Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JPH0672417B2 - How to remove a continuous concrete wall - Google Patents
[go: Go Back, main page]

JPH0672417B2 - How to remove a continuous concrete wall - Google Patents

How to remove a continuous concrete wall

Info

Publication number
JPH0672417B2
JPH0672417B2 JP2267989A JP2267989A JPH0672417B2 JP H0672417 B2 JPH0672417 B2 JP H0672417B2 JP 2267989 A JP2267989 A JP 2267989A JP 2267989 A JP2267989 A JP 2267989A JP H0672417 B2 JPH0672417 B2 JP H0672417B2
Authority
JP
Japan
Prior art keywords
concrete
sleeve
continuous
heater
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2267989A
Other languages
Japanese (ja)
Other versions
JPH02204521A (en
Inventor
孝幸 柴山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2267989A priority Critical patent/JPH0672417B2/en
Publication of JPH02204521A publication Critical patent/JPH02204521A/en
Publication of JPH0672417B2 publication Critical patent/JPH0672417B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】 《産業上の利用分野》 この発明は、コンクリート連続壁の撤去方法に関し、特
に形状記憶合金を用いて連続壁内部に埋設された鉄筋の
切断予定位置を簡単に切り離すことができるようにした
方法に関する。
Description: TECHNICAL FIELD The present invention relates to a method for removing a concrete continuous wall, and more particularly, to easily cut off a planned cutting position of a reinforcing bar embedded inside the continuous wall by using a shape memory alloy. Concerning the method that was made possible.

《従来の技術》 鉄筋コンクリート製の連続壁を利用した仮設構造物を構
築後にある深度まで撤去する必要がある場合には、従来
は分離計画位置のコンクリートをハツリなどによって除
去し、露出した鉄筋の切断や溶断を行うことで撤去作業
を完了するようにしていた。
《Conventional technology》 When it is necessary to remove a temporary structure using continuous walls made of reinforced concrete to a certain depth after construction, conventionally, concrete at the planned separation position is removed by chipping, etc., and the exposed reinforcement is cut. It was supposed that the removal work would be completed by fusing and cutting.

《発明が解決しようとする課題》 しかしながら、この撤去作業は大きな労力と時間を必要
とし、騒音を伴うなどの欠点があった。
<< Problems to be Solved by the Invention >> However, this removal work requires a great deal of labor and time, and has drawbacks such as noise.

また、このような方法は、大深度での地中または水中で
の撤去作業が危険なため比較的深度の浅い部分でしか適
用できなかった。
Further, such a method can be applied only to a relatively shallow portion because removal work in the ground or underwater at a large depth is dangerous.

この発明方法は以上の問題点を解決するもので、形状記
憶合金を利用してコンクリート連続壁の不要部分を大深
度においても容易かつ迅速に撤去できるコンクリート連
続壁の撤去方法を提供することを目的とする。
The method of the present invention solves the above problems, and an object of the present invention is to provide a method for removing a continuous concrete wall that can easily and quickly remove unnecessary portions of the continuous concrete wall using a shape memory alloy even at a large depth. And

《発明が解決しようとする課題》 前記目的を達成するため、この発明は、鉄筋コンクリー
ト製の連続壁を構築後に所定位置で切断して撤去する方
法において、前記所定位置の鉄筋同士を加熱ヒータが巻
回された形状記憶合金製のスリーブで予め接合するとと
もに、前記所定位置に沿って注入孔を削孔し、この削孔
内に静的破砕剤を注入して、コンクリート部を破砕し、
前記ヒータに通電して前記スリーブを形状変形させて、
前記鉄筋同士の拘束を解除するようにした。
<Problems to be Solved by the Invention> In order to achieve the above object, the present invention is a method of cutting and removing a continuous wall made of reinforced concrete at a predetermined position after construction, in which a heater is wound around the reinforcing bars at the predetermined position. While pre-joined with a sleeve made of a turned shape memory alloy, drilling an injection hole along the predetermined position, injecting a static crushing agent into this hole, crushing the concrete part,
By energizing the heater to deform the shape of the sleeve,
The restraint between the reinforcing bars is released.

《作用》 コンクリート部に注入された静的破砕剤は膨脹して体積
を増し、周縁のコンクリートを加圧し、切断予定位置
(所定位置)に沿ってコンクリートを破砕して切り離
す。また、ヒータの加熱によって形状記憶合金からなる
スリーブは、記憶していた状態に変形して鉄筋同士の接
合部外周の拘束状態を解除しする。
<< Action >> The static crushing agent injected into the concrete part expands to increase the volume, pressurizes the peripheral concrete, and crushes and separates the concrete along the planned cutting position (predetermined position). Further, the sleeve made of the shape memory alloy is deformed to the memorized state by the heating of the heater, and the restraint state of the outer periphery of the joint portion between the reinforcing bars is released.

