Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0642974B2 - Molding equipment for gas curing - Google Patents
[go: Go Back, main page]

JPH0642974B2 - Molding equipment for gas curing - Google Patents

Molding equipment for gas curing

Info

Publication number
JPH0642974B2
JPH0642974B2 JP61150590A JP15059086A JPH0642974B2 JP H0642974 B2 JPH0642974 B2 JP H0642974B2 JP 61150590 A JP61150590 A JP 61150590A JP 15059086 A JP15059086 A JP 15059086A JP H0642974 B2 JPH0642974 B2 JP H0642974B2
Authority
JP
Japan
Prior art keywords
sand
nozzle
mold
gas
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP61150590A
Other languages
Japanese (ja)
Other versions
JPS635852A (en
Inventor
優 迫田
明 津本
重利 中野
冨士雄 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mazda Motor Corp
Original Assignee
Mazda Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mazda Motor Corp filed Critical Mazda Motor Corp
Priority to JP61150590A priority Critical patent/JPH0642974B2/en
Priority to US07/066,343 priority patent/US4744404A/en
Publication of JPS635852A publication Critical patent/JPS635852A/en
Publication of JPH0642974B2 publication Critical patent/JPH0642974B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)
  • Casting Devices For Molds (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は鋳型造型装置、特に鋳物砂を金型内にブローイ
ングしたのち、硬化用ガスを噴射して該金型内の鋳物砂
を硬化させることにより鋳型を成型するガス硬化用造型
装置の改良に関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention relates to a mold making apparatus, and in particular, after blowing molding sand into a mold, a hardening gas is injected to cure the molding sand in the mold. Thus, the present invention relates to an improvement in a gas curing molding apparatus that molds a mold.

(従来の技術) 一般に、金型内に粘結剤と混練された鋳物砂をブローイ
ングにより充填したのち、この鋳物砂に硬化用ガスを噴
射して該鋳物砂を硬化させて鋳造用砂型を成型するよう
にしたガス硬化式の鋳型製造方法、所謂コールドボック
ス方が知られている。そして、この方法を用いて鋳型を
製造する造型機の一例として特公昭48−9246号公
報のり発明がある。
(Prior Art) In general, a mold is filled with a molding sand kneaded with a binder by blowing, and then a hardening gas is injected into the molding sand to cure the molding sand to mold the molding sand mold. A so-called cold box method, which is a gas hardening type mold manufacturing method, is known. And, as an example of a molding machine for producing a mold using this method, there is the invention of Japanese Patent Publication No. 48-9246.

これは、第5図に示すように、ブローボックス4下方に
固設されたスライドケース2内にスライドシャッター1
が摺動自在に装着されており、このスライドシャッター
1には、造型材料吹込み孔5が貫通されていると共に、
該シャッター1の一側に接続された反応触媒ガス導管8
にガス通路7を介して連通され且つパターン9側へのみ
開口された反応触媒ガス噴射口6が形成された構成とさ
れている。
As shown in FIG. 5, the slide shutter 1 is installed in a slide case 2 fixed below the blow box 4.
Is slidably mounted, and a molding material blowing hole 5 is penetrated through the slide shutter 1, and
Reaction catalyst gas conduit 8 connected to one side of the shutter 1
Is formed with a reaction catalyst gas injection port 6 which is communicated with the gas passage 7 and is opened only to the pattern 9 side.

これによれば、まずスライドケース2の上部に穿設され
た吹込み孔3に、スライドシャッター1に貫通穿設され
た造型材料吹込み孔5を一致させ、ブロータンク4内の
造型材料をパターン9内に吹込み、ついで図示のごとく
該スライドシャッター1をスライドさせてパターン9の
造型材料充填口と該シャッター1における反応触媒ガス
噴気孔6とを一致させることにより、反応触媒ガス導管
8および該ガス通路7を経て噴気される反応触媒ガスを
パターン9内の造型材料に噴射しつつ、該造型材料を硬
化させて鋳造用砂型を成型するようにされている。これ
により、造型材料吹込み終了後、パターン9あるいはブ
ロータンク4を移動することなく同一の位置でガッシン
グ工程を施し得て、造型工程に要する時間を短縮するこ
とができるように図られている。
According to this, first, the molding material blowing hole 5 penetratingly formed in the slide shutter 1 is aligned with the blowing hole 3 formed in the upper portion of the slide case 2, and the molding material in the blow tank 4 is patterned. 9 and then the slide shutter 1 is slid as shown in the drawing so that the molding material filling port of the pattern 9 and the reaction catalyst gas jet hole 6 in the shutter 1 are aligned with each other, so that the reaction catalyst gas conduit 8 and the While injecting a reaction catalyst gas that is blown out through the gas passage 7 into the molding material in the pattern 9, the molding material is cured to mold a sand mold for casting. As a result, after the blowing of the molding material, the gassing step can be performed at the same position without moving the pattern 9 or the blow tank 4, and the time required for the molding step can be shortened.

(発明が解決しようとする問題点) ところで、上記従来例をはじめとし、一般にコールドボ
ックス法においては硬化用ガスとしてアミンガス等が使
用されている。このアミンガスは鋳物砂等の造型材料に
対しては優れた硬化機能を有するものでありながら、同
時にまた、人体に対しては有害な性質があって、もし、
該アミンガスがガッシング工程中に外部に漏れるような
ことになれば、その場の作業環境を悪化させて環境衛生
上好ましくない。その為、このアミンガス等の硬化用ガ
スを使用する場合には、これの外部への漏れを確実に防
止するように考慮しなければならない。
(Problems to be Solved by the Invention) In the cold box method, amine gas or the like is generally used as a hardening gas, including the above-mentioned conventional examples. This amine gas has an excellent hardening function for molding materials such as foundry sand, but at the same time, it has harmful properties for the human body.
If the amine gas leaks to the outside during the gassing process, the working environment on the spot is deteriorated, which is not preferable in terms of environmental hygiene. Therefore, when using the curing gas such as the amine gas, consideration must be given to surely prevent the leakage of the curing gas to the outside.

