Shield excavation method and shield excavator for implementing this method

Info

Publication number
JPH0631553B2
JPH0631553B2 JP62330145A JP33014587A JPH0631553B2 JP H0631553 B2 JPH0631553 B2 JP H0631553B2 JP 62330145 A JP62330145 A JP 62330145A JP 33014587 A JP33014587 A JP 33014587A JP H0631553 B2 JPH0631553 B2 JP H0631553B2
Authority
JP
Japan
Prior art keywords
concrete
shield
lining
pouring
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62330145A
Other languages
Japanese (ja)
Other versions
JPH01174799A (en
Inventor
文夫 小坂
康治 二宮
征四郎 水野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JDC Corp
Original Assignee
JDC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JDC Corp filed Critical JDC Corp
Priority to JP62330145A priority Critical patent/JPH0631553B2/en
Publication of JPH01174799A publication Critical patent/JPH01174799A/en
Publication of JPH0631553B2 publication Critical patent/JPH0631553B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 本発明は、シールド掘進機のテール部においてコンクリ
ートを直接打設して覆工を施工しながら行う場所打ちラ
イニングシールド工法を適用したシールド掘進方法およ
びこの方法を実施するためのシールド掘進機に関する。
DETAILED DESCRIPTION OF THE INVENTION The present invention is intended to carry out a shield digging method and a method of applying a cast-in-place lining shield construction method, which is performed while directly placing concrete in the tail portion of the shield digging machine and performing lining. Of the shield machine.

セグメントを使用することなく覆工作業を行う、いわゆ
るノンセグメント工法は色々な様式で知られている。こ
の工法にあっては、場所打ちコンクリート覆工を施工し
つつトンネルを掘削する場合、このシールド掘進機の推
進は掘進機に固定されたジャッキにより覆工コンクリー
トの既に硬化した部分から何等かの手段で反力を得て行
うのが一般的であった。
The so-called non-segment construction method, in which lining work is performed without using segments, is known in various ways. In this construction method, when excavating a tunnel while constructing cast-in-place concrete lining, the shield machine is propelled by some means from the already hardened part of the lining concrete by the jack fixed to the machine. It was common to do so with the reaction force.

このシールド掘進機の推進方法にあっては、フレッシュ
コンクリートがシールド掘進機と既に充分に硬化した覆
工コンクリートとの間に位置しているので、この覆工コ
ンクリートから推進反力を得る場合ジャッキにこの推進
反力を伝達する手段が必要である。この手段としては種
々の様式が知られているが、主な様式としては 1)覆工コンクリート内に連続して埋設されたロッドを
仲介して行うプッシュロッド式、 2)既に硬化した覆工コンクリートに達するまで連続し
て建込んだ内型枠を介して行う内型枠式、 3)打設したてのコンクリートをジャッキで加圧して硬
化を促進し、これに当接されるプレスリングを介して行
うプレスリング式 があげられる。
In the method of propulsion of this shield machine, since the fresh concrete is located between the shield machine and the already hardened lining concrete, the jack should be used when the propulsion reaction force is obtained from this lining concrete. A means for transmitting this propulsion reaction force is necessary. Various methods are known as this means, but the main methods are as follows: 1) Push rod type, in which rods continuously buried in the lining concrete are intervened, and 2) already hardened lining concrete. Until it reaches the internal formwork, which is carried out through the internal formwork that has been built in continuously, 3) Pressing the freshly cast concrete with a jack to accelerate the hardening, and through the press ring that abuts against this. There is a press ring type.

しかし、これらの様式は以下のような欠点を有してい
る。
However, these modes have the following drawbacks.

先ず、プッシュロッド式にあっては、ロッドに圧縮力が
加わった際ロッドが座屈しないようにするため、ロッド
断面が大きくなり、取扱にくくなり、また経費を要し経
済上不利である。更にロッドにシールド掘進機の推進に
要する大きな荷重がかかった際ロッドの変位が生じ、打
設されたコンクリートの品質に悪影響をおよぼす恐れが
ある。その上、テールボイドの充填のため何等かの施策
が必要である。
First, in the push rod type, since the rod does not buckle when a compressive force is applied to the rod, the rod cross section becomes large, it becomes difficult to handle, and it is costly and economically disadvantageous. Further, when a large load required to propel the shield machine is applied to the rod, the rod is displaced, which may adversely affect the quality of the placed concrete. Moreover, some measures are needed to fill the tail voids.

次に、内型枠による方法にあっては、テールボイドの充
填のため何等かの施策が必要である。
Next, in the method using the inner mold, some measure is required to fill the tail void.

