JPH0629511B2 - Sheet pile driving construction method - Google Patents

Sheet pile driving construction method

Info

Publication number
JPH0629511B2
JPH0629511B2 JP22719488A JP22719488A JPH0629511B2 JP H0629511 B2 JPH0629511 B2 JP H0629511B2 JP 22719488 A JP22719488 A JP 22719488A JP 22719488 A JP22719488 A JP 22719488A JP H0629511 B2 JPH0629511 B2 JP H0629511B2
Authority
JP
Japan
Prior art keywords
pipe
sheet pile
ground
excavation
tip
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP22719488A
Other languages
Japanese (ja)
Other versions
JPH0274717A (en
Inventor
弘 福地
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JOHI JUKI JUGEN
Original Assignee
JOHI JUKI JUGEN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JOHI JUKI JUGEN filed Critical JOHI JUKI JUGEN
Priority to JP22719488A priority Critical patent/JPH0629511B2/en
Publication of JPH0274717A publication Critical patent/JPH0274717A/en
Publication of JPH0629511B2 publication Critical patent/JPH0629511B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は、シートパイルを地中に打込む工事方法に係
り、特に長尺で大形なシートパイルを打込むのに好適な
シートパイル打込み工事方法に関するものである。
The present invention relates to a construction method for driving a sheet pile into the ground, and particularly to driving a sheet pile suitable for driving a long and large sheet pile. It concerns construction methods.

[従来の技術] この種従来の技術では、通常振動法によってシートパイ
ルを地盤に打込んでいた。振動法によってシートパイル
を地中に打込む場合は、これに加える振動と共に、地盤
からその反力を受け、シートパイルの端部に亀裂や曲げ
といった損傷や変形の他、座屈による変形を受ける。シ
ートパイルは、薄い板状のものであるから、硬い地盤に
打込もうとすると簡単に曲ってしまい、終いには打込み
不可能になるといった問題点があった。
[Prior Art] In the conventional art of this type, a sheet pile is generally driven into the ground by a vibration method. When the sheet pile is driven into the ground by the vibration method, it receives the reaction force from the ground along with the vibration applied to it, and the edge of the sheet pile suffers damage and deformation such as cracks and bending, as well as deformation due to buckling. . Since the sheet pile has a thin plate shape, when it is driven into hard ground, it bends easily, and at the end it becomes impossible to drive.

この問題点に対応する方法として、一般的にはバイブロ
ハンマーのパワーアップ手段を採ったため、騒音、振動
もこれに伴って増大し、大きな公害問題となっていた。
As a method of coping with this problem, a power-up means of a vibro hammer is generally adopted, and noise and vibration are also increased accordingly, which has been a serious pollution problem.

本件発明者は、前記問題点を解消する目的で比較的低騒
音、低振動で地盤を容易に掘削できる工事方法、及びこ
れに用いる掘削管について、既に関連の提案を行ってい
る。その方法及び掘削管を応用すれば、シートパイル打
込みにある程度の効果が得られるものである。
The inventor of the present application has already made related proposals for a construction method capable of easily excavating the ground with relatively low noise and low vibration for the purpose of solving the above problems, and an excavation pipe used for the construction method. If the method and the drill pipe are applied, a certain degree of effect can be obtained in the sheet pile driving.

その1は、先端に尖鋭なツースを突設した鋼製中空の掘
削管の中心部分から、該掘削管より径の細いパイロット
管を下方に突出させ、そのパイロット管の先端に、基端
より外径の太い鋼管で形成された先端刃を設けた掘削管
を用い、パイロット管の外周側に地盤の緩みを作り掘削
して行く工事方法で、前記パイロット管の中空部分に高
圧水噴射用のノズルと送水配管を収納し、高圧水のジェ
ット噴射により掘削管先端刃の地盤圧入抵抗を減少さ
せ、低振動、低騒音、省力化を図ったものである(実開
昭63-65794号公報参照)。
The first is that a pilot pipe having a diameter smaller than that of the drill pipe is projected downward from the central portion of a steel hollow drill pipe having a sharp tooth projecting at the tip thereof, and the pilot pipe has a diameter smaller than that of the base end. A nozzle for high-pressure water injection in the hollow part of the pilot pipe by a construction method in which a slack of the ground is created on the outer peripheral side of the pilot pipe by using a drill pipe provided with a tip blade formed of a thick steel pipe. The water injection pipe is housed, and the jet pressurization of high-pressure water reduces the ground press-fitting resistance of the tip of the excavation pipe to achieve low vibration, low noise, and labor saving (see Japanese Utility Model Publication No. 63-65794). .

その2は、先端内周面に尖鋭なツースを下方に向けて突
設した鋼製中空の掘削管を用い、該掘削管にバイブロハ
ンマーにより振動を与えて地中に推進させ、同管内に土
砂が充填されたところでこれを引抜くことにより、その
跡に穴を残すようにした工事方法で、低振動、低騒音、
省力化を図ったものである(特開昭59-213891号公報参
照)。
The second method is to use a hollow steel-made drill pipe with a sharp tooth projecting downward on the inner peripheral surface of the tip, and vibrate the drill pipe with a vibrohammer to propel it into the ground to deposit earth and sand in the pipe. When it is filled with, it is pulled out to leave a hole in the mark, which is low vibration, low noise,
This is for labor saving (see Japanese Patent Laid-Open No. 59-213891).

