Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0663211B2 - Flexible mound - Google Patents
[go: Go Back, main page]

JPH0663211B2 - Flexible mound - Google Patents

Flexible mound

Info

Publication number
JPH0663211B2
JPH0663211B2 JP1185199A JP18519989A JPH0663211B2 JP H0663211 B2 JPH0663211 B2 JP H0663211B2 JP 1185199 A JP1185199 A JP 1185199A JP 18519989 A JP18519989 A JP 18519989A JP H0663211 B2 JPH0663211 B2 JP H0663211B2
Authority
JP
Japan
Prior art keywords
bag body
bag
flexible
anchor block
mound
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP1185199A
Other languages
Japanese (ja)
Other versions
JPH0351410A (en
Inventor
哲郎 堀
修一郎 源波
保夫 梶岡
正博 田中
巧 大山
正 小野
哲志 清川
博志 大内田
久雄 阿部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP1185199A priority Critical patent/JPH0663211B2/en
Publication of JPH0351410A publication Critical patent/JPH0351410A/en
Publication of JPH0663211B2 publication Critical patent/JPH0663211B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Revetment (AREA)

Description

【発明の詳細な説明】 「産業上の利用分野」 この発明は、沿岸近くでの波の伝播や海底等の砂の移動
を制御する水没型の潜堤に係わり、特に、可撓性素材か
らなる袋体を用いたフレキシブルマウンド(柔構造潜
堤)に関する。
TECHNICAL FIELD The present invention relates to a submerged submerged dike which controls the propagation of waves near the coast and the movement of sand such as the seabed, and is particularly useful for flexible submersible materials. Flexible mound (flexible submerged dike) using a bag

「従来の技術」 従来、沿岸近くの波や砂を制御する潜堤としては、ケー
ソンを用いて構築する方式や消波ブロックを海中に積み
上げる方式のもの等が一般的である。
“Prior art” Conventionally, as a submerged dike for controlling waves and sand near the coast, a method of using caisson or a method of stacking wave-dissipating blocks in the sea is generally used.

ところで、上記の潜堤では、ケーソンや多量の消波ブロ
ックを現場へ輸送しなければならず、構築現場の海底の
地ならしやマウンドなどの基礎施工が必要であり、工期
が長期化しコスト高になるといった問題点がある。ま
た、設置後、構造物を移動、撤去する必要が生じた場
合、その作業に非常に多くの期間とコストとを要する。
By the way, in the above-mentioned submerged dike, caisson and a large amount of wave-dissipating blocks must be transported to the site, and foundation work such as seabed leveling and mound at the construction site is required, resulting in a long construction period and high costs. There is a problem such as. Further, if it is necessary to move or remove the structure after installation, the work requires a very long period and cost.

さらに言えば、ケーソンや消波ブロックで構築される、
いわゆる剛構造の潜堤は、その天端上で波を砕波させる
と共にこの砕波による乱れを幅広い天端上で継続させる
ことで、波のエネルギー損失を図って消波させるもので
ある。従って、このような潜堤によって十分な消波効果
を得るためには、潜堤の天端を水面近くまで高くすると
共に、潜堤が非常に大規模なものになると共に、船舶等
の航行の妨げになる、という問題点がある。
Moreover, it's built with caisson and wave-dissipating blocks,
A so-called rigid structure submerged dike breaks the waves on the top of the crest and continues the turbulence due to the breaking on a wide range of the top of the crest to eliminate the energy loss of the wave. Therefore, in order to obtain a sufficient wave-dissipating effect with such a submerged dike, the top of the submerged dike is raised close to the water surface, the submerged dike becomes very large, and the navigation of vessels etc. There is a problem that it becomes an obstacle.

そこで、本出願人は前記問題点を解決しうる有効な手段
として、海底にアンカー等によって固定、保持されたシ
ート状の可撓性素材からなる袋体と、該袋体の内部に注
入されてこの袋体を膨らます海水、空気等の流体とから
なるフレキシブルマウンド(柔構造潜堤)を提案した
(特願昭60-280790号等)。このフレキシブルマウンド
によれば、輸送、施工、移動あるいは撤去等の作業が容
易になると共に、フレキシブルマウンド自体の可撓性を
利用することで小規模なものであっても有効な消波効果
を期待できる。すなわち、海面下に充分没した小型構造
物で波を制御できるので、フレキシブルマウンドが設置
された海域を有効に利用することができ合理的であると
して、注目され始めている。
Therefore, the present applicant has, as an effective means for solving the above-mentioned problems, a bag body made of a sheet-shaped flexible material fixed and held by an anchor or the like on the seabed, and is injected into the bag body. We proposed a flexible mound (soft structure submerged dike) consisting of a fluid such as seawater or air that inflates the bag (Japanese Patent Application No. 60-280790). This flexible mound facilitates work such as transportation, construction, movement, or removal, and expects effective wave-dissipating effect even on a small scale by utilizing the flexibility of the flexible mound itself. it can. That is, since waves can be controlled by a small structure sufficiently submerged below the sea surface, it is rational that the sea area in which the flexible mound is installed can be effectively used, and attention has begun.

