JPH066462B2 - Transfer device for roving bobbin - Google Patents
Transfer device for roving bobbinInfo
- Publication number
- JPH066462B2 JPH066462B2 JP24807986A JP24807986A JPH066462B2 JP H066462 B2 JPH066462 B2 JP H066462B2 JP 24807986 A JP24807986 A JP 24807986A JP 24807986 A JP24807986 A JP 24807986A JP H066462 B2 JPH066462 B2 JP H066462B2
- Authority
- JP
- Japan
- Prior art keywords
- rail
- bobbin
- roving
- carrage
- carriage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 claims description 73
- 238000009987 spinning Methods 0.000 claims description 58
- 230000003028 elevating effect Effects 0.000 claims description 8
- 239000011295 pitch Substances 0.000 description 8
- 238000005096 rolling process Methods 0.000 description 5
- 238000003860 storage Methods 0.000 description 4
- 238000001514 detection method Methods 0.000 description 3
- 241001061260 Emmelichthys struhsakeri Species 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 1
Landscapes
- Warehouses Or Storage Devices (AREA)
- Intermediate Stations On Conveyors (AREA)
- Branching, Merging, And Special Transfer Between Conveyors (AREA)
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Description
【発明の詳細な説明】 産業上の利用分野 この発明はエレベータ等の昇降装置を備えた工場の或階
層の粗紡機設置位置からその粗紡機から玉揚げした粗糸
ボビンを他の階層の精紡機設置位置に搬送する為の粗糸
ボビンの搬送装置に関するものである。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a roving bobbin fried from a roving machine from a roving machine installation position on a certain level of a factory equipped with a lifting device such as an elevator, and a spinning machine on another level. The present invention relates to a roving bobbin carrying device for carrying to an installation position.
従来の技術 従来にあっては粗紡機設置位置で玉揚げした粗糸ボビン
を運搬車の収納箱に収納させ、その運搬車をエレベータ
設置位置に移動させてそのエレベータに載せ、その後運
搬車をエレベータによって精紡機設置の階層に昇降させ
た後、その運搬車を精紡機設置位置に移動させ、その精
紡機設置位置で収納箱から粗糸ボビンを取出してボビン
ハンガーに吊下させている。2. Description of the Related Art Conventionally, a roving bobbin fried in a roving machine installation position is stored in a storage box of a transport vehicle, the transport vehicle is moved to an elevator installation position and placed on the elevator, and then the transport vehicle is lifted. After moving up and down to the level of the spinning machine installation, the carrier is moved to the spinning machine installation position, and the roving bobbin is taken out from the storage box at the spinning machine installation position and hung on the bobbin hanger.
発明が解決しようとする問題点 前記のように粗糸ボビンを運搬車の収納箱に収納させて
搬送するものでは、収納箱内への粗糸ボビンの収納によ
って粗糸相互或いは粗糸と箱内面とが擦れ合って粗糸が
損傷する問題点があった。そこで、前記問題点を解決す
る為に特公昭54−44786号公報に記載されている
ように運搬車に一対のエンドレス鎖を回動自在に配設
し、それらのエンドレス鎖に複数の水平支持梁を揺動自
在に架設し、それらの水平支持梁に粗糸ボビンを垂直に
挿着するようにしたものが提案されている。ところが、
前記公報に記載のものでは各運搬車にエンドレス鎖等の
複雑な装置を必要として搬送装置のコストが高くなり、
しかも運搬車を精紡機設置位置に運んだり、精紡機設置
位置で粗糸ボビンを再びボビンハンガーに吊下させる必
要があり、その為に多くの労力や費用を要する問題点が
あった。DISCLOSURE OF THE INVENTION Problems to be Solved by the Invention As described above, in the case where the roving bobbin is stored in the storage box of the transporting vehicle and conveyed, the roving bobbins are accommodated in the storage box so that the roving threads or the roving and the box inner surface are There was a problem that the roving was damaged by rubbing with each other. Therefore, in order to solve the above-mentioned problems, a pair of endless chains are rotatably arranged on a carrier as described in Japanese Patent Publication No. 54-44786, and a plurality of horizontal support beams are provided on the endless chains. It has been proposed that the slabs are oscillatably installed, and the roving bobbins are vertically attached to the horizontal support beams. However,
In the one described in the above publication, the cost of the transport device increases because each transport vehicle requires a complicated device such as an endless chain.
Moreover, it is necessary to carry the carrier to the spinning machine installation position, or to hang the roving bobbin again on the bobbin hanger at the spinning machine installation position, which requires a lot of labor and cost.
問題点を解決するための手段 本発明は前記問題点を解決するために、所定数のボビン
ハンガーを有すると共に互いに直列に曲折又は離脱可能
に連結し得るようにしてある複数のキャレージ要素から
成るボビンキャレージと、粗紡機設置の階層における粗
紡機設置位置と昇降装置設置位置との間に配設する第1
レールと、精紡機設置の階層における精紡機設置位置と
昇降装置設置位置との間に配設する第2レールと、昇降
装置に第1レールと第2レールに接続可能に配設する第
3レールとを備え、第1レールと第2レールはボビンキ
ャレージのキャレージ要素を直列状態で移動自在に案内
するように構成し、第3レールはボビンキャレージのキ
ャレージ要素を並列状態で移動自在に案内するように構
成すると共に第1レールと第2レールに接続可能に構成
したことを特徴としている。SUMMARY OF THE INVENTION To solve the above problems, the present invention provides a bobbin comprising a plurality of carrage elements having a predetermined number of bobbin hangers and adapted to be bent or detachably connected in series with each other. The first arrangement provided between the carrage and the position of the roving machine and the position of the lifting device in the roving installation level.
A rail, a second rail arranged between the spinning machine installation position and the lifting device installation position in the level of the spinning frame installation, and a third rail arranged on the lifting device so as to be connectable to the first rail and the second rail. The first rail and the second rail are configured to movably guide the carriage elements of the bobbin carriage in series, and the third rail movably guide the carriage elements of the bobbin carriage in parallel. It is characterized in that it is configured to be connectable to the first rail and the second rail.
作用 ボビンキャレージを粗紡機設置位置に移動させ、そのボ
ビンキャレージのボビンハンガーに粗糸ボビンを吊下さ
せた後、そのボビンキャレージを第1レールに案内させ
て昇降装置設置位置に移動させ、その位置でボビンキャ
レージのキャレージ要素を連結部で曲折又は離脱させて
直列状態から並列状態に整列変更させると共にその状態
のボビンキャレージを第3レールに案内させて昇降装置
に支持させ、その昇降装置を精紡機設置の階層に昇降さ
せた後、ボビンキャレージを第2レールに案内させると
共にボビンキャレージのキャレージ要素を並列状態から
直列状態に整列変更させ、その状態のボビンキャレージ
を第2レールに案内させて精紡機設置位置に移動させ
る。Action Move the bobbin carriage to the position of the roving machine, hang the roving bobbin on the bobbin hanger of the bobbin carriage, then guide the bobbin carage to the first rail and move it to the lifting device installation position. , At that position, the carriage element of the bobbin carrage is bent or separated at the connecting portion to change the alignment from the serial state to the parallel state, and the bobbin carrage in that state is guided to the third rail to be supported by the lifting device, After raising and lowering the lifting device to the level of the spinning machine installation, guide the bobbin carrage to the second rail and align the carriage elements of the bobbin carriage from the parallel state to the series state. 2 Guide to the rail and move to the spinning machine installation position.
実施例 第1図において、1は紡績工場の建屋で、1階の階層2
と2階の階層3とを備えた2階建ての場合を示してい
る。4は建屋1に設置してあるエレベータ装置で、本願
の昇降装置を構成している。そのエレベータ装置4は周
知のように一方が開放されている箱形のエレベータ5を
昇降機構6によって前記階層2、3へ昇降させるように
してある。7は昇降機構6のワイヤー、8は昇降モータ
である。EXAMPLE In FIG. 1, reference numeral 1 is a building of a spinning factory, which is a level 2 on the first floor.
It shows a case of a two-story structure including a second floor and a third floor. Reference numeral 4 denotes an elevator device installed in the building 1, which constitutes the lifting device of the present application. As is well known, the elevator device 4 is configured such that a box-shaped elevator 5 of which one side is opened is moved up and down to the floors 2 and 3 by a lifting mechanism 6. Reference numeral 7 is a wire of the lifting mechanism 6, and 8 is a lifting motor.
9は階層2の床面2aに設置してある周知の粗紡機で、
第2図に示すように複数台並設されている。前記粗紡機
9前方には自動管替装置10が配設され、後述の第1レ
ールに案内されたボビンキャレージに吊下されている空
ボビンとボビンホイール9aに載置されている粗糸ボビ
ン12とを交換するようにしてある。この自動管替装置
10は例えば特開昭57−106729号公報に開示さ
れている一斉管替機13と特開昭58−41919号公
報に開示されているボビン移載装置14とで構成されて
いる。一斉管替機13は第3図に示すように多数のペッ
グ15aを有するベルトコンベヤ15を備え、管替ヘッ
ド16の前後、上下移動によってボビンホイール9a上
の粗糸ボビン12をペッグ15aに挿着し、また別のペ
ッグ15aに挿着されている空ボビンをボビンホイール
9aに挿着するようにしてある。ボビン移載装置14は
ペッグ17aを有する昇降体17と交替腕18とを備
え、昇降体17の昇降によって後述のボビンキャレージ
に吊下されている空ボビンをペッグ17a上に取外し、
そのペッグ17a上の空ボビンを交替腕18によって前
記ペッグ15aに挿着し、またペッグ15a上の粗糸ボ
ビン12を交替腕18によってペッグ17aに挿着し、
そのペッグ17a上の粗糸ボビン12を昇降体17の昇
降によってボビンキャレージのボビンハンガーに吊下さ
せるようにしてある。なお、前記自動管替装置10の代
りに特公昭51−38814号公報に示されているよう
に走行式の管替機等を使用したり、従来のように人手に
よって管替するようにしても良い。9 is a well-known roving machine installed on the floor 2a of the floor 2,
As shown in FIG. 2, a plurality of units are installed side by side. An automatic pipe changing device 10 is arranged in front of the roving machine 9, and an empty bobbin hung in a bobbin carriage guided by a first rail described later and a roving bobbin placed on a bobbin wheel 9a. 12 is exchanged. The automatic pipe changer 10 is composed of, for example, a simultaneous pipe changer 13 disclosed in JP-A-57-106729 and a bobbin transfer device 14 disclosed in JP-A-58-41919. There is. As shown in FIG. 3, the simultaneous pipe changer 13 has a belt conveyor 15 having a large number of pegs 15a, and the roving bobbin 12 on the bobbin wheel 9a is inserted into the peg 15a by moving the pipe change head 16 back and forth and up and down. In addition, an empty bobbin inserted into another peg 15a is inserted into the bobbin wheel 9a. The bobbin transfer device 14 is provided with an elevating body 17 having a peg 17a and an alternation arm 18, and an empty bobbin suspended from a bobbin carriage, which will be described later, is removed on the peg 17a by elevating the elevating body 17.