《実施例》 以下、この発明の一実施例を図面を用いて詳細に説明す
る。
<< Embodiment >> An embodiment of the present invention will be described in detail below with reference to the drawings.

第1図ないし第7図はこの発明方法を仮設土留壁に適用
した場合の実施例を示すものである。
1 to 7 show an embodiment in which the method of the present invention is applied to a temporary earth retaining wall.

第1図,第2図において、仮設土留壁を構成するコンク
リート連続壁1は、その下部側1aを地下構造物の一部と
して埋め殺し、上部側1bを地下構造物の築造後に撤去す
べく切断計画位置Sに沿って切離すように設計される。
In Fig. 1 and Fig. 2, the concrete continuous wall 1 which constitutes the temporary earth retaining wall is cut so that the lower side 1a is buried as a part of the underground structure and the upper side 1b is removed after the underground structure is constructed. It is designed to cut along the planned position S.

そして、このコンクリート連続壁1は、地下構造物の築
造計画区域E1を囲んだ状態で地中Eに掘削された掘削溝
2の内部に鉄筋篭3を建込み、その後掘削溝2内部にコ
ンクリート4を打設することで、その築造を完了する。
And this concrete continuous wall 1 constructs a reinforced basket 3 inside the excavation groove 2 excavated in the ground E while enclosing the construction planning area E1 of the underground structure, and then the concrete 4 inside the excavation groove 2 The construction is completed by placing.

前記鉄筋篭3は縦筋5に横筋6を結束して長方形の篭状
に組立てたものであって、第1図に示すように、切断計
画位置S部分の縦筋5同士を予め切離しておくことによ
って、鉄筋篭3を地中に埋め殺される構造物となる下部
側鉄筋篭3aと、仮設工事完了後に撤去される上部側鉄筋
篭3bとに区分けし、上下の縦筋5同士の接合端外周に形
状記憶合金からなる接合用のスリーブ7を嵌合すること
で、各鉄筋篭3a,3b同士を一体的に接合してある。
The reinforcing bar cage 3 is a rectangular cage formed by binding the horizontal bars 6 to the vertical bars 5, and as shown in FIG. 1, the vertical bars 5 at the planned cutting position S are separated beforehand. As a result, the reinforcing bar cage 3 is divided into a lower reinforcing bar cage 3a, which is a structure that is buried in the ground, and an upper reinforcing bar cage 3b, which is removed after the completion of temporary construction work. By fitting a joining sleeve 7 made of a shape memory alloy on the outer periphery, the respective reinforcing bar cages 3a, 3b are integrally joined.

このスリーブ7は通常の温度では、筒状に保たれ、両縦
筋5の接合端外周をしばりばめ状態に接合する。
At a normal temperature, this sleeve 7 is kept in a tubular shape, and the outer circumferences of the joint ends of both longitudinal bars 5 are joined in a tight fit state.

また、高温になるとスリーブ7は平板状になるように記
憶されており、このためスリーブ7は外周のコンクリー
トを押圧して開き、両縦筋5同士の拘束が解除されるの
で、上部側縦筋5は下部側縦筋5から簡単に引き抜くこ
とができる。
Further, it is memorized that the sleeve 7 becomes a flat plate shape when the temperature becomes high. Therefore, the sleeve 7 presses the concrete on the outer periphery to open, and the restraint between the both vertical bars 5 is released. 5 can be easily pulled out from the lower vertical streak 5.

そして、スリーブ7の外周には加熱用のニクロム線等か
らなるヒータ8が巻回され、これらヒータ8のリード線
8aは下部側鉄筋篭3aの該側部に配置された受電ボックス
9に配線され、この受電ボックス9から地表側に導出さ
れるリード線10を通じて外部電源と接続されるようにな
っている。
A heater 8 made of nichrome wire or the like for heating is wound around the outer circumference of the sleeve 7, and lead wires of these heaters 8 are wound.
8a is wired to a power receiving box 9 arranged on the side of the lower reinforcing bar 3a, and is connected to an external power source through a lead wire 10 led from the power receiving box 9 to the surface side.

以上のようにして構築された連続壁1は、築造後通常の
土留壁として用いられ、構築が完了すると、第3図に示
すごとく、それの内部を切梁11で補強しつつ掘削し、地
下構造物12を構築する。
The continuous wall 1 constructed as described above is used as an ordinary earth retaining wall after construction, and when the construction is completed, as shown in FIG. Build the structure 12.

地下構造物12の築造完了後は、連続壁1の上部側1bが不
要になるので撤去される。
After the construction of the underground structure 12 is completed, the upper side 1b of the continuous wall 1 becomes unnecessary and is removed.

