Construction method of slope protection structure

Info

Publication number
JPH0678638B2
JPH0678638B2 JP31990991A JP31990991A JPH0678638B2 JP H0678638 B2 JPH0678638 B2 JP H0678638B2 JP 31990991 A JP31990991 A JP 31990991A JP 31990991 A JP31990991 A JP 31990991A JP H0678638 B2 JPH0678638 B2 JP H0678638B2
Authority
JP
Japan
Prior art keywords
intersection
ring
legal
porous
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP31990991A
Other languages
Japanese (ja)
Other versions
JPH05132946A (en
Inventor
晃代 山田
邦光 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kensetsu Kiso Engineering Co Ltd
Original Assignee
Kensetsu Kiso Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kensetsu Kiso Engineering Co Ltd filed Critical Kensetsu Kiso Engineering Co Ltd
Priority to JP31990991A priority Critical patent/JPH0678638B2/en
Publication of JPH05132946A publication Critical patent/JPH05132946A/en
Publication of JPH0678638B2 publication Critical patent/JPH0678638B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】この発明は法面の崩壊を防ぐため
の法面保護構造物の施工法に関するものであり、特に施
工が容易な法面保護構造物の施工法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a slope protection structure for preventing collapse of a slope, and more particularly to a method for constructing a slope protection structure which is easy to construct.

【0002】[0002]

【従来の技術】本件出願人は特願昭61ー142322
号(特開昭63ー533号広報)にかかる発明を開示し
ている。当該発明は、法面上に格子状に型枠を設置し、
さらに格子状の交差部にはこれを囲むよう型枠を設置す
るものである。コンクリートなどの硬化材を型枠に打設
して、格子状の法枠部分と交差部分を構築するものであ
る。周囲に張り出した部分が応力の集中する交差部分を
保護して、強度の大きな法面保護構造物となるものであ
る。特に交差部分は地山に打設したアンカーに固定する
ために、この部分の強度が必要となるものである。
2. Description of the Related Art The applicant of the present application filed Japanese Patent Application No. 61-142322.
The invention disclosed in Japanese Patent Laid-Open No. 63-533 is disclosed. According to the invention, the formwork is installed on the slope in a grid pattern,
Further, a formwork is installed at the grid-like intersection so as to surround it. Hardening material such as concrete is cast on the formwork to construct the grid-like method frame and intersections. The overhanging portion protects the intersection where stress concentrates and becomes a strong slope protection structure. In particular, since the crossing portion is fixed to the anchor placed in the natural ground, the strength of this portion is required.

【0003】[0003]

【発明が解決しようとする課題】このような発明で問題
となるのは、交差部分の構築の施工に手間がかかること
である。すなわち法枠部分を構築するための型枠に四枚
の交差部分補強用の型枠を現場で結び付けるのは煩雑
で、大きな労力を必要とする。また交差部分を形成する
型枠を金網状の部材によって形成すると、強度が小さ
く、交差部分が横方向に大きく膨れ出してしまうことが
あり、設計通りの構造物ができないことがある。また前
記したようにこの交差部分を地山に打設したグラウンド
アンカーに固定し、プレストレス力を与えるものであ
り、この引っ張り力に耐え得る大きな強度が要求されて
いる。
A problem with such an invention is that it takes time and effort to construct the intersection. That is, it is troublesome and labor-intensive to connect the four formwork for reinforcing the intersection part to the formwork for constructing the legal form part on site. Further, when the frame forming the intersecting portion is formed by a wire mesh member, the strength is low and the intersecting portion may largely bulge in the lateral direction, so that the structure as designed may not be obtained. Further, as described above, this crossing portion is fixed to the ground anchor placed in the ground to give a prestressing force, and a large strength capable of withstanding this pulling force is required.

【0004】この発明は以上のような課題を解決するた
めになされたもので、強度の大きな構造物を構築できる
とともに、施工が容易で設計通りの構造物の施工が可能
な法面保護構造物の施工法を提供することを目的とす
る。
The present invention has been made in order to solve the above problems, and can construct a structure having a large strength, can be easily constructed, and can construct a slope protection structure as designed. The purpose is to provide a construction method.