更に、プレスリング方式にあっては、このプレスリング
全周におよぶジャッキによる均等な押圧は制御が困難で
あり、掘進反力はシールド切羽の状態の変化に伴って異
なるためフレッシュコンクリートに加わる圧力は経時的
に一定に保つことはできない。これにより打設コンクリ
ートの品質が不均一になり、コンクリート品質上問題に
なる。
Further, in the press ring system, it is difficult to control the uniform pressing by the jacks over the entire circumference of the press ring, and the reaction force for excavation changes with changes in the state of the shield face, so the pressure applied to the fresh concrete is It cannot be kept constant over time. As a result, the quality of the poured concrete becomes uneven, which is a problem in terms of concrete quality.

本発明は、上記のような欠点を伴うことのない、かつ高
価な覆工材であるセグメントを使用する二次覆工を行う
ことなく、場所打コンクリートライニングによるトンネ
ル掘進方法および掘進装置を提供することである。
The present invention provides a tunnel excavation method and excavation device using cast-in-place concrete lining, without the above-mentioned drawbacks and without performing secondary lining using an expensive lining material segment. That is.

この課題は本発明により、シールドの掘進によって形成
されたトンネル周辺地山と環状に建込まれた内型枠間お
よび既成コンクリート覆工とによって形成された空隙内
にコンクリートを高圧ポンプにより高い打設圧力で圧入
することによりコンクリートを打設しつつ、その際閉合
された空隙で発生する打設コンクリートの打設圧力を反
力としてとり、この反力をシールドテール部に形成され
た端部型枠を介して掘進機に伝えて掘進機を推進させる
ことによって解決される。
According to the present invention, according to the present invention, concrete is highly placed by a high-pressure pump in a void formed by a ground around a tunnel formed by excavation of a shield and an inner formwork built in a ring and an existing concrete lining. While pouring concrete by press fitting with pressure, the pouring pressure of the pouring concrete generated in the closed void at that time is taken as a reaction force, and this reaction force is the end formwork formed in the shield tail part. It is solved by transmitting it to the machine and propelling the machine.

更に本発明による方法にあっては、覆工ライニングコン
クリートの打設をトンネル周辺地山と環状に建込まれた
内型枠間および既コンクリート覆工の空隙にコンクリー
トを高圧コンクリートポンプで圧入することにより、打
設されたフレッシュコンクリートに一定の圧力を加え、
締固めると共にテールボイドにコンクリートを押し込み
空隙をなくされる。
Further, in the method according to the present invention, the lining concrete is poured by using a high-pressure concrete pump to press the concrete between the ground around the tunnel and the inner formwork built in a ring and into the voids of the existing concrete lining. By applying a certain pressure to the placed fresh concrete,
While compacting, concrete is pushed into the tail void to eliminate voids.

上記の方法を行うにあたって、シールド掘進機の方向制
御および補助的に推進をより確実にするために、本発明
による方法にあっては、スキンプレートの端部型枠と環
状に建込まれた内型枠間と周辺地山および既成コンクリ
ート覆工とによって形成された空域内にコンクリートを
高圧ポンプにより高い打設圧力で圧入することによりコ
ンクリートを打設しつつ、その際閉合された空隙で発生
する打設コンクリートの打設圧力を反力としてとり、こ
の反力をシールドテール部に形成された端部型枠を介し
て掘進機に伝えて掘進機を推進させる間、シールド掘進
機の方向を制御する場合覆工されたコンクリートの円周
上に適宜埋設した鋼棒をシールド掘進機テール部に設け
たセンターポールジャッキに内通させ、曲げる方向で鋼
棒を強固に把持することにより制動力を形成し、把持さ
れない部位のみが推進して方向を転じるようにして方向
制御を行う これにより、地山の様相に関係なくシールド掘進機の方
向制御が可能となる。
In carrying out the above method, in order to more securely control the direction of the shield machine and additionally assist the propulsion, in the method according to the present invention, the end form of the skin plate and the inner ring are installed in an annular shape. While pouring concrete by pouring concrete with a high pouring pressure by a high-pressure pump into the air space formed between the formwork, the surrounding ground and the existing concrete lining, it occurs in the closed void at that time The direction of the shield machine is controlled while taking the pouring pressure of the concrete as reaction force and transmitting this reaction force to the machine through the end form formed in the shield tail to propel the machine. When doing so, insert a steel rod appropriately buried on the circumference of the lined concrete into the center pole jack provided on the tail part of the shield machine and firmly grip the steel rod in the bending direction. The braking force is formed by, thereby performing a manner the direction control so that only the site which is not gripped turns the direction to promote, it is possible to control the direction of the shield machine regardless aspects of the natural ground.

