JPH0647827B2 - Rock reinforcement method - Google Patents
Rock reinforcement methodInfo
- Publication number
- JPH0647827B2 JPH0647827B2 JP1202089A JP20208989A JPH0647827B2 JP H0647827 B2 JPH0647827 B2 JP H0647827B2 JP 1202089 A JP1202089 A JP 1202089A JP 20208989 A JP20208989 A JP 20208989A JP H0647827 B2 JPH0647827 B2 JP H0647827B2
- Authority
- JP
- Japan
- Prior art keywords
- fixing plate
- ground
- formwork
- forming
- hardening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、地山保護のために実施される地山補強工法
に関するものである。[Detailed Description of the Invention] [Industrial field of application] The present invention relates to a natural ground reinforcement method for protecting natural ground.
第15図は、例えば特公昭53−46361号公報に開示
されたこの種従来の地山補強工法の概要を説明するため
の断面図である。図において、(1)は補強すべき対象で
ある法面の地山、(1a)はこの地山(1)に浅く形成された
凹溝、(2)は所定の間隔で凹溝(1a)上に設置された一対
の型枠、(3)は横副筋で、型枠(2)を一定の間隔に支持す
る。(4)および(5)は、横副筋(3)によって支持され所定
の位置に設置されたそれぞれ主筋および副筋である。
(6)は凹溝(1a)に所定の間隔で植込まれたアンカー筋で
ある。FIG. 15 is a sectional view for explaining the outline of a conventional ground reinforcement method of this type disclosed in, for example, Japanese Patent Publication No. 53-46361. In the figure, (1) is a ground on the slope to be reinforced, (1a) is a groove formed shallowly in this ground (1), (2) is a groove at a predetermined interval (1a) A pair of molds installed above, (3) are collateral muscles, which support the molds (2) at regular intervals. (4) and (5) are a main muscle and a vice muscle, which are supported by the collateral muscle (3) and are installed at predetermined positions, respectively.
(6) is an anchor muscle embedded in the groove (1a) at a predetermined interval.
第15図に示すように、各材料の組立ができると、上方か
ら型枠(2)の間に向けて、コンクリートまたはモルタル
(以下、本明細書ではモルタルをも含む概念としてコン
クリートと称するものとする)を圧縮空気を用いて吹付
け充填し硬化させる。型枠(2)はコンクリート等の硬化
後、取外すようにしてもよいが、いわゆる埋殺しとして
もよい。As shown in FIG. 15, when each material can be assembled, from the top to between the formwork (2), concrete or mortar (hereinafter referred to as concrete as a concept including mortar in this specification) Is blow-filled with compressed air and cured. The mold (2) may be removed after hardening of concrete or the like, but may be so-called buried.
第16図は補強工事が完了し、地山表面に形成されたコン
クリート構造物の外観を示す平面図、第17図は、第16図
のXVII−XVII線の断面図である。FIG. 16 is a plan view showing the appearance of a concrete structure formed on the ground surface after the reinforcement work is completed, and FIG. 17 is a sectional view taken along line XVII-XVII in FIG.
従来、地山補強は以上の要領で行われるので、出来上が
ったコンクリート構造物としての機械的強度に問題が生
じる。即ち、コンクリートの吹付けは型枠(2)の上方か
ら行われるので、各鉄筋(3)(4)(5)の下面側にはこの吹
付けコンクリートが充填されにくく、空洞部分が生じる
等、鉄筋とコンクリートとの密着が不十分となって最終
的な圧縮強度が完全にコンクリートが充填された場合に
比較して十分な設計強度を期待し得ない欠点を有してい
る。このためその分、設計強度を低く設定する必要があ
る。また、吹付け作業時、コンクリートの型枠外への流
出ロスがあり、更に通常、コテ等による整形仕上げ作業
が必要となる。従って、材料,工費共に高価になるとい
う問題点があった。Conventionally, since the ground reinforcement is performed in the above manner, there is a problem in the mechanical strength of the finished concrete structure. That is, since the spraying of concrete is performed from above the formwork (2), it is difficult to fill this sprayed concrete on the lower surface side of each rebar (3) (4) (5), a hollow portion occurs, etc. It has a drawback that the adhesion between the reinforcing bar and the concrete becomes insufficient and the final compressive strength cannot be expected to have a sufficient design strength as compared with the case where the concrete is completely filled. Therefore, it is necessary to set the design strength low accordingly. Further, during the spraying work, there is a loss of concrete flowing out of the formwork, and usually, a shaping finishing work by a trowel or the like is required. Therefore, there is a problem that both the material and the manufacturing cost are high.
勿論、通常のコンクリート工事と同様、生コンクリート
を使ったいわゆる場所打コンクリート工法を採用すれば
上記強度上の問題は解消される。しかし、傾斜した地山
に、その形状に合わせてその都度気密度の高い型枠を設
置しようとすると、機材は大型となり作業性も悪く、施
工場所も大幅に限定されることになる。Of course, if the so-called cast-in-place concrete construction method using ready-mixed concrete is adopted as in the case of normal concrete construction, the above problem of strength can be solved. However, if an attempt is made to install a formwork that has a high airtightness according to its shape on a sloping ground, the equipment will become large and the workability will be poor, and the construction site will be greatly limited.
この発明は、以上のような従来の問題点を解決するため
になされたもので、安価な生コンクリートを使って高い
設計強度が得られるとともに、必要機材の標準化、かつ
その一部の再使用が可能となる経済的で信頼性の高い地
山補強工法を提供することを目的とする。The present invention has been made to solve the above-mentioned conventional problems. It is possible to obtain a high design strength by using cheap ready-mixed concrete, standardize necessary equipment, and reuse a part of it. The purpose is to provide an economical and highly reliable ground reinforcement method.
この発明に係る地山補強工法は、先ず、以下の各工程、
即ち、補強すべき地山の表面に平面状の基礎面を形成す
る工程と、上記地山表面への開口を設けた定着板をアン
カー筋により上記基礎面に固着する工程と、上記定着板
から筋枠を介して支持することにより主筋を所定位置に
配置する工程と、上記主筋を覆うように型枠を上記定着
板に取り付けることにより所定の密閉空間を形成する工
程と、上記密閉空間に生コンクリートを注入充填し硬化
させる工程と、硬化後上記型枠を上記定着板から取り外
す工程とからなるものである。これにより、生コンクリ
ートは、主筋と密着して一体の構造物となり、かつ定着
板に設けた開口から地山表面に至り、地山に強固に固着
する。型枠は取り外して再使用でき、硬化したコンクリ
ート構造物はそのままで仕上がっており、整形仕上げの
作業等は不要である。The ground reinforcement method according to the present invention, first, the following steps,
That is, a step of forming a flat base surface on the surface of the ground to be reinforced, a step of fixing the fixing plate having an opening to the ground surface to the base surface by an anchor bar, and the fixing plate A step of arranging the main bar at a predetermined position by supporting it through a streak frame, a step of forming a predetermined closed space by attaching a mold to the fixing plate so as to cover the main bar, and It comprises a step of injecting and filling concrete and hardening, and a step of removing the mold from the fixing plate after hardening. As a result, the ready-mixed concrete comes into close contact with the main bars to form an integral structure, and reaches the ground surface from the opening provided in the fixing plate, and firmly adheres to the ground. The formwork can be removed and reused, and the hardened concrete structure is finished as it is without the need for shaping work.
