Shield method and shield machine

Info

Publication number
JPH0635797B2
JPH0635797B2 JP62146661A JP14666187A JPH0635797B2 JP H0635797 B2 JPH0635797 B2 JP H0635797B2 JP 62146661 A JP62146661 A JP 62146661A JP 14666187 A JP14666187 A JP 14666187A JP H0635797 B2 JPH0635797 B2 JP H0635797B2
Authority
JP
Japan
Prior art keywords
shield
lining
concrete
shape
space
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62146661A
Other languages
Japanese (ja)
Other versions
JPS63312500A (en
Inventor
豊 加島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAIHO KENSETSU
Original Assignee
DAIHO KENSETSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAIHO KENSETSU filed Critical DAIHO KENSETSU
Priority to JP62146661A priority Critical patent/JPH0635797B2/en
Publication of JPS63312500A publication Critical patent/JPS63312500A/en
Publication of JPH0635797B2 publication Critical patent/JPH0635797B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は地中に横坑を築造するシールド工法およびその
シールド機に関する。
Description: TECHNICAL FIELD The present invention relates to a shield construction method for constructing a horizontal shaft in the ground and a shield machine therefor.

(従来技術およびその問題点) 従来、シールド工法で地中に横坑や立坑を構築するにあ
たっては、第10図に示す如く、地中を掘進するシールド
機100の内部後方のシールド筒101の内部で、例えば鋼製
あるいはコンクリート製のセグメント102を組立ててこ
れを筒状に形成し、この組立形成されたセグメント筒10
2にシールド機100に設けられたシールドジャッキ103の
推力の反力をとり、シールド機100の前面の切羽を掘削
し、ずりを排出しつつシールド機100を前進せしめてい
る。そして、セグメントと掘削横坑の間隙(テールポイ
ド)104に、例えばセグメントに予め設けられてあるグ
ラウト孔105より裏込注入材を充填している。
(Prior art and its problems) Conventionally, when constructing a horizontal shaft or a shaft in the ground by the shield construction method, as shown in FIG. 10, the inside of the shield machine 100 that digs into the ground Then, for example, a segment 102 made of steel or concrete is assembled and formed into a tubular shape, and this assembled segment tube 10 is formed.
In FIG. 2, the reaction force of the thrust of the shield jack 103 provided in the shield machine 100 is taken to excavate the front face of the shield machine 100, and the shield machine 100 is advanced while discharging the shear. Then, the gap (tail void) 104 between the segment and the excavation horizontal shaft is filled with the backfill injection material through, for example, a grout hole 105 provided in advance in the segment.

しかし、この方法ではセグメントの製作費が高価である
とともに、セグメントの重量が大きいので地上からシー
ルド筒内に運搬し組立てるのに危険であった。
However, in this method, the manufacturing cost of the segment is high, and the weight of the segment is large, so that it is dangerous to transport and assemble from the ground into the shield cylinder.

加えてセグメントが数片に分かれているので、セグメン
トの継手より漏水もあり、例えば電力通信用あるいは地
下鉄道等の横坑本来の使用目的を阻害することもあっ
た。
In addition, since the segment is divided into several pieces, there is water leakage from the joint of the segment, which may hinder the intended purpose of the side pit, such as for power communication or subway.

また、上記欠点を改善した他の従来例として、第11図に
示すように、シールド機200のシールド外筒201の後部内
側と筒状セグメント203との間に環状体202を配設するも
のがある。そしてこの環状体202は、シールド機200に固
定された調節ジャッキ203に連結され、かつこの環状体2
02を貫通し、筒状セグメント203の外周面と掘削された
横坑の内周面との間に、コンクリートを打設するための
コンクリート圧送管206を配置した構成のものがある。
Further, as another conventional example in which the above-mentioned drawbacks are improved, as shown in FIG. 11, one in which an annular body 202 is arranged between the rear inner side of the shield outer cylinder 201 of the shield machine 200 and the cylindrical segment 203. is there. The annular body 202 is connected to the adjustment jack 203 fixed to the shield machine 200, and the annular body 2
There is a structure in which a concrete pressure-feeding pipe 206 for placing concrete is arranged between the outer peripheral surface of the tubular segment 203 and the inner peripheral surface of the excavated lateral shaft so as to penetrate through 02.

