Oval steel pipe pile driving method and apparatus

Info

Publication number
JPH0639783B2
JPH0639783B2 JP62189733A JP18973387A JPH0639783B2 JP H0639783 B2 JPH0639783 B2 JP H0639783B2 JP 62189733 A JP62189733 A JP 62189733A JP 18973387 A JP18973387 A JP 18973387A JP H0639783 B2 JPH0639783 B2 JP H0639783B2
Authority
JP
Japan
Prior art keywords
steel pipe
pile
pipe pile
holder
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP62189733A
Other languages
Japanese (ja)
Other versions
JPS6433312A (en
Inventor
北村  精男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Giken Ltd
Original Assignee
Giken Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Giken Ltd filed Critical Giken Ltd
Priority to JP62189733A priority Critical patent/JPH0639783B2/en
Publication of JPS6433312A publication Critical patent/JPS6433312A/en
Publication of JPH0639783B2 publication Critical patent/JPH0639783B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、楕円鋼管杭の打設方法及びその装置に係り、
特に、鋼管杭を圧延装置により楕円形状に成形しながら
この楕円鋼管杭を打設する方法及びその装置に関する。
Description: TECHNICAL FIELD The present invention relates to a method and apparatus for driving an oval steel pipe pile,
In particular, the present invention relates to a method and an apparatus for driving an oval steel pipe pile while forming the steel pipe pile into an elliptical shape by a rolling device.

(従来の技術) 土木作業等において、鋼管、鋼管矢板、鋼管杭(以下、
単に鋼管杭という)はその強力な支持力と、経済性のた
めに、護岸橋梁工事などの永久構造物のみならず、鋼矢
板でカバーできない山留や締切工事などの仮設構造物あ
るいは支持杭としても広く利用されている。
(Prior Art) Steel pipes, steel pipe sheet piles, steel pipe piles (hereinafter,
Because of its strong bearing capacity and economic efficiency, steel pipe piles are not only used as permanent structures such as revetment bridge construction, but also as temporary structures or support piles such as mountain retaining and deadline construction that cannot be covered with steel sheet piles. Is also widely used.

これらの鋼管杭は、断面が円形である性質上どのような
方向の外力に対しても均一な強度を発揮することができ
る。このように方向性が無いことは逆に特定な応力方向
に対して大きな強度を発揮できないことになり、応力方
向が特定される使用に対してはあまり好ましくない。
Due to the circular cross section, these steel pipe piles can exhibit uniform strength against external force in any direction. Such lack of directionality, on the contrary, means that a large strength cannot be exhibited in a specific stress direction, which is not very preferable for use in which the stress direction is specified.

一方、上述のように鋼管杭は施工性が良いので、山留壁
として用いられることがあるが、鋼管杭を山留壁として
用いる場合には、所定の長さのものを互いに連続して打
設し、片側の土を掘削して排除すると、反対側の土の土
圧が夫々の鋼管の表面で受け止められて土の崩壊を防止
する。
On the other hand, since the steel pipe piles have good workability as described above, they are sometimes used as mountain retaining walls.However, when using steel pipe piles as mountain retaining walls, steel pipes of a predetermined length are continuously driven. When the soil is installed and excavated by excavating the soil on one side, the earth pressure of the soil on the other side is received by the surface of each steel pipe to prevent the soil from collapsing.

このような山留壁に用いられる鋼管杭のサイズ(径,肉
厚)は、土圧分布、根入れ長さ、切梁段数等の設計条件
によって計算される山留壁の単位巾当りの土圧方向の曲
げ応力と剪断応力を基に求められる。
The size (diameter, wall thickness) of the steel pipe pile used for such retaining wall is calculated by design conditions such as earth pressure distribution, rooting length, and number of truss beams, and the soil per unit width of retaining wall. It is calculated based on bending stress and shear stress in the pressure direction.

(発明が解決しようとする問題点) ところで、山留壁の厚さすなわち鋼管杭の径を敷地の制
約上で大きくとれない場合があり、このような場合に
は、鋼管杭の径を許容される山留壁の厚さ以下に設定し
なければならない。
(Problems to be solved by the invention) By the way, there are cases where the thickness of the retaining pipe, that is, the diameter of the steel pipe pile cannot be set large due to the site restrictions. In such a case, the diameter of the steel pipe pile is allowed. The thickness of the retaining wall must be less than the thickness of the retaining wall.