その3は、先端に尖鋭なツースを突設した鋼製中空の掘
削管の、適宜な位置に通水孔を空けておき、送水管を用
いて高圧水を先端から噴出させながら、掘削管を推進し
て地盤に埋設し、同管内に土砂を充填させて引抜くこと
により、その跡に穴を残すようにした工事方法で、砂れ
き、泥岩等に対応できるようにしながら低振動、低騒
音、省力化を図ったものである(特開昭60-43517号公報
参照)。
Part 3 is to open a water hole at an appropriate position in a hollow steel drilling pipe with a sharp tooth projecting at the tip, and use the water pipe to eject high-pressure water from the tip while By promoting it, burying it in the ground, filling the pipe with earth and sand, and pulling it out, leaving a hole in the trace, it is possible to respond to gravel, mudstone, etc., but low vibration, low noise, This is for labor saving (see Japanese Patent Laid-Open No. 60-43517).

前記掘削管及びそれらを用いた工事方法により、地盤を
掘削し、緩んだ掘削孔にシートパイルを打込むのが従来
の技術である。
A conventional technique is to excavate the ground and drive a sheet pile into a loose excavation hole by the excavation pipe and a construction method using the excavation pipe.

[発明が解決しようとする課題] 前記三種類の地盤掘削工法にあっては、三者三様の得失
を有している。すなわち、従来の技術その1の例では、
掘削管の内外壁面及び先端面の何れの面においても、地
盤圧入抵抗が小さくできるため、軟岩、硬岩の地盤状態
に適応させて、一度に太径の穴を掘削するのに好適であ
るが、地盤が細砂の様な締まり易い土質の場合、掘削管
を引抜いた跡の穴に、シートパイルを打設する際等、排
除体積の不足や打設振動で土砂が締まることにより打設
不可能になるといった問題点があった。
[Problems to be Solved by the Invention] The above three types of ground excavation methods have their advantages and disadvantages. That is, in the example of the conventional technique No. 1,
Since it is possible to reduce the ground press-fit resistance on both the inner and outer wall surfaces of the excavation pipe and the tip surface, it is suitable for excavating a large-diameter hole at a time by adapting to the ground condition of soft rock and hard rock. When the ground is a soil that is easy to tighten, such as fine sand, when the sheet pile is placed in the hole where the excavation pipe has been pulled out, the placement volume may be insufficient due to insufficient excluded volume or the placement vibration may cause the soil to become unloaded. There was a problem that it would be possible.

従来の技術その2の例では、掘削管の内外壁面で土圧の
排除がなされ、地盤圧入抵抗が小さくなるので、狭い空
間での地盤掘削と、土砂の排除に好適であるが、掘削管
の先端面圧入抵抗が大きいため、N値(丸鋼の先端につ
けた抵抗体を地中に圧入して、地層の抵抗を推定し、そ
れより地層の強度を表示する値)が50を越える硬い地
盤は掘削不可能、従ってシートパイル打設も不可能とい
った問題点があった。
In the example of the conventional technique No. 2, the earth pressure is eliminated on the inner and outer wall surfaces of the excavation pipe, and the ground press-fit resistance is reduced. Therefore, it is suitable for excavating the ground in a narrow space and eliminating the sediment, but Hard ground with an N value (a resistance value attached to the tip of round steel is press-fitted into the ground to estimate the resistance of the stratum and the strength of the stratum is displayed from that value) exceeds 50 because the tip surface press-fit resistance is large. There was a problem that it was not possible to excavate, and therefore it was not possible to place a sheet pile.

従来の技術その3の例は、前記その2の例における掘削
管に、高圧水の噴射構造を付加し、掘削管の先端から高
圧水を噴射させながら掘削を行うので、硬岩に近いN値
が50越える地盤の掘削可能であるが、この工法単独で
は、掘削跡にシートパイルを打設する十分な排除体積の
築造ができ難いといった問題点があった。
In the example of the related art No. 3, since the high-pressure water injection structure is added to the excavation pipe in the example of the second example, and the excavation is performed while the high-pressure water is ejected from the tip of the excavation pipe, the N value close to that of hard rock is obtained. It is possible to excavate the ground exceeding 50, but there is a problem that it is difficult to construct a sufficient excluded volume by placing a sheet pile on the excavation mark by this construction method alone.

ここにおいて、本発明の目的は、前述のようなシートパ
イルを打込むうえでの、それぞれの従来工法の問題点に
鑑み、これらを解決できるシートパイル打込み工事方法
を提供することにある。
Here, an object of the present invention is to provide a sheet pile driving construction method capable of solving the problems of the conventional construction methods for driving the above-mentioned sheet piles, in view of the problems.

[問題点を解決するための手段] すなわち、前記本発明の目的は、先端に尖鋭なツース
を、先端中央部にパイロット管を設けた掘削管の先端か
ら、高圧水を噴射させながら、予め地盤のシートパイル
打込み位置に、該掘削管を打設する第1の工程と、前記
掘削管を引抜いた跡に、先端に尖鋭なツースを取付けた
掘削管を抜き差しして管内に入った土砂を他所に排除
し、地中に排除体積を作る第2の工程と、前記第2の工
程で掘削管を引抜いた跡に、第2の工程の掘削管に高圧
水の噴射を付加した掘削管と、シートパイルを抱合せて
打設し、該掘削管のみ引抜く第3の工程からなることを
特徴とするシートパイル打込み工事方法によって達成さ
れる。
[Means for Solving the Problems] That is, the object of the present invention is to provide a sharp tooth at the tip and a high pressure water from the tip of an excavation pipe provided with a pilot pipe at the center of the tip while preliminarily digging the ground. The first step of driving the excavation pipe at the sheet pile driving position, and the excavation pipe having a sharp tooth at the tip of the excavation pipe is removed and inserted into the pipe to remove the excavation pipe from another location. And a second step of creating an excluded volume in the ground, and an excavation tube in which high-pressure water injection is added to the excavation tube of the second step after the excavation tube is pulled out in the second step, This is achieved by a sheet pile driving construction method, which comprises a third step of tying together sheet piles and pulling out only the excavation pipe.

