JPH0639845B2 - Construction method of formwork for dome type building - Google Patents
Construction method of formwork for dome type buildingInfo
- Publication number
- JPH0639845B2 JPH0639845B2 JP8127089A JP8127089A JPH0639845B2 JP H0639845 B2 JPH0639845 B2 JP H0639845B2 JP 8127089 A JP8127089 A JP 8127089A JP 8127089 A JP8127089 A JP 8127089A JP H0639845 B2 JPH0639845 B2 JP H0639845B2
- Authority
- JP
- Japan
- Prior art keywords
- bag body
- flat
- formwork
- fluid
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Tents Or Canopies (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【発明の詳細な説明】 (産業上の利用分野) 本発明は、コンクリートシェル等のドーム型建築物の建
築に使用する型枠の施工方法の改良に関する。Description: TECHNICAL FIELD The present invention relates to an improvement in a method for constructing a formwork used for building a dome-shaped building such as a concrete shell.
(従来技術と問題点) 空気膜を利用したドーム型建築物の建築施工方法が既に
知られている(たとえば、R.N.デント著 佐々木幹
夫・佐々木隆夫訳 昭和50年1月15日鹿島出版会発行
空気膜構造の建築第 139頁〜第 142頁参照)。(Prior art and problems) A construction method of a dome-shaped building using an air film is already known (for example, RN Dent, translated by Mikio Sasaki and Takao Sasaki, January 15, 1975, Kashima Publishing). Issue
Construction of air film structures (see pages 139-142).
上記刊行物に記載されているところのウォーレス・ネフ
によるいわゆるネフ構法は、そこに記載されているよう
な問題点、即ち該構法を短時間のうちに利用することが
困難なこと、コンクリートが吹付けられた気球内圧が建
設中のコンクリートの重みによって生じる過度の変形を
防ぐに不十分なこと、その結果コンクリートに亀裂が生
じたこと、かかる亀裂が発生しないように変形を小さく
するのに必要な大きな内圧を使用するためには、必然的
により大きな、そしてより高価な、基礎を必要としたと
思われるといった問題点を有している。そして、ダンテ
・ビニによるビニ・シェルは、前記刊行物に開示されて
いるように、周囲の土台に固定し、密閉した、伸縮自在
のネオプレン膜の表面に予めコンクリートを打設し、該
膜に与圧して膨張せしめ、コンクリートが硬化したら与
圧を解放してネオンプレン膜を撤去するという構法であ
る。この手段によるときは、ネオプレン膜の膨張による
コンクリートの流出防止手段,亀裂発生防止手段(補強
手段)などが必要となり、それらの手段として、コンク
リートに振動を与えること、メッシュ状鉄筋でコンクリ
ートを補強することなどの手段が明らかにされており、
余計な手間と余計な資材とが必要になる不利のほか、大
きな膨張力が使用される場合は、おもりとして重量の大
きな基礎が必要となり、複雑な配筋が不経済になるとい
う問題点も有している。また、ハイム・ハイフェッツに
よる構法は、前記刊行物に開示されているように、地上
にコンクリートを置くかわりに、大きな圧力で既に膨ら
ませた気球に吹付けられ、その大きな圧力は、放射状に
取付けられ、取りはずしが可能なトラスや鉄筋コンクリ
ートスラブによって反力が取られるというものである。
この手段によるときは、上記トラス,スラブなどの組立
配設が必要であるため、長い構法時間がかかるという問
題点がある。これらの問題点に加えて、上記三者とも、
気球,ネオプレン膜の周辺などを地面に気密性よく固定
するための技術が必要であること、表面に形成されるコ
ンクリート層を支えるため、高い圧力を与えねばなら
ず、それらの気球,ネオプレン膜などに相当な強度が必
要であることといった解決すべき課題を有している。The so-called Neff construction method by Wallace Neff, which is described in the above publication, has the problems as described therein, that is, it is difficult to use the construction method in a short time, and concrete is blown. The applied balloon pressure is not sufficient to prevent excessive deformation caused by the weight of the concrete under construction, resulting in cracking of the concrete, necessary to reduce the deformation to prevent such cracking. The use of large internal pressures entails the problems of necessarily larger and more expensive foundations that seem necessary. And, as disclosed in the above publication, the vinyl shell by Dante Vini is fixed to the surrounding base, and the concrete is pre-cast into the surface of the closed and stretchable neoprene film, and the film is applied to the film. It is a construction method that pressurizes and expands, and when the concrete hardens, the pressurization is released and the neonprene film is removed. When this means is used, means for preventing concrete from flowing out due to the expansion of the neoprene film, means for preventing cracks (reinforcing means), etc. are required. As these means, vibration is applied to concrete and concrete is reinforced with mesh-shaped reinforcing bars. Means such as things have been clarified,
