10 minutes or less, the effective range of the holding temperature, particularly the upper limit, can be expanded to 1300 ° C as compared with the conventional method. This is of great significance in terms of actual operation in terms of giving flexibility to the transportation time, in other words, the transportation method, when considering cooling of the slab during transportation from holding to rolling. Even in such a case, the lower limit temperature of holding is the same as the result of FIG. 1 and FIG.
It is 950 ℃.

さらに、タイプIIで保持から圧延開始までの時間がある
値以上になると急激に熱間加工性が低下しているが、こ
れはこの時点で割れ発生位置となる鋳片表面温度が Ar3
点未満となっており、旧γ粒界に初析フェライトがバン
ド状に析出し、その結果圧延に伴い発生する引張応力が
この部分に集中し、割れが発生しやすくなるためであ
る。
Furthermore, in Type II, when the time from holding to rolling start exceeds a certain value, the hot workability deteriorates sharply, but this is because the slab surface temperature at which the cracks occur is Ar 3
This is because the number of points is less than the point, and proeutectoid ferrite is deposited in a band shape at the old γ grain boundary, and as a result, the tensile stress generated during rolling is concentrated in this portion and cracks are easily generated.

したがって、保持による割れ防止対策を有効に活用する
ためには、圧延開始温度を Ar3点以上とすることが必要
である。
Therefore, in order to effectively utilize the crack prevention measures by holding, it is necessary to set the rolling start temperature to Ar 3 point or higher.

以上のことから明らかなように、従来技術においては保
持の特性の一部を確認したにすぎないものであり、実操
業において保持により割れを確実に防止するためには、
さらに解明すべき保持処理の本質は多く残されていたわ
けである。
As is clear from the above, in the prior art, only part of the holding characteristics was confirmed, and in order to reliably prevent cracking by holding in actual operation,
Many essences of the retention process to be clarified still remain.

本発明者は以上の基礎検討により保持のなんたるかを明
らかにしたものであり、その結果本発明の目的である保
持時間短縮に必要な技術項目を解明し、本発明を完成す
るに至ったものである。
The present inventor has clarified what kind of holding is performed by the above basic examination, and as a result, clarified the technical items necessary for shortening the holding time, which is the purpose of the present invention, and completed the present invention. It is a thing.

本発明は従来技術が抱える問題点を補い、改良するため
になされたものであり、その要件を明らかにするため
に、先の検討から得られた知見を改めて以下に整理す
る。
The present invention has been made in order to supplement and improve the problems of the prior art, and in order to clarify the requirements, the knowledge obtained from the previous study is summarized below.

(1) 保持後直ちに圧延する場合、割れ防止に必要な保持
時間は非常に短いが、実操業においては通常保持から圧
延開始までには鋳片は一旦冷却過程を経るため、この場
合保持時間はより長くする必要がある。
(1) When rolling immediately after holding, the holding time required to prevent cracking is very short, but in actual operation, the slab undergoes a cooling process once from normal holding to the start of rolling, so in this case the holding time is Need to be longer.