[作 用] 上記のような工程によるシートパイル打込み工事方法に
よれば、地盤に硬い部分があって、シートパイル単独で
打設不可能の場合、第1の工程によって、硬い地盤を掘
削して緩めることができる。又、地盤に細砂部分があ
り、極めて締り易く、第1の工程で掘削した跡に大きな
排除体積を築造でき難い場合、第2の工程により排除体
積を確保できる。更に、従来の方法とは全く異なる、シ
ートパイルと掘削管を抱き合せて地盤に打込む第3の工
程を遂次用いることにより、如何なる状態の地盤にも、
容易にシートパイルを打込むことが可能となる。
[Operation] According to the method for constructing a sheet pile by the above steps, if the ground has a hard portion and it is impossible to place the sheet pile alone, the hard ground is excavated in the first step. Can be loosened. In addition, when the ground has a fine sand portion and it is extremely easy to tighten and it is difficult to build a large excluded volume in the trace excavated in the first step, the excluded volume can be secured by the second step. Furthermore, by using the third step of tying up the sheet pile and the excavation pipe and driving it into the ground, which is completely different from the conventional method, by using the ground in any state,
It is possible to drive the sheet pile easily.

[実施例] 以下、本発明の実施例を添付図面を参照して説明する。
第1図は、本工事方法に適用される工程を詳述するため
の説明図である。第1の工程においては、掘削管1とし
てパイロット管と高圧水噴射ノズルを備えた第1の掘削
管1Aを地盤に打設する。第2の工程においては、掘削
管1として先端にツースを備えた第2の掘削管1Bを打
設する。第3の工程においては、掘削管として、第2の
掘削管に高圧水噴射パイプを付加した第3の掘削管1C
を使用し、該第3の掘削管1Cとシートパイルを抱合せ
て地盤に打込み、第3の掘削管1Cを引抜いて工事を完
了するが、それらの工事は、第1図に示す状態で行われ
る。
Embodiments Embodiments of the present invention will be described below with reference to the accompanying drawings.
FIG. 1 is an explanatory diagram for detailing the steps applied to this construction method. In the first step, as the excavation pipe 1, a first excavation pipe 1A equipped with a pilot pipe and a high-pressure water jet nozzle is placed in the ground. In the second step, as the excavation pipe 1, a second excavation pipe 1B having a tooth at its tip is driven. In the third step, as a drill pipe, a third drill pipe 1C in which a high-pressure water jet pipe is added to the second drill pipe
Using the above, the third excavation pipe 1C and the sheet pile are tied together and driven into the ground, and the third excavation pipe 1C is pulled out to complete the construction, but those constructions are performed in the state shown in FIG. .

すなわち、本発明によるシートパイル打込み工事では、
シートパイルを打込む予定地盤Gを先ずパワーショベル
等により浅く掘削して、掘削管1を垂直に支える掘削定
規6を設置する。そして、クレーン7で吊り下げたバイ
ブロパイルハンマー3によって、掘削管1の上端に設け
られたエンドグリップ5を把持し、掘削管1を地盤Gに
垂直に立て、この状態で同掘削管1に振動を与えつつ、
地中に推進させて行く。第1〜第3の掘削管は、全て鋼
管を用いており、エンドグリップはH鋼等を同掘削管1
に溶接して形成する。掘削管1の抜き差しはクレーン7
によって行われ、バイブロハンマー3はクレーン7のフ
ック9に吊り揚げられ、掘削管1のエンドグリップ5
は、バイブロハンマー3のチャック機構8により把持さ
れている。
That is, in the sheet pile driving work according to the present invention,
First, the ground G on which the sheet pile is to be driven is first shallowly excavated by a power shovel or the like, and an excavation ruler 6 that vertically supports the excavation pipe 1 is installed. Then, the end grip 5 provided at the upper end of the excavation pipe 1 is grasped by the vibro pile hammer 3 suspended by the crane 7, the excavation pipe 1 is erected vertically on the ground G, and in this state, the vibration is applied to the excavation pipe 1. While giving
Propel it in the ground. The first to third drill pipes are all steel pipes, and the end grips are made of H steel or the like.
Formed by welding. Crane 7 is used to insert and remove the drill pipe 1.
The vibro hammer 3 is lifted by the hook 9 of the crane 7, and the end grip 5 of the drill pipe 1
Are gripped by the chuck mechanism 8 of the vibro hammer 3.

