Tunnel lining concrete placing method and its center

Info

Publication number
JPH0631552B2
JPH0631552B2 JP63077704A JP7770488A JPH0631552B2 JP H0631552 B2 JPH0631552 B2 JP H0631552B2 JP 63077704 A JP63077704 A JP 63077704A JP 7770488 A JP7770488 A JP 7770488A JP H0631552 B2 JPH0631552 B2 JP H0631552B2
Authority
JP
Japan
Prior art keywords
concrete
displacement
center
side wall
lining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63077704A
Other languages
Japanese (ja)
Other versions
JPH01250598A (en
Inventor
弘明 安田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SAGA KOGYO KK
Original Assignee
SAGA KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SAGA KOGYO KK filed Critical SAGA KOGYO KK
Priority to JP63077704A priority Critical patent/JPH0631552B2/en
Publication of JPH01250598A publication Critical patent/JPH01250598A/en
Publication of JPH0631552B2 publication Critical patent/JPH0631552B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は掘削されたトンネルの内壁面に覆工コンクリー
トを打設する方法と、それに使用されるセントルに関す
るものである。
Description: TECHNICAL FIELD The present invention relates to a method for placing lining concrete on the inner wall surface of an excavated tunnel, and a centle used for the method.

(従来技術) トンネル工事において覆工コンクリートを打設する場
合、従来は、第7図のように門型構Aで支持されるセン
トル(通常は9m〜12mの長さ)BのトンネルC内へ
のセット、セントルBとトンネルCとの間の空間Dへの
コンクリートEの打設、同コンクリートEの養成、セン
トルBの脱型、トンネルCの掘削方向へのセントルBの
移動、セントルBのセットを繰り返して行なっている。
(Prior Art) When placing a lining concrete in tunnel construction, conventionally, as shown in FIG. 7, enter into a tunnel C of a center (usually 9 m to 12 m long) B supported by a portal structure A. Set, placing concrete E in the space D between the center B and the tunnel C, training the concrete E, demolding the center B, moving the center B in the excavating direction of the tunnel C, setting the center B Is repeated.

セントルBをセットする場合は、先に打設された既設コ
ンクリートにセントルBの後端部を一部ラップさせて、
次に打設されるコンクリートが既設コンクリートと面一
に仕上るようにしている。しかし、コンクリートの打設
に際しては、コンクリートの流体としての水平方向の荷
重(側圧)がセントルBに働き、その側圧によりセント
ルBが内側に押され、それにより門型構Aが内側に変位
するので、セントルBもその分だけ(通常は6〜10mm
程度)内側に変位し、打設されたコンクリートが内側に
突出する。このためセントルを次の位置にセットしてコ
ンクリートを打設すると、第9図のようにコンクリート
Eの打継ぎ部Fが面一に仕上らず、凹凸(目違い)にな
り体裁が悪いという問題があった。
When setting Centr B, part of the rear end of Centr B is lapped on the existing concrete that has been placed first,
The concrete to be poured next is flush with the existing concrete. However, when pouring concrete, a horizontal load (side pressure) as a fluid of concrete acts on the center B, and the side pressure pushes the center B inward, whereby the portal structure A is displaced inward. , Centle B is just that much (usually 6-10 mm
Displaced inward, and the cast concrete projects inward. Therefore, when the center is set in the next position and concrete is poured, the joint F of the concrete E is not finished flush as shown in Fig. 9, resulting in unevenness (misalignment), resulting in poor appearance. was there.

コンクリートの打継ぎ部Fの目違いを解消することは、
トンネル工事の仕上り、コンクリート覆工の仕上りを向
上させるために重要なことである。従来はこの目違いを
防止するため次のような対策がとられていた。
To eliminate the misalignment of the concrete joint F
This is important for improving the finish of tunnel construction and concrete lining. Conventionally, the following measures have been taken in order to prevent this misalignment.

(1)門型構Aを強固にして変位しにくくすること。(1) To make the gate structure A strong so that it is difficult to displace.