The empty bobbin on the peg 17a is inserted into the peg 15a by the alternate arm 18, and the roving bobbin 12 on the peg 15a is inserted into the peg 17a by the alternate arm 18,
The roving bobbin 12 on the peg 17a is hung on the bobbin hanger of the bobbin carriage by elevating the elevating body 17. Incidentally, instead of the automatic pipe changer 10, a traveling type pipe changer or the like as shown in Japanese Patent Publication No. 51-38814 may be used, or the pipe changer may be manually changed as in the conventional case. good.
19は階層3の床面3aに設置してある周知の精紡機
で、第4図に示すように複数台並設されている。各精紡
機19のクリール20には第5図に示すように前列ボビ
ンハンガー21と後列ボビンハンガー22が備えられ、
これらのボビンハンガー21、22に粗糸ボビン12を
吊下させるようにしてある。Reference numeral 19 is a well-known spinning machine installed on the floor 3a of the floor 3, and a plurality of spinning machines are arranged in parallel as shown in FIG. The creel 20 of each spinning machine 19 is provided with a front row bobbin hanger 21 and a rear row bobbin hanger 22, as shown in FIG.
The roving bobbin 12 is hung on these bobbin hangers 21 and 22.
次に、23は粗紡機設置位置Aで玉揚げした粗糸ボビン
12を精紡機設置位置Bに搬送する為の粗糸ボビン搬送
装置で、次にこの粗糸ボビン搬送装置23について説明
する。先ず、24は粗糸ボビン12を吊下させる為のボ
ビンキャレージで、第6図、第7図に示すように多数の
キャレージ要素24aを連結して構成されている。この
キャレージ要素24aにおいて、25は棒状のキャレー
ジバーで、上側には一対の支持杆26aが突設され、そ
れらの支持杆26aに回動自在に取り付けてある支持体
26に左右一対の支持ローラ27と前後一対の案内ロー
ラ28が回動自在に軸支されている。またキャレージバ
ー25の上側には後述のボビンハンガーの2ピッチ毎に
図示しない近接体が固着されている。各キャレージバー
25の下側には周知のボビンハンガー29が所定間隔あ
けて6個取着されている。これらのボビンハンガー29
の間隔Sは精紡機19のスピンドルピッチの2倍に設定
されている。30はキャレージバー25相互を連結する
連結片で、両端部がキャレージバー25の端部に夫々ピ
ン31a,31bによって回動自在に連結されている。
前記ピン31a,31bは夫々最端部のボビンハンガー
29と同一軸線上に位置され、最端部のボビンハンガー
29同士の間隔Tが前記間隔Sと同じ大きさに設定され
ている。連結片30の横幅はキャレージバー25の横幅
と同じになるように形成してある。32は各キャレージ
バー25の両端部に固着してあるコ字形又はU字形の間
隔保持片で、それらの両端部は平面的に見て最端部のボ
ビンハンガー29に吊下させた粗糸ボビン12の周面よ
り外側に位置され、両端部間の間隔Rは粗糸ボビン12
の最大径より大きく設定してある。前記キャレージ要素
24aの数はボビンハンガー29の総数が少なくとも粗
紡機9のボビンホイール9aの数となるように例えば粗
紡機9が96錘の場合16本以上に設定してある。Next, 23 is a roving yarn bobbin transporting device for transporting the roving yarn bobbin 12 fried in the roving spinning machine setting position A to the spinning frame setting position B. Next, the roving yarn bobbin transporting device 23 will be described. First, 24 is a bobbin carriage for suspending the roving bobbin 12, and is constituted by connecting a number of carrage elements 24a as shown in FIGS. 6 and 7. In this carriage element 24a, 25 is a bar-shaped carriage bar, and a pair of support rods 26a are projectingly provided on the upper side, and a pair of left and right support rollers 27 are provided on a support body 26 rotatably attached to the support rods 26a. A pair of front and rear guide rollers 28 are rotatably supported. Further, on the upper side of the carriage bar 25, proximity bodies (not shown) are fixed at every two pitches of bobbin hangers described later. Six well-known bobbin hangers 29 are attached to the lower side of each carriage bar 25 at predetermined intervals. These bobbin hangers 29
The interval S is set to twice the spindle pitch of the spinning machine 19. Reference numeral 30 denotes a connecting piece for connecting the carriage bars 25 to each other, and both ends thereof are rotatably connected to the ends of the carriage bar 25 by pins 31a and 31b, respectively.
The pins 31a and 31b are respectively located on the same axis as the bobbin hanger 29 at the end, and the interval T between the bobbin hangers 29 at the end is set to be the same as the interval S. The horizontal width of the connecting piece 30 is formed to be the same as the horizontal width of the carriage bar 25. Reference numeral 32 denotes a U-shaped or U-shaped space holding piece fixed to both ends of each carrage bar 25. Both ends of the roving bobbin 12 suspended from the bobbin hanger 29 at the end when viewed two-dimensionally. Is located outside the peripheral surface of the roving bobbin 12.
Is set larger than the maximum diameter of. The number of the carrage elements 24a is set to 16 or more so that the total number of the bobbin hangers 29 is at least the number of the bobbin wheels 9a of the roving frame 9 when the roving frame 9 has 96 spindles.
次に、80はボビンキャレージ24を粗紡機設置位置A
から精紡機設置位置Bへ或いはその逆へ移動自在に案内
する搬送レールで、第2図、第4図に示すように粗紡機
設置の階層2における粗紡機設置位置Aとエレベータ設
置位置Cとの間の天井2b近くに配設してある第1レー
ル33と、精紡機設置の階層3における精紡機設置位置
Bとエレベータ設置位置Cとの間の天井3b近くに配設
してある第2レール34と、エレベータ5内に第1レー
ル33と第2レール34に接続可能に配設してある第3
レール35とで構成されている。この搬送レール80は
第9図に示すように断面 に形成され、ボビンキャレージ24の支持ローラ27を
案内する水平方向の一対の支持面80aと案内ローラ2
8を案内する垂直方向の一対の案内面80bとが形成さ
れている。前記第1レール33は粗紡機設置位置Aとエ
レベータ設置位置C間の主レール33aと、粗紡機設置
位置Aにおいて各粗紡機9に対応するように主レール3
3aから分岐されている分岐レール33bと、エレベー
タ設置位置Cにおいて主レール33aを分岐させた2本
の整列レール33cとで構成されている。主レール33
aと分岐レール33bはボビンキャレージ24のキャレ
ージ要素24aを直列状態で案内するように配設され、
分岐レール33bは第3図に示すように昇降体17のペ
ッグ17aの真上を通過するように位置されている。2
本の整列レール33cは一方が各キャレージ要素24a
の一方の案内ローラ28を、他方が各キャレージ要素2
4aの他方の案内ローラ28を夫々案内するように配設
してある。また第2レール34は第1レール33と同様
に精紡機設置位置Bとエレベータ設置位置C間の主レー
ル34aと、精紡機設置位置Bにおいて各精紡機19の
スピンドル列に対応するように主レール34aから分岐
されている予備レール34bと、エレベータ設置位置C
近くにおいて主レール34aを分岐させた2本の整列レ
ール34cとで構成されている。主レール34aと予備
レール34bはボビンキャレージ24のキャレージ要素
24aを直列状態で案内するように配設され、予備レー
ル34bは第5図に示すようにクリール20の上部前方
に位置されている。2本の整列レール34cは一方が各
キャレージ要素24aの一方の案内ローラ28を、他方
が各キャレージ要素24aの他方の案内ローラ28を夫
々案内するように配設してある。また第3レール35は
第1図、第10図に示すようにエレベータ5の天井5a
近くに並設してある2本のレール要素35aによって構
成されている。2本のレール要素35aの間隔は各キャ
レージ要素24aの一対の支持体26間の間隔と同じ大
きさに設定され、一方が各キャレージ要素24aの一方
の案内ローラ28を、他方が各キャレージ要素24aの
他方の案内ローラ28を夫々案内し、ボビンキャレージ
24のキャレージ要素24aを並列状態に折畳み得るよ
うにしてある。2本のレール要素35aはエレベータ5
を階層2、3で昇降停止させた状態で前記2本の整列レ
ール33c、34cに夫々接続されるように位置設定し
てある。Next, at 80, the bobbin carriage 24 is installed at the roving machine installation position A.
From the spinning machine installation position B to the reverse, and vice versa. As shown in FIGS. 2 and 4, there are a roughing machine installation position A and an elevator installation position C on the tier 2 of the roving machine installation. The first rail 33 arranged near the ceiling 2b between the two, and the second rail arranged near the ceiling 3b between the spinning machine installation position B and the elevator installation position C in the level 3 of the spinning machine installation. 34, and a third rail 33 that is connectable to the first rail 33 and the second rail 34 in the elevator 5.
It is composed of a rail 35. This transport rail 80 has a cross section as shown in FIG. And a pair of horizontal support surfaces 80a for guiding the support roller 27 of the bobbin carrage 24 and the guide roller 2.
A pair of vertical guide surfaces 80b for guiding the vehicle 8 are formed. The first rail 33 is a main rail 33a between the roving machine installation position A and the elevator installation position C, and the main rail 3 corresponds to each roving machine 9 at the roving machine installation position A.