(2) これは保持後、鋳片が空冷されるような場合、保持
開始まで、および保持中に析出しきらない硫化物が、そ
の冷却過程で再び熱間加工性を低下させるような形態で
γ粒界に析出するためであり、したがって鋳片が短時間
の保持で、しかもその後冷却過程を経る場合でも割れ発
生を防止するためには、保持後の冷却過程で新たに硫化
物の析出が生じないよう、言い換えれば保持開始までに
硫化物の析出をほぼ完了させ、しかも再固溶しないよう
な状態で保持を行うことにより、その効果は十分活かさ
れることになる。このように保持後鋳片が冷却過程を経
る場合でも、短時間の保持で割れを防止するためには、
1050〜950 ℃で保持することが有効であるが、製品々質
等の要求から圧延開始温度を前記保持温度以上にしなけ
ればならない場合もある。その場合、1050〜950 ℃の範
囲で2 分間以上保持後、再度所要の温度まで昇温しても
よいが、一旦鋳片を1050℃以下に冷却後、1200〜950 の
所要温度で保持することが、省エネルギー等の観点から
は望ましい。後述するように、前記温度履歴を必要とす
るのは表面割れ発生位置となる鋳片該箇所の表層部であ
り、したがって後者の場合、割れ発生位置となる鋳片表
面温度のみ1050℃以下まで冷却することにより、他の部
分、特に鋳片内部はいまだ高温のため、その後所要温度
まで昇温するにしても鋳片の保有熱を利用することによ
り必要なエネルギーは少なくてすむ。これに対し前者は
保持中に鋳片全体が均熱化されるため、再び所要温度ま
で鋳片全体を昇温するには多くのエネルギーが必要とな
る。いずれにしても、本発明において必要とする要件の
一つは鋳片を一旦1050℃以下まで冷却し、(もちろんこ
の場合鋳片表面温度、しかも割れ発生位置となる部分だ
けでもよい)その後、1300〜950 ℃の温度域で2 〜10分
間保持を行うことである。
(2) This is a form in which, when the slab is air-cooled after holding, the sulfide that does not completely precipitate until the start of holding and during holding again reduces the hot workability during the cooling process. This is because precipitation occurs at the γ grain boundary, and therefore the slab is held for a short time, and in order to prevent cracking even when the cooling process is performed thereafter, in order to prevent cracking, precipitation of sulfide is newly added in the cooling process after holding. By preventing the occurrence of the sulfide, in other words, by substantially completing the precipitation of the sulfide by the start of holding, and holding the sulfide in a state where it does not re-dissolve, the effect is sufficiently utilized. In this way, even if the cast piece undergoes the cooling process after holding, in order to prevent cracking by holding for a short time,
It is effective to maintain the temperature at 1050 to 950 ° C, but in some cases it is necessary to set the rolling start temperature to the above-mentioned holding temperature or higher due to the requirements of product quality and the like. In that case, the temperature may be raised to the required temperature again after holding it in the temperature range of 1050 to 950 ° C for 2 minutes or more, but once the slab is cooled to 1050 ° C or less, it should be held at the required temperature of 1200 to 950. However, it is desirable from the viewpoint of energy saving. As will be described later, it is the surface layer portion of the slab that becomes the surface crack generation position that requires the temperature history, so in the latter case, only the slab surface temperature that becomes the crack generation position is cooled to 1050 ° C or less. By doing so, the other parts, especially the inside of the slab, are still at high temperature, so that even if the temperature is raised to the required temperature thereafter, the energy required by using the heat retained in the slab can be reduced. On the other hand, in the former case, since the entire slab is soaked during holding, much energy is required to raise the temperature of the entire slab to the required temperature again. In any case, one of the requirements required in the present invention is that the slab is once cooled to 1050 ° C. or lower (in this case, the slab surface temperature, and only the part at which the cracks are generated) is then used. Hold for 2-10 minutes in the temperature range of ~ 950 ° C.

(3) 保持により硫化物は形態変化ないし粗大化するた
め、熱間加工性は向上するが、保持後割れ発生位置とな
る鋳片表面が Ar3点未満になると、硫化物以外の原因、
即ち旧γ粒界に沿ったαバンドへの応力集中により折角
の保持処理が無意味になる。したがって、保持時間を2
〜10分だけ確保することにより、その後の冷却過程での
熱間加工性の低下は防止できるが、さらに Ar3点以上で
圧延開始することが必要である。
(3) Since the sulfide undergoes a morphological change or coarsening due to holding, hot workability is improved, but if the slab surface at the position where cracking occurs after holding is less than Ar 3 points, causes other than sulfide,
That is, the stress concentration on the α band along the old γ grain boundary makes the bending angle holding process meaningless. Therefore, hold time is 2
By ensuring only ~ 10 minutes, the deterioration of hot workability in the subsequent cooling process can be prevented, but it is necessary to start rolling at an Ar point of 3 or higher.

以上の知見は、前述のように、直送圧延あるいは直接圧
延の本来の目的が省エネルギーにあることだけでなく、
鋳片保持に必要な設備の簡素化を図ることにもあること
から、意味をもつのである。
As described above, the above knowledge is that not only is the original purpose of direct feed rolling or direct rolling to be energy saving,
This is significant because it also aims to simplify the equipment required for holding the slab.

