JPH0645927B2 - Ground compaction method - Google Patents
[go: Go Back, main page]

JPH0645927B2 - Ground compaction method - Google Patents

Ground compaction method

Info

Publication number
JPH0645927B2
JPH0645927B2 JP60276398A JP27639885A JPH0645927B2 JP H0645927 B2 JPH0645927 B2 JP H0645927B2 JP 60276398 A JP60276398 A JP 60276398A JP 27639885 A JP27639885 A JP 27639885A JP H0645927 B2 JPH0645927 B2 JP H0645927B2
Authority
JP
Japan
Prior art keywords
ground
pillar
drain
vibration
penetration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP60276398A
Other languages
Japanese (ja)
Other versions
JPS62137317A (en
Inventor
篤生 尾上
啓 阿部
吉秀 境
信夫 森
卓郎 小田原
勝彦 横山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP60276398A priority Critical patent/JPH0645927B2/en
Publication of JPS62137317A publication Critical patent/JPS62137317A/en
Publication of JPH0645927B2 publication Critical patent/JPH0645927B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 本発明は、軟弱地盤を改良する地盤の締固め工法に関す
る。
TECHNICAL FIELD The present invention relates to a method of compacting ground for improving soft ground.

「従来の技術」 従来、砂質地盤や粘性土地盤のような、いわゆる軟弱地
盤を改良する工法として、例えばバイブロ・フローテー
ション工法やサンド・コンパクション・パイル工法等が
知られている。
“Conventional Technology” Conventionally, for example, a vibro flotation method or a sand compaction pile method is known as a method for improving so-called soft ground such as sandy ground and cohesive ground.

バイブロ・フローテーション工法は、地盤中に棒状の振
動機を貫入し、振動機部分に水を噴出しながら地盤を振
動させて締固め、かつ、振動機付近に生じる空隙に砂や
砕石等を投入して振動効果や圧入効果の増大を図る工法
である。
In the vibro flotation method, a bar-shaped vibrator is penetrated into the ground, the ground is vibrated and compacted while ejecting water to the vibrator part, and sand and crushed stones are put into the voids near the vibrator. This is a construction method for increasing the vibration effect and the press-fitting effect.

また、サンド・コンパクション・パイル工法は、地盤中
に振動あるいは衝撃荷重を用いて砂を圧入し、地盤中に
圧縮された砂柱を造成して地盤の相対密度の増加を図る
工法である。
Further, the sand compaction pile method is a method for increasing the relative density of the ground by injecting sand into the ground by using vibration or impact load and creating a compressed sand column.

「発明が解決しようとする問題点」 ところで、バイブロ・フローテーション工法では、地盤
を振動させつつ、砂等の投入と振動機のわずかな引き抜
きとを交互に繰り返し、また、サンド・コンパクション
・パイル工法では砂の投入と圧縮とを交互に繰り返す。
従って、これらの工法は、工期が長引く欠点を有すると
ともに、砂柱造成用の、あるいは投入材としての砂等を
必要とすることも相まって工費がかさむという欠点を持
っている。また、バイブロ・フローテーション工法の場
合、砂質地盤への適用を目的としており、シルト分以下
の土粒子の含有率が40%以上の地盤には効果がなく、
さらに、水平振動を要するため市販の加振機を使用でき
ない等の不具合もある。
"Problems to be solved by the invention" By the way, in the vibro flotation method, the sand is compacted and the sand is slightly pulled out alternately while vibrating the ground, and the sand compaction pile method is also used. Then, sand input and compression are alternately repeated.
Therefore, these construction methods have the drawback of prolonging the construction period, and also have the drawback that the construction cost is increased due to the need for sand or the like for sand column formation or as an input material. In addition, in the case of the vibro flotation method, it is intended to be applied to sandy ground, and there is no effect on the ground where the content ratio of soil particles below silt is 40% or more.
Further, there is a problem that a commercially available vibration exciter cannot be used because horizontal vibration is required.

本発明は上記の事情に鑑みてなされたもので、その目的
とするところは、地盤を確実に締固めて特に地震時にお
ける地盤の液状化を防止し、しかも、工期および工費の
著しい削減を実現する全く新しい地盤の締固め工法を提
供することにある。
The present invention has been made in view of the above circumstances, and an object thereof is to reliably compact the ground and prevent liquefaction of the ground particularly during an earthquake, and realize a significant reduction in construction period and construction cost. It is to provide a completely new ground compaction method.