【0005】[0005]

【課題を解決するための手段】この発明は、リング状筋
とそれに多孔性堰板を張った交差部型枠を使用して、施
工を容易にするものである。リング状筋を上下に平行に
配置して、このリング状筋の間に適宜間隔置いて多孔性
堰板を張設して交差部型枠を構成する。交差部型枠は工
場で予めリング状に組んでおいてもよいが、二本の鉄筋
間に多孔性堰板を張っていたものを現場で組んでリング
状にしてもよい。この交差部型枠の中に前記リング状筋
と同心となるリング状のフープ筋を配筋する。交差部型
枠の四方には多孔性堰板の各間隙が形成され、この間隙
に左右に平行に起立した法型枠を挿入する。四方から挿
入した法型枠は、先端が前記フープ筋に近接させる。こ
の交差部型枠と法型枠内にセメント系硬化材を打設し
て、交差部と法枠部を構築する。
SUMMARY OF THE INVENTION The present invention uses a ring-shaped streak and an intersecting form having a porous dam plate stretched thereon to facilitate construction. The cross-shaped form is constructed by arranging the ring-shaped streaks in parallel in the vertical direction and stretching the porous dam plates at appropriate intervals between the ring-shaped streaks. The crossing form may be assembled in a ring shape in advance at the factory, but it may be assembled in the field with a porous dam plate stretched between two reinforcing bars to form a ring shape. A ring-shaped hoop muscle that is concentric with the ring-shaped muscle is arranged in the intersecting part form. Each gap of the porous dam plate is formed on each of the four sides of the intersecting formwork, and the normal formwork standing upright parallel to each other is inserted into this gap. The tip of the normal formwork inserted from all sides is brought close to the hoop muscle. A cement-based hardening material is placed in the cross section form and the normal form to construct the cross section and the normal form.

【0006】またこの出願にかかる他の方法は、リング
状のフープ筋を地山に配設する。この後法型枠を地山に
縦横に並べて法面に格子状に組み、先端フープ筋に近接
させる。この法型枠の交差部分を囲むようにリング状筋
を上下に配筋する。リング状筋は法型枠の多孔性堰板の
孔に通して地山に対して水平に配筋する。この上下のリ
ング状筋の間であって、法型枠の隅角部を覆うように多
孔性堰板を張設して交差部型枠を構成することも可能で
ある。以上のような多孔性堰板としてエキスパンドメタ
ルやクリンプ金網が使用できる。
In another method according to the present application, ring-shaped hoop muscles are arranged in the ground. After this, the normal formwork is arranged vertically and horizontally on the natural ground, assembled on the slope in a grid pattern, and brought close to the tip hoop muscle. The ring-shaped streaks are arranged vertically so as to surround the intersection of this legal formwork. The ring-shaped streaks are arranged horizontally with respect to the ground by passing through the holes of the porous dam plate of the standard formwork. Between the upper and lower ring-shaped streaks, a porous dam plate may be stretched so as to cover the corners of the normal formwork to form the intersecting formwork. Expanded metal or crimp wire mesh can be used as the porous dam plate as described above.

【0007】[0007]

【実施例】以下、図に示す一実施例に基づきこの発明を
詳細に説明する。図において1は交差部型枠であって、
上下に配筋したリング状筋2・2とこの間に張った多孔
性堰板より構成されている。多孔性堰板として実施例で
はクリンプ金網3が使用されている。交差部型枠1は工
場で予めリング形状に構成してもよく、また二本の鉄筋
の間にクリンプ金網3を溶接等によって張ったものを形
成しておき、現場にてリング状に曲げて構成することも
できる。クリンプ金網3は適宜間隔を置いて張設してお
くもので、交差部型枠1の四方にクリンプ金網3間の間
隙4が開口するようにする。図において13は地山に打
設したグラウンドアンカーであり、構造物が完成した後
プレストレス力を与えて、交差部を固定する。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described in detail below based on an embodiment shown in the drawings. In the figure, 1 is an intersection formwork,
It is composed of ring-shaped streaks 2 and 2 arranged vertically and a porous dam plate stretched between them. In the embodiment, a crimp wire net 3 is used as the porous dam plate. The intersection form 1 may be preliminarily formed into a ring shape at the factory, or a crimp wire net 3 stretched by welding or the like may be formed between two rebars and bent into a ring shape on site. It can also be configured. The crimp wire nets 3 are stretched at appropriate intervals, and the gaps 4 between the crimp wire nets 3 are opened on all four sides of the intersecting form 1. In the figure, 13 is a ground anchor placed in the ground, which gives a prestressing force after the structure is completed to fix the intersection.

