JPH0649976B2 - How to build a true pillar - Google Patents
How to build a true pillarInfo
- Publication number
- JPH0649976B2 JPH0649976B2 JP1139666A JP13966689A JPH0649976B2 JP H0649976 B2 JPH0649976 B2 JP H0649976B2 JP 1139666 A JP1139666 A JP 1139666A JP 13966689 A JP13966689 A JP 13966689A JP H0649976 B2 JPH0649976 B2 JP H0649976B2
- Authority
- JP
- Japan
- Prior art keywords
- casing
- true
- column
- concrete
- pillar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 5
- 230000003014 reinforcing effect Effects 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000007796 conventional method Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 230000000087 stabilizing effect Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 230000002195 synergetic effect Effects 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
- Rod-Shaped Construction Members (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明は、土木工事やビルの建設工事等において、所定
の杭打ち場所に構真柱を建て込むための方法に関するも
のである。TECHNICAL FIELD The present invention relates to a method for erection of a true column at a predetermined pile driving place in civil engineering work, building construction work and the like.
[従来の技術] 従来、土木工事や建設工事等において構真柱を建て込む
場合、次のような方法が取られていた。[Prior Art] Conventionally, the following method has been used to build a true pillar in civil engineering work or construction work.
即ち、第7図及び第8図に示すように、ハンマーグラブ
で掘削しながら油圧を利用した圧入装置等で地中に圧入
したケーシング1の回りの地盤を、コンクリート2や覆
工板3等によって構真柱7の重量に十分耐え得るように
補強し、その上に構真柱7を支持させる架台4をセット
して、該架台4の中心をケーシング1の中心に合わせる
と共に、架台4の水平度をレベル5で確認しながらジャ
ッキ6により調整する。That is, as shown in FIG. 7 and FIG. 8, the ground around the casing 1 press-fitted into the ground by a press-fitting device using hydraulic pressure while excavating with a hammer grab is replaced by concrete 2, a lining plate 3, etc. The gantry 4 is reinforced so that it can sufficiently bear the weight of the true column 7, and the pedestal 4 for supporting the true column 7 is set on it. The center of the gantry 4 is aligned with the center of the casing 1, and While checking the degree at level 5, adjust with jack 6.
次に、第9図に示すように、構真柱7の上端に吊り治具
8を連結すると共に、下端部近傍にアングル9を放射方
向に溶接し、これらのアングル9にそれぞれ水平油圧ジ
ャッキ10をワイヤーにより外部から取り外し可能に取り
付け、各水平油圧ジャッキ10に構真柱7の上部まで延び
る油圧ホース11を接続する。Next, as shown in FIG. 9, a hanging jig 8 is connected to the upper end of the structure post 7, and angles 9 are radially welded near the lower end, and horizontal hydraulic jacks 10 are respectively attached to these angles 9. Is detachably attached from the outside by a wire, and each horizontal hydraulic jack 10 is connected to a hydraulic hose 11 extending to the upper part of the structure column 7.
そして、上記構真柱7をケーシング1内に挿入して、吊
り治具8に設けたブラケット12を架台4上の油圧ジャッ
キ13上に載置させることにより該架台4に支持させ、タ
ーンテーブル14及び方向固定装置15によって位置決めす
ると共に、上記油圧ジャッキ13によって上端部の位置調
整を行い、更に、地上で傾斜計16を見ながら水平油圧ジ
ャッキ10を遠隔操作することにより鉛直精度の調整行
う。Then, the true column 7 is inserted into the casing 1, and the bracket 12 provided on the hanging jig 8 is placed on the hydraulic jack 13 on the pedestal 4 so that the pedestal 4 is supported and the turntable 14 is turned on. The position of the upper end portion is adjusted by the hydraulic jack 13 while the positioning is performed by the direction fixing device 15, and the vertical accuracy is adjusted by remotely operating the horizontal hydraulic jack 10 while watching the inclinometer 16 on the ground.