ここで、このフレキシブルマウンドの消波原理について
説明する。
Here, the principle of wave cancellation of this flexible mound will be described.

第10図に示すように、可撓性素材からなる袋体中に海水
等の流体が注入されてなるフレキシブルマウンド20が海
底地盤G上に設置されていると仮定する。この時、フレ
キシブルマウンド20にむかって海面Sを伝わって入射波
Wが到来すると、この入射波Wの持つエネルギーがフレ
キシブルマウンド20に伝達されて、第10図点線に示す如
くフレキシブルマウンド20が変化する。この変化に伴っ
て、図中矢印Aに示すようにフレキシブルマウンド20自
体から海面Sに向かって放射波Rが放射され、この放射
波Rと入射波Wとの干渉により消波が行われる。同時
に、フレキシブルマウンド20を変形させることに入射波
Wのエネルギーが消費されることで、このエネルギーが
減衰されることでも、入射波Wの消波が行われる。
As shown in FIG. 10, it is assumed that a flexible mound 20 in which a fluid such as seawater is injected into a bag made of a flexible material is installed on the seabed G. At this time, when the incident wave W arrives at the flexible mound 20 along the sea surface S, the energy of the incident wave W is transmitted to the flexible mound 20, and the flexible mound 20 changes as shown by the dotted line in FIG. . Along with this change, a radiation wave R is radiated from the flexible mound 20 itself toward the sea surface S as shown by an arrow A in the figure, and the radiation wave R and the incident wave W interfere with each other to cancel the wave. At the same time, the energy of the incident wave W is consumed to deform the flexible mound 20, and the energy of the incident wave W is attenuated, so that the incident wave W is extinguished.

従って、可撓性素材からなるフレキシブルマウンド20
は、前記のように従来の剛構造潜堤のように、潜堤天端
において入射波を砕波させると共に、砕波による乱れを
潜堤天端の幅方向に亙って継続させることで消波を行う
必要がないため、フレキシブルマウンド20天端の水深を
深くすることができると共に、堤幅方向の規模を小規模
なものとすることが可能となる。
Therefore, the flexible mound 20 made of a flexible material
As in the case of the conventional rigid structure submerged dike, as described above, the incident wave is broken at the crown of the submerged dike, and the disturbance due to the breaking wave is continued over the width direction of the submerged dike to cancel the wave. Since it is not necessary to do so, the water depth at the top of the flexible mound 20 can be deepened and the scale in the bank width direction can be made small.

ところで、このようなフレキシブルマウンドを海底地盤
上に固定、定着する場合には、まず陸上で袋体を製作
し、コンクリート基礎等を介して袋体をアンカー等によ
り海底に固定するか、あるいは袋体内に土砂等を充填す
る、いわゆる重力方式の固定を行うような手段が考えら
れる。
By the way, when fixing and fixing such a flexible mound on the seabed, first make a bag on land and fix the bag to the seabed with an anchor or the like via a concrete foundation, or Means such as so-called gravity-type fixing, which is to fill up with earth and sand etc., can be considered.

この重力方式の固定方法を用いたフレキシブルマウンド
の施工方法の一実施例を第11図ないし第14図を参照して
説明する。
An embodiment of a method of constructing a flexible mound using this gravity type fixing method will be described with reference to FIGS. 11 to 14.

