Method for launching submerged concrete pavement

Info

Publication number
JPH0657929B2
JPH0657929B2 JP11032589A JP11032589A JPH0657929B2 JP H0657929 B2 JPH0657929 B2 JP H0657929B2 JP 11032589 A JP11032589 A JP 11032589A JP 11032589 A JP11032589 A JP 11032589A JP H0657929 B2 JPH0657929 B2 JP H0657929B2
Authority
JP
Japan
Prior art keywords
area
curved surface
jack
subsidence
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP11032589A
Other languages
Japanese (ja)
Other versions
JPH02289704A (en
Inventor
勝久 佐藤
孝志 草間
晴雄 犬飼
Original Assignee
運輪省港湾技術研究所長
株式会社ピー・エス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 運輪省港湾技術研究所長, 株式会社ピー・エス filed Critical 運輪省港湾技術研究所長
Priority to JP11032589A priority Critical patent/JPH0657929B2/en
Publication of JPH02289704A publication Critical patent/JPH02289704A/en
Publication of JPH0657929B2 publication Critical patent/JPH0657929B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Road Repair (AREA)

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明は、コンクリート舗装された路面等の部分的な沈
下を修復し、路面全体を平らにするための沈下したコン
クリート舗装版の高さ修復工事に使用する、扛上方法に
関する。
DETAILED DESCRIPTION OF THE INVENTION (Industrial field of application) The present invention repairs a partial subsidence of a concrete paved road surface or the like and restores the height of a submerged concrete paving plate for flattening the entire road surface. This is related to the lifting method used for construction.

(従来の技術) コンクリート舗装の部分的な沈下の修復方法として従来
は、舗装表面に表面舗装を盛り上げる、いわゆるオーバ
ーレイや、沈下部分の舗装版全体を取り除き、新たに打
ち直すといった方法が採られていた。
(Prior Art) Conventionally, a method of repairing a partial subsidence of a concrete pavement has been adopted in which the surface pavement is raised on the pavement surface, so-called overlay, or the entire pavement plate in the subsidence is removed and a new re-punch is performed. .

しかし、従来のオーバーレイによる舗装はコンクリート
舗装版表面が高くなるため、側溝や縁石まで施工し直さ
なければならなくなることが多く、しかも盛り上げた部
分と盛り上げない部分との境界の段差をなくすことがで
きないため、段差が不都合な場所では沈下の生じていな
い部分まで広範囲に施工する必要が生じる。更に表面コ
ンクリートを打設するため、コンクリートの養生が必要
となり、長時間にわたって交通を遮断しなければならな
い等の問題がある。
However, in the case of conventional overlay pavement, the surface of the concrete pavement plate becomes high, so it is often necessary to reconstruct the gutters and curbs, and it is not possible to eliminate the step between the raised and non-raised portions. Therefore, in a place where the step is inconvenient, it is necessary to construct a wide area up to a portion where no subsidence occurs. Further, since the surface concrete is cast, it is necessary to cure the concrete, and there is a problem that traffic must be cut off for a long time.

またコンクリート舗装版を新たに打ち直す方法は、新舗
装と同じだけ経費を要し、しかもオーバーレイよりも更
に長時間の交通遮断を要し、更に既設部分との連絡が必
要となる場合には、作業空間に限りがあるため、作業性
に問題が生じる等の問題がある。
In addition, the method of rehashing the concrete pavement requires the same cost as the new pavement, and also requires a longer traffic cutoff than the overlay, and when it is necessary to contact the existing part, work is required. Since the space is limited, there are problems such as workability problems.

このような問題を解決する方法として、予め沈下を想定
し、最初の舗装版打設成形時に、舗装面の全域に一定間
隔毎にリフトアップ用の金具を埋め込んでおき、必要な
場所の金具にジャッキを取り付けて持ち上げ、裏込めを
なす方法(特開昭61−169504号公報)や、コン
クリート舗装版の沈下域に作業穴をあけ、これにジャッ
キを装着し、その沈下域を表面が平らになるまで持ち上
げて裏込めをなすようにした高さ修復方法が提案され
た。
As a method to solve such a problem, assuming subsidence in advance, at the time of the first pavement plate casting and molding, the lift-up metal fittings are embedded at regular intervals throughout the pavement surface, and the metal fittings at the necessary locations are set. A method of backfilling by attaching a jack and lifting it (Japanese Patent Laid-Open No. 61-169504), or by making a working hole in the subsidence area of a concrete paving slab and attaching a jack to this, flattening the subsidence area. A height restoration method was proposed, in which the height was raised and backfilling was performed.