「問題点を解決するための手段」 上記目的を達成するために本発明の地盤の締固め工法で
は、地盤中に竪穴を掘削し、この竪穴内にドレーン柱を
形成した後、このドレーン柱周辺の地盤中に柱体を振動
させながら貫入することにより、地盤を締固めるように
している。
“Means for Solving Problems” In order to achieve the above-mentioned object, in the ground compaction method of the present invention, a vertical hole is excavated in the ground, and a drain pillar is formed in the vertical hole, and then the drain pillar and its surroundings. The ground is compacted by vibrating the pillar into the ground while vibrating.

「作用」 この発明の地盤の締固め工法によれば、柱体を地盤中へ
振動させながら貫入した時に、この柱体の振動により地
盤中に過剰水圧が生じ、この過剰水圧で地盤中の水が、
柱体の周囲に配置されたドレーン柱に向けて水平排水さ
れ、これによって地盤が沈下して、鉛直方向に圧縮され
る。
[Operation] According to the ground compaction method of the present invention, when the pillar penetrates into the ground while vibrating, the vibration of the pillar causes excessive water pressure in the ground, and this excessive water pressure causes water in the ground But,
The water is horizontally drained toward the drain pillars arranged around the pillar body, which causes the ground to sink and is compressed in the vertical direction.

そして、このような工法を採用することにより、柱体の
周辺に複数のドレーン柱を配置した状態で、該柱体を地
盤中に貫入させれば、これらドレーン柱に対して、効率
良く地下水を排出することができ、その結果、一度の柱
体貫入、振動によって、比較的広い範囲で地盤の圧縮作
業を行うことができ、その締固め作業を効率良く行うこ
とが可能となる。
Then, by adopting such a construction method, when a plurality of drain pillars are arranged around the pillar body and the pillar body is penetrated into the ground, groundwater can be efficiently supplied to these drain pillars. It can be discharged, and as a result, the work of compressing the ground can be performed in a relatively wide range by one penetration and vibration of the column body, and the compaction work can be efficiently performed.

「実施例」 以下、本発明を図面に示す実施例に基づいて説明する。[Examples] Hereinafter, the present invention will be described based on examples shown in the drawings.

第1図〜第7図は本発明の一実施例を示すものであり、
これらの図において、第1図〜第3図は本発明の地盤の
締固め工法に適用される締固め装置の概略を示す。
1 to 7 show one embodiment of the present invention,
In these figures, FIGS. 1 to 3 show the outline of a compaction device applied to the soil compaction method of the present invention.

まず、第1図において符号1で示すものはクローラクレ
ーンである。クローラクレーン1はガイドマスト2を支
持しており、ガイドマイト2の上端には吊り治具3を介
して柱体4が縦に吊り下げられている。この柱体4は例
えば大型のH形鋼であり、その横断面は第3図の如くほ
ぼH形をなしている。そして、その上端には第2図の如
く加振機(いわゆるバイブロハンマ)5が取り付けられ
ている。この加振機5は柱体4に鉛直方向の振動を与え
るものである。また、柱体4の表面には、その長さ方向
と交差する方向に突出する多数の突出部(突起)6が設
けられている。これら突起部6は、例えば山形鋼を寸断
して柱体4に溶接したものである。
First, a crawler crane is denoted by reference numeral 1 in FIG. The crawler crane 1 supports a guide mast 2, and a pillar 4 is vertically hung on the upper end of the guide mite 2 via a hanging jig 3. The column 4 is, for example, a large H-shaped steel, and its cross section is substantially H-shaped as shown in FIG. A vibrator (so-called vibro hammer) 5 is attached to the upper end thereof as shown in FIG. The vibration exciter 5 applies vertical vibration to the columnar body 4. Further, on the surface of the columnar body 4, a large number of projecting portions (projections) 6 projecting in a direction intersecting the length direction thereof are provided. These protrusions 6 are, for example, angle steels cut into pieces and welded to the columnar body 4.

次いで、上記のような構成の装置を使用して軟弱地盤を
締固める工法について説明する。
Next, a method of compacting the soft ground by using the device having the above-mentioned configuration will be described.