然しながら、上記従来例においては、スライドケース2
内に収納されたスライドシャッター1を必要に応じてス
ライドさせることにより、ブローイング工程とガッシン
グ工程とを行うようにされているのであるが、このよう
にスライドシャッター1がスライド可能な構成とされて
いる為に、該スライドシャッター1とスライドケース2
との間に、ガッシング工程時における反応触媒ガス(硬
化用ガス)の外部への漏れを防止するシール機能をも付
加することは非常に困難となる。しかも、上記スライド
ケース2に対してスライドシャッター1が摺動すること
により、その両者の摩耗を避け難く、特に、ブロータン
ク4内の造型材料、即ち未使用の鋳物砂がスライドシャ
ッター1とスライドケース2との間に噛み込んだ場合に
は、益々両者の摩耗を助長させることになる。
However, in the above conventional example, the slide case 2
The sliding shutter 1 housed therein is slid as necessary to perform the blowing process and the gassing process. In this way, the sliding shutter 1 is slidable. Therefore, the slide shutter 1 and the slide case 2
It is very difficult to add a sealing function of preventing the reaction catalyst gas (curing gas) from leaking to the outside during the gassing step. In addition, the sliding of the slide shutter 1 with respect to the slide case 2 makes it difficult to avoid wear of both of them. If it gets caught between the two, the wear of both is further promoted.

この場合には、ガッシング工程時において上記スライド
シャッター1内に供給された反応触媒ガス(硬化用ガ
ス)が、該シャッター1とスライドケース2との間から
外部に漏れることになって、上記のごとくその場の作業
環境を悪化させることはいうまでもなく、該ガスがスラ
イドケース2の上部に穿設された吹込み孔3を介してブ
ロータンク4内に流入した場合には、該タンク内におけ
る未使用の鋳物砂を硬化させてしまい、その後のブロー
イング工程に支障を来たすことになっていた。
In this case, the reaction catalyst gas (curing gas) supplied into the slide shutter 1 during the gassing process leaks to the outside from between the shutter 1 and the slide case 2, and as described above. It goes without saying that the working environment on the spot is deteriorated, and when the gas flows into the blow tank 4 through the blowing hole 3 formed in the upper part of the slide case 2, the inside of the tank is The unused foundry sand was hardened and hindered the subsequent blowing process.

そこで本発明は、コールドボックス法を用いて鋳造用砂
型を成型するガス硬化用造型装置において、上記従来例
と同様に同じ位置でブローイング工程とガッシング工程
とを施し得ると共に、しかも、ガッシング工程時におけ
る硬化用ガスの漏れを確実に防止して作業環境ならびに
当該造型装置内に貯留された未使用の鋳物砂に対して悪
影響を及ぼすことのないようにすることを目的とする。
Therefore, the present invention, in a gas hardening molding apparatus for molding a sand mold for casting using the cold box method, it is possible to perform a blowing step and a gassing step at the same position as in the above-mentioned conventional example, and further, at the time of the gassing step. An object of the present invention is to surely prevent the hardening gas from leaking so as not to adversely affect the working environment and the unused molding sand stored in the molding apparatus.

(問題を解決するための手段) 即ち、本発明は、サンドタンク内に貯留された鋳物砂を
該タンクの下面に穿設されたブロー孔を介して金型内に
充填したのち、この金型内の鋳物砂に硬化用ガスを噴射
して該鋳物砂を硬化させることにより鋳型を成型するよ
うにしたガス硬化用造型装置において、上記サンドタン
クの上部に設けられ且つ隔壁により該タンクと仕切られ
たガス供給室と、上記ブロー孔の下端に装着されて上記
金型に設けられた鋳物砂充填口に押圧される弾性材でな
るノズルチップと、一端が上記ブロー孔に対向するよう
にサンドタンク内に位置され且つ他端が上記隔壁を貫通
して該供給室内に突入されている管状ノズルと、該ノズ
ルを常時上方に付勢してノズルの先端とブロー孔との間
に所定の間隙を形成させる弾性部材と、上記管状ノズル
を弾性部材に抗して押圧することにより該ノズルの先端
を上記ノズルチップ内に嵌入させる押圧プレートとを設
けると共に、該ノズルのノズルチップ内への嵌入時に、
ノズル先端の外周面をノズルチップの内周面により圧着
するように構成したことを特徴とする。
(Means for Solving the Problem) That is, according to the present invention, after the foundry sand stored in the sand tank is filled into the mold through the blow hole formed in the lower surface of the tank, In a gas curing molding apparatus configured to mold a mold by injecting a curing gas into the molding sand therein to cure the molding sand, the molding apparatus is provided above the sand tank and is separated from the tank by a partition wall. Gas supply chamber, a nozzle tip made of an elastic material that is attached to the lower end of the blow hole and is pressed against a molding sand filling port provided in the mold, and a sand tank so that one end faces the blow hole. A tubular nozzle positioned inside and having the other end penetrating the partition wall and projecting into the supply chamber; and a predetermined gap between the tip of the nozzle and the blow hole by constantly urging the nozzle upward. Elastic member to be formed, and While providing a pressing plate for fitting the tip of the nozzle into the nozzle chip by pressing the tubular nozzle against the elastic member, when fitting the nozzle into the nozzle chip,
It is characterized in that the outer peripheral surface of the nozzle tip is crimped by the inner peripheral surface of the nozzle tip.