シールド掘進機の推進に必要な力は、これまでの経験か
ら切羽単位面積当たり70〜130tf/m2(土木学会編トンネ
ル標準示方書)であるので、本発明による方法のコンク
リート圧入に伴うシールド掘進機の推進には、以下の式
に基づいて、即ち (上記式中Pはコンクリートの打設圧(t/m2)Dはシール
ド掘進機の外径(m)およびdは覆工コンクリート内径
(m)) に示す圧力P(t/m2)の圧力を上限とした切羽の土質に見
合った圧力で、コンクリートを打設した際、シールド掘
進機の推進が可能になることを見出したことによる。
Since the force required for propelling the shield machine is 70 to 130 tf / m 2 per unit area of cutting face (tunnel standard specification edited by the Japan Society of Civil Engineers) from the experience so far, the shield machine accompanying the concrete press fitting of the method according to the present invention The propulsion of the machine is based on the following formula: (In the above formula, P is the concrete placing pressure (t / m 2 ), D is the outer diameter (m) of the shield machine, and d is the inner diameter of the lining concrete.
It has been found that the shield machine can be propelled when concrete is placed with a pressure commensurate with the soil quality of the face with the upper limit of the pressure P (t / m 2 ) shown in (m)). by.

上記方法を実施するための本発明によるシールド掘進機
の特徴とするところは、シールドテール部の端部にコン
クリート打設用のコンクリート配送導管のための取付け
開口部を設けたコンクリート打設用端部型枠10をトンネ
ル軸線に対して半径方向に剛接し、このコンクリート打
設用端部型枠とトンネル覆工用内型枠との間にパッキン
を介在させて内型枠を建込み、一方シールド掘進機内部
に高圧コンクリートポンプを架設し、かつこの高圧コン
クリートポンプのコンクリート打設用コンクリート配送
導管をコンクリート打設用端部型枠の上記取付け開口部
を介して空隙内に開口するように設けたことである。
The shield machine according to the invention for carrying out the method is characterized in that the end of the shield tail is provided with a mounting opening for a concrete delivery conduit for concrete pouring. The formwork 10 is rigidly contacted in the radial direction with respect to the tunnel axis, and the inner formwork is built with a packing interposed between the end formwork for concrete pouring and the inner formwork for the tunnel lining, and one-sided shield A high-pressure concrete pump was installed inside the excavator, and a concrete delivery conduit for concrete pouring of this high-pressure concrete pump was provided so as to open into the void through the above-mentioned mounting opening of the end-form for concrete pouring. That is.

更に、上記本発明による方法を実施するためのシールド
掘進機の特徴とするところは、シールドテール部の端部
にコンクリート打設用のコンクリート配送導管のための
取付け開口部を設けたコンクリート打設用端部型枠トン
ネル軸線に対して半径方向に剛接し、このコンクリート
打設用端部型枠とトンネル覆工用内型枠との間にパッキ
ンを介在させて内型枠を建込み、一方シールド掘進機内
部に高圧コンクリートポンプを支台上に架設し、かつこ
の高圧コンクリートポンプのコンクリート打設用コンク
リート配送導管をシールド掘進機内側のコンクリート打
設用端部型枠の上記取付け開口部を介して空域内に開口
するように設けたことである。
Further, the characteristic feature of the shield machine for carrying out the method according to the present invention is that the end of the shield tail portion is provided with a mounting opening for a concrete delivery conduit for concrete placement. The end formwork is rigidly contacted in the radial direction with respect to the tunnel axis, and the inner formwork is erected by packing between the end formwork for concrete pouring and the inner formwork for the tunnel lining, and one-sided shield A high-pressure concrete pump is installed on the abutment inside the excavator, and the concrete delivery conduit for concrete pouring of this high-pressure concrete pump is inserted through the above-mentioned mounting opening of the concrete pouring end formwork inside the shield machine. It is provided so as to open in the air space.

更に、上記本発明による方法を実施するためのシールド
掘進機の特徴とするところは、前工程で、既成ライニン
グに埋設され、内型枠の建込みに継いで延長されたて固
定されるて固定される鋼棒を把持して制動作用を及し方
向制御を行うセンターホール型ジャッキをシールドスキ
ンプレートの端部に固定したコンクリート打設用端部型
枠の内側に設けたことである。
Further, the characteristic feature of the shield machine for carrying out the method according to the present invention is that it is embedded in the existing lining in the previous step and is fixed by being extended and fixed following the construction of the inner formwork. The center hole type jack for gripping the steel rod and exerting a braking action to control the direction is provided inside the concrete end casting form fixed to the end of the shield skin plate.