まず上部シートと下部シートとを接合して一体化された
袋体21を陸上Oにて製作し、洋上に引き出す。つぎに、
2台の作業船D、Dに架設された係留索F、Fによりこ
の袋体21を支持する。この場合、袋体21内に適宜海水B
(あるいは海水Bと空気A)を注入して、袋体21の形で
整えつつ、この袋体21の比重が海水よりも若干小さくな
るようにその注入量を調整することが好ましい。このよ
うに袋体21の準備をする一方で、設置予定海域では、袋
体21を設置するためのコンクリート基礎C、Cをその海
底地盤G上に杭K、Kを打ち込むことによって固定して
おく。そして、前記作業船D、Dに曳航されて予定海域
に運ばれた袋体21を、2台の作業船D、Dの係留検索
F、Fをゆっくり伸ばすことで海底に沈めていき、海底
地盤G上に設けられたコンクリート基礎C、Cの上にボ
ルト、ナット等の連結手段を用いて連結する。その後、
ポンプPを備えた作業船Eを前記袋体21からなるフレキ
シブルマウンド20が設置された海域まで運航させると共
に、前記ポンプPにより充填弁22から袋体21内部に砂H
と海水Bの混合物を注入しつつ、余分な海水Bを排出弁
23から外部に排出することで、袋体21に所定量の砂Hと
海水Bの混合物を注入、充填し、これにより袋体21を所
定形状まで膨らませる。
First, an upper bag and a lower sheet are joined together to produce an integrated bag body 21 on land O, and the bag 21 is pulled out to the sea. Next,
The bag body 21 is supported by the mooring lines F, F laid on the two work boats D, D. In this case, the seawater B can be appropriately stored in the bag 21.
It is preferable to inject (or seawater B and air A) into the shape of the bag 21 and adjust the injection amount so that the specific gravity of the bag 21 is slightly smaller than that of seawater. While preparing the bag body 21 in this way, in the planned sea area, the concrete foundations C, C for installing the bag body 21 are fixed by driving the piles K, K onto the seabed ground G. . Then, the bag body 21 towed by the work vessels D, D and carried to the planned sea area is sunk to the sea bottom by slowly extending the mooring search F, F of the two work vessels D, D, and the seabed ground. The concrete foundations C, C provided on G are connected to each other using connecting means such as bolts and nuts. afterwards,
The work boat E equipped with the pump P is operated to the sea area where the flexible mound 20 composed of the bag body 21 is installed, and the pump P is used to fill the sand H from the filling valve 22 into the bag body 21.
Excess seawater B is discharged while injecting the mixture of water and seawater B
When the bag 21 is discharged to the outside, the bag 21 is filled with a predetermined amount of a mixture of sand H and seawater B, and the bag 21 is inflated to a predetermined shape.

「発明が解決しようとする課題」 しかし、上記のようなフレキシブルマウンドの施工方法
においては、作業船によって袋体を海水中になかば水没
させた状態で曳航するために、袋体に対する海水の抵抗
や、バランス等を考慮して、袋体への海水の注入等の作
業が必要であり、またコンクリート基礎等の資材を設置
予定海域へ運搬する作業や、さらにコンクリート基礎の
設置や、この基礎への袋体の定着作業などの海底作業を
必要とする。それゆえ、このフレキシブルマウンドの施
工は、大変手間のかかるものであり、施工期間が長くな
り、コスト高を招く恐れもある。
[Problems to be Solved by the Invention] However, in the method of constructing a flexible mound as described above, in order to tow the bag body while submerged in seawater by the work boat, resistance of seawater to the bag body and In consideration of balance, balance, etc., it is necessary to perform work such as injecting seawater into the bag, work to transport materials such as concrete foundation to the planned sea area, installation of concrete foundation, and installation of this foundation. Submarine work such as fixing the bag is required. Therefore, the construction of this flexible mound is very time-consuming, and the construction period becomes long, which may result in high cost.

この発明は前記事情に鑑みてなされたもので、設置予定
海域への運搬、海底への定着、設置作業が簡易かつ迅速
なものとなるフレキシブルマウンドを提供しようとする
ものである。
The present invention has been made in view of the above circumstances, and it is an object of the present invention to provide a flexible mound that can be easily and quickly transported to a planned sea area, fixed to the seabed, and installed.

「課題を解決するための手段」 本発明のフレキシブルマウンドでは、シート状の可撓性
素材からなり流体を注入することによって膨らむ袋体
と、この袋体の底部外周に配設されて前記袋体が連結さ
れその上部に内外に貫通する開口部が設けられた中空状
鋼製ケーソンを有するアンカー用ブロック体とからなる
ものにすることによって前記課題を解決するようにし
た。
"Means for Solving the Problem" In the flexible mound of the present invention, a bag body made of a sheet-shaped flexible material and inflated by injecting a fluid, and the bag body disposed on the outer periphery of the bottom portion of the bag body. And an anchor block body having a hollow steel caisson provided with an opening penetrating inward and outward in its upper part.