本発明は、以上の知見をその構成要件とするものであ
り、その要旨とするところは、連続鋳造した鋳片を直送
圧延もしくは直接圧延する方法において、鋳込み後、溶
融体の凝固に引き続く冷却過程で、該鋳片の全表面を一
旦1050℃以下900 ℃超に冷却して硫化物を粒界析出させ
てから1300〜950 ℃の温度域で2分間以上10分間未満の
時間保持を行い、かつ Ar3点以上で圧延を開始すること
を特徴とする、鋼片の表面割れを防止した熱間圧延法で
ある。
The present invention has the above findings as its constituent features, and the gist thereof is that in a method of directly feeding or directly rolling a continuously cast slab, after casting, a cooling process following solidification of the melt. Then, the entire surface of the cast slab is once cooled to below 1050 ° C. and above 900 ° C. to precipitate sulfides at grain boundaries, and then held in the temperature range of 1300 to 950 ° C. for 2 minutes or more and less than 10 minutes, and It is a hot rolling method that prevents surface cracking of steel slabs, characterized by starting rolling at an Ar point of 3 or more.

ここに、「保持」は、一定温度に保つ保持ばかりでな
く、昇温を行う場合も包含する。
Here, "holding" includes not only holding at a constant temperature but also raising the temperature.

本発明において最初に1050℃以下に冷却するのは、前記
したように鋳片を1050℃以下に一旦冷却すると硫化物の
析出が総て完了してしまい、保持後の冷却時に硫化物が
新たに析出することがないからである。1050℃を超えた
温度にまで冷却するだけでは未析出硫化物がその後の保
持過程で微細硫化物として析出し、これが割れ発生の原
因となることがあるからである。
In the present invention, first cooling to 1050 ° C. or lower means that once the slab is once cooled to 1050 ° C. or lower as described above, precipitation of sulfide is completely completed, and sulfide is newly added during cooling after holding. This is because it does not precipitate. This is because unprecipitated sulfides may precipitate as fine sulfides during the subsequent holding process only by cooling to a temperature exceeding 1050 ° C, which may cause cracking.

なお、一旦1050℃以下まで冷却する箇所は前述の如く、
割れ発生位置のしかも鋳片表面のみでよいことから、該
部分のみを水あるいはガス等により強制的に冷却するこ
とは、その後の昇温時に鋳片保有熱をより多く活用する
意味で有効である。
In addition, as described above, the points that are once cooled to 1050 ° C or lower are
Since only the surface of the slab where the crack occurs is sufficient, it is effective to forcibly cool only that part with water, gas, etc. in the sense that the slab retained heat is utilized more during the subsequent temperature rise. .

このように、本発明は実操業において、保持後鋳片が冷
却過程を経る場合でも短時間の保持で割れが発生するこ
となく、圧延開始温度を Ar3点以上とすることにより、
保持の効果を有効に活用して割れを防止せんとするもの
である。
Thus, the present invention, in the actual operation, even if the slab after holding undergoes the cooling process without cracking in holding for a short time, by setting the rolling start temperature to Ar 3 points or more,
The effect of retention is effectively used to prevent cracking.

また、本発明においては直送圧延もしくは直接圧延時の
表面割れ原因の本質は硫化物の析出状態にあることか
ら、その対策として保持を行うものであり、しかも、2
〜10分間という短時間の保持で割れを防止するため、鋳
片の温度履歴を前述の如く規定したものである。
Further, in the present invention, since the essence of the surface cracking during direct feed rolling or direct rolling is the precipitation state of sulfides, it is held as a countermeasure, and further, 2
In order to prevent cracking by holding for a short time of up to 10 minutes, the temperature history of the slab is specified as described above.

なお、ここにおいて述べる温度は割れ発生位置となる鋳
片の表面温度を示すものである。これは一般に鋳片温度
は厚み方向、幅方向とも均一でなく、割れ発生位置も圧
延条件により異なるため、上記の如く定義するものであ
る。
The temperature described here indicates the surface temperature of the slab at the position where cracking occurs. This is defined as above because the slab temperature is generally not uniform in the thickness direction and the width direction, and the crack generation position also differs depending on the rolling conditions.