In addition to the disadvantage of requiring extra effort and extra materials, there is also the problem that if a large expansion force is used, a heavy foundation is required as a weight, and complicated bar arrangement becomes uneconomical. is doing. Also, the construction method by Heim Heifetz, as disclosed in the publication, instead of placing concrete on the ground, is sprayed on a balloon that has already been inflated with a large pressure, the large pressure is attached radially, The reaction force is removed by a removable truss or reinforced concrete slab.
When this means is used, it is necessary to assemble and dispose the truss, slab, and the like, so that there is a problem that a long construction time is required. In addition to these problems, all three mentioned above
It is necessary to have a technique to fix the surroundings of balloons and neoprene membranes to the ground with good airtightness, high pressure must be applied to support the concrete layer formed on the surface, and those balloons and neoprene membranes, etc. There is a problem to be solved such as the need for considerable strength.
本発明はかかる事情に鑑みてなしたもので、大きな内圧
が必要でなく、型枠の亀裂発生防止手段及び型枠の流出
防止手段を施さずとも型枠に亀裂が発生せず、かつ型枠
が流出する心配がなく、トラス,鉄筋コンクリートスラ
ブなどの組立配設が必要でなく、さらには、前記周知の
気球,ネオプレン膜などの如き立体裁断が不必要な袋体
の使用、工期を大幅に短縮しえる有益なドーム型建築物
用型枠の施工方法の提案を目的とする。The present invention has been made in view of the above circumstances, does not require a large internal pressure, does not crack in the mold even without applying the crack generation preventing means of the mold and the outflow preventing means of the mold, and the mold There is no concern that water will flow out, there is no need to assemble and dispose trusses, reinforced concrete slabs, etc. Furthermore, the use of bags such as the well-known balloons and neoprene membranes that do not require steric cutting, and the construction period is greatly shortened. The purpose is to propose a useful construction method for a dome-shaped building formwork.
(問題点を解決するための手段) 上述の目的を達成するために本発明がなした手段は不通
気性の平膜袋体を地面のどこにも固定せず、索条をゆる
く取去り自在に掛渡するにとどめ、平面袋体内に流体を
送入すると、それにつれて袋体周辺が垂直面内,水平面
内で自由に動き、やがて平面袋体の上部が膨らみ、緊張
した上記索条によって規制された断面形状の立体袋体に
なるようにし、その立体袋体の表面に急結性の軽量モル
タルセメント層を形成し、短時間に硬化せしめ、その後
で立体袋体内の流体を抜取り、その立体袋体を再び平面
袋体に戻して前記索条と共に取去るということである。(Means for Solving the Problems) Means of the present invention for achieving the above-mentioned object does not fix the air-impermeable flat membrane bag body anywhere on the ground, and allows the cord to be loosely removed. When the fluid is fed into the flat bag body only by hanging it, the periphery of the bag body freely moves in the vertical plane and the horizontal plane, and the upper part of the flat bag body swells and is regulated by the tensioned rope. To form a solid bag with a cross-sectional shape, form a quick-setting lightweight mortar cement layer on the surface of the solid bag, cure it in a short time, and then drain the fluid from the solid bag, and then remove the solid bag. This means that the body is returned to the flat bag body and removed together with the cord.