上記本発明による掘進方法およびシールド掘進機によ
り、極めて簡単な方法により、しかも装備上の費用も多
く要すること無くトンネルを連続して掘進することが可
能となる。
With the above-described excavation method and shield machine according to the present invention, it is possible to continuously excavate a tunnel by an extremely simple method and without requiring a large equipment cost.

更に、本発明により周辺地山と内型枠との間に敷設した
鋼棒、例えばPC-鋼棒或いはワイヤーロープをスキンプ
レートの内周に固定された端部型枠に取付けたセンター
ホール型ジャッキで制動操作を行うことにより、シール
ド掘進機の方向制御が容易に可能となる。
Further, according to the present invention, a center hole type jack in which a steel rod, for example, a PC-steel rod or a wire rope laid between the surrounding ground and the inner formwork is attached to an end formwork fixed to the inner circumference of the skin plate. By performing the braking operation with, it becomes possible to easily control the direction of the shield machine.

以下に添付した図面に図示した実施例につき本発明を詳
しく説明する。
Hereinafter, the present invention will be described in detail with reference to the embodiments illustrated in the accompanying drawings.

第1図には本発明によるシールド掘進機本体Aが掘進状
態で断面図で示されている。この掘進機本体Aは通常の
シールドの構造、例えばメカニカルシールドの構造に相
応して切羽側にカッターを備えているシールドスキン部
1とシールドテール部8とから成る。このシールドスキ
ン部1の延長部はシールドテール部8において、トンネ
ル内方へと内型枠5の直ぐ近傍で終わるコンクリート打
設用の端部型枠10が剛性に溶接されている。
FIG. 1 is a sectional view showing a shield excavator body A according to the present invention in a state of excavation. The excavator body A is composed of a shield skin portion 1 and a shield tail portion 8 each having a cutter on the face side corresponding to the structure of a normal shield, for example, a mechanical shield. In the shield tail portion 8 of the extension of the shield skin portion 1, an end formwork 10 for concrete pouring is rigidly welded to the inside of the tunnel in the immediate vicinity of the inner formwork 5.

第5図に示すように、このコンクリート打設用の端部型
枠10の端部と内型枠5との間にはパッキン12が間挿さ
れており、周辺地山Bと内型枠5との間の空域をシール
ド掘進機本体Aの内部に対して密閉している。
As shown in FIG. 5, packing 12 is inserted between the end of the end form 10 for concrete pouring and the inner form 5, and the surrounding ground B and the inner form 5 are inserted. The air space between and is sealed from the inside of the shield machine main body A.

このコンクリート打設用の端部型枠10は打設用コンクリ
ートを圧送するための導管3を引通すための開口を備え
ている。従ってこの導管3はこのコンクリート打設用の
端部型枠10において周辺地山Bと内型枠5との空域内に
開口している。
The end formwork 10 for pouring concrete is provided with an opening for passing a conduit 3 for pumping concrete for pouring. Therefore, the conduit 3 is open in the space between the peripheral ground B and the inner mold 5 in the end mold 10 for pouring concrete.

シールド掘進機本体Aの内部空域Cの中央部には、第4
図による断面から明瞭であるように、支台11上に載置さ
れて高圧コンクリートポンプ9が設けられており、この
高圧コンクリートポンプ9からライニングコンクリート
打設用コンクリート圧送導管3がシールド掘進機の半径
方向に適当な間隔をもって案内され、この導管3は上記
コンクリート打設用の端部型枠10に形成された開口で終
わっている。
At the center of the internal air space C of the shield machine body A,
As is clear from the cross section shown in the figure, a high-pressure concrete pump 9 is installed on the abutment 11 and from this high-pressure concrete pump 9, the concrete pressure-feeding conduit 3 for lining concrete placement is connected to the radius of the shield machine. Guided with appropriate spacing in the direction, this conduit 3 terminates in an opening formed in the end casting 10 for concrete pouring.

内型枠5は通常の連接型枠であり、掘進進捗に伴って順
次硬化したライニングコンクリート部から取外され掘進
方向の先方に建込まれて行くが、第1図に図示したよう
にシールド掘進機は切羽を掘削しながら前進するので掘
進方向で先方において型枠一つ分D以上の区画増設され
ているのが有利である。
The inner formwork 5 is a normal connecting formwork, and is removed from the lining concrete part that is sequentially hardened as the digging progresses and is built in the direction ahead of the digging direction, but as shown in FIG. Since the machine moves forward while excavating the face, it is advantageous that the number of molds is increased by D or more for one mold in the direction of excavation.