このように土圧方向の厚さが制限される山留壁では、所
定の鋼材使用量に対して剪断強度は確保できても、曲げ
強度が不足するおそれがある。
In such a mountain retaining wall whose thickness in the earth pressure direction is limited, the bending strength may be insufficient even if the shear strength can be secured for a predetermined amount of steel used.

このため山留壁の単位巾当り所定の曲げ強度を得ようと
すると、単位巾当りの鋼材の断面積を大きくすること、
すなわち鋼材の肉厚を厚くすることが必要であり、鋼材
の使用量が嵩んで、経済性の面で大きな問題が発生す
る。
Therefore, in order to obtain a predetermined bending strength per unit width of the retaining wall, increase the cross-sectional area of the steel material per unit width,
That is, it is necessary to increase the thickness of the steel material, the amount of the steel material used increases, and a large problem occurs in terms of economy.

また、鋼管杭は施工性を考慮してできるだけ同一サイズ
のものが多用されるが、この場合には、鋼管杭のサイズ
は、前記のような設計条件によって計算される単位巾当
り土圧方向の曲げ応力と剪断応力の最大値を同時に満足
できるサイズのものが使用され、部位によっては過剰設
計になることがある。
In addition, steel pipe piles with the same size are often used in consideration of workability, but in this case, the size of the steel pipe pile is calculated in the earth pressure direction per unit width calculated based on the above design conditions. A size that can simultaneously satisfy the maximum values of bending stress and shear stress is used, and it may be overdesigned depending on the site.

ところが、このような場合には使用中の鋼管杭の断面形
状を変更させて、必要最小限の曲げ強度を確保した上
で、鋼管杭1本当りの土と接する面を拡大することがで
きれば、杭材料の有効利用ができ無駄がなくなる。
However, in such a case, if the cross-sectional shape of the steel pipe pile in use is changed to ensure the minimum necessary bending strength, and if the surface that contacts the soil per steel pipe pile can be expanded, Pile materials can be used effectively and waste is eliminated.

従来の楕円鋼管杭を用いた山留壁を構築する場合は、打
設現場から離れた場所で楕円鋼管杭を成形して、それを
打設現場まで運搬していた。したがって、現場で要求さ
れる杭の必要量よりも多少多めに用意するために、鋼材
の使用量も嵩み不経済であり、また鋼管杭をストックす
るためのスペースも用意しなければならないという問題
点があった。
When constructing a mountain retaining wall using a conventional elliptical steel pipe pile, the elliptical steel pipe pile was formed in a place away from the casting site and was transported to the casting site. Therefore, in order to prepare a little more than the required amount of piles at the site, the amount of steel used is bulky, which is uneconomical, and the space for stocking steel pipe piles must be prepared. There was a point.

本発明は、このような問題点を解決するためになされた
ものであり、杭圧入引抜機に楕円鋼管杭の成形装置を取
付けることにより打設現場において必要量だけの楕円鋼
管杭を形成しながら打設することができる楕円鋼管杭打
設方法及びその装置を提供することを目的としている。
The present invention has been made in order to solve such a problem, while forming a required amount of elliptical steel pipe piles at a setting site by attaching a forming device for elliptical steel pipe piles to a pile press-in / pull-out machine. An object of the present invention is to provide a method and apparatus for driving an oval steel pipe pile that can be driven.

(問題点を解決するための手段) 上記目的を達成するために本発明は、既設杭等からなる
支持体上に杭圧入引抜機を固定し、該杭圧入引抜機に取
付けられ上下動可能な杭保持体に鋼管杭を挟持させた
後、前記杭保持体の下方に設けられ鋼管杭を楕円形状に
形成する圧延装置に前記鋼管杭の先端を当接させ、前記
杭保持体を下降させて鋼管杭を楕円形状に成形しながら
地中に打設することを特徴とし、また杭圧入引抜機の前
部にアームを介して上下動可能に形成された杭保持体
と、該杭保持体に挟持された鋼管杭を楕円形状に成形す
る圧延手段を有する圧延装置を前記杭保持体の下方に設
けたことを特徴としている。
(Means for Solving Problems) In order to achieve the above object, the present invention has a pile press-fitting / pulling machine fixed on a support made of existing piles, etc., and is attached to the pile press-fitting / pulling machine and is vertically movable. After sandwiching the steel pipe pile in the pile holder, the tip of the steel pipe pile is brought into contact with a rolling device that is provided below the pile holder and forms a steel pipe pile in an elliptical shape, and the pile holder is lowered. A steel pipe pile is formed into an elliptical shape while being driven into the ground, and a pile holder formed in the front part of the pile press-fitting / pulling machine so as to be vertically movable via an arm, and the pile holder. A rolling device having a rolling means for forming the sandwiched steel pipe pile into an elliptical shape is provided below the pile holder.