(実施例) 図面を参照しながら使用部材の構造,施工法の順序で説
明する。(Example) The structure of a member to be used and the construction method will be described in this order with reference to the drawings.
平面袋体(1)は、不通気性資材(たとえば、熱可塑性
の塩化ビニル樹脂)を平面円形,平面角形,その他適宜
な平面形状に普通に裁断し、その裁断した平膜(1′)
を2枚重ね、周辺を相互に溶着せしめて構成する。平面
袋体(1)を構成する2枚の平膜(1′)は、わざわざ
立体裁断する必要がない。上記2枚の平膜(1′)の周
辺を溶着せしめるときは、補強テープ(5)を溶着せし
めてもよい。そして、平面袋体(1)は、一方の平膜
(1′)に流体抜取口を兼用する流体送入口(2)を設
け、その送入口から水,空気,その他の気体などの流体
を送入しえるように構成すると共に、使用済の流体を抜
取り得るように構成する。索条(3)は、ロープ,ケー
ブル等の丈夫なもので、両端にフック,カラビナ或いは
ターンバクルなどの如き分離可能な連結具(6)を設
け、その連結具を利用することによって、地面に配設し
た固定索条(7)の連結具(8)に連結分離可能に構成
し、型枠施工後に取去り自在ならしめる。型枠の施工に
際して索条(3)を平面袋体(1)上に乗せるときの載
せたかは、交差載置(直角交差載置,斜交差載置等)、
平行載置、その他各種の特殊形態載置が考えられ、いず
れの場合であっても、弛緩せしめて載せた後に上記の如
く固定索条(7)に分離可能に連結するようにする。そ
して、不図示であるが、平面袋体(1)上に載せた索条
(3)は、平面袋体(1)が膨らんで立体袋体(1)に
なる過程で位置ずれを起さないようにするため(索条が
位置ずれを起して、設計と違った断面形状の型枠が完成
することを防止するため)、索条(3)の交差部を交互
に止めたり、或いは平面袋体(1)を構成している平膜
(1′)と索条(3)との所望位置を止めたりすること
がある。このような場合に使用する止具(不図示)は、
簡単に脱着できる構造のもの(たとえば、洗濯挟み,事
務用クリップ、その他の挟具、粘着テープ,ベルベット
式ファスナー,紐、など)を使用するようにする。急結
性の軽量モルタルセメント層(4)は、周知のモルタル
セメントや軽量モルタルセメントなどよりも比重の軽い
モルタルセメントで、セメント急結剤(たとえば、日本
セメント株式会社製の商品名アサノスーパーナトム 粉
末,ポゾリス物産株式会社製の商品名QP−500LS
液体)を配合して短時間で硬化しえるようにしたもので
成形する。The flat bag body (1) is formed by normally cutting an impermeable material (for example, thermoplastic vinyl chloride resin) into a flat circular shape, a flat rectangular shape, or any other suitable flat shape, and cutting the flat membrane (1 ').