而して、構真柱7の鉛直精度が出たところでケーシング
1内に所要量のコンクリートを打設すると共に、ケーシ
ング1を引き抜き、ワイヤーで水平油圧ジャッキ10を取
り出した後、埋め戻しを行うものである。Then, when the vertical accuracy of the true column 7 comes out, a required amount of concrete is placed in the casing 1, the casing 1 is pulled out, the horizontal hydraulic jack 10 is taken out with a wire, and then backfilling is performed. Is.
しかしながら、上記従来の方法は、重量の大きい構真柱
7を地面に設置した架台4に支持させるようにしていた
ため、該構真柱7の重量に十分耐え得るだけの地盤補強
が必要があるばかりでなく、各種調整機構を備えた強度
の大きい架台4も必要であり、更に、鉛直度を出すため
の水平油圧ジャッキ10も必要であった。そのため、設備
が非常に複雑でその設置や撤去に手数がかかり、架台4
及び水平油圧ジャッキ10による構真柱7の鉛直度の調整
も面倒であり、構真柱7の建て込みに多くの手数と時間
とを費やしていた。しかも、このような構真柱の建て込
みには通常1/800程度の精度が要求されるが、従来の方
法では、構真柱の重量が大きくなると動きにくくなるた
め、その位置調整や鉛直度の調整が困難になり、必要な
精度を出しにくいという欠点もあった。However, in the above-mentioned conventional method, since the large weight of the true structural column 7 is supported by the gantry 4 installed on the ground, it is not only necessary to reinforce the ground enough to withstand the weight of the true structural column 7. Instead, a strong base 4 equipped with various adjustment mechanisms was required, and a horizontal hydraulic jack 10 was also required for achieving verticality. Therefore, the equipment is very complicated, and it takes time to install and remove it.
Also, it is troublesome to adjust the verticality of the structure post 7 by the horizontal hydraulic jack 10, and a lot of time and effort are spent to build the structure post 7. Moreover, the accuracy of about 1/800 is usually required for the construction of such a true pillar, but with the conventional method, it becomes difficult to move when the weight of the true pillar becomes large. There is also a drawback that it becomes difficult to adjust and the required accuracy is difficult to obtain.
[発明が解決しようとする課題] 本発明の課題は、設備が簡単で施工も容易な構真柱の建
て込み方法を提供することにある。[Problems to be Solved by the Invention] An object of the present invention is to provide a method for erection of a true column that is simple in equipment and easy in construction.
[課題を解決するための手段] 上記課題を解決するため、本発明によれば、地中に圧入
したケーシングの内部に、鉄筋篭を下端に固定した構真
柱をワイヤーにより吊り下げて挿入し、該構真柱を、鉄
筋篭が穴底より若干離間した状態に上記ワイヤーで鉛直
に吊り下げたまま、ケーシングに対して位置決めした
後、ケーシングの上端部に載置した固定枠によって鉛直
に固定し、その後に穴内へのコンクリートの打設とケー
シングの引き抜き及び埋め戻しを行うことを特徴とする
構真柱の建て込み方法が提供される。[Means for Solving the Problems] In order to solve the above problems, according to the present invention, a structure column having a reinforcing bar cage fixed to the lower end is hung by a wire and inserted into the casing press-fitted into the ground. , The structural column is positioned vertically with respect to the casing while vertically suspended by the wire with the rebar cage slightly separated from the bottom of the hole, and then vertically fixed by the fixing frame placed on the upper end of the casing. Then, there is provided a method of erection of a true column, which comprises pouring concrete into the hole and then withdrawing and backfilling the casing.
[発明の具体例] 以下、本発明の方法を図面を参照しながら更に詳細に説
明する。DETAILED DESCRIPTION OF THE INVENTION Hereinafter, the method of the present invention will be described in more detail with reference to the drawings.
第1図において、20は地中に圧入されたケーシングであ
って、該ケーシング20は、従来より公知の方法、例え
ば、ハンマーグラブで地盤を掘削しながら油圧を利用し
た圧入装置21で加圧することによって圧入されるもので
ある。該ケーシング20の上端部には、第2図に示すよう
に、その中心に構真柱22(第3図参照)をセットできる
ようするため、該構真柱22の中心に合わせるべき目印23
がX,Y方向に付されている。In FIG. 1, reference numeral 20 denotes a casing press-fitted into the ground. The casing 20 is pressurized by a conventionally known method, for example, a hydraulic press-fitting device 21 while excavating the ground with a hammer grab. It is pressed in by. As shown in FIG. 2, at the upper end portion of the casing 20, a mark 23 to be aligned with the center of the true-fixation column 22 so that the true-fixation column 22 (see FIG. 3) can be set at the center thereof.