「作用」 陸上で、袋体の底部に鋼製ケーソンからなるアンカー用
ブロック体を配設し、このアンカー用ブロック体を曳航
用浮体として利用することによって、フレキシブルマウ
ンドを設置予定海域まで曳航することができ、特に曳航
用浮体となるアンカー用ブロックが袋体の外周に配設さ
れるので曳航状態がきわめて安定する。また、アンカー
用ブロック体への袋体の連結は、地上ではもちろんのこ
と、アンカーブロック体を海面上に浮かせた状態とし海
面上で行うことも可能である。設置予定海域では、この
フレキシブルマウントのアンカー用ブロック体の中空内
部に開口部からコンクリート、捨石等の充填材を充填
し、かつ袋体に流体を注入し、フレキシブルマウンドを
海底に沈めたのち、このアンカー用ブロック体を海底地
盤上に杭打ちして固定することによってフレキシブルマ
ウンドの定着がなされる。
[Operation] To anchor the flexible mound to the planned sea area by arranging the anchor block body made of steel caisson on the bottom of the bag and using this anchor block body as a towing floater on land. In particular, since the anchor block serving as a towing floating body is arranged on the outer periphery of the bag body, the towing state is extremely stable. Further, the bag body may be connected to the anchor block body not only on the ground but also on the sea surface with the anchor block body floating above the sea surface. In the sea area where the installation is planned, the hollow inside of the block body for anchor of this flexible mount is filled with a filling material such as concrete and rubble stone from the opening, and the fluid is injected into the bag body, and the flexible mound is sunk to the seabed. The flexible mound is fixed by fixing the anchor block body by staking it on the seabed.

「実施例」 以下、この発明の実施例について図面を参照して説明す
る。
[Examples] Examples of the present invention will be described below with reference to the drawings.

第1図ないし第4図は本発明の一実施例を示すもので、
図中符号1は本発明のフレキシブルマウンドである。
1 to 4 show an embodiment of the present invention.
Reference numeral 1 in the figure is a flexible mound of the present invention.

第1図および第2図に示すように、フレキシブルマウン
ド1は外殻をなす袋体2とこの袋体2の底部に配設され
たアンカー用ブロック体3とから概略構成されている。
As shown in FIGS. 1 and 2, the flexible mound 1 is roughly composed of a bag body 2 forming an outer shell and an anchor block body 3 arranged at the bottom of the bag body 2.

前記袋体2は、例えば第3図に示すようにゴムシート、
塩化ビニールシート等のシート状の可撓性のある素材に
よって作られたもので、偏平で上面に湾曲した凸状形態
の上部シート4とアンカー用ブロック体3および海底地
盤Gに接する下部シート5とが、これらの端縁部で一体
に接合されてた構造となっている。この袋体2の上部シ
ート4の下部には、この袋体2内部に海水および砂を注
入、充填するための充填弁6と、内部に注入された余分
な海水を外部に排出する排出弁7とがそれぞれ設けられ
ている。
The bag 2 is made of a rubber sheet, as shown in FIG.
An upper sheet 4 which is made of a sheet-like flexible material such as a vinyl chloride sheet and has a flat and convex upper surface, an anchor block body 3, and a lower sheet 5 which is in contact with the seabed G However, the structure is such that these edge portions are integrally joined. Below the upper sheet 4 of the bag body 2, a filling valve 6 for injecting and filling seawater and sand into the bag body 2 and a discharge valve 7 for discharging the extra seawater injected inside to the outside. And are provided respectively.

なお、前記袋体2の下部シート5としては、上部シート
4などに比して特に海底の凹凸によく追随しうる可撓性
に富んだシートが用いられることが好ましく、また、袋
体2を形成する可撓性素材としては、前述のゴムや塩化
ビニールに限定されず、ポリエチレン等の合成樹脂、あ
るいはゴム引き布等でも良い。さらに、袋体2の平面形
状としては、円形、楕円形、あるいは長円形等が一例と
してあげられるが、これらに限定されるものではない。
ただし、楕円形、長円形のごとく袋体2の形状に長手方
向が存在する場合、この長手方向を海面を伝わって到来
する入射波の進行方向に略直交させておくことが好まし
い。
As the lower sheet 5 of the bag body 2, it is preferable to use a highly flexible sheet that can follow unevenness of the seabed particularly better than the upper sheet 4 and the like. The flexible material to be formed is not limited to the above-mentioned rubber or vinyl chloride, but may be a synthetic resin such as polyethylene or a rubberized cloth. Furthermore, the planar shape of the bag body 2 is, for example, a circle, an ellipse, an oval, or the like, but is not limited thereto.
However, when there is a longitudinal direction in the shape of the bag body 2 such as an elliptical shape or an oval shape, it is preferable that the longitudinal direction is made substantially orthogonal to the traveling direction of the incident wave that arrives along the sea surface.

また、袋体2の下部シート5には、上部シート4と接合
された周縁部にアンカー用ブロック体3に固定されるた
めの取り付け片8が設けられており、この取り付け片8
には、連結用孔9、9、…が設けられている。
Further, the lower sheet 5 of the bag body 2 is provided with a mounting piece 8 to be fixed to the anchor block body 3 at a peripheral portion joined to the upper sheet 4, and the mounting piece 8
Are provided with connection holes 9, 9, ....