しかして、この構成においてはシールド機200の掘進に
従い、このシールド機200が掘削形成する横坑204とセグ
メント203の間の空間205に生コンクリートが圧送管206
より圧送されたこの空間205を完全に充填し、かくして
筒状のコンクリート構造体207が形成され、横坑が築造
される。
Then, in this configuration, as the shield machine 200 is dug, the fresh concrete is pumped into the space 205 between the horizontal shaft 204 and the segment 203 formed by the shield machine 200.
The space 205 that has been pumped further is completely filled, thus forming a cylindrical concrete structure 207 and constructing a side shaft.

しかしながら、この方法において、上記空間205に圧送
されるコンクリートに鉄筋等の補強材が配置されていな
いため、この筒形コンクリート構造体に地中力が作用す
る時、これに対応できず同コンクリート構造体が破壊す
る場合がある。さらにこれに対抗するために、同圧送コ
ンクリートに特殊な鋼繊維等を混入して圧送する場合が
あるが、この鋼繊維は高価であり、経済的に問題があ
り、かつその強度が小さく軟弱な地盤では強度上不利で
ある。
However, in this method, since reinforcing material such as reinforcing bars is not arranged in the concrete pumped into the space 205, when underground force acts on this tubular concrete structure, it cannot respond to this and the concrete structure The body may be destroyed. To counter this, special steel fibers may be mixed into the same concrete for pressure feeding, but this steel fiber is expensive, economically problematic, and its strength is small and weak. It is disadvantageous in strength on the ground.

このため、更に他の方法として、第12図(イ)〜(ハ)
に示すように、シールド機300のテール部で鉄筋301を組
み、その内側に内径枠302を組み、そこへコンクリート3
03を打設してプレスリングを介してシールドジャッキ30
4により、コンクリート303をプレスし、同時にその反力
を利用してシールド機を掘進させるという方法もある。
Therefore, as another method, FIG. 12 (a) to (c)
As shown in Fig. 3, rebar 301 is assembled at the tail part of the shield machine 300, inner frame 302 is assembled inside it, and concrete 3
Place 03 and press shield 30 through shield jack 30
According to 4, there is also a method of pressing concrete 303 and at the same time utilizing the reaction force to dig the shield machine.

しかし、この場合、打設したコンクリート303がある程
度の強度を発現するまでは次の鉄筋301、型枠302組みに
取りかかることができないので掘進速度が遅く、鉄筋30
1の組立てにも手間と時間がかかるという問題点があっ
た。
However, in this case, since the next set of the reinforcing bar 301 and the formwork 302 cannot be started until the cast concrete 303 exhibits a certain level of strength, the excavation speed is slow and the reinforcing bar 30
There was a problem that assembly of 1 also took time and effort.

(問題点を解決するための手段) 本発明は、これらの問題を解決するものであって、その
目的とするところは、掘進作業を円滑に行うことがで
き、かつ所望の強度のトンネルを得ることができる経済
的なシールド工法およびシールド機を提供することにあ
る。
(Means for Solving Problems) The present invention is intended to solve these problems, and an object of the present invention is to obtain a tunnel having a desired strength, which enables smooth excavation work. It is to provide an economical shield construction method and a shield machine that can perform.

すなわち、本発明は上記目的を達成するために、要する
に、シールド機の前進によって形成された坑壁と、シー
ルド筒内に配設されたシールド筒よりやや小さい筒形の
型枠兼反力受外周側との間の空間に、拡開部が拡開可能
な複数の補強材を互いに隣接して略筒状に組込んで成る
補強材を設置し、かつ、例えばコンクリートの如き充填
物を圧送して充填していくようにしたものである。
That is, in order to achieve the above object, the present invention is, in short, a tunnel wall formed by the forward movement of the shield machine and a cylindrical form frame / reaction force receiving outer periphery slightly smaller than the shield cylinder disposed in the shield cylinder. In the space between the side and the side, there is installed a reinforcing member formed by incorporating a plurality of reinforcing members whose expanding portions can expand adjacent to each other in a substantially cylindrical shape, and pumping a filling material such as concrete. It is designed to be filled with.

(作用) 本発明ではシールド機の前進によってできた坑の坑壁
と、シールド筒内に設けられた型枠兼反力受との間に打
設される充填物中に拡開部が広がって全体として筒状に
なす、例えば鉄筋等にてなる補強材を設けることによっ
て充填物に十分な強度をもたせている。
(Operation) In the present invention, the expansion portion spreads in the filling material placed between the pit wall formed by the advance of the shield machine and the form and reaction force receiver provided in the shield cylinder. The filling material has sufficient strength by being provided with a reinforcing material which is formed in a tubular shape as a whole, for example, a reinforcing bar.

また、補強材は拡開すると、各拡開部は円周方向に重な
り合い、ほぼ円環状となるので、トンネルに作用する曲
げ荷重に対し有効に対抗する。
Further, when the reinforcing material is expanded, the expanded portions overlap each other in the circumferential direction and form a substantially annular shape, so that the bending load effectively acting on the tunnel is effectively counteracted.

(実施例) 以下、図面に沿って本発明の一実施例を説明する。Embodiment An embodiment of the present invention will be described below with reference to the drawings.

第1図は本発明のシールド機の側断面図であり、これら
の図中1は鋼板等よりなる略筒状のシールド筒で、この
シールド筒1の前方部内には隔壁1aが形成されている。
そして、この隔壁1aの略中央部には軸受2が設けられ、
この軸受2を介し隔壁1aに対しシャフト3が貫設されて
いる。このシャフト3の先端部には地山を掘削するため
の周知構成の回転可能なカッター4が設けられている。
また、5はこのカッター4で切削され形成された切羽と
シールド筒前方のフード1bの内周面と前記隔壁1aとによ
って区画形成された切羽室、6は切羽室5の掘削土砂を
排土する排土装置で、例えばポンプと接続された排土管
やスクリューコンベア等から成り、隔壁1aの下部に前端
が接続され、カッター4により掘削された土砂はこの排
土装置6によって坑内側へ排出される。
FIG. 1 is a side sectional view of a shield machine of the present invention. In these drawings, reference numeral 1 is a substantially cylindrical shield cylinder made of a steel plate or the like, and a partition wall 1a is formed in the front part of the shield cylinder 1. .
And, a bearing 2 is provided at a substantially central portion of the partition wall 1a,
A shaft 3 extends through the partition wall 1a via the bearing 2. A rotatable cutter 4 having a well-known structure for excavating the natural ground is provided at the tip of the shaft 3.
Further, 5 is a cutting face chamber defined by the cutting face formed by cutting with the cutter 4, the inner peripheral surface of the hood 1b in front of the shield cylinder and the partition wall 1a, and 6 is for excavating the excavated earth and sand in the cutting face chamber 5. This is an earth discharging device, which is composed of, for example, an earth discharging pipe connected to a pump, a screw conveyor, etc., the front end is connected to the lower part of the partition wall 1a, and the earth and sand excavated by the cutter 4 is discharged inside the mine by this earth discharging device 6. .

また、7はシールド機を掘進させるための適数本のシー
ルドジャッキであり、8はその反力用の枠で、型枠をも
兼用し筒状に組込まれる。9は、シールド機の前方に向
って進んでできた横坑の内周壁、すなわち坑壁と型枠兼
反力枠8の外周側との間の空間に、例えばコンクリート
のような充填物を打設するためのコンクリート供給管、
10は環状のライニング支圧部であり、シールド筒1の後
部内に設けられ、かつシールドの前進に伴って前進する
もので、このライニング支圧部10には後述する拡開可能
な補強材11を通過させる孔10aが略円周方向において互
いに離間して複数形成されている。
Further, 7 is an appropriate number of shield jacks for advancing the shield machine, and 8 is a frame for the reaction force thereof, which is also used as a mold and is assembled in a tubular shape. Reference numeral 9 designates a filling material such as concrete, for example, in the space between the inner peripheral wall of the side shaft formed forward of the shield machine, that is, the outer wall of the form / cumulative force frame 8. Concrete supply pipe for installation,
Reference numeral 10 denotes an annular lining pressure-bearing portion, which is provided in the rear portion of the shield cylinder 1 and advances as the shield advances. The lining pressure-bearing portion 10 has an expandable reinforcement member 11 described later. A plurality of holes 10a for passing through are formed so as to be separated from each other in the substantially circumferential direction.

また、このライニング支圧部10はシールド後部の内側
に固設されている。
The lining support portion 10 is fixed inside the shield rear portion.

12は、型枠兼反力受8とライニング支圧部10との間や孔
10aの外周部分等に設けられたコンクリート漏れ防止用
のテールシールであり、機内へのコンクリート漏出が防
止される。また、13は前記空間内に打設されたコンクリ
ートである。
12 is a space between the formwork / reaction force receiver 8 and the lining bearing 10 or a hole
This is a tail seal for preventing concrete leakage provided on the outer peripheral portion of 10a, etc., and prevents concrete leakage into the machine. Further, 13 is concrete cast in the space.

次に本発明に用いられる、拡開可能な例えば鉄筋から成
る補強材11について説明する。この補強材11は、例えば
筒形のコンクリート13中に在り、地中の土圧等の外力に
対してコンクリート13と一体的に働くものが望ましい。
Next, the expandable reinforcing member 11 made of, for example, a reinforcing bar used in the present invention will be described. It is desirable that the reinforcing material 11 be present in, for example, a tubular concrete 13 and work integrally with the concrete 13 against an external force such as earth pressure in the ground.

第2図は拡開可能な補強材11を示すもので、この補強材
11は、シールド筒1の軸方向に配設され、順次継ぎたし
可能な略丸棒状の基部11aと、この基部11aの外周に一端
が結合され、かつ他端が略矢印状に拡開可能な拡開部11
bとにて構成されている。この補強材11は、基部11aが鉄
筋、拡開部11bをバネ鉄筋にて構成するのが好適である
が、材質は必らずしも鉄に限らず、また、拡開部11bは
バネのような弾性復元力を持つその他の金属ないしは合
成樹脂などであってもよい。また、基部11aも補強材11
の位置と、方向を規定する機能を持つものであれば金属
ないしは合成樹脂などでもよい。また、補強材11は、コ
ンクリートとの付着力を増すために表面に凹凸を付けた
り、先端を曲げたりしても良いことは勿論である。
FIG. 2 shows the expandable reinforcement member 11.
Numeral 11 is arranged in the axial direction of the shield cylinder 1 and has a substantially round bar-shaped base 11a which can be successively spliced, and one end of which is connected to the outer periphery of the base 11a and the other end of which can be expanded in a substantially arrow shape. Expanded part 11
It consists of b and. The reinforcing member 11 is preferably configured such that the base portion 11a is a reinforcing bar and the expanding portion 11b is a spring reinforcing bar, but the material is not necessarily limited to iron, and the expanding portion 11b is a spring. Other metal or synthetic resin having such elastic restoring force may be used. In addition, the base 11a is also a reinforcement member 11
A metal or a synthetic resin may be used as long as it has a function of defining the position and the direction. Further, it goes without saying that the reinforcing material 11 may have irregularities on the surface or the tip thereof may be bent in order to increase the adhesive force with the concrete.

さらに、補強材11の断面形状は第3図(イ)〜(ハ)に
それぞれ示すように、相方共に丸形もしくは、四角、板
状ないしは全体の断面が円形または長円形となるような
形状でもよい。
Further, the cross-sectional shape of the reinforcing material 11 is, as shown in FIGS. 3 (a) to 3 (c), respectively, both sides are round, or square, plate-shaped, or a shape such that the entire cross section is circular or oval. Good.

次に第4図等を参照しつつ本発明の動作を説明する。Next, the operation of the present invention will be described with reference to FIG.

地山はカッター4により掘削され、掘削土砂は切羽室5
内に取込まれ、シールドジャッキ7を伸長しての掘進過
程で切羽室5内の掘削土砂は排土装置6を介し坑内側へ
排土されてゆく。
The ground is excavated by the cutter 4, and the excavated earth and sand is in the face chamber 5.
The excavated earth and sand in the face chamber 5 is discharged to the inside of the mine through the earth unloading device 6 in the excavation process of being taken in and extending the shield jack 7.

しかして、シールド機の掘進により形成される坑壁G
と、型枠兼反力受8の外周面側と、シールド筒後部内に
設けたライニング支圧板10の後面等により囲まれた空間
には、例えば生コンクリートのような充填物が例えば図
示されていないコンクリートポンプ等により、コンクリ
ート供給管9から供給され、空間を加圧充満するもので
ある。
Then, the tunnel wall G formed by the excavation of the shield machine
In the space surrounded by the outer peripheral surface side of the formwork / reaction force receiver 8 and the rear surface of the lining pressure support plate 10 provided in the rear portion of the shield cylinder, for example, a filling material such as ready-mixed concrete is illustrated. It is supplied from the concrete supply pipe 9 by a concrete pump or the like, and fills the space under pressure.

しかるにこの場合、(イ)図に示すように、1サイクル
分の掘進およびライニングが終ったら、 (ロ)図に示すように、シールドジャッキ7を引き締め
る。
However, in this case, when the excavation and the lining for one cycle are completed, as shown in (a), the shield jack 7 is tightened as shown in (b).

そして、補強材11の1サイクル分をライニング支圧板10
の孔10aから突き出している既設の補強材11((イ)図
参照)に継ぎたし、さらにその内周側に新たに型枠兼反
力受8を組み立てる。
Then, one cycle of the reinforcing material 11 is used for the lining pressure bearing plate 10.
It is joined to the existing reinforcing material 11 (see FIG. 7 (a)) protruding from the hole 10a, and the form and reaction force receiver 8 is newly assembled on the inner peripheral side thereof.

つぎに、(ハ)図に示すように、シールドジャッキ7を
伸ばして型枠兼反力受8に反力をとってシールド機を前
進させ、同時にコンクリート供給管9よりライニング支
圧部後方の空間部分にコンクリート13を打設する。な
お、シールド機の前進に際してはカッター1で地盤を掘
削しつつ排土装置6によりスクリューコンベアないしは
流体輸送等の方法により排土が行なわれる。
Next, as shown in FIG. 3C, the shield jack 7 is extended to apply a reaction force to the formwork / reaction force receiver 8 to move the shield machine forward, and at the same time, the space behind the concrete supply pipe 9 behind the lining bearing portion. Place concrete 13 on the part. When the shield machine advances, the earth is excavated by the cutter 1 and the earth is discharged by the earth discharging device 6 by a method such as a screw conveyor or fluid transportation.

これらの過程でコンクリート13の補強用として機能する
補強材11は、詳しくは第5図(イ)に示すように、シー
ルド機の推進あるいはシールド機の一部の前進に伴って
前進するライニング支圧部10の孔10aの形状に沿って当
初閉じた状態となってシールド内からライニングコンク
リート内へと移っていく。この時、ライニング支圧部10
のすぐ後方のコンクリート13は、打設後間もないので、
まだ固まっていないが、数サイクル後方のライニング部
におけるコンクリート13は、打設後ある程度の時間を経
過しているため、すでに固まっているので、補強材11は
既設ライニング部に固定されていることとなり、その位
置は動くことはない。
The reinforcing material 11 that functions to reinforce the concrete 13 in these processes is, as shown in detail in FIG. 5 (a), the lining bearing pressure that advances as the shield machine is propelled or part of the shield machine is advanced. Following the shape of the hole 10a of the part 10, it is initially closed and moves from the inside of the shield to the inside of the lining concrete. At this time, the lining bearing 10
Since the concrete 13 immediately behind is shortly after placing,
Although not yet set, the concrete 13 in the lining part, which is a few cycles behind, has already set since some time has passed since it was placed, so the reinforcement material 11 is fixed to the existing lining part. , Its position does not move.

つぎに、(ロ),(ハ)に示すように、補強材11全体が
孔10aを通過して、まだ固まらないコンクリート13の中
に入るとその強力な弾性力によって補強材11の拡開部11
bが初期の形態に戻る。つまり、拡開する。
Next, as shown in (b) and (c), when the entire reinforcing material 11 passes through the hole 10a and enters the concrete 13 which is not yet solidified, the expanding portion of the reinforcing material 11 is generated by its strong elastic force. 11
b returns to its initial form. That is, it expands.

このようにして、第6図に示すように、補強材11をライ
ニングの内部に円周上に複数本配置してライニング内部
において隣り合う補強材11の拡開部11bがほぼ円環状に
重なり合うようにすれば、円周方向に鉄筋を格子筒状に
配置したと同様の効果を得ることができ、コンクリート
13は土圧、水圧などによる曲げ荷重に対して強くなるも
のである。
In this way, as shown in FIG. 6, a plurality of reinforcing members 11 are circumferentially arranged inside the lining so that the expanded portions 11b of the adjacent reinforcing members 11 overlap each other in a substantially annular shape inside the lining. By doing so, it is possible to obtain the same effect as arranging the reinforcing bars in a grid shape in the circumferential direction.
No. 13 is strong against bending load due to earth pressure and water pressure.

なお、補強材11のライニング内への配置は、第7図
(イ)に示すように、ライニングの略中央部に環状に配
置してもよいし、(ロ)のように、内より、外よりに2
重配置してもよいし、さらに必らずしも全周な渡って均
一な配置とする必要はなく、上下部では内より、また、
左右部では外よりという配置でもよいし、2重、3重の
配置を部分的に取ることもできるし、間隔を変化させて
もよい。
The reinforcing material 11 may be arranged in the lining in a ring shape at the substantially central portion of the lining as shown in FIG. 7 (a), or as shown in FIG. Than 2
It may be arranged in a double layer, and it is not always necessary to arrange it uniformly over the entire circumference.
The left and right parts may be arranged from the outside, a double or triple arrangement may be partially provided, or the intervals may be changed.

第8図は本発明の第2実施例を示すもので、この実施例
において使用される弾性材を用いた補強材としては、
(イ)図に示すように、弾性材の一枚板を加工したもの
でもよい。つまりこの実施例では板状の弾性材11Aに切
り込み11cを入れてその切り込みによって形成された一
対の弾性アーム11dが、(ロ)図に示すように、左右に
開く構造としたものである。また、左右に開いた弾性材
の弾性アーム11dの先端は、その巾を広げたり、穴11eを
開けるなどしてコンクリートとの付着力を増すようにす
ることもできる。なお、この時、ライニング支圧部10に
形成される孔10aは、細長い略長方形状となる。
FIG. 8 shows a second embodiment of the present invention. As a reinforcing material using an elastic material used in this embodiment,
(A) As shown in the figure, a single plate of elastic material may be processed. In other words, in this embodiment, the notch 11c is formed in the plate-shaped elastic member 11A, and the pair of elastic arms 11d formed by the notch has a structure that opens to the left and right as shown in FIG. Further, the tip end of the elastic arm 11d made of an elastic material opened to the left and right can be made wider or the hole 11e can be opened to increase the adhesive force with the concrete. At this time, the hole 10a formed in the lining support portion 10 has an elongated, substantially rectangular shape.

なお、上記図示の実施例では、例えば第6図に示した如
く、シールドの断面形状が円形となっているが、円形の
みならず楕円形、略四角形、長円形、馬蹄形などが考え
られ、特に非円形断面には環状断面に土・水圧による曲
げモーメントが比較的大きく生ずるのでこのような補強
材を必要とする場合が多い。
In the illustrated embodiment, the shield has a circular cross-sectional shape as shown in FIG. 6, for example. However, not only a circular shape but also an oval shape, a substantially quadrangular shape, an oval shape, a horseshoe shape, and the like are possible. Such a reinforcing member is often required for a non-circular cross section because a bending moment due to soil and water pressure is relatively large in an annular cross section.

すなわち、通常、軟弱な地中においてトンネルに発生す
る曲げ応力は概ね第9図(イ)の如くなることは周知で
ある。つまり、トンネルの上下部ではトンネルの内側に
引張りが働き、左右側部ではトンネルの外側に引張りが
作用する。したがって、これに対応する鉄筋は第9図
(ロ)に示す如く、トンネルの断面で上、下部では断面
の内側に、トンネルの左右側部では断面の外側に偏っ
て、トンネル断面方向に鉄筋の補強材を配設することが
望ましい。したがって、当該シールドの断面が円形であ
っても、ライニング支圧部10の補強材設置用の孔10aの
配列を楕円形状にし、これによって補強材11が同形状に
形成すればよい。このようにすれば地中の土・水圧によ
りトンネルに発生する曲げ応力に有効に対抗できる。
That is, it is well known that the bending stress usually generated in the tunnel in the soft ground is as shown in FIG. 9 (a). That is, the tension acts inside the tunnel at the upper and lower portions of the tunnel, and the tension acts outside the tunnel at the left and right side portions. Therefore, as shown in Fig. 9 (b), the reinforcing bars corresponding to this are biased toward the inside of the cross section at the cross section of the tunnel, and to the outside of the cross section at the left and right sides of the tunnel, and It is desirable to provide a stiffener. Therefore, even if the shield has a circular cross section, the holes 10a for installing the reinforcing material in the lining pressure bearing portion 10 may be arranged in an elliptical shape so that the reinforcing material 11 is formed in the same shape. By doing so, it is possible to effectively counter the bending stress generated in the tunnel due to soil and water pressure in the ground.

また、本工法および本装置は、水平用トンネルのみなら
ず立坑を築造する時にも使用される事は勿論である。
Further, it goes without saying that the present construction method and the present apparatus are used not only when constructing a horizontal tunnel but also when constructing a vertical shaft.

(発明の効果) 以上のように本発明によれば、シールド筒後部内に略環
状のライニング支圧部を設け、かつこのライニング支圧
部の内側に型枠兼反力受を組込み、シールドの前進に伴
い形成された坑壁と、それに伴って順次組込まれた上記
型枠兼反力受の外周側との間の、コンクリートの如き充
填物が圧送される空間に、拡開可能な拡開部を有する複
数の補強材を上記ライニング支圧部に形成された孔を介
して上記空間部分に位置せしめ、かつその拡開部を広
げ、隣接する補強材相互を略筒状をなす補強材として掘
進作業を行うようにしたから、 (イ)従前のように、いちいち鉄筋を組み立てる必要が
ないので、その分作業時間の短縮ができる。
(Effects of the Invention) As described above, according to the present invention, a substantially annular lining bearing portion is provided in the rear portion of the shield cylinder, and a formwork and reaction force receiver is incorporated inside the lining bearing portion to protect the shield. Expansion that can be expanded into the space where the filling material such as concrete is pumped between the mine wall formed along with the advancement and the outer peripheral side of the above-mentioned formwork and reaction force receiver that are sequentially installed along with it A plurality of reinforcing members each having a portion are positioned in the space through the holes formed in the lining support portion, and the expanded portion thereof is widened so that adjacent reinforcing members have a substantially tubular reinforcing member. Since the excavation work is performed, (a) Since it is not necessary to assemble the reinforcing bars one by one as in the past, the work time can be shortened accordingly.

(ロ)ライニングのまだ固まらないコンクリート部は、
常に密閉された状態なため、前サイクルのコンクリート
が固まっていなくても次のサイクルの作業に移ることが
できるので、ライニングの速度が速くなる。
(B) The concrete part of the lining that has not solidified yet
Since it is always sealed, it is possible to move to the work of the next cycle even if the concrete of the previous cycle is not solidified, so the lining speed becomes faster.

(ハ)以上から工期の短縮が行えるので経済的となる効
果がある。
(C) Since the construction period can be shortened from the above, there is an economical effect.

(ニ)また、拡開部は拡開した場合、互いに重なり合い
ほぼ円環状となるため、土圧や水圧等による曲げ荷重に
対しても十分な強度が得られる。
(D) Further, when the expanded portions are expanded, they overlap each other and form a substantially annular shape, so that sufficient strength can be obtained against bending load due to earth pressure or water pressure.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の第1実施例のシールド機の概略側断面
図、第2図は本発明に用いられる鉄筋の一例の斜視図、
第3図(イ)〜(ハ)は同上の鉄筋の各種変形例、第4
図(イ)〜(ハ)は掘進の工程説明図、第5図(イ)〜
(ハ)は補強材の動作説明図、第6図はコンクリートの
如き充填物によって形成された構造物内に補強材が設け
られた状態を示す説明図、第7図(イ)はライニング支
圧部、型枠兼反力受をシールド隔壁後方から坑内側に向
かって見た説明図、(ロ)はライニング支圧部の孔の配
列が異なる同上の説明図、第8図(イ),(ロ)は本発
明の第2実施例、第9図(イ)はトンネルに発生する曲
げ応力の説明図、(ロ)は補強材の形状の他の例、第10
図ないし第12図はそれぞれ従来例である。 1……シールド筒、10……ライニング支圧部、 10a……孔、11……補強材
FIG. 1 is a schematic side sectional view of a shield machine according to a first embodiment of the present invention, and FIG. 2 is a perspective view of an example of a reinforcing bar used in the present invention.
FIGS. 3 (a) to 3 (c) show various modifications of the same reinforcing bar,
Figures (a) to (c) are explanatory views of the process of excavation, and FIG. 5 (a) to
(C) is an explanatory view of the operation of the reinforcing material, FIG. 6 is an explanatory view showing a state in which the reinforcing material is provided in the structure formed by the filling material such as concrete, and FIG. 7 (A) is the lining bearing pressure. Part, formwork and reaction force receiver as viewed from the rear of the shield partition wall toward the inside of the mine, (b) is an explanatory view of the above in which the arrangement of the holes of the lining bearing part is different, and FIG. 8 (a), ( (B) is a second embodiment of the present invention, FIG. 9 (a) is an explanatory view of bending stress generated in the tunnel, (b) is another example of the shape of the reinforcing material, and 10th.
Each of FIGS. 1 to 12 is a conventional example. 1 ... Shield cylinder, 10 ... Lining bearing part, 10a ... Hole, 11 ... Reinforcing material