ここにおいて、第1図と第2図の工程説明図を併用し
て、本発明の第1の工程について述べる。第2図(a)
は第1の工程の説明図、(b)は第1の掘削管1Aを示
す一部破断側面図である。図において、一点鎖線で示し
たのは、打設する予定のシートパイル10である。掘削
管1Aの先端側の中心軸上に、本管より径の細いパイロ
ット管2を配置し、その先端刃11を本管の先端より更
に先に突出させる。本管の先端とパイロット管2の先端
は鋭いツースを持っている。そして、パイロット管2は
中空で先端内部に高圧水噴射用送水管12と噴射ノズル
13を備えている。前記掘削管1Aをバイブロハンマー
3で振動させ、高圧水を噴射しながら、第2図(a)に
示した地盤位置G1、G2に推進させて行く、ある程度
の深さまで推進したところでこれを地中から引抜くこと
によって、同管1Aに詰まった土砂を排除し、地盤に穴
を残すことができる。掘削管の抜き差しは必要に応じて
繰返えすものとする。第1の工程によれば、掘削管1A
の圧入抵抗を軽減でき、掘削管1Aの土圧排除作用と相
俟って、軟らかい地盤は勿論、硬い地盤にも容易に穴を
掘削できるものである。
Here, the first step of the present invention will be described with reference to the process explanatory diagrams of FIG. 1 and FIG. Fig. 2 (a)
Is an explanatory view of the first step, and (b) is a partially cutaway side view showing the first excavation pipe 1A. In the figure, the one-dot chain line shows the sheet pile 10 to be placed. The pilot pipe 2 having a diameter smaller than that of the main pipe is arranged on the central axis on the tip side of the excavation pipe 1A, and the tip blade 11 of the pilot pipe 2 is projected further ahead of the tip of the main pipe. The tip of the main pipe and the tip of the pilot pipe 2 have sharp teeth. The pilot pipe 2 is hollow and has a water supply pipe 12 for jetting high-pressure water and a jet nozzle 13 inside the tip. The excavation pipe 1A is vibrated by the vibro hammer 3 and propelled to the ground positions G1 and G2 shown in FIG. 2 (a) while injecting high-pressure water, where it is propelled to a certain depth. By pulling out from the pipe, the sand and sand clogged in the pipe 1A can be removed and a hole can be left in the ground. The excavation pipes should be inserted and removed as necessary. According to the first step, the drill pipe 1A
It is possible to reduce the press-fitting resistance, and in combination with the earth pressure eliminating action of the excavation pipe 1A, it is possible to easily excavate holes not only on soft ground but also on hard ground.

しかしながら、前記第1の工程を実施した後、掘削管1
Aを引抜いた跡に、シートパイル10をそのまま打設し
ようとしても不可能な場合が生じる。例えば、地盤に細
砂層部分があり、高圧水で撹拌されても、直ぐに締って
しまう場合等である。地中に一旦排除体積を築造して
も、次にシートパイル打設に入るとその打設振動で地盤
が締まって打設不可能になる。
However, after performing the first step, the drill pipe 1
In some cases, even if the sheet pile 10 is to be placed as it is after the A is pulled out, it is impossible. For example, there is a case where the ground has a fine sand layer portion, and even if it is stirred with high-pressure water, it is quickly tightened. Even if the excluded volume is built in the ground, when the next sheet pile driving is started, the ground is tightened by the vibration of the driving and the driving becomes impossible.

前記のような場合、第2の工程により地盤に大きな排除
体積を作り、シートパイルの打設を容易にする。第3図
(a)及び(b)を用いて第2の工程を説明する。第3
図(a)は工程説明図、(b)は第2の工程に使用する
掘削管1Bの側面図である。掘削管1Bの先端には突起
状のツース4が設けられており、細砂地盤への打込みが
容易である。第3図に示す第1の工程で掘削管1Aを引
抜いた跡G1、G2に、掘削管1Bをバイブロハンマー
3で振動を与えながら打込んで行く。掘削管1Bをある
程度の深さまで打込んだところで、一旦同管1Bをクレ
ーン7によってできるかぎり振動を与えないようにして
地中から引抜く。この時、掘削管1Bは管中に砂を充満
したまま引抜かれ、掘削管1Bを引抜いた跡G1、G2
には穴が残る。この第2の工程では、水を使用しないの
で、第1の工程により破壊して緩めた細砂、その他を容
易に同管1B内に満たし、他の場所に排除できる。すな
わち、掘削跡G1、G2にはシートパイルを打込むのに
十分な排除体積が築造される。
In the above case, the second step creates a large excluded volume in the ground to facilitate the placement of the sheet pile. The second step will be described with reference to FIGS. 3 (a) and 3 (b). Third
Drawing (a) is a process explanatory view and (b) is a side view of excavation pipe 1B used for the 2nd process. Since the protruding tooth 4 is provided at the tip of the excavation pipe 1B, it can be easily driven into the fine sand ground. In the first step shown in FIG. 3, the excavation pipe 1B is driven into the traces G1 and G2 that have been extracted from the excavation pipe 1A while vibrating with the vibro hammer 3. When the excavation pipe 1B has been driven to a certain depth, the pipe 1B is once pulled out from the ground by the crane 7 so as not to give vibration as much as possible. At this time, the excavation pipe 1B is withdrawn while the pipe is filled with sand, and the traces G1 and G2 of the excavation pipe 1B withdrawn.
There is a hole in it. In this second step, since water is not used, the fine sand that has been broken and loosened in the first step and the like can be easily filled in the same pipe 1B and removed to another place. That is, the excavation traces G1 and G2 are constructed with an exclusion volume sufficient to drive the sheet pile.

次が、前記第2の工程で築造された掘削跡G1、G2に
シートパイルを打込む第3の工程である。工事の必要
上、例えば長さ25m以上、幅50cm以上と大型のシ
ートパイル打込みの必要がある場合、打込み地盤が予め
緩められ、ある程度の排除体積を確保してあっても、従
来の水を使用したジェットバイブロ工法では、土質が細
砂の場合粒子が非常に小さく、また比重も大きいので、
噴射された高圧水に撹拌された砂が再び締ったり、水圧
が吸収されてしまい、シートパイルと砂の間の縁を切る
ことが難しく、変形や損傷による打込みの困難性が残
る。
Next is the third step of driving the sheet pile into the excavation marks G1 and G2 built in the second step. When it is necessary to drive a large sheet pile with a length of 25 m or more and a width of 50 cm or more due to the construction work, conventional water is used even if the driving ground is loosened in advance and a certain amount of excluded volume is secured. In the jet vibro method, when the soil is fine sand, the particles are very small and the specific gravity is large, so
The agitated sand is re-tightened or the water pressure is absorbed in the jetted high-pressure water, and it is difficult to cut the edge between the sheet pile and the sand, and it remains difficult to drive due to deformation or damage.

