Tunnel excavator with double erector

Info

Publication number
JPH066880B2
JPH066880B2 JP63240388A JP24038888A JPH066880B2 JP H066880 B2 JPH066880 B2 JP H066880B2 JP 63240388 A JP63240388 A JP 63240388A JP 24038888 A JP24038888 A JP 24038888A JP H066880 B2 JPH066880 B2 JP H066880B2
Authority
JP
Japan
Prior art keywords
segment
erector
drum
double
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP63240388A
Other languages
Japanese (ja)
Other versions
JPH0288894A (en
Inventor
康一 田名網
幸次 坂東
保徳 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Heavy Industries Ltd
Original Assignee
Kawasaki Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Heavy Industries Ltd filed Critical Kawasaki Heavy Industries Ltd
Priority to JP63240388A priority Critical patent/JPH066880B2/en
Publication of JPH0288894A publication Critical patent/JPH0288894A/en
Publication of JPH066880B2 publication Critical patent/JPH066880B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【発明の詳細な説明】 〔産業上の利用分野〕 この発明は、トンネル掘削機によって掘削されたトンネ
ル内に短時間にセグメントリングを構築するため、同一
旋回範囲を作動する二つのエレクター(以下、「ダブル
エレクター」という)を装備したトンネル掘削機に関す
る。
DETAILED DESCRIPTION OF THE INVENTION [Industrial field of application] The present invention constructs a segment ring in a tunnel excavated by a tunnel excavator in a short time. Tunnel excavator equipped with "double erector").

〔従来の技術〕[Conventional technology]

トンネル掘削機によりトンネルを構築する場合の工期
は、カッターディスクによる掘削の時間と掘削後のエレ
クターによるセグメント組立時間により決定される。従
って、トンネル掘削の工期を短縮させるためには、トン
ネルライニングであるセグメントの組立時間を相対的に
短縮することが有効な手段となる。
The construction period for constructing a tunnel with the tunnel excavator is determined by the time for excavation by the cutter disk and the segment assembly time by the erector after excavation. Therefore, in order to shorten the tunnel excavation period, it is effective to relatively reduce the assembly time of the segment which is the tunnel lining.

ところで、従来のトンネル掘削機においては、シールド
フレーム内に回転自在に構成された旋回輪に支持アー
ム、吊りビーム、セグメントチャッキング(把持)装置
等からなる一つのエレクターのみを備えている(例え
ば、特開昭61-79000号公報、特開昭62-50599号公報、実
開昭60-58698号公報、実開昭62-50300号公報参照)。
By the way, in a conventional tunnel excavator, only one erector including a support arm, a suspension beam, and a segment chucking (grasping) device is provided on a slewing wheel that is rotatably configured in a shield frame (for example, See JP-A-61-79000, JP-A-62-50599, JP-A-60-58698 and JP-A-62-50300).

トンネル周壁にセグメントリングを構築する場合、台車
やホイスト等で搬送されてきたセグメントをチャッキン
グ装置で把持して受取り、旋回輪や吊りビーム等を連動
操作してトンネル周壁の所定位置に一つ一つ搬送してリ
ング状に組み立て、既設のセグメントリングに組み入れ
ていく。
When constructing a segment ring on the tunnel wall, the chucking device grips and receives the segments transported by the trolley and hoist, and operates the swivel wheels and suspension beams in an interlocking manner to individually position the segments on the tunnel wall. Then, they are assembled into a ring shape and assembled into the existing segment ring.

〔発明が解決しようとする課題〕[Problems to be Solved by the Invention]

しかしながら、従来のトンネル掘削機にはエレクターが
一つしか装備されていないので、セグメントを受け取る
作業と組立作業を同時に行ったり、或いはトンネル左右
のセグメント組立作業を同時に行うことができない。こ
れでは、セグメント組立に要する時間は必然的に膨大に
ならざるを得ない。特に、近年、トンネルの大口径化に
よりセグメントの分割数が増加していることから、セグ
メント組立時間が益々増大する傾向にある。
However, since the conventional tunnel excavator is equipped with only one erector, it is not possible to perform the work of receiving the segments and the assembly work at the same time, or the segment assembly work of the left and right sides of the tunnel at the same time. This inevitably requires a huge amount of time for segment assembly. In particular, in recent years, the number of segment divisions has increased due to the increase in the diameter of the tunnel, and therefore the segment assembly time tends to increase more and more.