まず、第4図の如く地盤G中に、所定の深度に達するド
レーン柱Dを多数造成する。これらドレーン柱Dの配置
は、例えば第5図の如く地盤G上に碁盤の目を描くよう
な配置とする。各ドレーン柱Dは、例えば先端を閉塞し
たパイプを地盤G中に貫入した後、パイプの先端を開放
し、パイプを引き抜きながら引き抜き後の竪穴にドレー
ン材を投入することにより造成する。また、ドレーン材
としては例えば切り込み砂利、砕石、礫、鉱滓、シンダ
ーアッシュ、ボトムアッシュ(フライアッシュの大
塊)、あるいは下水道の焼却灰等を用いる。しかる後
に、クローラクレーン1を操作して柱体4をドレーン柱
D相互間の地盤G上、すなわち第5図鎖線で示すような
位置に吊り降ろし、柱体4の下端を第6図の如く地盤G
に当接させる。そして、加振機5を作動させて柱体4に
振動を与え、これにより第7図の如く柱体4を地盤G中
の所定深度まで貫入する。このとき、柱体4の振動が、
柱体4自体の表面積の広さ、および突出部7の存在によ
り地盤G中へ良好に伝達し、この振動により地盤G中に
過剰水圧が生じる。そして、この過剰水圧により地盤G
中の水が貫入箇所周辺のドレーン柱D内へ水平排水され
る。従って、排水された地盤Gは沈下し、鉛直方向に圧
縮されて締固められる。続いて、柱体4を継続的に振動
させながらクローラクレーン1により柱体4を地盤Gか
ら引き抜き、柱体4を地盤G上の他の位置、すなわちド
レーン柱D相互間に移動して上記と同様の作業を繰り返
す。つまり、このような作業を各ドレーン柱D周辺の地
盤Gに対して施すことにより、多数のドレーン柱Dを配
置した付近一帯の地盤Gを締固める。ちなみに、上記工
法により沈下した地表面(局所的に発生する穴等)を元
の標高まで回復させる必要がある場合には、機械的な転
圧、締固め、または動圧密等により他の場所から運んだ
土砂を締固めればよい。
First, as shown in FIG. 4, a large number of drain columns D reaching a predetermined depth are formed in the ground G. The drain pillars D are arranged such that a grid pattern is drawn on the ground G as shown in FIG. 5, for example. Each drain pillar D is formed by, for example, penetrating a pipe whose tip is closed into the ground G, opening the tip of the pipe, and, while pulling out the pipe, introducing a drain material into the vertical hole after the pipe is pulled out. Further, as the drain material, for example, cut gravel, crushed stone, gravel, slag, cinder ash, bottom ash (a large block of fly ash), or incineration ash of sewer is used. Then, the crawler crane 1 is operated to hang the pillar 4 on the ground G between the drain pillars D, that is, at a position shown by a chain line in FIG. 5, and the lower end of the pillar 4 is grounded as shown in FIG. G
Abut. Then, the vibration exciter 5 is operated to give vibration to the columnar body 4, and as a result, the columnar body 4 penetrates to a predetermined depth in the ground G as shown in FIG. At this time, the vibration of the column 4
Due to the large surface area of the column 4 itself and the presence of the protrusions 7, the column body 4 is satisfactorily transmitted to the ground G, and this vibration causes excess water pressure in the ground G. Then, due to this excess water pressure, the ground G
The water inside is horizontally drained into the drain pillar D around the intrusion site. Therefore, the drained ground G sinks and is vertically compressed and compacted. Subsequently, while continuously vibrating the pillar body 4, the pillar body 4 is pulled out from the ground G by the crawler crane 1, and the pillar body 4 is moved to another position on the ground G, that is, between the drain pillars D and the above. Repeat the same work. That is, by performing such an operation on the ground G around each drain pillar D, the ground G in the vicinity where the many drain pillars D are arranged is compacted. By the way, if it is necessary to recover the ground surface (such as locally generated holes) subsided by the above construction method to the original altitude, mechanical rolling, compaction, or dynamic consolidation should be performed from another location. All you have to do is compact the transported soil.