そこで、第3の工程においては、シートパイル10と掘
削管1Cを抱合わせて、打込みを行う。第4図(a)は
工程説明図、(b)はその状態斜視図、(c)は第3の
工程に使用する掘削管1Cの側面図である。ここにおい
ても、第1図と第4図を併用して説明する。図におい
て、先ずクレーン7によりシートパイル10を図示した
位置に吊り込み、そのままバイブロパイルハンマー3で
容易に打込める位置まで打込んで自立させる。打込み深
さはシートパイルの全長のおよそ1/2〜3/4程度とし、静
かに仮打込みする。
Therefore, in the third step, the sheet pile 10 and the excavation pipe 1C are tied together and driven. 4A is a process explanatory view, FIG. 4B is a perspective view of the state, and FIG. 4C is a side view of the excavation pipe 1C used in the third process. Also in this case, description will be given by using FIG. 1 and FIG. 4 together. In the figure, first, the crane 7 is used to hang the sheet pile 10 at a position shown in the figure, and then the vibrating pile hammer 3 is used to drive the sheet pile 10 to a position where the sheet pile 10 can be easily driven to be self-supporting. The driving depth should be approximately 1/2 to 3/4 of the total length of the sheet pile, and the temporary driving should be performed gently.

次に、掘削管1Cをバイブロパイルハンマー3でチャッ
キングしたまま、先に仮打ちしたシートパイル10に添
わせるように、地盤G3の位置に打込む。そして、打込
み定規6の上方50〜150cmまでの部分の2個所で
シートパイルバンドで固定し、シートパイル10と掘削
管1Cを一体化させる。固定位置は工事の状態に合せて
適宜とする。
Next, while excavating the excavation pipe 1C with the vibro pile hammer 3, the excavation pipe 1C is driven into the position of the ground G3 so as to be attached to the sheet pile 10 that has been provisionally hammered. Then, the sheet pile 10 and the excavation pipe 1C are integrated by fixing them with the sheet pile bands at two portions of the driving ruler 6 above 50 to 150 cm. The fixed position will be appropriate according to the construction conditions.

前記掘削管1Cは、第1、第2の工程で使用した掘削管
と同様に、バイブロパイルハンマー3によって把持する
ことができるエンドグリップ5が設けられている。又、
下端には尖鋭なツース4を備え、側端に高圧水の噴射の
ための高圧パイプ14を有している。
The excavation pipe 1C is provided with an end grip 5 which can be grasped by the vibropile hammer 3 similarly to the excavation pipes used in the first and second steps. or,
A sharp tooth 4 is provided at the lower end, and a high pressure pipe 14 for injecting high pressure water is provided at the side end.

前述のシートパイル10と一体化した掘削管1Cを、バ
イブロパイルハンマー3により更に両者の頭部上面が略
一致するところまで打込む。エンドグリップ5の上端に
は、シートパイル10の上端部を上から咥え込む一対の
突起15が溶接されており、掘削管1Cの突起15がシ
ートパイル10の上端部を押さえ込む状態で、両者の上
端部が略一致したところで打込みを一旦停止する。
The excavation pipe 1C integrated with the above-mentioned sheet pile 10 is further driven by the vibro pile hammer 3 until the upper surfaces of both heads substantially coincide with each other. The upper end of the end grip 5 is welded with a pair of protrusions 15 that hold the upper end of the seat pile 10 from above, and the protrusion 15 of the excavation pipe 1C presses the upper end of the seat pile 10 so that both The driving is temporarily stopped when the upper ends substantially coincide with each other.

ここでチャック機構8を一時開放して、掘削管1Cを放
し、シートパイル10と掘削管1Cを一緒にチャッキン
グする。一体化されたシートパイル10と掘削管1C
を、バイブロパイルハンマー3によりエンドグリップ5
に振動を加えて所定の深さまで打込む。高圧パイプ14
は土質に対応した吐出量の高圧水を噴射させ、排土を容
易にする。又、工程途中で必要があれば、バキューム装
置16により水と共に土砂を吸い出す作業を付加する。
シートパイル10を所定の位置に所定の深さまで打込ん
だところで、チャック機構8のチャックを解き、次のシ
ートパイルを次の打込み予定地盤位置G4に吊込み、自
立させた後、掘削管1Cを引抜き次の打設に移るもので
ある。掘削管1Cの引抜きはシートパイル10と離れる
までバイブロパイルハンマー3により静かに振動を加え
ながら行う。必要最小限の振動を与えながら引き抜く。
この時、同管1Cのエンドグリップ5に設けられた突起
15の下方は開いているので、シートパイル10は打込
み位置に打設したままとなる。
Here, the chuck mechanism 8 is temporarily opened, the excavation pipe 1C is released, and the sheet pile 10 and the excavation pipe 1C are chucked together. Integrated sheet pile 10 and drill pipe 1C
The end grip 5 with the vibro pile hammer 3.
Apply vibration to and drive to the specified depth. High pressure pipe 14
Discharges high-pressure water with a discharge rate that corresponds to the soil quality, facilitating soil removal. Further, if necessary during the process, a work of sucking earth and sand together with water by the vacuum device 16 is added.
When the sheet pile 10 is driven into a predetermined position to a predetermined depth, the chuck of the chuck mechanism 8 is released, the next sheet pile is hung at the next driven ground position G4, and is made to stand by itself. It will be pulled out and moved to the next placement. The excavation pipe 1C is pulled out while vibrating gently with the vibro pile hammer 3 until it is separated from the sheet pile 10. Pull out while giving the minimum required vibration.
At this time, since the lower part of the projection 15 provided on the end grip 5 of the tube 1C is open, the sheet pile 10 remains driven in the driving position.