(発明が解決しようとする課題) このように、舗装時に扛上のための金具を埋め込んだ
り、沈下後に作業穴を開けたりしてジャッキにより舗装
版を持ち上げ裏込めして高さを修復する方法において
は、コンクリート舗装版に亀裂を生じさせないで沈下域
を扛上させる必要があり、これには、全域を同時に扛上
されることが考えられる。しかし、空港や、道路等の沈
下域は広大に生じる場合が多く、広大な面積を同時に扛
上させるには多数の扛上ジャッキと、大きな動作エネル
ギーを必要とし、膨大な経費を要するという問題があ
る。
(Problems to be Solved by the Invention) As described above, a method of embedding metal fittings for uplifting during pavement or opening a work hole after sinking, lifting a pavement slab with a jack and backfilling it to restore the height In, it is necessary to raise the subsidence area without causing cracks in the concrete paving slab, and it is considered that the whole area is raised at the same time. However, airports and subsidence areas such as roads often occur vastly, and in order to raise a large area at the same time, many raising jacks, large operating energy are required, and a huge cost is required. is there.

本発明は、このようにジャッキを使用して持ち上げるこ
とにより高さを修復する方法において、既存のコンクリ
ート舗装版を損傷することなく、正確かつ迅速にしかも
少ない資材にて経済的にコンクリート舗装版表面を平ら
に持ち上げることができる沈下したコンクリート舗装版
の扛上方法の提供を目的としたものである。
As described above, the present invention provides a method for restoring the height of a concrete pavement plate by using a jack in such a manner that the concrete pavement plate surface is accurately, quickly, and economically with a small amount of material without damaging the existing concrete pavement plate. The purpose of the present invention is to provide a method for raising a submerged concrete paving slab that can lift a flat surface.

(課題を解決するための手段) 上述の如き目的を達成する本発明の沈下したコンクリー
ト舗装版の扛上方法の特徴は、コンクリート舗装版の沈
下域全域に格子状配置に多数の扛上作業穴を貫通開口さ
せ、その沈下域の一方縁部側の一定広さ範囲の各扛上作
業穴にそれぞれ扛上ジャッキを装着して扛上させ、該扛
上ジャッキの装着域を移動させて沈下域全域を所定の高
さまで扛上させる沈下したコンクリート舗装版の扛上方
法において、沈下域の一方縁部側の一定範囲のジャッキ
装着域を該一方縁部側が高く他方縁部側が低い傾斜扛上
曲面に扛上させ、その高い側の扛上ジャッキを低い側の
未扛上部に順次装着し直して前記傾斜扛上曲面を移動さ
せ、かつ、該傾斜扛上曲面の低い側の縁部が沈下域にお
ける前記傾斜扛上曲面移動方向に向いて先上りの沈下傾
斜面域に差しかかる以前に該沈下傾斜面と傾斜扛上曲面
との間の部分を同時に平らになるまで扛上させることに
ある。
(Means for Solving the Problems) A feature of the method of raising a submerged concrete pavement plate of the present invention that achieves the above-mentioned object is that a large number of raising work holes are arranged in a grid pattern over the entire settling area of the concrete pavement plate. Through the opening of the submerged area, attach each of the submerged jacks to each of the submerged work holes in a certain width range on one edge side of the submerged area to raise the submerged area, and move the area of the submerged jack to move the submerged area. In the method of raising a submerged concrete pavement that raises the entire area to a predetermined height, a certain range of jack mounting area on one edge side of the sinking area is sloped upward on the one side and low on the other side. The upper jack on the lower side of the sloped upper curved surface to move the inclined upper curved surface, and the lower edge of the inclined upper curved surface is settled down. Point in the direction of movement of the inclined curved surface at It is to raise the part between the subsidence inclined surface and the inclined uplift curved surface at the same time until it becomes flat before reaching the uphill subsidence inclined surface area.

(作用) 一般に、修復しようとする舗装がコンクリート構造であ
る場合、局部的に一定以上の強い曲げ力が加わると損傷
される。
(Operation) In general, when the pavement to be restored has a concrete structure, it is damaged when a locally strong bending force is applied.

本発明方法では、沈下域の一部に扛上ジャッキを装着
し、部分的に持ち上げるものであるため、既扛上部分と
未扛上部分とに高低差が生じることとなるが、端部より
一定の傾斜扛上曲面となるように扛上させることによ
り、扛上時のコンクリート舗装版の湾曲度が積極的にコ
ントロールされることとなる。
In the method of the present invention, since the lifting jack is attached to a part of the subsidence area and is partially lifted, a height difference occurs between the already lifted portion and the unsupported portion, but from the end portion. By raising the curved surface so that it has a constant sloped curved surface, the curvature of the concrete pavement plate during the lifting is positively controlled.

このようにして一定の傾斜扛上曲面をコンクリート舗装
版の最大弾性限界に近つけて設定することにより能率的
に亀裂を生じさせないで扛上できる。
In this way, by setting a constant sloped curved surface close to the maximum elastic limit of the concrete paving slab, it is possible to efficiently raise the surface without causing cracks.