Are attached in the X and Y directions.
次に、第3図に示すように、下端部に鋼材25によって鉄
筋篭24を固定した構真柱22をクレーンによりワイヤー26
で鉛直に吊り下げ、上記ケーシング20の内部中央に静か
に挿入する。そして、該構真柱22を、下端部の鉄筋篭24
が穴底から若干離間した状態で鉛直に吊り下げたまま、
トランシット27で確認しながら構真柱22の中心をケーシ
ング20に付された目印23に合わせることにより、該構真
柱22をケーシング20の中心に位置決めし、該構真柱22を
ケーシング20の上端部に載置した固定枠28によって鉛直
に固定する。このとき、構真柱22はワイヤー26により吊
り下げられているから、その重量の大小に関係なく簡単
に鉛直状態を保つことになり、従って、従来のように水
平油圧ジャッキによって鉛直度の調整を行うことなく、
簡単且つ確実に鉛直度を出すことができる。なお、構真
柱22の天端はレベルで確認する。また、上記の如く構真
柱22をワイヤー26で吊り下げる場合、構真柱を直接ワイ
ヤーで吊り下げても良いが、適当な吊り治具を介して吊
り下げることもできる。Next, as shown in FIG. 3, the structure pillar 22 having the reinforcing bar cage 24 fixed to the lower end portion by the steel material 25 is used to attach the wire 26 by the crane.
And hang it vertically, and gently insert it into the center of the inside of the casing 20. Then, the structure column 22 is attached to the rebar cage 24 at the lower end.
Is hung vertically from the bottom of the hole,
By aligning the center of the true post 22 with the mark 23 attached to the casing 20 while checking with the transit 27, the true post 22 is positioned at the center of the casing 20, and the true post 22 is located at the upper end of the casing 20. It is fixed vertically by the fixed frame 28 placed. At this time, since the structure column 22 is suspended by the wire 26, the vertical state can be easily maintained regardless of the weight of the structure column. Therefore, the vertical degree can be adjusted by the horizontal hydraulic jack as in the conventional case. Without doing
The verticality can be easily and reliably obtained. In addition, the crown of the true pillar 22 is confirmed at the level. Further, when the true pillar 22 is hung by the wire 26 as described above, the true pillar may be directly hung by the wire, but it may be hung by an appropriate hanging jig.
上記固定枠28は、第4図に示すように、構真柱22をY−
Y方向から挾持する二本の枠材29,29に、該構真柱22を
X−X方向から挾持するブラケット30、30をそれぞれ取
り付けたもので、ケーシング20の上端に適宜手段によっ
て着脱自在に固定できるようになっている。As shown in FIG. 4, the fixed frame 28 has the structure column 22 with the Y-shaped column.
Two frame members 29, 29 that are held in the Y direction are provided with brackets 30, 30 that hold the true column 22 in the X-X direction, and are detachably fixed to the upper end of the casing 20 by appropriate means. You can do it.
このようにして構真柱22の固定を行った後、第5図に示
すように、ケーシング20内にトレミー管32を鉄筋篭24に
当らないように順次ジョイントしながら挿入し、鉄筋篭
24及びトレミー管32の建て込み中に沈殿した安定液中の
スライムの除去と、コンクリートの打設とを行う。After fixing the structure columns 22 in this way, as shown in FIG. 5, the tremie pipes 32 are inserted into the casing 20 while sequentially joining them so as not to hit the rebar cages 24.
The slime that has settled during the installation of 24 and the tremie pipe 32 is removed and concrete is poured.