次に、実施例によって本発明をさらに具体的に説明する
が、それらは単に本発明の例示として示すものであっ
て、何ら本発明を制限するものではない。
Next, the present invention will be described in more detail by way of examples, but they are merely provided as exemplifications of the present invention and do not limit the present invention in any way.

実施例1 C: ≦0.06%、Si:0.04%、Mn:0.15 〜0.30%、P:
≦0.030 %、S: ≦0.030 %、sol.Al:0.020〜0.050
%の組成(Ar3点=850 ℃)を有する、厚さ40mm×幅600
mm の形状からなる鋳片を一旦T1℃まで空冷により冷却
後、T2でt 分間保持後、直径800mm のロール径を有する
圧延機により、各パス50%の圧下率で連続3 パスの直送
圧延もしくは直接圧延に供した。
Example 1 C: ≤0.06%, Si: 0.04%, Mn: 0.15 to 0.30%, P:
≤0.030%, S: ≤0.030%, sol.Al: 0.020 to 0.050
% Composition (Ar 3 points = 850 ° C), thickness 40 mm x width 600
After cooling the slab with mm shape by air cooling to T 1 ℃, hold it at T 2 for t minutes, and then directly feed it for 3 consecutive passes with a rolling ratio of 50% for each pass by a rolling machine with a roll diameter of 800 mm. It was subjected to rolling or direct rolling.

第1表に示すように本発明の構成要件を満たすことによ
り割れは防止される。なお、本実施例の圧延条件におい
て発生する割れは鋼片幅方向端面での割れであり、した
がって、第1表に示すT1は鋳片端面の表面温度である。
As shown in Table 1, cracking is prevented by satisfying the constitutional requirements of the present invention. The cracks generated under the rolling conditions of the present example are cracks on the end surface in the width direction of the steel slab, and therefore T 1 shown in Table 1 is the surface temperature of the end surface of the slab.

実施例2 C:0.13 〜0.17%、Si:0.25 〜0.45%、Mn:1.25 〜
1.50%、P: ≦0.030 %、S: ≦0.030 %、Nb:0.020
〜0.040 %、V:0.030〜0.050 %、sol.Al:0.020〜0.
050 %の組成(Ar3点=750 ℃)を有する厚さ264mm ×幅
1240mmの形状からなる鋳片を一旦T1℃まで冷却してか
ら、T2でt分間保持した後、直径1300mmのロール径を有
するロールを備えた圧延機により、各パス15%の圧下率
で連続5 パスの条件で直送圧延もしくは直接圧延に供し
た。
Example 2 C: 0.13 to 0.17%, Si: 0.25 to 0.45%, Mn: 1.25 to
1.50%, P: ≤0.030%, S: ≤0.030%, Nb: 0.020
~ 0.040%, V: 0.030-0.050%, sol.Al: 0.020-0.
Thickness 264mm x width with 050% composition (Ar 3 points = 750 ° C)
A slab with a shape of 1240 mm was once cooled to T 1 ℃, held at T 2 for t minutes, and then rolled with a roll having a roll diameter of 1300 mm at a rolling reduction of 15% for each pass. Direct rolling or direct rolling was carried out under the condition of continuous 5 passes.

結果を第2表にまとめて示すが、本発明の構成要件を満
たすことにより割れは効果的に防止される。なお、本実
施例の圧延条件において発生する割れは、ロールと接触
する、鋼片長辺面での割れであり、したがって第2表に
示すT1は鋳片長辺面の表面温度である。
The results are summarized in Table 2, and cracking is effectively prevented by satisfying the constituent requirements of the invention. The cracks generated under the rolling conditions of the present example are cracks on the long side surface of the steel slab that come into contact with the roll, and therefore T 1 shown in Table 2 is the surface temperature of the long side surface of the slab.