第1図から認められるように、掘進は例えば全断面掘進
機により行われ、掘進進捗と共に上記内型枠5と周辺地
山Bに形成される空域4′にコンクリート4が打設さ
れ、これにより覆工6が形成される。この際このコンク
リートは高圧コンクリートポンプ9からライニングコン
クリート打設用コンクリート圧送導管3を介して高圧、
即ち上記式に適応した圧力で圧入されるので、圧入され
たコンクリート4は前記の空域4′に充満後シールド掘
進機Aを前方へと推進するように働く。またこの圧力に
よりコンクリートは自体が加圧作用を受けて上記空域
4′内において緻密な覆工6を形成する。
As can be seen from FIG. 1, the excavation is carried out, for example, by a full-section excavator, and as the excavation progresses, concrete 4 is placed in the air space 4 ′ formed in the inner formwork 5 and the surrounding ground B. The lining 6 is formed. At this time, this concrete is pressurized from the high-pressure concrete pump 9 through the concrete pressure-feeding conduit 3 for placing the lining concrete,
That is, since the concrete 4 which has been press-fitted into the space 4'is filled with the pressure adapted to the above equation, the concrete 4 works to propel the shield machine A forward after the space 4'is filled. Further, due to this pressure, the concrete itself receives a pressurizing action to form a dense lining 6 in the air space 4 '.

第2図から見られるように、周辺地山Bと内型枠5間の
空域4′の既成ライニングには、前もって鋼棒7、例え
ばPC鋼棒が掘削トンネルの周面一体に適当な間隔をもっ
て埋設され、この鋼棒7は、図示していないねじ等で連
結延長されて引通し案内されている。この鋼棒7はコン
クリート打設用の端部型枠10をライニングコンクリート
打設用コンクリート圧送導管3の中間の位置で貫通し、
かつコンクリート打設用の端部型枠10にシールド掘進
機本体Aの内側に設けられているセンターホール型ジャ
ッキ23によって方向制御時には把持されてシールドを制
動する働きを行い、制動作用を行わない時は摺動自由に
案内されている。この鋼棒7は覆工が形成されると共に
その内部にそのまま埋込まれ、覆工コンクリートの支持
体の役をも果たす。
As can be seen from Fig. 2, in the existing lining of the air space 4'between the surrounding ground B and the inner formwork 5, the steel rods 7, for example PC steel rods, are previously arranged at appropriate intervals on the peripheral surface of the excavation tunnel. The steel rod 7 is embedded and is guided by being extended by connecting with a screw or the like (not shown). This steel rod 7 penetrates the end formwork 10 for concrete pouring at an intermediate position of the concrete pumping pipe 3 for lining concrete pouring,
In addition, when the direction is controlled by the center hole type jack 23 provided inside the shield machine main body A in the end formwork 10 for concrete pouring, it is gripped to brake the shield, and when the braking action is not performed. Is guided to slide freely. A lining is formed and the steel rod 7 is embedded as it is in the inside thereof, and also serves as a support for the lining concrete.

他方上記鋼棒7は本質的にシールド掘進機Aの方向制御
のために働く。即ち、シールドの方向制御は、この鋼棒
7とセンターホール型ジャッキとにより、その転向され
るべき全円周方向に、周面に適宜配分して設けられてい
るセンターホール型ジャッキ23の何れかがその相応する
鋼棒7を掴んで作用し、いずれかが把持力を作用せず開
いたまま留まるような操作によって行われる。
On the other hand, the steel rod 7 essentially serves to control the direction of the shield machine A. That is, the direction control of the shield is performed by the steel rod 7 and the center hole type jack, and any one of the center hole type jacks 23 is appropriately distributed on the peripheral surface in the entire circumferential direction to be turned. Is operated by grasping the corresponding steel rod 7 and either of them is held open without exerting a grasping force.

以下に本発明による方法の施工方法を記載する。The construction method of the method according to the present invention will be described below.

施工のためのコンクリートとして例えば遅延型早強コン
クリートを使用し、このコンクリートを高圧コンクリー
トポンプ9からライニングコンクリート打設用コンクリ
ート圧送導管3を介して、上記の計算値に相応する圧力
で圧入する。例えばシールド掘進機が掘進速度3cm/分
の速度で切羽方向に推進されると、打設されたコンクリ
ートが凝結するまでには時間を要するので、本発明によ
る方法にあっては、コンクリートが凝結開始するまでは
二〜三時間あるので、この間の掘進可能量は4〜5mで
ある。これは以下に述べる計算式、即ち(2〜3)時間
×3cm/分=3.6〜5.4mから算出され、施工地山が特異
な性状を備えていない限り一般的な数値である。
As the concrete for construction, for example, a delay type early-strength concrete is used, and this concrete is pressed from the high-pressure concrete pump 9 through the concrete pressure-feeding conduit 3 for placing the lining concrete at a pressure corresponding to the above calculated value. For example, when the shield machine is propelled in the direction of the face at a speed of 3 cm / minute, it takes time for the cast concrete to set. Therefore, in the method according to the present invention, the concrete starts to set. It takes 2 to 3 hours to do so, and the excavation amount during this period is 4 to 5 m. This is calculated from the calculation formula described below, that is, (2 to 3) hours × 3 cm / min = 3.6 to 5.4 m, and is a general numerical value as long as the construction ground has no peculiar property.