It is constructed by stacking two sheets and welding the surroundings to each other. The two flat membranes (1 ') forming the flat bag body (1) do not need to be three-dimensionally cut. When welding the periphery of the two flat membranes (1 '), a reinforcing tape (5) may be welded. The flat bag body (1) is provided with a fluid inlet port (2) also serving as a fluid outlet on one flat membrane (1 '), and a fluid such as water, air, or other gas is fed from the inlet port. It is configured to be able to enter and also to be able to remove the used fluid. The rope (3) is made of a sturdy material such as a rope or a cable, and is provided with a separable connecting tool (6) such as a hook, carabiner or turnbuckle at both ends, and the connecting tool is used to place the rope on the ground. It is configured so that it can be connected and separated to the connecting tool (8) of the fixed rope (7) that has been installed, and can be removed freely after the formwork construction. When placing the rope (3) on the flat bag body (1) when constructing the formwork, it depends on whether it is cross-mounted (right-angled cross-mounted, oblique cross-mounted, etc.),
Parallel mounting and various other special-shaped mountings are conceivable. In any case, after being loosened and mounted, it is detachably connected to the fixed rope (7) as described above. Although not shown, the cords (3) placed on the flat bag body (1) do not shift in position in the process of the flat bag body (1) swelling and becoming the three-dimensional bag body (1). In order to do so (to prevent the ropes from being displaced and completing the formwork having a cross-sectional shape different from the designed one), the intersections of the ropes (3) are alternately stopped or a flat surface is formed. The flat membrane (1 ') and the cord (3) forming the bag body (1) may be stopped at desired positions. The stopper (not shown) used in such cases is
Use a structure that can be easily removed (for example, clothespins, office clips, other clips, adhesive tape, velvet fasteners, strings, etc.). The quick-setting lightweight mortar cement layer (4) is a mortar cement having a lighter specific gravity than well-known mortar cement or lightweight mortar cement, and is a cement quick-setting agent (for example, a product name of Asano Supernatom Powder manufactured by Nippon Cement Co., Ltd. , POSOLIS Bussan Co., Ltd. product name QP-500LS
(Liquid) is added so that it can be cured in a short time.
次に施工法を述べる。Next, the construction method will be described.
施工場所の地盤にアンカーボルト(9)が立設されたコ
ンクリート基礎(10)を構築する。このコンクリート基
礎(10)の平面形状は、平面袋体(1)の平面形状と相
似形、異形のいずれでもよいが、平面袋体(1)の平面
形状に比べ相対的にやや小さめに構築する。次に平面袋
体(1)を周辺がアンカーボルト(9)の至近位置とな
るように施工場所に置く。このとき、平面袋体(1)
は、地面に固定しない。その平面袋体(1)上に弛緩し
た索条(3)を載せ、アンカーボルト(9)に連結され
た固定索条(7)に連結する。流体送入口(2)から平
面袋体(1)内に流体を送入する。平面袋体(1)は流
体が送入され始めると、周辺が垂直面内,平面内で夫々
自由に動き始め、内圧が高まるに従って上部が膨らみ始
める。膨らみ始めた平面袋体(1)は索条(3)が緊張
するまで膨らみ、各索条(3)間でさらに小径に膨らん
で強度と剛性とが与えられ、同時に該索条の緊張によっ
て規制された断面形状(たとえば、略卵形の断面形状,
略饅頭形の断面形状など)の立体袋体(1)になる。立
体袋体(1)になったら、内圧をそのままに維持しなが
ら、該袋体の表面に急結性の軽量モルタルセメントを極
めて薄く吹付け、内面にリブを有する極めて薄い軽量モ
ルタルセメント層(4)を形成せしめる。このモルタル
セメント吹付けに際しては、立体袋体(1)の周辺にお
ける軽量モルタルセメント層(4)の周辺部が前記コン
クリート基礎(10)と一体化されるように吹付け、その
コンクリート基礎が型枠(11)のおもりとして機能する
ようにする。そして、軽量モルタルセメント層(4)が
硬化したら、立体袋体(1)内の流体を抜取り、この立
体袋体を再び平面袋体(1)に戻して撤去し、前記索条
(3)を固定索条(7)から分離して取去る。Build a concrete foundation (10) with anchor bolts (9) standing on the ground at the construction site. The plane shape of the concrete foundation (10) may be similar to or different from the plane shape of the plane bag body (1), but is constructed to be relatively small compared to the plane shape of the plane bag body (1). . Next, the flat bag body (1) is placed at the construction site so that the periphery is close to the anchor bolts (9). At this time, the flat bag (1)