そして、その請求項1のものは、型枠を複数個連接して
いく場合であって、互いに隣接する一方の型枠の端部を
他方の型枠の端部に所定の隙間を介して嵌め込み、上記
隙間をパツキンで埋めるようにしたものである。And, when the plural molds are connected to each other, the end of one of the molds adjacent to each other is fitted into the end of the other mold through a predetermined gap. The above gap is filled with a packing.
この場合、地山の表面形状の関係で、隣接する両型枠の
中心軸が上下または左右方向に多少傾斜しても、上記パ
ッキンが伸縮して上記隙間を常に埋めるので、生コンク
リートが両型枠の連接部分から漏れることはない。In this case, due to the surface shape of the ground, even if the central axes of the two adjacent formwork incline vertically or horizontally, the packing expands and contracts to always fill the gap. It does not leak from the connecting part of the frame.
また、請求項2のものは、互いに隣接する両型枠の端部
を対向させて配置するとともに、上記両型枠の端部周縁
に沿って上記対向方向に開口する所定深さの溝を形成
し、軸方向両端が上記両型枠の溝に挿入される可撓性板
を設けて上記両型枠間を連接するようにしたものであ
る。According to a second aspect of the present invention, the ends of the two molds adjacent to each other are arranged so as to face each other, and a groove having a predetermined depth that opens in the facing direction is formed along the peripheral edges of the ends of the two molds. However, flexible plates whose axial ends are inserted into the grooves of the two molds are provided so as to connect the two molds.
この場合も、上記同様、両型枠の中心軸が多少傾斜して
も、上記可撓性板が変形して密閉性を維持し、連接部分
からの生コンクリートの漏出を防止する。Also in this case, similarly to the above, even if the central axes of both molds are slightly inclined, the flexible plate is deformed to maintain the hermeticity, and leak of fresh concrete from the connecting portion is prevented.
更に、請求項3のものは、型枠の上面に開口と係止部と
を形成し、この係止部に摺動自在に取り付けられて上記
開口を開閉する止水板と、上記係止部に着脱可能に取り
付けられた生コンクリート注入のための注入口とを備え
たものである。Further, according to a third aspect of the present invention, an opening and a locking portion are formed on the upper surface of the mold, a water stop plate slidably mounted on the locking portion to open and close the opening, and the locking portion. And a pouring port for pouring fresh concrete, which is detachably attached to.
この場合、型枠上面の開口に連通する注入口を経て生コ
ンクリートを注入充填するので、充填作業が迅速に行え
る。また、充填が完了すると止水板を摺動して開口を閉
塞する。注入口は取り外して他の型枠に流用することも
できる。In this case, since the fresh concrete is poured and filled through the injection port communicating with the opening on the upper surface of the mold, the filling work can be performed quickly. When the filling is completed, the water blocking plate slides to close the opening. The inlet can be removed and used for other forms.
以下、この発明の一実施例における地山補強工法を図に
ついて説明する。The ground reinforcement method in one embodiment of the present invention will be described below with reference to the drawings.
先ず、補強すべき地山の表面に平面状の基礎面を形成す
る。これは、以下に詳述する定着板を所定の姿勢で地山
に固着するための前処理である。第1図はこの基礎面に
固着された定着板(7)を示す平面図、第2図は第1図のI
I−II線の断面図である。図において、(1)は地山、(1b)
は地山(1)の表面に形成された基礎面で、定着板(7)を定
位置定姿勢に保つべく平面状に仕上げられる。基礎面(1
b)はコンクリートやモルタルの吹付け等により形成す
る。なお、平面状に仕上げるのは地山(1)の表面全体で
はなく定着板(7)を取付ける部分のみで足りるので、例
えば定着板(7)の形状に合わせた型板を使用して作業能
率を上げるようにするのもよい。(71)は直線部定着板
で、量販されている軽量鋼材を使用して製作される。第
3図の斜視図でその詳細を示すように、アングル状の鋼
材(71a)を両側に平行に配置し、両鋼材(71a)間を所定の
間隔で配置された板状の鋼材(71b)により溶接で結合し
ている。鋼材(71b)の間は開口(71c)になっている。(72)
はコーナー部定着板で、各端部が直線部定着板(71)とボ
ルト締(第1図中Aで示す部分)で連結されて一体とな
る。その周縁近傍には、直線部定着板(71)のアングル状
鋼材(71a)の縦辺に連接するように鋼材(72a)が溶接で一
体に結合されている。(72b)は後述の筋枠等を取付ける
ための鋼材で、定着板(72)の補強を兼ねている。(72c)
はコーナー部定着板(72)に設けられた開口である。(8)
はコーナー部定着板(72)の中央に設けられた主アンカー
筋(8a)(図示せず)用の丸穴、(9)は両定着板(71)(72)
の側部に適当な間隔で設けられた補助アンカー筋(9a)用
の丸穴である。そして、各定着板(71)(72)は、地山(1)
の基礎面(1b)上の所定位置に主アンカー筋(8a)および補
助アンカー筋(9a)により強固に固着される。First, a flat base surface is formed on the surface of the ground to be reinforced. This is a pretreatment for fixing the fixing plate, which will be described in detail below, to the ground in a predetermined posture. FIG. 1 is a plan view showing the fixing plate (7) fixed to the base surface, and FIG.
