JPH0663353B2 - Mesh formwork - Google Patents
Mesh formworkInfo
- Publication number
- JPH0663353B2 JPH0663353B2 JP63300099A JP30009988A JPH0663353B2 JP H0663353 B2 JPH0663353 B2 JP H0663353B2 JP 63300099 A JP63300099 A JP 63300099A JP 30009988 A JP30009988 A JP 30009988A JP H0663353 B2 JPH0663353 B2 JP H0663353B2
- Authority
- JP
- Japan
- Prior art keywords
- mesh plate
- support
- mesh
- support member
- top end
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 title claims description 10
- 230000002787 reinforcement Effects 0.000 description 13
- 239000000463 material Substances 0.000 description 10
- 239000010953 base metal Substances 0.000 description 6
- 239000002699 waste material Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000012779 reinforcing material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G9/00—Forming or shuttering elements for general use
- E04G9/02—Forming boards or similar elements
- E04G9/06—Forming boards or similar elements the form surface being of metal
- E04G9/065—Forming boards or similar elements the form surface being of metal the form surface being of wire mesh
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【発明の詳細な説明】 [産業上の利用分野] 本発明はメッシュ板を用いて組み立てられるメッシュ型
枠に関するものである。DETAILED DESCRIPTION OF THE INVENTION [Industrial application] The present invention relates to a mesh formwork assembled using a mesh plate.
[従来の技術] 従来のメッシュ型枠にあっては、一対のメッシュ板を相
対向するように配置し、メッシュ板の相対向する内面側
に立設された支柱部材にメッシュ板を固定し、メッシュ
板の上端に沿って配置した天端支持材を支柱部材の上端
に取着し、一対の天端支持材を間隔保持材にて連結して
組み立てていた。[Prior Art] In a conventional mesh formwork, a pair of mesh plates are arranged so as to face each other, and the mesh plates are fixed to column members standing upright on the inner surface sides of the mesh plates facing each other. The top end support member arranged along the upper end of the mesh plate is attached to the upper end of the column member, and the pair of top end support members are connected by the spacing member to assemble.
[発明が解決しようとする課題] ところがかかる従来例にあっては、メッシュ板の内側面
に立設された支柱部材にメッシュ板を固定してメッシュ
板を保持しており、コンクリートを打設したときコンク
リート内に支柱部材が埋設されてしまうため支柱部材を
再度使用できず、部材の無駄が多いという問題があり、
またメッシュ板でコンクリートからかかる荷重を支える
ためには支柱部材にメッシュ板を多くの箇所で固定しな
ければならなく施工に手間がかかるという問題があっ
た。[Problems to be Solved by the Invention] However, in such a conventional example, a mesh plate is fixed to a support member erected on the inner side surface of the mesh plate to hold the mesh plate, and concrete is poured. At this time, since the pillar member is buried in the concrete, the pillar member cannot be reused, and there is a problem that the member is wasted,
Further, in order to support the load applied from the concrete by the mesh plate, there is a problem that the mesh plate has to be fixed to the strut member at many places and it takes time and effort for the construction.
本発明は叙述の点に鑑みてなされたものであって、本発
明の目的とするところはメッシュ板を簡単に支持できる
と共に支柱や天端支持材やバタ角を繰り返し使用できて
部材の無駄をなくすことができ、さらにコンクリートを
打設したときコンクリートからメッシュ板にかかる荷重
を確実に支えることができるメッシュ型枠を提供するに
ある。The present invention has been made in view of the above-mentioned points, and the object of the present invention is to easily support the mesh plate and to repeatedly use the pillars, the top end support member, and the flank angle to waste members. Another object of the present invention is to provide a mesh formwork that can be eliminated and can reliably support the load applied to the mesh plate from the concrete when the concrete is placed.
[課題を解決するための手段] 上記目的を達成するため本発明メッシュ型枠は、一対の
メッシュ板1を相対向するように配置し、メッシュ板1
の外側に立設した支柱2にバタ角3を装着してバタ角3
にてメッシュ板1の外面を支持し、各メッシュ板1の上
方に天端支持材4を配置してこの天端支持材4を上記支
柱2に連結し、天端支持材4に設けたクランプ具32と天
端支持材4との間にメッシュ板1の上端を挟むと共にね
じ具32aにて締め付け支持し、バタ角3にメッシュ板支
持材28の上端を引っ掛けると共にメッシュ板支持材28の
下端に設けた受け部28bにメッシュ板1の下端を載置し
てメッシュ板1の下端を吊り支持して成ることを特徴と
するものである。[Means for Solving the Problems] In order to achieve the above-mentioned object, the mesh formwork of the present invention has a pair of mesh plates 1 arranged so as to face each other.