(2)先に打設されるコンクリートに第10図のように
アンカーGを埋設し、そのコンクリートが硬化してから
同アンカーGをセントルBの端部に設けた取付け具Hに
固定してセントルBを変移しにくくすること。
(2) An anchor G is embedded in the concrete to be placed first as shown in FIG. 10, and after the concrete is hardened, the anchor G is fixed to a fixture H provided at the end of the centle B, and the centle is fixed. Make B difficult to move.

(3)トンネルの側壁部よりも先に床盤部Iへコンクリ
ートを打設して床盤部Iを固め、それにアンカーを設置
し、そのアンカーとセントルBとを固定して、セントル
Bを変位しにくくすること。
(3) Concrete is cast into the floor I to solidify the floor I before the side wall of the tunnel is fixed, an anchor is installed on the floor I, the anchor is fixed to the center B, and the center B is displaced. Hard to do.

(4)トンネル岩盤へ打ち込んだロックボルトとセント
ルBとを固定して、セントルBを変位しにくくするこ
と。
(4) Fix the lock bolt and the Centle B driven into the tunnel bedrock so that the Centle B is difficult to displace.

(従来技術の問題点) しかし前記(1)の方法は門型構のコストが上昇し、し
かも門型構Aの変位は減少するが目違いの完全な解決策
とはならない、という問題があった。
(Problems of the prior art) However, the method (1) has a problem that the cost of the gate-shaped structure increases and the displacement of the gate-shaped structure A decreases, but it is not a complete solution without mistake. It was

前記(2)(3)(4)の方法は、アンカーG或はロッ
クボルトの設置及びそれらとセントルとの固定という作
業が必要であり、しかもアンカー、ロックボルト、セン
トルとも位置決めセットが大変むずかしく、その上、ト
ンネル長が長くなるとアンカーやロックボルトの数が多
くなり、その分だけコスト増になるという問題があっ
た。
The above methods (2), (3) and (4) require the work of installing the anchor G or the lock bolt and fixing them to the center, and the positioning set of the anchor, the lock bolt and the center is very difficult, In addition, the longer the tunnel, the larger the number of anchors and lock bolts, which increases the cost.

(発明の目的) 本発明の目的は、コンクリート打設時にセントルに側圧
が加わっても門型構が変位せず、ひいてはセントルも変
位せず、打継ぎ部の目違いが発生しないようにしたトン
ネル覆工コンクリート打設方法とそのセントルを提供す
ることにある。
(Object of the Invention) An object of the present invention is to prevent the gate-shaped structure from being displaced even when lateral pressure is applied to the centle at the time of concrete pouring, and thus the centle not to be displaced, so that no misalignment of the joint portion occurs. The purpose is to provide a lining concrete pouring method and its center.

(問題点を解決するための手段) 本発明のうち請求項1のトンネル覆工コンクリート打設
方法は、第1図のように側壁部セントル1が上部セント
ル2とヒンジ4により回動自在に取付けられ、各部のセ
ントルが門型構5により保持されてなるセントル6をト
ンネル7の壁面に適宜間隔離して対向させ、その対向間
隙に覆工コンクリートを打設するようにしたトンネル覆
工コンクリート打設方法において、前記門型構5に第5
図のように、コンクリート打設時に側壁部セントル1に
加わる変位量よりも多くの変位(第5図の仮想線の位置
までの変位)を、コンクリートの打設前に、同変位方向
に、予め付与するようにしたことを特徴とするものであ
る。
(Means for Solving Problems) In the method for placing concrete in a tunnel lining according to claim 1 of the present invention, as shown in FIG. 1, the side wall centr 1 is rotatably attached by the upper centle 2 and the hinge 4. A tunnel lining concrete pouring is made such that the centle 6 in which each part of each portion is held by the gate type structure 5 is appropriately separated from the wall surface of the tunnel 7 so as to face each other, and the lining concrete is placed in the facing gap. In the method, the gate structure 5
As shown in the figure, more displacement (displacement up to the position of the imaginary line in Fig. 5) than the amount of displacement applied to the side wall center 1 at the time of pouring concrete, in advance in the same displacement direction, before pouring concrete It is characterized by being provided.