It is sectional drawing of the I-II line. In the figure, (1) is the ground, (1b)
Is a base surface formed on the surface of the ground (1), and is finished in a flat shape to keep the fixing plate (7) in a fixed position and posture. Foundation surface (1
b) is formed by spraying concrete or mortar. Since it is not necessary to finish the entire surface of the ground (1) but only the part where the fixing plate (7) is attached, it is sufficient to finish it in a flat shape, for example, using a template that matches the shape of the fixing plate (7). You may want to raise it. Reference numeral (71) is a straight-line fixing plate, which is manufactured using lightweight steel that is mass-marketed. As shown in detail in the perspective view of FIG. 3, angled steel materials (71a) are arranged in parallel on both sides, and plate-shaped steel materials (71b) are arranged at a predetermined interval between both steel materials (71a). Are joined by welding. There is an opening (71c) between the steel materials (71b). (72)
Is a corner fixing plate, and each end is connected to the linear fixing plate (71) by bolting (portion indicated by A in FIG. 1) to be integrated. A steel material (72a) is integrally joined by welding to the vicinity of the peripheral edge so as to be connected to the vertical side of the angled steel material (71a) of the straight part fixing plate (71). (72b) is a steel material for attaching a later-described streak frame or the like, and also serves as reinforcement of the fixing plate (72). (72c)
Is an opening provided in the corner fixing plate (72). (8)
Is a round hole for the main anchor bar (8a) (not shown) provided in the center of the corner fixing plate (72), and (9) is both fixing plates (71) (72)
These are round holes for auxiliary anchor muscles (9a) provided at appropriate intervals on the side of the. And each fixing plate (71) (72) is a ground (1)
The main anchor muscles (8a) and the auxiliary anchor muscles (9a) are firmly fixed to the base surface (1b) at predetermined positions.
次に、コンクリート構造物の強度メンバーとなる鋼材の
主筋およびこれを固定支持する筋枠を取付ける。第4図
はこの工程と、更に次の型枠を取付ける工程とをあわせ
て説明するため、第2図と同一位置で切断して示す断面
図である。図において、(10)は縦副筋で、鋼材(71b)に
設けられた丸穴を利用して直線部定着板(71)に支持固定
されている。なお、コーナー部定着板(72)とは鋼材(72
b)に設けられた丸穴を利用して固定される。(11)は縦副
筋(10)を介して支持固定された横副筋で、両副筋(10)(1
1)により筋枠(12)を構成する。そして、両定着板(71)(7
2)から筋枠(12)を介して支持することにより、主筋(13)
を所定位置に支持固定する。Next, a steel main bar, which is a strength member of the concrete structure, and a frame for fixing and supporting the main bar are attached. FIG. 4 is a cross-sectional view taken at the same position as in FIG. 2 in order to explain this step and the step of attaching the next mold together. In the figure, reference numeral (10) is a collateral bar, which is supported and fixed to the straight-line fixing plate (71) by using a round hole provided in the steel material (71b). The corner fixing plate (72) is made of steel (72
It is fixed using the round hole provided in b). (11) is the collateral muscle supported and fixed via the collateral muscle (10).
The frame (12) is formed by 1). And both fixing plates (71) (7
By supporting from 2) via the frame (12), the main bar (13)
Supported and fixed in place.
筋枠(12)が所定位置に取付けられると、次に、第4図に
示すように、断面がコ字状の型枠(14)を定着板(71)に取
付け、内部に密閉空間(15)を形成する。型枠(14)は直線
部定着板(71)に取付けられるもので、第5図に斜視図で
示すように、長手方向側端には取付片(14a)が形成さ
れ、補助アンカー筋(9a)を挿通させるための丸穴(14b)
を設けている。また、長手方向両端にはフランジ片(14
c)が形成されており、隣接するコーナー部定着板(72)に
取付けられる型枠(16)に同様に形成されたフランジ片と
当接する構成となっている。なお、上記実施例では、型
枠(14)(16)の取付けは基礎面(1b)に植込まれた補助アン
カー筋(9a)を使用してその先端に形成された鉤部にクサ
ビを打込み定着板(71)(72)と一体で固定する方式として
いるが、例えば定着板(71)の鋼材(71a)にネジのスタッ
ドを上向きに設けておき、これに型枠(14)の取付片(14
a)に設けた丸穴を挿通させナットで締付け固定をする方
式等を採用してもよい。When the streak frame (12) is attached at a predetermined position, next, as shown in FIG. 4, a mold frame (14) having a U-shaped cross section is attached to the fixing plate (71), and an enclosed space (15) is formed inside. ) Is formed. The formwork (14) is attached to the straight part fixing plate (71). As shown in the perspective view of FIG. 5, a mounting piece (14a) is formed at the longitudinal side end, and the auxiliary anchor bar (9a) is formed. ) Through hole (14b)
Is provided. In addition, flange pieces (14
c) is formed, and is configured to come into contact with a flange piece that is also formed on the form (16) attached to the adjacent corner fixing plate (72). In the above embodiment, the attachment of the formwork (14) (16) uses the auxiliary anchor bar (9a) embedded in the foundation surface (1b) to drive a hook into the hook formed at the tip of the form. The fixing plate (71) (72) is fixed integrally with the fixing plate (71), but for example, the steel plate (71a) of the fixing plate (71) is provided with a screw stud facing upward, and the fixing piece of the mold (14) is attached to this. (14
A method of inserting the round hole provided in a) and tightening and fixing with a nut may be adopted.
第6図は、すべての型枠(14)(16)の取付けを完了した状
態を示す斜視図である。隣接する型枠同士は両者の端部
に形成されたフランジ片を当接しそれを外周からクラン
プ(17)で挾持することにより連結されている。なお、両
フランジ片の間には適宜、パッキンを挿入して密閉度を
上げるようにする。FIG. 6 is a perspective view showing a state in which all the mold forms (14) and (16) have been attached. Adjacent molds are connected to each other by abutting flange pieces formed at the ends of the two and holding them by clamps (17) from the outer circumference. In addition, a packing is appropriately inserted between both flange pieces to improve the degree of sealing.
施工範囲にわたって型枠(14)(16)の取付け組立が終了す
ると、端末部分は適当に鋼材を使って閉塞し、法面の上
端に位置する型枠に注入口を設けて、ここから生コンク
リートをポンプ車により注入充填する。なお、第6図に
は図示していないが、型枠(14)(16)の適当個所に空気抜
栓を設け、生コンクリートの注入段階で適宜、この空気
抜栓を開閉操作するようにすれば、充填速度が速まり、
かつ充填度合も向上する。更に型枠の一部に透視窓を設
けたり型枠自体を透明材料で構成するようにしておけ
ば、充填の進行状態を目視することができる。When the installation of the molds (14) and (16) is completed over the construction range, the end part is appropriately closed using steel material, the injection hole is provided in the formwork located at the upper end of the slope, and the fresh concrete is started from here. Is injected and filled by a pump car. Although not shown in FIG. 6, if an air vent is provided at an appropriate place on the molds (14) and (16) and the air vent is appropriately opened and closed at the injection stage of the fresh concrete, Filling speed is faster,
Moreover, the filling degree is also improved. Further, if a transparent window is provided in a part of the mold or the mold itself is made of a transparent material, the progress of filling can be visually checked.