スライムの除去は、トレミー管32の内部にエアホースを
挿入すると共にトレミー管32の先端にエアリフト装置を
取り付け、該トレミー管32内に約7気圧程度のエアを圧
入して穴底付近の泥水を揚水することにより行う。この
場合、揚水が穴底一ケ所に集中することがないように、
絶えず管の位置を変えながら穴底全域から均等に揚水す
ることが必要である。また、揚水によって穴内の安定液
の水位が低下することのないように常時監視し、必要に
応じて給水できるようにしておくことが望ましい。To remove slime, insert an air hose inside the tremie pipe 32 and attach an air lift device to the tip of the tremie pipe 32, and press about 7 atm of air into the tremie pipe 32 to pump mud water near the bottom of the hole. By doing. In this case, to prevent the pumping water from concentrating on one hole bottom,
It is necessary to constantly change the position of the pipe and evenly pump water from the entire bottom of the hole. Further, it is desirable to constantly monitor so that the level of the stabilizing solution in the hole does not drop due to pumping, so that water can be supplied as needed.
スライムの除去が終ると、ケーシング20内に上記トレミ
ー管32を通じて所要量のコンクリート34を打設する(第
6図参照)。このコンクリートの打設は水中打設である
ため、コンクリートと泥水との混合を防止する意味で、
トレミー管32内にプランジャー33を挿入して打設するプ
ランジャー方式を用いるのが好ましい。また、トレミー
管32の下端を穴底から20〜25cm程度持ち上げておくこと
により、コンクリートの分離を防ぐことができる。When the slime has been removed, the required amount of concrete 34 is poured into the casing 20 through the tremie pipe 32 (see FIG. 6). Since this concrete is placed underwater, it means that mixing of concrete and muddy water is prevented.
It is preferable to use a plunger system in which the plunger 33 is inserted into the tremie pipe 32 and driven. Moreover, by separating the lower end of the tremie pipe 32 from the bottom of the hole by about 20 to 25 cm, it is possible to prevent the separation of the concrete.
コンクリートの打設が完了すると、トレミー管32を引き
抜くと共に、固定枠28を一旦取り外して圧入装置21によ
りケーシング20を引き抜き、更に、第6図に示すように
圧入装置21を撤去して地面上に覆工板35を設置し、該覆
工板35上に固定枠28をセットすることにより再び構真柱
22を支持させる。そして、X−Y2方向からトランシッ
トを覗きながらウエート36により構真柱22を引っ張って
柱芯を調整し、穴内の安定液をポンプにより吸い上げた
後、良質な残土37により埋め戻しを行い、構真柱22の建
て込みが完了する。When the pouring of concrete is completed, the tremie pipe 32 is pulled out, the fixed frame 28 is once removed, the casing 20 is pulled out by the press fitting device 21, and the press fitting device 21 is removed as shown in FIG. The lining plate 35 is installed, and the fixed frame 28 is set on the lining plate 35 to re-establish the true pillar.
Support 22. Then, while looking into the transit from the X-Y2 direction, pull the construction column 22 with the weight 36 to adjust the column core, suck up the stabilizing liquid in the hole with a pump, and then backfill it with high quality residual soil 37. Building of pillar 22 is completed.
なお、構真柱22は、断面形状が上述したようなH形のも
のに限定される訳ではなく、○形や□形、その他任意の
断面形状のものを使用することができる。The true-columns 22 are not limited to those having the H-shaped cross section as described above, and may be o-shaped, □ -shaped, or any other cross-sectional shape.
[発明の効果] このように本発明によれば、構真柱をワイヤーで吊り下
げることによりその鉛直度を出すと共に、吊り下げ状態
のままケーシングに対して位置決めし、その後で該ケー
シングの上端部に載置した固定枠によって鉛直に固定す
るようにしたので、該構真柱の重量の大小に関係なくそ
の鉛直度を極めて簡単に出すことができると共に、その
位置調整を行うことができ、従来のように、鉛直度の調
整や位置調整等のために水平油圧ジャッキ等の複雑な装
置を使用して面倒な作業を一切行う必要がなく、しか
も、大重量の構真柱を支持させるために各種調整機構を
備えた構造が複雑で強度の大きい架台を地面に設ける必
要がないばかりでなく、該架台を載置するための地盤補
強を行う必要もない。[Effects of the Invention] According to the present invention as described above, the verticality of the column is increased by suspending it with a wire, and it is positioned with respect to the casing in the suspended state, and then the upper end portion of the casing. Since it is fixed vertically by the fixing frame placed on the, the verticality can be extremely easily obtained regardless of the weight of the structure column, and its position can be adjusted. As described above, it is not necessary to use complicated devices such as horizontal hydraulic jacks to adjust the verticality and position, and to support various heavy articulated columns. It is not necessary to provide a pedestal having a complicated structure with an adjusting mechanism and high strength on the ground, and it is not necessary to reinforce the ground for mounting the pedestal.
