Pipe burying method

Info

Publication number
JPH0663269B2
JPH0663269B2 JP62330973A JP33097387A JPH0663269B2 JP H0663269 B2 JPH0663269 B2 JP H0663269B2 JP 62330973 A JP62330973 A JP 62330973A JP 33097387 A JP33097387 A JP 33097387A JP H0663269 B2 JPH0663269 B2 JP H0663269B2
Authority
JP
Japan
Prior art keywords
pipe
resin foam
groove
sand
buried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP62330973A
Other languages
Japanese (ja)
Other versions
JPH01174729A (en
Inventor
修幸 大場
芳美 小野
博 本間
弘 本間
中島  隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Engineering Corp
Original Assignee
Nippon Kokan Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Kokan Ltd filed Critical Nippon Kokan Ltd
Priority to JP62330973A priority Critical patent/JPH0663269B2/en
Publication of JPH01174729A publication Critical patent/JPH01174729A/en
Publication of JPH0663269B2 publication Critical patent/JPH0663269B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 本発明は水道管、ガス管等の配管の埋設方法に関する。The present invention relates to a method for burying pipes such as water pipes and gas pipes.

〔従来の技術〕[Conventional technology]

従来、水道管、ガス管等の配管の埋設は第5図に示すよ
うな手順で行われている。
Conventionally, the burying of pipes such as water pipes and gas pipes has been performed in the procedure as shown in FIG.

溝8を掘削する。 The groove 8 is excavated.

溝8内に埋戻土10を突き固め、基盤面を形成する。 The backfill soil 10 is tamped in the groove 8 to form a base surface.

基盤面に配管9を敷設する。 The pipe 9 is laid on the base surface.

溝8内の配管の周囲に埋戻土10を層状に突き固め
る。
The backfill soil 10 is tamped in layers around the pipe in the groove 8.

場合によっては、最終的に地表面にコンクリートを
打設する。
In some cases, concrete is finally placed on the ground surface.

この場合、埋戻土として発生土を用いることはほとんど
なく、川砂や山砂等粒度分布の良い良質の砂が用いられ
る。
In this case, the generated soil is rarely used as the backfill soil, and good quality sand such as river sand or mountain sand with good particle size distribution is used.

〔発明が解決しようとする問題点〕[Problems to be solved by the invention]

しかしながら、このような従来の方法には以下の問題が
ある。
However, such a conventional method has the following problems.

溝を埋め戻すのに良質の埋戻土(砂)が大量に必要
となるが、近年このような砂は入手困難になってきてい
る。
A large amount of good quality backfill soil (sand) is required to refill the trench, but in recent years such sand has become difficult to obtain.

埋戻土の中に礫等を入れてしまった場合は取り除き
が困難となる。
If gravel is put in the backfill soil, it will be difficult to remove it.

土砂(埋戻土)自体が重いため、埋戻作業に重機
(バックホー、トラック)が必要となる。
Since the earth and sand (backfill soil) itself is heavy, heavy equipment (backhoe, truck) is required for the backfill work.

地盤ひずみが配管に直接伝播するため、地震等によ
り配管が損傷を受け易い。
Since the ground strain propagates directly to the pipe, the pipe is easily damaged by an earthquake or the like.

配管の点検、補修の際の掘下げ作業は配管の埋戻し
作業と同様な作業となり、煩雑である。
The digging work when inspecting and repairing the pipe is the same as the backfilling work of the pipe, which is complicated.

掘上げ作業時には土砂と配管の区別がつきにくく、
配管を傷めてしまうことがある。
When excavating, it is difficult to distinguish between sediment and piping,
It may damage the piping.

本発明はこのような従来の問題を生じることのない新た
な配管埋設方法を提供しようとするものである。
The present invention aims to provide a new pipe burying method that does not cause such a conventional problem.

〔問題点を解決するための手段〕[Means for solving problems]

このため、本発明は、掘削した溝に、配管を埋設する方
法において、前記溝のうち表層側の一部を除いてその殆
んどを占めるように、樹脂発泡体のブロックを前記配管
の周囲に配して埋設することをその基本的特徴とする。
Therefore, in the present invention, in a method of burying a pipe in an excavated groove, a block of resin foam is provided around the pipe so as to occupy most of the groove except a part on the surface layer side. Its basic feature is to place and bury it.

通常、発泡スチロール等の樹脂発泡体ブロックは、配管
周方向でいくつかの分割ブロックに構成され、埋設構内
で配管を囲むようにして組み付けられる。
Usually, a resin foam block such as styrofoam is composed of several divided blocks in the circumferential direction of the pipe, and is assembled so as to surround the pipe in the buried structure.

配管を囲った樹脂発泡体の上部すなわち溝の表層側の一
部には、必要に応じて土砂等が埋め戻される。
The upper part of the resin foam surrounding the pipe, that is, a part on the surface layer side of the groove is backfilled with earth and sand as necessary.

樹脂発泡体としては、発泡スチロール以外にも、他の高
分子材料からなる発泡体を用いることができる。
As the resin foam, a foam made of another polymer material can be used in addition to the polystyrene foam.

このような本発明の埋設方法は、上下水道、ガス管、石
油等のパイプラインをはじめ、あらゆる配管の埋設に適
用できる。
The burying method of the present invention as described above can be applied to burying of various pipes including pipelines for water and sewerage, gas pipes, oil and the like.

〔実施例〕〔Example〕

第1図は本発明の埋設方法による配管の埋設状態の一例
を示している。図において、1は埋設溝、2は配管であ
る。
FIG. 1 shows an example of a buried state of a pipe by the burying method of the present invention. In the figure, 1 is a buried groove and 2 is a pipe.

本実施例では、樹脂発泡体ブロックとして、第2図に示
すような断半円形状の溝30を有し、配管を上下で挾む一
対の樹脂発泡体ブロック3a、3bと、これらの上部に配置
する平板状の樹脂発泡体ブロック3cとを用いている。そ
して、これら樹脂発泡体ブロック3a、3b、3cは、それら
を埋設溝1に配した際、その溝1の表層側の一部を除い
てその殆んどを占めるようになっている。
In this embodiment, as the resin foam block, a pair of resin foam blocks 3a and 3b having a semicircular groove 30 as shown in FIG. The flat resin foam block 3c to be arranged is used. When the resin foam blocks 3a, 3b, 3c are arranged in the buried groove 1, most of the resin foam blocks 3a, 3b, 3c are occupy except a part of the groove 1 on the surface layer side.

次に、これらによる埋設方法を説明すると、埋設溝1内
に、樹脂発泡体ブロック3aをその溝30を上向きにして嵌
め込み、その溝30内に配管2を配した後、その上から、
樹脂発泡体ブロック3bを載せ、さらにその上に樹脂発泡
体ブロック3cを配する。そして、この樹脂発泡体ブロッ
ク3c上、すなわち表層側の一部には、土砂6(60は砂利
層、61は砂層)を埋め戻す。なお、この土砂は樹脂発泡
体ブロックがコンクリート打設時の熱によって溶け出す
のを防止する上で有利である。
Explaining the embedding method using these, the resin foam block 3a is fitted into the embedding groove 1 with the groove 30 facing upward, and the pipe 2 is arranged in the groove 30.
The resin foam block 3b is placed, and the resin foam block 3c is further arranged thereon. Then, the sand 6 (60 is a gravel layer, 61 is a sand layer) is backfilled on the resin foam block 3c, that is, on a part of the surface layer side. It should be noted that this earth and sand is advantageous in preventing the resin foam block from being melted out by heat during concrete pouring.

第3図は他の実施例を示すもので、樹脂発泡体ブロック
として、第1図に示すものと同様の上下一対の樹脂発泡
体ブロック3a、3bと、その両側に配される樹脂発泡体ブ
ロック3d、3eとを用いたものである。これらの樹脂発泡
体ブロック3a、3b、3d、3eも、それらを埋設溝1に配し
た際、その溝1の表層側の一部を除いてその殆んどを占
めるようになっている。
FIG. 3 shows another embodiment. As the resin foam block, a pair of upper and lower resin foam blocks 3a and 3b similar to those shown in FIG. 1 and resin foam blocks arranged on both sides thereof. 3d and 3e are used. These resin foam blocks 3a, 3b, 3d, 3e also occupy most of the grooves 1 when they are arranged in the buried groove 1, except for a part of the groove 1 on the surface layer side.