一方、近年、掘削技術、掘削性能の向上により、トンネ
ル掘削機の掘削所要時間は短縮しつつある。例えば、セ
グメント組立作業の能率向上等のためその自動化が進め
られているが、これにしてもセグメント組立時間の大幅
短縮化の要請に応えうるものではない。
On the other hand, in recent years, due to improvements in excavation technology and excavation performance, the time required for excavation of a tunnel excavator is decreasing. For example, automation of the segment assembly work has been promoted to improve the efficiency of the segment assembly work, but this cannot meet the demand for a significant reduction in segment assembly time.

そこで、本発明はかかる課題に鑑み、セグメントリング
を迅速に構築するために同一旋回範囲を同時作動可能に
構成された二つのエレクター(ダブルエレクター)を具
備したトンネル掘削機を提供することを目的とする。
Therefore, in view of the above problems, an object of the present invention is to provide a tunnel excavator equipped with two erectors (double erectors) configured to be simultaneously operable in the same turning range in order to quickly construct a segment ring. To do.

〔課題を解決するための手段〕[Means for Solving the Problems]

上記目的達成のため、本発明に係るトンネル掘削機は、
シールドフレームに保持され、このシールドフレーム軸
方向に延びるガイドビームを設け、このガイドビームに
支持されたドラムを前記シールドフレームに同心状に設
けると共に、このドラムの前後に対称的にエレクターを
配装してダブルエレクターを形成したことを特徴とす
る。
To achieve the above object, the tunnel excavator according to the present invention,
A guide beam which is held by the shield frame and extends in the axial direction of the shield frame is provided, a drum supported by the guide beam is concentrically provided on the shield frame, and erectors are symmetrically arranged in front of and behind the drum. It is characterized by forming a double erector.

さらに、この構成において、ダブルエレクターそれぞれ
が、シールドフレーム内周に沿って回動自在にドラム端
部に支持された旋回輪と、この旋回輪にその外周面上半
径方向に移動自在に設けられたアーチ状の吊りビーム
と、この吊りビームにシールドフレーム軸方向に摺動自
在に設けられ前記ドラム周面上を旋回範囲とするセグメ
ント把持装置とから構成されたことを特徴とする。
Further, in this configuration, each of the double erectors is provided with a slewing wheel rotatably supported on the drum end along the inner circumference of the shield frame, and on the slewing wheel movably in the radial direction on the outer peripheral surface thereof. It is characterized by comprising an arch-shaped suspension beam and a segment gripping device slidably provided on the suspension beam in the axial direction of the shield frame and having a swing range on the peripheral surface of the drum.

〔作用〕[Action]

上記構成において、ドラム前後に対称的に設けられたダ
ブルエレクターを形成する各エレクターは、独立にセグ
メント組立のために動作する。すなわち、各旋回輪はそ
れぞれドラムに支持されてシールドフレーム内周に沿っ
て回動し、これに伴って各セグメント把持装置は同一旋
回範囲を形成するドラムの上を旋回移動する。ダブルエ
レクターの装備により、各エレクターは各々独立の動作
(旋回、伸縮、摺動、位置合わせ、セグメントの脱着)
ができる。そのため、両方(前後)のエレクターを同時
に作動させて、例えば、一方はセグメントの受取り、他
方はセグメントの組み付け作業、或いは一方はトンネル
右側のセグメントの組み付け、他方は左側のセグメント
の組み付け作業を同時に行うことができる。
In the above structure, each erector forming a double erector symmetrically provided in the front and rear of the drum operates independently for segment assembly. That is, each of the turning wheels is supported by the drum and turns along the inner circumference of the shield frame, and accordingly, each segment gripping device turns and moves on the drum forming the same turning range. Equipped with a double erector, each erector operates independently (turning, expanding, contracting, sliding, aligning, attaching and detaching segments)
You can Therefore, by operating both (front and rear) erectors at the same time, for example, one receives the segment, the other assembles the segment, or one assembles the segment on the right side of the tunnel and the other assembles the segment on the left side at the same time. be able to.

〔実施例〕〔Example〕

以下、本発明の一実施例を図面を参照しながら説明す
る。
An embodiment of the present invention will be described below with reference to the drawings.

第1図は本発明の要部であるダブルエレクター全体を示
す斜視図、第2図はダブルエレクターを具備したトンネ
ル掘削機の側断面図、第3図は同背面図を示す。
FIG. 1 is a perspective view showing an entire double erector, which is a main part of the present invention, FIG. 2 is a side sectional view of a tunnel excavator equipped with the double erector, and FIG. 3 is a rear view thereof.