一方沈下域は、その中央部分が低く、周縁部が中央部分
に向けて低く傾斜していることが多く、従って沈下域の
一方の縁部から他方の縁部に向けて、前述した進行方向
側が低い傾斜扛上曲面をコンクリートの弾性限界に近い
状態で進行させて行くと、進行方向側が高く傾斜した沈
下傾斜面と交差することとなり、その交差部の曲率が弾
性限界をこえることとなるが、その交差以前に傾斜扛上
曲面と沈下傾斜曲面との間の部分を平らになるまで持ち
上げることにより最大弾性限界以内で、これに近い曲率
を維持しつつ扛上できる。
On the other hand, in the subsidence area, the central portion is low, and the peripheral portion is often inclined low toward the central portion. Therefore, from the one edge of the subsidence area to the other edge, When a low sloped curved surface is advanced in a state close to the elastic limit of concrete, it will intersect the settling inclined surface where the direction of travel is high, and the curvature of the intersection will exceed the elastic limit. Before the intersection, by raising the portion between the sloped curved surface and the sinked curved surface until it becomes flat, it is possible to lift up while maintaining a curvature close to this within the maximum elastic limit.

(実施例) 次に本発明の実施例を図面について説明する。(Example) Next, the Example of this invention is described about drawing.

第1図(イ)〜(チ)は修復工程の概略を順に図示して
いる。まず、コンクリート舗装版Aの沈下域B(第2図
に示す)の形状及びその各部分の高さを全域にわたって
測定する。この測定は、例えば第1図に(イ)に示すよ
うに通常使用されているレベル1及び目盛尺2等、従来
使用されている各種の方法のいずれかを選択して行う。
FIGS. 1A to 1H sequentially show the outline of the repair process. First, the shape of the subsidence area B (shown in FIG. 2) of the concrete paving slab A and the height of each part thereof are measured over the entire area. This measurement is performed by selecting any one of various conventionally used methods such as the level 1 and the scale 2 which are normally used as shown in FIG.

次いで第1図(ロ)及び第2図に示すように沈下域B全
域にわたって作業穴3を形成する。この作業穴3は、直
径150m/m程度の円形にコア抜きカッター4により
コンクリート舗装版Aの表面から裏面に貫通させて開口
させる。また作業穴3は、第2図に示すように4〜5m
程度の間隔を隔てて格子状配置に開口させる。
Next, as shown in FIGS. 1B and 2, working holes 3 are formed over the entire subsidence area B. The working hole 3 is formed in a circular shape having a diameter of about 150 m / m by a core removing cutter 4 so as to penetrate from the front surface to the back surface of the concrete paving plate A. The working hole 3 is 4 to 5 m long as shown in FIG.
The openings are arranged in a grid-like arrangement at regular intervals.

作業穴3を開口させた後、第1図(ハ)に示すように各
作業穴3毎に、その穴下及びその周辺の基礎路盤5の表
面部分を掘削し、舗装版下に作業空間6を形成する。こ
の掘削は、例えば回転することにより半径方向に拡径す
る掘削刃を有する電動工具を使用し、バキュームにより
掘削土を吸い出すことによって行う。次いで、第1図
(ニ)に示すようにその掘削穴の底面にコンクリートを
打設して表面が平らな反力盤7を形成する。
After the working holes 3 are opened, as shown in FIG. 1C, the surface portion of the foundation roadbed 5 under and around each working hole 3 is excavated, and the working space 6 is placed under the paving slab. To form. This excavation is performed by sucking the excavated soil with a vacuum using an electric tool having an excavating blade whose diameter is expanded in the radial direction by rotating, for example. Next, as shown in FIG. 1 (d), concrete is placed on the bottom surface of the excavation hole to form a reaction plate 7 having a flat surface.

また基礎路盤5の強度が、後述するジャッキの反力を充
分に支持し得るものである場合には、コンクリートを打
設せずに掘削面8そのものを反力盤としてもよい。
If the strength of the foundation roadbed 5 is sufficient to support the reaction force of the jack, which will be described later, the excavated surface 8 itself may be used as a reaction force plate without placing concrete.

反力盤7の形成後、第1図(ホ)及び第4図に示すよう
に作業穴3にジャッキ装着金具10を装着するととも
に、その中央の反力盤7上に固定金具11を設置する。
ジャッキ装着金具10は、第3図、第4図に示すように
作業穴3内に位置させる円筒部12と、その円筒部12
の下端外周からコンクリート舗装版A下に突出させた張
出部13とからなっている。張出部13は第3図に示す
ように、円盤を三分割した分割片13aからなり、舗装
版下の作業穴空間6内にて、円筒部12の下端に螺嵌さ
れる補助筒14のフランジ14a上にピン14bにて止
められ、上面が円筒部12の下端にて押圧されることに
よって組み付けられるようにしている。また固定金具1
1は円盤状に形成され、反力盤7上に載置した状態で上
端がジャッキ装着金具10の円筒部12内に挿入される
高さに複数枚重ねて柱状となす。
After the reaction board 7 is formed, as shown in FIG. 1 (e) and FIG. 4, the jack mounting metal fitting 10 is installed in the work hole 3 and the fixing metal fitting 11 is installed on the reaction board 7 at the center thereof. .
As shown in FIGS. 3 and 4, the jack mounting metal fitting 10 includes a cylindrical portion 12 positioned in the working hole 3 and the cylindrical portion 12 thereof.
And a projecting portion 13 protruding from the outer periphery of the lower end of the concrete pavement A to the bottom. As shown in FIG. 3, the overhanging portion 13 is composed of a divided piece 13a obtained by dividing the disk into three parts, and of the auxiliary cylinder 14 screwed into the lower end of the cylindrical portion 12 in the working hole space 6 under the paving plate. It is fixed to the flange 14a by a pin 14b, and the upper surface is pressed by the lower end of the cylindrical portion 12 so that the cylindrical portion 12 can be assembled. Fixing bracket 1
1 is formed in a disk shape, and a plurality of sheets 1 are piled up at a height where the upper end of the disk 1 is inserted into the cylindrical portion 12 of the jack mounting metal fitting 10 in a state of being placed on the reaction force disk 7 to form a columnar shape.