また、バイブレーターを併用すれば特に末端部への充填
が容易となる。In addition, if a vibrator is used in combination, the filling of the end portion becomes particularly easy.
第7図ないし第9図は、生コンクリートの充填作業を一
層迅速に行えるよう、型枠(16)等自体に注入口を設ける
場合の構造を示す。第7図はその平面図、第8図および
第9図は第7図のそれぞれVIII−VIII線およびIX−IX線
の断面図である。図において、(18)は型枠(16)の上面で
ある天板、(19)は天板(18)に形成された開口、(20)は天
板(18)から所定の間隔を介して平行に配置した略コ字状
の板材を、その3側辺縁部を天板(18)に連接することに
より形成した係止部、(21)は金属管の外周にねじ部(21
a)をそして下端につば部(21b)をそれぞれ形成した注入
口で、第7図で示す下方位置から上方へ向ってそのつば
部(21b)を係止部(20)に挿入し、更に第8図に示すよう
に、この注入口(21)の下方へ止水板(22)を挿入して固定
する。FIGS. 7 to 9 show a structure in which an injection port is provided in the mold (16) itself so that the filling work of the ready-mixed concrete can be performed more quickly. FIG. 7 is a plan view thereof, and FIGS. 8 and 9 are sectional views taken along lines VIII-VIII and IX-IX of FIG. 7, respectively. In the figure, (18) is a top plate which is the upper surface of the formwork (16), (19) is an opening formed in the top plate (18), and (20) is a predetermined distance from the top plate (18). An engaging portion formed by connecting substantially parallel U-shaped plate members with their three side edges connected to the top plate (18), and (21) is a screw part (21) on the outer periphery of the metal pipe.
a) and a collar (21b) formed at the lower end, and the collar (21b) is inserted into the locking portion (20) from the lower position shown in FIG. As shown in FIG. 8, the water stop plate (22) is inserted and fixed below the inlet (21).
止水板(22)を第8図に示す位置に図示しない固定具で固
定し、ポンプ車からのホースの先端を注入口(21)のねじ
部(21a)に螺合結合し、生コンクリートを開口(19)から
型枠(16)で形成する密閉空間(15)内に注入充填する。Fix the water stop plate (22) to the position shown in FIG. 8 with a fixture (not shown), screw the end of the hose from the pump car to the screw part (21a) of the inlet (21), and mix the ready-mixed concrete. The closed space (15) formed by the mold (16) is injected and filled from the opening (19).
充填が完了すると、第8図において、止水板(22)を左方
へ摺動させ、開口(19)を閉塞した後、ホースを注入口(2
1)から取外し、次の型枠へ作業を移す。硬化が終了した
型枠では、注入口(21)を取外し、他の部分へ流用するこ
とも可能である。When the filling is completed, in FIG. 8, slide the water stop plate (22) to the left to close the opening (19), and then connect the hose to the inlet (2).
Remove from 1) and move the work to the next formwork. It is also possible to remove the injection port (21) and divert it to another part in the mold after curing.
なお、この開口(19)および注入口(21)は、前述した空気
抜栓として利用することも可能であることは言うまでも
ない。Needless to say, the opening (19) and the inlet (21) can also be used as the air vent plug described above.
生コンクリートが密閉空間(15)に完全に充填されると、
定着板(71)(72)には開口(71c)(72c)が設けられているの
で、生コンクリートは当然この開口から地山(1)の表面
に達し、その硬化によって地山(1)と高い接着力で固着
する。従って、この効果がアンカー筋(9a)(9b)による固
着力に加わることになり、定着板(71)(72)更には主筋(1
3)筋枠(12)の地山(1)に対する固着力が一層強化される
ことになる。When the fresh concrete is completely filled in the closed space (15),
Since the fixing plates (71) and (72) are provided with openings (71c) and (72c), the raw concrete naturally reaches the surface of the natural ground (1) through this opening, and the hardening causes it to become the natural ground (1). It adheres with high adhesive strength. Therefore, this effect is added to the fixing force by the anchor muscles (9a) (9b), and the fixing plates (71) (72) and the main muscles (1
3) The fixing force of the streak frame (12) to the natural ground (1) is further strengthened.
また、従来のような吹付けでなく、生コンクリートを密
閉空間(15)内に有圧状態で充填させるので、主筋(13)と
は完全に密着して一体に結合し、コンクリート構造物と
しての本来の高い機械的特性を発揮する。Also, instead of spraying as in the past, fresh concrete is filled in the sealed space (15) in a pressurized state, so that it is completely in close contact with the main bar (13) and integrally joined to form a concrete structure. Demonstrate the original high mechanical properties.
生コンクリートが十分充填され所定の硬化時間が経過す
るとすべての型枠(14)(16)を取外し補強工事が完了す
る。型枠(14)(16)の内部にはコンクリートが空洞なく充
填されるので型枠(14)(16)を取除けば、構造物の表面は
そのままで仕上っており、その後の整形仕上げ作業を必
要としない。緑色等の着色コンクリートを使用すれば、
一層美観が良好となり、特に観光地等で有用である。When the ready-mixed concrete is sufficiently filled and a predetermined hardening time has passed, all the formwork (14) and (16) are removed, and the reinforcing work is completed. Concrete is filled in the molds (14) and (16) without voids, so if the molds (14) and (16) are removed, the surface of the structure is finished as it is, and the subsequent shaping and finishing work is performed. do not need. If you use colored concrete such as green,
It has a better appearance and is especially useful in tourist areas.
従来の工法による場合には、冬期、浸透した水分が凍結
することにより、施工後1〜2年でコンクリートが崩壊
していく現象もあったが、本工法ではこのような現像も
なく、安定した補強面が得られる。従って、例えば、ア
ンカー筋として長尺ロックボルト等を採用すれば、長年
月にわたる確実な表土崩壊防止を達成することができ
る。In the case of the conventional construction method, there was a phenomenon that concrete collapsed in 1-2 years after construction due to freezing of the infiltrated water in the winter, but in this construction method, there was no such development and it was stable. A reinforced surface is obtained. Therefore, for example, if a long lock bolt or the like is used as the anchor bar, it is possible to achieve reliable prevention of topsoil collapse over many years.
以上の通り、本工法では、型枠(14)(16)は再使用が可能
となるので、多少その材料費,加工費が高価になっても
全体の経済性は損われない。従って、その型枠(14)(16)
は必ずしも鋼材で製作するのでなく、寸法,形状を統一
化することにより、例えばFRPや合成樹脂による注型
品としてもよく、またこの場合材料自体を透明または半
透明のものを使用すれば、上述した生コンクリートの充
填状況が即座に把握できる利点もある。As described above, according to this construction method, the molds (14) and (16) can be reused, so that even if the material cost and the processing cost are slightly increased, the overall economical efficiency is not deteriorated. Therefore, the formwork (14) (16)
Is not necessarily made of steel, but may be cast by FRP or synthetic resin by unifying the dimensions and shapes. In this case, if the material itself is transparent or translucent, There is also an advantage that the filling status of the ready-mixed concrete can be immediately grasped.