また、一般に、構真柱を挿入したケーシングの内部にコ
ンクリートを注入するとき、構真柱には該コンクリート
による非常に大きな押圧力が作用する。この場合、コン
クリートは構真柱の側方の地点において注入されるた
め、該構真柱に作用する力は側方からの偏った力とな
り、この作用力により構真柱が移動したり傾斜したりし
て建て込み精度が低下するという問題があった。特に、
水平油圧ジャッキを使用しない方法では、コンクリート
による作用力で構真柱が動き易い。これに対して本願に
おいては、構真柱の下端に鉄筋篭を一体に固定してお
き、この鉄筋篭に構真柱の下端部を支持させた状態でコ
ンクリートを注入するようにしたので、コンクリートに
よる押圧力が構真柱に作用しても、該構真柱は鉄筋篭に
よりその中心にしっかりと支持されて動くことがなく、
しかも、注入されたコンクリートは、鉄筋篭を構成する
多数の細線により分散されて拡散し、1点のみに集中し
て作用力を及ぼすようなことがないばかりか、各細線に
分散して作用する作用力も、それらが相互に相殺し合う
ことになるため、偏った力として構真柱及び鉄筋篭に1
方向から強く作用することがなく、これらの相乗効果に
より、コンクリート打設時の該構真柱の移動や傾斜等を
確実に防止することができる。In addition, generally, when concrete is poured into the casing into which the true pillar is inserted, a very large pressing force of the concrete acts on the true pillar. In this case, concrete is poured at a point on the side of the true column, so the force acting on the true column becomes a biased force from the side, and this action force causes the true column to move or tilt. Then, there was a problem that the build-up accuracy was lowered. In particular,
In the method that does not use a horizontal hydraulic jack, the concrete column is easy to move due to the acting force of concrete. On the other hand, in the present application, the reinforcing bar cage is integrally fixed to the lower end of the structure pillar, and the concrete is poured while the lower end portion of the structure pillar is supported by the reinforcing bar cage. Even if the pressing force by the force acts on the true column, the true column is firmly supported at the center by the rebar cage and does not move,
Moreover, the injected concrete is dispersed and diffused by a large number of fine wires forming the rebar cage, and not only exerts an action force by concentrating on only one point, but also acts on each fine wire in a dispersed manner. As for the acting force, they will cancel each other out.
It does not act strongly from the direction, and by these synergistic effects, it is possible to surely prevent the movement and inclination of the concrete columns during concrete pouring.