【0008】地山上に置いた交差型枠1の中にリング状
筋と同心となるフープ筋12を配筋する。フープ筋12
は複数本上下に適宜間隔を置いて配筋する。この交差部
型枠1の各間隙から、左右に平行にクリンプ金網5・5
を起立した法型枠6を挿入する。法型枠6を挿入する前
に予めこの法型枠6の間に配筋する下端鉄筋7を地山に
沿って配設しておく。法型枠6は交差部型枠1の中に
て、前記フープ筋12に近接する位置まで至らせる。し
たがって法型枠6はフープ筋12を中心にして、これよ
り四方に伸びることになる。このように法型枠6の先端
をフープ筋12の手前にて止めることによって、法型枠
がフープ筋12の配筋の支障とならない。
A hoop muscle 12 concentric with the ring-shaped muscle is arranged in the cross frame 1 placed on the natural ground. Hoop muscle 12
Are laid out at appropriate intervals above and below. From each gap of this intersection part formwork 1, the crimp wire nets 5
Insert the legal formwork 6 upright. Before inserting the legal form 6, a lower end reinforcing bar 7 to be reinforced between the legal forms 6 is arranged in advance along the ground. The legal form 6 is brought to a position in the intersection form 1 close to the hoop muscle 12. Therefore, the legal form 6 extends in all directions from the hoop muscle 12 as the center. By stopping the tip of the legal form 6 in front of the hoop muscle 12, the legal form does not hinder the arrangement of the hoop muscle 12.

【0009】その後法型枠6の左右のクリンプ金網5・
5間をスペーサーにて保持し、上端鉄筋8を法型枠6に
沿って配筋する。この交差部型枠1と法型枠6内にセメ
ント系硬化材であるコンクリート9を打設して、図4に
示すような法枠部10が格子状に地山に伸び、その交差
部分に、周囲に張り出した補強部分を有する交差部11
が形成された法面保護構造物を構築する。
After that, the crimp wire nets 5 on the left and right of the legal form 6
The space between 5 is held by a spacer, and the upper end reinforcing bar 8 is arranged along the normal form frame 6. Concrete 9 which is a cement-based hardening material is placed in the intersecting form 1 and the method form 6, and the forming method part 10 as shown in FIG. , Crossing 11 having reinforced portion projecting around
A slope protection structure is formed in which the ridge is formed.

【0010】図5と図6に示すのは他の施工法を示すも
のであり、まず地山に複数本のフープ筋12を配筋す
る。このフープ筋12を中心にして、これより四方に伸
びるように、法型枠6を地山に縦横に格子状に組む。こ
の縦横の法型枠の交差部分を囲むように、上下にリング
状筋2・2を配筋する。リング状筋2は法型枠6の堰板
の孔、すなわち実施例ではクリンプ金網5の網目を通し
て、水平となるように維持するものであり、クリンプ金
網5によってリング状筋2・2が支持されることにな
る。この上下のリング状筋2・2間に法型枠6・6の隅
角部を覆うようにクリンプ金網3を張る。クリンプ金網
3はリング状筋2・2の間隔より高さを若干高くしてお
き、リング状筋2・2の内側から張り、溶接や結束線な
どにより固定する。
FIG. 5 and FIG. 6 show another construction method. First, a plurality of hoop muscles 12 are arranged in the ground. The normal form frame 6 is assembled in a vertical and horizontal lattice pattern so as to extend in all directions around the hoop streak 12. The ring-shaped streaks 2 are arranged vertically so as to surround the intersection of the vertical and horizontal formwork. The ring-shaped streaks 2 are to be maintained horizontally through the holes of the dam plate of the legal form 6, that is, the mesh of the crimp wire net 5 in the embodiment, and the ring-shaped streaks 2 and 2 are supported by the crimp wire net 5. Will be. A crimp wire mesh 3 is stretched between the upper and lower ring-shaped streaks 2 and 2 so as to cover the corners of the normal formwork 6 and 6. The crimp wire netting 3 is made slightly higher than the space between the ring-shaped streaks 2 and 2, and is stretched from the inside of the ring-shaped streaks 2 and fixed by welding or binding wires.

【0011】図7と図8に示すのは他の実施例であり、
交差部型枠1のリング状筋2とフープ筋12を八角形に
屈曲して交差部11の周囲への張り出し部分が三角形と
なるようにしたものである。その他リング状筋3を四角
形など他の多角形にしてもよい。
FIG. 7 and FIG. 8 show another embodiment,
The ring-shaped muscle 2 and the hoop muscle 12 of the intersection part form 1 are bent into an octagon so that the projecting portion of the intersection part 11 to the periphery is a triangle. In addition, the ring-shaped streak 3 may be another polygon such as a quadrangle.