以上述べた第1〜第3の打込み工程を遂次行うことによ
り、何れの工程でも、単独では打設不可能であった、細
砂層を含んだ地盤への、シートパイルの打込みが容易に
可能となる。因に第5図は、本件発明者が本発明の打込
み工事方法による試験的シートパイル打込みを行った地
盤の柱状図と、これに対応する貫入試験の結果をN値6
0まで示したものである。この地盤は深さおよそ5m〜
15mは中砂、およそ15m〜20mは細砂、その他、
大きな石を含んだ砂礫、小石混りの細砂、ローム層等が
混在している。土質が砂礫となる深度22m以降では、
7〜11cm打ち込むのにそれぞれ50回の打ち込み回数
を要しており、これから推定すると貫入試験のN値は明
らかに150前後となる。上記地盤柱状図は本件発明者
が国補工事としてシートパイル施工を行った土質の一例
である。
By successively performing the above-mentioned first to third driving steps, it is possible to easily drive the sheet pile into the ground including the fine sand layer, which could not be driven alone in any of the steps. Becomes By the way, FIG. 5 shows a columnar view of the ground on which the inventor of the present invention has made a trial sheet pile driving by the driving method of the present invention and the result of the penetration test corresponding to the N value of 6
It is shown up to 0. This ground is about 5m deep
15m is medium sand, 15m to 20m is fine sand, etc.
Gravel containing large stones, fine sand with small stones, loam layer, etc. are mixed. After the depth of 22 m where the soil becomes gravel,
It takes 50 times each to drive 7 to 11 cm, and it is estimated from this that the N value in the penetration test is obviously around 150. The above-mentioned ground column diagram is an example of the soil quality that the present inventor has carried out sheet pile construction as national repair work.

前記第5図に示した地盤においては、砂の粒子が極めて
小さく、比重の大きい細砂部分と、砂礫部分が混在して
おり、工事上必要とする長さ25m、幅50cmのシー
トパイルの単独打込みは不可能であった。それだけでは
なく、先に述べた第1、第2、第3の工程を単独で用い
てある程度の排除体積を築造した後も、シートパイル単
独では打込み不可能であった。これはシートパイル打込
みの際、細砂が高圧水等で撹拌されても、直ぐに締っ
て、摩擦抵抗を減少させることができなかったためと考
えられる。上記工事に本発明の工事方法を用いた実際例
を示すと、シートパイル寸法は上記の通り長さ25m、
幅50cm、第1の工程に用いた掘削管1Aの管径が2
70φ、第2の工程に用いた掘削管1Bの管径が270
φ、第3の工程に用いた掘削管1Cの管径が270φ
で、日平社製60psのバイブロパイルハンマー1台
と、150kg/cm2のジェットポンプ1台を用い、
深さ25mまで容易にシートパイルを打込むことができ
た。第1及び第2の工程は、従来の工法を用いるが、こ
の工法は従来例で述べたように、工事が容易であると共
に低振動、低騒音である。
In the ground shown in FIG. 5, the sand particles are extremely small, and the fine sand portion having a large specific gravity and the sand and gravel portion are mixed, and a sheet pile having a length of 25 m and a width of 50 cm which is necessary for construction is used alone. It was impossible to drive. Not only that, even after a certain amount of excluded volume was built by using the above-mentioned first, second, and third steps alone, it was impossible to drive the sheet pile alone. This is considered to be because when the sheet pile was driven in, even if the fine sand was stirred with high-pressure water or the like, it quickly tightened and the frictional resistance could not be reduced. An actual example of using the construction method of the present invention for the above construction shows that the sheet pile has a length of 25 m as described above,
The width of the excavation pipe 1A used in the first step is 50 cm and the diameter is 2
70φ, the diameter of the excavation pipe 1B used in the second step is 270
φ, the diameter of the excavation pipe 1C used in the third step is 270φ
Then, using one Nipira 60ps vibropile hammer and one 150kg / cm 2 jet pump,
The sheet pile could be easily driven up to a depth of 25 m. A conventional method is used for the first and second steps, but this method is easy to construct and has low vibration and low noise as described in the conventional example.

第3の工程もこれに準じるもので、極めて低振動であ
る。例として、第6図及び第7図、第8図、第9図に、
従来のジェットバイブロ工法及び本件発明者が本発明の
第3の工程でシートパイルを打込んだ場合の振動試験結
果を示す。音響測器社製のOV−25B型公害用振動計
を使用し、振動レベルを記録したチャートより転記した
データである。シートパイルはVL型の長さ25mのも
のを使用し、打設条件はほぼ同様とした。但し本発明で
使用したジェットポンプは150kg/cmが1台、
従来例では、同型2台であった。地盤深度20〜25m
付近における測定結果である。
The third step conforms to this and has extremely low vibration. As an example, in FIGS. 6 and 7, FIG. 8 and FIG.
The conventional jet vibro method and the vibration test result when the inventor of the present invention drives a sheet pile in the third step of the present invention are shown. It is the data transcribed from the chart which recorded the vibration level using the OV-25B pollution vibrometer manufactured by Acoustic Instruments Co., Ltd. The sheet pile used was a VL type having a length of 25 m, and the driving conditions were almost the same. However, one jet pump used in the present invention is 150 kg / cm 2 ,
In the conventional example, there were two units of the same type. Ground depth 20-25m
It is a measurement result in the vicinity.