(作用) 杭圧入引抜機に上下動可能に取付けられた杭保持体の下
方に楕円鋼管杭を形成する圧延装置を設けて、鋼管杭を
挟持した杭保持体を下方に移動させて楕円鋼管杭を形成
しながら、この杭を地中に打設することができるので打
設現場に既成の楕円鋼管杭を持ち運ぶ必要がなく作業効
率がよい。
(Operation) A rolling device for forming an elliptical steel pipe pile is provided below the pile holder mounted vertically movable on the pile press-in / pull-out machine, and the pile holder holding the steel pipe pile is moved downward to move the elliptical steel pipe pile. Since this pile can be driven into the ground while forming, it is not necessary to carry a ready-made elliptical steel pipe pile to the driving site and work efficiency is good.

(実施例) 次に添付図面と共にこの発明の実施例を詳細に説明す
る。
(Embodiment) Next, an embodiment of the present invention will be described in detail with reference to the accompanying drawings.

第1図ないし第3図は鋼管本体の断面を任意の楕円形状
に形成された鋼管杭を示す図である。
1 to 3 are views showing a steel pipe pile in which the cross section of the steel pipe main body is formed into an arbitrary elliptical shape.

鋼管杭1、2、3は、夫々短辺S、S1、S2、長辺
L、L1、L2を有し、径、肉厚が共に等しい同サイズ
の円形鋼管本体から形成されている。
The steel pipe piles 1, 2, 3 have short sides S, S1, S2 and long sides L, L1, L2, respectively, and are formed from circular steel pipe main bodies of the same size with the same diameter and wall thickness.

このような断面が楕円形状に形成された鋼管杭は、曲げ
強度に方向性を持たせることができ、例えば鋼管杭1で
は長辺Lの方向の土圧に対しては、短辺Sが基の円形鋼
管杭の径よりも小さくなって土圧受面が減少するが、こ
の方向の曲げ強度は基の円形鋼管杭よりも大きくするこ
とができる。
Such a steel pipe pile having an elliptical cross section can give directionality to the bending strength. For example, in the steel pipe pile 1, the short side S is the basis for earth pressure in the direction of the long side L. However, the bending strength in this direction can be made larger than that of the base circular steel pipe pile.

このように鋼管杭1、2、3は短辺S、S1、S2と長
辺L、L1、L2を変えることで、使用個所に最適なも
のを選択することができる。
In this way, the steel pipe piles 1, 2, and 3 can be selected to be the optimum ones for use by changing the short sides S, S1, S2 and the long sides L, L1, L2.

第4図〜第9図は本発明の楕円鋼管杭の打設方法及びそ
の装置により形成された楕円鋼管杭で構築する山留壁を
示す図である。
FIG. 4 to FIG. 9 are diagrams showing a retaining wall constructed with an elliptic steel pipe pile formed by the method and apparatus for placing an elliptic steel pipe pile according to the present invention.

第4図は構築する山留壁の第1の形態を示し、楕円の鋼
管杭1の短辺Sを土圧方向Pに配置して鋼管杭1同士を
互いに隣接させたものである。
FIG. 4 shows a first form of the mountain retaining wall to be constructed, in which the short sides S of the oval steel pipe piles 1 are arranged in the earth pressure direction P so that the steel pipe piles 1 are adjacent to each other.

このように配列した山留壁4では、第13図に示すよう
な短辺Sと同じ径Sを有する円形の鋼管50を互いに隣
接させて形成した山留壁51と比較して、単位巾当りで
大きな曲げ強度を得ることができ、しかも単位巾当りの
鋼材断面を小さく設定することができる。
In the mountain retaining wall 4 arranged in this way, compared with the mountain retaining wall 51 formed by adjoining circular steel pipes 50 having the same diameter S as the short side S as shown in FIG. It is possible to obtain a large bending strength, and it is possible to set a small steel material cross section per unit width.