定着板(7)は、いわゆる埋殺しとして工事毎の消耗品と
なるが、本工法にあってはその寸法,形状を統一化する
ことができる点は上述した型枠(14)(16)の場合と同様で
ある。従って、大量生産によるコスト低減は十分可能で
ある。The fixing plate (7) is a so-called buried item and becomes a consumable item for each construction. However, in this construction method, the size and shape can be unified, which is the same as the formwork (14) (16) described above. It is similar to the case. Therefore, cost reduction by mass production is sufficiently possible.
本工法を実施する場合の作業内容としては、第1段階で
ある基礎面の形成工程については、工事の対象となる個
々の地山の表面形状に合わせた個別の作業とならざるを
得ないが、それ以降の工程の作業内容はすべて統一化画
一化することができるので、省力化、工期短縮が実現し
やすい。Regarding the work content when implementing this method, the first step, the formation process of the foundation surface, must be an individual work in accordance with the surface shape of each ground to be constructed. Since all the work contents of the subsequent processes can be unified and standardized, it is easy to save labor and shorten the construction period.
ところで、補強工事の対象となる地山の表面形状によっ
ては、第1段階として形成すべき上記基礎面をすべて平
面状とすることが困難な場合がある。即ち、第10図はこ
の場合の状況を示すもので、同図(A)は地山(1)を側面か
らみた図で、基礎面(1b)は隣接する型枠(14)(16)の連接
部分で一定の傾斜各θを有している。従って、このよう
な部分では、先に第4図,第5図、更には第6図に示し
たように、型枠(14)等の長手方向端部に形成したフラン
ジ片(14c)を当接しクランプ(17)で挾持するという連接
構造では、十分な密閉構成が得られず、この部分から生
コンクリートが漏れ出すことになり実用に供し得ない。By the way, depending on the surface shape of the ground to be reinforced, it may be difficult to make all of the foundation surfaces to be formed in the first stage flat. That is, FIG. 10 shows the situation in this case, the figure (A) is a view of the ground (1) as seen from the side, and the foundation surface (1b) of the adjacent formwork (14) (16). Each connecting portion has a constant inclination θ. Therefore, in such a portion, as shown in FIGS. 4 and 5 and further in FIG. 6, the flange pieces (14c) formed at the longitudinal ends of the mold (14) are fitted. The connection structure of contacting and holding by the clamp (17) does not provide a sufficient sealed structure, and fresh concrete leaks out from this part, which cannot be put to practical use.
また、第10図(B)は地山(1)を上方からみた平面図で、地
形の状況から隣接する型枠(14)および(16)の中心軸を左
右方向に角度θだけ傾けた場合を示す。ここでも、同図
(A)の場合と同様、フランジ片(14c)(16c)の連接構造で
は問題がある。In addition, Fig. 10 (B) is a plan view of the natural ground (1) seen from above, and when the central axes of the adjacent formworks (14) and (16) are tilted in the left-right direction by an angle θ, depending on the terrain situation. Indicates. Again, the same figure
Similar to the case of (A), there is a problem in the connection structure of the flange pieces (14c) and (16c).
この場合、地山(1)の形状に応じて型枠(14)等の種類を
増やせばよいが、特にこの型枠(14)等にFRP等の高価な
材料を使用するような場合には、経済性が大きく損われ
ることになる。In this case, the types of formwork (14) and the like may be increased according to the shape of the ground (1), but especially when using expensive materials such as FRP for this formwork (14) and the like. However, the economic efficiency will be greatly impaired.
もっとも、基礎面(1b)を常に平面状に仕上げるようにす
ればよいが、地山(1)の形状によってはこの基礎面(1b)
の工事規模が膨大となり不経済となる場合も多い。However, the foundation surface (1b) should always be finished in a flat shape, but depending on the shape of the ground (1), this foundation surface (1b)
There are many cases where the construction scale is huge and uneconomical.
以下に示す実施例は、上記のように、補強工事の工程に
おいて複数個の型枠(14)等を地山(1)上に連接して配置
する場合の連接機構を改善したものである。The embodiment described below is an improvement of the connecting mechanism when a plurality of molds (14) and the like are connected and arranged on the ground (1) in the step of the reinforcing work as described above.
第11図はこの連接機構の一実施例を一部断面で示す側面
図、第12図は第11図のXII−XII線の断面図である。図
において、(14)は直線部型枠、(14a)はその取付片、(1
6)はコーナー部型枠、(16a)はその取付片である。そし
て、(71a)は直線部定着板(71)のアングル状鋼片、(72a)
はコーナー部定着板(72)の鋼材で、それぞれ地山(1)に
形成された基礎面(1b)に図示しない補助アンカー筋等を
利用して固定される。なお、これらの図では筋枠(12)等
は図示を省略している。FIG. 11 is a side view showing a partial cross-section of one embodiment of this connecting mechanism, and FIG. 12 is a cross-sectional view taken along the line XII-XII in FIG. In the figure, (14) is a straight part form, (14a) is its mounting piece, (1
6) is the corner form, and (16a) is its mounting piece. And, (71a) is an angle-shaped steel piece of the straight part fixing plate (71), (72a)
Is a steel material for the corner fixing plate (72) and is fixed to the base surface (1b) formed on the ground (1) by using not-shown auxiliary anchor streaks or the like. Note that the streak frame (12) and the like are omitted in these figures.
コーナー部型枠(16)の端部には段付部(16b)が形成さ
れ、所定長だけ径が大きくなっている。一方、直線部型
枠(14)は、断面がコ字状一定で、第5図に示したような
フランジ片(14a)はなく、その端部はコーナー部型枠(1
6)の段付部(16b)に嵌まり込む構造になっている。A stepped portion (16b) is formed at an end of the corner portion form (16), and has a diameter increased by a predetermined length. On the other hand, the straight part formwork (14) has a constant U-shaped cross section, does not have the flange piece (14a) as shown in FIG. 5, and its end portion has a corner part formwork (1).
It is structured to fit in the stepped portion (16b) of 6).
そして、この段付部(16b)の内面と型枠(14)の外面との
間に所定の隙間(23)を確保するようにし、この隙間(23)
にシリコンゴム等のパッキン(24)を挿入する。Then, a predetermined gap (23) is secured between the inner surface of the stepped portion (16b) and the outer surface of the form (14), and the gap (23)
Insert the packing (24) such as silicone rubber into.