(作用) 上記の構成によれば、サンドタンクにおけるブロー孔の
下端に装着された弾性材でなるノズルチップを、金型に
設けられた鋳物砂充填口に押し込むことにより、該充填
口と上記ブロー孔とを連通させた状態でサンドタンク内
に加圧エアを導入すれば、該サンドタンク内の鋳物砂が
金型内に吹込まれることになる。その後、押圧プレート
により管状ノズルを弾性部材に抗して押圧し下降させ
て、該ノズルの先端を上記ノズルチップ内に嵌入したう
えで、ガス供給室内に加圧した硬化用ガスを導入すれ
ば、このガス供給室内に一端を突入された上記管状ノズ
ルを介して該硬化用ガスが金型内に噴射されて、該金型
内に充填された鋳物が硬化されることになる。この時、
上記ノズルチップが金型に設けられた鋳物砂充填口に強
く押し付けられているので、金型内に噴射された上記硬
化用ガスが該充填口とノズルチップとの間から外部へ漏
れることがない。更に、上記ノズルチップが充填口に強
く押し付けられることにより、その反力の影響を受けて
該ノズルチップの内径が絞縮された状態のもとに、上記
管状ノズルの先端が強制的に嵌入されていることによ
り、該ノズルチップの内周面で管状ノズルの先端外周面
を強く周面シールすることになるので、上記硬化用ガス
がノズルチップと該ノズルとの間からブロー孔を介して
サンドタンク内に逆流することがない。その結果、作業
環境の悪化を招くことなく、しかもサンドタンク内にお
ける未使用の鋳物砂を硬化させることがない。
(Operation) According to the above configuration, the nozzle tip made of the elastic material, which is mounted on the lower end of the blow hole in the sand tank, is pushed into the molding sand filling port provided in the mold, whereby the filling port and the blow port are blown. If pressurized air is introduced into the sand tank while communicating with the holes, the molding sand in the sand tank will be blown into the mold. After that, by pressing the tubular nozzle against the elastic member by the pressing plate to lower it and inserting the tip of the nozzle into the nozzle tip, and then introducing the pressurized curing gas into the gas supply chamber, The hardening gas is injected into the mold through the tubular nozzle whose one end penetrates into the gas supply chamber, so that the casting filled in the mold is hardened. At this time,
Since the nozzle tip is strongly pressed against the molding sand filling port provided in the mold, the curing gas injected into the mold does not leak outside between the filling port and the nozzle chip. . Further, the tip of the tubular nozzle is forcibly inserted under the condition that the inner diameter of the nozzle tip is contracted under the influence of its reaction force by strongly pressing the nozzle tip against the filling port. By virtue of this, the inner peripheral surface of the nozzle tip strongly seals the outer peripheral surface of the distal end of the tubular nozzle, so that the curing gas is sandwiched between the nozzle tip and the nozzle via the blow hole. It does not flow back into the tank. As a result, the working environment is not deteriorated and the unused molding sand in the sand tank is not hardened.

(実施例) 次に本発明の具体的な実施例を図面に基づいて説明す
る。
(Example) Next, the specific Example of this invention is described based on drawing.

第1図に示すように、この実施例に係るガス硬化用造型
装置11は、フレーム12に吊下げ状に支持され、且つ
下面13aが下方に設置された金型Aの上面に対接され
るブローヘッド部とされたサンドタンク13とこれの上
部に隔壁14を介して一体的に設けられたガス供給室1
5とを有する。このサンドタンク13およびガス供給室
15は、上記フレーム12の上面に設置された昇降用シ
リンダ16から下方に突出された17の下端部に取付け
られ、該シリンダ16に対する油圧(もしくは空気圧)
の給排によるピストン18の上下動により、上記ピスト
ンロッド17を介して図示の位置と、その一定ストロー
ク上方の位置との間で昇降されるようになっている。そ
して、上記ガス供給室15の上面15aには複数のガイ
ドロッド19…19が立設されていると共に、これらロ
ッド19…19が上記フレーム12の上面に固設された
ガイドスリーブ20…20に夫々上下動自在に嵌合さ
れ、これによりサンドタンク13および該供給室15が
これらに案内されながら昇降されるようになっている。
As shown in FIG. 1, the gas curing molding apparatus 11 according to this embodiment is supported by the frame 12 in a suspended manner, and the lower surface 13a is in contact with the upper surface of the mold A installed below. A sand tank 13 serving as a blow head part and a gas supply chamber 1 integrally provided above the sand tank 13 via a partition wall 14.
5 and. The sand tank 13 and the gas supply chamber 15 are attached to the lower end portion of 17 which is projected downward from the lifting cylinder 16 installed on the upper surface of the frame 12, and the hydraulic pressure (or pneumatic pressure) to the cylinder 16 is provided.
By the vertical movement of the piston 18 due to the supply and discharge of the above, the piston 18 is moved up and down through the piston rod 17 between a position shown in the figure and a position above a certain stroke thereof. A plurality of guide rods 19 ... 19 are erected on the upper surface 15a of the gas supply chamber 15, and these rods 19 ... 19 are respectively fixed to guide sleeves 20 ... 20 fixed to the upper surface of the frame 12. The sand tank 13 and the supply chamber 15 are vertically movable while being guided by them.

また、上記ピストンロッド17は、中空パイプ状とされ
て下端が上記ガス供給室15の上面15aから該供給室
15および隔壁14を貫通してサンドタンク13内に突
入されていると共に、該ロッド17の内部にはパイプ2
1が貫挿されている。そして、該ロッド17とパイプ2
1との間の空間がサンドタンク13内に通じるエアー通
路22とされていると共に、ロッド17におけるシリン
ダ16の上端から突出した端部には加圧エアー源(図示
せず)から上記エアー通路22ないしサンドタンク13
内へのエアー入口23が設けられている。また、上記パ
イプ21の内部には同じくサンドタンク13内に通じる
砂通路24とされていると共に、該パイプ21の上端に
砂供給装置(図示せず)から上記砂通路24ないしサン
ドタンク13内へ予め粘結剤と混練された鋳物砂Bを導
入させる砂供給口25が設けられ、且つ砂通路24の下
端のサンドタンク13への開口部24aには、パイプ2
1の上端に設置されたシリンダ26により該パイプ21
内を貫通するロッド27を介して上下動される開閉弁2
8が備えられ、該開閉弁28が上記開口部24aを開い
た時に砂通路24を通ってサンドタンク13内へ上記鋳
物砂Bが供給されるようになっている。
The piston rod 17 has a hollow pipe shape, the lower end of which is penetrated from the upper surface 15a of the gas supply chamber 15 through the supply chamber 15 and the partition wall 14 into the sand tank 13, and the rod 17 is also provided. Inside the pipe 2
1 is inserted. And the rod 17 and the pipe 2
1 is an air passage 22 communicating with the inside of the sand tank 13, and the end of the rod 17 protruding from the upper end of the cylinder 16 is connected to the air passage 22 from a pressurized air source (not shown). Or sand tank 13
An air inlet 23 to the inside is provided. A sand passage 24 is also provided inside the pipe 21 and communicates with the inside of the sand tank 13. At the upper end of the pipe 21, a sand feeder (not shown) is provided to the sand passage 24 or inside the sand tank 13. The sand supply port 25 for introducing the casting sand B previously kneaded with the binder is provided, and the pipe 2 is provided at the opening 24a to the sand tank 13 at the lower end of the sand passage 24.
The cylinder 21 installed at the upper end of the pipe 21
An on-off valve 2 that is moved up and down via a rod 27 that penetrates the inside.
8 is provided so that the molding sand B is supplied into the sand tank 13 through the sand passage 24 when the opening / closing valve 28 opens the opening 24a.

然して、上記サンドタンク13内には、その底部から立
設された複数の筒体29…29が配設されている。これ
らの筒体29…29には下部側面にサンドタンク13の
下面13aに穿設された複数のブロー孔30…30に開
口する孔29a…29aが形成されると共に、これら筒
体29…29内には内部中空とされた管状ノズル31…
31が上下動可能に夫々貫通されており、各管状ノズル
31は筒体29内に装着されたスプリング32により上
方に付勢されて通常は図示の上端位置に保持されてお
り、この状態で、各管状ノズル31の上端部31aが上
記ガス供給室15内に突入されると共に、上端部31a
にはガッシング工程時における硬化用ガスを各管状ノズ
ル31内へ流入させるための導入口31bが、例えば図
示のごとく周方向に複数個穿設され、また、下端部31
cが上記ブロー孔30との間に所定の間隙を形成するよ
うにして該ブロー孔30内に突入されている。また、各
筒体29におけるブロー孔30に通じる孔29aは鋳物
砂Bの吹出しを円滑に行わせるため所定の角度で傾斜状
に設けられているが、この角度はサンドタンク13内に
加圧エアーが導入されていない時に鋳物砂Bがブロー孔
30から落下しない角度に設定されている。
However, in the sand tank 13, a plurality of cylinders 29 ... 29 which are erected from the bottom thereof are arranged. 29a are formed in the lower side surface of the lower surface 13a of the sand tank 13 and have holes 29a ... 29a which open to a plurality of blow holes 30. The inside is a hollow tubular nozzle 31 ...
Each of the tubular nozzles 31 is urged upward by a spring 32 mounted in the tubular body 29 and normally held at the upper end position shown in the drawing. The upper end 31a of each tubular nozzle 31 is projected into the gas supply chamber 15, and the upper end 31a
A plurality of inlets 31b for allowing the hardening gas to flow into each tubular nozzle 31 at the time of the gassing process are provided in the circumferential direction as shown in the drawing, and the lower end 31b is provided.
c projects into the blow hole 30 so as to form a predetermined gap with the blow hole 30. In addition, the hole 29a communicating with the blow hole 30 in each tubular body 29 is provided in an inclined shape at a predetermined angle in order to smoothly blow out the molding sand B. Is set so that the casting sand B does not fall from the blow hole 30 when the is not introduced.

ここで、上記ブロー孔30…30は、金型A(上型
)の上壁に設けられてキャビティA′内に通じる鋳
物砂Bの充填口A″…A″の配設位置に対応させて設け
られていると共に、各ブロー孔30…30の下端には弾
性材でなるノズルチップ33…33が装着されており、
図示のようにサンドタンク13の下面(ブローヘッド)
13aが金型Aの上面に対接された時に、各ノズルチッ
プ33が上記充填口A″に押圧された状態で上記各ブロ
ー孔30…30と各充填口A″…A″とが連通されるよ
うになっている。その場合に、第2図に拡大して示すよ
うに、上記ノズルチップ33によりブロー孔30および
充填口A″の連通部がシールされると共に、該ノズルチ
ップ33が充填口A″に押圧されてその内径が絞縮され
た状態となる。
Here, the blow holes 30 ... 30 correspond to the positions of the filling ports A ″ ... A ″ of the molding sand B which are provided on the upper wall of the mold A (upper mold A 1 ) and communicate with the cavity A ′. Nozzle chips 33 ... 33 made of elastic material are attached to the lower ends of the blow holes 30.
Lower surface of the sand tank 13 (blow head) as shown
When the nozzle tip 33 is pressed against the filling port A ″, the blow holes 30 ... 30 and the filling ports A ″ ... A ″ communicate with each other when the nozzle tip 33 is pressed against the filling port A ″. In this case, as shown in an enlarged view in Fig. 2, the nozzle tip 33 seals the communicating portion between the blow hole 30 and the filling port A ", and the nozzle tip 33 is filled. It is pressed by the mouth A ″ and its inner diameter is reduced.

一方、上記ガス供給室15内には、該供給室15を貫通
してサンドタンク13内に突入された上記ピストンロッ
ド17の外周面にボス部34aが上下摺動可能に嵌合さ
れた押圧プレート34が上記管状ノズル31における上
端部31aの直上方に位置されていると共に、該供給室
15の上面15aには、ピストンロッド35…35を介
して押圧プレート34を図示の位置とその一定ストロー
ク下方の位置(第3図参照)との間で上下動させるシリ
ンダ36…36が固設されている。更に、このガス供給
室15の側壁15bには、ガッシング工程時とブローイ
ング工程時とに応じて、硬化用ガスあるいは加圧エアー
を夫々の供給源(図示せず)より導入するための導入管
37が接続された導入口38が設けられている。
On the other hand, in the gas supply chamber 15, a pressing plate in which a boss portion 34a is vertically slidably fitted to the outer peripheral surface of the piston rod 17 penetrating the supply chamber 15 and protruding into the sand tank 13. 34 is positioned immediately above the upper end 31a of the tubular nozzle 31, and a pressing plate 34 is provided on the upper surface 15a of the supply chamber 15 via piston rods 35 ... Cylinders 36 ... 36 that are moved vertically with respect to the position (see FIG. 3) are fixed. Further, an inlet pipe 37 for introducing a hardening gas or pressurized air from respective supply sources (not shown) to the side wall 15b of the gas supply chamber 15 depending on the gassing process and the blowing process. Is connected to the inlet 38.

なお、金型Aを構成する下型Aの底部には、ガッシン
グ工程時おいてキャビティA′内に噴射された硬化用ガ
スを受け台Cに形成された吸引通路39へ排出させるた
めの排出通路40が設けられていると共に、該通路40
の上端には、上面に鋳物砂漏出防止用の網を張設したベ
ントプラグ41が装着されている。
At the bottom of the lower mold A 2 that constitutes the mold A, a discharge for discharging the curing gas injected into the cavity A ′ into the suction passage 39 formed in the pedestal C during the gassing process. The passage 40 is provided and the passage 40
A vent plug 41 having a net for preventing leakage of foundry sand is attached to the upper end of the vent plug 41.

次に、この実施例の作用を説明する。先ず、第1図に示
すようにサンドタンク13内に砂通路24から所要量の
鋳物砂Bを供給し、且つ昇降用シリンダ16により該タ
ンク13を下降させ、その下面13aを下方にセットさ
れている金型A(上型A)の上面に対接させる。この
時、サンドタンク13の下面に穿設されたブロー孔30
の下端に装着された弾性材でなるノズルチップ33が、
上型Aの上壁に開設された充填口A″に押圧されて、
これにより、サンドタンク13内と金型Aを構成する上
型A,A間に形成されるキャビティA′とが、筒体
29における導入口29a,ブロー孔30,ノズルチッ
プ33および上型Aにおける充填口A″を介して連通
される。
Next, the operation of this embodiment will be described. First, as shown in FIG. 1, a required amount of foundry sand B is supplied into the sand tank 13 from the sand passage 24, and the tank 13 is lowered by the lifting cylinder 16, and its lower surface 13a is set downward. The upper surface of the existing mold A (upper mold A 1 ) is brought into contact with it. At this time, the blow hole 30 formed in the lower surface of the sand tank 13
The nozzle tip 33 made of elastic material attached to the lower end of
Pressed by the filling port A ″ opened on the upper wall of the upper mold A 1 ,
As a result, the cavity A ′ formed in the sand tank 13 and between the upper molds A 1 and A 2 forming the mold A is defined by the introduction port 29a, the blow hole 30, the nozzle tip 33 and the upper mold of the cylindrical body 29. It is communicated via the filling port A ″ at A 1 .

次に、この状態でピストンロッド17の上端に設けられ
た入口23からエアー通路22を介して上記サンドタン
ク内に加圧エアーを導入すると共に、同じくガス供給室
15内へ少なくともサンドタンク内へ導入される加圧エ
アーと同圧のあるいはそれ以上の圧力を有する加圧エア
ーを導入口38を介して導入すれば、該タンク13内に
貯留されている鋳物砂Bがエアーの圧力により上記各孔
29A,ブロー孔30,ノズルチップ33および充填口
A″を経て金型AのキャビティA′内に充填される。ま
た、この時、ガス供給室15内へ導入された加圧エアー
が管状ノズル31内を通過して該ノズル31の先端部3
1cよりブロー孔30内へ流出することになるので、サ
ンドタンク13内より金型AのキャビティA′への鋳物
砂Bの流入を促進し、該鋳物BのキャビティA′への充
填がより効果的に行われると共に、この管状ノズル31
の先端部31cより流出する加圧エアーが鋳物砂Bの該
ノズル31内への逆流を防止して、ノズル先端部31c
が鋳物砂Bにより閉塞されることがない。
Next, in this state, pressurized air is introduced into the sand tank from the inlet 23 provided at the upper end of the piston rod 17 through the air passage 22, and is also introduced into the gas supply chamber 15 at least into the sand tank. If pressurized air having a pressure equal to or higher than that of the pressurized air introduced is introduced through the introduction port 38, the molding sand B stored in the tank 13 will have the above-mentioned holes due to the pressure of the air. 29A, the blow hole 30, the nozzle tip 33, and the filling port A ″ to fill the cavity A ′ of the mold A. At this time, the pressurized air introduced into the gas supply chamber 15 is the tubular nozzle 31. The tip 3 of the nozzle 31 passing through the inside
Since it flows out from the 1c into the blow hole 30, the inflow of the molding sand B from the inside of the sand tank 13 into the cavity A'of the mold A is promoted, and the filling of the casting B into the cavity A'is more effective. This tubular nozzle 31
The pressurized air flowing out from the tip portion 31c of the nozzle prevents the casting sand B from flowing back into the nozzle 31, and the nozzle tip portion 31c
Is not blocked by the foundry sand B.

そして、金型AのキャビティA′内に鋳物砂Bを充填し
た状態で、ガス供給室15の上面15aに設置されたシ
リンダ36…36を作動して押圧プレート34を下降さ
せることにより、各管状ノズル31の上端部31aを押
圧し、該ノズル31をスプリング32に抗して下降させ
ると、第2図に鎖線で示すように該ノズルの先端部31
cが上型Aの充填口A″に押圧されることにより内径
を絞縮されたノズルチップ33内へ強制的に嵌入される
と共に、該ノズルの上端部31aに形成された導入口3
1bがガス供給室15内に突出された状態となる。この
状態で、上記ガス供給室15内に導入口38を介して加
圧した硬化用ガスを供給すれば、このガス供給室15内
に突出された上記導入口31bに硬化用ガスが流入し、
該硬化用ガスが管状ノズル31を介して金型Aのキャビ
ティA′内に充填された鋳物砂Bに噴射されて該鋳物砂
Bが硬化され、これにより上記キャビティA′の形状の
中子が成型されることになる。この時、上記ノズルチッ
プ33が弾性材とされ、しかも金型Aの上型Aにおけ
る充填口A″に強く押し付けられていることにより該充
填口A″に密着した状態とされているので、キャビティ
A′内に噴射された硬化用ガスが充填口A″とノズルチ
ップ33との間から外部へ漏れることがない。更に、管
状ノズルの先端部31cの外周面が上記のごとく内径を
絞縮されたノズルチップ33の内周により周面シールさ
れていることにより、上記硬化用ガスがノズルチップ3
3と管状ノズル31との間からサンドタンク13内へ逆
流することがない。その結果、硬化用ガスの外部への漏
出に起因する作業環境の悪化を招くことなく、しかも該
硬化用ガスのサンドタンク13内への逆流を防止して該
タンク内における未使用砂を硬化させることがない。
Then, while the molding sand B is filled in the cavity A ′ of the mold A, the cylinders 36 ... 36 installed on the upper surface 15a of the gas supply chamber 15 are operated to lower the pressing plate 34, and When the upper end portion 31a of the nozzle 31 is pressed and the nozzle 31 is lowered against the spring 32, the tip end portion 31 of the nozzle 31 as shown by the chain line in FIG.
When c is pressed against the filling port A ″ of the upper mold A 1, the c is forcibly fitted into the nozzle tip 33 whose inner diameter is narrowed, and the introduction port 3 formed at the upper end 31 a of the nozzle 3
1b is projected into the gas supply chamber 15. In this state, if the curing gas pressurized is supplied into the gas supply chamber 15 through the introduction port 38, the curing gas flows into the introduction port 31b protruding into the gas supply chamber 15,
The hardening gas is injected through the tubular nozzle 31 into the molding sand B filled in the cavity A ′ of the mold A to cure the molding sand B, whereby the core of the cavity A ′ is formed. It will be molded. At this time, since the nozzle tip 33 is made of an elastic material and is strongly pressed against the filling port A ″ of the upper die A 1 of the mold A, the nozzle tip 33 is brought into close contact with the filling port A ″. The hardening gas injected into the cavity A'does not leak to the outside from between the filling port A "and the nozzle tip 33. Further, the outer peripheral surface of the distal end portion 31c of the tubular nozzle has the inner diameter reduced as described above. Since the peripheral surface is sealed by the inner circumference of the nozzle tip 33 thus formed, the above-mentioned curing gas is applied to the nozzle tip 3
3 does not flow back into the sand tank 13 between the nozzle 3 and the tubular nozzle 31. As a result, the working environment is not deteriorated due to the leakage of the hardening gas to the outside, and the backflow of the hardening gas into the sand tank 13 is prevented to cure the unused sand in the tank. Never.

このようにして金型A内に中子が形成されると、上記ガ
ス供給室15内へ導入口38を介して再び加圧エアーを
供給することにより、該供給室15内はもとより金型A
のキャビティA′内に充満した硬化用ガスを一掃して、
下型Aに設けられた排出通路40及び受け台Cに形成
された吸引通路39を介して所定位置に設けられた中和
タンク(図示せず)内へ硬化用ガスを導入した後、上記
昇降用シリンダ16が作動し、第3図に示すようにピス
トンロッド17を介してサンドタンク13が上方位置ま
で上昇される。また、サンドタンク13の上昇後に、別
途備えられた昇降手段D,Dにより金型Aの上型A
上昇されて、該金型Aの型開きが行われるのであるが、
この時、キャビティA′内で形成された中子Eはこの上
型Aの下方に結合した状態で該上型Aと共に上昇さ
れる。
When the core is formed in the mold A in this way, the pressurized air is supplied again into the gas supply chamber 15 through the inlet 38, so that the mold A as well as the inside of the supply chamber 15 is supplied.
The curing gas filled in the cavity A'of
After introducing the curing gas into the neutralization tank (not shown) provided at a predetermined position through the discharge passage 40 provided in the lower mold A 2 and the suction passage 39 formed in the pedestal C, The elevating cylinder 16 operates and the sand tank 13 is elevated to the upper position via the piston rod 17 as shown in FIG. Further, after the sand tank 13 is raised, the upper die A 1 of the die A is elevated by the separately provided lifting means D, D, and the die A is opened.
At this time, the core is formed in the cavity A 'E is increased with the upper mold A 1 remain attached to the lower the upper mold A 1.

そして、第3図に示すように上型Aの上面がサンドタ
ンク13の下面13aに再び対接された状態で、ガス供
給室15の上面に固設されたシリンダ36を作動し、押
圧プレート34を下降させて、各管状ノズルの先端部3
1cをガッシング工程時より更に下方に突出させると、
該先端部31cが上型Aにおける各充填口A″内に突
入されることになる。これにより、上型Aの下方に結
合していた中子Eが該上型Aから強制的に分離され、
下方に搬入された受部材F上に取出されることになる。
即ち、管状ノズル31…31を中子Eの取出し用エジェ
クトピンとしても応用することが可能となる。
Then, as shown in FIG. 3, with the upper surface of the upper mold A 1 in contact with the lower surface 13a of the sand tank 13 again, the cylinder 36 fixedly mounted on the upper surface of the gas supply chamber 15 is operated to press the pressing plate. 34 to lower the tip portion 3 of each tubular nozzle.
If 1c is projected further downward than during the gassing process,
Tip portion 31c is to be plunged into the filling opening A "in the upper mold A 1. Forcibly Thus, the core has been attached to the lower upper mold A 1 E is from the upper mold A 1 Is separated into
It will be taken out on the receiving member F carried in below.
That is, the tubular nozzles 31 ... 31 can also be applied as eject pins for taking out the core E.

なお、第4図に拡大して示すように、管状ノズル31′
における先端部31c′に、複数のスリット42a′…
42a′が形成されたノズルキャップ42′を装着する
ように構成しても良い。このようにすれば、ブローイン
グ工程における鋳物砂Bの管状ノズル31′内への逆流
をより効果的に阻止できることになる。
Incidentally, as shown in an enlarged manner in FIG. 4, the tubular nozzle 31 '
A plurality of slits 42a '...
You may comprise so that the nozzle cap 42 'in which 42a' was formed may be mounted. By doing so, it is possible to more effectively prevent the backflow of the molding sand B into the tubular nozzle 31 'in the blowing step.

(発明の効果) 以上のように本発明は、サンドタンク内から該タンクの
下面に設けられたブロー孔を介して金型内に充填された
鋳物砂に硬化用ガスを噴射して該鋳物砂を硬化させて鋳
型を成型するようにしたガス硬化用造型装置において、
上記サンドタンクの上部に隔壁により仕切られたガス供
給室を一体的に設けると共に、該ガス供給室内に一端が
突入され且つ他端が上記ブロー孔に対向される管状ノズ
ルを配設して、この管状ノズルの先端をブロー孔の下端
に装着されたノズルチップ内に嵌入させることにより上
記ガス供給室内に供給される硬化用ガスを金型内に噴射
するように構成したから、同一の位置でブローイング工
程とガッシング工程と行い得て、鋳物造型工程に要する
時間を短縮できる。更に、ガッシング工程時において、
上記管状ノズルの先端外周面を、金型の充填口に押圧さ
れることより内径を絞縮された状態にあるノズルチップ
の内周面で圧着するようにしたから、管状ノズル先端か
ら噴射される硬化用ガスに対するシール性が著しく向上
し、該硬化用ガスの外部への漏出はもとより、サンドタ
ンク内への逆流をも確実に防止することができる。その
結果、作業環境の悪化ならびにサンドタンク内における
未使用鋳物砂の硬化を招くことがない。
(Effect of the Invention) As described above, according to the present invention, the hardening gas is injected from the inside of the sand tank into the molding sand filled in the mold through the blow hole provided on the lower surface of the tank to cure the molding sand. In the molding device for gas curing, which is configured to cure and mold the mold,
A gas supply chamber partitioned by a partition wall is integrally provided on the upper part of the sand tank, and a tubular nozzle having one end protruding into the gas supply chamber and the other end facing the blow hole is provided. The tip of the tubular nozzle is inserted into the nozzle tip attached to the lower end of the blow hole to inject the curing gas supplied into the gas supply chamber into the mold, so that the blowing is performed at the same position. The process and the gassing process can be performed, and the time required for the casting molding process can be shortened. Furthermore, during the gassing process,
Since the tip outer peripheral surface of the tubular nozzle is pressed by the inner peripheral surface of the nozzle tip whose inner diameter is narrowed by being pressed by the filling port of the mold, it is ejected from the tip of the tubular nozzle. The sealing property with respect to the curing gas is remarkably improved, and it is possible to reliably prevent not only the leakage of the curing gas to the outside but also the backflow into the sand tank. As a result, the working environment is not deteriorated and the unused foundry sand in the sand tank is not hardened.