このような方法によって巻立られた覆工は従来の施工方
法に比して打設継目間隔が4〜5mとなり、従って止水
性が向上する。また、他の工法と同様にコンクリート打
設時にコンクリートが加圧作用を受けるのでテールボイ
ドが発生せず、地盤沈下が生じない。
The lining which is wound up by such a method has a pouring seam interval of 4 to 5 m as compared with the conventional construction method, and therefore the water stopping property is improved. Further, as in the case of other construction methods, the concrete is subjected to a pressure action during concrete pouring, so that tail voids do not occur and ground subsidence does not occur.

更にまた、コンクリートを加圧下に圧入した際コンクリ
ートが均質化されると言う利点が得られることが確認さ
れた。
Furthermore, it was confirmed that the advantage that the concrete is homogenized when the concrete is pressed under pressure is obtained.

更に、未だ固まらないコンクリートに加圧した場合コン
クリートに作用する圧縮力が加圧点の近傍領域において
のみ高く、それ以遠においては急激に低下するので連続
的な打設作業も可能である。
Furthermore, when the concrete that has not yet solidified is pressed, the compressive force acting on the concrete is high only in the region near the pressing point, and sharply decreases beyond that point, so continuous pouring work is also possible.

この場合は、上記断続覆工作業の利点に加えて打継目が
生じないので従来方法に比べて止水性、均質性が向上す
る。
In this case, in addition to the advantages of the intermittent lining work described above, no seam is produced, so that the waterproofness and homogeneity are improved as compared with the conventional method.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明による方法を実施するためのシールド掘
進機のトンネル軸線に沿った縦断面図、第2図は第1図
と断面を変じて鋼棒とセンターホール型ジャッキを示し
た図、 第3図は第2図の切断線A−Aに沿ったトンネル横断面
図、 第4図は第1図の切断線A−Aに沿ったトンネル横断面
図、 第5図は第1図における位置Sの拡大図。 図中符号は、 1……シールド掘進機本体 3……コンクリート打設用コンクリート配送管 4……打設コンクリート 5……トンネル覆工用内型枠 6……仕上がり覆工 7……鋼棒 8……シールドテール部 9……高圧コンクリートポンプ 10……コンクリート打設用の端部型枠 11……支台 12……パッキン 23……センターホール型ジャッキ A……シールド本体 B……地山 C……シールド内部空域 D……先頭内型枠
FIG. 1 is a vertical cross-sectional view of a shield machine for carrying out the method according to the present invention, taken along the tunnel axis, and FIG. 2 is a view showing a steel rod and a center-hole type jack with the cross section changed from that of FIG. 3 is a tunnel cross-sectional view taken along the section line AA of FIG. 2, FIG. 4 is a tunnel cross-sectional view taken along the section line AA of FIG. 1, and FIG. 5 is shown in FIG. The enlarged view of the position S. The symbols in the figure are: 1 ... shield machine main body 3 ... concrete delivery pipe for concrete placement 4 ... cast concrete 5 ... inner formwork for tunnel lining 6 ... finished lining 7 ... steel rod 8 …… Shield tail 9 …… High-pressure concrete pump 10 …… End formwork for concrete placement 11 …… Abutment 12 …… Packing 23 …… Center hole type jack A …… Shield body B …… Ground C …… Air space inside the shield D …… Inside mold at the top

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭61−172997(JP,A) 特開 昭60−126496(JP,A) 特開 昭60−123700(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (56) Reference JP 61-172997 (JP, A) JP 60-126496 (JP, A) JP 60-123700 (JP, A)