作業順序としては、先ず、直線部型枠(14)をアングル状
鋼片(71a)に取付け、次に、この型枠(14)の端部にパッ
キン(24)を配置した後、コーナー部型枠(16)をその段付
部(16b)が型枠(14)の端部に重なるようにして鋼材(72a)
に取付け固定する。なお、パッキン(24)の位置決めをす
るため、例えば型枠(14)の外周面の当該位置にパッキン
(24)の一部を嵌め込む溝を形成するようにしてもよい。The work order is as follows: first, attach the straight part formwork (14) to the angled steel piece (71a), then place the packing (24) at the end of this formwork (14), and then Steel (72a) so that the step (16b) of the frame (16) overlaps the end of the form (14).
Attach and fix to. In addition, in order to position the packing (24), for example, at the position on the outer peripheral surface of the mold (14),
You may make it form the groove which fits a part of (24).
以上のように構成したので、第11図では両型枠(14)(16)
の中心軸が一致した状態で示しているが、第10図に示す
ように、これら中心軸が上下または左右に多少傾斜した
場合においても、隙間(23)の範囲内で上記傾斜分を吸収
することができる。そして、この隙間(23)は常にパッキ
ン(24)によって埋められ閉塞されているので、生コンク
リートを型枠(14)(16)内に注入した場合でも、生コンク
リートがこの連接部分から外部へ漏出することはない。Because of the above configuration, in FIG. 11 both formwork (14) (16)
The center axes of the two are shown to match, but as shown in FIG. 10, even when these center axes are slightly tilted vertically or horizontally, the tilted portion is absorbed within the range of the gap (23). be able to. Since this gap (23) is always filled and closed by the packing (24), even when pouring fresh concrete into the formwork (14) (16), the fresh concrete leaks out from this connecting part. There is nothing to do.
発明者等による試作結果では、隙間(23)の寸法、幅、お
よびパッキン(24)の種類、形状を適当に選定することに
より、最大30°程度の傾斜は吸収可能であることが判明
した。この結果、具体的工事で必要となる型枠の種類を
大幅に削減することが可能となる。As a result of trial production by the inventors, it was found that the inclination of up to about 30 ° can be absorbed by appropriately selecting the size and width of the gap (23) and the type and shape of the packing (24). As a result, it is possible to significantly reduce the types of formwork required for concrete construction.
第13図は型枠の連接機構の他の実施例を一部断面で示す
側面図、第14図は第13図のXIV−XIV線の断面図であ
る。ここでは、両型枠(14)(16)はいずれもその端部に肉
厚部(14d)(16d)を形成しておき、開口側が互いに対向す
るように、両肉厚部(14d)(16d)の厚さ方向中央に周縁に
沿って所定深さの溝(14e)(16e)を設けている。FIG. 13 is a side view partially showing a cross section of another embodiment of the frame connecting mechanism, and FIG. 14 is a cross sectional view taken along line XIV-XIV in FIG. Here, both molds (14) and (16) have thick portions (14d) and (16d) formed at their ends, and both thick portions (14d) ( Grooves (14e) (16e) having a predetermined depth are provided along the peripheral edge in the center of the thickness direction of 16d).
そして、シリコンゴム等からなる可撓性板(25)の幅方向
両端が両溝(14e)(16e)に嵌まり込むようにしながら両型
枠(14)および(16)を互いに突き合わせて配置し、それぞ
れアングル状鋼片(71a)および鋼材(72a)に取付け固定す
る。Then, the both sides in the width direction of the flexible plate (25) made of silicon rubber or the like are fitted into both the grooves (14e) and (16e), and the both molds (14) and (16) are arranged to face each other. , And the angle-shaped steel piece (71a) and the steel material (72a), respectively.
即ち、ここでは、両型枠(14)および(16)の間に生じる長
手方向の隙間(26)の部分を変形可能な可撓性板(25)が覆
うことで密閉空間(15)の密閉性を確保している訳であ
る。That is, here, the deformable flexible plate (25) covers the part of the longitudinal gap (26) generated between the two molds (14) and (16) to seal the closed space (15). That is the reason for ensuring the sex.
従って、この隙間(26)の寸法および可撓性板(25)の材
料、形状を適当に選定することにより、連接する型枠間
の傾斜をより一層広範囲に吸収することが可能となる。Therefore, by appropriately selecting the size of the gap (26) and the material and shape of the flexible plate (25), it is possible to absorb the inclination between the connected molds in a wider range.
以上のように、この発明では、先ず、地山の表面に形成
された基礎面に、開口を設けた定着板をアンカー筋によ
り固着し、この定着板に筋枠および主筋とこれを覆う型
枠を取り付け密閉空間を形成し、この密閉空間内に生コ
ンクリートを注入充填し硬化後、上記型枠を取り外すよ
うにしたので、コンクリートと主筋および筋枠とが完全
に密着して一体物となりコンクリート構造物としての本
来の高い機械的強度が得られることは勿論、仕上がった
コンクリート構造物と地山との固着力も強化され、従来
のいわゆる吹き付けコンクリートによる工法に比較して
地山の補強強度、信頼性が著しく向上する。強度を従来
と同等とすれば材料を大幅に節減できる。また、凍結に
よるコンクリートの早期破壊も防止され、補強面として
の寿命も増大する。更に、従来のいわゆる場所打コンク
リート工法と異なり、機材はすべてその寸法形状を統一
化することができるので、機材費用、現地作業費用を共
に大幅に削減できるとともに、型枠自体は再利用が可能
で、一層の低廉化を図ることができる。As described above, in the present invention, first, a fixing plate having an opening is fixed to a base surface formed on the surface of the ground by an anchor bar, and the fixing frame and the main bar and the formwork covering the fixing frame are fixed to the fixing plate. To form a closed space, and to inject and fill fresh concrete into the closed space and cure it, and then remove the formwork, the concrete and the main bar and the frame are completely in close contact with each other and become a unitary structure. In addition to obtaining the original high mechanical strength of the material, the strength of adhesion between the finished concrete structure and the ground is also strengthened. Significantly improved. If the strength is the same as the conventional one, the material can be saved significantly. In addition, early destruction of concrete due to freezing is prevented, and the life of the reinforcing surface is increased. Furthermore, unlike the conventional so-called cast-in-place concrete construction method, all the equipment can be unified in size and shape, so both equipment costs and on-site work costs can be greatly reduced, and the formwork itself can be reused. Further, the cost can be further reduced.
そして、連接すべき型枠の一方の端部を他方の端部に嵌
め込み、その隙間をパッキンで埋めるようにしたので、
隣接する両型枠の中心軸が上下また左右方向に多少傾斜
しても上記パッキンが伸縮して上記隙間を常に埋めるの
で、この連接部分からの生コンクリートの漏出が防止さ
れる。従って、地山の形状等から具体的工事で必要とな
る型枠の種類を大幅に削減することができ、本補強工法
の経済性実用性が大きく改善される。Then, one end of the formwork to be connected is fitted into the other end, and the gap is filled with packing.
Even if the central axes of the two adjacent formwork are slightly inclined vertically or horizontally, the packing expands and contracts to always fill the gap, so that leakage of fresh concrete from this connecting portion is prevented. Therefore, it is possible to significantly reduce the types of formwork required for concrete construction due to the shape of the ground, etc., and the economical efficiency and practicability of the present reinforcement method are greatly improved.
また、連接すべき型枠を対向して配置し、その端部周縁
に沿って形成された溝に跨って可撓性板を挿入するよう
にしたので、この可撓性板が適宜変形することにより、
型枠間の傾斜をより一層広範囲に吸収することができ、
必要な型枠の種類を一層削減することが可能となる。Further, since the molds to be connected are arranged so as to face each other and the flexible plate is inserted across the groove formed along the peripheral edge of the end, the flexible plate can be appropriately deformed. Due to
It is possible to absorb the inclination between the molds in a wider range,
It is possible to further reduce the required types of formwork.
また、型枠の上面に開口と係止部とを形成し、更に所定
の止水板と注入口とを備えたので、生コンクリートの充
填作業を迅速に行うことができる。Further, since the opening and the locking portion are formed on the upper surface of the form, and further the predetermined water blocking plate and the injection port are provided, the filling work of the fresh concrete can be performed quickly.
第1図はこの発明の一実施例における定着板の設置工程
を説明する平面図、第2図は第1図のII−II線の断面
図、第3図は直線部定着板の構造を示す斜視図、第4図
は筋枠,主筋および型枠の取付け工程を説明する断面
図、第5図は直線部の型枠の構造を示す斜視図、第6図
は型枠の取付けが完了した状態を示す斜視図、第7図は
型枠自体に注入口を設けた実施例のものを示す平面図、
第8図および第9図は第7図のそれぞれVIII−VIII線お
よびIX−IX線の断面図、第10図は連接すべき型枠の中心
軸が傾斜する場合の状況を示す図、第11図は他の実施例
による型枠の連接機構を一部断面で示す側面図、第12図
は第11図のXII−XII線の断面図、第13図は更に他の実
施例による型枠の連接機構を一部断面で示す側面図、第
14図は第13図のXIV−XIV線の断面図、第15図は従来の
いわゆる吹付けコンクリートによる工法を説明する断面
図、第16図は地山補強として形成されたコンクリート構
造物の外観を示す平面図、第17図は第16図のXVII−XV
II線の断面図である。 図において、(1)は地山、(1b)は基礎面、(7)(71)(72)は
定着板、(71c)(72c)は定着板に設けられた開口、(8)(9)
はアンカー筋用丸穴、(9a)は補助アンカー筋、(12)は筋
枠、(13)は主筋、(14)(16)は型枠、(15)は密閉空間、(1
8)は型枠の上面である天板、(19)は開口、(20)は係止
部、(21)は注入口、(22)は止水板、(23)(26)は隙間、(2
4)はパッキン、(25)は可撓性板である。 なお、各図中同一符号は同一または相当部分を示す。FIG. 1 is a plan view for explaining a fixing plate installation step in one embodiment of the present invention, FIG. 2 is a sectional view taken along line II-II of FIG. 1, and FIG. 3 shows a structure of a straight-line fixing plate. FIG. 4 is a perspective view, FIG. 4 is a cross-sectional view for explaining the attaching process of the reinforcement frame, the main reinforcement and the form, FIG. 5 is a perspective view showing the structure of the form of the straight part, and FIG. FIG. 7 is a perspective view showing a state, FIG. 7 is a plan view showing an embodiment in which an injection port is provided in the mold itself,
8 and 9 are cross-sectional views taken along lines VIII-VIII and IX-IX of FIG. 7, respectively, and FIG. 10 is a view showing a situation where the central axes of the molds to be connected are inclined, and FIG. FIG. 12 is a side view showing the connecting mechanism of a mold according to another embodiment in a partial cross section, FIG. 12 is a sectional view taken along the line XII-XII in FIG. 11, and FIG. 13 is a mold according to still another embodiment. A side view showing the connecting mechanism in a partial section,
Fig. 14 is a cross-sectional view taken along the line XIV-XIV in Fig. 13, Fig. 15 is a cross-sectional view illustrating a conventional so-called shotcrete construction method, and Fig. 16 is an external view of a concrete structure formed as ground reinforcement. The plan view shown in FIG. 17 is XVII-XV in FIG.
It is a sectional view taken along line II. In the figure, (1) is a ground, (1b) is a base surface, (7) (71) (72) is a fixing plate, (71c) (72c) are openings provided in the fixing plate, (8) (9) )
Is a round hole for anchor reinforcement, (9a) is an auxiliary anchor reinforcement, (12) is a frame, (13) is a main reinforcement, (14) and (16) are formwork, (15) is a closed space, (1
8) is a top plate which is the upper surface of the mold, (19) is an opening, (20) is a locking part, (21) is an inlet, (22) is a water stop plate, (23) and (26) are gaps, (2
4) is a packing, and (25) is a flexible plate. In the drawings, the same reference numerals indicate the same or corresponding parts.
Claims (3)
形成する工程と、上記地山表面への開口を設けた定着板
をアンカー筋により上記基礎面に固着する工程と、上記
定着板から筋枠を介して支持することにより主筋を所定
位置に配置する工程と、上記主筋を覆うように型枠を上
記定着板に取り付けることにより所定の密閉空間を形成
する工程と、上記密閉空間に生コンクリートを注入充填
し硬化させる工程と、硬化後上記型枠を上記定着板から
取り外す工程とからなる地山補強工法であって、上記型
枠を複数個連接して互いに連通する密閉空間を形成する
場合において、 互いに隣接する一方の型枠の端部を他方の型枠の端部に
所定の隙間を介して嵌め込み、上記隙間をパツキンで埋
めるようにした地山補強工法。1. A step of forming a flat base surface on the surface of the ground to be reinforced, a step of fixing a fixing plate having an opening to the ground surface to the base surface by an anchor bar, Arranging the main bar at a predetermined position by supporting it from the fixing plate via a streak frame; forming a predetermined closed space by attaching a mold to the fixing plate so as to cover the main bar; A ground reinforcement method comprising the steps of injecting and filling a space with fresh concrete and hardening it, and removing the formwork from the fixing plate after hardening, which is a closed space in which a plurality of the formwork are connected to communicate with each other. In the case of forming, the ground reinforcement method in which the ends of one of the molds adjacent to each other are fitted into the ends of the other mold via a predetermined gap, and the gap is filled with a packing.