一方、第8図〜第10図は本発明の他の実施例を示すも
のであり、これらの図において、第8図及び第9図は、
本発明の地盤の締固め工法に適用される締固め装置を示
している。この実施例の柱体7は、大口径の鋼管であ
る。この柱体7は、第9図の如くその上端に柱体7内を
その径方向に横断するバイブロチャック用板8を備え、
このバイブロチャック用板8に加振機5が取り付けられ
ている。また、柱体7の管壁にはこれを貫通する多数の
透水孔9が設けられ、さらに柱体7の外面には多数の突
出部6が設けられている。
On the other hand, FIGS. 8 to 10 show another embodiment of the present invention. In these figures, FIG. 8 and FIG.
The compaction apparatus applied to the ground compaction method of the present invention is shown. The column 7 of this embodiment is a large-diameter steel pipe. As shown in FIG. 9, this column 7 is provided with a vibrochuck plate 8 at its upper end that traverses the inside of the column 7 in its radial direction.
The vibrator 5 is attached to the vibro chuck plate 8. In addition, a large number of water-permeable holes 9 are formed through the tube wall of the columnar body 7, and a large number of protrusions 6 are provided on the outer surface of the columnar body 7.

このような構成の装置を使用して軟弱地盤を締固める場
合には、上記一実施例の工法同様、まず、地盤G中に多
数のドレーン柱Dを造成した後、クローラクレーン1で
柱体7を一つのドレーン柱D上に吊り降ろす。そして、
加振機5により柱体7に振動を与え、この振動によって
柱体7を第10図の如く所定深度まで貫入する。すなわち
柱体7の内部にドレーン柱Dが内包されるようにする。
このとき、柱体7の内側の地盤G中へはその全周を柱体
7が取り囲むことにより振動が良好に伝達し、また、柱
体7の外側の地盤G中へは突出部6の存在により振動が
良好に伝達する。従って、柱体7内外の地盤G中に過剰
水圧が生じ、この過剰水圧により内側地盤G中の水が柱
体7内のドレーン柱D内へ、また、外側地盤G中の水が
貫入箇所周辺のドレーン柱D内、あるいは透水孔9を介
して柱体7内のドレーン柱D内へ水平排水される。続い
て、柱体7を継続的に振動させながらクローラクレーン
1により柱体7を地盤Gから引き抜き、柱体7を他のド
レーン柱D上に移動して上記と同様の作業を繰り返すよ
うにする。
When compacting the soft ground using the apparatus having such a structure, first, like the construction method of the above-described embodiment, first, a large number of drain pillars D are formed in the ground G, and then the pillar body 7 is formed by the crawler crane 1. Is hung on one drain pillar D. And
Vibration is applied to the columnar body 7 by the vibration exciter 5, and the columnar body 7 penetrates to a predetermined depth as shown in FIG. 10 by this vibration. That is, the drain pillar D is included inside the pillar body 7.
At this time, the vibration is satisfactorily transmitted to the ground G inside the pillar body 7 by surrounding the entire circumference by the pillar body 7, and the presence of the protrusion 6 in the ground G outside the pillar body 7. Vibration is transmitted satisfactorily. Therefore, excess water pressure is generated in the ground G inside and outside the pillar body 7, and due to this excess water pressure, the water in the inner ground G enters the drain pillar D in the pillar body 7, and the water in the outer ground G penetrates around the location. The water is horizontally drained into the drain pillar D inside the pillar body 7 or through the water permeable hole 9 into the drain pillar D inside the pillar body 7. Then, while continuously vibrating the pillar 7, the pillar 7 is pulled out from the ground G by the crawler crane 1, the pillar 7 is moved onto another drain pillar D, and the same work as above is repeated. .

次に、幾つかの実験結果を示して本発明の作用効果をよ
り明確にする。ただし、実験は直径1200mm、長さ1
2000mmの鋼管(柱体、ただし透水孔および突出部の
無いもの)が直径500mm、深さ11000mmのグラベ
ルドレーン(ドレーン柱)を内包する工法により行っ
た。また、加振機としてはバイブロハンマVM2-25000Aを
用いた。
Next, some experimental results will be shown to clarify the effect of the present invention. However, the experiment was 1200 mm in diameter and 1 in length
A 2,000 mm steel pipe (column, but no water-permeable holes and protrusions) was included by a method of enclosing a gravel drain (drain column) having a diameter of 500 mm and a depth of 11,000 mm. A vibro hammer VM2-25000A was used as the vibration exciter.

第11図は、鋼管貫入前の地盤(点線)および貫入後の地
盤(実線)に対して各々標準貫入試験を行い、各々の試
験結果すなわちN値と、地盤の深度との関係を貫入前地
盤の地層状態とともに示したものである。貫入前のN値
は平均で4.55、貫入後のN値は平均で23.6であった。こ
の図から明らかなように貫入後の地盤が貫入前の地盤に
対して著しく締固まっていることがわかる。
Fig. 11 shows a standard penetration test for the ground before the steel pipe penetration (dotted line) and the ground after the penetration (solid line), and shows the relationship between each test result, that is, the N value and the depth of the ground. It is shown together with the stratum condition of. The N value before penetration was 4.55 on average, and the N value after penetration was 23.6 on average. As is clear from this figure, the ground after intrusion is significantly compacted with respect to the ground before intrusion.

第12図は、道路橋示方書に基づく液状化抵抗強度Rを貫
入前のN値および貫入後のN値を用いて算出したもので
ある。貫入後のR(平均0.384)は貫入前のR(平
均0.16)より顕著に増加することがわかる。ただ
し、グラフの上限および下限は±σ(:Rの平均
値、σ:標準偏差)の値である。また、貫入後のRの変
動係数σ/(0.283)は貫入前のRの変動係数σ
/(0.403)よりかなり小さくなり、貫入後の地
盤は均質に締固まることがわかる。
FIG. 12 shows the calculation of the liquefaction resistance strength R based on the road bridge specifications using the N value before penetration and the N value after penetration. It can be seen that R after penetration (average 0.384) is significantly higher than R before penetration (average 0.16). However, the upper and lower limits of the graph are values of ± σ (: average value of R, σ: standard deviation). In addition, the coefficient of variation of R after penetration σ / (0.283) is the coefficient of variation of R before penetration σ
It is much smaller than /(0.403), and it can be seen that the ground after intrusion uniformly compacts.

第13図は、細粒分(粒径74μ以下)含有率と貫入後の
Rとの関係を示したものである。この実験における地盤
は細粒分含有率が38%以下の地盤であるが、細粒分含
有率が増えてもR値は低下せず、当工法により細粒分含
有率のいかんにかかわらずR(またはN値)の増加を期
待することができるといえる。
FIG. 13 shows the relationship between the content of fine particles (particle size 74 μ or less) and R after penetration. The ground in this experiment is a ground with a fine particle content rate of 38% or less, but the R value does not decrease even if the fine particle content rate increases. It can be said that an increase in (or N value) can be expected.

第14図は、鋼管貫入時間と貫入深度との関係を示したも
のである。図から11m貫入に3分〜12分要すること
がわかるが、従来の工法のサイクルタイムは20分程度
であるから、かなり施工速度が速まることがわかる。
FIG. 14 shows the relationship between the steel pipe penetration time and the penetration depth. From the figure, it can be seen that it takes 3 to 12 minutes to penetrate 11 m, but it can be seen that the construction speed is considerably increased because the cycle time of the conventional construction method is about 20 minutes.

なお、上記一実施例では柱体4としてH形鋼を用いたが
これに限るものではなく、例えば横断面十字形のもの、
あるいは十字に交差する各腕部の先に、さらにフランジ
部を有する形状のもの等を用いてもよい。また、上記他
の実施例では柱体7として横断面円形の鋼管を用いた
が、角形の鋼管を用いてもよい。さらに、両実施例にお
いて、突出部6を突起としたが、例えば柱体4,7の長
さ方向に沿う棒状のもの(鋼棒等)や、あるいは柱体
4,7の周囲に沿う形状のもの(柱体7の場合は鋼リン
グ等)としてもよい。
Although the H-shaped steel is used as the columnar body 4 in the above-described embodiment, the columnar body 4 is not limited to this.
Alternatively, it is also possible to use a shape having a flange portion at the tip of each arm portion that crosses in a cross shape. Further, in the other embodiments described above, a steel pipe having a circular cross section is used as the columnar body 7, but a square steel pipe may be used. Furthermore, in both of the embodiments, the protrusion 6 is a protrusion, but for example, a rod-shaped member (steel rod or the like) along the length direction of the pillars 4 and 7, or a shape along the periphery of the pillars 4 and 7. It may be a thing (steel ring or the like in the case of the column 7).