ジャッキ装着金具10は円筒部12の内面に雌ねじ15
が刻設され、これに外周に雄ねじが刻設されたリング状
のロックナット16が螺嵌されている。このロックナッ
ト16は、下端面に前述した固定金具11の上端周縁部
が当接される大きさに形成されているものであり、その
上端面にはこれを旋回して螺進させるための工具係合穴
が開口されている。
The jack fitting 10 has a female screw 15 on the inner surface of the cylindrical portion 12.
Is engraved, and a ring-shaped lock nut 16 having an external thread engraved on the outer periphery thereof is screwed into this. The lock nut 16 is formed to have a size such that the lower end surface of the lock nut 16 is in contact with the upper peripheral edge portion of the fixing metal fitting 11, and the upper end surface of the lock nut 16 is a tool for turning and screwing the same. The engagement hole is opened.

このように構成されるジャッキ装着金具10及び固定金
具11を各作業穴3毎に装着して準備作業を終え、次い
で第1図(ヘ)(ト)に示すように扛上ジャッキ20を
使用して持ち上げ作業を行う。なお前述した準備作業中
において、昼間の路面使用時には、各作業穴3に鋼製の
蓋(図示せず)を装着しておく。これによって車輌の走
行に影響を及ぼさない。
The jack mounting metal fitting 10 and the fixing metal fitting 11 configured as described above are mounted for each work hole 3 to complete the preparatory work. Then, as shown in FIG. And lift up. During the preparatory work described above, a steel lid (not shown) is attached to each work hole 3 when the road surface is used during the daytime. This does not affect the running of the vehicle.

持ち上げ作業に使用する扛上ジャッキ20は、第4図に
示すように周囲に窓21aを有する円筒状のラムチェア
を有し、そのラムチェア21の下端を前述したジャッキ
装着金具10の円筒部12の上端に螺嵌させるようにし
ている。ラムチェア21の上端には油圧シリンダ22の
下端外周が固定され、その油圧シリンダ22の下端面中
央にラム23が油圧により出入されるようにしている。
ラム23の先端に円筒状をした鋼製のエクステンション
ロッド24の上端が当接されている。このエクステンシ
ョンロッド24は、その下端を前述した固定金具11の
上端に当接させており、ラム23が押し出されることに
よりエクステンションロッド24を介して固定金具11
の上面が押され、その反力によってラムチェア21が引
き上げられ、ジャッキ装着金具10を介してコンクリー
ト舗装版Aが扛上されるようにしている。一方ラムチェ
ア21とエクステンションロッド24の間には、これら
と同心配置に円筒状をしたナット旋回工具25が挿入さ
れている。このナット旋回工具25には、下端にナット
係合突起26が突設され、これをロックナット16の工
具係合穴に嵌合させるようにしており、ラムチェア21
の窓21aから工具25を旋回させることによってロッ
クナット16を螺進退させるようにしている。
The lifting jack 20 used for lifting work has a cylindrical ram chair having a window 21a in its periphery as shown in FIG. 4, and the lower end of the ram chair 21 is the upper end of the cylindrical portion 12 of the jack mounting bracket 10 described above. It is designed to be screwed into. The outer periphery of the lower end of the hydraulic cylinder 22 is fixed to the upper end of the ram chair 21, and the ram 23 is hydraulically moved in and out of the center of the lower end surface of the hydraulic cylinder 22.
The upper end of a cylindrical steel extension rod 24 is in contact with the tip of the ram 23. The lower end of the extension rod 24 is brought into contact with the upper end of the fixing metal fitting 11 described above, and when the ram 23 is pushed out, the fixing metal fitting 11 is inserted through the extension rod 24.
The upper surface of the stool is pushed and the ram chair 21 is pulled up by the reaction force, and the concrete paving slab A is lifted through the jack fitting 10. On the other hand, a cylindrical nut swivel tool 25 is inserted between the ram chair 21 and the extension rod 24 in a concentric arrangement with them. The nut turning tool 25 has a nut engaging projection 26 projecting from the lower end thereof, which is fitted into the tool engaging hole of the lock nut 16.
The lock nut 16 is screwed back and forth by turning the tool 25 through the window 21a.