アンカー用ブロック体3は、第4図に示すように、中空
方形状の鋼製ケーソンからなる2つのブロック部10、10
と短冊状鋼板によって枠組みされ、かつ2つのブロック
部10、10を両端に固定した袋体支持部11とからなる。ブ
ロック部10、10は、この上面から底面に貫通するととも
に水密構造の数個の杭打用孔12、12、…が設けられてお
り、また、上面にはコンクリート、捨石等の充填材を充
填するための内外に貫通する開口部13、13、…が設けられ
ている。杭打用孔12、12、…を通して海底地盤に杭が打ち
込まれることによって、フレキシブルマウンド1が海底
地盤上に固定される。またブロック部10、10の上面に
は、その長手方向に沿って袋体2を取り付けるための連
結用孔14、14、…が設けられており、この連結用孔14、14、
…に袋体2の取り付け片9に設けられた連結用孔9、
9、…を合わせ、ボルト、ナット等の連結手段により袋
体2とアンカー用ブロック体3とを連結することができ
る。
As shown in FIG. 4, the anchor block body 3 includes two block portions 10 and 10 each made of a hollow caustic steel caisson.
And a bag support portion 11 which is framed by strip steel plates and has two block portions 10, 10 fixed at both ends. The block parts 10 and 10 penetrate from the top surface to the bottom surface and are provided with several watertight pile driving holes 12, 12, ... And the top surface is filled with a filling material such as concrete or rubble. Are provided with penetrating openings 13, 13 ,. The flexible mound 1 is fixed on the seabed ground by driving the piles into the seabed ground through the pile driving holes 12, 12, .... Further, on the upper surfaces of the block portions 10, 10, there are provided connection holes 14, 14, ... For attaching the bag body 2 along the longitudinal direction thereof. The connection holes 14, 14,
And a connecting hole 9 provided in the attachment piece 9 of the bag body 2,
, 9 and so on, and the bag body 2 and the anchor block body 3 can be connected by connecting means such as bolts and nuts.

次に、第5図ないし第9図を参照して、本発明のフレキ
シブルマウンドの施工方法の例を説明する。
Next, an example of the method for constructing the flexible mound of the present invention will be described with reference to FIGS. 5 to 9.

まず始めに、第5図に示すように、上部シート4および
下部シート5を接合して一体化された袋体2を陸上Oに
て製作するとともに、この袋体2をアンカー用ブロック
体3に取り付けておく。この際、袋体2およびアンカー
用ブロック体3のブロック部10、10の内部は空の状態で
ある。
First, as shown in FIG. 5, an upper bag 4 and a lower sheet 5 are joined to form an integrated bag body 2 on land O, and this bag body 2 is used as an anchor block body 3. Install it. At this time, the insides of the block portions 10 and 10 of the bag body 2 and the anchor block body 3 are empty.

つぎに、袋体2を取り付けたアンカー用ブロック体3を
洋上に引き出し、第6図に示すように作業船Dに架設さ
れた係留索Fにこのアンカー用ブロック体3を連結す
る。この場合、袋体2内に適宜海水Bをバラストとして
注入し、かつ袋体2内部の空隙に空気Aを充填して袋体
2の形とバランスとを整えて、作業船Dによる曳航を容
易にするのが好ましい。
Next, the anchor block body 3 to which the bag body 2 is attached is pulled out to the sea, and the anchor block body 3 is connected to the mooring line F laid on the work boat D as shown in FIG. In this case, seawater B is appropriately injected as ballast into the bag body 2 and air A is filled in the voids inside the bag body 2 to adjust the shape and balance of the bag body 2 and facilitate the towing by the work boat D. Is preferred.

つづいて、袋体2を取り付けたアンカー用ブロック体3
を作業船Dによって設置予定海域まで曳航する。この
際、図では作業船Dの進行方向に対してアンカー用ブロ
ック体3の長手方向が垂直になるようにされているが、
この進行方向とこの長手方向とが平行になるようにして
曳航するほうが、海水の抵抗が少なくなり作業船Dによ
る曳航がより一層容易となる。このフレキシブルマウン
トの曳航の際には、アンカー用ブロック体3のブロック
部10、10が曳航用の浮体として有効に利用でき、このブ
ロック部10、10は袋体2の外周に配設されて連結されて
いるので曳航状態がきわめて安定する。なお、このよう
にアンカー用ブロック体3のブロック部10、10が浮体と
なるので、まずアンカー用ブロック体3を設置予定海域
まで曳航しその洋上で袋体2をアンカー用ブロック体3
に取り付けるようにしてもよい。
Next, the anchor block body 3 with the bag body 2 attached
Is towed by the work vessel D to the planned sea area. At this time, although the longitudinal direction of the anchor block body 3 is perpendicular to the traveling direction of the work boat D in the figure,
If the towing is performed such that the traveling direction and the longitudinal direction are parallel to each other, the resistance of seawater is reduced and the towing by the work boat D becomes easier. When the flexible mount is towed, the block portions 10 and 10 of the anchor block body 3 can be effectively used as a floating body for towing, and the block portions 10 and 10 are arranged on the outer periphery of the bag body 2 and are connected to each other. The towed condition is extremely stable because it is operated. Since the block portions 10, 10 of the anchor block body 3 are floating bodies in this manner, first, the anchor block body 3 is towed to the planned sea area and the bag body 2 is anchored to the anchor block body 3 on the ocean.
It may be attached to.

そして、設置予定海域に到着したら、アンカー用ブロッ
ク体3のブロック部10、10内部と袋体2内部とに開口部1
3、13、…および充填弁6から海水を注入し、かつ空気A
を排出弁7から抜きながら比重を大きくすることによっ
て袋体2を取り付けたアンカー用ブロック体3を海底に
沈める。2台の作業船D、Dの係留索F、Fによってア
ンカー用ブロック体3を支持し、第7図に示すように、
係留索F、Fをゆっくり伸ばすことで袋体2を取り付け
たアンカー用ブロック体3を海底地盤G上に着底さえ、
アンカー用ブロック体3の杭打用孔12、12、…に杭K、K
を通し、この杭K、Kを海底地盤G上に打ち込んで固定
する。また、このブロック部10、10の中空内部に上面の
開口部13、13、…から水中コンクリート、捨石等の充填材
を充填してフレキシブルマウンド1の基礎とする。
Then, when the water arrives at the planned sea area, the opening 1 is formed inside the block parts 10 and 10 of the anchor block body 3 and inside the bag body 2.
3, 13, ... and seawater are injected from the filling valve 6 and the air A
The anchor block body 3 to which the bag body 2 is attached is sunk to the seabed by increasing the specific gravity while removing the water from the discharge valve 7. The anchor block body 3 is supported by the mooring lines F and F of the two work boats D and D, and as shown in FIG.
Even by anchoring the anchor block body 3 to which the bag body 2 is attached on the seabed ground G by slowly extending the mooring lines F, F,
Piles K, K in the pile driving holes 12, 12, ... Of the anchor block body 3.
Then, the piles K, K are driven and fixed on the seabed G. Further, a filling material such as underwater concrete or rubble is filled into the hollow interiors of the block portions 10 through the openings 13 on the upper surface to form the foundation of the flexible mound 1.

上記のようにして、海底地盤上にフレキシブルマウンド
が定着されたら、第8図に示すように、ポンプPを備え
た作業船Eを前記フレキシブルマウンド1が設置される
海域にまで運航すると共に、前記袋体2の充填弁6およ
び排出弁7を開放し、前記ポンプPにより充填弁6から
袋体2内部に砂Hと海水Bとの混合物を注入しつつ、余
分な海水Bを排出弁7から外部に排出することで、袋体
2内部に所定量の砂Hおよび海水Bを注入し、充填し、
これにより袋体2を所定形状にまで膨らます。この砂H
は、フレキシブルマウンド設置海域の海底地盤の土砂で
も、他の場所から運搬してきた土砂でも良いことは勿論
である。
When the flexible mound is settled on the seabed as described above, as shown in FIG. 8, the work boat E equipped with the pump P is operated to the sea area where the flexible mound 1 is installed, and The filling valve 6 and the discharge valve 7 of the bag body 2 are opened, and while the mixture of sand H and seawater B is injected into the bag body 2 from the filling valve 6 by the pump P, the excess seawater B is discharged from the discharge valve 7. By discharging to the outside, a predetermined amount of sand H and seawater B are injected into the bag body 2 and filled,
With this, the bag body 2 is inflated to a predetermined shape. This sand H
Needless to say, it may be sediment on the seabed in the flexible mound installation area, or sediment transported from another place.

以上説明した施工方法により、第9図に示すようにフレ
キシブルマウンド1が海底地盤G上に設置される。
By the construction method described above, the flexible mound 1 is installed on the seabed G as shown in FIG.

ここで、このフレキシブルマウンド1は海底地盤Gに杭
を打ち込むことによって固定されるものなので、海底地
盤Gの土質等に左右されずに設置することができる。ま
た、アンカー用ブロック体3のブッロク部10、10の中空
内部に上部の開口部13、13、…から水中コンクリート、捨
石等の充填材を充填した構成の基礎を得ることにより、
設置状態が長期にわたって安定し、これにともなって消
波機能が長期にわたって維持される。
Here, since this flexible mound 1 is fixed by driving a pile into the seabed ground G, it can be installed regardless of the soil quality of the seabed ground G. In addition, by obtaining a foundation of a structure in which a filling material such as underwater concrete and rubble is filled in the hollow inside of the block portion 10 of the anchor block body 3 from the upper opening portions 13, 13 ,.
The installation condition is stable for a long period of time, and the wave-dissipating function is maintained for a long time.