本発明のうち請求項2のトンネル覆工コンクリート打設
セントルは、第1図のように側壁部セントル1が上部セ
ントル2とヒンジ4により回動自在に取付けられ、側壁
部セントル1が門型構5により保持されてなるトンネル
覆工コンクリート打設セントルにおいて、第2図、第3
図のように前記門型構5より既設コンクリート側に片持
梁9が張り出され、この片持梁9に先行変位付与体10
の一端が取付けられ、同変位付与体10の他端が打設済
み仕上りコンクリートに押しつけられ、同変位付与体1
0は片持梁9を介して門型構5に、コンクリート打設時
に側壁部セントル1に加わる変位量よりも多くの変位
を、コンクリートの打設前に、変位の発生する方向に、
予め付与するようにしたものであることを特徴とするも
のである。
In the concrete lining concrete lining for tunnel lining according to claim 2 of the present invention, as shown in FIG. 1, the side wall center 1 is rotatably attached by the upper center 2 and the hinge 4, and the side wall center 1 is a gate type structure. 2 and 3 of the concrete lining concrete pouring center which is held by
As shown in the figure, a cantilever beam 9 is projected from the gate type structure 5 to the existing concrete side, and the pre-displacement imparting body 10 is attached to the cantilever beam 9.
One end of the displacement imparting body 1 is attached, and the other end of the displacement imparting body 10 is pressed against the finished finished concrete.
0 is a displacement greater than the displacement applied to the side wall center 1 at the time of concrete pouring to the gate-shaped structure 5 via the cantilever 9 in the direction in which the displacement occurs before concrete pouring.
It is characterized in that it is given in advance.

本発明のうち請求項3のトンネル覆工コンクリート打設
セントルは、第1図のように側壁部セントル1が上部セ
ントル2とヒンジ4により回動自在に取付けられ、側壁
部セントル1が門型構5により保持されてなるトンネル
覆工コンクリート打設セントルにおいて、第4図のよう
に前記門型構5の両側の脚部11に高張力ケーブル12
が張られ、高張力ケーブル12に張力を付与して門型構
5に、コンクリート打設によりセントルに加わる変位量
よりも多くの変位を、コンクリート打設前に、同変位方
向に付与するようにしたものであることを特徴とするも
のである。
In the concrete lining concrete lining for tunnel lining according to claim 3 of the present invention, as shown in FIG. 1, the side wall center 1 is rotatably attached by the upper center 2 and the hinge 4, and the side wall center 1 is a gate type structure. As shown in FIG. 4, in the concrete laying concrete lining for the tunnel lining held by the high tension cable 12 on the leg portions 11 on both sides of the gate structure 5, as shown in FIG.
The tension is applied to the high-tensile cable 12 so that the gate-shaped structure 5 is applied with a displacement larger than the displacement applied to the center by concrete placing in the same displacement direction before concrete placing. It is characterized by being

(作用) 本発明のコンクリート打設方法は、門型構5及びセント
ル6の天端部の高さをセットした後、門型構5に先行変
位を付与する。先行変位の付与は例えば第1図における
先行変位付与体10又は、第4図における高張力ケーブ
ル12及び張力付与体13により行なう。
(Operation) In the concrete pouring method of the present invention, after the heights of the top ends of the gate-shaped structure 5 and the center 6 are set, the preceding displacement is applied to the gate-shaped structure 5. The advance displacement is applied by, for example, the advance displacement applying body 10 in FIG. 1 or the high tension cable 12 and the tension applying body 13 in FIG.

第1図の先行変位付与体10により先行変位を付与する
場合は、第2図、第3図のように門型構5より張出した
片持梁9に設けられた先行変位付与体(例えばジャッ
キ)10を操作して、その先端に取付けられた載荷盤
(以下グリッパーという)14を第3図の既設コンクリ
ート15の側端部に押しつけて左右のグリッパー14を
確実に接触させる。その後、先行変位付与体10により
門型構5の左右の脚部11に均等に徐々に荷重をかけて
反力をとり、片持梁9を介して門型構5を第5図のよう
に内側に先行変位させる。
When the preceding displacement imparting body 10 of FIG. 1 is used to impart the preceding displacement, the preceding displacement imparting body (for example, a jack) provided on the cantilever beam 9 extending from the gate-shaped structure 5 as shown in FIGS. 2 and 3. ) 10 is operated to push a loading board (hereinafter referred to as a gripper) 14 attached to the tip thereof against the side end portion of the existing concrete 15 shown in FIG. 3 to surely bring the left and right grippers 14 into contact with each other. Thereafter, the preceding displacement imparting body 10 uniformly applies a load to the left and right legs 11 of the portal structure 5 to take a reaction force, and the portal structure 5 is moved through the cantilever 9 as shown in FIG. Pre-displace inward.