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】シールド掘進機のテール部においてコンク
リートを直接打設して覆工を施工しながら行う場所打ち
ライニングシールド工法を適用したシールド掘進方法に
おいて、シールドの掘進によって形成されたトンネル周
辺地山と環状に建込まれた内型枠間および既成コンクリ
ート覆工とによって形成された空隙内にコンクリートを
高圧ポンプにより高い打設圧力で圧入することによりコ
ンクリートを打設しつつ、その際閉合された空隙で発生
する打設コンクリートの打設圧力を反力としてとり、こ
の反力をシールドテール部に形成された端部型枠を介し
て掘進機に伝えて掘進機を推進させることを特徴とす
る、上記シールド掘進方法。
1. A shield excavation method applying a cast-in-place lining shield construction method in which concrete is directly placed in the tail portion of a shield excavator while a lining is being constructed, and a ground around a tunnel formed by excavating a shield. While pouring concrete by press-fitting concrete with a high pouring pressure by a high-pressure pump into the void formed between the inner formwork built in and the ring and the existing concrete lining, it was closed at that time. It is characterized in that the pouring pressure of the pouring concrete generated in the void is taken as a reaction force, and this reaction force is transmitted to the excavator through the end formwork formed in the shield tail portion to propel the excavator. , The above shield digging method.
【請求項2】覆工ライニングコンクリートの打設をトン
ネル周辺地山と環状に建込まれた内型枠間および既コン
クリート覆工の空隙にコンクリートを高圧コンクリート
ポンプで圧入することにより、打設されたフレッシュコ
ンクリートに一定の圧力を加え、締固めると共にテール
ボイドにコンクリートを押し込み空隙をなくす、特許請
求の範囲第1項に記載のシールド掘進方法。
2. The lining concrete is placed by pouring concrete with a high-pressure concrete pump between the ground around the tunnel and the inner formwork built in a ring and into the voids of the existing concrete lining. The shield excavation method according to claim 1, wherein a constant pressure is applied to the fresh concrete to compact it and the concrete is pushed into the tail void to eliminate voids.
【請求項3】シールド掘進機のテール部において直接コ
ンクリートを打設して覆工を施工しながら行う場所打ち
ライニングシールド工法を適用したシールド掘進方法に
おいて、スキンプレートの端部型枠と環状に建込まれた
内型枠間と周辺地山および既成コンクリート覆工とによ
って形成された空域内にコンクリートを高圧ポンプによ
り高い打設圧力で圧入することによりコンクリートを打
設しつつ、その際閉合された空隙で発生する打設コンク
リートの打設圧力を反力としてとり、この反力をシール
ドテール部に形成された端部型枠を介して掘進機に伝え
て掘進機を推進させる間、シールド掘進機の方向を制御
する場合覆工されたコンクリートの円周上に適宜埋設し
た鋼棒をシールド掘進機テール部に設けたセンターポー
ルジャッキに内通させ、曲げる方向で鋼棒を強固に把持
することにより制動力を形成し、把持されない部位のみ
が推進して方向を転じるようにして方向制御を行う、上
記シールド掘進方法。
3. A shield excavation method applying a cast-in-place lining shield construction method, in which concrete is directly placed in the tail part of the shield excavator while a lining is applied, and the shield plate is constructed annularly with the end formwork of the skin plate. While the concrete was being placed by pouring the concrete into the air space formed by the embedded inner formwork, the surrounding ground and the existing concrete lining with a high placing pressure using a high-pressure pump, it was closed at that time. While taking the pouring pressure of the pouring concrete generated in the void as a reaction force, this reaction force is transmitted to the excavator through the end formwork formed in the shield tail portion and the excavator is propelled while the shield machine is propelled. To control the direction of the lining, a steel rod appropriately buried on the circumference of the lined concrete is internally routed to the center pole jack provided on the tail part of the shield machine. Thereby, bending the braking force is formed by firmly gripping the steel rod in the direction, performs direction control so as to turn the direction only sites that are not gripped to promote, the shield method.
【請求項4】シールド掘進機の端部型枠と環状に建込ま
れた内型枠間および既成コンクリート覆工の空隙にコン
クリートを打設して覆工を施工しつつ行う場所打ちライ
ニングシールド工法を使用して行うシールド掘進方法を
行うための、シールド掘進機において、シールドテール
部(8)の端部にコンクリート打設用のコンクリート配送
導管(3)のための取付け開口部(21)を設けたコンクリー
ト打設用端部型枠(10)にトンネル軸線に対して半径方向
に剛接し、このコンクリート打設用端部型枠(10)とトン
ネル覆工用内型枠(5)との間にパッキン(12)を介在させ
て内型枠(5)を建込み、一方シールド掘進機内部に高圧
コンクリートポンプ(9)と支台(11)上に架設し、かつこ
の高圧コンクリートポンプ(9)のコンクリート打設用コ
ンクリート配送導管(3)をコンクリート打設用端部型枠
(10)の上記取付け開口部(21)を介して空域(4′)内に開
口するように設けたことを特徴とする、上記シールド掘
進機。
4. A cast-in-place lining shield construction method in which concrete is placed between the end formwork of the shield machine and the inner formwork built in a ring shape and in the gap of the existing concrete lining while the lining work is performed. In order to carry out the shield excavation method performed by using, a mounting opening (21) for the concrete delivery conduit (3) for concrete placement is provided at the end of the shield tail (8) in the shield excavator. The end formwork for concrete pouring (10) is rigidly contacted in the radial direction with respect to the tunnel axis, and between the end formwork for concrete pouring (10) and the inner formwork for tunnel lining (5). The inner formwork (5) is built with the packing (12) in between, and the high-pressure concrete pump (9) and the abutment (11) are installed inside the shield machine, and this high-pressure concrete pump (9) Concrete delivery conduits for concrete pouring (3)設用 end formwork
The shield machine, wherein the shield machine is provided so as to open into the air space (4 ') through the mounting opening (21) of (10).
【請求項5】前工程で既成ライニングに埋設され、内型
枠の建込みに継いで延長されたて固定されるて固定され
る鋼棒(7)を把持して制動作用を及し方向制御を行うセ
ンターホール型ジャッキ(23)をシールドスキンプレート
の端部に固定したコンクリート打設用端部型枠(10)の内
側に設けたことを特徴とする、上記シールド掘進機。
5. A steel rod (7) which is embedded in an existing lining in the previous step and which is extended and fixed following the erection of the inner formwork is gripped to exert a braking action and direction control. The shield machine as described above, characterized in that the center hole type jack (23) for performing the above is provided inside the end formwork (10) for concrete pouring fixed to the end of the shield skin plate.
JP62330145A 1987-12-28 1987-12-28 Shield excavation method and shield excavator for implementing this method Expired - Lifetime JPH0631553B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62330145A JPH0631553B2 (en) 1987-12-28 1987-12-28 Shield excavation method and shield excavator for implementing this method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62330145A JPH0631553B2 (en) 1987-12-28 1987-12-28 Shield excavation method and shield excavator for implementing this method