【図面の簡単な説明】[Brief description of drawings]

第1図は本実施例に係るガス硬化用造型装置のブローイ
ング工程時の状態を示す全体縦断面図、第2図は、該ガ
ス硬化用造型装置の要部拡大断面図、第3図はエジェク
ト工程時の状態を示す要部縦断面図、第4図は管状ノズ
ル先端部の他の実施例を示す拡大断面図、第5図は、従
来の鋳型造型機を示す縦断面図である。 13……サンドタンク、14……隔壁、15……ガス供
給室、30,30……ブロー孔、31,31……管状ノ
ズル、32,32……スプリング(弾性部材)、33,
33……ノズルチップ、34……押圧プレート、A……
金型(A……上型、A……下型)、A″……充填
口、B……鋳物砂。
FIG. 1 is an overall vertical sectional view showing a state of a gas curing molding apparatus according to the present embodiment during a blowing process, FIG. 2 is an enlarged sectional view of an essential part of the gas curing molding apparatus, and FIG. 3 is an eject. FIG. 4 is a longitudinal sectional view of a main part showing a state during a process, FIG. 4 is an enlarged sectional view showing another embodiment of the tip portion of the tubular nozzle, and FIG. 5 is a vertical sectional view showing a conventional mold making machine. 13 ... Sand tank, 14 ... Partition, 15 ... Gas supply chamber, 30, 30 ... Blow hole, 31, 31 ... Tubular nozzle, 32, 32 ... Spring (elastic member), 33,
33 ... Nozzle tip, 34 ... Pressing plate, A ...
Mold (A 1 ... upper mold, A 2 ... lower mold), A "... filling port, B ... casting sand.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】サンドタンク内に貯留された鋳物砂を該タ
ンクの下面に穿設されたブロー孔を介して金型内に充填
したのち、この金型内の鋳物砂に硬化用ガスを噴射して
該鋳物砂を硬化させることにより鋳型を成型するように
したガス硬化用造型装置であって、上記サンドタンクの
上部に設けられ且つ隔壁により該タンクと仕切られたガ
ス供給室と、上記ブロー孔の下端に装着されて上記金型
に設けられた鋳物砂充填口に押圧される弾性材でなるノ
ズルチップと、一端が上記ブロー孔に対向するようにサ
ンドタンク内に位置され且つ他端が上記隔壁を貫通して
ガス供給室内に突入されている管状ノズルと、該ノズル
を常時上方に付勢してノズルの先端とブロー孔との間に
所定の間隙を形成させる弾性部材と、上記管状ノズルを
弾性部材に抗して押圧することにより該ノズルの先端を
上記ノズルチップ内に嵌入させる押圧プレートとからな
り、該ノズルのノズルチップ内への嵌入時に、ノズル先
端の外周面がノズルチップの内周面により圧着されるよ
うに構成されていることを特徴とするガス硬化用造型装
置。
1. A mold sand is filled with molding sand stored in a sand tank through a blow hole formed in the lower surface of the tank, and then a hardening gas is injected into the molding sand in the mold. A molding apparatus for gas hardening, which is configured to mold a mold by hardening the foundry sand, wherein a gas supply chamber provided at an upper portion of the sand tank and partitioned from the tank by a partition, and the blow A nozzle tip made of an elastic material that is attached to the lower end of the hole and is pressed against the foundry sand filling port provided in the mold, and the other end is located in the sand tank so that one end faces the blow hole and the other end A tubular nozzle penetrating the partition wall and projecting into the gas supply chamber; an elastic member for constantly urging the nozzle upward to form a predetermined gap between the tip of the nozzle and the blow hole; Against the elastic member A pressing plate for fitting the tip of the nozzle into the nozzle tip by pressing, so that the outer peripheral surface of the nozzle tip is crimped by the inner peripheral surface of the nozzle tip when the nozzle is fitted into the nozzle tip. A molding apparatus for gas curing, which is configured.
JP61150590A 1986-06-25 1986-06-25 Molding equipment for gas curing Expired - Lifetime JPH0642974B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP61150590A JPH0642974B2 (en) 1986-06-25 1986-06-25 Molding equipment for gas curing
US07/066,343 US4744404A (en) 1986-06-25 1987-06-25 Foundry sand blowing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP61150590A JPH0642974B2 (en) 1986-06-25 1986-06-25 Molding equipment for gas curing

Publications (2)

Publication Number Publication Date
JPS635852A JPS635852A (en) 1988-01-11
JPH0642974B2 true JPH0642974B2 (en) 1994-06-08

Family

ID=15500209

Family Applications (1)

Application Number Title Priority Date Filing Date
JP61150590A Expired - Lifetime JPH0642974B2 (en) 1986-06-25 1986-06-25 Molding equipment for gas curing

Country Status (1)

Country Link
JP (1) JPH0642974B2 (en)

Also Published As

Publication number Publication date
JPS635852A (en) 1988-01-11

Similar Documents

Publication Publication Date Title
US4208368A (en) Method and apparatus for injection molding foamed plastic articles using a pre-pressurized mold having fixed core members with controlled venting
EP0283207B1 (en) Injection moulding apparatus
CN100404231C (en) Thermal flow passage coinjection nozzle
US4770225A (en) Device for spray applying mold-release agent to a die casting mold
CA1204262A (en) Injection mold apparatus with gas ejection
KR101769207B1 (en) Valve apparatus for an inclined gate of a hot runner injection mold
JPH07251431A (en) Valve gate injection molding device
US3952991A (en) Apparatus for ejecting a workpiece from a mold cavity
US4313486A (en) Sand mold-producing method and apparatus
US3645492A (en) Ejection actuator for plastic injection mold
KR200324439Y1 (en) mold for injection molding
CN217098745U (en) Injection mold convenient to drawing of patterns
JPS625701B2 (en)
JPH0642974B2 (en) Molding equipment for gas curing
EP0844036B1 (en) Cope with bore for gassing cores
KR102240758B1 (en) Nozzle apparatus for infection machine
KR20000000445A (en) Nozzle
JPS635853A (en) Molding apparatus for gas curing type mold
CN211218577U (en) High accuracy adds sand and penetrates sand all-in-one
US4538665A (en) Molding box apparatus
KR20090094597A (en) A gate valve for injection molding
WO2018016123A1 (en) Mold forming method
JPH07185741A (en) Molding device with liquid mist ejecting means
KR0149202B1 (en) Injection nozzle
KR20120042204A (en) Nozzle of hot runner system