第1図乃至第3図において、トンネル掘削機のシールド
フレーム1内にはその内周壁に沿ってシールドフレーム
1の補強を兼ねた支持リング2が設けられている。この
支持リング2の内周壁に左右一対の支柱3、3が設けら
れており、この各々の支柱3、3に一端が固定された片
持ちのガイドビーム4、4がシールドフレームの軸方向
に略水平に延びて設けられている。この各ガイドビーム
4、4は、断面がボックス状をなしており、その上下面
には軸方向に案内溝4a、4aが刻設されている。
1 to 3, in a shield frame 1 of a tunnel excavator, a support ring 2 which also functions as a reinforcement of the shield frame 1 is provided along the inner peripheral wall thereof. A pair of left and right columns 3 and 3 are provided on the inner peripheral wall of the support ring 2, and cantilevered guide beams 4 and 4 whose one ends are fixed to the columns 3 and 3 are arranged substantially in the axial direction of the shield frame. It extends horizontally. Each of the guide beams 4 and 4 has a box-shaped cross section, and guide grooves 4a and 4a are axially formed on the upper and lower surfaces thereof.

上記ガイドビーム4、4に支持されたリング状のドラム
5がシールドフレーム1に同心状に設けられている。す
なわち、ドラム5の左右両側にはガイドビーム4、4の
案内溝4a、4aに係合する凸部を有する上下一対のガ
イドアーム5a、5bが取着されている。このように、
ガイドビーム4、4を上下両側から挟持するようにガイ
ドアーム5a、5bを設けることにより、後述する旋回
輪7、7Aの回転反力を支持するようになっている。
A ring-shaped drum 5 supported by the guide beams 4 and 4 is concentrically provided on the shield frame 1. That is, a pair of upper and lower guide arms 5a and 5b having convex portions that engage with the guide grooves 4a and 4a of the guide beams 4 and 4 are attached to both left and right sides of the drum 5. in this way,
By providing the guide arms 5a and 5b so as to sandwich the guide beams 4 and 4 from the upper and lower sides, the rotational reaction force of the turning wheels 7 and 7A, which will be described later, is supported.

そして、下方のガイドアーム5b、5bとガイドビーム
4、4の間には、ドラム5をガイドビーム4、4に沿っ
てシールドフレーム軸方向に移動自在に構成するための
移動ジャッキ8、8がガイドビーム4、4に沿って平行
に設けられている。
Between the lower guide arms 5b and 5b and the guide beams 4 and 4, there are movable jacks 8 and 8 for configuring the drum 5 to be movable along the guide beams 4 and 4 in the shield frame axial direction. It is provided in parallel along the beams 4 and 4.

上記ドラム5には二つのエレクター(ダブルエレクタ
ー)6A、6が配装されている。図中、前エレクター6Aに
対するものには、符号に添字「A」を付して示す。
The drum 5 is provided with two erectors (double erectors) 6A and 6A. In the figure, those for the front erector 6A are indicated by adding a suffix "A" to the reference numeral.

ドラム5の前後に対称的に設けられた前エレクター6A、
後エレクター6は、それぞれ旋回輪7A、7、支持アーム
11A、11、吊りビーム14A、14、セグメント把持装置17
A、17等から構成されている。
Front erectors 6A symmetrically arranged in front of and behind the drum 5,
The rear erectors 6 are swivel wheels 7A, 7 and support arms, respectively.
11A, 11, hanging beams 14A, 14, segment gripping device 17
It is composed of A, 17 etc.

以下、便宜上、後エレクター6の構成について詳述する
が、前エレクター6Aの構成も特記以外は同じである。
Hereinafter, for the sake of convenience, the configuration of the rear erector 6 will be described in detail, but the configuration of the front erector 6A is also the same except for special notes.

上記ドラム5の後端に設けられた旋回輪7は、ベアリン
グ10を介してドラム5に回動自在に支持されている。こ
の回動手段たる駆動モータ9は、各エレクターにつき4
箇所配備されている。この駆動モータ9は、通常、油圧
モータが採用され、図示しない油圧ポンプユニットから
油圧ラインが導設され、接続されている。なお、図示は
していないが、旋回輪7は従来と同様ラック&ピニオン
方式で駆動されるようになっている。
The slewing wheel 7 provided at the rear end of the drum 5 is rotatably supported by the drum 5 via a bearing 10. The drive motor 9, which is the rotating means, has four
It is deployed in some places. As the drive motor 9, a hydraulic motor is usually adopted, and a hydraulic line is guided and connected from a hydraulic pump unit (not shown). Although not shown, the turning wheel 7 is driven by a rack and pinion system as in the conventional case.