第1図は構真柱の建て込み前の状態を示す断面図、第2
図はその平面図、第3図はケーシング内に構真柱を挿入
した状態の断面図、第4図はその平面図、第5図はコン
クリート打設前の状態を示す断面図、第6図は建て込み
完了直前の状態を示す断面図、第7図乃至第9図は従来
の構真柱の建て込み方法を示す説明図である。 20……ケーシング、22……構真柱 24……鉄筋篭、26……ワイヤー 28……固定枠、34……コンクリートFIG. 1 is a cross-sectional view showing a state before the construction of the true column,
The figure is a plan view, FIG. 3 is a cross-sectional view of a case where a true column is inserted in a casing, FIG. 4 is its plan view, FIG. 5 is a cross-sectional view showing a state before placing concrete, and FIG. Is a cross-sectional view showing a state immediately before completion of building, and FIGS. 7 to 9 are explanatory views showing a conventional method of building a true-column. 20 …… Casing, 22 …… Structured pillar 24 …… Reinforcing cage, 26 …… Wire 28 …… Fixed frame, 34 …… Concrete
Claims (1)
籠を下端に固定した構真柱をワイヤーにより吊り下げて
挿入し、該構真柱を、鉄筋籠が穴底より若干離間した状
態に上記ワイヤーで鉛直に吊り下げたまま、ケーシング
に対して位置決めした後、ケーシングの上端部に載置し
た固定枠によって鉛直に固定し、その後に穴内へのコン
クリートの打設とケーシングの引き抜き及び埋め戻しを
行うことを特徴とする構真柱の建て込み方法。1. A structure column having a reinforcing bar cage fixed to the lower end is inserted by being suspended by a wire into a casing press-fitted into the ground, and the structure column is in a state in which the reinforcing bar cage is slightly separated from the hole bottom. While vertically suspended with the above wire, after positioning with respect to the casing, fix vertically with a fixing frame placed on the upper end of the casing, and then place concrete into the hole and pull out and refill the casing. The method of erection of the true pillar which is characterized by performing.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139666A JPH0649976B2 (en) | 1989-06-01 | 1989-06-01 | How to build a true pillar |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP1139666A JPH0649976B2 (en) | 1989-06-01 | 1989-06-01 | How to build a true pillar |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH035522A JPH035522A (en) | 1991-01-11 |
| JPH0649976B2 true JPH0649976B2 (en) | 1994-06-29 |
Family
ID=15250592
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP1139666A Expired - Fee Related JPH0649976B2 (en) | 1989-06-01 | 1989-06-01 | How to build a true pillar |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0649976B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2808908B2 (en) * | 1991-03-26 | 1998-10-08 | 三菱マテリアル株式会社 | How to make foundation pile |
| JP4615102B2 (en) * | 2000-08-21 | 2011-01-19 | 財団法人鉄道総合技術研究所 | Steel pipe column erection method and cast-in-place pile head treatment method |
| JP4523869B2 (en) * | 2005-04-11 | 2010-08-11 | 新日鉄エンジニアリング株式会社 | Column fixing member installation method and column fixing member installation device for steel pipe foundation pile |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5215608Y2 (en) * | 1971-10-18 | 1977-04-08 |
-
1989
- 1989-06-01 JP JP1139666A patent/JPH0649976B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JPH035522A (en) | 1991-01-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JPH08296243A (en) | Construction method of underground structure with precast concrete true columns | |
| CN111945714A (en) | Steel sleeve guiding method combined with steel upright column inserting construction method | |
| JP2747566B2 (en) | Construction method of straight pillar | |
| JPH0649976B2 (en) | How to build a true pillar | |
| JP2556215B2 (en) | Construction method | |
| CN209145296U (en) | A kind of installation lifting device for material distributing machine | |
| JPH0657763A (en) | Construction of vertical shaft with center column by solidification of mud slurry | |
| JP3053296B2 (en) | Pillar hanging jig | |
| JP2001241287A (en) | Construction method of shaft, assembly method of structural body used for construction method, and assembly device used for assembly method | |
| JPH0531631B2 (en) | ||
| CN213296330U (en) | Pile splicing construction device under quicksand geological conditions | |
| JPH07122273B2 (en) | Structure pillar built-in stand | |
| JP2996113B2 (en) | How to build a shaft | |
| JP6792239B2 (en) | Scuttling prevention device for steel pipe piles and scuttling prevention method | |
| JP2556216B2 (en) | Construction pillar installation jig | |
| JPH10317391A (en) | Steel tower foundation structure and steel tower foundation construction method | |
| JP3325550B2 (en) | Pile construction equipment and pile construction method | |
| CN220644210U (en) | Filling pile with reinforced structure | |
| JP3265491B2 (en) | Positioning method of vertical columns | |
| JP2979198B2 (en) | Construction method of pile body including straight pillar | |
| JPH10299019A (en) | Joining method for permanent sub-structural column and main steel in inverted construction method | |
| JPH1122365A (en) | Construction method of shaft and device therefor | |
| JPH0762658A (en) | Guide pipes used for installation of structure columns and installation method of structure columns using them | |
| JPH05247951A (en) | Construction method of basement of building and traction device used therefor | |
| JPH0821180A (en) | Vertical shaft construction method |