Publications (2)

Publication Number Publication Date
JPH01174799A JPH01174799A (en) 1989-07-11
JPH0631553B2 true JPH0631553B2 (en) 1994-04-27

Family

ID=18229319

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62330145A Expired - Lifetime JPH0631553B2 (en) 1987-12-28 1987-12-28 Shield excavation method and shield excavator for implementing this method

Country Status (1)

Country Link
JP (1) JPH0631553B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6211279B2 (en) * 2013-03-07 2017-10-11 独立行政法人鉄道建設・運輸施設整備支援機構 Tunnel construction method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60123700A (en) * 1983-09-26 1985-07-02 株式会社熊谷組 Assembling of iron skeletal in covering concrete of site casting lining shield construction method
JPS60126496A (en) * 1983-12-13 1985-07-05 株式会社間組 Control apparatus and method of shield drilling machine
JPS61172997A (en) * 1985-01-24 1986-08-04 鉄建建設株式会社 Method of lining shielding tunnel and formwork device used for said method

Also Published As

Publication number Publication date
JPH01174799A (en) 1989-07-11

Similar Documents

Publication Publication Date Title
JPH0511195B2 (en)
JPH0631553B2 (en) Shield excavation method and shield excavator for implementing this method
JPH0237480B2 (en)
JP2953312B2 (en) Cast-in-place lining shield method and shield excavator
JPS63300200A (en) Method of cast-in-place lining shielding construction
JPH02132295A (en) Constructing method for tunnel lining work
JPH0361840B2 (en)
JPH0786317B2 (en) The method of lining curved parts with a shield machine
JPS6145037B2 (en)
JP2526312B2 (en) Shield machine and in-situ lining type shield construction method using the machine
JP2676691B2 (en) Construction method of shield and lining using shield
JPH0519000B2 (en)
JPH0692718B2 (en) Cast-in-place concrete lining construction method and equipment
JPH01312199A (en) Construction of tunnel linining work
JPH057357Y2 (en)
JPS62206198A (en) Method of constructing tunnel lining
JPH07247790A (en) Underground pipe making method for concrete pipes
JP2000303796A (en) Slim lining method for small diameter tunnels
JPH0578636B2 (en)
JP2501072Y2 (en) Shield pressure machine for shield machine
JPH0816439B2 (en) Shield tunnel secondary lining method
JPH0511200B2 (en)
JPH062496A (en) Shield excavating machine and covering method for shield tunnel
JPH0696959B2 (en) Tunnel construction method
JPH04250298A (en) Cast-in-place lining method