第4図の高張力ケーブル12及び張力付与体13により
先行変位を付与するには、張力付与体13により高張力
ケーブル12を引いて門型構5の脚部11を内側に変位
させ、所望位置まで変位したら同ケーブル12をナット
16で固定する。
In order to apply the preceding displacement by the high tension cable 12 and the tension applying body 13 of FIG. 4, the high tension cable 12 is pulled by the tension applying body 13 to displace the leg portion 11 of the portal structure 5 inward, and the desired position is obtained. When the cable 12 has been displaced, the cable 12 is fixed with a nut 16.

いずれの場合も、付与される先行変位量は門型構5が本
来備える強固性、剛性により異なるが、一般的には10
mm前後とする。
In either case, the amount of advance displacement to be applied varies depending on the rigidity and rigidity originally possessed by the portal structure 5, but is generally 10
It should be around mm.

次に、変位させた門型構5と、側壁部セントル1との間
に設けられているターンバックルやジャッキなど30
(第3図)を伸ばしてセントル6を所定の位置にセット
する。
Next, a turnbuckle, a jack, etc. provided between the displaced gate structure 5 and the side wall center 1
Extend (Fig. 3) and set the center 6 in place.

ここで、グリッパー14を介して付与される既設コンク
リート15への圧縮力は、例えば20トンとした場合、
グリッパー14の面積を50cm×80cmとすれば200
00kg÷50cm÷80cm=5kg/cm2となり、側壁セント
ルの保有する早期強度未満に充分おさまるので、既設コ
ンクリートに悪影響はない。
Here, when the compressive force applied to the existing concrete 15 through the gripper 14 is, for example, 20 tons,
200 if the area of the gripper 14 is 50 cm x 80 cm
00kg ÷ 50cm ÷ 80cm = 5kg / cm 2 , and the so fully fit below early strength to hold the side walls Sentoru no adverse effect on the existing concrete.

コンクリート打設にあたっては、コンクリートの側圧に
よりまず側壁部セントル1が荷重を受け、同セントル1
と門型構5との間に設置されたターンバックル30が押
され、そのターンバックル30により門型構5が押され
るが、この場合、予め門型構5に与えられている先行変
位が第6図のA点で、打設コンクリートの側圧による応
力が同図のB点であれば、側圧がA点に達しない限り門
型構5は変位しない。
When placing concrete, the side wall Centr 1 is first loaded by the lateral pressure of the concrete,
The turnbuckle 30 installed between the gate type frame 5 and the gate type frame 5 is pushed, and the gate type frame 5 is pushed by the turnbuckle 30. In this case, the preceding displacement given to the gate type frame 5 in advance is At point A in FIG. 6, if the stress due to the lateral pressure of the poured concrete is point B in the same figure, the gate structure 5 will not be displaced unless the lateral pressure reaches point A.

なお、コンクリートの側圧により側壁セントル1、ター
ンバックル30に微小な変位が生ずるが、それが現実に
は無視できる変位量でしかないため、既設コンクリート
と次に打設されるコンクリートとの側壁打継ぎ部の目違
いは発生しない。
It should be noted that although a slight displacement occurs in the side wall center 1 and the turnbuckle 30 due to the lateral pressure of the concrete, since the displacement amount is actually negligible, the side wall splicing between the existing concrete and the concrete to be placed next is performed. No misalignment of parts occurs.

(実施例) 第1図〜第3図は本発明の一実施例の説明図である。こ
れは先行変位付与体10により門型構5に前記した先行
変位を付与するものである。
(Embodiment) FIGS. 1 to 3 are explanatory views of an embodiment of the present invention. This is to apply the preceding displacement to the portal structure 5 by the preceding displacement imparting body 10.

同図において1は側壁部セントル、2は上部セントルで
ある。
In the figure, 1 is a side wall center, and 2 is an upper center.