It is composed of a branch rail 33b branched from 3a and two alignment rails 33c obtained by branching the main rail 33a at the elevator installation position C. Main rail 33
a and the branch rail 33b are arranged so as to guide the carrage element 24a of the bobbin carrage 24 in series,
The branch rail 33b is positioned so as to pass right above the peg 17a of the lifting body 17 as shown in FIG. Two
One of the alignment rails 33c of the book is one of the carriage elements 24a.
One of the guide rollers 28 and the other of each of the carrage elements 2
The other guide roller 28 of 4a is arranged to guide each. Similarly to the first rail 33, the second rail 34 is a main rail 34a between the spinning machine installation position B and the elevator installation position C, and the main rail 34a at the spinning machine installation position B corresponds to the spindle row of each spinning machine 19. A spare rail 34b branched from 34a and an elevator installation position C
It is composed of two alignment rails 34c that branch off the main rail 34a in the vicinity. The main rail 34a and the spare rail 34b are arranged so as to guide the carrage elements 24a of the bobbin carrage 24 in series, and the spare rail 34b is located in front of the upper portion of the creel 20 as shown in FIG. The two alignment rails 34c are arranged so that one guides one guide roller 28 of each carrage element 24a and the other guides the other guide roller 28 of each carrage element 24a. The third rail 35 is mounted on the ceiling 5a of the elevator 5 as shown in FIGS.
It is constituted by two rail elements 35a which are juxtaposed near each other. The distance between the two rail elements 35a is set to the same size as the distance between the pair of supports 26 of each carrage element 24a, one guide roller 28 of each carrage element 24a, and the other carrage element 24a of the other. The other guide rollers 28 are guided so that the carrage elements 24a of the bobbin carrage 24 can be folded in parallel. The two rail elements 35a are the elevator 5
Are positioned so that they are connected to the two alignment rails 33c and 34c, respectively, in a state where they are stopped moving up and down on the floors 2 and 3.
36は整列レール33cの分岐点に設けてある転轍器
で、第12図に示すように構成されている。この転轍器
36において、37は第1レール33に枢軸38を介し
て枢着してある転轍片で、キャレージ要素24aの案内
ローラ28を2本の整列レール33cへ選択的に案内す
るようにしてある。39は自体の長孔39aを転轍片3
7上の掛止片37a嵌合させてある操作レバーである。
40は掛止片37aと長孔39a両端の掛止部39bと
の間に張設してあるバネで、転轍片37を弾力的に保持
している。41は操作レバー39を移動させるエヤシリ
ンダで、転轍片37を第12図の実線位置と仮想線位置
とに切替えるように整列レール33cに取付けてある。
42a、42bは転轍片37の切替を確認するリミット
スイッチである。43はキャレージ要素24aの中間部
に設けた表示体が通過したことを検出する近接スイッチ
等の検出器で、エヤシリンダ41の作動を切替るように
してある。44は整列レール34cの分岐点に設けてあ
る転轍器で、前記転轍器36と同様に構成されており、
ここでの重複説明を省略する。なお、一般に分岐レール
33bの分岐点と予備レール34bの分岐点にも転轍器
36と略同様な転轍器が設けられている。Reference numeral 36 denotes a switch provided at a branch point of the alignment rail 33c, which is configured as shown in FIG. In the switch 36, 37 is a switch piece pivotally attached to the first rail 33 via a pivot 38 so as to selectively guide the guide roller 28 of the carrage element 24a to the two alignment rails 33c. I am doing it. 39 is the long hole 39a of its own
7 is an operating lever fitted to the hook piece 37a.
Reference numeral 40 denotes a spring stretched between the hooking piece 37a and the hooking portions 39b at both ends of the long hole 39a, and elastically holds the rolling piece 37. Reference numeral 41 is an air cylinder for moving the operation lever 39, and is mounted on the alignment rail 33c so as to switch the rolling piece 37 between the solid line position and the virtual line position in FIG.
42a and 42b are limit switches for confirming the switching of the switching piece 37. Reference numeral 43 denotes a detector, such as a proximity switch, which detects that the display body provided in the middle portion of the carriage element 24a has passed, and switches the operation of the air cylinder 41. Reference numeral 44 denotes a switch provided at a branch point of the alignment rail 34c, which has the same structure as the switch 36,
The duplicate description here is omitted. Note that generally, a switch similar to the switch 36 is provided at a branch point of the branch rail 33b and a branch point of the auxiliary rail 34b.
次に、45は搬送レール80にボビンキャレージ24の
長さより短いピッチ間隔で多数配設してある直列送り装
置で、第8図、第9図に示すように構成されている。こ
の直列送り装置45において、46は搬送レール80の
上面に止着してあるブラケットで、両端部に揺動アーム
47、48が夫々枢着され、それらの揺動アーム47、
48に軸受49、50が取付けられている。前記軸受4
9、50は送りローラ51、52の軸51a、52aを
回動自在に支承している。53は一方の軸受49に取付
けてある駆動モータで、軸51aを正逆回転させるよう
にしてある。前記揺動アーム47、48の先端部間には
バネ54が張設され、送りローラ51、52間にキャレ
ージバー25が存在するとき送りローラ51、52をキ
ャレージバー25に圧接させるようにしてある。なお、
粗紡機設置位置Aの昇降体17近くの直列送り装置45
にはキャレージバー25に設けた図示しない近接体を検
出する近接スイッチ55が付設されている。また整列レ
ール33cの分岐点近くの直列送り装置45において
は、送りローラ51と駆動モータ53のモータ軸との間
にトルクリミッタ等のスリップ機構が介在され、キャレ
ージバー25に大きな停止力が加えられるとモータ軸が
空転するようにしてある。Next, reference numeral 45 denotes a serial feeding device which is arranged on the transport rail 80 at a pitch interval shorter than the length of the bobbin carrage 24, and is configured as shown in FIGS. 8 and 9. In the serial feeding device 45, reference numeral 46 denotes a bracket fixed to the upper surface of the transport rail 80, and swing arms 47 and 48 are pivotally attached to both ends of the bracket, respectively.
Bearings 49 and 50 are attached to 48. The bearing 4
Reference numerals 9 and 50 rotatably support shafts 51a and 52a of the feed rollers 51 and 52, respectively. Reference numeral 53 denotes a drive motor attached to one bearing 49, which rotates the shaft 51a in the forward and reverse directions. A spring 54 is stretched between the tip ends of the swing arms 47 and 48 so that the feed rollers 51 and 52 are pressed against the carriage bar 25 when the carriage bar 25 exists between the feed rollers 51 and 52. In addition,
Series feeder 45 near the lifting body 17 at the roving machine installation position A
A proximity switch 55 for detecting a proximity body (not shown) provided on the carriage bar 25 is attached to this. Further, in the serial feed device 45 near the branch point of the alignment rail 33c, a slip mechanism such as a torque limiter is interposed between the feed roller 51 and the motor shaft of the drive motor 53, and a large stopping force is applied to the carrage bar 25. The motor shaft is designed to idle.
56はエレベータ5の側壁5bの天井近くに装設してあ
る並列送り装置で、第10図、第11図に示すように構
成されている。この並列送り装置56において、57、
57は両側壁5bに夫々ブラケット58を介して取付け
られている一対の送りモータで、そのモータ軸57aに
は駆動プーリ59が楔着されている。前記駆動プーリ5
9は同調回動するように関連されている。60は両側壁
5bに夫々取付けられている一対の軸受で、従動プーリ
61の軸61aを回転自在に支承している。62は駆動
プーリ59と従動プーリ61との間に懸回してある送り
ベルトで、外周面に多数の係止体63が所定のピッチ間
隔Qで突設されている。前記ピッチ間隔Qはボビンキャ
レージ24の間隔保持片32の両端部間の間隔Rと略同
じ大きさに設定されている。前記送りベルト62は第1
1図に示すようにレール要素35a、35aに並列に案
内させたキャレージ要素24aの両外壁5b側に位置す
るように配設され、第10図に示すように各係止体63
がキャレージ要素24aの間隔保持片32を係止してキ
ャレージ要素24aを平行移動させるようにしてある。Reference numeral 56 denotes a parallel feed device installed near the ceiling of the side wall 5b of the elevator 5, and is configured as shown in FIGS. 10 and 11. In this parallel feeding device 56, 57,
Reference numeral 57 denotes a pair of feed motors mounted on both side walls 5b via brackets 58, respectively, and a drive pulley 59 is wedged on a motor shaft 57a thereof. The drive pulley 5
Nine are associated so as to rotate in unison. Reference numeral 60 denotes a pair of bearings respectively mounted on both side walls 5b, and rotatably supports a shaft 61a of a driven pulley 61. Reference numeral 62 denotes a feed belt suspended between a drive pulley 59 and a driven pulley 61, and a large number of locking bodies 63 are provided on the outer peripheral surface so as to project at a predetermined pitch Q. The pitch interval Q is set to be substantially the same as the interval R between the both ends of the interval holding piece 32 of the bobbin carage 24. The feed belt 62 is the first
As shown in FIG. 1, the rail elements 35a, 35a are arranged so as to be positioned on the outer wall 5b side of the carriage element 24a guided in parallel with each other, and as shown in FIG.
Engages the spacing piece 32 of the carrage element 24a to move the carrage element 24a in parallel.
前記構成のものにあっては、粗紡機9から玉揚げした粗
糸ボビン12を精紡機設置位置Bへ搬送する場合、予め
エレベータ5を粗紡機設置の階層2に下降させ、第3レ
ール35を第1レール33に接続させておき、また粗紡
機9の運転中にボビンキャレージ24をその粗紡機9に
対応する分岐レール33bに移動させておく。粗紡機9
が満管近くになるとそのボビンハンガー29に吊下され
ている空ボビンを昇降体17の昇降によってペッグ17
a上に抜取り、そのペッグ17a上の空ボビンを交替腕
18によってベルトコンベア15のペッグ15aに挿着
し、それらの空ボビンを各ボビンホイール9aの前方に
位置させる。その後、粗紡機9が満管になると、粗紡機
9の運転が停止した後自動管替装置10が作動し、管替
ヘッド16が移動してボビンホイール9a上の粗糸ボビ
ン12を取出してベルトコンベア15上のペッグ15a
に挿着させ、その後ベルトコンベヤ15上の前記空ボビ
ンを抜取ってボビンホイール9a上に載置させる。その
後粗紡機9は再び運転を開始する。また前記ベルトコン
ベヤ15上のペッグ15aに挿着された粗糸ボビン12
は順次交替腕18によって昇降体17のペッグ17aに
挿着され、その後昇降体17の昇降によって分岐レール
33bに案内されているボビンキャレージ24のボビン
ハンガー29に吊下される。なお前記の場合、昇降体1
7近くに位置されている直列送り装置45の駆動モータ
53はボビンハンガー29に粗糸ボビン12が挿着され
る毎に駆動され、近接スイッチ55が近接体を検出する
と停止され、ボビンキャレージ24をボビンハンガー2
9の2ピッチ分ずつ間欠移動させる。前記のようにして
総ての粗糸ボビン12をボビンハンガー29に吊下させ
て交替動作を完了すると、そのことを図示しない検出手
段によつて検出して信号を発信したり、作業者が確認し
て指令スイッチを操作すると、その粗紡機9に対応する
分岐レール33b位置と主レール33a位置とに設けて
ある直列送り装置45の駆動モータ53が作動して送り
ローラ51を第8図において反時計方向へ回転させる。
これにより送りローラ51は送りローラ52との間に挟
んでいるキャレージバー25を移動させ、分岐レール3
3bに案内されているボビンキャレージ24を主レール
33a位置に送り出す。その結果、ボビンキャレージ2
4のキャレージバー25が主レール33a位置の直列送
り装置45の送りローラ51、52間に送り込まれて同
様に移動され、その後も各直列送り装置45によって順
次移動されてエレベータ設置位置Cに向けて自動搬送さ
れる。In the case of the configuration described above, when the roving bobbin 12 fried from the roving machine 9 is conveyed to the spinning machine setting position B, the elevator 5 is lowered in advance to the tier 2 of the roving setting and the third rail 35 is moved. It is connected to the first rail 33, and the bobbin carriage 24 is moved to the branch rail 33b corresponding to the roving machine 9 while the roving machine 9 is operating. Rover 9
When the bobbin hanger 29 is near full, the empty bobbin suspended by the bobbin hanger 29 is lifted by the elevating / lowering body 17 to move the peg 17
The empty bobbin on the peg 17a is inserted into the peg 15a of the belt conveyor 15 by the alternate arm 18, and the empty bobbin is positioned in front of each bobbin wheel 9a. After that, when the roving frame 9 is full, the automatic tubing changing device 10 is activated after the roving frame 9 stops operating, the pipe changing head 16 moves, and the roving bobbin 12 on the bobbin wheel 9a is taken out to remove the belt. Peg 15a on conveyor 15
Then, the empty bobbin on the belt conveyor 15 is removed and placed on the bobbin wheel 9a. After that, the roving frame 9 starts operation again. The roving bobbin 12 inserted into the peg 15a on the belt conveyor 15
Is sequentially inserted into the peg 17a of the lifting / lowering body 17 by the alternating arm 18, and is then suspended by the lifting / lowering of the lifting / lowering body 17 on the bobbin hanger 29 of the bobbin carriage 24 guided by the branch rail 33b. In the above case, the lifting body 1
The drive motor 53 of the serial feeding device 45 located near 7 is driven every time the roving bobbin 12 is inserted into the bobbin hanger 29, and is stopped when the proximity switch 55 detects a proximity object, and the bobbin carriage 24 Bobbin hanger 2
Intermittently move by 2 pitches of 9. When all the roving bobbins 12 are hung on the bobbin hangers 29 as described above and the alternation operation is completed, that fact is detected by a detection means (not shown) and a signal is transmitted, or the operator confirms it. Then, when the command switch is operated, the drive motor 53 of the serial feeding device 45 provided at the position of the branch rail 33b corresponding to the roving frame 9 and the position of the main rail 33a is actuated to move the feeding roller 51 to the opposite position in FIG. Rotate clockwise.
As a result, the feed roller 51 moves the carriage bar 25 sandwiched between the feed roller 51 and the feed roller 52, and the branch rail 3
The bobbin carriage 24 guided by 3b is sent to the main rail 33a position. As a result, Bobbin Carrage 2
The carriage bar 25 of No. 4 is fed between the feed rollers 51 and 52 of the serial feeder 45 at the position of the main rail 33a and moved in the same manner, and after that, it is sequentially moved by each serial feeder 45 to automatically move toward the elevator installation position C. Be transported.
ボビンキャレージ24がエレベータ設置位置C近くに搬
送されると、先頭のキャレージ要素24aに備えた前側
の一対の案内ローラ28が転轍器36の転轍片37に案
内されて一方(第12図の場合送り方向に向かって右
側)の整列レール33cに移動される。その後検出器4
3がキャレージバー25の中間部の表示体を検出する
と、その信号によってエヤシリンダ41の作動を切替え
て転轍片37を第12図に仮想線で示す逆側位置へ切替
える。従って、先頭のキャレージ要素24aに備えた後
側の一対の案内ローラ28が転轍器36の転轍片37に
案内されて他方(第12図の場合送り方向に向かって左
側)の整列レール33cに移動される。その先頭のキャ
レージ要素24aは後方のキャレージバー25及び連結
片30が送りローラ51、52によって送られることに
よって第10図に示すように整列レール33cに対して
斜めに変向される。その後先頭から2番目のキャレージ
要素24aに備えた前側の案内ローラ28が他方の整列
レール33cに移動され、その2番目のキャレージバー
25の表示体が検出器43位置を通過すると、その検出
器43がその表示体を検出してエヤシリンダ41を切替
え、転轍片37を再び第12図の実線の位置に揺動させ
る。その後も後方のキャレージバー25が送りローラ5
1、52によって送られるので、2番目のキャレージ要
素24aは先頭のキャレージ要素24aとの間の連結片
30による連結部で折曲げられ、そのキャレージ要素2
4aも整列レール33cに対して斜めに変向される。そ
の後2番目のキャレージ要素24aの後側の案内ローラ
28と3番目のキャレージ要素24aの前側の案内ロー
ラ28とが一方の整列レール33cに移動され、3番目
のキャレージ要素24aの表示体が検出器43位置を通
過すると、その検出器43が再びエヤシリンダ41を切
替え、転轍片37を第12図の仮想線の位置に揺動さ
せ、以後前記作動を繰り返す。一方、先頭のキャレージ
要素24aの2組の案内ローラ28が第3レール35の
2本のレール要素35a位置に移動されると、そのキャ
レージ要素24aがレール要素35aに対して直角な方
向になり、同時にそのキャレージ要素24aに備えた一
対の間隔保持片32が並列送り装置56の係止体63相
互間に夫々嵌まり込む。前記嵌まり込みを図示しない検
出器が検出したり、そのことを作業者が確認して図示し
ない指令スイッチを操作すると、その信号によって一対
の送りモータ57が同期駆動されてベルト62を矢印方
向へゆっくり回動させ、これにより両側の係止体63が
間隔保持片32を係止してエレベータ5の奥方向へ移動
させ、キャレージ要素24aを平行移動させる。前記キ
ャレージ要素24aが間隔R分移動される間に次の2番
目のキャレージ要素24aの間隔保持片32が次の係止
体63相互間に夫々嵌め込まれ、以後前記と同様にして
各キャレージ要素24aが並列状態に折り畳まれて平行
移動される。ボビンキャレージ24の最後端のキャレー
ジバー25が送りローラ51、52間から外れると、そ
のキャレージバー25の移動が停止されるので、作業者
はその最後端のキャレージバー25を適宜の引掛棒を用
いてベルト62間に引っ張り移動させ、総てのキャレー
ジ要素24aを並列状態でエレベータ5内に収容させ、
その後送りモータ57の駆動を停止させる。なお最後端
のキャレージバー25が送りローラ51、52間から外
れると、エヤシリンダ等を用いてそのキャレージバー2
5を引っ掛け、そのキャレージバー25を機械的にベル
ト62間に移動させてエレベータ5内に収容するように
しても良い。When the bobbin carrage 24 is transported to the vicinity of the elevator installation position C, the pair of front guide rollers 28 provided on the leading carrage element 24a are guided by the turning piece 37 of the turning device 36 (FIG. 12). In the case of, it is moved to the alignment rail 33c on the right side in the feed direction. Then detector 4
When 3 detects the indicator in the middle of the carriage bar 25, the signal switches the operation of the air cylinder 41 to switch the switching piece 37 to the opposite position shown by the phantom line in FIG. Therefore, the pair of rear guide rollers 28 provided on the leading carrage element 24a are guided by the rolling piece 37 of the shifting device 36 and the other alignment rail 33c (on the left side in the feeding direction in FIG. 12). Be moved to. The leading carrage element 24a is obliquely deflected with respect to the alignment rail 33c as shown in FIG. 10 by the rear carrage bar 25 and the connecting piece 30 being fed by the feed rollers 51 and 52. After that, when the front guide roller 28 provided in the second carage element 24a from the top is moved to the other alignment rail 33c and the display body of the second carrage bar 25 passes the position of the detector 43, the detector 43 is moved. The indicator is detected, the air cylinder 41 is switched, and the rolling piece 37 is swung again to the position shown by the solid line in FIG. Even after that, the carriage bar 25 on the rear side moves the feed roller 5
1 and 52, the second carrage element 24a is bent at the connecting portion between the first carrage element 24a and the first carrage element 24a by the connecting piece 30.
4a is also obliquely deflected with respect to the alignment rail 33c. After that, the guide roller 28 on the rear side of the second carrage element 24a and the guide roller 28 on the front side of the third carrage element 24a are moved to one alignment rail 33c, and the indicator of the third carrage element 24a is detected. After passing the 43 position, the detector 43 again switches the air cylinder 41, swings the rolling piece 37 to the position of the phantom line in FIG. 12, and thereafter repeats the above operation. On the other hand, when the two guide rollers 28 of the leading carrage element 24a are moved to the positions of the two rail elements 35a of the third rail 35, the carrage element 24a becomes a direction perpendicular to the rail element 35a, At the same time, the pair of distance holding pieces 32 provided in the carrage element 24a are fitted between the locking bodies 63 of the parallel feeding device 56, respectively. When a detector (not shown) detects the engagement, or when an operator confirms the detection and operates a command switch (not shown), the pair of feed motors 57 are synchronously driven by the signal to move the belt 62 in the arrow direction. It is rotated slowly, whereby the locking bodies 63 on both sides lock the spacing holding piece 32 and move it in the depth direction of the elevator 5, and move the carriage element 24a in parallel. While the carrage element 24a is moved by the distance R, the space holding pieces 32 of the next second carrage element 24a are fitted between the next locking bodies 63, respectively, and thereafter, in the same manner as described above. Are folded in parallel and moved in parallel. When the carriage bar 25 at the rearmost end of the bobbin carriage 24 is disengaged from the space between the feed rollers 51 and 52, the movement of the carriage bar 25 is stopped. 62 by pulling and moving them to accommodate all the carrage elements 24a in parallel in the elevator 5,
After that, the driving of the feed motor 57 is stopped. When the carriage bar 25 at the rearmost end comes out of the space between the feed rollers 51 and 52, an air cylinder or the like is used to remove the carriage bar 2.
5 may be hooked and the carriage bar 25 may be mechanically moved between the belts 62 to be housed in the elevator 5.
次に、エレベータ5を精紡機設置の階層3に上昇させて
第3レール35を第2レール34に接続させる。その後
並列送り装置56の送りモータ57の軸57aを逆転さ
せると共に最も手前側(最前側)のキャレージ要素24
aを整列レール34c位置に引出してそのキャレージバ
ー25を主レール34a位置に設けた直列送り装置45
の送りローラ51、52間に挟持させる。前記の場合、
転轍器44の転轍片が一方の整列レール34cを閉じて
いるが、案内ローラ28は転轍片を揺動させて主レール
34a位置に移動する。なお前記最前側のキャレージ要
素24aの引出しはエヤシリンダ等によって機械的に行
なうようにしても良い。前記キャレージバー25が送り
ローラ51、52間に挟持されると、キャレージ要素2
4a精紡機設置位置Bに向けて移動され、その結果エレ
ベータ5内の各キャレージ要素24aは再び直列状態に
引き延ばされ、主レール34a位置の各直列送り装置4
5の送りローラ51、52によって精紡機設置位置Bに
搬送される。前記並列送り装置56の送りローラ57は
総てのキャレージ要素24aがエレベータ5内から引き
出されると、作業者のスイッチ操作又は適宜な検出器の
検出信号によって駆動が停止される。精紡機設置位置B
においては、予め粗糸ボビン12を必要とする精紡機1
9に対応する予備レール34b位置の転轍器がキャレー
ジ要素24aの案内ローラ28をその予備レール34b
に案内するように切替えられると共に、その予備レール
34b位置の直列送り装置45の駆動モータ53が駆動
されている。従って、主レール34aを移動されてきた
ボビンキャレージ24の各案内ローラ28は前記転轍器
の転轍片によって案内されて前記予備レール34b位置
に移動され、ボビンキャレージ24のボビンハンガー2
9に吊下されている粗糸ボビン12は第5図に示すよう
に精紡機19のクリール20の前列ボビンハンガー21
前方に位置される。なお予備レール34b位置の直列送
り装置45の作動はボビンキャレージ24が所定位置に
移動されると停止される。その後予備レール34b位置
のボビンハンガー29の吊下されている粗糸ボビン12
は前列ボビンハンガー21に吊下されている残糸ボビン
11と人手または篠交替機によって交替される。その交
替後、交替によって残糸ボビン11が吊下されたボビン
キャレージ24は前記と略逆の作動によって粗紡機設置
位置Aに戻し移動され、途中で図示を省略したロービン
グストリッパによって残糸処理された後空ボビンを必要
としている粗紡機9に対応する分岐レール33bに送り
込まれる。Next, the elevator 5 is elevated to the level 3 where the spinning machine is installed and the third rail 35 is connected to the second rail 34. Thereafter, the shaft 57a of the feed motor 57 of the parallel feed device 56 is rotated in the reverse direction, and the carage element 24 on the frontmost side (the frontmost side) is also rotated.
serial feed device 45 in which a is pulled out to the alignment rail 34c position and the carriage bar 25 is provided at the main rail 34a position.
The feed rollers 51 and 52 are clamped. In the above case,
Although the turning piece of the turning device 44 closes one of the alignment rails 34c, the guide roller 28 swings the turning piece and moves to the position of the main rail 34a. The frontmost carrage element 24a may be pulled out mechanically by an air cylinder or the like. When the carriage bar 25 is nipped between the feed rollers 51 and 52, the carriage element 2
4a is moved towards the spinning machine installation position B, so that each carrage element 24a in the elevator 5 is again stretched in series and each serial feeder 4 at the position of the main rail 34a.
It is conveyed to the spinning machine installation position B by the feed rollers 51 and 52 of No. 5. The drive of the feed roller 57 of the parallel feed device 56 is stopped by a switch operation by an operator or a detection signal of an appropriate detector when all the carrage elements 24a are pulled out from the elevator 5. Spinning machine installation position B
The spinning machine 1 that requires the roving bobbin 12 in advance.
A switch at the position of the spare rail 34b corresponding to 9 moves the guide roller 28 of the carriage element 24a to its spare rail 34b.
And the drive motor 53 of the serial feeding device 45 at the position of the spare rail 34b is being driven. Therefore, the guide rollers 28 of the bobbin carriage 24, which have been moved along the main rail 34a, are moved to the position of the spare rail 34b by being guided by the turning piece of the switch, and the bobbin hanger 2 of the bobbin carriage 24 is moved.
As shown in FIG. 5, the roving bobbin 12 hung on 9 is the front row bobbin hanger 21 of the creel 20 of the spinning machine 19.
It is located in the front. The operation of the serial feeding device 45 at the position of the spare rail 34b is stopped when the bobbin carriage 24 is moved to the predetermined position. After that, the roving bobbin 12 suspended from the bobbin hanger 29 at the position of the spare rail 34b.
Are replaced by a residual thread bobbin 11 suspended from the front row bobbin hanger 21 by a hand or Shino shift machine. After the replacement, the bobbin carriage 24 on which the residual thread bobbin 11 is hung by the replacement is returned to the roving machine installation position A by an operation substantially reverse to the above operation, and the residual thread is processed by a roving stripper (not shown) on the way. After that, the empty bobbin is fed to the branch rail 33b corresponding to the roving machine 9 requiring the bobbin.
第13図〜第16図は本願の異なる実施例を示すもの
で、粗紡機設置位置Aeと精紡機設置位置Beとの間に
ボビンキャレージ24eを折り畳み状態でストックし得
るようにしたストック手段65を配設したものである。
前記ストック手段65において、66は精紡機設置の階
層3eにおけるエレベータ設置位置Ce近くに設置して
ある中間壁で、その中間壁66とその上方の天井3be
との下側に夫々2本のストックレール67、68が平行
に配設されている。69はエレベータ5eの天井5ae
近くに配設してある支持レールで、前記ストックレール
67、68の端部に接続可能に2本並設されている。7
0はストックレール67、68や支持レール69に移動
自在に取付けられている移送体で、2組の支持ローラ7
1を介して支持されている2本の移送バー72とそれら
の移送バー72を連結している2本のレール要素35a
eとで構成されている。2本のレール要素35aeは第
3レール35eを構成し、折畳み状態のボビンキャレー
ジ24eを支持するようにしてある。前記移送体70は
空の状態で一方のストックレール67に多数支持され、
粗糸ボビン12e付ボビンキャレージ24eが送り込ま
れた後他方のストックレール68に移動されるようにし
てある。また移送体70はストックレール67や支持レ
ール69に移送バー72の長さよりも小さい間隔で付設
してある図示しない送り装置によって第15図の左右方
向へ移動させ得るようにしてある。前記送り装置は前記
直列送り装置45と略同様な構成のもので良く、ここで
の説明を省略する。また並列送り装置56eは階層3e
の天井に設置され、エレベータ5eの手前でボビンキャ
レージ24eのキャレージ要素24aeを並列状態にし
た後第3レール35eに支持させるようにしてある。こ
の場合最後部のキャレージ要素24aeは図示しないエ
ヤシリンダー等の押し込み手段によってエレベータ5e
内に完全に位置されるようにしてある。FIGS. 13 to 16 show different embodiments of the present application, and the stocking means 65 is adapted to stock the bobbin carriage 24e in a folded state between the roving spinning machine setting position Ae and the spinning frame setting position Be. Is provided.
In the stock means 65, 66 is an intermediate wall installed near the elevator installation position Ce in the level 3e where the spinning machine is installed, and the intermediate wall 66 and the ceiling 3be above it.
Two stock rails 67 and 68 are arranged in parallel below and. 69 is the ceiling 5ae of the elevator 5e
Two support rails are provided in the vicinity, and two stock rails 67 and 68 are juxtaposed so as to be connectable to the ends of the stock rails 67 and 68. 7
Reference numeral 0 denotes a transfer body that is movably attached to the stock rails 67 and 68 and the support rail 69.
Two transfer bars 72 supported via 1 and two rail elements 35a connecting the transfer bars 72
e and. The two rail elements 35ae form a third rail 35e, and support the folded bobbin carriage 24e. A large number of the transfer bodies 70 are supported by one stock rail 67 in an empty state,
After the bobbin carriage 24e with the roving bobbin 12e is fed, it is moved to the other stock rail 68. Further, the transfer body 70 can be moved in the left-right direction in FIG. 15 by a feeding device (not shown) attached to the stock rail 67 or the support rail 69 at intervals smaller than the length of the transfer bar 72. The feeding device may have substantially the same structure as the serial feeding device 45, and a description thereof will be omitted here. In addition, the parallel feeding device 56e is the layer 3e
Is installed on the ceiling of the car, and the carrage elements 24ae of the bobbin carrage 24e are arranged in parallel before the elevator 5e and then supported by the third rail 35e. In this case, the carage element 24ae at the rearmost portion is lifted by the pushing means such as an air cylinder not shown in the elevator 5e.
It is located completely inside.
前記構成のものにあっては、精紡機19における段取換
え等の為に粗紡機9から玉揚げした粗糸ボビン12を一
時ストックする必要が生じた場合、予めエレベータ5e
を昇降させて支持レール69をストックレール67に接
続させ、この状態で空の移送体70を支持レール69位
置に移動させてエレベータ5e内に収容し、その後エレ
ベータ5eを階層2に下降させて移送体70のレール要
素35aeを整列レール33ceに接続させる。この状
態で折畳み状態の粗糸ボビン付ボビンキャレージ24e
をレール要素35ae位置に移動させ、そのボビンキャ
レージ24eをエレベータ5e内に収容する。その後エ
レベータ5eを上昇させて支持レール69をストックレ
ール68に接続させ、この状態で支持レール69位置の
移送体70をストックレール68位置に移動させ、その
ストックレール68位置にストックする。前記作動を繰
り返すくことによって多数の粗糸ボビン付ボビンキャレ
ージ24eをストックレール68位置にストックするこ
とができる。その後前記ストック状態の粗糸ボビン付ボ
ビンキャレージ24eを精紡機設置位置Beに搬送する
場合には、エレベータ5eを昇降させて支持レール69
をストックレール68に接続させ、この状態で粗糸ボビ
ン付ボビンキャレージ24eを支持している移送体70
を支持レール69位置に移動させてエレベータ5e内に
収容すると共にその移送体70のレール要素35aeを
整列レール34ceに接続させる。その後折畳み状態の
ボビンキャレージ24eを整列レール34ce位置に引
き出して精紡機設置位置Beに搬送する。その後エレベ
ータ5eを下降させて支持レール69をストックレール
67に接続させた後、空の移送体70をストックレール
67位置に送り出し、その後前記作動を繰り返す。な
お、前記実施例と同一又は均等な部分には対応する部分
と同じ符号にアルファベットのeを付して重複説明を省
略した。次の実施例についても同様にアルファベットの
fを付した重複説明を省略する。In the case of the above-mentioned structure, when it is necessary to temporarily stock the roving bobbins 12 fried from the roving machine 9 for setup change in the spinning machine 19, etc.
Is moved up and down to connect the support rail 69 to the stock rail 67, and in this state, the empty transfer body 70 is moved to the position of the support rail 69 and accommodated in the elevator 5e, and then the elevator 5e is moved down to the hierarchy 2. The rail element 35ae of the body 70 is connected to the alignment rail 33ce. Bobbin carriage 24e with roving bobbin in the folded state in this state
Is moved to the rail element 35ae position and its bobbin carriage 24e is housed in the elevator 5e. After that, the elevator 5e is raised to connect the support rail 69 to the stock rail 68, and in this state, the transfer body 70 at the position of the support rail 69 is moved to the position of the stock rail 68 and is stocked at the position of the stock rail 68. By repeating the above operation, a large number of bobbin carriages 24e with roving bobbins can be stocked at the position of the stock rail 68. After that, when the bobbin carriage 24e with the roving bobbin in the stock state is conveyed to the spinning machine installation position Be, the elevator 5e is raised and lowered to support the rail 69.
Is connected to the stock rail 68, and in this state, the transfer body 70 that supports the bobbin carriage 24e with the roving bobbin.
Is moved to the position of the support rail 69 to be housed in the elevator 5e, and the rail element 35ae of the transfer body 70 is connected to the alignment rail 34ce. Then, the bobbin carriage 24e in the folded state is pulled out to the alignment rail 34ce position and conveyed to the spinning machine installation position Be. After that, the elevator 5e is lowered to connect the support rail 69 to the stock rail 67, and then the empty transfer body 70 is sent to the position of the stock rail 67, and then the above operation is repeated. Note that the same or equivalent parts as those in the above-described embodiment are designated by the same reference numerals as those of corresponding parts, and the letter e is attached to omit duplicate description. Also in the following examples, the duplicated description with the letter "f" is omitted.
第19図〜第22図は本願の異なる実施例を示すもの
で、複数のキャレージ要素24afを離脱可能に直列に
連結させてボビンキャレージ24fを構成し、キャレー
ジ要素24afを分離させてキャレージ要素24afを
並列状態に整列させるようにしたものである。ボビンキ
ャレージ24fにおいて、74は1本おきに隣合う一方
のキャレージバー25fの端部に形成してある角孔で、
角ピン75が上下摺動自在に嵌合されている。角ピン7
5は上端部の掛止鍔75aとキャレージバー25f間に
介在したバネ76によって上方へ付勢され、下端部には
略三角形の連結片30fが固着されている。連結片30
fの上面には連結ピン77が突設され、その連結ピン7
7が隣合うキャレージバー25fの端部に形成してある
連結孔78に回転自在に嵌挿され、両キャレージ要素2
4afが離脱可能に連結されている。なおボビンキャレ
ージ24fは総てのキャレージ要素24afを互いに離
脱可能に連結して構成しても良い。階層2f、3fの天
井2bf、3bfにストックレール67f、68fが夫
々配設され、それらのストックレール67f、68fに
移送体70fを支持させてある。その移送体70fの移
送本体72fには第3レール35fを構成する多数のレ
ール要素35afが平行に配設され、各レール要素35
afに2つのキャレージ要素24afを支持させ得るよ
うにしてある。移送本体72fの上面には駆動モータ7
9が取付けられ、その駆動モータ79によって回転され
る軸81にピニオン82が固着されている。このピニオ
ン82は天井5af、2bf、3bfに止着してあるラ
ック83に噛合され、ピニオン82の回転によって移送
体70fをストックレール67f、68fに沿って移動
させるようにしてある。また第1レール33fと第2レ
ール34fの一端部は第19図に示すように移送体70
fのレール要素35afと接続可能に配設され、その第
1レール33fと第2レール34fの一端部近くに夫々
カム板84が固着されている。このカム板84は第21
図に示すようにボビンキャレージ24fの連結片30f
を押し下げる斜面84aが形成され、その連結片30f
位置で連結ピン77と連結孔78との係合を外すように
してある。19 to 22 show a different embodiment of the present application, in which a plurality of carage elements 24af are detachably connected in series to form a bobbin carriage 24f, and the carrage elements 24af are separated to form the carrage element 24af. Are arranged in parallel. In the bobbin carriage 24f, 74 is a square hole formed at the end of one of the adjacent one of the carriage bars 25f.
The square pin 75 is fitted so as to be slidable up and down. Square pin 7
5 is urged upward by a spring 76 interposed between a catch collar 75a at the upper end and the carriage bar 25f, and a substantially triangular connecting piece 30f is fixed at the lower end. Connecting piece 30
A connecting pin 77 is provided on the upper surface of f so that the connecting pin 7
7 are rotatably fitted in the connection holes 78 formed at the ends of the adjacent carrage bars 25f, so that both carrage elements 2
4af is detachably connected. The bobbin carrage 24f may be configured by connecting all the carrage elements 24af so that they can be separated from each other. Stock rails 67f and 68f are provided on the ceilings 2bf and 3bf of the floors 2f and 3f, respectively, and the stock rails 67f and 68f support the transfer body 70f. On the transfer body 72f of the transfer body 70f, a large number of rail elements 35af forming the third rail 35f are arranged in parallel, and each rail element 35f.
The af can support two carrage elements 24af. The drive motor 7 is provided on the upper surface of the transfer body 72f.
9 is attached, and a pinion 82 is fixed to a shaft 81 rotated by the drive motor 79. The pinion 82 is meshed with a rack 83 fixed to the ceilings 5af, 2bf, 3bf, and the rotation of the pinion 82 moves the transfer body 70f along the stock rails 67f, 68f. Further, one end portions of the first rail 33f and the second rail 34f are provided with a transfer body 70 as shown in FIG.
The cam plate 84 is fixed to the first rail 33f and the second rail 34f near one end of the first rail 33f and the second rail 34f. This cam plate 84 is the 21st
As shown in the figure, the connecting piece 30f of the bobbin carriage 24f
Is formed with a slope 84a for pushing down the connecting piece 30f.
The connection pin 77 and the connection hole 78 are disengaged at the position.
前記構成のものにあっては、ボビンキャレージ24fを
第1レール33fに案内させてエレベータ設置位置Cf
近くに移動されると、ボビンキャレージ24fの連結片
30fがカム板84に係合して押し下げられ連結ピン7
7が連結孔78から離脱され、キャレージ要素24af
が分離される。この時カム板84より後方に位置する直
列送り装置45fは一時停止される。前記分離されたキ
ャレージ要素24afは直列送り装置45fによって移
送体70fのレール要素35afに送り込まれ、完全に
送り込まれると移送体70fがレール要素35afの1
ピッチ分だけ移動され、その後一時停止していた直列送
り装置45fが再び駆動されて次の連結片30fがカム
板84に押し下げられキャレージ要素24afが分離さ
れる。以後前記作動を繰り返して総てのキャレージ要素
25fをレール要素35afに支持させる。次に移送体
70fを移動させてストックレール67fから支持レー
ル69fに支持させてエレベータ5f内に収容させる。
その後エレベータ5fを上昇させて支持レール69fを
ストックレール68fに接続させた後、移送体70fを
ストックレール68f位置に送り出してレール要素35
afを第2レール34fに接続させる。その後レール要
素35af位置のキャレージ要素24afを第2レール
34f位置に送り出し、そのキャレージ要素24afの
連結片30fがカム板84に押し下げられるとそのキャ
レージ要素24afの送りが一時停止される。その後移
送体70fが1ピッチ分移動された後次のキャレージ要
素24afが第2レール34f位置に送り出され、前記
停止中のキャレージ要素25fに当接され、その後両キ
ャレージ要素24afが再び移動され、これにより連結
片30fがカム板84から外れてバネ76によって押し
上げられ、連結ピン77が連結孔78に嵌合されて両キ
ャレージ要素24afが連結される。前記作動を繰り返
してボビンキャレージ24fの総てのキャレージ要素2
4afが直列に連結され、この状態でボビンキャレージ
24fが精紡機設置位置Bfに移動される。前記作動は
周知の適宜の検出手段や移動手段の組合せによって機械
化できるが、作業者の判断や操作を交えて行なっても良
い。また連結ピン77と連結孔78との係脱は作業者の
人手によって行なっても良い。In the above configuration, the bobbin carriage 24f is guided by the first rail 33f and the elevator installation position Cf is set.