撤去に際しては、第4図に示すように切断計画位置Sに
沿って紙面と直交する方向に所定の間隔を開けて複数の
注入孔14を削孔し、削孔された注入孔14の内部に静的破
砕剤15を注入する。
At the time of removal, as shown in FIG. 4, a plurality of injection holes 14 are drilled at predetermined intervals in the direction orthogonal to the paper surface along the planned cutting position S, and the injection holes 14 are drilled inside. Inject static crushing agent 15.

この静的破砕剤15は、例えば生石灰などの酸化カルシウ
ムと水を混合し反応させたもので、反応後水酸化カルシ
ウムとなって体積を二倍に膨脹させ、その圧力(約300k
g/cm2)によってコンクリートを破砕し、切断計画位置
Sに沿って連続壁1の上部側1bと下部側1aのコンクリー
ト部4が切離される。
This static crushing agent 15 is, for example, calcium oxide such as quicklime mixed with water and reacted. After the reaction, calcium hydroxide becomes calcium hydroxide to double its volume, and its pressure (about 300 k
The concrete is crushed by g / cm 2 ) and the concrete portion 4 on the upper side 1b and the lower side 1a of the continuous wall 1 is separated along the planned cutting position S.

しかしながら、この状態では、縦筋5同士は接続状態を
保っているため、上部側1bは内側に倒れることなく、自
立性を保っている。
However, in this state, since the vertical streaks 5 are kept in the connected state, the upper side 1b does not fall inward and maintains independence.

そこで、この静的破砕剤15によるコンクリート部4の切
離し作業が完了した後、第5図に示すように築造計画区
域E1を土砂16によって埋め戻すことで上部側1bの倒れ込
みを防止する。
Therefore, after the work of separating the concrete part 4 by the static crushing agent 15 is completed, the construction planned area E1 is backfilled with the earth and sand 16 as shown in FIG. 5 to prevent the upper side 1b from collapsing.

次に、地表に導出したリード線10に外部電源を通電する
ことでヒータ8を加熱する。ヒータ8の温度上昇に伴っ
て前記スリーブ7は加熱され、所定の温度に達すると変
形して縦筋5の接合部外周に対する拘束を解除する。
Next, the heater 8 is heated by energizing an external power source to the lead wire 10 led to the surface of the earth. The sleeve 7 is heated as the temperature of the heater 8 rises, and when the temperature reaches a predetermined temperature, the sleeve 7 is deformed to release the restraint of the vertical streak 5 from the outer periphery of the joint.

この状態で連続壁1の上部側1bを大型クレーンなどで吊
り上げれば、第6図に示すように、上部側1bのみを引き
抜くことができ、撤去作業を完了する。
In this state, if the upper side 1b of the continuous wall 1 is lifted by a large crane or the like, as shown in FIG. 6, only the upper side 1b can be pulled out, and the removal work is completed.

次いで引き抜いた部分を土砂16によって埋め戻せば、工
事が完了する。
Then, the extracted portion is backfilled with earth and sand 16 to complete the construction.

なお、前記実施例ではこの発明を仮設用土留壁に適用し
た場合を示したが、他の仮設構造物であって、構造物完
成後撤去する必要のある、例えばコンクリートケーソン
の仮壁などの撤去や、増設計画部の端部処理などにも適
用できることは勿論である。
In addition, although the case where the present invention is applied to the earth retaining wall for temporary construction is shown in the above-mentioned embodiment, it is another temporary structure and needs to be removed after completion of the structure, for example, removal of temporary wall of concrete caisson. Of course, it can be applied to the end processing of the expansion planning section.

《発明の効果》 以上実施例によって詳細に説明したように、この発明に
よるコンクリート連続壁の撤去方法にあっては、コンク
リート内部に充填された静的破砕剤で切断予定位置に沿
ってコンクリート部を破砕状態に切り離し、形状記憶合
金からなるスリーブを変形させて上部側鉄筋を下部側鉄
筋から分離するようにしているので、従来のはつりによ
る撤去方法に比べて、大深度の水中または地中での撤去
作業を安全確実、かつ経済的に行うことができる。
<< Effects of the Invention >> As described in detail with reference to the embodiments above, in the method for removing a concrete continuous wall according to the present invention, the concrete portion is cut along the planned cutting position with the static crushing agent filled inside the concrete. Since it is separated into crushed state and the sleeve made of shape memory alloy is deformed to separate the upper side reinforcing bar from the lower side reinforcing bar, compared to the conventional removal method by chipping, it can be used in deep water or underground. The removal work can be performed safely, reliably and economically.