また、第13図に示すように径ψの同一サイズの円形鋼
管を使用している山留壁では、使用部位によっては過剰
な強度となるところがあり、このような場合には、この
円形鋼管を楕円形状に形成して山留壁4のような配列と
することで、1本当りの曲げ強度を低下させるかわり
に、長辺Lが円形鋼管の径ψよりも大きくなって土圧受
面積が増大するので杭材料が少なくてすみ経済性が向上
する。このように楕円鋼管杭1の楕円形状を任意に形成
することで、土圧Pに対する曲げ強度と土圧受面積を最
適な組合せに設定できる。
In addition, as shown in FIG. 13, a mountain retaining wall using a circular steel pipe of the same size with a diameter ψ may have excessive strength depending on the part to be used. By forming an elliptical shape and arranging it like the mountain retaining wall 4, the long side L becomes larger than the diameter ψ of the circular steel pipe, but the earth pressure receiving area increases, instead of decreasing the bending strength per piece. As a result, less pile material is needed and the economy is improved. By arbitrarily forming the elliptical shape of the elliptical steel pipe pile 1 in this manner, the bending strength with respect to the earth pressure P and the earth pressure receiving area can be set to an optimum combination.

第5図は構築する山留壁の第2の形態を示す図である。
この山留壁5では楕円鋼管杭1の長辺Lを土圧方向Pに
配置して互いに隣接させたものであり、同一サイズの円
形鋼管を使用している山留壁で、使用部位によって強度
不足となるところで適用できる。
FIG. 5 is a diagram showing a second form of the Yamadome wall to be constructed.
In this mountain retaining wall 5, the long sides L of the elliptical steel pipe piles 1 are arranged in the earth pressure direction P so as to be adjacent to each other. The mountain retaining wall uses circular steel pipes of the same size, and the strength depends on the part to be used. It can be applied where there is a shortage.

第6図は構築する山留壁の第3の形態を示す図である。
この山留壁6では鋼管杭1の長辺Lを土圧受面に対して
角αだけ傾斜させたものであり、鋼管杭1のサイズと短
辺S、長辺Lを一定にして角αを任意に設定することで
土圧Pに対する曲げ強度と土圧受面積を最適な組合せに
設定できる。
FIG. 6 is a view showing a third form of the Yamadome wall to be constructed.
In this mountain retaining wall 6, the long side L of the steel pipe pile 1 is inclined with respect to the earth pressure receiving surface by an angle α, and the size of the steel pipe pile 1 and the short side S and the long side L are constant and the angle α is set. By arbitrarily setting, the bending strength with respect to the earth pressure P and the earth pressure receiving area can be set to an optimum combination.

第7図は構築する山留壁の第4の形態を示す図である。
この山留壁7のコーナの鋼管杭1a、b同士が土圧方向
Pa、Pbと45°の面で互いに接して、競り合うので
高強度が得られる。
FIG. 7 is a view showing a fourth form of the Yamadome wall to be constructed.
Since the steel pipe piles 1a and 1b at the corners of the mountain retaining wall 7 are in contact with each other at the surface of the earth pressure directions Pa and Pb at 45 ° and compete with each other, high strength is obtained.

第8図は構築する山留壁の第5の形態を示す図である。
この山留壁8では楕円に形成する前の径ψの円形の鋼管
杭9を、短辺S、長辺Lの楕円の鋼管杭1と併設して建
物の支持杭等として利用するものである。
FIG. 8 is a view showing a fifth form of the Yamadome wall to be constructed.
In this mountain retaining wall 8, a circular steel pipe pile 9 having a diameter ψ before being formed into an ellipse is used together with an elliptical steel pipe pile 1 having a short side S and a long side L to be used as a support pile or the like of a building. .

第9図は構築する山留壁の第6の形態を示す図である。
この山留壁9の鋼管杭1同士が隣接する部分に雄部10
aと雌部10bからなるセクシヨン10を設けたもので
ある。
FIG. 9 is a diagram showing a sixth form of the Yamadome wall to be constructed.
The male portion 10 is provided at a portion of the mountain retaining wall 9 where the steel pipe piles 1 are adjacent to each other.
A section 10 including a and a female portion 10b is provided.

山留壁の施工に際しては、上述の各形態に示したものを
適宜組合せて行う。
When constructing a mountain retaining wall, those shown in each of the above-mentioned modes are appropriately combined.