また油圧シリンダ22の上端には、ラム23とともに往
復動作する出入ロッド27が突出され、その外側に出入
ロッド27の動作量を測定する扛上量検出センサー28
が備えられている。
Further, an in-and-out rod 27 which reciprocates together with the ram 23 is projected from the upper end of the hydraulic cylinder 22, and an up-and-down amount detecting sensor 28 for measuring the operation amount of the in-and-out rod 27 is provided outside thereof.
Is provided.

持ち上げに際しては、上述の如く構成される扛上ジャッ
キ20を、沈下域Bの一方側の縁部から第5図に示すよ
うに、平行に4列配置に各作業穴に装着する。次いで、
第6図に示すように先に測定した沈下域曲面30及びコ
ンクリート舗装版Aの許容曲げ量を考慮して、数段階の
中間扛上曲面、31a、31b、及び最終段階の傾斜扛
上曲面31cを予め設定しておき、まず第1段階の中間
扛上曲面31aに到るまで各ジャッキ列20〜20
のジャッキを動作させて一旦停止させる。同様にして第
2段階から最終段階の傾斜扛上曲面31cに順に持ち上
げる。
At the time of lifting, the lifting jack 20 configured as described above is mounted in parallel from each edge of one side of the subsidence area B in four rows as shown in FIG. Then
As shown in FIG. 6, in consideration of the subsidence area curved surface 30 and the allowable bending amount of the concrete paving slab A, which have been measured previously, several stages of intermediate uplifting curved surfaces, 31a and 31b, and a final stage of uplifting curved surface 31c. Is set in advance, and first, the jack rows 20 1 to 20 4 are reached until the intermediate rising curved surface 31a of the first stage is reached.
Operate the jack to stop it. In the same manner, the slope-up curved surface 31c is sequentially lifted from the second stage to the final stage.

なお、ここでは第3段階のみ示しているが実際には最小
扛上高さが0.2mm程度になるように各段階の扛上予定曲
面を設定する。
Although only the third stage is shown here, the actual planned uplifting curved surface for each stage is set so that the minimum uplifting height is about 0.2 mm.

次いで第1列目のジャッキ列20の各ジャッキにおい
て、ナット旋回工具26を操作してロックナット16を
下降させ、その下端面を固定金具11の上端に当接させ
る。これによってジャッキ20を取り外してもコンクリ
ート舗装版Aは固定金具11に支持される。この状態で
第1列目の各ジャッキ20を取り外し、第5列目に移動
させて各作業穴3に装着し、前述と同様に数段階の中間
扛上曲面に合わせて順次扛上させる。
Then, in the first column of each jack of the jack column 20 1, by operating the nut turning tool 26 is lowered the lock nut 16, it is brought into contact with the lower end surface to the upper end of the fixing bracket 11. As a result, even if the jack 20 is removed, the concrete paving slab A is supported by the fixture 11. In this state, the jacks 20 in the first row are removed, moved to the fifth row, mounted in the work holes 3, and similarly lifted up in accordance with the intermediate uplifted curved surface of several stages as described above.

この各扛上作業には第7図に示す自動コントロール装置
を使用する。この装置は、油圧ポンプ40から各列毎に
同じ油圧を供給する油圧制御盤41を有している。また
各扛上ジャッキ20の扛上量検出センサー28からの検
出信号は変位計42に送られるようにしている。変位計
42では、あらかじめ記憶させた扛上曲面に対応した計
画量とセンサー28からの検出量と比較し、検出量が計
画量に達するまで操作盤43に動作信号を発するように
している。操作盤43では、油圧制御盤に内蔵している
各油圧ジャッキ20の流路開閉用の電磁弁をON、OF
Fコントロールするようにしており、扛上ジャッキ20
をその各列を単位に、前記変位計42からの制御信号に
応じて動作させるように電磁弁をコントロールすると同
時に、各列内の各扛上ジャッキの扛上速度にばらつきが
でないように0.2〜0.8mmを単位に間欠的に扛上させ、
各列毎に全扛上ジャッキが単位長さづつ動作されるよう
にコントロールしている。また全扛上ジャッキの油圧供
給路に圧力センサー44が設けられ、その信号を荷重計
45に送るようにしている。荷重計45では許容最大荷
重をあらかじめ記憶させておき、その許容最大荷重と圧
力センサー44によって検出した荷重と比較して操作盤
に制御信号を送り、圧力センサー44により検出された
圧力、即ち各扛上ジャッキにかかる負荷が一定以上にな
った時には電磁弁を閉じ油圧の供給を停止させるように
している。
The automatic control device shown in FIG. 7 is used for each lifting work. This device has a hydraulic control panel 41 that supplies the same hydraulic pressure from the hydraulic pump 40 to each column. Further, the detection signal from the lifting amount detection sensor 28 of each lifting jack 20 is sent to the displacement meter 42. The displacement meter 42 compares the planned amount corresponding to the curved surface stored in advance with the detected amount from the sensor 28, and outputs an operation signal to the operation panel 43 until the detected amount reaches the planned amount. In the operation panel 43, the solenoid valve for opening and closing the flow path of each hydraulic jack 20 built in the hydraulic control panel is turned on and OF.
It is designed to be F controlled, and the Uegami jack 20
For each row, the solenoid valve is controlled so as to operate in accordance with the control signal from the displacement gauge 42, and at the same time, the lifting speed of each lifting jack in each row is 0. 2 to 0.8 mm is the unit to lift up intermittently,
All the jacks are controlled so that each row is operated by a unit length. Further, a pressure sensor 44 is provided on the hydraulic pressure supply path of all the jacks, and the signal thereof is sent to the load meter 45. The load cell 45 stores the maximum allowable load in advance, compares the maximum allowable load with the load detected by the pressure sensor 44, and sends a control signal to the operation panel to detect the pressure detected by the pressure sensor 44, that is, each pressure sensor. When the load on the upper jack exceeds a certain level, the solenoid valve is closed and the supply of hydraulic pressure is stopped.