4は側壁部セントル1と上部セントル2を回動自在に連
結するヒンジである。
Reference numeral 4 denotes a hinge that rotatably connects the side wall center 1 and the upper center 2.

第1図〜第3図の9は片持梁であり、これは門型構5よ
り後方に張り出されている。第1図〜第3図の10は同
片持梁9に取付けられた先行変位付与体10であり、こ
れには例えばジャッキが使用される。この先行変位付与
体10はその先端に設けられたグリッパー14を第2図
のように既設のコンクリート15に押しつけて、門型構
5に前記した先行変位を付与するものである。
Reference numeral 9 in FIGS. 1 to 3 denotes a cantilever beam, which is projected rearward from the portal structure 5. Reference numeral 10 in FIGS. 1 to 3 is a preceding displacement imparting body 10 attached to the cantilever beam 9, for which a jack, for example, is used. The preceding displacement imparting body 10 is such that the gripper 14 provided at the tip thereof is pressed against the existing concrete 15 as shown in FIG. 2 to impart the preceding displacement to the portal structure 5.

なお、グリッパー14の既設コンクリート15に接する
面には、ゴム板、合板、ビニール板などの弾性を有する
材料を貼り、同コンクリート15へ局部荷重が働きにく
くするのが望ましい。
In addition, it is preferable that an elastic material such as a rubber plate, a plywood, or a vinyl plate is attached to the surface of the gripper 14 that contacts the existing concrete 15 so that a local load does not easily act on the concrete 15.

第4図は本発明の他の実施例の説明図である。これは高
張力ケーブル12及び張力付与体13により門型構5に
前記した先行変位を付与するものである。張力付与体1
3としては例えば油圧ジャッキが使用される。
FIG. 4 is an explanatory view of another embodiment of the present invention. This is to apply the preceding displacement to the portal structure 5 by the high tension cable 12 and the tension applying body 13. Tensioner 1
For example, a hydraulic jack is used as 3.

第4図の16は締付けナットであり、これは張力付与体
13で締付けた高張力ケーブル12を固定するものであ
る。
Reference numeral 16 in FIG. 4 is a tightening nut for fixing the high-tensile cable 12 tightened by the tension applying body 13.

第4図の20は門型構5の上部に取付けられたロールで
あり、これは高張力ケーブル12を掛けるためのもので
ある。
Reference numeral 20 in FIG. 4 denotes a roll mounted on the upper portion of the portal structure 5, which is used for hanging the high tension cable 12.

第4図の21は高張力ケーブル12が門型構5から外れ
ないようにするために、同ケーブル12を門型構5に係
止するものである。
Reference numeral 21 in FIG. 4 is for locking the high-tensile cable 12 to the portal structure 5 so as not to come off from the portal structure 5.

(発明の効果) 本発明は次のような効果がある。(Effects of the Invention) The present invention has the following effects.

(1)本発明のトンネル覆工コンクリート打設方法によ
れば、コンクリート打設時のコンクリートの側圧が、先
行変位されている門型構5により吸収されるので、側壁
に打継ぎ部の目違いがない良好なコンクリート覆工がで
きる。
(1) According to the tunnel lining concrete pouring method of the present invention, the lateral pressure of concrete at the time of pouring concrete is absorbed by the portal structure 5 which has been displaced in advance, so that the side wall has misaligned joints. Good concrete lining can be obtained.