次に本発明の楕円鋼管杭の打設方法及びその装置の一実
施例を説明する。
Next, one embodiment of the method for placing an elliptic steel pipe pile and the apparatus therefor according to the present invention will be described.

第10図は円形鋼管を楕円形状に形成させながら圧入す
る装置を示す図である。図中符号11は鋼管杭12の杭
圧入引抜機であり、この杭圧入引抜機11は基台13の
下部に構成したクランプ14により支持体15に固定さ
れ、基台13上に立設したマスト16にはリーダ17を
介して、先端にチャック18を有するアーム19が上下
に摺動可能に取付けられている。マスト16とアーム1
9との間には油圧装置20が設けられ、チャック18で
鋼管杭12を挾持してアーム19を下方に移動すると鋼
管杭12が地中に圧入される。
FIG. 10 is a view showing a device for press-fitting a circular steel pipe while forming it into an elliptical shape. Reference numeral 11 in the drawing is a pile press-fitting / pulling-out machine for the steel pipe pile 12, and the pile press-fitting / pulling-out machine 11 is fixed to a support body 15 by a clamp 14 formed at a lower portion of a base 13, and a mast standing on the base 13. An arm 19 having a chuck 18 at its tip is attached to the 16 via a reader 17 so as to be vertically slidable. Mast 16 and arm 1
A hydraulic device 20 is provided between the steel pipe pile 9 and the pipe 9, and when the steel pipe pile 12 is held by the chuck 18 and the arm 19 is moved downward, the steel pipe pile 12 is pressed into the ground.

チャックは第11図に示すように、環状のフレーム22
の内側に、流体圧シリンダ23、24、25、26が配
置され、その先端に設けた挾持板23a、24a、25
a、26aを介して鋼管杭12を挾持する。
As shown in FIG. 11, the chuck has an annular frame 22.
Fluid pressure cylinders 23, 24, 25, 26 are disposed inside the holding cylinders, and holding plates 23a, 24a, 25 provided at the tips thereof.
The steel pipe pile 12 is held via a and 26a.

一方、基台13にはコネクタ27を介してチャック18
の下方にローラ圧延装置28が支持されており、このロ
ーラ圧延装置28は第12図に示すように、フレーム2
9に互いの距離が調節可能に固定される平行な2本のロ
ーラ30、31よりなる。このローラ30、31の間に
鋼管杭12を上方から圧入することで、鋼管杭12の両
側から押圧力を加え、その断面を楕円形状に形成する。
On the other hand, the chuck 18 is attached to the base 13 via the connector 27.
A roller rolling device 28 is supported below the roller rolling device 28. As shown in FIG.
It is composed of two parallel rollers 30 and 31 which are fixed to each other at an adjustable distance. By pressing the steel pipe pile 12 between the rollers 30 and 31 from above, a pressing force is applied from both sides of the steel pipe pile 12 to form an elliptical cross section.

従って、鋼管12を地中に圧入する場合には、まずクラ
ンプ14で所定位置に固定された杭圧入引抜機11のア
ーム19を最上部に移動させた状態で、チャック18の
シリンダ23〜26を短縮し、チャック18に円形の鋼
管杭12を挿通して鋼管杭12の先端をローラ圧延装置
28の上端に当接させてからシリンダ23〜26を伸長
させてチャック18を締め付け鋼管杭12を挾持する。
Therefore, when press-fitting the steel pipe 12 into the ground, first, the cylinders 23 to 26 of the chuck 18 are moved with the arm 19 of the pile press-fitting / extracting machine 11 fixed at a predetermined position by the clamp 14 being moved to the uppermost part. Shorten and insert the circular steel pipe pile 12 into the chuck 18 to bring the tip of the steel pipe pile 12 into contact with the upper end of the roller rolling device 28, and then extend the cylinders 23 to 26 to tighten the chuck 18 and clamp the steel pipe pile 12. To do.

つぎに、ローラ圧延装置28のローラ30、31の間隔
Sを鋼管杭12の径ψよりも小さく設定して、アーム1
9を下方に移動させると、鋼管杭12がローラ圧延装置
28に圧入されて短辺Sの楕円部12bが形成され、こ
こを通過した後地中に圧入され楕円鋼管杭1が構築され
る。
Next, the distance S between the rollers 30 and 31 of the roller rolling device 28 is set to be smaller than the diameter ψ of the steel pipe pile 12, and the arm 1
When 9 is moved downward, the steel pipe pile 12 is press-fitted into the roller rolling device 28 to form the elliptical portion 12b of the short side S, and after passing through this, it is press-fitted into the ground to construct the elliptical steel pipe pile 1.