「発明の効果」 以上詳細に説明したような地盤の締固め工法によれば、
柱体を地盤中へ振動させながら貫入した時に、この柱体
の振動により地盤中に過剰水圧が生じ、この過剰水圧で
地盤中の水が、柱体の周囲に配置されたドレーン柱に向
けて水平排水され、これによって地盤が沈下して、鉛直
方向に圧縮される。
"Effects of the Invention" According to the ground compaction method as described in detail above,
When the pillar penetrates into the ground while vibrating, the vibration of the pillar causes excess water pressure in the ground, and this excess water pressure causes the water in the ground toward the drain pillars arranged around the pillar. It is drained horizontally, which sinks the ground and compresses it vertically.

そして、このような工法を採用することにより、以下の
ような優れた効果を得ることができる。
By adopting such a construction method, the following excellent effects can be obtained.

柱体の周辺に複数のドレーン柱を配置した状態で、該
柱体を地盤中に貫入させれば、これらドレーン柱に対し
て、効率良く地下水を排出することができ、その結果、
一度の柱体貫入、振動によって、比較的広い範囲で地盤
の圧縮作業を行うことができ、その締固め作業を効率良
く行うことが可能となり、工期、工費の著しい削減を実
現することが可能となる。
With a plurality of drain pillars arranged around the pillar body, if the pillar body is penetrated into the ground, groundwater can be efficiently discharged to these drain pillars, and as a result,
It is possible to compress the ground in a relatively wide range by a single penetration of the pillar and vibration, and it is possible to efficiently perform the compaction work, and it is possible to realize a significant reduction in construction period and cost. Become.

地盤を鉛直方向に圧縮するのみであるから地盤中に空
隙は生じず、砂や砕石等の投入が不要である。従って、
工期の削減効果も相まって工費を大幅に削減することが
できる。特に、沈下した地表面をもとの標高に回復させ
る必要がない場合、例えば地下室を造るための掘削を伴
う建設工事等の場合は、改良後の地盤のN値が40前
後、あるいはそれ以上となり、基礎の支持地盤として直
接使用できるから、基礎工事費を大幅に削減できる。
Since the ground is only compressed in the vertical direction, there are no voids in the ground and it is not necessary to add sand or crushed stone. Therefore,
Combined with the effect of reducing the construction period, the construction cost can be significantly reduced. Especially when it is not necessary to restore the subsided ground surface to its original altitude, for example, in the case of construction work that involves excavation to build a basement, the N value of the improved ground is around 40 or more. Since it can be used directly as a foundation for the foundation, the foundation construction cost can be significantly reduced.

地盤を確実に締固めて地震時における地盤の液状化を
防止することができる。
The ground can be reliably compacted to prevent liquefaction of the ground during an earthquake.

【図面の簡単な説明】[Brief description of drawings]

第1図〜第7図は本発明の一実施例を説明するもので、
第1図は締固め装置の全体構成を示す概略図、第2図は
要部の側面図、第3図は第2図のIII-III線矢視図、第
4図、第6図および第7図は第1図の装置を使用した締
固め工法を工程順に示す垂直断面図、第5図はドレーン
柱の配置例を示す平面図、第8図〜第10図は本発明の他
の実施例を説明するもので、第8図は要部の縦断面図、
第9図は第8図のIX-IX線矢視図、第10図は第8図の装
置を使用した締固め工法を説明する垂直断面図、第11図
〜第14図は本発明の作用効果を明確にするための実験結
果を示すグラフである。 1……クローラクレーン、4,7……柱体、5……加振
機、6……突出部、9……透水孔、G……地盤。
FIGS. 1 to 7 explain one embodiment of the present invention.
FIG. 1 is a schematic view showing the overall structure of the compaction device, FIG. 2 is a side view of the main part, FIG. 3 is a view taken along the line III-III of FIG. 2, FIG. 4, FIG. 6 and FIG. FIG. 7 is a vertical sectional view showing a compaction method using the apparatus of FIG. 1 in the order of steps, FIG. 5 is a plan view showing an arrangement example of drain columns, and FIGS. 8 to 10 are other embodiments of the present invention. To explain an example, FIG. 8 is a longitudinal sectional view of the main part,
FIG. 9 is a view taken along the line IX-IX of FIG. 8, FIG. 10 is a vertical sectional view for explaining the compaction method using the apparatus of FIG. 8, and FIGS. 11 to 14 are the functions of the present invention. It is a graph which shows the experimental result for clarifying an effect. 1 ... crawler crane, 4, 7 ... pillars, 5 ... vibrator, 6 ... protrusion, 9 ... water permeation hole, G ... ground.