なお、この発明のフレキシブルマウンドは、その細部が
前記実施例に限定されず、種々の変形例が可能である。
一例として、前記フレキシブルマウンドは一個の袋体の
みに限定されず、多数の袋体を連設した構成であっても
良い。また、前記袋体内に注入し、充填される流体は空
気等海水以外の流体でも良く、同様に袋体底部に充填さ
れる充填材は砂のみならず砂泥水等海水より比重の大き
いものであれば良く、さらに言えば、この充填材を省略
した構成であっても良い。
The details of the flexible mound of the present invention are not limited to those in the above embodiment, and various modifications are possible.
As an example, the flexible mound is not limited to a single bag body, and may have a configuration in which a large number of bag bodies are continuously provided. Further, the fluid injected and filled in the bag body may be a fluid other than seawater such as air, and similarly, the filler filled in the bottom portion of the bag body is not only sand but also sand sand muddy water or the like having a larger specific gravity. In other words, the structure may be such that the filler is omitted.

また、この発明に用いられるアンカー用ブロック体は、
前記実施例に限定されず、例えば、環状に成型された鋼
製ケーソンを用いることによって、袋体下部における洗
掘の発生を防ぐことも可能となる。
Further, the anchor block body used in the present invention,
The present invention is not limited to the above-described embodiment, and for example, by using a steel caisson formed in a ring shape, it is possible to prevent scour at the lower portion of the bag body.

「発明の効果」 以上、説明したように本発明のフレキシブルマウンド
は、シート状の可撓性素材からなり流体を注入すること
によって膨らむ袋体と、この袋体の底部外周に配設され
て前記袋体が連結されその上部に内外に貫通する開口部
が設けられた中空状鋼製ケーソンを有するアンカー用ブ
ロック体とからなるもので、地上において袋体を浮体に
取り付けることを可能とするのみならず設置予定海域へ
の曳航による運搬の際にはアンカー用ブロック体を浮体
として利用でき、かつこのアンカー用ブロック体は袋体
の外周に配設されて連結されるのでその曳航状態がきわ
めて安定するとともに、アンカー用ブロック体を海面上
に浮かしその海面上で袋体を連結することも可能である
こと等から、設置予定海域への運搬、海底への定着、設
置作業が簡易、かつ安全迅速なものとなる。また、海底
地盤上に定着するときにはアンカー用ブロック体を海底
地盤に杭打ち等の手段で固定するだけでなく、さらにア
ンカー用ブロック体の内部に上部の開口部からコンクリ
ート、捨石等の充填材を充填することにより設置状態が
長期にわたって安定し、これにともなって消波機能が長
期にわたって維持される。
"Effects of the Invention" As described above, the flexible mound of the present invention is made of a sheet-shaped flexible material and swells by injecting a fluid, and the bag is disposed on the outer periphery of the bottom of the bag. It is composed of an anchor block body having a hollow steel caisson with a bag body connected to the bag body and an opening penetrating the inside and the outside of the bag body.If only the bag body can be attached to the floating body on the ground. The anchor block body can be used as a floating body when transported by towing to the planned sea area, and this anchor block body is arranged and connected to the outer periphery of the bag body, so that the towing state is extremely stable. At the same time, it is possible to float the anchor block body on the sea surface and connect the bag body to the sea surface, etc., so that it can be transported to the planned sea area, fixed to the seabed, and installed. The work will be simple, safe and quick. In addition, when anchoring on the seabed, not only fixing the anchor block body to the seabed ground by means such as pile driving, but also filling the anchor block body with a filler such as concrete and rubble from the upper opening. By filling, the installation condition is stable for a long period of time, and the wave-dissipating function is maintained for a long time.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第4図は、本発明のフレキシブルマウンド
の一実施例を示す図で、第1図は本発明の構成を示す上
面図、第2図は第1図のII−II線に沿う断面図、第3図
は袋体の斜視図、第4図はアンカー用ブロック体の斜視
図、第5図ないし第9図は本発明のフレキシブルマウン
ドの施工方法を説明するための図、第10図はフレキシブ
ルマウンドの消波原理を説明するための図、第11図ない
し第14図は従来のフレキシブルマウンドの施工方法を説
明するための図である。 G……海底地盤、 1……フレキシブルマウンド、 2……袋体、 3……アンカー用ブロック体、 13……開口部。
1 to 4 are views showing an embodiment of the flexible mound of the present invention. FIG. 1 is a top view showing the structure of the present invention, and FIG. 2 is taken along the line II-II of FIG. Sectional view, FIG. 3 is a perspective view of a bag body, FIG. 4 is a perspective view of a block body for anchors, and FIGS. 5 to 9 are diagrams for explaining a flexible mound construction method of the present invention. FIG. 11 is a diagram for explaining the wave-dissipating principle of a flexible mound, and FIGS. 11 to 14 are diagrams for explaining a conventional flexible mound construction method. G: Submarine ground, 1 ... Flexible mound, 2 ... Bag, 3 ... Anchor block, 13 ... Opening.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 田中 正博 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 大山 巧 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 小野 正 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 清川 哲志 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 大内田 博志 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (72)発明者 阿部 久雄 東京都中央区京橋2丁目16番1号 清水建 設株式会社内 (56)参考文献 特開 昭62−141209(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Masahiro Tanaka 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Takumi Oyama 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Building Co., Ltd. (72) Inventor Tadashi Ono 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Satoshi Kiyokawa 2-16-1 Kyobashi, Chuo-ku, Tokyo Shimizu Building (72) Inventor Hiroshi Ouchida 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Co., Ltd. (72) Inventor Hisao Abe 2-16-1, Kyobashi, Chuo-ku, Tokyo Shimizu Construction Stocks In-house (56) References JP-A-62-141209 (JP, A)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】シート状の可撓性素材からなり流体を注入
することによって膨らむ袋体と、 この袋体の底部外周に配設されて前記袋体が連結されそ
の上部に内外に貫通する開口部が設けられた中空状鋼製
ケーソンを有するアンカー用ブロック体と からなることを特徴とするフレキシブルマウンド。
1. A bag body which is made of a sheet-shaped flexible material and swells by injecting a fluid, and an opening which is arranged on the outer periphery of the bottom portion of the bag body and which is connected to the bag body and which penetrates the inside and outside of the upper part thereof. A flexible mound, which comprises an anchor block body having a hollow steel caisson provided with a portion.
JP1185199A 1989-07-18 1989-07-18 Flexible mound Expired - Lifetime JPH0663211B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1185199A JPH0663211B2 (en) 1989-07-18 1989-07-18 Flexible mound