実施例1および実施例2に示す例においては保持の方法
として、例えば保持炉の如く、一定温度に保温した炉中
に鋳片を装入した場合であり、したがって、例えば実施
例1のNo.4 に示す例の場合、鋳片端面を 950℃まで冷
却後、1200℃に保温された炉中に装入したものである。
そしてその時の保持時間 2分なるものは炉中に装入した
時点から抽出するまでの時間であり、抽出時の鋳片端面
の温度は1200℃まで昇温されていないが、本発明の構成
要件である1300〜950 ℃の温度域で 2分間保持される結
果、割れが防止されるものである。
In the examples shown in Examples 1 and 2, the holding method is, for example, the case where the slab is charged into a furnace kept at a constant temperature, such as a holding furnace. In the case of the example shown in Fig. 4, the end surface of the cast slab was cooled to 950 ° C and then charged into a furnace kept at 1200 ° C.
And the holding time at that time is 2 minutes is the time from the time of charging into the furnace to the extraction, the temperature of the cast slab end face at the time of extraction is not raised to 1200 ℃, but the constituent requirements of the present invention As a result of being held in the temperature range of 1300 to 950 ° C for 2 minutes, cracking is prevented.

実施例3 実施例1と同じ組成、鋳片形状およびロール径、パス・
スケジュールの条件により直送圧延もしくは直接圧延を
行った。この時溶融体からの凝固に引き続く冷却過程
で、何ら保持を行うことなく、1100℃から圧延した場
合、鋼片端面に割れが発生した。そこで鋳片端面、つま
り板幅端部を1000℃まで冷却後、該鋳片端面を、ガスバ
ーナー方式、誘導加熱方式などのエッジヒーターにより
1150℃まで加熱後、1100℃から圧延を開始した。この時
エッジヒーターによる加熱開始から終了までの時間は5
分間であり、割れは発生しなかった。このようにエッジ
ヒーターによる保持は、保持を局部的かつ効率的に行え
るという点で有効である。
Example 3 Same composition, cast shape and roll diameter as in Example 1, pass
Direct-feed rolling or direct rolling was performed depending on the schedule conditions. At this time, in the cooling process subsequent to the solidification from the melt, when the steel was rolled from 1100 ° C without any holding, cracks occurred on the end faces of the steel pieces. Therefore, after cooling the slab end face, that is, the plate width end portion to 1000 ° C., the slab end face is subjected to an edge heater such as a gas burner method or an induction heating method
After heating to 1150 ° C, rolling was started from 1100 ° C. At this time, the time from the start of heating by the edge heater to the end is 5
It was a minute, and no cracking occurred. As described above, the holding by the edge heater is effective in that the holding can be performed locally and efficiently.

さらには外部からとくに加熱することなく、鋳片保有熱
の放散を抑制するため、断熱カバーなどを設置し、その
保有熱による復熱を利用することはより有効である。
Furthermore, it is more effective to install a heat insulating cover or the like and utilize the recuperation due to the retained heat in order to suppress the dissipation of the retained heat of the slab without external heating.

なお、以上のように本発明における「保持」とは単に恒
温保持だけでなく、前述のような等温過程をも含めたも
のであり、従来法における「保定」すなわち恒温保持だ
けの場合と区別する意味で用いたものである。
As described above, the term "holding" in the present invention includes not only the isothermal holding but also the isothermal process as described above, and is distinguished from the "retaining" in the conventional method, that is, the isothermal holding only. It is used as a meaning.

(発明の効果) 以上のように、本発明は直送圧延あるいは直接圧延時の
表面割れ対策としての保持に関し、従来十分な解明がな
されていなかった保持の本質を明らかとすることによ
り、本発明の目的である保持時間の短縮に必要な技術項
目を解明、その結果一層の省エネルギーが図れるだけで
なく、著しい設備の簡素化が可能となり、直送圧延もし
くは直接圧延の実操業化にとって多大の効果を有するも
のである。
(Effects of the Invention) As described above, the present invention relates to retention as a countermeasure for surface cracking during direct rolling or direct rolling, by clarifying the essence of retention that has not been sufficiently clarified in the past, Elucidation of the technical items necessary for shortening the holding time, which is the purpose, and as a result not only further energy saving can be achieved, but also remarkable simplification of equipment is possible, which has a great effect on the actual operation of direct feed rolling or direct rolling It is a thing.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第4図は、本発明における予備試験の結果
を保持条件によって整理したグラフである。
1 to 4 are graphs in which the results of preliminary tests in the present invention are arranged according to holding conditions.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】連続鋳造した鋳片を直送圧延もしくは直接
圧延する方法において、溶融体からの凝固に引き続く冷
却過程で、該鋳片の全表面を一旦1050℃以下900 ℃超に
冷却して硫化物を粒界析出させてから、1300〜950 ℃の
温度域で2 分間以上10分間未満の時間保持を行い、かつ
Ar3点以上で圧延を開始することを特徴とする、鋼片の
表面割れを防止した熱間圧延法。
1. A method of directly feeding or directly rolling a continuously cast slab, wherein the entire surface of the slab is once cooled to below 1050 ° C. and above 900 ° C. in a cooling process subsequent to solidification from a melt. After precipitation at the grain boundary, hold the material in the temperature range of 1300 to 950 ° C for 2 minutes or more and less than 10 minutes, and
A hot rolling method that prevents surface cracking of steel slabs, characterized by starting rolling at 3 or more points of Ar.
JP61045820A 1986-03-03 1986-03-03 Hot rolling method that prevents surface cracking of billets Expired - Lifetime JPH0627287B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61045820A JPH0627287B2 (en) 1986-03-03 1986-03-03 Hot rolling method that prevents surface cracking of billets