なお、上記の構築装置では、形成機としてのローラ圧延
装置28と、打設装置としての杭圧入引抜機11を一体
に構成したが、形成機は打設装置と分離して別体に設け
て着脱可能にしても良い。さらには、第14図に示すよ
うにチャック18と一体にローラ圧延機28を構成する
こともできる。また打設装置としては圧入機のほかにバ
イブロハンマや打撃装置を用いていも良い。
In the above construction apparatus, the roller rolling apparatus 28 as a forming machine and the pile press-fitting / pulling-out machine 11 as a placing apparatus are integrally configured. However, the forming machine is provided separately from the placing apparatus. It may be removable. Further, as shown in FIG. 14, the roller rolling machine 28 can be configured integrally with the chuck 18. A vibro hammer or a striking device may be used as the driving device in addition to the press-fitting device.

鋼管杭12の異形断面は楕円に限定されることはなく、
また形成機はローラ式に限定されず、例えばチャック式
として断続的に楕円に形成しても良い。この場合には、
杭打引抜機11のチャック18を利用して、チャック1
8の挾持板23a〜26aで鋼管杭2を異形に変形しつ
つ、打設することもできる。
The modified cross section of the steel pipe pile 12 is not limited to an ellipse,
The forming machine is not limited to the roller type, and may be, for example, a chuck type to intermittently form an ellipse. In this case,
Using the chuck 18 of the pile punching / pulling machine 11, the chuck 1
It is also possible to drive the steel pipe pile 2 while deforming the steel pipe pile 2 into a deformed shape by the holding plates 23a to 26a of No. 8.

(発明の効果) 本発明は以上説明したように構成されているので、曲げ
強度に方向性をもった楕円鋼管杭を打設現場において形
成しながら直ちに打設することができるので、楕円杭を
余分に用意する必要がなく鋼材の使用量が嵩むことがな
いので経済的であり、また現場から離れた場所で形成し
た楕円杭をわざわざ運搬する必要がないので作業効率が
向上する。
(Effects of the Invention) Since the present invention is configured as described above, it is possible to immediately drive an elliptical steel pipe pile having directionality in bending strength while forming it at a casting site. It is economical because there is no need to prepare extra and the amount of steel used does not increase, and it is not necessary to transport the elliptical pile formed at a location away from the site, thus improving work efficiency.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第3図は断面が任意の楕円形状に形成され
た鋼管杭を示す平面図、第4図ないし第9図は楕円鋼管
杭により構築される山留壁の第1ないし第6形態を示す
平面図、第10図は本発明の一実施例である円形鋼管を
楕円形状に形成させながら圧入する装置を示す側面図、
第11図は第10図のXI−XI断面図、第12図は第10
図のXII−XII断面図、第13図は従来の円形鋼管杭を用
いる山留壁を示す平面図及び第14図は本発明の一実施
例である円形鋼管を楕円形状に形成させながら圧入する
装置の他例を示す側面図である。 1.2.3……楕円鋼管杭 11……杭圧入引抜機
1 to 3 are plan views showing a steel pipe pile whose cross section is formed in an arbitrary elliptical shape, and FIGS. 4 to 9 are first to sixth forms of a retaining wall constructed by the elliptical steel pipe pile. And FIG. 10 is a side view showing an apparatus for press-fitting a circular steel pipe as an embodiment of the present invention while forming it into an elliptical shape,
11 is a sectional view taken along line XI-XI of FIG. 10, and FIG.
XII-XII sectional view of the figure, FIG. 13 is a plan view showing a mountain retaining wall using a conventional circular steel pipe pile, and FIG. 14 is press-fitting while forming a circular steel pipe which is an embodiment of the present invention into an elliptical shape. It is a side view which shows the other example of an apparatus. 1.2.3 …… Oval steel pipe pile 11 …… Pile press-in / pull-out machine