また、第4図は、断面距形の配管(下水管等)の埋設例
であり、この場合には、先ず、埋設溝1の底部に平板状
の樹脂発泡体ブロック6fを敷き、その上に配管2′を配
置するとともに、配管側に上端面が配管上面と面一とな
る平板状の樹脂発泡体ブロック3g、3hを配置、さらに配
管2とこれら樹脂発泡体ブロック3g、3hの上に樹脂発泡
体ブロック3iを配したものである。これらの樹脂発泡体
ブロック3f、3g、3h、3iも図示のように埋設溝1の表層
側の一部を除いてその殆んどを占めるものとなってい
る。なお、この樹脂発泡体ブロック3iの上には土砂6′
が埋め戻され、その上に敷石8が敷設されている。
Further, FIG. 4 is an example of embedding a distance section pipe (sewer pipe, etc.). In this case, first, a flat resin foam block 6f is laid on the bottom of the embedding groove 1 and is laid on it. In addition to arranging the pipe 2 ', a flat plate-shaped resin foam block 3g, 3h having an upper end surface flush with the upper surface of the pipe is arranged on the pipe side. The foam block 3i is arranged. These resin foam blocks 3f, 3g, 3h and 3i also occupy most of the buried groove 1 except for a part on the surface layer side, as shown in the figure. Note that earth and sand 6'on the resin foam block 3i.
Is backfilled and paving stone 8 is laid on it.

〔発明の効果〕〔The invention's effect〕

以上述べた本発明の配管の埋設方法によれば、埋設溝の
殆んどを占めるように、樹脂発泡体ブロックを周囲に配
して配管を埋設するため、次のような効果が得られる。
According to the pipe burying method of the present invention described above, the resin foam block is arranged around the pipe so as to occupy most of the burying groove, and the pipe is buried, so that the following effects can be obtained.

埋戻し用の良質の土砂の使用量が表層側の一部だけ
でよいため極く小量で済み、配管埋設工事を低コストに
行うことができる。
Since only a part of the surface layer of good quality earth and sand for backfilling needs to be used, only a very small amount is required, and pipe burying work can be performed at low cost.

材質が均一で、強度も十分な発泡スチロール等の樹
脂発泡体が埋設溝の殆んどを占めつつ配管を囲むため、
地盤沈下等によって配管に負荷応力が発生したり、地震
時の地盤ひずみが配管に直接伝播することが少なく、内
容物の漏洩等を効果的に抑えることができる。
Since the resin foam such as Styrofoam, which is made of uniform material and has sufficient strength, occupies most of the buried groove and surrounds the pipe,
Load stress is not generated in the pipe due to ground subsidence, etc., and ground strain at the time of an earthquake is rarely directly transmitted to the pipe, and leakage of contents can be effectively suppressed.

樹脂発泡体ブロック中に配管を敷設し、しかもそれ
が埋設溝の殆んどを占めているため、掘り上げて配管を
露出させることが極めて容易である。
Since the pipe is laid in the resin foam block, and it occupies most of the buried groove, it is extremely easy to dig up and expose the pipe.

配管の点検や補修のための掘上げ作業に際しても重
機(バックホー、トラック)を用いる必要がまったくな
く、このため配管を傷めることはない。
There is no need to use heavy equipment (backhoe, truck) at the time of excavation work for inspection and repair of the piping, and therefore the piping is not damaged.

【図面の簡単な説明】[Brief description of drawings]

第1図は本発明の一実施例による配管の埋設状態を示す
断面図である。第2図は第1図における埋設構造の上下
樹脂発泡体ブロックと配管との分解斜視図である。第3
図は本発明法の他の実施例による配管埋設状態を示す断
面図である。第4図は本発明法の他の実施例による配管
埋設状態を示す断面図である。第5図は従来法による配
管埋設状態を示す断面図である。 図において、1は埋設溝、2、2′は配管、3a〜3iは樹
脂発泡体ブロック、6、6′は土砂を各示す。
FIG. 1 is a sectional view showing a buried state of a pipe according to an embodiment of the present invention. FIG. 2 is an exploded perspective view of the upper and lower resin foam blocks and the pipe of the buried structure in FIG. Third
The drawing is a cross-sectional view showing a buried state of a pipe according to another embodiment of the method of the present invention. FIG. 4 is a sectional view showing a buried state of a pipe according to another embodiment of the method of the present invention. FIG. 5 is a sectional view showing a buried state of the pipe by the conventional method. In the figure, 1 is a buried groove, 2 2'is a pipe, 3a to 3i are resin foam blocks, and 6 and 6'are earth and sand.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 本間 弘 東京都千代田区丸の内1丁目1番2号 日 本鋼管株式会社内 (72)発明者 中島 隆 東京都千代田区丸の内1丁目1番2号 日 本鋼管株式会社内 (56)参考文献 特開 昭63−44021(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Hiroshi Honma 1-2, Marunouchi, Chiyoda-ku, Tokyo Day Steel Pipe Co., Ltd. (72) Takashi Nakajima 1-2-1 Marunouchi, Chiyoda-ku, Tokyo Date Inside this steel pipe company (56) Reference JP-A-63-44021 (JP, A)

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】掘削した溝に、配管を埋設する方法におい
て、前記溝のうち表層側の一部を除いてその殆んどを占
めるように、樹脂発泡体のブロックを、前記配管の周囲
に配して埋設することを特徴とする配管の埋設方法。
1. A method of burying a pipe in an excavated groove, wherein a block of resin foam is provided around the pipe so as to occupy most of the groove except for a part on the surface layer side. A method for burying a pipe, which is characterized in that it is arranged and buried.
JP62330973A 1987-12-26 1987-12-26 Pipe burying method Expired - Lifetime JPH0663269B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP62330973A JPH0663269B2 (en) 1987-12-26 1987-12-26 Pipe burying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP62330973A JPH0663269B2 (en) 1987-12-26 1987-12-26 Pipe burying method

Publications (2)

Publication Number Publication Date
JPH01174729A JPH01174729A (en) 1989-07-11
JPH0663269B2 true JPH0663269B2 (en) 1994-08-22

Family

ID=18238420

Family Applications (1)

Application Number Title Priority Date Filing Date
JP62330973A Expired - Lifetime JPH0663269B2 (en) 1987-12-26 1987-12-26 Pipe burying method

Country Status (1)

Country Link
JP (1) JPH0663269B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100909952B1 (en) * 2007-07-05 2009-07-30 한국가스공사 Settlement method of the pipe
JP5311604B1 (en) * 2012-11-05 2013-10-09 日新化成工業株式会社 Protective structure for resin buried pipe and protective block for resin buried pipe

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0814349B2 (en) * 1990-04-04 1996-02-14 日本鋼管工事株式会社 Civil engineering method for underground pipes
CN108253195A (en) * 2018-02-26 2018-07-06 中国石油大学(北京) The preparation method of the protective device of buried pipeline, guard system and protective device

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3626702A (en) * 1970-02-12 1971-12-14 Edward J Monahan Floating foundation and process therefor
JPS5529317B2 (en) * 1972-01-17 1980-08-02
JPS55106246U (en) * 1979-01-16 1980-07-24
JPS5820804A (en) * 1981-07-31 1983-02-07 大阪瓦斯株式会社 Temporal embedding method
JPS58111492U (en) * 1982-01-25 1983-07-29 株式会社クボタ Earth pressure reduction structure
JPS58122087U (en) * 1982-02-12 1983-08-19 積水化成品工業株式会社 tube support body
JPS62181669U (en) * 1986-05-01 1987-11-18
JPS631884A (en) * 1986-06-19 1988-01-06 住宅・都市整備公団 Method of foundation construction of buried sewer
JPS6344021A (en) * 1986-08-12 1988-02-25 Keihan Concrete Kogyo Kk Earth pressure reducing construction with foamed block of synthetic resin

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100909952B1 (en) * 2007-07-05 2009-07-30 한국가스공사 Settlement method of the pipe
JP5311604B1 (en) * 2012-11-05 2013-10-09 日新化成工業株式会社 Protective structure for resin buried pipe and protective block for resin buried pipe

Also Published As

Publication number Publication date
JPH01174729A (en) 1989-07-11

Similar Documents

Publication Publication Date Title
JPH0663269B2 (en) Pipe burying method
JPH01172691A (en) How to bury piping and cables
JPH02300430A (en) Civil engineering method for embedding pipe
JP3314191B2 (en) Underground construction method of underground structure by geotextile
JPH01278612A (en) Method of taking countermeasure against liquefaction of linear structure buried in ground
JP3101371B2 (en) Temporary backfill method
JPH0634076A (en) Subsidence preventive method for buried pipe conduit by civil engineering work sheet
KR200194046Y1 (en) A back filling structure for the paving road
JPH0545837B2 (en)
JPS6124624Y2 (en)
JP3720989B2 (en) Sewer pipe burial method
KR0167035B1 (en) Method of laying hume pipes
JPS6124625Y2 (en)
JPH03279516A (en) Laying for underground buried pipe
JPH03288079A (en) Civil engineering construction method of underground buried pipe
JPH07300845A (en) Liquefaction countermeasure method for underground linear structures
JP2001032301A (en) Construction method for submarine buried structure
JPH0439482A (en) Construction method for preventing sinking of pipe line
JPH02213538A (en) Civil work method of underground pipe
JP3352951B2 (en) Installation method of invert and underground drainage in mountain tunnel
CN119466115A (en) A water-stopping structure and construction method for offshore drainage immersed pipe joint
JPH07119162A (en) Method for protecting buried pipes under footing foundation
JP3178357B2 (en) Construction method of large section tunnel
JPH05126282A (en) Pipe laying method
JPH08232230A (en) How to attach the impermeable wall to the gutter pipe