第6図は、従来のジェットバイブロ工法における振動レ
ベルを示すものである。振動は、ほぼ78dbと高いレ
ベルで持続するが打設不能であった。シートパイル打設
地盤は、後述の国補工事を行った地盤と似た土質構成の
地盤を選択し、測定は打設地点より10m離れた地点で
行った。
FIG. 6 shows the vibration level in the conventional jet vibro method. The vibration continued at a high level of about 78db, but could not be placed. As the sheet pile placing ground, a soil having a soil structure similar to the ground subjected to the national repair work described below was selected, and the measurement was performed at a position 10 m away from the placing position.

第7図は、第6図と同じ地盤を同じ条件で、本発明の第
3の工程により、シートパイル打設を行った場合の振動
レベル測定結果である。振動レベルはおよそ60dbで
打込み可能であった。
FIG. 7 is a vibration level measurement result when sheet pile driving is performed according to the third step of the present invention under the same conditions as in FIG. 6 under the same conditions. The vibration level was about 60 db, and the implant was possible.

第8図、第9図は、先に述べた国補工事を行った際の振
動レベルを示すものである。シートパイル打設条件は第
5図〜第7図と同じである。第8図は打設地点より10
m離れた地点での測定結果、第9図は打設地点より10
m離れた前記測定点の対称点における測定結果である。
振動規制法に定める基準値75dbより遥かに小さい値
で、打設可能である。ただ、第1、第2の工程と異なる
点は、従来になかった、シートパイルに掘削管を添わ
せ、上端部を一致させて打込む点である。それに掘削管
先端部で土砂を掘削し、その砂を掘削管の上端部排出口
から吹上げさせながらシートパイルの打設を行うので、
掘削管周辺及びシートパイル周辺の土砂が次第に移動し
て打設を容易にする。この場合、ウエルバキュームを用
いて砂を強制的に排出すれば更に有効である。
FIG. 8 and FIG. 9 show the vibration level when the above-mentioned national auxiliary work is carried out. The conditions for placing the sheet pile are the same as those shown in FIGS. Figure 8 shows 10 points from the placement point.
The result of measurement at a distance of m, Fig. 9 shows 10
It is a measurement result in the symmetrical point of the said measurement point which was m distance.
It is possible to drive with a value much smaller than the reference value 75db specified by the Vibration Regulation Law. However, what is different from the first and second steps is that the excavation pipe is attached to the sheet pile, which is not in the past, and the upper end portions are aligned and driven. Since the earth and sand are excavated at the tip of the excavation pipe, and the sand is blown up from the discharge port at the upper end of the excavation pipe, the sheet pile is placed,
Sediment around the excavation pipe and around the sheet pile gradually moves to facilitate placing. In this case, it is more effective to use well vacuum to forcefully discharge the sand.

この事は、第1の工程で地盤の砂礫層、小石混り砂層通
を含めて、土圧排除工法を用いて地面を容易に緩め、第
2の工程で大きな排除体積を築造し、これに次ぐ第3の
工程では、掘削管のシートパイルを抱き合わせ打込むこ
とにより、掘削管が地中に打込まれた際、一定の面積で
内部と外部の砂の縁を切り、ツースによって破壊された
砂は、水圧によって上方に向って管内部を容易に吹上げ
管上端部に設けた排出口より管外に排出してしまい、シ
ートパイル周辺の土砂は管先端部に向かって移動するこ
とにより、摩擦抵抗が減少するためと考えられる。管中
に充填された砂を地表面に抜き上げ他の場所に排出する
ことにより、打設地盤には更に大きな排除体積が生じ、
次々に影響を及ぼし、大きな石等も容易に逃げ、シート
パイルの打込み時間が短縮されるものである。
This is because in the first step, including the gravel layer of the ground and the pebble-mixed sand layer, the ground pressure is easily loosened using the earth pressure elimination method, and in the second step a large excluded volume is built, In the next third step, the piles of the piles of the excavation pipe were struck together, and when the excavation pipe was driven into the ground, the inner and outer edges of the sand were cut at a certain area and destroyed by the tooth. Sand easily blows up the inside of the pipe due to water pressure and is discharged to the outside of the pipe from the discharge port provided at the upper end of the pipe, and the sand around the sheet pile moves toward the tip of the pipe, It is considered that the frictional resistance decreases. By pulling out the sand filled in the pipe to the ground surface and discharging it to another place, a larger excluded volume is generated in the placing ground,
It affects one after another, easily escapes large stones, etc., and the driving time of the sheet pile is shortened.