Does not fix to the ground. The relaxed cord (3) is placed on the flat bag body (1) and connected to the fixed cord (7) connected to the anchor bolt (9). A fluid is introduced into the flat bag body (1) through the fluid inlet (2). When the fluid is introduced into the flat bag body (1), the periphery of the flat bag body (1) starts to move freely in the vertical plane and in the flat plane, and the upper portion starts to bulge as the internal pressure increases. The flat bag body (1) that has begun to swell expands until the cord (3) is tensioned, and further expands to a smaller diameter between the cords (3) to give strength and rigidity, and at the same time, is regulated by the tension of the cord. Cross-sectional shape (for example, a substantially oval cross-sectional shape,
It becomes a three-dimensional bag body (1) having a substantially bun-shaped cross section. When the three-dimensional bag (1) is formed, while maintaining the internal pressure as it is, an extremely thin lightweight mortar cement layer (4) having a rib on the inner surface is sprayed with an extremely thin light-setting mortar cement sprayed on the surface of the bag. ) Is formed. When spraying this mortar cement, the lightweight mortar cement layer (4) around the three-dimensional bag body (1) is sprayed so as to be integrated with the concrete foundation (10), and the concrete foundation is used for the formwork. Make it function as a weight for (11). Then, when the lightweight mortar cement layer (4) hardens, the fluid in the three-dimensional bag body (1) is drained, this three-dimensional bag body is returned to the flat bag body (1) again, and removed, and the cord (3) is removed. Separate from the fixed cord (7) and remove.
かくして、リブによって強度の向上した軽量モルタルセ
メント層(4)で形成された極めて薄い型枠(11)が完
成する。Thus, the extremely thin formwork (11) formed of the lightweight mortar cement layer (4) having the strength improved by the ribs is completed.
上記型枠(11)は、あくまでも構造体用の型枠として利
用するものであって、その型枠上に構造体としてコンク
リートシェル(12)を建築する。コンクリートシェル
(12)の建築は、型枠(11)上に鉄筋を配設してコンク
リートを打設する通常の工法,型枠(11)上に鋼繊維補
強コンクリート(S.F.R.C)を打設する工法又は
吹付ける工法等から適宜に選択して行うようにする。The formwork (11) is used as a formwork for a structure, and a concrete shell (12) is constructed as a structure on the formwork. The construction of the concrete shell (12) is a normal construction method in which the reinforcing bars are arranged on the formwork (11) and the concrete is placed, and the steel fiber reinforced concrete (SFRC) is placed on the formwork (11). ) Is to be appropriately selected from the construction method of placing or spraying.
ところで、立体袋体(1)内の流体抜取り、及び索条
(3)の撤去作業は、型枠(11)が完成した時点で行な
わずとも、型枠(11)の表面にコンクリートシェル(1
2)を形成せしめた後で行っても差支えない。By the way, even if the fluid removal from the three-dimensional bag body (1) and the work of removing the cord (3) are not performed at the time when the formwork (11) is completed, the concrete shell (1
It does not matter if it is done after forming 2).
また、流体が抜取られて再び平面袋体(1)に戻ったも
のの撤去作業は、型枠(11)の完成時点、或いはコンク
リートシェル(12)の完成時点のいずれでも構わない。Further, although the fluid is extracted and returned to the flat bag body (1) again, the removal work may be performed either at the completion of the form (11) or at the completion of the concrete shell (12).
しかして、型枠(11)に構成すべき出入口(不図示)
は、型枠施工時に開口せしめるも、コンクリートシェル
(12)の完成後に開口せしめるも任意であるが、流体抜
取り後の平面袋体(1)及び索条(3)の撤去作業は上
記出入口を利用して行うようにする。Then, the doorway (not shown) to be formed in the formwork (11)
Can be opened during construction of the formwork or after the concrete shell (12) is completed, but use the above-mentioned doorway to remove the flat bag body (1) and the cord (3) after fluid removal. And do it.
(発明の効果) 本発明は、叙上の如く流体送入前における不通気性平面
袋体の表面に予めコンクリート送を形成することなく、
かつ該平面袋体を地面のどこにも固定することなく施工
場所に置いて索条をゆるく取去り自在に掛渡するにとど
め、該平面袋体内に流体を送入すると、それにつれて袋
体周辺が垂直面内,水平面内で自由に動き得るようにし
てあるので、平面袋体用の平膜に大きな伸びを与えなく
ても平面袋体を膨らますことができ、緊張した索条によ
って規制された断面形状の立体袋体にすることが容易で
ある。そして、この立体袋体の表面に形成する急結性の
薄い軽量モルタルセメント層は、形成直後からたちどこ
ろに凝結硬化するので、立体袋体の内圧が低くても、袋
体の変形を小さくすることができ、形成作業時の亀裂発
生や流出が惹起されないという効果がある。さらに、平
面袋体は、立体裁断せずに構成し得るのでその加工が容
易となり、かつ型枠施工後は、型枠表面にコンクリート
による構造体の施工、型枠と同質のセメント層の再形
成、その他の外装を施主の希望通りに施工し得るなどの
利点がある。(Effect of the invention) The present invention, as described above, without forming concrete feed in advance on the surface of the air-impermeable flat bag body before fluid feeding.
And the flat bag is placed on the construction site without fixing it anywhere on the ground, and the rope is loosely removed and hung freely, and when the fluid is fed into the flat bag, the periphery of the bag is changed accordingly. Since it can move freely in the vertical plane and the horizontal plane, the flat bag can be inflated without giving a large stretch to the flat membrane for the flat bag, and the cross section regulated by the tensioned cords. It is easy to form a three-dimensional bag. Then, the quick-setting thin lightweight mortar cement layer formed on the surface of the three-dimensional bag body is set and hardened immediately after formation, so that the deformation of the three-dimensional bag body is reduced even if the internal pressure of the three-dimensional bag body is low. Therefore, there is an effect that generation of cracks and outflow are not caused during the forming work. Furthermore, since the flat bag can be constructed without being cut three-dimensionally, its processing is easy, and after construction of the formwork, construction of the structure with concrete on the surface of the formwork, reforming of the cement layer of the same quality as the formwork. The other advantages are that the exterior can be constructed as the client desires.
図面は、本発明施工方法に使用する平面袋体の平面形状
が平面円形の場合の一例を示したもので、第1図は該袋
体の縦断面図,第2図はその一部切欠平面図,第3図は
施工開始時を表わす縦断面図,第4図はその平面図,第
5図は流体送入時を示す縦断面図,第6図は軽量モルタ
ルセメント層形成時を表わす縦断面図,第7図は型枠完
成時を示す縦断面図である。 図中 (1)……平面袋体(立体袋体) (2)……流体用送入口、(3)……索条 (4)……急結性の軽量モルタルセメント層 (11)……型枠The drawings show an example in which the plane shape of the flat bag body used in the construction method of the present invention is a plane circular shape. FIG. 1 is a longitudinal sectional view of the bag body, and FIG. Fig. 3 is a vertical cross-sectional view showing the start of construction, Fig. 4 is a plan view of the same, Fig. 5 is a vertical cross-sectional view showing the fluid feeding, and Fig. 6 is a vertical cross-section showing the formation of a lightweight mortar cement layer. FIG. 7 is a vertical sectional view showing the completion of the mold. In the figure (1) …… flat bag (3D bag) (2) …… fluid inlet, (3) …… rope (4) …… quick-setting lightweight mortar cement layer (11) …… Formwork
Claims (1)
用送入口を設け、該袋体を施工場所に置いて索条をゆる
くかつ取去り自在に掛渡し、流体用送入口から平面袋体
内に流体を送入して膨らまし、この膨らんだ立体袋体の
表面に急結性の薄い軽量モルタルセメント層を形成せし
め、該モルタルセメント層が硬化した後立体袋体内の流
体を抜取って平面袋体に戻し、この平面袋体及び前記索
条を取去ることを特徴とするドーム型建築物用型枠の施