なお、図中46は計算機である。In the figure, reference numeral 46 is a computer.

このようにして順次ジャッキ20を、列を単位にして装
着位置を変え、沈下域Bの他方縁部側に向けて傾斜扛上
曲面31cを移動させる。そして、他方側縁部の先上り
の沈下傾斜曲面30aの手前の位置まで移動させた後、
その沈下傾斜曲面30aと進行してきた傾斜扛上曲面3
1cとによって形成される凹曲面部の全域に、第6図中
左側に示すように扛上ジャッキ列20〜20をセッ
トし、全体を同時に作動させて、該凹曲面部が平らにな
るまで扛上させ、沈下域B全体の扛上を完了させる。
In this manner, the mounting positions of the jacks 20 are sequentially changed in units of rows, and the sloped curved surface 31c is moved toward the other edge of the subsidence area B. Then, after moving to the position in front of the rising subsidence inclined curved surface 30a of the other side edge portion,
The sinking inclined curved surface 30a and the inclined rising curved surface 3
As shown on the left side in FIG. 6, the upper jack rows 20 1 to 20 4 are set in the entire area of the concave curved surface portion formed by 1c and all of them are simultaneously operated to flatten the concave curved surface portion. And complete the subsidence area B as a whole.

尚、上述の実施例では、第8図の扛上工程図に示すよう
に、コンクリート舗装版Aの縁部(目地部)から扛上を
開始させているが沈下域Bが同一コンクリート舗装版A
内にある場合は、第9図に示すように沈下域Bの一方側
縁部から開始し、他方側縁部に向けて傾斜扛上曲面31
cを移動させる。
In the above-mentioned embodiment, as shown in the elevation process diagram of FIG. 8, the elevation is started from the edge (joint) of the concrete pavement A, but the settlement area B is the same concrete pavement A.
If it is inside, as shown in FIG. 9, it starts from one side edge of the subsidence area B and slopes upward toward the other side edge 31.
Move c.

また、沈下が大きい場合は第10図に示すように沈下域
全域にわたって一定高さだけ持ち上げた後、同様にして
全域にわたって数度重ねて施工し、所定の高さまで持ち
上げる。
Further, when the settlement is large, as shown in FIG. 10, after raising it by a certain height over the entire settlement area, it is similarly piled up several times over the entire area and raised to a predetermined height.

更に、第11図に示すように沈下域Bの沈下域曲面が連
続した凹曲面である場合はその底部を先ず平らに持ち上
げた後傾斜扛上曲面31cを移動させて全域を扛上させ
る。なお第9図〜第11図中における,……の数字
は扛上工程順を示している。このようにして沈下域全域
を所定の高さまで持ち上げた後、コンクリート舗装版1
と基礎路盤5間にできた空間に砂や発泡セメントモルタ
ル等の充填材32を前期作業穴3とは別に開口させた注
入穴33よりホースを通して注入し、作業穴3内にジャ
ッキ装着金具10、固定金具11を残した状態でその作
業穴3に蓋をし作業を完了する。なおこの蓋はコンクリ
ートによって埋め込んでもよく、また後日の再修復のた
めに使用できるように取り外し可能な蓋を使用してもよ
いものである。
Further, as shown in FIG. 11, when the subsidence area curved surface of the subsidence area B is a continuous concave curved surface, the bottom is first lifted flat and then the inclined uplifting curved surface 31c is moved to uplift the entire area. The numbers in Fig. 9 to Fig. 11 indicate the order of the raising process. After lifting the entire subsidence area to a predetermined height in this way, the concrete paving slab 1
A filler 32 such as sand or foamed cement mortar is injected into the space formed between the base road base 5 and the base road base 5 through a hose through an injection hole 33 opened separately from the work hole 3 in the previous period, and the jack mounting metal fitting 10 is inserted into the work hole 3. The work hole 3 is covered with the fixing metal fitting 11 left, and the work is completed. It should be noted that this lid may be embedded with concrete, or a removable lid may be used so that it can be used for later re-restoration.