[発明の効果] 以上の説明から分るように、本発明の工事方法によれ
ば、従来シートパイルの打込み不可能であった細砂で締
り易い地盤、あるいは砂礫層を含んだ複雑な地盤等にお
いても、地盤の相当に深い所まで、バイブロパイルハン
マーとジェットポンプのように比較的簡易な機材により
シートパイルの打込みが可能となる。
[Effects of the Invention] As can be seen from the above description, according to the construction method of the present invention, it is easy to consolidate the sheet pile with fine sand, which is conventionally impossible to drive, or a complicated ground including a gravel layer. Also, in the deep ground, it is possible to drive the seat pile by using relatively simple equipment such as a vibro pile hammer and a jet pump.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の工程説明図、第2図(a)及び(b)
は本発明の第1の工程の説明図及び使用する掘削管の側
面図、第3図(a)及び(b)は第2の工程の説明図及
び使用する掘削管の側面図、第4図(a)、(b)及び
(c)は第3の工程の説明図、その斜視図及び使用する
掘削管の側面図、第5図は本発明工事方法でシートパイ
ルを試験的に打込んだ地盤構造を示す柱状図と貫入試験
結果を示す図表、第6図及び第7図、第8図、第9図
は、従来のジェットパイル工法及び本実施例の振動試験
結果を示す図である。 1、1A、1B、1C……掘削管、2……パイロット
管、3……バイブロパイルハンマー、4……ツース、5
……エンドグリップ、6……掘削定規、7……クレー
ン、10……シートパイル
FIG. 1 is a process explanatory diagram of the present invention, and FIGS. 2 (a) and 2 (b).
Is an explanatory view of the first step of the present invention and a side view of the drill pipe used, FIGS. 3 (a) and (b) are explanatory views of the second step and a side view of the drill pipe used, FIG. (A), (b) and (c) are explanatory views of the third step, a perspective view thereof and a side view of a drill pipe used, and FIG. 5 is a test pile driven by a construction method of the present invention. A column diagram showing the ground structure and a chart showing the results of the penetration test, FIGS. 6 and 7, FIG. 8 and FIG. 9 are diagrams showing the vibration test results of the conventional jet pile construction method and this embodiment. 1, 1A, 1B, 1C ... Drilling pipe, 2 ... Pilot pipe, 3 ... Vibro pile hammer, 4 ... Tooth, 5
…… End grip, 6 …… Excavation ruler, 7 …… Crane, 10 …… Seat pile

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】シートパイル打込み工事において、先端に
尖鋭なツースを、先端中央部にパイロット管を設けた掘
削管の先端から高圧水を噴射させながら、予め地盤のシ
ートパイル打込み位置に、該掘削管を打設する第1の工
程と、前記掘削管を引抜いた跡に、先端に尖鋭なツース
を取付けた掘削管を抜き差しして管内に入った土砂を他
所に排除し、地中に排除体積を作る第2の工程と、前記
第2の工程で掘削管を引抜いた跡に、第2の工程の掘削
管に高圧水の噴射を付加した掘削管と、シートパイルを
抱合せて打設し、該掘削管のみ引抜く第3の工程からな
ることを特徴とするシートパイル打込み工事方法。
1. In a sheet pile driving work, a sharp tooth is provided at the tip and high pressure water is jetted from the tip of an excavation pipe provided with a pilot pipe at the center of the tip, and the excavation is carried out in advance at the seat pile driving position of the ground. The first step of placing a pipe and the excavation pipe with a sharp tooth attached to the tip of the excavated pipe to remove the sand and sand that has entered the pipe to another place, and remove the volume to the ground. And a second step of making a digging pipe in the second step, a digging pipe in which high-pressure water is added to the digging pipe of the second step, and a sheet pile are laid together. A sheet pile driving construction method comprising a third step of extracting only the excavation pipe.
JP22719488A 1988-09-10 1988-09-10 Sheet pile driving construction method Expired - Fee Related JPH0629511B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP22719488A JPH0629511B2 (en) 1988-09-10 1988-09-10 Sheet pile driving construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP22719488A JPH0629511B2 (en) 1988-09-10 1988-09-10 Sheet pile driving construction method

Publications (2)

Publication Number Publication Date
JPH0274717A JPH0274717A (en) 1990-03-14
JPH0629511B2 true JPH0629511B2 (en) 1994-04-20

Family

ID=16856968

Family Applications (1)

Application Number Title Priority Date Filing Date
JP22719488A Expired - Fee Related JPH0629511B2 (en) 1988-09-10 1988-09-10 Sheet pile driving construction method

Country Status (1)

Country Link
JP (1) JPH0629511B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4653127B2 (en) * 2007-02-08 2011-03-16 株式会社コーワン Auger combined steel sheet pile press-in method

Also Published As

Publication number Publication date
JPH0274717A (en) 1990-03-14

Similar Documents

Publication Publication Date Title
JPH0629511B2 (en) Sheet pile driving construction method
JPH09268555A (en) Pile pulling method and device
JP2000352052A (en) Pile driving method combined with water jet and guide pile in the method
CN115198750B (en) Cast-in-place pile head blocking and cutting device and method
JP2005220573A (en) Pile driving method
JP2820247B2 (en) Pile pull-out method and device
JP2886374B2 (en) Vibration compaction method
CN103866763B (en) Method for making pile by performing pile pressure irrigation through immersed tube and special device and application
JPH05287745A (en) How to attach the abdomen in the column construction method
JP2006009468A (en) Driving method of medium digging type steel pipe sheet pile and steel pipe sheet pile used therefor
JP3047330U (en) Sheet pile driving equipment
JP3039558U (en) Sheet pile driving equipment
JP2000273900A (en) Air suction type soil discharge device and construction method
JP3472561B2 (en) Underground casting steel casting equipment
JP2003003459A (en) Filling grout method
JP2002242219A (en) Debris removal device
JP2777950B2 (en) Vibration compaction device
JPH07305351A (en) Method and device for cutting underground obstacles
JP2641710B2 (en) How to drive structures
JP3973401B2 (en) Ground compaction method
JPH08170332A (en) Seat pile driving device and driving method
JP2001146745A (en) Pile pulling device and pile pulling method
JPH03140594A (en) Construction work of water-stopping shaft
JPH08284163A (en) Pile driving method
CN114108627A (en) Casing mud flushing method for dismantling pile foundation structure in deep water field

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees