Construction method and equipment for crushed stone foundation

Info

Publication number
JPH0637772B2
JPH0637772B2 JP61186946A JP18694686A JPH0637772B2 JP H0637772 B2 JPH0637772 B2 JP H0637772B2 JP 61186946 A JP61186946 A JP 61186946A JP 18694686 A JP18694686 A JP 18694686A JP H0637772 B2 JPH0637772 B2 JP H0637772B2
Authority
JP
Japan
Prior art keywords
spat
rail girder
crushed stone
barge
rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61186946A
Other languages
Japanese (ja)
Other versions
JPS6344016A (en
Inventor
望 篠原
雄一 芳野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP61186946A priority Critical patent/JPH0637772B2/en
Publication of JPS6344016A publication Critical patent/JPS6344016A/en
Publication of JPH0637772B2 publication Critical patent/JPH0637772B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

【発明の詳細な説明】 [産業上の利用分野] 本発明は海底にスクリード装置を用いて砕石基礎を築造
する方法とその装置に関する。
Description: TECHNICAL FIELD The present invention relates to a method and an apparatus for constructing a crushed stone foundation using a screed apparatus on the seabed.

[従来技術] 水底に基礎構築物を構築する場合は、例えば第8図に示
すように、まず水底の堆積層を浚渫し、その浚渫底面B
上に砂利、砕石等の捨石層C1、C2、C3を所定の厚
みに順次形成しその上に構造物Dを構築し、さらに捨石
の層Eを形成している。
[Prior Art] When constructing a foundation structure on the bottom of the water, for example, as shown in FIG. 8, first, the sedimentary layer on the bottom of the water is dredged, and then the bottom surface B of the dredging is formed.
Rubble stone layers C1, C2, C3 of gravel, crushed stone, etc. are sequentially formed to a predetermined thickness, a structure D is built on the rubble stone layers C1, C2, C3, and a rubble stone layer E is further formed.

このように捨石層はその上面を敷き均しして実質的に平
面となければならない。そのために捨石の投入工程およ
び敷き均しのスクリード工程を必要としている。
In this way, the rubble stone layer must be laid evenly on the upper surface and made substantially flat. Therefore, it requires a rubble stone input process and a leveling screed process.

この基礎の築造方法及びその装置として本出願人は既に
特開昭60−105713号公報、特開昭60−702
24号公報、特開昭60−212519号公報、特開昭
60−212520号公報、特開昭61−72123号
公報等の種々の提案を行ってきている。
The applicant of the present invention has already disclosed, as a method and apparatus for constructing this foundation, JP-A-60-105713 and JP-A-60-702.
Various proposals such as JP-A No. 24, JP-A-60-212519, JP-A-60-212520, and JP-A-61-72123 have been made.

しかしながら、かかる従来の技術においては、レール桁
装置を高精度で海底に敷設することができず、精度の高
い基礎を得るのが困難であった。
However, in such a conventional technique, the rail girder device cannot be laid on the seabed with high accuracy, and it has been difficult to obtain a highly accurate foundation.

また特開昭52−89225号公報には吊り下げた水中
桁に支承されたスクレーパにより捨石を均す装置が開示
されている。しかしながら、かかる公知技術では水中桁
が双胴形船体から吊り下げられているので、双胴形船体
を脚で支持するにあたって潮の干満を考慮する必要があ
り、作業が面倒であり、また水中桁が潮の干満や波浪の
影響を受けやすく、精度に問題がある。
Further, Japanese Patent Laid-Open No. 52-89225 discloses an apparatus for leveling rubble stones by a scraper supported by a suspended underwater girder. However, in such a known technique, the underwater girder is suspended from the catamaran hull, so it is necessary to consider the tidal tide in supporting the catamaran hull with legs, and the work is troublesome. Is susceptible to tides and waves, and there is a problem with accuracy.

さらに特開昭58−173223号公報には方形枠内を
案内されている移動するスクリード桁により捨石を均す
装置が開示されている。しかしながら、かかる公知技術
では所定の深度に方形枠をセットするために、多数の直
立脚シリンダを同調操作するので、制御が面倒である。
Further, JP-A-58-173223 discloses a device for leveling rubble stones by a moving screed girder guided in a rectangular frame. However, in such a known technique, a large number of upright leg cylinders are synchronously operated in order to set the rectangular frame at a predetermined depth, which makes the control troublesome.

[解決する課題] したがって、本発明の目的は、潮の干満や波浪の影響が
なく、砕石基礎を高精度で施工できる砕石基礎の築造方
法および装置を提供するにある。
[Problem to be solved] Therefore, an object of the present invention is to provide a method and a device for constructing a crushed stone foundation that can be constructed with high accuracy without the influence of tides and waves.

[課題を解決する手段] 本発明によれば、水底にスクリード装置を用いて砕石基
礎を築造する方法において、バージを曳航して所定位置
に繋留した後に浮上させたレール桁装置を引込んでスパ
ットを把持装置に挿入把持する工程と、前記レール桁装
置に設けたタンクに注水してレール桁装置を水底に吊り
降する工程と、スパットの先端が水底に着底した後にス
パット押込み装置を駆動してスパットにプレロードをか
けて押込む工程と、そのスパット押込装置を解放してバ
ージとスパットとをフリーにする工程と、下端部をレー
ル桁装置に固定した測量装置を用いてレール桁装置のレ
ベルを調整する工程と、レール桁装置のレベル調整後に
ホッパーの砕石をトレミー管を介してスクリード機に送
り込み砕石基礎を築造する工程とよりなっている。
[Means for Solving the Problems] According to the present invention, in a method of constructing a crushed stone foundation by using a screed device on a water bottom, a rail girder device towed at a predetermined position after towing a barge is pulled in to pull a spat. Inserting and grasping into the gripping device, pouring water into the tank provided in the rail girder device and suspending the rail girder device to the water bottom, and driving the spat pushing device after the tip of the spat bottoms on the water bottom. Preload the spat to push it in, release the spat pushing device to free the barge and spat, and adjust the rail girder level using a surveying instrument with the lower end fixed to the rail girder. The process consists of adjusting the level of the rail girder and sending the crushed stone from the hopper to the screed machine via the tremie pipe to build a crushed stone foundation. .

また本発明によれば、水底にスクリード装置を用いて砕
石基礎を築造する方法において、砕石を有するホッパー
台車を案内レールによって移動可能に設けたバージと、
そのバージに押込み可能に設けたスパットと、バージ上
に立設された前記スパットを下方に押込むスパット押込
み装置と、そのスパットの下部に設けられスパット把持
装置に装着されたレール桁装置と、そのレール桁装置に
セットされて案内されるスクリード機と、そのレール桁
装置のレベルを検出する測量装置と、そのレール桁装置
のレベルを調整する巻上げ装置とよりなっている。
Further, according to the present invention, in a method of constructing a crushed stone foundation using a screed device on a water bottom, a hopper cart having crushed stone movably provided by a guide rail, and a barge.
A spat provided so that it can be pushed into the barge, a spat pushing device that pushes down the spat that is erected on the barge, a rail girder device that is attached to the spat gripping device that is provided under the spat, and that It consists of a screed machine set and guided by a rail girder, a surveying device for detecting the level of the rail girder, and a hoisting device for adjusting the level of the rail girder.

[作用効果の説明] したがって、スパット押込み装置によってスパットにプ
レロードをかけることができるので、スクリード作業に
より荷電の変動による影響を防止できる。そしてレール
桁装置を所定の水底に敷設して、そのレール桁装置によ
って基礎を築造するので、高精度な基礎を築造すること
ができる。また、そのために、バージ上にスパットの押
込み装置や測量装置により、効率のよい作業を行うこと
ができる。
[Explanation of Action and Effect] Therefore, since the spat can be preloaded by the spat pushing device, it is possible to prevent the influence of the fluctuation of the charge due to the screed work. Since the rail girder device is laid on a predetermined water bottom and the foundation is constructed by the rail girder device, a highly accurate foundation can be constructed. Further, for that reason, an efficient work can be performed by the pushing device of the spat or the surveying device on the barge.

また、レール桁内はスパット押込み装置をフリーにする
ことによって潮の干満や波浪によるバージの上下動の影
響を受けない。
In addition, by making the spat pushing device free inside the rail girder, it is not affected by the up and down movement of the barge due to the tides and waves.

さらに、本発明では、レール桁装置がスパットに把持さ
れているので、水底の構造による誤差がなく、また装置
の移動により連続したマウントを築造できる。
Further, in the present invention, since the rail girder device is gripped by the spat, there is no error due to the structure of the water bottom, and a continuous mount can be built by moving the device.

[実施例] 以下図面に基づいて本発明の実施例を説明する。[Embodiment] An embodiment of the present invention will be described below with reference to the drawings.

本発明の砕石基礎の築造方法に使用する装置は、第1図
乃至第7図に示すように装置全体を搭載した双胴のバー
ジ1、バージを結ぶガーダー2、バージ1上に立設した
スパットを摺動支持、押込みするスパット押込み装置2
0、垂直方向に移動自在のスパット3、スパット3によ
り案内されて、浮沈可能なレール桁装置4、レール桁装
置4に設けられたスパット把持装置5、レール桁装置4
により案内されるスクリード機6、バージ上に移動可能
に設けられたホッパー台車7、台車7を案内するレール
11、台車走行装置8、台車7上に取付けたスクリード
機操作ユニット9等の主要装置を備えており、ホッパー
台車7とスクリード機6とはトレミー管15により連結
されている。
The apparatus used in the method for constructing a crushed stone foundation according to the present invention is, as shown in FIGS. 1 to 7, a twin-barreled barge 1 on which the entire apparatus is mounted, a girder 2 for connecting the barges, and a spat standing on the barge 1. Pushing device 2 for slidingly supporting and pushing in
0, a spat 3 movable in the vertical direction, a rail girder device 4 that can be lifted and lowered by being guided by the spat 3, a spat gripping device 5 provided on the rail girder device 4, and a rail girder device 4
Main equipment such as a screed machine 6 guided by, a hopper carriage 7 movably provided on the barge, a rail 11 for guiding the carriage 7, a carriage traveling device 8, and a screed machine operation unit 9 mounted on the carriage 7. The hopper truck 7 and the screed machine 6 are connected by a tremie pipe 15.

またホッパー台車7上には、クローラクレーン10も装
備されていて、全体の操作は操作室18内でコントロー
ルされる。スパット押込み装置20の詳細は第3図に示
されていて、スパット3は押込み装置20のガイド21
により案内されており、必要時には、油圧ジャッキ22
を操作してスパット3をガーダー2に対して強制的に駆
動して押し込むように構成されている。又比較的硬質の
海底面においては、油圧ジャッキ22と揺動装置を組合
せることにより対応することも可能である。
A crawler crane 10 is also mounted on the hopper cart 7, and the entire operation is controlled in the operation room 18. Details of the spat pushing device 20 are shown in FIG. 3, and the spat 3 includes a guide 21 of the pushing device 20.
Guided by the hydraulic jack 22 when needed.
Is operated to forcibly drive and push the spat 3 against the girder 2. Further, on a relatively hard sea bottom, it is possible to deal with it by combining the hydraulic jack 22 and the rocking device.

本発明の方法に使用する装置は以上のように構成されて
いるが、次にこの装置を利用してスクリード機の案内用
レール桁装置を精度よく設置し、砕石基礎を効率よく築
造する工程を第4図以下を利用して説明する。
The apparatus used in the method of the present invention is configured as described above. Next, using this apparatus, a guide rail girder device for a screed machine is accurately installed, and a step of efficiently constructing a crushed stone foundation is performed. This will be described with reference to FIG.

工程1 バージ1を曳航し、所定位置に係留した後に、浮上させ
たレール桁装置を曳込んでスパット3を把持装置5に挿
入把持する工程(第4図)。
Step 1 A step of towing the barge 1 and mooring the barge 1 at a predetermined position, and then towing the floated rail girder device to insert and hold the spat 3 into the holding device 5 (FIG. 4).