Attach the flap angle 3 to the column 2 that is erected outside the
Supports the outer surface of the mesh plate 1 and arranges the top end support members 4 above each mesh plate 1 and connects the top end support members 4 to the support columns 2 to provide a clamp provided on the top end support members 4. The upper end of the mesh plate 1 is sandwiched between the tool 32 and the top end support member 4 and tightened and supported by the screw tool 32a, and the upper end of the mesh plate support member 28 is hooked on the flap angle 3 and the lower end of the mesh plate support member 28. The lower end of the mesh plate 1 is placed on the receiving portion 28b provided in the above, and the lower end of the mesh plate 1 is suspended and supported.
[作用] メッシュ板1を天端支持材4及びバタ角3を介して支柱
2に支持できてメッシュ板1を確実に支持でき、またメ
ッシュ板1間にコンクリートを打設したときコンクリー
トに埋設される無駄な部材がないようにでき、さらにメ
ッシュ板1を天端支持材4やバタ角3に吊り下げるだけ
でメッシュ板1を取り付けることができ、さらにコンク
リートを打設してコンクリートが硬化した後、型枠を分
解すると支柱2や天端支持材4やバタ角3を繰り返し使
用できる。[Operation] The mesh plate 1 can be supported by the support columns 2 through the top end supporting member 4 and the flap angle 3, so that the mesh plate 1 can be surely supported, and when the concrete is placed between the mesh plates 1, it is embedded in the concrete. It is possible to eliminate unnecessary members, and furthermore, the mesh plate 1 can be attached only by suspending the mesh plate 1 on the top end supporting member 4 and the flap corner 3, and after the concrete is cast and the concrete hardens. By disassembling the formwork, the pillar 2, the top end support member 4, and the flap corner 3 can be repeatedly used.
[実施例] ベース筋6は直線ベース筋6aとコーナーベース筋6bとで
構成されており、第3図(a)に示すように基礎を施工
する地面に並べて配置してある。コーナー部に配置され
るコーナーベース筋6bには4つの土台金具7を一体に設
けてあり、土台金具7を地面に載置してコーナーベース
筋6bを地面に対して浮かせてあり、直線ベース筋6aの端
部をコーナーベース筋6bに連結することにより直線ベー
ス筋6aも地面に対して浮かせてある。各土台金具7には
ボルト8を立設してあり、ボルト8にナット9を螺合し
てある。ベース筋6の直線ベース筋6aとコーナーベース
筋6b上には第3図(b)に示すように主鉄筋10が一体に
立設される。次いで第3図(c)に示すように逆円錐台
筒状の連結具11が土台金具7上に載設され、連結具11上
には支柱2が立設される。連結具11を土台金具7に取り
付けるときは連結具11の下端開口からボルト8を挿入
し、ナット9に連結具11の下端を載置してある。このと
きナット9の高さを調整することにより連結具11の高さ
を調整できるようになっている。連結具11の上端のフラ
ンジ12と支柱2の下端のフランジ13とは重ねられ、ボル
ト,ナット34にて連結してある。支柱2の外面には上下
一対のピン14a,14bを一組として複数組のピン14a,14bを
外方に突設してあり、支柱2の上端には固定片15を二方
向に突設してある。天端支持材4は直線支持材4aとコー
ナー支持材4bとで構成されている。コーナー支持材4bは
出隅材16と入隅材17を間隔保持材18で連結し、出隅材16
及び入隅材17の端部からジョイナー21を突設して形成さ
れている。出隅材16の端部と入隅材17の端部とには門型
の止めピン19を架設してあり、止めピン19の両端のピン
部をジョイナー21に挿通してジョイナー21を連結してあ
る。間隔保持材18にはアンカー孔20を設けてあり、ジョ
イナー21には連結孔21aを穿孔してある。このコーナー
支持材4bは第3図(d)に示すように支柱2の上端上に
配置され、止めピン19のピン部を固定片15の透孔に挿通
することにより取り付けてある。バタ角支持材22は略L
字状であって、縦片22aと横片22bと引っ掛け部22cとを
具備する。そして第3図(e)に示すようにバタ角支持
材22の引っ掛け部22cは上のピン14aに引っ掛け係止さ
れ、縦片22aの下部を下のピン14bに当接して回転しない
ように取り付けられている。バタ角3はコーナー部間に
亘るように架設され,第3図(f)に示すようにバタ角
支持材22の横片22bに載置して取付けられる。天端支持
材4の直線支持材4aは一対のアングル23間に間隔保持材