工方法。1. A fluid bag inlet provided with a fluid bag inlet in a flat bag body made of an air-impermeable flat membrane, the bag body being placed at a construction site, and the cords being laid loosely and detachably. Then, the fluid is fed into the flat bag body and inflated, and a light-weight mortar cement layer with quick-setting property is formed on the surface of the bulged solid bag body, and after the mortar cement layer is hardened, the fluid in the solid bag body is removed. A method for constructing a dome-type building formwork, characterized in that the flat bag body is returned to the flat bag body and the flat bag body and the rope are removed.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8127089A JPH0639845B2 (en) | 1989-03-31 | 1989-03-31 | Construction method of formwork for dome type building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP8127089A JPH0639845B2 (en) | 1989-03-31 | 1989-03-31 | Construction method of formwork for dome type building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02261164A JPH02261164A (en) | 1990-10-23 |
| JPH0639845B2 true JPH0639845B2 (en) | 1994-05-25 |
Family
ID=13741672
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP8127089A Expired - Lifetime JPH0639845B2 (en) | 1989-03-31 | 1989-03-31 | Construction method of formwork for dome type building |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0639845B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2024072970A3 (en) * | 2022-09-28 | 2024-05-02 | North Carolina State University | Flexible mold for the rapid deployment of structures |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2840876B2 (en) * | 1990-08-31 | 1998-12-24 | 株式会社石井鐵工所 | Formwork for constructing a concrete dome roof and its construction method |
-
1989
- 1989-03-31 JP JP8127089A patent/JPH0639845B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2024072970A3 (en) * | 2022-09-28 | 2024-05-02 | North Carolina State University | Flexible mold for the rapid deployment of structures |
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02261164A (en) | 1990-10-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20050210767A1 (en) | Trilithic and/or twin shell dome type structures and method of making same | |
| US3734670A (en) | Portable mold for erecting concrete or plastic shelters | |
| CA2101594A1 (en) | Method of forming a concrete deck by the use of a flexible formwork | |
| US3959423A (en) | Modular construction system | |
| US4279680A (en) | Methods for forming thinwall structures | |
| JPH0639845B2 (en) | Construction method of formwork for dome type building | |
| US20240286312A1 (en) | Airforming constructive system | |
| Pronk | Concrete | |
| US20240309660A1 (en) | Construction of monolithic structures with air forms | |
| Van Mele et al. | Lightweight cable-net and fabric formwork system for the HiLo unit at NEST | |
| US825627A (en) | Reinforced concrete construction for buildings. | |
| Sobek | On design and construction of concrete shells | |
| JP2840876B2 (en) | Formwork for constructing a concrete dome roof and its construction method | |
| JP2002188148A (en) | Outer wall panel for bubble-mixed lightweight fill and banking method | |
| CN100564749C (en) | A kind of cavity former component | |
| CN100588795C (en) | A permanent formwork for concrete filling | |
| CN101144305B (en) | Cast-in-situ concrete hollow floor slab | |
| JP2005076183A (en) | Concrete void slab method and bottom plate with embedded body used in this method | |
| CN101113625B (en) | Cavity formwork member | |
| CN101158233B (en) | Cavity mould component | |
| CN101144304B (en) | Cast-in-situ concrete hollow floor slab | |
| CN100545374C (en) | A permanent formwork for concrete filling | |
| CN101240603B (en) | Cast-in-situ concrete hollow slab | |
| CN101187234B (en) | In situ casting concrete hollow building board | |
| CN100593056C (en) | A permanent formwork for concrete filling |