上記旋回輪7の外周には、左右一対の支持アーム11、11
が半径方向に突出して形成されており、この両支持アー
ム11、11の頂部間に旋回輪7の外周面上をアーチ状の吊
りビーム14が架設されている。この吊りビーム14の両端
部には伸縮ロッド12(第3図)が突設され、支持アーム
11に摺動自在に嵌挿されている。すなわち、吊りビーム
14と支持アーム11の間に伸縮ジャッキ13が設けてあり、
この伸縮ジャッキ13の伸縮により、伸縮ロッド12が支持
アーム11にガイドされつつ、吊りビーム14が半径方向に
移動するようになっている。
A pair of left and right support arms 11, 11 are provided on the outer circumference of the slewing wheel 7.
Is formed so as to protrude in the radial direction, and an arch-shaped suspension beam 14 is provided on the outer peripheral surface of the slewing wheel 7 between the tops of the two support arms 11, 11. Telescopic rods 12 (Fig. 3) are provided at both ends of the suspension beam 14 so as to project from the support arm.
It is slidably inserted in 11. Ie hanging beams
A telescopic jack 13 is provided between 14 and the support arm 11,
By the expansion and contraction of the expansion and contraction jack 13, the suspension beam 14 is moved in the radial direction while the expansion and contraction rod 12 is guided by the support arm 11.

上記吊りビーム14には一対の摺動ロッド15、15がドラム
5の外周面の上方にオーバハングして、トンネル前方に
突設されている。一方、前エレクター6Aの吊りビーム14
Aにも同様に一対の摺動ロッド15A、15Aがドラム5上
方、トンネル後方に突設されているから、前エレクター
6Aの摺動ロッド15A、15Aと後エレクター6の摺動ロッド
15、15とは、第3図に示すように、相対向した格好で、
ドラム5周面上同一旋回範囲を旋回移動するようになっ
ている。
The suspension beam 14 is provided with a pair of sliding rods 15, 15 overhanging above the outer peripheral surface of the drum 5 and projecting forward of the tunnel. On the other hand, the suspension beam 14 of the front erector 6A
Similarly, a pair of sliding rods 15A, 15A is also provided on A above the drum 5 and behind the tunnel.
6A sliding rods 15A, 15A and rear Electa 6 sliding rod
As shown in FIG. 3, 15 and 15 are facing each other,
The drum 5 is designed to move in the same turning range on the circumferential surface of the drum 5.

上記摺動ロッド15、15には、セグメント把持装置17を備
えた摺動部材18が摺動自在に嵌合されている。すなわ
ち、吊りビーム14と摺動部材18の間には摺動ジャッキ1
6、16が設けられていて、その伸縮により摺動部材18、
即ち、セグメント把持装置17が摺動ロッドに沿ってシー
ルドフレーム軸方向に移動できるようになっている。ま
た、セグメント把持装置17は、摺動部材18にセグメント
Sの姿勢制御を容易にするため球面軸受18aを介して支
承されている。
A sliding member 18 having a segment gripping device 17 is slidably fitted to the sliding rods 15 and 15. That is, the sliding jack 1 is provided between the suspension beam 14 and the sliding member 18.
6 and 16 are provided, and by the expansion and contraction of the sliding member 18,
That is, the segment gripping device 17 can move in the axial direction of the shield frame along the sliding rod. The segment gripping device 17 is supported by the sliding member 18 via a spherical bearing 18a for facilitating the attitude control of the segment S.

第4図は、このセグメント把持装置17を示す要部斜視図
である。セグメントSを把持するためのセグメント受台
19の背面(内側)側には、セグメント組立時、セグメン
トの姿勢制御のために作動されるポジショニングジャッ
キ20、ロータリジャッキ21、キーセグメント用のジャッ
キ22等が配装されている。なお、特に図示はしていない
が、セグメントSの把持はセグメント受台19の外面に設
けた吸着パッドで吸着して行うようになっている。な
お、図中、24(第2図)はトンネル掘削機を掘進させる
ためのシールドジャッキ、26、26A(第3図)は電線、
油圧ホース、真空ホース用のケーブル/ホースリール
で、各エレクターにつき左右各2台設けてある。
FIG. 4 is a perspective view of an essential part showing the segment gripping device 17. Segment pedestal for holding the segment S
A positioning jack 20, a rotary jack 21, a jack 22 for a key segment, etc., which are operated to control the posture of the segment when the segment is assembled, are provided on the back surface (inner side) of 19. Although not particularly shown, the segment S is gripped by a suction pad provided on the outer surface of the segment receiving base 19. In the figure, 24 (Fig. 2) is a shield jack for advancing the tunnel excavator, 26 and 26A (Fig. 3) are electric wires,
Cables / hose reels for hydraulic hoses and vacuum hoses, two for each erector, left and right.