(発明の効果) 上述の如く、本発明のコンクリート舗装版の扛上方法
は、沈下域の一方の縁部に扛上ジャッキを装着し、部分
的に持ち上げ、これを順次移動させるものであり、か
つ、その際にあらかじめ定めた傾斜扛上曲面を順次移動
させるものであるため、小型でしかも少い数のジャッキ
にて扛上作業を施工することができることとなり、ま
た、傾斜扛上曲面を順次移動させて扛上するに際し、こ
れが先上りの沈下傾斜曲面と交わる以前に、曲面の間の
部分を平らになるように扛上させるようにしたことによ
り、傾斜扛上曲面の曲げをコンクリート舗装版の弾性限
界に近づけて施工することができることとなり、施工現
場に応じて最良の作業能率が得られ、安全かつ迅速に扛
上作業をなし得ることとなったものである。
(Effects of the invention) As described above, the method for raising concrete pavement slabs of the present invention is to attach a raising jack to one edge of the subsidence area, partially lift it, and sequentially move it. In addition, at that time, since the predetermined sloped curved surface is sequentially moved, it is possible to carry out the lifting work with a small number of small jacks. When it is moved and lifted, it is designed so that the part between the curved surfaces is flattened before it intersects the subsidence tilted curved surface of the uphill slope. Since it is possible to carry out the construction close to the elastic limit of No. 1, the best work efficiency can be obtained according to the construction site, and it is possible to perform the lifting work safely and promptly.

【図面の簡単な説明】[Brief description of drawings]

第1図(イ)〜(チ)は本発明方法の工程の概略を順に
示す断面図、第2図は沈下域に形成する作業穴の配置を
示す平面図、第3図はジャッキ装着金具の分解斜視図、
第4図は扛上ジャッキ装着状態の縦断面図、第5図は扛
上ジャッキ装着配置の平面図、第6図は扛上工程を示す
グラフ、第7図は扛上制御装置を示すブロックダイアグ
ラム、第8図〜第11図はそれぞれ別々の扛上作業順を
示す線図である。 A……コンクリート舗装版、B……沈下域、3……作業
穴、5……基礎路盤、 6……舗装版下作業空間、7……反力盤、8……掘削
面、 10……ジャッキ装着金具、11……固定金具、12…
…円筒部、 12a……環状凹溝、13……張出部、13a……分割
片、15……雌ねじ、 16……ロックナット、20……扛上ジャッキ、 20〜20……ジャッキ列、21……ラムチェア、 22……油圧シリンダ、23……ラム、24……エクス
テンションロッド、 25……ナット旋回工具、26……ナット係合突起、2
7……出入ロッド、 28……扛上量検出センサー、30……沈下域曲面、 30a……沈下傾斜曲面、31a、31b……中間扛上
曲面、 31c……傾斜扛上曲面、32……充填材、33……注
入穴、 40……油圧ポンプ、41……制御盤、42……変位
計、43……操作盤、 44……圧力センサー、45……荷重計。
1 (a) to 1 (h) are cross-sectional views showing the steps of the method of the present invention in order, FIG. 2 is a plan view showing the arrangement of working holes formed in the subsidence area, and FIG. Exploded perspective view,
FIG. 4 is a vertical cross-sectional view of the lifting jack installed state, FIG. 5 is a plan view of the lifting jack mounting arrangement, FIG. 6 is a graph showing the lifting process, and FIG. 7 is a block diagram showing the lifting controller. , FIG. 8 to FIG. 11 are diagrams showing different ascending work orders, respectively. A: concrete pavement plate, B: subsidence area, 3 ... work hole, 5 ... foundation roadbed, 6 ... work space under the pavement plate, 7 ... reaction plate, 8 ... excavation surface, 10 ... Jack mounting bracket, 11 ... Fixing bracket, 12 ...
... Cylindrical part, 12a ... Annular groove, 13 ... Overhanging part, 13a ... Dividing piece, 15 ... Female screw, 16 ... Lock nut, 20 ... Hakage jack, 20 1 to 20 4 ... Jack Row, 21 ... Ram chair, 22 ... Hydraulic cylinder, 23 ... Ram, 24 ... Extension rod, 25 ... Nut swivel tool, 26 ... Nut engaging projection, 2
7-in / out rod, 28-uplift amount detection sensor, 30-sinking area curved surface, 30a-sinking inclined curved surface, 31a, 31b-intermediate uplifting curved surface, 31c-inclined uplifting curved surface, 32- Filling material, 33 ... injection hole, 40 ... hydraulic pump, 41 ... control panel, 42 ... displacement meter, 43 ... operation panel, 44 ... pressure sensor, 45 ... load cell.