(2)請求項2、3のトンネル覆工コンクリート打設用
セントルは、構成が簡潔であり、しかも先行変位付与体
10又は高張力ケーブル12及び張力付与体13を操作
するだけで先行変位を付与できるので、取扱いも容易で
ある。しかもアンカーやロックボルトを打ち込んだりす
る必要がないのでトンネル長が長くなってもコスト高に
なることもない。
(2) The construction of the concrete for placing concrete in the tunnel lining according to claims 2 and 3 has a simple structure, and the preceding displacement is imparted only by operating the preceding displacement imparting body 10 or the high tension cable 12 and the tension imparting body 13. It can be handled easily. Moreover, since it is not necessary to drive an anchor or a lock bolt, the cost does not increase even if the tunnel length becomes long.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明のコンクリート打設セントルの一例を示
す正面説明図、第2図は第1図の側面図、第3図は第2
図のA矢視図、第4図は本発明のコンクリート打設セン
トルの他例を示す正面説明図、第5図は本発明の先行変
位の説明図、第6図は先行変位と応力との関係を示す説
明図、第7図は従来のコンクリート打設方法の正面説明
図、第8図は同打設方法の平面説明図、第9図は従来の
コンクリート打設方法により形成された覆工コンクリー
トの側壁部の目違いの説明図、第10図は従来のコンク
リート打設方法のアンカー部分の説明図である。 1は側壁部セントル 2は上部セントル 4はヒンジ 5は門型構 6はセントル 7はトンネル 8は覆工コンクリート 9は片持梁 10は先行変位付与体 11は門型構の脚部 12は高張力ケーブル 13は張力付与体
FIG. 1 is a front explanatory view showing an example of a concrete pouring centle of the present invention, FIG. 2 is a side view of FIG. 1, and FIG.
FIG. 4 is a front view showing another example of the concrete placing centle of the present invention, FIG. 5 is an explanatory view of the preceding displacement of the present invention, and FIG. 6 is a drawing of the preceding displacement and stress. Explanatory diagram showing the relationship, FIG. 7 is a front explanatory diagram of a conventional concrete placing method, FIG. 8 is a plan explanatory diagram of the same placing method, and FIG. 9 is a lining formed by the conventional concrete placing method. FIG. 10 is an explanatory view of a misalignment of a side wall portion of concrete, and FIG. 10 is an explanatory view of an anchor portion of a conventional concrete placing method. 1 is a side wall 2 is an upper part 4 is a hinge 4 is a hinge 5 is a gate structure 6 is a center 7 is a tunnel 8 is a lining concrete 9 is a cantilever beam 10 is a preceding displacement imparting body 11 is a leg of a gate structure 12 is high Tension cable 13 is a tension applying body

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】側壁部セントル1が上部セントル2とヒン
ジ4により回動自在に取付けられ、各部セントルが門型
構5により保持されてなるセントル6をトンネル7に適
宜間隔離して対向させ、その対向間隙に覆工コンクリー
ト8を打設するようにしたトンネル覆工コンクリート打
設方法において、前記門型構5に、コンクリート打設時
に側壁部セントル1に加わる変位量よりも多くの変位
と、コンクリートの打設前に、変位の発生する方向に、
予め付与するようにしたことを特徴とするトンネル覆工
コンクリート打設方法。
1. A side wall section 1 is rotatably attached to an upper section 2 and a hinge 4, and a section 6 having each section held by a gate structure 5 is opposed to a tunnel 7 while being appropriately separated. In a concrete lining concrete placing method in which lining concrete 8 is placed in the facing gap, in the gate type structure 5, a displacement larger than the amount of displacement applied to the side wall center 1 at the time of placing concrete, Before placing, in the direction of displacement,
A method for placing concrete in a tunnel lining, characterized in that it is given in advance.
【請求項2】側壁部セントル1が上部セントル2とヒン
ジ4により回動自在に取付けられ、側壁部セントル1が
門型構5により保持されてなるトンネル用コンクリート
打設セントルにおいて、前記門型構5より既設コンクリ
ート側に片持梁9が張り出され、同片持梁9に先行変位
付与体10の一端が取付けられ、同変位付与体10の他
端が打設済みコンクリートに押し付けられ、同変位付与
体10は片持梁9を介して門型構5に、コンクリート打
設時に側壁部セントル1に加わる変位量よりも多くの変
位を、コンクリートの打設前に、変位の発生する方向
に、予め付与するものであることを特徴とするトンネル
覆工コンクリート打設セントル。
2. A concrete pouring center for a tunnel in which a side wall center 1 is rotatably attached by an upper center 2 and a hinge 4, and the side wall 1 is held by a gate structure 5, wherein said gate structure is 5, a cantilever beam 9 is projected to the existing concrete side, one end of the preceding displacement imparting body 10 is attached to the cantilever beam 9, and the other end of the displacement imparting body 10 is pressed against the placed concrete. The displacement imparting body 10 causes a displacement larger than the displacement amount applied to the side wall center 1 at the time of concrete pouring to the gate structure 5 through the cantilever 9 in the direction in which the displacement occurs before concrete pouring. , A concrete lining concrete lining for tunnel lining characterized by being given in advance.
【請求項3】側壁部セントル1が上部セントル2とヒン
ジ4により回動自在に取付けられ、側壁部セントル1が
門型構5により保持されてなるトンネル用コンクリート
打設セントルにおいて、前記門型構5の両側の脚部11
に高張力ケーブル12が張られ、この高張力ケーブル1
2に張力を付与して、コンクリート打設により門型構5
が変位する方向に、コンクリート打設前に門型構5に先
行荷重を付加して、門型構5に先行変位を付与するよう
にしたことを特徴とするトンネル覆工コンクリート打設
セントル。
3. A concrete pouring center for a tunnel in which a side wall center 1 is rotatably mounted by an upper center 2 and a hinge 4, and the side wall 1 is held by a gate structure 5, wherein the gate structure is provided. Legs 11 on both sides of 5
A high tension cable 12 is stretched over the
Applying tension to 2 and pouring concrete into the gate structure 5
In the direction of displacement, a preload is applied to the gate-shaped structure 5 before the concrete is placed so that the gate-shaped structure 5 is subjected to the preceding displacement.
JP63077704A 1988-03-30 1988-03-30 Tunnel lining concrete placing method and its center Expired - Lifetime JPH0631552B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63077704A JPH0631552B2 (en) 1988-03-30 1988-03-30 Tunnel lining concrete placing method and its center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63077704A JPH0631552B2 (en) 1988-03-30 1988-03-30 Tunnel lining concrete placing method and its center