形成する工程と、上記地山表面への開口を設けた定着板
をアンカー筋により上記基礎面に固着する工程と、上記
定着板から筋枠を介して支持することにより主筋を所定
位置に配置する工程と、上記主筋を覆うように型枠を上
記定着板に取り付けることにより所定の密閉空間を形成
する工程と、上記密閉空間に生コンクリートを注入充填
し硬化させる工程と、硬化後上記型枠を上記定着板から
取り外す工程とからなる地山補強工法であって、上記型
枠を複数個連接して互いに連通する密閉空間を形成する
場合において、 互いに隣接する両型枠の端部を対向させて配置するとと
もに、上記両型枠の端部周縁に沿って上記対向方向に開
口する所定深さの溝を形成し、幅方向両端が上記両型枠
の溝に挿入される可撓性板を設けて上記両型枠間を連接
するようにした地山補強工法。2. A step of forming a flat base surface on the surface of the ground to be reinforced, a step of fixing a fixing plate having an opening to the ground surface to the base surface by an anchor bar, Arranging the main bar at a predetermined position by supporting it from the fixing plate via a streak frame; forming a predetermined closed space by attaching a mold to the fixing plate so as to cover the main bar; A ground reinforcement method comprising the steps of injecting and filling a space with fresh concrete and hardening it, and removing the formwork from the fixing plate after hardening, which is a closed space in which a plurality of the formwork are connected to communicate with each other. In the case of forming, the end portions of both molds adjacent to each other are arranged so as to face each other, and a groove of a predetermined depth is formed along the peripheral edges of the end portions of the both molds, the groove having a predetermined depth, Both ends of the direction are A natural ground reinforcement method in which a flexible plate to be inserted into the groove is provided so that the two molds are connected to each other.
形成する工程と、上記地山表面への開口を設けた定着板
をアンカー筋により上記基礎面に固着する工程と、上記
定着板から筋枠を介して支持することにより主筋を所定
位置に配置する工程と、上記主筋を覆うように型枠を上
記定着板に取り付けることにより所定の密閉空間を形成
する工程と、上記密閉空間に生コンクリートを注入充填
し硬化させる工程と、硬化後上記型枠を上記定着板から
取り外す工程とからなる地山補強工法であって、 上記型枠の上面に開口と係止部とを形成し、この係止部
に摺動自在に取り付けられて上記開口を開閉する止水部
と、上記係止部に着脱可能に取り付けられた生コンクリ
ート注入のための注入口とを備えた地山補強工法。3. A step of forming a flat base surface on the surface of the ground to be reinforced, a step of fixing a fixing plate provided with an opening to the ground surface to the base surface by an anchor bar, Arranging the main bar at a predetermined position by supporting it from the fixing plate via a streak frame; forming a predetermined closed space by attaching a mold to the fixing plate so as to cover the main bar; A ground reinforcement method comprising the steps of injecting and filling fresh concrete into a space and hardening it, and removing the formwork from the fixing plate after hardening, wherein an opening and a locking part are formed on the upper surface of the formwork. Then, the ground reinforcement provided with a water stop portion slidably attached to the locking portion to open and close the opening, and an injection port detachably attached to the locking portion for pouring fresh concrete. Construction method.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1202089A JPH0647827B2 (en) | 1988-08-10 | 1989-08-03 | Rock reinforcement method |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63-200827 | 1988-08-10 | ||
| JP20082788 | 1988-08-10 | ||
| JP1202089A JPH0647827B2 (en) | 1988-08-10 | 1989-08-03 | Rock reinforcement method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02167928A JPH02167928A (en) | 1990-06-28 |
| JPH0647827B2 true JPH0647827B2 (en) | 1994-06-22 |
Family
ID=26512414
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1202089A Expired - Lifetime JPH0647827B2 (en) | 1988-08-10 | 1989-08-03 | Rock reinforcement method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0647827B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS59426A (en) * | 1982-06-25 | 1984-01-05 | Furii Kogyo Kk | Slope protection work |
| JPS63134751A (en) * | 1986-11-26 | 1988-06-07 | フリ−工業株式会社 | Construction of normal frame |
-
1989
- 1989-08-03 JP JP1202089A patent/JPH0647827B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02167928A (en) | 1990-06-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR100480867B1 (en) | Method of Construction of Concrete Structure For use Fiber-Reinforced Resin Fire Retardant Pannel | |
| JPH06272495A (en) | Construction method of tunnel | |
| KR101549418B1 (en) | Wedge shaped water stop and embeded concrete expansion joint form using the same | |
| JP2634381B2 (en) | Split type box culvert and method of assembling the same | |
| JP2003328381A (en) | Flexible rubber joint, its mounting structure and its construction method | |
| JP4052918B2 (en) | Outer formwork for tunnel gate and tunnel tunnel construction method using this | |
| CN100473795C (en) | Thermoplastic resin form | |
| JPH0647827B2 (en) | Rock reinforcement method | |
| KR20180013048A (en) | FRP Permanent form for water treatment facilities | |
| JP3439436B2 (en) | Raising method of concrete frame | |
| JPH04306398A (en) | Repairing method of concrete wall surface | |
| CN111827112B (en) | Construction method of concrete railing upright post in middle of bridge road | |
| KR200189807Y1 (en) | Precast concrete panel form | |
| JP3396851B2 (en) | Jointing method and groove forming form of reverse-casting concrete and jointing part partition plate | |
| KR20040030756A (en) | Concrete Block with (steel)-reinforced Edges | |
| JP3050780B2 (en) | Formwork for inner surface forming of lining segment consisting of steel shell filled with concrete | |
| JP4587714B2 (en) | Residual decorative form for housing and construction method for housing foundation | |
| KR200167417Y1 (en) | Reinforcement pipe for cap of steel plate mold | |
| CN111926701B (en) | Bridge road end concrete railing stand column for cast-in-place construction | |
| JP3848015B2 (en) | Buffer material for prism glass and PC panel | |
| JPH0941338A (en) | Coating method of structure and installation method of jig frame or coating material and concrete-based coating material and manufacture of concrete-based coating material | |
| KR200314313Y1 (en) | Concrete injection assembly frame | |
| JPH089274Y2 (en) | Tunnel lining structure with curved plate for tunnel lining | |
| JP3382596B2 (en) | Roof railing support | |
| JP3210886B2 (en) | Parapet jaw structure |