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】シールド筒後部内に設けられたライニング
支圧部の内側に型枠兼反力受を設置し、シールド前進に
伴い形成された坑壁とそれに伴い順次組込まれた上記型
枠兼反力受と外周側との間の空間に、ほぼ円周方向に拡
開可能な拡開部を有する複数の補強材を上記ライニング
支圧部に形成された適数の孔を介して挿入時にほぼ丸棒
状または板状となっている前記補強材を挿入し、上記空
間部に位置せしめ、前記拡開部が拡開して円周方向にお
いて互いに重なり合いほぼ円環状となり、この空間にコ
ンクリートの如き充填物を充填して、シールド機を前進
せしめることを特徴としたシールド工法。
1. A pit wall formed by advancing the shield and a mine wall formed by advancing the shield, and the form and the molds sequentially incorporated therein, by installing a form and reaction force receiver inside a lining pressure bearing provided in the rear part of the shield cylinder. At the time of inserting a plurality of reinforcing members having an expanding portion capable of expanding in a substantially circumferential direction into a space between the reaction force receiving member and the outer peripheral side through a proper number of holes formed in the lining supporting portion. Insert the reinforcing material in the shape of a substantially round bar or plate and position it in the space, and the expanding portions expand and overlap each other in the circumferential direction to form a substantially annular shape, such as concrete. A shield construction method characterized by advancing a shield machine by filling a filling material.
【請求項2】シールド筒の後部に固設されたライニング
支圧部の内側に設置された型枠兼反力受の外周と掘進に
よって形成された坑壁の間の空間に充填物を充填する手
段と、上記ライニング支圧部に形成された適数の孔を介
して拡開可能な拡開部を有する複数の補強材を上記空間
内に設置する手段とを備え、前記補強材は孔への挿入時
にほぼ丸棒状または板状であり、かつ拡開時に円周方向
において互いに重なり合ってほぼ円環状をなすことを特
徴とするシールド機。
2. A filler is filled in a space between the outer periphery of a formwork / reaction force receiver installed inside a lining pressure-supporting portion fixedly provided at the rear portion of the shield cylinder and a pit wall formed by excavation. Means and a means for installing a plurality of reinforcing members having an expanding portion capable of expanding through an appropriate number of holes formed in the lining support portion in the space, wherein the reinforcing member is a hole A shield machine having a substantially round bar shape or a plate shape when inserted, and overlapping each other in a circumferential direction when expanded to form a substantially annular shape.
JP62146661A 1987-06-12 1987-06-12 Shield method and shield machine Expired - Lifetime JPH0635797B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62146661A JPH0635797B2 (en) 1987-06-12 1987-06-12 Shield method and shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62146661A JPH0635797B2 (en) 1987-06-12 1987-06-12 Shield method and shield machine

Publications (2)

Publication Number Publication Date
JPS63312500A JPS63312500A (en) 1988-12-20
JPH0635797B2 true JPH0635797B2 (en) 1994-05-11

Family

ID=15412767

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62146661A Expired - Lifetime JPH0635797B2 (en) 1987-06-12 1987-06-12 Shield method and shield machine

Country Status (1)

Country Link
JP (1) JPH0635797B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6013700A (en) * 1983-06-27 1985-01-24 三菱重工業株式会社 Marine cargo liquid stowage rate control alarm device
JPS60123700A (en) * 1983-09-26 1985-07-02 株式会社熊谷組 Assembling of iron skeletal in covering concrete of site casting lining shield construction method
JPS61172997A (en) * 1985-01-24 1986-08-04 鉄建建設株式会社 Method of lining shielding tunnel and formwork device used for said method

Also Published As

Publication number Publication date
JPS63312500A (en) 1988-12-20

Similar Documents

Publication Publication Date Title
JP6636773B2 (en) Construction structure and construction method of tunnel lining body
JP3285261B2 (en) Precast formwork for tunnel lining
JP2788953B2 (en) Structure of tunnel structure
JP2593284B2 (en) Tunnel lining structure and construction method
JPH0835391A (en) Preceding leg reinforcing type fore piling method by heading
JP3890528B2 (en) Tunnel construction method
JP6636774B2 (en) Integrated structure of pipe roof material
JPH0635797B2 (en) Shield method and shield machine
JP2554885B2 (en) Shield method and shield machine
JPH0932495A (en) Bagged concrete lining method
US3449916A (en) Tunnel liner and method of making same
JPH04319198A (en) Construction method of tunnel
JPH0194199A (en) Method of constructing concrete lining body into ground and segment containing coarse aggregate used for said construction
JP2849605B2 (en) Large section tunnel and its construction method
JPH0462299A (en) Larger section tunnel and construction method thereof
JPH0536599B2 (en)
JPH0637836B2 (en) Tunnel lining method
JPH09328987A (en) Tunnel and construction method
JPH0772476B2 (en) How to build a tunnel lining
JPH011895A (en) Shield construction method and shield machine
JP3178357B2 (en) Construction method of large section tunnel
JPH04277298A (en) Primary segment for shield tunnel and working method thereof
JPH02183090A (en) Cutter shield excavator
JPS61113999A (en) Method of placing concrete lining shielding construction
JP2005194837A (en) Tunnel widening method