When moved to the vicinity, the connecting piece 30f of the bobbin carriage 24f engages with the cam plate 84 and is pushed down, so that the connecting pin 7f
7 is disengaged from the connecting hole 78 and the carrage element 24af
Are separated. At this time, the serial feeding device 45f located behind the cam plate 84 is temporarily stopped. The separated carrage element 24af is fed into the rail element 35af of the transfer body 70f by the serial feeding device 45f, and when it is completely fed, the transfer body 70f becomes 1 of the rail element 35af.
The series feed device 45f, which has been moved by the pitch, is then driven again and the next connecting piece 30f is pushed down by the cam plate 84 to separate the carrage element 24af. Thereafter, the above operation is repeated so that all the carrage elements 25f are supported by the rail elements 35af. Next, the transfer body 70f is moved to be supported by the support rail 69f from the stock rail 67f and accommodated in the elevator 5f.
After that, the elevator 5f is raised to connect the support rail 69f to the stock rail 68f, and then the transfer body 70f is sent to the stock rail 68f position to move the rail element 35.
af is connected to the second rail 34f. After that, when the carriage element 24af at the rail element 35af position is sent to the second rail 34f position and the connecting piece 30f of the carriage element 24af is pushed down by the cam plate 84, the carriage element 24af is temporarily stopped from being fed. After that, after the transfer body 70f is moved by one pitch, the next carrage element 24af is sent to the position of the second rail 34f and brought into contact with the stopped carrage element 25f, and then both the carrage elements 24af are moved again. By this, the connecting piece 30f is disengaged from the cam plate 84 and pushed up by the spring 76, the connecting pin 77 is fitted into the connecting hole 78, and both the carrage elements 24af are connected. By repeating the above operation, all the carrage elements 2 of the bobbin carrage 24f.
4af are connected in series, and in this state, the bobbin carriage 24f is moved to the spinning machine installation position Bf. The above-described operation can be mechanized by a combination of well-known appropriate detecting means and moving means, but it may be performed by the operator's judgment and operation. The engagement and disengagement of the connecting pin 77 and the connecting hole 78 may be performed manually by an operator.
なお、本願にあっては第1、第2、第3レールを複列に
して夫々往、復専用とし、ボビンキャレージを連続的に
搬送し得るようにしたり、ストック手段を昇降装置設置
位置から離れた位置に配設しても良い。また精紡機位置
において、予備レールの代りにクリールの前、後列ボビ
ンハンガーの配置場所上方にクリールレールを夫々配設
し、そのクリールレールにボビンキャレージを送り込
み、ボビンキャレージのボビンハンガーをクリールのボ
ビンハンガーとして利用するようにしても良く、その場
合ボビンキャレージボビンハンガーを2列並設し、前記
クリールレールを精紡機の片側1本にしても良い。また
昇降装置は第3レールを直接昇降させるクレーン等で構
成しても良く、既設のエレベータに限定されるものでは
ない。In the present application, the first, second, and third rails are arranged in a double row to be forward and backward respectively, so that the bobbin carriage can be continuously transported, and the stock means can be moved from the lifting device installation position. You may arrange | position in a distant position. In the spinning machine position, instead of the spare rail, the creel rails are arranged in front of the creel and above the rear row bobbin hangers, respectively, and the bobbin carriage is fed to the creel rails. It may be used as a bobbin hanger. In that case, two rows of bobbin carriage bobbin hangers may be arranged side by side, and the creel rail may be provided on one side of the spinning machine. Further, the elevating device may be configured by a crane or the like that directly elevates and lowers the third rail, and is not limited to the existing elevator.
発明の効果 以上のように本発明にあっては、粗紡機設置の階層に第
1レールを、精紡機設置の階層に第2レールを、昇降装
置に第3レールを夫々配設し、その第1レールに案内さ
せたボビンキャレージのボビンハンガーに粗紡機から玉
揚げした粗糸ボビンを吊下させ、そのボビンキャレージ
を第3レールに支持させた後昇降装置を精紡機設置の階
層に昇降させ、その後ボビンキャレージを第2レールに
案内させて精紡機設置位置に移動させることができ、こ
れにより粗紡機から玉揚げした粗糸ボビンを吊下状態で
精紡機設置位置に搬送することができ、粗糸ボビンを異
なる階層へ搬送する場合でもその粗糸ボビンの粗糸の損
傷を阻止できて糸品質の向上を図ることができ、しかも
ボビンハンガーに吊下させた粗糸ボビンを精紡機位置に
機械的に搬送できて粗糸ボビンの搬送や積み降ろしの手
間を少なくでき、自動化による省力化を図ることができ
る。またボビンキャレージのキャレージ要素を連結部で
曲折又は離脱させて直列状態から並列状態に整列変更さ
せ、その状態のボビンキャレージを第3レールに案内さ
せて昇降装置内に支持させ得るようにしたので、長いボ
ビンキャレージを短い昇降装置に容易に支持させること
ができ、これによりボビンキャレージの昇降に既設のエ
レベータを利用でき、建家の大幅な変更を不要にできて
設備費用を安くできる。また本発明にあっては、或階層
にボビンキャレージを案内するようにしたストックレー
ルを配設し、そのストックレールによってボビンキャレ
ージをストックし得るようにしたので、多品種小ロット
の品質の糸を紡出する場合でも、粗紡機で紡出した粗糸
ボビンをストックしておくことにより、精紡機で必要と
する品種の糸を素早く供給でき、多品種小ロットの糸の
生産にフレキシブルに対応できる効果がある。EFFECTS OF THE INVENTION As described above, according to the present invention, the first rail is arranged in the layer of the rough spinning machine, the second rail is arranged in the layer of the spinning frame installation, and the third rail is arranged in the lifting device. The bobbin hangers of the bobbin carriage guided on the 1 rail hang the roving bobbin fried from the roving frame, and the bobbin carrage is supported on the 3rd rail, and then the lifting device is moved up and down to the level of the spinning frame installation. After that, the bobbin carrage can be guided to the second rail and moved to the spinning machine installation position, whereby the roving bobbin fried from the roving machine can be conveyed to the spinning machine installation position in a suspended state. Even when the roving bobbin is conveyed to different layers, the roving of the roving bobbin can be prevented from being damaged and the yarn quality can be improved. Moreover, the roving bobbin hung on the bobbin hanger can be spun. Mechanical in position Therefore, it is possible to reduce the trouble of carrying and loading / unloading the roving bobbins, and it is possible to save labor by automation. In addition, the carriage element of the bobbin carriage is bent or separated at the connecting portion to change the alignment from the serial state to the parallel state, and the bobbin carriage in that state can be guided to the third rail and supported in the lifting device. Therefore, the long bobbin carriage can be easily supported by the short hoisting device, which allows the existing elevator to be used for hoisting the bobbin carrage, which can reduce the cost of equipment by making no major changes to the building. . Further, according to the present invention, the stock rails for guiding the bobbin carrage to a certain level are arranged, and the bobbin carrage can be stocked by the stock rails. Even when spinning yarn, by stocking the roving bobbins spun by the roving machine, it is possible to quickly supply the yarns of the types required by the spinning machine, making it flexible for the production of small-lot multi-type yarns. There is an effect that can be dealt with.
図面は本願の実施例を示すもので、第1図は紡績工場の
縦断面図、第2図は粗紡機設置の階層の概略平面図、第
3図は粗紡機部分の拡大平面図、第4図は精紡機設置の
階層の概略平面図、第5図は精紡機部分の断面図、第6
図はボビンキャレージの平面図、第7図はボビンキャレ
ージの側面図、第8図は送り装置の平面図、第9図はIX
−IX線断面図、第10図は昇降装置設置位置部分の構造
及び作動を一部を省略して示す平面図、第11図はXI−
XI線断面図、第12図は第10図の転轍器を一部を省略
して示す平面図、第13図は異なる例を示す粗紡機設置
の階層の概略平面図、第14図は同じく精紡機設置の階
層の概略平面図、第15図はXV−XV線拡大断面図、
第16図はXVI−XVI線拡大断面図、第17図は別の異
なる例を示す粗紡機設置の階層の概略平面図、第18図
は同じく精紡機設置の階層の概略平面図、第19図は第
17図の昇降装置設置位置部分の構造及び作動を一部を
省略して示す平面図、第20図はXX−XX線拡大断面
図、第21図は第20図のボビンキャレージを示す側面
図、第22図は第21図のボビンキャレージの平面図で
ある。 2…階層、3…階層、A…粗紡機設置位置、B…精紡機
設置位置、C…エレベータ設置位置、12…粗糸ボビ
ン、23…粗糸ボビンの搬送装置、24…ボビンキャレ
ージ、24a…キャレージ要素、29…ボビンハンガ
ー、33…第1レール、34…第2レール、35…第3
レールThe drawings show the embodiments of the present application. FIG. 1 is a vertical cross-sectional view of a spinning factory, FIG. 2 is a schematic plan view of a level of installation of a roving frame, FIG. 3 is an enlarged plan view of a roving frame, and FIG. Figure is a schematic plan view of the level of the spinning frame installation. Figure 5 is a cross-sectional view of the spinning frame.
The figure is a plan view of the bobbin carriage, Fig. 7 is a side view of the bobbin carriage, Fig. 8 is a plan view of the feeding device, and Fig. 9 is IX.
-IX line sectional view, FIG. 10 is a plan view showing the structure and operation of the lifting device installation position part with a part omitted, and FIG. 11 is XI-
A cross-sectional view taken along the line XI, FIG. 12 is a plan view of the switch shown in FIG. 10 with a part thereof omitted, FIG. A schematic plan view of the level of the spinning machine installation, FIG. 15 is an enlarged cross-sectional view taken along line XV-XV,
FIG. 16 is an enlarged cross-sectional view taken along the line XVI-XVI, FIG. 17 is a schematic plan view of a layer for installation of a roving frame showing another different example, and FIG. 18 is a schematic plan view of a layer for installation of a spinning frame similarly, FIG. Is a plan view showing the structure and operation of the lifting device installation position portion in FIG. 17 with a part omitted, FIG. 20 is an enlarged sectional view taken along the line XX-XX, and FIG. 21 is the bobbin carrage of FIG. A side view and FIG. 22 are plan views of the bobbin carriage of FIG. 2 ... Hierarchy, 3 ... Hierarchy, A ... Rover spinning machine installation position, B ... Spinner installation position, C ... Elevator installation position, 12 ... Rough yarn bobbin, 23 ... Rough yarn bobbin transport device, 24 ... Bobbin carriage, 24a ... Carrage element, 29 ... Bobbin hanger, 33 ... First rail, 34 ... Second rail, 35 ... Third
rail
Claims (4)
置位置で玉揚げした粗糸ボビンを他の階層の精紡機設置
位置に搬送する為の粗糸ボビンの搬送装置において、所
定数のボビンハンガーを有すると共に互いに直列に曲折
又は離脱可能に連結し得るようにしてある複数のキャレ
ージ要素から成るボビンキャレージと、粗紡機設置の階
層における粗紡機設置位置と昇降装置設置位置との間に
配設するようにしてある第1レールと、精紡機設置の階
層における精紡機設置位置と昇降装置設置位置との間に
配設するようにしてある第2レールと、昇降装置に第1
レールと第2レールに接続可能に配設するようにしてあ
る第3レールとを備え、第1レールと第2レールはボビ
ンキャレージのキャレージ要素を直列状態で移動自在に
案内するように構成し、第3レールはボビンキャレージ
のキャレージ要素を並列状態で移動自在に案内するよう
に構成すると共に第1レールと第2レールに接続可能に
構成してあることを特徴とする粗糸ボビンの搬送装置。1. A roving bobbin transporting device for transporting a roving bobbin fried at a roving installation position of a certain level of a factory equipped with a lifting device to a roving installation position of another level. Between the bobbin carriage having the bobbin hangers and the plurality of carriage elements which can be bent or detachably connected in series with each other, and the position of the roving frame and the position of the lifting device in the tier of the roving frame installation. The first rail, which is arranged between the spinning machine installation position and the lifting device installation position in the level of the spinning frame installation, and the first lifting device.
A rail and a third rail adapted to be connectably arranged to the second rail, the first rail and the second rail being configured to movably guide the carriage elements of the bobbin carriage in series. The third rail is configured to guide the carrage elements of the bobbin carrage in a parallel state so as to be movable, and is connectable to the first rail and the second rail. apparatus.
置位置から玉揚げした粗糸ボビンを他の階層の精紡機設
置位置に搬送する為の粗糸ボビンの搬送装置において、
所定数のボビンハンガーを有すると共に互いに直列に曲
折又は離脱可能に連結し得るようにしてある複数のキャ
レージ要素から成るボビンキャレージと、粗紡機設置の
階層における粗紡機設置位置と昇降装置設置位置との間
に配設するようにしてある第1レールと、精紡機設置の
階層における精紡機設置位置と昇降装置設置位置との間
に配設するようにしてある第2レールと、昇降装置に第
1レールと第2レールに接続可能に配設するようにして
ある第3レールとを備え、第1レールと第2レールはボ
ビンキャレージのキャレージ要素を直列状態で移動自在
に案内するように構成し、第3レールはボビンキャレー
ジのキャレージ要素を並列状態で移動自在に案内するよ
うに構成すると共に第1レールと第2レールに接続可能
に構成し、更に或階層に配設されてボビンキャレージを
案内するようにしてあるストックレールを備え、そのス
トックレールは第1、第2又は第3レールに接続可能に
構成してあることを特徴とする粗糸ボビンの搬送装置。2. A roving bobbin transfer device for transferring a fried roving bobbin from a roving installation position of a certain level of a factory equipped with an elevating device to a spinning installation position of another level.
A bobbin carriage having a predetermined number of bobbin hangers and a plurality of carrage elements that can be bent or detachably connected in series with each other, a roving machine installation position and a lifting device installation position in a roving installation stage. A first rail that is arranged between the spinning machine and a second rail that is arranged between the spinning machine installation position and the lifting device installation position in the level of the spinning machine installation. A first rail and a third rail arranged to be connectable to the second rail, the first rail and the second rail being configured to movably guide the carriage elements of the bobbin carriage in series. The third rail is configured to guide the carriage elements of the bobbin carriage in a parallel state so as to be movable, and is connectable to the first rail and the second rail. A roving bobbin comprising stock rails arranged in layers and adapted to guide a bobbin carriage, the stock rails being connectable to the first, second or third rails. Transport device.
のキャレージ要素を曲折可能に直列に連結させてボビン
キャレージを構成し、第1、第2レールの第3レール側
端部にキャレージ要素の一方の案内部を案内するレール
要素と他方の案内部を案内するレール要素とを分岐さ
せ、それらのレール要素によって各案内部を案内するこ
とによってボビンキャレージをキャレージ要素が並列に
並ぶ状態に折畳み得るように構成したことを特徴とする
特許請求の範囲第2項記載の粗糸ボビンの搬送装置。3. A bobbin carrage is constructed by connecting a plurality of carrage elements, which are guided by two guide parts, in series in a bendable manner, and at the ends of the first and second rails on the third rail side. Carriage elements are arranged side by side by branching a rail element that guides one guide portion of the carrage element and a rail element that guides the other guide portion and guiding each guide portion by these rail elements. The roving bobbin transporting device according to claim 2, wherein the roving bobbin transporting device is configured to be foldable into a state.
数のキャレージ要素を離脱可能に直列に連結させてボビ
ンキャレージを構成し、各離脱されたキャレージ要素の
案内部を案内するようにした並設状態の複数のレール要
素によって第3レールを構成し、その第3レールのレー
ル要素を第1、第2レールに接続可能に構成して成るこ
とを特徴とする特許請求の範囲第2項記載の粗糸ボビン
の搬送装置。4. A bobbin carrage is constructed by detachably connecting a plurality of carage elements, which are guided by a plurality of guide portions, in series so as to guide the guide portions of each detached carrage element. A third rail is constituted by a plurality of rail elements arranged side by side, and the rail element of the third rail is configured to be connectable to the first and second rails. Conveying device of the roving bobbin according to the item.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24807986A JPH066462B2 (en) | 1986-10-17 | 1986-10-17 | Transfer device for roving bobbin |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP24807986A JPH066462B2 (en) | 1986-10-17 | 1986-10-17 | Transfer device for roving bobbin |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS63101284A JPS63101284A (en) | 1988-05-06 |
| JPH066462B2 true JPH066462B2 (en) | 1994-01-26 |
Family
ID=17172892
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP24807986A Expired - Lifetime JPH066462B2 (en) | 1986-10-17 | 1986-10-17 | Transfer device for roving bobbin |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH066462B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0759441B2 (en) * | 1990-11-21 | 1995-06-28 | 東和工業株式会社 | Storage device for roving bobbin |
| CN102517709A (en) * | 2011-12-31 | 2012-06-27 | 无锡宏源机电科技有限公司 | Pneumatic guide rail piece opening and closing type mechanical control device |
| CN116161492B (en) * | 2023-04-26 | 2023-08-08 | 广州珀锐赛斯智能装备有限公司 | Yarn drum carrying equipment and method |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4912859B2 (en) | 2006-12-25 | 2012-04-11 | 花王株式会社 | Dishwasher finish composition |
| JP5426624B2 (en) | 2011-08-19 | 2014-02-26 | 株式会社沖データ | Image forming apparatus |
-
1986
- 1986-10-17 JP JP24807986A patent/JPH066462B2/en not_active Expired - Lifetime
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4912859B2 (en) | 2006-12-25 | 2012-04-11 | 花王株式会社 | Dishwasher finish composition |
| JP5426624B2 (en) | 2011-08-19 | 2014-02-26 | 株式会社沖データ | Image forming apparatus |
Also Published As
| Publication number | Publication date |
|---|---|
| JPS63101284A (en) | 1988-05-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2552260B2 (en) | Transfer method of roving bobbin | |
| JP2534727B2 (en) | Roving yarn transport system | |
| JP2554606B2 (en) | Roving bobbin conveyor | |
| US5222350A (en) | Roving frame and method | |
| US4999988A (en) | Method and apparatus for changing roven bobbins for a textile machine | |
| JPH08157144A (en) | Bobbin carrying system in spinning machine | |
| US4858746A (en) | Method and apparatus for transporting articles | |
| JPH066462B2 (en) | Transfer device for roving bobbin | |
| US5797255A (en) | Bobbin changing method and apparatus | |
| JPH066463B2 (en) | Transfer method of roving bobbin | |
| KR0132621B1 (en) | Fine spinning frame with roving bobbin transfer apparatus | |
| JPS63176270A (en) | Bobbin transport device | |
| JP2906735B2 (en) | Doffing device in roving machine | |
| JP2552259B2 (en) | Transfer device for roving bobbin | |
| JPH0653546B2 (en) | Transfer method of roving bobbin | |
| JPH03193936A (en) | Roving-changing method in fine spinning machine and roving-changing device | |
| JPH0740535Y2 (en) | Transfer device for roving bobbin | |
| JP2684777B2 (en) | Coarse yarn end position alignment device | |
| JPH0518925B2 (en) | ||
| KR0139236B1 (en) | Method and apparatus of doffing and donning bobbins in a roving machine | |
| JP2725007B2 (en) | Roving bobbin conveyor | |
| JPH05286651A (en) | Coarse thread bobbin transporting system | |
| JPS61215724A (en) | Method for conveying roving bobbin between roving and spinning steps | |
| JPH0515809B2 (en) | ||
| JPS6351943B2 (en) |