この際には、スクリード機6はレール桁装置4に既にセ
ットしておく。
At this time, the screed machine 6 is already set on the rail girder device 4.

工程2 レール桁装置4に設けたタンク30に注水してレール桁
装置4を海底へ吊り降ろす工程(第5図)。
Step 2 A step of pouring water into the tank 30 provided in the rail girder device 4 and hanging the rail girder device 4 to the seabed (FIG. 5).

この時には、スパット押込み装置20はスパット3に対
して、フリーな状態にしておき、吊り下げウインチワイ
ヤ25を操作して、レール桁装置4を吊り降ろす。
At this time, the spat pushing device 20 is set in a free state with respect to the spat 3, and the suspension winch wire 25 is operated to suspend the rail girder device 4.

工程3 スパット3の先端が海底40に着底した後に、スパット
押込み装置20を駆動してスパット3にプレロードをか
けて押し込む工程(第6図)。
Step 3 A step in which the spat pushing device 20 is driven to apply a preload to the spat 3 to push it in after the tip of the spat 3 reaches the seabed 40 (FIG. 6).

この際には、レール桁装置4のスパット把持装置5はス
パット3を把持した状態にしておき、また押込み荷重は
スクリード作業により発生する荷重変動を上まわる力で
プレロードをかけるものとする。
At this time, the spat gripping device 5 of the rail girder device 4 is held in a state of gripping the spat 3, and the pushing load is preloaded by a force exceeding the load fluctuation generated by the screed work.

そしてプレロード実施後は、バージ側の押込み装置20
を開施してバージとスパットをフリーにし、潮位波動に
よるバージの上下動を吸収するようにする。
After the preloading, the pushing device 20 on the barge side
Open the barge to make the barge and spat free to absorb the vertical movement of the barge caused by the tidal wave.

工程4 下端部をレール桁装置4に固定した測量テープ55等を
用い、陸上の基準点を基に、作業者50がレベル測量を
行ってスパットにマーク58を付する(第7図)。
Step 4 Using a surveying tape 55 having the lower end fixed to the rail girder device 4, etc., the worker 50 carries out a level survey based on a land reference point and puts a mark 58 on the spat (Fig. 7).

このマーキングを全てのスパットに対して行うことによ
って海底に敷設したレール桁装置4のレベルの状態を知
ることができる。
By performing this marking on all the spats, the level condition of the rail girder device 4 laid on the seabed can be known.

レベル調整が必要なときには、レール桁装置のスパット
把持装置5を開放し、巻上げ装置25でレール桁装置4
のレベルを調整した後に再度スパットを把持する。
When level adjustment is required, the spat gripping device 5 of the rail girder device is opened, and the hoisting device 25 is used to lift the rail girder device 4.
Grip the spat again after adjusting the level.

工程5 レール桁装置4を所定のレベルに設置した後は、第1図
に示すような通常のスクリード工法によってホッパー7
の砕石をトレミー管を介してスクリード機に送り込み、
砕石基礎を築造していく。この作業中に、レール桁装置
を支えるスパットは、プレロードをかけて海底に押し込
んであるので、荷重が変化してもレール桁装置のレベル
は一定に保たれ、精度の高い基礎を築造することができ
る。
Step 5 After the rail girder device 4 is installed at a predetermined level, the hopper 7 is installed by the normal screed construction method as shown in FIG.
Send the crushed stones of the
Build a crushed stone foundation. During this work, the spat supporting the rail girder is pushed into the seabed with a preload, so the level of the rail girder is kept constant even if the load changes, and it is possible to build a highly accurate foundation. it can.

[発明の効果] 以上の通り本発明によれば、下記のすぐれた効果を奏す
る。
[Effects of the Invention] As described above, the present invention has the following excellent effects.

(i) スパット押込み装置によりプレロードをかける
ことにより、スクリード作業により発生する荷重変動の
影響を防止できる。
(I) By applying the preload by the spat pushing device, it is possible to prevent the influence of the load fluctuation caused by the screed work.