【図面の簡単な説明】[Brief description of drawings]

第1図ないし第7図はこの発明方法を仮設土留壁に適用
した場合の実施例を示す説明図である。 1…コンクリート連続壁 1a…下部側、1b…上部側 S…切断計画位置 3…鉄筋篭 3a…下部側鉄筋篭、3b…上部側鉄筋篭 4…コンクリート 5…縦筋 6…横筋 7…形状記憶合金からなる接合用スリーブ 8…ヒータ 8a,10…リード線 14…注入孔 15…静的破砕剤
1 to 7 are explanatory views showing an embodiment when the method of the present invention is applied to a temporary earth retaining wall. 1 ... Continuous concrete wall 1a ... Lower side, 1b ... Upper side S ... Cutting plan position 3 ... Reinforcing bar cage 3a ... Lower side reinforcing bar cage, 3b ... Upper side reinforcing bar cage 4 ... Concrete 5 ... Vertical bar 6 ... Horizontal bar 7 ... Shape memory Joining sleeve made of alloy 8 ... Heater 8a, 10 ... Lead wire 14 ... Injection hole 15 ... Static crushing agent

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】鉄筋コンクリート製の連続壁を構築後に所
定位置で切断して撤去する方法において、前記所定位置
の鉄筋同士を加熱ヒータが巻回された形状記憶合金製の
スリーブで予め接合するとともに、前記所定位置に沿っ
て注入孔を削孔し、この削孔内に静的破砕剤を注入し
て、コンクリート部を破砕し、前記ヒータに通電して前
記スリーブを形状変形させて、前記鉄筋同士の拘束を解
除することを特徴とするコンクリート連続壁の撤去方
法。
1. A method of cutting and removing a continuous wall made of reinforced concrete at a predetermined position after being constructed, wherein the reinforcing bars at the predetermined positions are pre-joined with a sleeve made of a shape memory alloy around which a heater is wound, The injection hole is drilled along the predetermined position, the static crushing agent is injected into the drilled hole, the concrete part is crushed, the heater is energized to deform the sleeve, and the reinforcing bars are joined together. A method for removing a continuous concrete wall, which is characterized by releasing the restraint of.
JP2267989A 1989-02-02 1989-02-02 How to remove a continuous concrete wall Expired - Lifetime JPH0672417B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2267989A JPH0672417B2 (en) 1989-02-02 1989-02-02 How to remove a continuous concrete wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2267989A JPH0672417B2 (en) 1989-02-02 1989-02-02 How to remove a continuous concrete wall

Publications (2)

Publication Number Publication Date
JPH02204521A JPH02204521A (en) 1990-08-14
JPH0672417B2 true JPH0672417B2 (en) 1994-09-14

Family

ID=12089547

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2267989A Expired - Lifetime JPH0672417B2 (en) 1989-02-02 1989-02-02 How to remove a continuous concrete wall

Country Status (1)

Country Link
JP (1) JPH0672417B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6541238B2 (en) * 2017-08-02 2019-07-10 株式会社ガイアート Asphalt pavement removal method
CN115584730A (en) * 2022-10-12 2023-01-10 中交四航局第一工程有限公司 A Construction Method for Cutting Out High Water Level Pile Heads

Also Published As

Publication number Publication date
JPH02204521A (en) 1990-08-14

Similar Documents

Publication Publication Date Title
KR100877974B1 (en) Bottom-Up Sequential Removal and Sequential Landfilling Method Using Struts
JPH0672417B2 (en) How to remove a continuous concrete wall
CN208950162U (en) It is easily installed the concrete column of supporting beam and the connection structure of itself and supporting beam
JP5351125B2 (en) Open shield machine start method of open shield method
US20070215383A1 (en) Hydraulic Pile Cap Removal
JP4359700B2 (en) Precast concrete pile core and method for removing reinforced concrete structure using the same
JPH0140165B2 (en)
JPS6248011B2 (en)
JP3853491B2 (en) Pile head internal processing method in ready-made pile burial method
JPH0960471A (en) Wall body for shield tunneling method
JPS61257529A (en) Underground continuous wall construction work
JPH04333718A (en) Crushing of concrete pile head
JPS58195622A (en) Removing method of earth anchor
JP2009121218A (en) Pile head separating method
JPH074073A (en) Partial removal method of reinforced concrete structure
JPS607398Y2 (en) Anchor device for underground wall construction
JPS5938424A (en) Drawing method of steel material in soil pillar-row landslide protection wall
JPS6128774B2 (en)
KR960001455Y1 (en) Type device of section steel for earth wall construction
JPH0517327B2 (en)
JPS6122688B2 (en)
JP2569991B2 (en) Concrete removal method for reinforced concrete joints
KR200245407Y1 (en) Soil-Nail able to Withdraw Itself by Blasting
JPS62291318A (en) Connection of underground wall
JPS61155512A (en) Removal of negative frictional force of in-site pile