18や連結材24を架設して形成され、アングル23の端部に
は透孔25を穿孔してある。この直線支持材4aは第3図
(g)(h)に示すように隣合うコーナー支持材4b間に
架設し、適宜の透孔25と適宜の連結孔21aとを合致させ
てしの26を挿通して位置決めし、適宜の連結孔21aと適
宜の透孔25とにクリップ27を通して止め、クリップ27に
てジョイナー21と直線支持材4aとを連結した後、しの26
を外す。次いで第3図(h)に示すように下方に位置す
るバタ角3にはメッシュ板支持材28を適当な間隔で取り
付けてある。このメッシュ板支持材28は上端の引っ掛け
部28aをバタ角3に引っ掛けてあり、メッシュ板支持材2
8の下端には受け部28bを設けてある。メッシュ板1には
縦方向を向くリブ29を適当な間隔で多数本設けてある。
かかるリブ29は多数のメッシュ素材をはぜ結合で結合す
るときの継ぎ目で形成されている。メッシュ板1の上下
端には必要に応じて補強材31を設けてある。このメッシ
ュ板1は第3図(i)に示すように上方から挿入され、
バタ角3の内面に沿わせられ、メッシュ板1の下端が受
け部28bに載置されてメッシュ板1の下端が吊り支持さ
れている。天端支持材4のアングル23の内面にはクラン
プ具32を設けてあって、アングル23とクランプ具32との
間にメッシュ板1の上端を挟んでねじ具32aの操作で締
め付けてメッシュ板1の上端を吊り支持している。この
ようにメッシュ板1を取り付けた後、第1図に示すよう
にベース筋6を囲むようにフーチング用型枠33が組み立
てられる。アンカー孔20にはアンカーボルトを挿通して
支持される。[Example] The base reinforcement 6 is composed of a linear base reinforcement 6a and a corner base reinforcement 6b, which are arranged side by side on the ground on which the foundation is constructed, as shown in Fig. 3 (a). Four base metal fittings 7 are integrally provided on the corner base reinforcements 6b arranged at the corners, and the base metal fittings 7 are placed on the ground to make the corner base reinforcements 6b float on the ground. By connecting the end of 6a to the corner base reinforcement 6b, the straight base reinforcement 6a is also floated on the ground. A bolt 8 is erected on each base metal fitting 7, and a nut 9 is screwed onto the bolt 8. On the straight base reinforcement 6a and the corner base reinforcement 6b of the base reinforcement 6, a main reinforcing bar 10 is integrally erected on the base reinforcement 6a as shown in FIG. 3 (b). Next, as shown in FIG. 3 (c), an inverted frustoconical tubular connector 11 is placed on the base metal 7, and the support 2 is erected on the connector 11. When attaching the connecting tool 11 to the base metal fitting 7, the bolt 8 is inserted from the lower end opening of the connecting tool 11 and the lower end of the connecting tool 11 is placed on the nut 9. At this time, the height of the connector 11 can be adjusted by adjusting the height of the nut 9. The flange 12 at the upper end of the connecting tool 11 and the flange 13 at the lower end of the support column 2 are overlapped with each other and connected by bolts and nuts 34. A plurality of sets of pins 14a, 14b are provided on the outer surface of the support column 2 as a set of a pair of upper and lower pins 14a, 14b, and fixing pieces 15 are provided on the upper end of the support column 2 in two directions. There is. The top support member 4 is composed of a straight support member 4a and a corner support member 4b. The corner support member 4b connects the projecting corner member 16 and the entering corner member 17 with a spacing member 18 to form the projecting corner member 16b.
Also, the joiner 21 is formed so as to project from the end of the corner member 17. Gate-shaped stop pins 19 are provided at the ends of the projected corner material 16 and the entrance corner material 17, and the pin portions at both ends of the stop pin 19 are inserted into the joiner 21 to connect the joiner 21. There is. The spacing member 18 is provided with an anchor hole 20, and the joiner 21 is formed with a connecting hole 21a. As shown in FIG. 3 (d), this corner support member 4b is arranged on the upper end of the column 2, and is attached by inserting the pin portion of the stop pin 19 into the through hole of the fixing piece 15. The flap support 22 is approximately L
It is V-shaped and includes a vertical piece 22a, a horizontal piece 22b, and a hooking portion 22c. Then, as shown in FIG. 3 (e), the hooking portion 22c of the flap supporting member 22 is hooked and locked by the upper pin 14a, and the lower portion of the vertical piece 22a is attached to the lower pin 14b so as not to rotate. Has been. The flap corner 3 is installed so as to extend between the corner portions, and is mounted on the horizontal piece 22b of the flap support member 22 as shown in FIG. 3 (f). The straight support member 4a of the top support member 4 is a spacing member between the pair of angles 23.
It is formed by bridging 18 and a connecting member 24, and a through hole 25 is bored at the end of the angle 23. As shown in FIGS. 3 (g) and 3 (h), the linear support member 4a is installed between the adjacent corner support members 4b, and the appropriate through hole 25 and the appropriate connecting hole 21a are aligned with each other. After being inserted and positioned, the clip 27 is stopped by inserting the clip 27 into the appropriate connecting hole 21a and the appropriate through hole 25, and the joiner 21 and the linear support member 4a are connected by the clip 27, and then the shino 26
Remove. Next, as shown in FIG. 3 (h), mesh plate supporting members 28 are attached to the lower flank corners 3 at appropriate intervals. This mesh plate supporting member 28 has a hook portion 28a at the upper end hooked on the flap angle 3, and the mesh plate supporting member 2
The lower end of 8 is provided with a receiving portion 28b. The mesh plate 1 is provided with a large number of ribs 29 oriented in the vertical direction at appropriate intervals.
The rib 29 is formed by a seam when a large number of mesh materials are joined together by a seam connection. Reinforcing materials 31 are provided on the upper and lower ends of the mesh plate 1 as required. This mesh plate 1 is inserted from above as shown in FIG. 3 (i),
Along the inner surface of the flap angle 3, the lower end of the mesh plate 1 is placed on the receiving portion 28b, and the lower end of the mesh plate 1 is suspended and supported. A clamp tool 32 is provided on the inner surface of the angle 23 of the top end support member 4, and the upper end of the mesh plate 1 is sandwiched between the angle 23 and the clamp tool 32 and tightened by operating the screw tool 32a. The upper end of is suspended and supported. After mounting the mesh plate 1 in this manner, the footing mold 33 is assembled so as to surround the base muscle 6 as shown in FIG. Anchor bolts are inserted into and supported by the anchor holes 20.
上記のようにメッシュ型枠が組み立てられ、フーチング
用型枠33内及びメッシュ板1間にコンクリートが打設さ
れて基礎が形成される。コンクリートはフーチングでは
フーチング用型枠33の上端まで打設され、メッシュ板1
間ではメッシュ板1の上端まで打設される。コンクリー
トが硬化すると、コンクリート内にベース筋6、主鉄筋
10、土台金具7及び連結具11が埋設されると共に表面に
メッシュ板1が一体化される。コンクリートが硬化する
と上記と逆に天端支持材4、バタ角3、支柱2等が分解
される。つまり、メッシュ板支持材28がメッシュ板1の
下端及びバタ角3から外されると共にメッシュ板1の上
端が天端支持材4から外され、クリップ27を外して直線
支持材4aが外され、次いでバタ角3が外されると共にバ
タ角支持材22が外され、コーナー支持材4bが外され、次
いで支柱2が外される。支柱2を外すときボルト,ナッ
ト34を外して連結具11と支柱2との間が外される。コン
クリートが硬化した後、外した各部材は繰り返して再度
使用される。The mesh formwork is assembled as described above, and concrete is placed in the footing formwork 33 and between the mesh plates 1 to form the foundation. In the footing, concrete is cast up to the upper end of the footing formwork 33, and the mesh plate 1
Between them, the mesh plate 1 is driven up to the upper end. When the concrete hardens, the base reinforcement 6 and the main reinforcement are
10, the base metal fitting 7 and the connecting tool 11 are embedded, and the mesh plate 1 is integrated on the surface. Contrary to the above, when the concrete hardens, the top end support 4, the flap 3, the pillar 2, etc. are disassembled. That is, the mesh plate support member 28 is removed from the lower end of the mesh plate 1 and the flap angle 3, the upper end of the mesh plate 1 is removed from the top end support member 4, the clip 27 is removed, and the linear support member 4a is removed. Next, the flap angle 3 is removed, the flap support 22 is removed, the corner support 4b is removed, and then the column 2 is removed. When removing the column 2, the bolts and nuts 34 are removed to disconnect the connection tool 11 and the column 2. After the concrete hardens, the removed members are repeatedly used again.
[発明の効果] 本発明は叙述の如く一対のメッシュ板を相対向するよう
に配置し、メッシュ板の外側に立設した支柱にバタ角を
装着してバタ角にてメッシュ板の外面を支持し、各メッ
シュ板の上方に天端支持材を配置してこの天端支持材を
上記支柱に連結し、天端支持材及びバタ角にメッシュ板
を吊り下げ保持しているので、メッシュ板を天端支持材
及びバタ角を介して支柱に支持できてメッシュ板を確実
に支持できるものであり、またメッシュ板間にコンクリ
ートを打設したとき支柱等がコンクリートに埋設される
ことなく部材を繰り返し使用できて部材の無駄ができな
いものであり、さらに天端支持材に設けたクランプ具と
天端支持材との間にメッシュ板の上端を挟むと共にねじ
具にて締め付け支持したので、メッシュ板の上端を天端
支持材とクランプ具との間にねじ具の操作にて挟んで取
り付けることができるものであって、メッシュ板の上端
を簡単に天端支持材に支持できると共にメッシュ板の上
端の天端支持材からの取り外しも容易にできるものであ
り、しかもバタ角にメッシュ板支持材の上端を引っ掛け
ると共にメッシュ板支持材の下端に設けた受け部にメッ
シュ板の下端を載置してメッシュ板の下端を吊り支持し
たので、メッシュ板支持材にてメッシュ板の下端を吊り
支持できてメッシュ板の下端の支持が簡単にできると共
にメッシュ板の下端の取り外しも容易にできるものであ
り、さらにまたメッシュ板の下端をメッシュ板支持材の
受け部に載せて吊り支持するために重量のあるメッシュ
板でも確実に支持できるものである。[Effects of the Invention] As described above, the present invention arranges a pair of mesh plates so as to face each other, and attaches a flank angle to a pillar standing upright on the outer side of the mesh plate to support the outer surface of the mesh plate at the flank angle. Then, the top end support material is arranged above each mesh plate, this top end support material is connected to the above-mentioned support, and since the mesh plate is suspended and held at the top end support material and the flap angle, It can be supported on the pillars via the top support and the corners and can reliably support the mesh plates, and when concrete is placed between the mesh plates, the members are repeated without being embedded in the concrete. Since it can be used and waste of the members is not possible, the upper end of the mesh plate is sandwiched between the clamp tool provided on the top support member and the top support member, and it is tightened and supported by the screw tool. Top end It can be attached by sandwiching it between a holding material and a clamp tool by operating a screw tool, and the upper end of the mesh plate can be easily supported by the top end support member and the top end support member of the upper end of the mesh plate. It can also be easily removed from the mesh plate, and the upper end of the mesh plate support is hooked at the flap angle, and the lower end of the mesh plate is placed on the receiving part provided at the lower end of the mesh plate support so that the lower end of the mesh plate is Since it is suspended and supported, the lower end of the mesh plate can be suspended and supported by the mesh plate support material, and the lower end of the mesh plate can be easily supported and the lower end of the mesh plate can be easily removed. Since the lower end is placed on the receiving portion of the mesh plate supporting member and suspended and supported, it is possible to reliably support even a heavy mesh plate.
第1図は本発明の一実施例の斜視図、第2図は同上の断
面図、第3図(a)乃至(i)は同上の組み立てる手順
を示す斜視図であって、1はメッシュ板、2は支柱、3
はバタ角、4は天端支持材、28はメッシュ板支持材、28
bは受け部、32はクランプ具、32aはねじ具である。FIG. 1 is a perspective view of an embodiment of the present invention, FIG. 2 is a cross-sectional view of the same as above, and FIGS. 3 (a) to (i) are perspective views showing an assembling procedure of the same, where 1 is a mesh plate. 2 is a pillar, 3
Is a flap angle, 4 is a top support material, 28 is a mesh plate support material, 28
b is a receiving part, 32 is a clamp tool, and 32a is a screw tool.
Claims (1)
し、メッシュ板の外側に立設した支柱にバタ角を装着し
てバタ角にてメッシュ板の外面を支持し、各メッシュ板
の上方に天端支持材を配置してこの天端支持材を上記支
柱に連結し、天端支持材に設けたクランプ具と天端支持
材との間にメッシュ板の上端を挟むと共にねじ具にて締
め付け支持し、バタ角にメッシュ板支持材の上端を引っ
掛けると共にメッシュ板支持材の下端に設けた受け部に
メッシュ板の下端を載置してメッシュ板の下端を吊り支
持して成ることを特徴とするメッシュ型枠。1. A pair of mesh plates are arranged so as to oppose each other, a sloping angle is attached to a pillar standing on the outside of the mesh plate, and the outer surface of the mesh plate is supported by the sloping angle. Place the top end support member on the upper side and connect the top end support member to the above-mentioned pillar, and sandwich the upper end of the mesh plate between the clamp member provided on the top end support member and the top end support member and use it as a screw tool. The upper end of the mesh plate support is hooked to the flap angle and the lower end of the mesh plate is placed on the receiving part provided at the lower end of the mesh plate support to suspend and support the lower end of the mesh plate. A characteristic mesh formwork.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63300099A JPH0663353B2 (en) | 1988-11-28 | 1988-11-28 | Mesh formwork |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63300099A JPH0663353B2 (en) | 1988-11-28 | 1988-11-28 | Mesh formwork |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH02147765A JPH02147765A (en) | 1990-06-06 |
| JPH0663353B2 true JPH0663353B2 (en) | 1994-08-22 |
Family
ID=17880699
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63300099A Expired - Lifetime JPH0663353B2 (en) | 1988-11-28 | 1988-11-28 | Mesh formwork |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0663353B2 (en) |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5965156U (en) * | 1982-10-26 | 1984-05-01 | 東線鋼建株式会社 | Wire mesh fixture |
| JPH0322355Y2 (en) * | 1986-06-02 | 1991-05-15 |
-
1988
- 1988-11-28 JP JP63300099A patent/JPH0663353B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH02147765A (en) | 1990-06-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2009011516A2 (en) | Form with reinforcing bars, non-support form system and non-support construction method using the same | |
| KR20190018453A (en) | The all-in-one PC panel structure with improved safety | |
| JP2782453B2 (en) | Column formwork device | |
| JPH0663353B2 (en) | Mesh formwork | |
| JP2003105774A (en) | Anchor installation device for pedestal part of steel pipe structure | |
| JPH03260264A (en) | Column formwork construction method | |
| JP3671061B2 (en) | Suspension staircase and its temporary method | |
| JP2598154Y2 (en) | Temporary support | |
| JP4072726B2 (en) | Precast concrete panel mounting structure and mounting method | |
| JPH02147769A (en) | Mounting structure of form column | |
| JPH0631051Y2 (en) | Top ruler for T-shaped intersection of mesh formwork | |
| JP4067091B2 (en) | Residual perforated frame for formwork, concrete frame and concrete frame construction method | |
| JP2860501B2 (en) | Concrete foundation | |
| JPH0663352B2 (en) | Mesh formwork | |
| JPH0673786A (en) | Junction of precast concrete column | |
| JPH02147767A (en) | Base reinforcement with groundsill | |
| JPH0371546B2 (en) | ||
| JP2647638B2 (en) | Concrete panel for slope construction | |
| JPH0650611Y2 (en) | Curing net mounting hardware | |
| JP2611917B2 (en) | Pillar formwork equipment | |
| JPH0412296Y2 (en) | ||
| JPH02147770A (en) | Mounting structure of form column | |
| JPS6136698Y2 (en) | ||
| JP3964056B2 (en) | Extruded cement board mounting structure | |
| JPH09217357A (en) | Anchor frame |