上記説明から明らかなように、ドラム5の前後に対称的
に設けた旋回輪7、7Aの回動に伴って、それぞれのセグ
メント把持装置17、17Aも同一旋回範囲であるドラム5
の外周面上を旋回移動する。従って、両エレクター6、
6Aを同時使用してセグメント組立作業を行う際、両者の
干渉防止のための装置が必要となる。
As is clear from the above description, as the slewing wheels 7 and 7A symmetrically provided on the front and rear of the drum 5 rotate, the respective segment gripping devices 17 and 17A also have the same slewing range.
It moves on the outer peripheral surface of the. Therefore, both erectors 6,
When performing segment assembly work using 6A at the same time, a device is required to prevent interference between the two.

そこで、第5図及び第6図に示すように、ケーブル/ホ
ースリール26、26(26A、26A)取り付け用の取付台27、
27(27A、27A)が左右の支持アーム11、11(11A、11A)の側
面に、ドラム5周面上オーバハングして突設されてお
り、左右にそれぞれ干渉防止装置が形成される。すなわ
ち、左側にある取付台27、27A端部の相対向位置に、後
エレクター6側にはスイッチブラケット29を介して近接
スイッチ28が、前エレクター6A側にはストライカーブラ
ケット31Aを介してストライカー30Aが設けられている。
右側にある取付台27、27Aにも同様に、前エレクター6A
側にはスイッチブラケット29Aを介して近接スイッチ28A
が、後エレクター6側にはストライカーブラケット31を
介してストライカー30が設けられている。
Therefore, as shown in FIGS. 5 and 6, a mounting base 27 for mounting the cable / hose reels 26, 26 (26A, 26A),
27 (27A, 27A) is projectingly provided on the side surfaces of the left and right support arms 11, 11 (11A, 11A) so as to overhang on the circumferential surface of the drum 5, and interference preventing devices are formed on the left and right respectively. That is, the proximity switch 28 is located on the left side of the mounting bases 27 and 27A facing each other through the switch bracket 29 on the rear erector 6 side, and the striker 30A is located on the front erector 6A side via the striker bracket 31A. It is provided.
Similarly, for the mounting bases 27 and 27A on the right side, the front erector 6A
Proximity switch 28A via switch bracket 29A on the side
However, a striker 30 is provided on the rear erector 6 side via a striker bracket 31.

これにより、例えば、後エレクター6の旋回輪7が左旋
回して近接スイッチ28とストライカー30Aが近接する
と、近接スイッチ28と駆動モータ9へ接続されている油
圧ライン上の電磁切り換え弁(図示略)間が通電状態に
なって弁ポートが切り換わり、駆動モータ9は停止する
ようになっている。かくして、旋回輪7のそれ以上の旋
回は阻止され、セグメント把持装置17、17Aに把持され
ているセグメントS同士が衝突することがないようにな
っている。
Thereby, for example, when the turning wheel 7 of the rear erector 6 turns left and the proximity switch 28 and the striker 30A come close to each other, the proximity switch 28 and the electromagnetic switching valve (not shown) on the hydraulic line connected to the drive motor 9 are connected. Is energized, the valve port is switched, and the drive motor 9 is stopped. Thus, the turning wheel 7 is prevented from turning further, and the segments S held by the segment holding devices 17 and 17A do not collide with each other.

なお、旋回輪7(7A)の旋回動の惰性を考慮して、スト
ライカー30(30A)は長く形成され、しかもストライカ
ーブラケット31(31A)に位置調整可能に取り付けられて
おり、早めに近接状態を検知できるようになっている。
また、バックアップのため、近接スイッチ28(28A)は各
ブラケットに2個づつ設けてある。
The striker 30 (30A) is formed to be long in consideration of the inertia of the turning motion of the turning wheel 7 (7A), and is attached to the striker bracket 31 (31A) so that the position can be adjusted quickly, so that the approach state can be changed quickly. It can be detected.
Further, for backup, two proximity switches 28 (28A) are provided on each bracket.