Publications (2)

Publication Number Publication Date
JPH01250598A JPH01250598A (en) 1989-10-05
JPH0631552B2 true JPH0631552B2 (en) 1994-04-27

Family

ID=13641287

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63077704A Expired - Lifetime JPH0631552B2 (en) 1988-03-30 1988-03-30 Tunnel lining concrete placing method and its center

Country Status (1)

Country Link
JP (1) JPH0631552B2 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593472B (en) * 2016-12-23 2020-01-31 湖南五新隧道智能装备股份有限公司 lining trolley suitable for construction of main tunnel and branch tunnel in parallel tunnel
CN110409634A (en) * 2019-07-03 2019-11-05 中国三峡建设管理有限公司 High side wall concrete construction joint zero defect construction method
JP7701039B2 (en) * 2021-09-27 2025-07-01 株式会社フジタ Lining centre and lining concrete pouring method

Also Published As

Publication number Publication date
JPH01250598A (en) 1989-10-05

Similar Documents

Publication Publication Date Title
CA1257100A (en) Formwork apparatus for concrete placing
CN115182578B (en) Reinforcing device for building construction square column formwork
JPH0631552B2 (en) Tunnel lining concrete placing method and its center
US5676874A (en) Floor form assembly and apparatus used therewith
JP4070566B2 (en) Tunnel block continuous construction method
JPH03241200A (en) Method and device for setting precast board for tunnel
JPH07180114A (en) Shearing deformation correction device of seismic isolation bearing
US4949935A (en) Apparatus for positioning and supporting an inner mold panel of a form
CN112324472B (en) Tunnel steel frame supporting structure and construction method
JPH0522611U (en) Joint structure of precast floor slab and girder
JP2002332645A (en) Foundation structure of ground traveling crane rail and method of laying foundation
JP7134079B2 (en) reaction force receiving structure
JP2000319989A (en) Mounting structure and construction method of exposed column base
JP2002194897A (en) Dislocation correcting jig for steel column
JP2956831B2 (en) Hinge structure and expansion structure of tunnel support material
JPH0649676Y2 (en) Tunnel lining structure
JPH0639878B2 (en) Moving mechanism for mobile formwork for lining
CN223608200U (en) Construction template fastener
JPS6215406Y2 (en)
JP7463331B2 (en) Temporary jig and method for constructing artificial ground using said temporary jig
JP3265054B2 (en) PC board
JP2000192796A (en) Rack for restoring brick tunnel
JPH034487Y2 (en)
SU1213134A1 (en) Method of reinforcing a foundation
JPH0566462B2 (en)