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】コンクリート舗装版の沈下域全域に格子状
配置に多数の扛上作業穴を貫通開口させ、その沈下域の
一方縁部側の一定広さ範囲の各扛上作業穴にそれぞれ扛
上ジャッキを装着して扛上させ、該扛上ジャッキの装着
域を移動させて沈下域全域を所定の高さまで扛上させる
沈下したコンクリート舗装版の扛上方法において、沈下
域の一方縁部側の一定範囲のジャッキ装着域を該一方縁
部側が高く他方縁部側が低い傾斜扛上曲面に扛上させ、
その高い側の扛上ジャッキを低い側の未扛上部に順次装
着し直して前記傾斜扛上曲面を移動させ、かつ、該傾斜
扛上曲面の低い側の縁部が沈下域における前記傾斜扛上
曲面移動方向に向いて先上りの沈下傾斜面域に差しかか
る以前に該沈下傾斜面と傾斜扛上曲面との間の部分を同
時に平らになるまで扛上させることを特徴としてなる沈
下したコンクリート舗装版の扛上方法。
1. A concrete paving slab is provided with a grid-like arrangement of a plurality of uplifting work holes all over the subsidence region, and each of the uplifting work holes of a certain area on one edge side of the subsidence region is raised. In the method of lifting a submerged concrete pavement, one side of the subsided area is used to lift up by mounting the upper jack, and move the area where the upper jack is installed to lift up the entire subsided area to a predetermined height. The jack mounting area of a certain range is raised to the sloped curved surface where the one edge side is high and the other edge side is low,
The upper jack on the higher side is sequentially re-installed on the upper portion on the lower side to move the inclined up curved surface, and the edge on the low side of the inclined up curved surface is the inclined up in the subsidence area. Settled concrete pavement characterized in that the portion between the sinking inclined surface and the inclined uplifting curved surface is simultaneously lifted up to be flat before facing the direction of the curved surface moving direction and reaching the uphill settling inclined surface area. How to raise the plate.
JP11032589A 1989-04-28 1989-04-28 Method for launching submerged concrete pavement Expired - Lifetime JPH0657929B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11032589A JPH0657929B2 (en) 1989-04-28 1989-04-28 Method for launching submerged concrete pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11032589A JPH0657929B2 (en) 1989-04-28 1989-04-28 Method for launching submerged concrete pavement

Publications (2)

Publication Number Publication Date
JPH02289704A JPH02289704A (en) 1990-11-29
JPH0657929B2 true JPH0657929B2 (en) 1994-08-03

Family

ID=14532866

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11032589A Expired - Lifetime JPH0657929B2 (en) 1989-04-28 1989-04-28 Method for launching submerged concrete pavement

Country Status (1)

Country Link
JP (1) JPH0657929B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH086284B2 (en) * 1993-01-25 1996-01-24 株式会社ピー・エス How to repair height of sunken concrete pavement
MY144329A (en) * 2009-03-20 2011-08-23 Ong Chin Dr Chai Circular pile head for underpinning a slab

Also Published As

Publication number Publication date
JPH02289704A (en) 1990-11-29

Similar Documents

Publication Publication Date Title
US6539685B2 (en) Apparatus and method for lifting sunken foundations
US3852970A (en) Building raising and underpinning system
US4536103A (en) Adjustable manhole frame and method of construction and installation
US5318376A (en) Manhole frame
EP2888410A1 (en) Method and apparatus for lifting and leveling a concrete panel
CN107059667A (en) Door shape assembled armored concrete box culvert and its construction method
KR100661049B1 (en) Manhole repair method using manhole height adjusting device and height adjusting method
EP0726361B1 (en) Method of forming pavement on automobile test road and pavement member for automobile test road
JPH0657929B2 (en) Method for launching submerged concrete pavement
JPH0347305A (en) Repairing of settling of concrete paving board
JPH06146213A (en) Height restoration method of sunk concrete pavement slab
CN111576488A (en) Sewage pipe jacking pipe construction fabricated working well structure and construction process
JPH01318604A (en) Restoring method of height of settled concrete paving slab
JP2019078065A (en) Laying method of cantilever-type retaining wall
CN106703072A (en) Scaffolding equipment foundation embedded part construction method
JPH01318606A (en) Lifting method for settled concrete paving slab
JPH01290803A (en) Device for lifting up concrete pavement slab
CA1204317A (en) Adjustable manhole frame and method of construction and installation
KR102856176B1 (en) Apparatus for Lifting a Subsided Floor Slab and Method of Restoring the Same
JP2004218348A (en) Laying method for concrete block
JP3942152B2 (en) Road surface lining construction method
GB2278101A (en) Method and device for raising subsided concrete pavement
CN220565274U (en) A cutting and leveling manhole cover assembly
JPH0565736A (en) Drainage ditch for concrete paved road that can be repaired and repair method
JPH08277536A (en) Constructing method for concrete manufacture, concrete manufacture, and insert to be buried therein

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090803

Year of fee payment: 15