次に、上記ダブルエレクターの動作について説明する。Next, the operation of the double erector will be described.

第2図及び第3図において、今、前エレクター6Aは、吊
りビーム14Aを下方に位置させて、セグメント把持装置1
7AでセグメントSを把持して、これより、トンネル下方
部においてセウメントSを既設のセグメントリングS′
に組み付けようとしている段階である。一方、後エレク
ター6は、吊りビーム14を上方に位置させて、セグメン
ト搬送用マガジンでトンネル上方に搬送されてきた、こ
れから組立てられるべきセグメントSをセグメント把持
装置17で受取って把持した状態を示している。
2 and 3, the front erector 6A is now arranged so that the suspension beam 14A is located below the segment gripping device 1A.
The segment S is gripped with 7A, and from this, the cement S is attached to the existing segment ring S'in the lower part of the tunnel.
It is in the stage of being attached to. On the other hand, the rear erector 6 shows the state in which the segment holding device 17 has received the segment S to be assembled from the segment S that has been transported above the tunnel by the segment transport magazine, with the suspension beam 14 positioned above. There is.

後エレクター6はセグメントSを受け取った後駆動モー
タ9で旋回輪7を右旋回させて、第3図においてトンネ
ル右側の位置までセグメントを持ってくる。この場合、
上記した干渉防止装置が設けられているので両セグメン
トS同士が衝突することはない。ここで、伸縮ジャッキ
13や摺動ジャッキ16等を連動操作してセグメントSの位
置決めを行い、また、ポジショニングジャッキ20やロー
タリジャッキ21を作動させてセグメントSの姿勢制御を
行って、既設セグメントS′への組み付け作業を行う。
When the rear erector 6 receives the segment S, the rear drive motor 9 turns the slewing wheel 7 to the right to bring the segment to the position on the right side of the tunnel in FIG. in this case,
Since the above-described interference prevention device is provided, both segments S do not collide with each other. Where the telescopic jack
13 and the sliding jack 16 are operated in conjunction to position the segment S, and the positioning jack 20 and the rotary jack 21 are operated to control the attitude of the segment S, and the assembly work to the existing segment S'is performed. To do.

一方、前エレクター6Aの方は、上記と同要領でトンネル
下部におけるセグメント組み付け作業を完了した後、旋
回輪7Aを右方向に回動させ、再びセグメントの受け取り
のために、セグメント把持装置17Aを上方位置まで旋回
移動させる。そして、セグメントSを受け取った後、左
旋回させてトンネル左側の位置まで持っていき、そこで
セグメント組み付け作業を行う。この状態において、後
エレクター6は、右側のセグメント組み付けが完了すれ
ば再び上方位置まで旋回させてセグメントSを受け取
る。そして、上方位置においてセグメントSの組み付け
作業を行う。
On the other hand, the front erector 6A, after completing the segment assembling work in the lower part of the tunnel in the same manner as described above, rotates the slewing wheel 7A to the right and again moves the segment gripping device 17A upward to receive the segment. Rotate to the position. After receiving the segment S, the segment S is turned to the left and brought to the position on the left side of the tunnel, where the segment assembling work is performed. In this state, the rear erector 6 receives the segment S by turning to the upper position again when the assembly of the right segment is completed. Then, the assembly work of the segment S is performed at the upper position.

上記のように前後エレクター7A、7は、同時にセグメン
ト組立作業を行うことができるようになっている。な
お、最後に組み付けられるキーセグメントはキーセグメ
ント用ジャッキ22を利用して組み付けられる。
As described above, the front and rear erectors 7A, 7 can simultaneously perform segment assembly work. The last key segment to be assembled is assembled using the key segment jack 22.

かくして、トンネル周面に新たなセグメントリングが構
築されたことになる。
Thus, a new segment ring was built around the tunnel.

なお、移動ジャッキ8、8を作動させて、ドラム5をガ
イドビーム4、4に沿ってトンネル後方に移動させれ
ば、トンネル掘削機のテールシール25(第2図)の交換
を極めて容易かつ迅速に行うことができる。
By operating the moving jacks 8 and 8 to move the drum 5 along the guide beams 4 and 4 to the rear of the tunnel, the tail seal 25 (Fig. 2) of the tunnel excavator can be replaced very easily and quickly. Can be done.

〔発明の効果〕〔The invention's effect〕

以上説明したように、本発明によれば、ドラム前後に対
称的にエレクターを設け、ダブルエレクターを構成した
ので、両方(前後)のエレクターを同時に作動させて、
同時にセグメント組立作業を行うことが可能となる。す
なわち、例えば、一方はセグメントの受取り、他方はセ
グメントの組み付け、或いは一方はトンネル右側のセグ
メントの組み付け、他方は左側のセグメントの組み付け
を同時に行うことができる。その結果、セグメント組立
に要する時間が従来の約半分で済み、トンネル掘削に要
する工期の大幅短縮化が実現できる。
As described above, according to the present invention, since the erectors are symmetrically provided in the front and rear of the drum to form the double erector, both (front and rear) erectors are simultaneously operated,
It is possible to perform segment assembly work at the same time. That is, for example, one can receive the segment, the other can assemble the segment, or one can assemble the segment on the right side of the tunnel and the other can assemble the segment on the left side at the same time. As a result, the time required for segment assembly is about half that of conventional products, and the construction period required for tunnel excavation can be greatly shortened.

工期の大幅短縮化に伴い、トンネル内での作業時間も大
幅に短縮されることから、それだけ安全性が飛躍的に向
上し、また、掘削に要する経費も大幅に減少しうるとい
う顕著な効果がある。
As the construction period has been greatly shortened, the work time in the tunnel has also been greatly shortened, which has significantly improved safety and has the significant effect of significantly reducing the cost required for excavation. is there.

特に、近年のトンネル大口径化に伴い、セグメント組立
時間が益々増大する中で、本発明の効果は絶大なるもの
がある。
In particular, with the recent increase in the diameter of the tunnel, the effect of the present invention is extremely large as the segment assembly time increases.

【図面の簡単な説明】[Brief description of drawings]

第1図〜第6図は、本発明の実施例を説明するための図
面であって、第1図は本発明の要部であるダブルエレク
ター全体の斜視図、第2図はダブルエレクターを具備し
たシールド掘削機の側断面図、第3図は同背面図を示
す。第4図はセグメント把持装置の要部斜視図、第5図
及び第6図はダブルエレクターの干渉防止装置の説明図
である。 1…シールドフレーム、2…支持リング、 3…支柱、 4… ガイドビーム、 5…ドラム、 6…後エレクター、 6A…前エレクター、 7、7A…旋回輪、 8…移動ジャッキ、 9、9A…駆動モータ、 10、10A…ベアリング、11、11A…支持アーム、 14、14A…吊りビーム、15、15A…摺動ロッド、 17、17A…セグメント把持装置、 S…セグメント。
1 to 6 are drawings for explaining an embodiment of the present invention. FIG. 1 is a perspective view of the entire double erector which is a main part of the present invention, and FIG. 2 is provided with a double erector. FIG. 3 is a side sectional view of the shield excavator, and FIG. 3 is a rear view of the shield excavator. FIG. 4 is a perspective view of an essential part of the segment gripping device, and FIGS. 5 and 6 are explanatory views of a double-erector interference prevention device. 1 ... Shield frame, 2 ... Support ring, 3 ... Struts, 4 ... Guide beam, 5 ... Drum, 6 ... Rear erector, 6A ... Front erector, 7, 7A ... Swivel wheel, 8 ... Moving jack, 9, 9A ... Drive Motor, 10, 10A ... Bearing, 11, 11A ... Support arm, 14, 14A ... Suspension beam, 15, 15A ... Sliding rod, 17, 17A ... Segment gripping device, S ... Segment.

───────────────────────────────────────────────────── フロントページの続き (56)参考文献 特開 昭62−182397(JP,A) 特開 平2−74800(JP,A) ─────────────────────────────────────────────────── ─── Continuation of front page (56) References JP-A-62-182397 (JP, A) JP-A-2-74800 (JP, A)

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】シールドフレームに保持され、このシール
ドフレーム軸方向に延びるガイドビームを設け、このガ
イドビームに支持されたドラムを前記シールドフレーム
に同心状に設けると共に、このドラムの前後に対称的に
エレクターを配装してダブルエレクターを形成したこと
を特徴とするダブルエレクターを有するトンネル掘削
機。
1. A guide beam, which is held by a shield frame and extends in the axial direction of the shield frame, is provided with a drum supported by the guide beam concentrically with the shield frame, and symmetrically before and after the drum. A tunnel excavator having a double erector, wherein the erector is arranged to form a double erector.
【請求項2】ダブルエレクターそれぞれが、シールドフ
レーム内周に沿って回動自在にドラム端部に支持された
旋回輪と、この旋回輪にその外周面上半径方向に移動自
在に設けられたアーチ状の吊りビームと、この吊りビー
ムにシールドフレーム軸方向に摺動自在に設けられ前記
ドラム周面上を旋回範囲とするセグメント把持装置とか
ら構成されたことを特徴とする請求項1記載のダブルエ
レクターを有するトンネル掘削機。
2. A slewing wheel in which each of the double erectors is rotatably supported on a drum end along an inner circumference of a shield frame, and an arch provided on the slewing wheel so as to be radially movable on an outer peripheral surface thereof. The double-shaped suspension beam according to claim 1, further comprising: a suspension beam and a segment gripping device slidably provided on the suspension beam in the axial direction of the shield frame and having a swing range on the peripheral surface of the drum. Tunnel excavator with erector.
JP63240388A 1988-09-26 1988-09-26 Tunnel excavator with double erector Expired - Lifetime JPH066880B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63240388A JPH066880B2 (en) 1988-09-26 1988-09-26 Tunnel excavator with double erector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63240388A JPH066880B2 (en) 1988-09-26 1988-09-26 Tunnel excavator with double erector

Publications (2)

Publication Number Publication Date
JPH0288894A JPH0288894A (en) 1990-03-29
JPH066880B2 true JPH066880B2 (en) 1994-01-26

Family

ID=17058740

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63240388A Expired - Lifetime JPH066880B2 (en) 1988-09-26 1988-09-26 Tunnel excavator with double erector

Country Status (1)

Country Link
JP (1) JPH066880B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019190058A (en) * 2018-04-20 2019-10-31 川崎重工業株式会社 Shield machine

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0638959Y2 (en) * 1989-09-19 1994-10-12 清水建設株式会社 Electa device for shield machine
JP7336823B2 (en) * 2019-12-17 2023-09-01 株式会社奥村組 Erector device, lining construction system, and lining construction method
CN114856591B (en) * 2022-03-22 2023-01-31 中国矿业大学(北京) A self-locking blocking shield TBM construction auxiliary equipment
CN116792125B (en) * 2022-03-25 2026-04-21 郑州轻工业大学 A construction method for simultaneous assembly of multiple tunnel segments in conventional tunnel construction
CN116792126A (en) * 2022-03-25 2023-09-22 郑州轻工业大学 Double-slide rail four-piece segment erector
CN116085003B (en) * 2023-03-07 2023-12-15 重庆亿扬建筑工程有限公司 Civil construction tunnel supporting system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019190058A (en) * 2018-04-20 2019-10-31 川崎重工業株式会社 Shield machine

Also Published As

Publication number Publication date
JPH0288894A (en) 1990-03-29

Similar Documents

Publication Publication Date Title
CN108661678A (en) Tunneling equipment and its support system
JPH066880B2 (en) Tunnel excavator with double erector
JPH0654079B2 (en) Tunnel excavator
JPH0626639Y2 (en) Vacuum type segment grip device
JPH1023629A (en) Manipulator for power distribution work
JP4347462B2 (en) Tunnel excavator body structure
JP2700183B2 (en) Tunnel lining method and lining device
JP3075554B2 (en) Electa device
CN114575899A (en) TBM (tunnel boring machine) online multi-mode supporting system and construction method
JP3784241B2 (en) Shield machine and its temporary propulsion method
ITTO20010294A1 (en) DEVICE FOR POSITIONING AN OPERATING BODY, AND WELDING EQUIPMENT THAT USES IT.
JP3438750B2 (en) Segment assembly equipment for shield machine
JP3845254B2 (en) Segment erector apparatus and shield machine using the same
JP2002054398A (en) Segment assembling apparatus and assembling method
JPS6033200Y2 (en) segment erector
JP2584378B2 (en) Box shield machine
JPH04269300A (en) Assembling device for segment
JP3360103B2 (en) Elector gripping device and erector using the same
JP3266488B2 (en) Shield moat machine
JPS62260999A (en) Erector device for extension shield
JPH0637120Y2 (en) Tunnel excavation construction equipment
JPH083518Y2 (en) Tunnel excavator
JPH0819835B2 (en) Shield segment erector
JP2891641B2 (en) Electa device of tunnel excavator
JP3616885B2 (en) Parent-child two-stage shield machine