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】既設杭等からなる支持体上に杭圧入引抜機
を固定し、該杭圧入引抜機に取付けられ上下動可能な杭
保持体に鋼管杭を挿通し、該鋼管杭の先端を、前記杭保
持体の下方に設けられ鋼管杭を楕円形状に形成する圧延
装置の上端に当接させ、次に前記杭保持体により鋼管杭
を挟持し、その後杭保持体を下方に移動して鋼管杭を楕
円形状に成形しながら地中に打設する楕円鋼管杭打設方
法。
1. A pile press-fitting / pulling machine is fixed on a support made of an existing pile, and the steel pipe pile is inserted into a vertically movable pile holder mounted on the pile press-fitting / pulling machine. , The steel pipe pile provided below the pile holder is brought into contact with the upper end of a rolling device for forming an elliptical shape, then the steel pipe pile is sandwiched by the pile holder, and then the pile holder is moved downward. A method for placing an oval steel pipe pile, in which a steel pipe pile is formed into an elliptical shape and placed in the ground.
【請求項2】杭圧入引抜機の前部にアームを介して上下
動可能に形成された杭保持体と、該杭保持体に挟持され
た鋼管杭を楕円形状に成形する圧延手段を有する圧延装
置を前記杭保持体の下方に設けた楕円鋼管杭打設装置。
2. Rolling having a pile holder formed vertically in the front of the pile press-in / pull-out machine via an arm, and rolling means for forming a steel pipe pile sandwiched by the pile holder into an elliptical shape. An oval steel pipe pile placing device provided with a device below the pile holder.
JP62189733A 1987-07-29 1987-07-29 Oval steel pipe pile driving method and apparatus Expired - Fee Related JPH0639783B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62189733A JPH0639783B2 (en) 1987-07-29 1987-07-29 Oval steel pipe pile driving method and apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62189733A JPH0639783B2 (en) 1987-07-29 1987-07-29 Oval steel pipe pile driving method and apparatus

Publications (2)

Publication Number Publication Date
JPS6433312A JPS6433312A (en) 1989-02-03
JPH0639783B2 true JPH0639783B2 (en) 1994-05-25

Family

ID=16246275

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62189733A Expired - Fee Related JPH0639783B2 (en) 1987-07-29 1987-07-29 Oval steel pipe pile driving method and apparatus

Country Status (1)

Country Link
JP (1) JPH0639783B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02197617A (en) * 1989-01-26 1990-08-06 Toshinobu Masuda Steel tubular pile
JP6316246B2 (en) * 2015-07-24 2018-04-25 株式会社設計室ソイル Rotary press-fitting jig

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084080B2 (en) * 1986-02-14 1996-01-17 ロ−ム株式会社 Semiconductor wafer cleaning equipment

Also Published As

Publication number Publication date
JPS6433312A (en) 1989-02-03

Similar Documents

Publication Publication Date Title
CN102713074B (en) Connecting wall structure of steel pipe sheet pile and steel sheet pile and construction method thereof
JP2005299202A (en) Steel sheet pile, retaining structure using the sheet pile, and construction method of retaining structure
CN115288117A (en) Assembled steel pipe pile and construction method thereof
JPH0639783B2 (en) Oval steel pipe pile driving method and apparatus
JP2003232039A (en) Upset structure of retaining wall
CN218233437U (en) Grouting steel pipe pile
CN215252871U (en) Sheet pile positioning control device
JPH11303062A (en) Soil cement wall
CN211646341U (en) Steel sheet pile apex angle fixed connector
CN213597489U (en) Reserved joint bar template structure for combined steel template cast-in-place structure
KR101623342B1 (en) Earth retaining structure utilizing in-situ soil and earth retaining structure construction Method
JP2011111873A (en) Steel pipe sheet pile structure and method for constructing the same
CN221167860U (en) Single-side formwork structure for backfilling deep and narrow fertilizer grooves
JPH0333781Y2 (en)
JP2009215754A (en) Back face block for retaining wall
CN216108542U (en) Squeeze into formula reinforced steel pipe soil nail underground structure
KR20170090190A (en) Steel structures having departure prevention structure for sheathing work and construction method thereof
JP2005002561A (en) Hybrid cell and construction method therefor
RU2167240C2 (en) Device for shoring foundation supporting part in raising unidirectional momentary load
JP2832583B2 (en) Slope protection block and construction method
JP3848406B2 (en) Curved frame with variable curvature
CN110984396A (en) Rear-mounted anchor net and operation method thereof
CN215367440U (en) Fixing device for water stop
KR200209819Y1 (en) Wall panels
CN210315584U (en) Foundation pit supporting mechanism

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees