On-site reinforcement method for steel pipe columns and piles

Info

Publication number
JPH0643693B2
JPH0643693B2 JP63072118A JP7211888A JPH0643693B2 JP H0643693 B2 JPH0643693 B2 JP H0643693B2 JP 63072118 A JP63072118 A JP 63072118A JP 7211888 A JP7211888 A JP 7211888A JP H0643693 B2 JPH0643693 B2 JP H0643693B2
Authority
JP
Japan
Prior art keywords
steel pipe
concrete
pile
piles
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63072118A
Other languages
Japanese (ja)
Other versions
JPH01244807A (en
Inventor
正泰 東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP63072118A priority Critical patent/JPH0643693B2/en
Publication of JPH01244807A publication Critical patent/JPH01244807A/en
Publication of JPH0643693B2 publication Critical patent/JPH0643693B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Rod-Shaped Construction Members (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、既設の鋼管柱、杭をコンクリートによって
補強する鋼管柱、杭の現場補強工法に関する。
Description: TECHNICAL FIELD The present invention relates to an existing steel pipe column, a steel pipe column for reinforcing a pile with concrete, and a method for on-site reinforcement of a pile.

《従来の技術》 周知のように、例えば、建築構造物の柱部材として、鋼
管の内部に鉄筋等の補強材を配置するとともに、鋼管に
生じる軸方向圧縮力を補うためのコンクリートを充填し
てなる鋼管柱があり、このような構造を有する鋼管柱に
よれば、柱の上部から加えられる荷重に対して、鋼管が
コンクリートの膨脹を規制するので、軸方向の荷重に対
する強度の向上を図ることができる。
<< Prior Art >> As is well known, for example, as a pillar member of a building structure, a reinforcing material such as a reinforcing bar is arranged inside a steel pipe, and concrete is filled to supplement the axial compressive force generated in the steel pipe. According to the steel pipe column having such a structure, the steel pipe regulates the expansion of the concrete against the load applied from the upper part of the column, so the strength against the axial load should be improved. You can

この種の鋼管柱の一種として、補強材を緊張して鋼管内
に充填されるコンクリートプレストレスを導入したもの
もあり、例えば実開昭61−204455号公報や特開
昭62−170634号公報にその構造および構築方法
が開示されている。
As one type of this type of steel pipe column, there is also one in which concrete prestress is introduced by tensioning a reinforcing material to fill the steel pipe. For example, Japanese Utility Model Laid-Open No. 61-204455 and Japanese Patent Laid-Open No. 62-170634 disclose. Its structure and construction method are disclosed.

ところで、土木の分野に属する橋梁の支柱や大型構造物
の基礎杭などに上記コンクリートで補強した鋼管を用い
れば、同じように強度の向上が期待できるが、この時に
以下に説明する技術的課題があった。
By the way, if steel pipes reinforced with the concrete are used for the pillars of bridges and foundation piles of large structures that belong to the field of civil engineering, the strength can be expected to increase in the same way, but at this time, the technical problems described below there were.

《発明が解決しようとする課題》 すなわち、前述した大型構造物の支柱や杭は、建築構造
物用の柱部材と異なりかなり大口径となるが、構築現場
に予め設置されたこれらの大口径の鋼管内のすべてをコ
ンクリートで充填すると、支柱ないしは杭自体の自重が
大きくなり過ぎて、地盤中に沈下する倶れがある。
<< Problems to be solved by the invention >> That is, the pillars and piles of the large structure described above have a considerably large diameter unlike the pillar members for the building structure, but these large diameters installed in advance at the construction site If all of the steel pipe is filled with concrete, the weight of the pillars or the piles themselves will become too large, and there will be a subsidence in the ground.

これを防止するためには、コンクリートを、鋼管を補強
するに足る必要な量だけ当該鋼管の内面側に層状に打設
し、全体重量を軽減させればよいが、このような構造を
得るためには、鋼管の内面に沿って鉄筋等の補強材を縦
横に配筋した状態で、鋼管の内側に型枠を組立てて、コ
ンクリートを打設することになるので、型枠の組立,撤
去に時間および手間がかかり、工期および工費の面で問
題があった。
In order to prevent this, concrete should be cast in layers on the inner surface of the steel pipe in an amount sufficient to reinforce the steel pipe to reduce the overall weight. In order to assemble and remove the formwork, the formwork will be assembled inside the steel form and concrete will be placed in the state that reinforcing materials such as reinforcing bars are arranged in the vertical and horizontal directions along the inner surface of the steel form. It took time and labor, and there was a problem in terms of construction period and construction cost.

この発明はこのような問題点に鑑みてなされたものであ
って、その目的とするところは、柱、杭として用いる鋼
管の内面にコンクリート層を形成して鋼管を補強する際
に、係る補強作業を経済的かつ迅速に行うことのできる
鋼管柱、杭の現場補強工法を提供することにある。
The present invention has been made in view of such problems, and an object thereof is to perform a reinforcing work when a concrete layer is formed on the inner surface of a steel pipe used as a pillar or a pile to reinforce the steel pipe. The purpose of the present invention is to provide an on-site reinforcement method for steel pipe columns and piles that can be performed economically and quickly.

《課題を解決するための手段》 上記目的を達成するために、このい発明は、構築現場に
予め設置された鋼管柱,杭をコンクリートによって補強
する鋼管柱,杭の現場補強工法において、前記予め設置
された鋼管柱,杭の内面には、鉄筋やグラスファイバー
等の線状のコンクリート補強材を係止するためのフック
を突設し、このフックに前記コンクリート補強材を係止
することにより当該コンクリート補強材を前記鋼管柱,
杭の内面に沿って配設し、しかる後にコンクリートを、
前記鋼管柱,杭の内部に挿入したノズルを介して前記鋼
管柱,杭の内面に向けて吹き付けることにより、当該内
面に前記コンクリート補強材によって補強されたコンク
リート層を形成することを特徴とする。
<Means for Solving the Problem> In order to achieve the above object, the present invention provides a steel pipe column pre-installed at a construction site, a steel pipe column for reinforcing a pile with concrete, and a site reinforcement method for a pile, wherein: On the inner surface of the installed steel pipe columns and piles, a hook for locking a linear concrete reinforcing material such as a reinforcing bar or glass fiber is projected, and the concrete reinforcing material is locked to this hook. Concrete reinforcement is the steel pipe pillar,
Arrange along the inner surface of the pile, and then concrete
A concrete layer reinforced by the concrete reinforcing material is formed on the inner surface of the steel pipe pillar or the pile by spraying the inner surface of the steel pipe pillar or the pile through a nozzle inserted inside the steel pipe pillar or the pile.

《作用》 上記構成の鋼管柱,杭の現場補強工法によれば、コンク
リート層は、ノズルからコンクリートを噴出して吹き付
けることのみによって形成されるので、型枠は全く不要
になる。
<< Operation >> According to the on-site reinforcement method for steel pipe columns and piles having the above-described configuration, the concrete layer is formed only by ejecting concrete from a nozzle and spraying it, so that no formwork is required.

また、コンクリート補強材は、外殻シェルとしての鋼管
内に突設されたフックに係止させるので、簡単に配置で
きる。
Further, the concrete reinforcing material can be easily arranged because it is hooked on the hook projecting in the steel pipe as the outer shell.

《実施例》 以下、この発明の好適な実施例について添付図面を参照
にして詳細に説明する。
<Example> Hereinafter, a preferred example of the present invention will be described in detail with reference to the accompanying drawings.

第1図および第2図は、この発明に係る鋼管柱,杭の現
場補強工法の一実施例を示している。
FIG. 1 and FIG. 2 show an embodiment of a steel pipe column and pile on-site reinforcement method according to the present invention.