(ii) スパット押込み装置をフリーとし、潮位や波浪
によるバージの上下動を吸収できる。
(Ii) The spat pushing device is free, and the vertical movement of the barge due to the tide level and waves can be absorbed.

(iii)レール桁装置を水底に保持せずにスパットに把
持したので、水底に凹凸があっても全く影響がなく正確
にセットできる。
(Iii) Since the rail girder device is held on the spat without being held on the bottom of the water, even if the bottom of the water has irregularities, the rail girder can be accurately set without any influence.

(iv) 装置を移動させることにより連続した砕石基礎
を築造できる。
(Iv) A continuous crushed stone foundation can be built by moving the equipment.

(v) スクリード機がレール上を動くので、高精度の
砕石基礎を簡単に作ることができる。
(V) Since the screed machine moves on the rail, it is possible to easily make a highly accurate crushed stone foundation.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の実施例装置の正面図、第2図は平面
図、第3図はスパット押込み装置の正面図、第4図は本
発明方法の第1工程を示す正面図、第5図は第2工程を
示す正面図、第6図は第3工程を示す正面図、第7図は
第4工程を示す正面図、第8図は砕石の基礎を築造する
概念図である。 1……バージ、2……ガーダー、3……スパット、4…
…レール桁装置、5……スパット把持装置、6……スク
リード機、7……ホッパー台車、20……スパット押込
み装置、25……レール桁吊り下げ装置
FIG. 1 is a front view of an apparatus according to an embodiment of the present invention, FIG. 2 is a plan view, FIG. 3 is a front view of a spat pushing device, and FIG. 4 is a front view showing a first step of the method of the present invention. The figure is a front view showing the second step, FIG. 6 is a front view showing the third step, FIG. 7 is a front view showing the fourth step, and FIG. 8 is a conceptual diagram for constructing a crushed stone foundation. 1 ... Barge, 2 ... Girder, 3 ... Spat, 4 ...
… Rail girder device, 5 …… Spat gripping device, 6… Screed machine, 7… Hopper cart, 20… Spat pushing device, 25… Rail girder suspension device

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】水底にスクリード装置を用いて砕石基礎を
築造する方法において、バージを曳航して所定位置に繋
留した後に浮上させたレール桁装置を引込んでスパット
を把持装置に挿入把持する工程と、前記レール桁装置に
設けたタンクに注水してレール桁装置を水底に吊り降す
る工程と、スパットの先端が水底に着底した後にスパッ
ト押込み装置を駆動してスパットにプレロードをかけて
押込む工程と、そのスパット押込装置を解放してバージ
とスパットとをフリーにする工程と、下端部をレール桁
装置に固定した測量装置を用いてレール桁装置のレベル
を調整する工程と、レール桁装置のレベル調整後にホッ
パーの砕石をトレミー管を介してスクリード機に送り込
み砕石基礎を築造する工程とよりなることを特徴とする
砕石基礎の築造方法。
1. A method of constructing a crushed stone foundation using a screed device on a water bottom, which comprises pulling a barge and anchoring it at a predetermined position, and then retracting a floating rail girder device to insert and hold a spat into a gripping device. , A step of pouring water into the tank provided in the rail girder device and suspending the rail girder device on the water bottom, and after the tip of the spat has landed on the water bottom, drive the spat pushing device to preload the spat and push it in A step, a step of releasing the spat pushing device to free the barge and the spat, a step of adjusting the level of the rail girder device using a surveying device having a lower end fixed to the rail girder device, and a rail girder device After adjusting the level of the crushed stone, a method of constructing a crushed stone foundation characterized by comprising the step of sending the crushed stone of the hopper to a screed machine through a tremy pipe to build a crushed stone foundation. .
【請求項2】水底にスクリード装置を用いて砕石基礎を
築造する装置において、砕石を有するホッパー台車を案
内レールによって移動可能に設けたバージと、そのバー
ジに押込み可能に設けたスパットと、バージ上に立設さ
れた前記スパットを下方に押込むスパット押込み装置
と、そのスパットの下部に設けられスパット把持装置に
装着されたレール桁装置と、そのレール桁装置にセット
されて案内されるスクリード機と、そのレール桁装置の
レベルを検出する測量装置と、そのレール桁装置のレベ
ルを調整する巻上げ装置とよりなることを特徴とする砕
石基礎の築造装置。
2. A device for constructing a crushed stone foundation by using a screed device on a water bottom, a barge on which a hopper cart having crushed stone is movably provided by a guide rail, a spat capable of being pushed into the barge, and a barge top. A spat pushing device that pushes down the spat standing upright, a rail girder device that is attached to a spat gripping device that is provided under the spat, and a screed machine that is set and guided in the rail girder device. A crushed stone foundation construction device comprising a surveying device for detecting the level of the rail girder device and a hoisting device for adjusting the level of the rail girder device.
JP61186946A 1986-08-11 1986-08-11 Construction method and equipment for crushed stone foundation Expired - Lifetime JPH0637772B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP61186946A JPH0637772B2 (en) 1986-08-11 1986-08-11 Construction method and equipment for crushed stone foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61186946A JPH0637772B2 (en) 1986-08-11 1986-08-11 Construction method and equipment for crushed stone foundation