フロントページの続き (72)発明者 森 信夫 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 小田原 卓郎 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 横山 勝彦 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (56)参考文献 特開 昭57−119012(JP,A) 実開 昭52−65006(JP,U)Front Page Continuation (72) Inventor Nobuo Mori 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Takuro Odawara 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Stock In-company (72) Inventor Katsuhiko Yokoyama 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (56) References JP-A-57-119012 (JP, A) SAIKAI 52-65006 (JP) , U)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】地盤中に竪穴を掘削し、この竪穴内にドレ
ーン柱を形成した後、このドレーン柱周辺の地盤中に柱
体を振動させながら貫入することにより地盤を締固める
ことを特徴とする地盤の締固め工法。
1. A pit is excavated in the ground, a drain pillar is formed in the pit, and the pillar is vibrated and penetrated into the ground around the drain pillar to compact the ground. A method for compacting the ground.
【請求項2】前記柱体は管状をなし、かつその管壁を貫
通する多数の透水孔が設けられており、この柱体の内部
に前記ドレーン柱が内包されるように柱体を貫入するこ
とを特徴とする特許請求の範囲第1項記載の地盤の締固
め工法。
2. The columnar body has a tubular shape and is provided with a large number of water permeable holes penetrating through the tube wall, and the columnar body is inserted so that the drain column is contained in the columnar body. The method for compacting the ground according to claim 1, wherein
JP60276398A 1985-12-09 1985-12-09 Ground compaction method Expired - Lifetime JPH0645927B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60276398A JPH0645927B2 (en) 1985-12-09 1985-12-09 Ground compaction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60276398A JPH0645927B2 (en) 1985-12-09 1985-12-09 Ground compaction method

Publications (2)

Publication Number Publication Date
JPS62137317A JPS62137317A (en) 1987-06-20
JPH0645927B2 true JPH0645927B2 (en) 1994-06-15

Family

ID=17568851

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60276398A Expired - Lifetime JPH0645927B2 (en) 1985-12-09 1985-12-09 Ground compaction method

Country Status (1)

Country Link
JP (1) JPH0645927B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4996475A (en) 1987-05-31 1991-02-26 Hamamatsu Photonics Kabushiki Kaisha Electro-optic voltage detector having a transparent electrode

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5238001Y2 (en) * 1976-10-20 1977-08-30
JPS6053133B2 (en) * 1981-01-14 1985-11-22 日立造船株式会社 Vibration dewatering acceleration type ground compaction equipment

Also Published As

Publication number Publication date
JPS62137317A (en) 1987-06-20

Similar Documents

Publication Publication Date Title
JP3486572B2 (en) Ground reinforcement composite method
JP3361879B2 (en) Construction method of pile with drain layer and construction device used for it
JP2000170149A (en) Forming method for underground pile and equipment therefor
JPS62242011A (en) Method and apparatus for constructing shallow ground-improving pile
JPH0645927B2 (en) Ground compaction method
JP3144767B2 (en) Underground pile forming method and apparatus
JP3450725B2 (en) Ground improvement method
JP2002047638A (en) Ground improvement construction method combined with blasting construction method
JPH08284158A (en) Application method of pile with water hole
JPH086307B2 (en) Liquefaction prevention method for sand ground and excavation compaction device used therefor
JP2743055B2 (en) Liquefaction prevention method for sand ground
JPH0639772B2 (en) Ground compaction method and compaction device
JPS63315721A (en) Foundation pile driving method as well as ground compaction
JP6876526B2 (en) Specification setting method for sandy ground compaction method
JP2729237B2 (en) Ground compaction method
KR101932415B1 (en) Construction Method of Cast-in Situ Piles Using Free-Falling Compaction Equipment
KR960003748B1 (en) Working method of concrete pile or sand pile for a soft-soil foundation
JPS63304816A (en) Construction of crushed stone continuous underground wall
JPH02108719A (en) Soft ground improvement method
JP2927612B2 (en) Foundation method
JPS5972321A (en) Piling work for liquefied ground
JPH066805B2 (en) Construction method of cast-in-place pile
JP2003082649A (en) Improvement method for soft ground
JPH051849B2 (en)
Le et al. Application of vibro stone columns for a fabrication yard in Vietnam