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1185199A JPH0663211B2 (en) 1989-07-18 1989-07-18 Flexible mound

Publications (2)

Publication Number Publication Date
JPH0351410A JPH0351410A (en) 1991-03-05
JPH0663211B2 true JPH0663211B2 (en) 1994-08-22

Family

ID=16166598

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1185199A Expired - Lifetime JPH0663211B2 (en) 1989-07-18 1989-07-18 Flexible mound

Country Status (1)

Country Link
JP (1) JPH0663211B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2537415B2 (en) * 1989-11-16 1996-09-25 清水建設株式会社 Flexible mound basic structure

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0730535B2 (en) * 1985-12-13 1995-04-05 清水建設株式会社 Artificial reef and its installation method

Also Published As

Publication number Publication date
JPH0351410A (en) 1991-03-05

Similar Documents

Publication Publication Date Title
US3640075A (en) Method of installing breakwater caissons
US3969900A (en) Breakwater construction
JP2019511656A (en) Submarine foundation structure and installation method thereof
US20020018696A1 (en) Submersible modular dike
JPH0663211B2 (en) Flexible mound
JPS58143023A (en) Caisson for pile supporting type breakwater
JP2537415B2 (en) Flexible mound basic structure
KR101961655B1 (en) Quay wall and construction method using driven pile and box type pre-cast concrete structure
JP2815492B2 (en) How to build an underwater foundation
US8419315B2 (en) Harbor structure and a method of building such a structure
JP2655322B2 (en) Construction method of revetment structure
JPH0730535B2 (en) Artificial reef and its installation method
JP2597878B2 (en) Weir structure
JPH0819657B2 (en) Flexible Mound Foundation Structure Construction Method
JPS58160420A (en) Levee body using king post
KR20240074169A (en) A doupling device of the barge and regulation of floatation of fabric
JPH01304211A (en) Construction method of flexible structure submerged embankment
JPH0619125B2 (en) Submersible wave-dissipating structure
JP2920795B2 (en) Mortar foundation construction method for offshore structures
JPS63147018A (en) Marine transportation, storage, and setting method of structure
JP2535905Y2 (en) Artificial ground
JPH0619131B2 (en) Construction method of temporary revetment for landfill
Binnie & Partners Construction Methods and Times
JPS62276112A (en) Artificial reef and its construction method
JPS6178924A (en) Temporary coffering work for dry dock

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060110

A977 Report on retrieval

Effective date: 20080526

Free format text: JAPANESE INTERMEDIATE CODE: A971007

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081028

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20090303