Publications (2)

Publication Number Publication Date
JPS6344016A JPS6344016A (en) 1988-02-25
JPH0637772B2 true JPH0637772B2 (en) 1994-05-18

Family

ID=16197490

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61186946A Expired - Lifetime JPH0637772B2 (en) 1986-08-11 1986-08-11 Construction method and equipment for crushed stone foundation

Country Status (1)

Country Link
JP (1) JPH0637772B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4792123B1 (en) * 2010-08-19 2011-10-12 大成建設株式会社 Underwater working machine and underwater working method
CN112482389B (en) * 2020-11-18 2022-02-08 山东君合市政建设集团有限公司 Floating type water channel cleaning device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5289225A (en) * 1976-01-19 1977-07-26 Ishikawajima Harima Heavy Ind Riprap leveling device
JPS58173223A (en) * 1982-04-03 1983-10-12 Metsukusu:Kk Seabed leveller

Also Published As

Publication number Publication date
JPS6344016A (en) 1988-02-25

Similar Documents

Publication Publication Date Title
CN114991072B (en) Working platform and working method for dredging and stone throwing among piles of high-pile wharf
KR101782456B1 (en) Submarine cable laying apparatus and laying method
KR20130049804A (en) Surface-breaking re-usable submergeable template for installing one or more submerged columns/piles
CN114197439B (en) Construction method and construction equipment for high-current deepwater underwater gravel pile
US3230721A (en) Walking work barge
CN110847185B (en) Stone throwing and tamping integrated ship
JP2515888B2 (en) Construction method of steel pipe pile for building offshore structure and its equipment
CN110805044B (en) Working method for stone throwing and tamping integrated ship
JPH0637772B2 (en) Construction method and equipment for crushed stone foundation
CN213323580U (en) Posture adjusting device of leveling frame device of riprap leveling ship
CN211494398U (en) Stone sliding pipe device of riprap leveling ship
JPH06322764A (en) Underwater concrete construction method and equipment
JP2759428B2 (en) Underwater steel pipe pile driving method and equipment
US4285614A (en) Structure allowing the attainment of a precise seabed location
CN212714952U (en) Leveling frame device of riprap leveling ship
JP2004256990A (en) Immersed tunneling method for immersed tube and its apparatus
JPS6233822Y2 (en)
CN111764418A (en) Steel cofferdam positioning system in deep water
JP4179525B2 (en) Sinking method
CN110805043B (en) Stone throwing and tamping device
CN221590889U (en) Underwater controlled excavation system of water diversion channel
JPH0739647B2 (en) Method of laying waterproof sheet
CN213014227U (en) Special-shaped hydraulic static force injection device with adjustable inclination angle
JP2592654B2 (en) Sinking method
JPS5968410A (en) Method and apparatus for constructing pier