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61045820A JPH0627287B2 (en) 1986-03-03 1986-03-03 Hot rolling method that prevents surface cracking of billets

Publications (2)

Publication Number Publication Date
JPS62203606A JPS62203606A (en) 1987-09-08
JPH0627287B2 true JPH0627287B2 (en) 1994-04-13

Family

ID=12729884

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61045820A Expired - Lifetime JPH0627287B2 (en) 1986-03-03 1986-03-03 Hot rolling method that prevents surface cracking of billets

Country Status (1)

Country Link
JP (1) JPH0627287B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04253505A (en) * 1991-01-31 1992-09-09 Nkk Corp Direct rolling method for continuously cast slabs

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6167549A (en) * 1984-09-11 1986-04-07 Nippon Kokan Kk <Nkk> Hot direct rolling method in continuous casting
JPH0619108B2 (en) * 1986-02-28 1994-03-16 住友金属工業株式会社 Hot rolling method that prevents surface cracking of billets

Also Published As

Publication number Publication date
JPS62203606A (en) 1987-09-08

Similar Documents

Publication Publication Date Title
EP0357800B1 (en) Process for producing nonoriented silicon steel sheet having excellent magnetic properties
EP3889276B1 (en) Method for manufacturing high-manganese steel cast slab and method for manufacturing high-manganese steel slab or steel sheet
US6451136B1 (en) Method for producing hot-rolled strips and plates
JPH0688125A (en) Method for hot-working continuously cast slab and steel ingot
JPH0627287B2 (en) Hot rolling method that prevents surface cracking of billets
JPH07251265A (en) How to scarf steel slabs
JP3149763B2 (en) Prevention method of placing cracks in continuous cast slabs of bearing steel
JPH0776375B2 (en) Hot rolling method that prevents surface cracking of billets
JPH0619108B2 (en) Hot rolling method that prevents surface cracking of billets
JP2512650B2 (en) Method for producing Cr-Ni type stainless steel thin plate excellent in material and surface quality
JPH0568525B2 (en)
JPS62212001A (en) Hot rolling method for preventing surface cracking of ingot
JPH10305302A (en) Method for Preventing Surface Cracking in Hot Width Rolling of Continuously Cast Slab
JPH07256306A (en) Surface flaw prevention method during hot rolling of steel slab
JP2579863B2 (en) Manufacturing method of ultra-high silicon electrical steel sheet
JP2526122B2 (en) Manufacturing method of cold-rolled steel sheet for deep drawing by strip casting
JP3494043B2 (en) Hot-rolled steel sheet for processing excellent in shearing and punching properties and method for producing the same
JPS59189001A (en) Method for rolling hot billet by direct feeding
JP2001226715A (en) Method for producing martensitic stainless steel
JP2001081516A (en) Hot rolling method for Ni-containing steel with excellent surface properties
JPH06328214A (en) How to prevent ferritic stainless steel from cracking
JP6515292B2 (en) Method of manufacturing high strength steel plate
JPS592725B2 (en) Method for producing thermosetting high-strength cold-rolled steel sheet for deep drawing
JPH07290101A (en) Method of preventing surface cracks during hot width reduction rolling of continuously cast slabs
JPH07238322A (en) Method to prevent surface cracking of steel slab