同図に示す現場補強工法では、橋梁の支柱などとして用
いられる鋼管柱を鉄筋コンクリートによって補強する場
合の例を示しており、少なくとも上端が開口した所定長
さの大口径の鋼管10が橋梁の構築現場に予め設置され
ている。
The site reinforcement method shown in the figure shows an example in which a steel pipe column used as a pillar of a bridge is reinforced with reinforced concrete. A steel pipe 10 of a large diameter having a predetermined length with at least an open upper end is a construction site of the bridge. Installed in advance.

この実施例では、鋼管10は円断面筒状のものであっ
て、内部に形成されるコンクリート層の外型枠としての
外殻シェルを構成するとともに、その内面には、周方向
および軸方向に適宜間隔を置いてL字形に折曲されたフ
ック12,12……が多数突設されている。
In this embodiment, the steel pipe 10 has a cylindrical cross-section and constitutes an outer shell shell as an outer formwork of a concrete layer formed inside, and the inner surface thereof is circumferentially and axially formed. A large number of hooks 12, 12, ... Which are bent in an L shape at appropriate intervals are provided in a protruding manner.

ここで使用されるフック12の材質としては、鋼製,プ
ラスチック製などのものであって、鋼製のフック12は
鋼管10の内面に溶接で固設され、プラスチック製のフ
ック12は接着剤で固設される。
The material of the hook 12 used here is made of steel, plastic, or the like. The steel hook 12 is fixed to the inner surface of the steel pipe 10 by welding, and the plastic hook 12 is an adhesive. It is fixed.

次いで、線状のコンクリート補強材としての横補強材1
4,例えば、鉄筋,あるいは炭素繊維,グラスファイバ
ーなどの新素材線状物などが、上記フック12,12…
…に上方ないしは下方から順次係止されて鋼管10すな
わち外殻シェルの内面に沿って螺旋状に捲回される。
Next, horizontal reinforcement 1 as linear concrete reinforcement
4, For example, a reinforcing rod, or a new material such as carbon fiber or glass fiber, or the like, is used as the hook 12, 12, ...
Are sequentially locked from above or below to be wound spirally along the inner surface of the steel pipe 10, that is, the outer shell.

ここで、フック12と横補強材14との係止は、例え
ば、結束線を使用して行なわれる。
Here, the hook 12 and the lateral reinforcing member 14 are locked by using, for example, a binding wire.

横補強材14の配置が完了すると、横補強材14の内側
に沿って縦補強材16が配置される。
When the arrangement of the lateral reinforcing members 14 is completed, the vertical reinforcing members 16 are arranged along the inside of the lateral reinforcing members 14.

縦補強材16は、横補強材14と同様な材質が使用さ
れ、周方向に適当な間隔をあけて配設され、横補強材1
4と交叉する部分が結束線によって固定される。
The vertical reinforcing member 16 is made of the same material as the horizontal reinforcing member 14 and is arranged at appropriate intervals in the circumferential direction.
The portion intersecting with 4 is fixed by a binding wire.

以上のようにしてフック12を介した補強材14,16
の配置が完了すると、鋼管10の内部に先端にノズル1
8を備えたコンクリート供給管20が挿入され、コンク
リート供給管20を回転させながら、ノズル18からコ
ンクリートを噴射させて、コンクリートの打設が行なわ
れる。
As described above, the reinforcing members 14 and 16 through the hook 12
When the arrangement is completed, the nozzle 1 is attached to the tip inside the steel pipe 10.
The concrete supply pipe 20 provided with 8 is inserted, and the concrete is injected from the nozzle 18 while rotating the concrete supply pipe 20, and the concrete is poured.

ここで使用されるコンクリートは、ノズル18からの噴
射に必要な流動性を確保するために各種混和剤等が添加
混合されている。
In the concrete used here, various admixtures and the like are added and mixed in order to ensure the fluidity necessary for the injection from the nozzle 18.

そして、ノズル18からの吹き付けにより所定厚みWの
コンクリート層22が形成されると施工が完了する。
Then, when the concrete layer 22 having a predetermined thickness W is formed by spraying from the nozzle 18, the construction is completed.

さて、以上の如き鋼管柱を鋼管10の内部に形成したコ
ンクリート層22により補強する方法によれば、コンク
リート層はノズル18からの吹き付けにより形成される
ので、鋼管内に設置される型枠が全く不要になるととも
に、特に、横補強材14の配置は、鋼管10の内面に突
設されたフック12に順次係止させて螺旋状に捲回させ
つつ行われるので簡単且つ容易に施工できる。
Now, according to the method of reinforcing the steel pipe column with the concrete layer 22 formed inside the steel pipe 10 as described above, since the concrete layer is formed by spraying from the nozzle 18, the formwork installed in the steel pipe is completely eliminated. In addition, it becomes unnecessary, and in particular, since the lateral reinforcing member 14 is arranged while being sequentially wound on the hook 12 projecting from the inner surface of the steel pipe 10 and wound in a spiral shape, it can be easily and easily installed.

なお、上記実施例では、鋼管柱を補強する場合を例示し
たが、この発明の実施はこれに限定されることはなく、
例えば、大型構造物の基礎杭として地盤中に埋設された
鋼管10ついて上述した工程を行えば、鋼管杭の補強工
法としても採用することができる。
In addition, in the above embodiment, the case of reinforcing the steel pipe column is illustrated, but the implementation of the present invention is not limited to this,
For example, if the above-described steps are performed on the steel pipe 10 buried in the ground as a foundation pile for a large structure, it can be adopted as a reinforcing method for the steel pipe pile.

また、鋼管10の断面形状も円形だけでなく角形であっ
てもよい。
Further, the sectional shape of the steel pipe 10 may be not only circular but also rectangular.

さらに、上記実施例で示した縦補強材16は、必要なコ
ンクリート層22が形成された後に、端部を引張ってコ
ンクリート層22にプレストレスを導入するようにして
もよい。
Further, in the vertical reinforcing member 16 shown in the above-mentioned embodiment, after the necessary concrete layer 22 is formed, the end portion may be pulled to introduce prestress to the concrete layer 22.

《発明の効果》 以上、実施例で詳細に説明したように、本発明に係る鋼
管柱,杭の現場補強工法によれば、特に大型構造物の支
柱や基礎杭として用いられる大口径の鋼管柱,杭を構築
現場においてコンクリートにより補強すべく鋼管柱,杭
の内面にコンクリート層を形成する際に、鉄筋等の線状
のコンクリート補強材の配設を容易にするとともに、型
枠の設置を不要にして、経済的かつ迅速に鋼管柱,杭を
補強することができる。
<< Effects of the Invention >> As described in detail in the above, according to the steel pipe column and pile on-site reinforcement method according to the present invention, a large-diameter steel pipe column particularly used as a column for a large structure or a foundation pile. , When forming a concrete layer on the inner surface of steel pipe columns and piles to reinforce the piles with concrete at the construction site, it is easy to arrange linear concrete reinforcements such as reinforcing bars and there is no need to install formwork. Thus, the steel pipe columns and piles can be reinforced economically and quickly.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例の施工状態を示す斜視図、第
2図は第1図の上面図である。 10……鋼管、12……フック 14……横補強材、16……縦補強材 18……ノズル、22……コンクリート層
FIG. 1 is a perspective view showing a construction state of an embodiment of the present invention, and FIG. 2 is a top view of FIG. 10 ... Steel pipe, 12 ... Hook 14 ... Horizontal reinforcement, 16 ... Vertical reinforcement 18 ... Nozzle, 22 ... Concrete layer

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】構築現場に予め設置された鋼管柱,杭をコ
ンクリートによって補強する鋼管柱,杭の現場補強工法
において、前記予め設置された鋼管柱,杭の内面には、
鉄筋やグラスファイバー等の線状のコンクリート補強材
を係止するためのフックを突設し、このフックに前記コ
ンクリート補強材を係止することにより当該コンクリー
ト補強材を前記鋼管柱,杭の内面に沿って配設し、しか
る後にコンクリートを、前記鋼管柱,杭の内部に挿入し
たノズルを介して前記鋼管柱,杭の内面に向けて吹き付
けることにより、当該内面に前記コンクリート補強材に
よって補強されたコンクリート層を形成することを特徴
とする鋼管柱、杭の現場補強工法。
1. A steel pipe column pre-installed on a construction site, a steel pipe column for reinforcing a pile with concrete, and a site reinforcement method for a pile, wherein the pre-installed steel pipe column and the inner surface of the pile are:
A hook for locking a linear concrete reinforcing material such as a reinforcing bar or glass fiber is projected, and the concrete reinforcing material is locked on the hook to attach the concrete reinforcing material to the inner surface of the steel pipe column or pile. Then, the concrete was reinforced along with the concrete reinforcing material by spraying the concrete toward the inner surfaces of the steel pipe pillar and the pile through a nozzle inserted into the steel pipe pillar and the pile. A site reinforcement method for steel pipe columns and piles that is characterized by forming a concrete layer.
JP63072118A 1988-03-28 1988-03-28 On-site reinforcement method for steel pipe columns and piles Expired - Lifetime JPH0643693B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63072118A JPH0643693B2 (en) 1988-03-28 1988-03-28 On-site reinforcement method for steel pipe columns and piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63072118A JPH0643693B2 (en) 1988-03-28 1988-03-28 On-site reinforcement method for steel pipe columns and piles

Publications (2)

Publication Number Publication Date
JPH01244807A JPH01244807A (en) 1989-09-29
JPH0643693B2 true JPH0643693B2 (en) 1994-06-08

Family

ID=13480118

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63072118A Expired - Lifetime JPH0643693B2 (en) 1988-03-28 1988-03-28 On-site reinforcement method for steel pipe columns and piles

Country Status (1)

Country Link
JP (1) JPH0643693B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7135974B2 (en) 2019-03-28 2022-09-13 トヨタ自動車株式会社 strut

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS57151726A (en) * 1981-03-13 1982-09-18 Tomomichi Niwa Manufacture of composite concrete pile
JPS61233117A (en) * 1985-04-05 1986-10-17 Tousen Asano Paul Kk Axial reinforcement omnipresence-type composite concrete pile and its manufacture

Also Published As

Publication number Publication date
JPH01244807A (en) 1989-09-29

Similar Documents

Publication Publication Date Title
JPH09317008A (en) Joint structure of filled steel tube concrete columns
JP7703061B2 (en) Design method for underground structure, construction method for underground structure, and underground structure
KR102351779B1 (en) Phc pile for soil retaining wall
JP2531038B2 (en) Pillar PC structure
JPH0643693B2 (en) On-site reinforcement method for steel pipe columns and piles
JPH05263421A (en) Column type earth retaining wall
JP2914183B2 (en) Thickening reinforcement method of existing earthquake-resistant wall
JP2004076362A (en) Joint structure of structural steel and method of forming joint
JP6088883B2 (en) Connection method and connection structure of fiber reinforced pile material for shield excavation
JP3232487B2 (en) Construction method of column base and column base structure
JPH0314483Y2 (en)
JP2827850B2 (en) Precast concrete wall joint structure
JPH0458522B2 (en)
KR20080059951A (en) Combined pile foundation and underground retaining wall construction method and shear friction reinforcement for them
JPH07158016A (en) Steel pipe lap joint structure of steel pipe/concrete composite structure columnar body
JPH11181807A (en) Construction method for underground story
JPH01125416A (en) Concrete pile
JPS5841118A (en) Sheathing and protecting method for long-sized slope
JPH04124354A (en) Packed tube-concrete composite column
JP3665412B2 (en) Concrete wall reinforcement
JPH03144014A (en) Geotextile integral with fixing part and steep slope banking using thereof
JPH07292861A (en) Connecting structure of beam and wall
JPS64435Y2 (en)
JPH0337603B2 (en)
CN121473378A (en) An embedded column base construction structure and its construction method