【0012】以上のように、法型枠6の多孔性堰板が交
差部型枠1内のフープ筋2に近接するまで深く入り込ん
でいる。これはその部分の堰板に対する硬化材のかぶり
が大きくなることであり、法型枠6の堰板が交差部11
内にて構造材として充分機能することになる。したがっ
て応力の集中する交差部分が、その内部に入り込んだ堰
板によって補強されることになる。結局、この発明では
法型枠6の堰板5がフープ筋12の手前まで深く入り込
んで、フープ筋12と交差していないことに特徴があ
る。これによってフープ筋12の配筋に支障が生じない
とともに、交差部11に入り込んだ堰板とフープ筋12
によって応力の集中する部分を補強することになる。
[0012] As described above, the porous dam plate of the legal form 6 is deeply inserted until it comes close to the hoop muscle 2 in the intersecting form 1. This means that the covering material of the hardening material on the dam plate at that portion becomes large, and the dam plate of the legal form 6 has an intersection 11
It will fully function as a structural material inside. Therefore, the intersection where stress is concentrated is reinforced by the weir plate that has entered inside. In the end, the present invention is characterized in that the dam plate 5 of the legal form 6 is deeply inserted in front of the hoop muscle 12 and does not intersect the hoop muscle 12. This does not cause any hindrance to the arrangement of the hoop muscles 12, and the weir plate and the hoop muscles 12 that have entered the intersection 11
This will reinforce the part where stress is concentrated.

【0013】[0013]

【発明の効果】この発明は以上のような構成を有するた
め、以下のような効果を得ることができる。 上下のリング状筋を使用して交差部型枠を組むもので
あり、現場における作業が著しく軽減され、施工が簡易
化できる。 法型枠の先端をフープ筋に近接させてフープ筋と交差
させないため、複数本のフープ筋の配筋の支障となるこ
とがない。 交差部部分によって縦梁と横梁の交差部分の面積が広
くなり、その直下の地盤の受圧面積が広くなってアンカ
ーにプレストレス力を与えたとき、その引っ張り荷重に
よって地盤の沈下が生じるようなことがない。 リング状筋によって交差部型枠の形状が維持されるた
め、硬化材の重みによっても変形することがなく、設計
通りの施工が可能となる。 法型枠の堰板が交差部分に入り込んで構造材として機
能するとともに、交差部分の中に配筋したフープ筋とに
よって補強され、応力の集中する部分の強度が極めて大
きな構造物となる。特にフープ筋の設置によって交差部
分の割裂の防止をすることができる。 大きなフープ筋の設置によって、従来のアンカー支圧
板直下のスパイラル筋としての効果とは異なり、縦梁と
横梁の交差部分のせん断補強が可能となる。
Since the present invention has the above-mentioned structure, the following effects can be obtained. The upper and lower ring-shaped streaks are used to form the intersection formwork, which significantly reduces on-site work and simplifies construction. Since the tip of the legal form is close to the hoop muscle and does not intersect the hoop muscle, it does not hinder the arrangement of multiple hoop muscles. The area of the intersection of the vertical beam and the horizontal beam becomes wider due to the intersection part, and the pressure receiving area of the ground beneath it becomes wider, and when the prestressing force is applied to the anchor, the ground load may cause the ground to sink. There is no. Since the shape of the intersecting part form is maintained by the ring-shaped streaks, it can be constructed as designed without being deformed by the weight of the hardening material. The weir plate of the legal form enters the intersection and functions as a structural material, and is reinforced by the hoop reinforcement arranged in the intersection, and the strength of the portion where the stress is concentrated becomes extremely large. In particular, installation of the hoop muscle can prevent splitting at the intersection. By installing a large hoop, unlike the conventional effect of a spiral bar directly below the anchor bearing plate, it becomes possible to perform shear reinforcement at the intersection of the vertical beam and the horizontal beam.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明にかかる法面保護構造物の施工状態の
一実施例の斜視図である。
FIG. 1 is a perspective view of an embodiment of a construction state of a slope protection structure according to the present invention.

【図2】型枠を組んだ状態の斜視図である。FIG. 2 is a perspective view showing a state in which a mold is assembled.

【図3】その平面図である。FIG. 3 is a plan view thereof.

【図4】法面保護構造物の全体図である。FIG. 4 is an overall view of a slope protection structure.

【図5】他の施工例の平面図である。FIG. 5 is a plan view of another construction example.

【図6】そのA−A線断面図である。FIG. 6 is a sectional view taken along the line AA.

【図7】交差部型枠の斜視図である。FIG. 7 is a perspective view of an intersection formwork.

【図8】その平面図である。FIG. 8 is a plan view thereof.

【符号の説明】[Explanation of symbols]

1 交差部型枠 2 リング状筋 3 クリンプ金網 4 間隙 5 クリンプ金網 6 法型枠 7 下端鉄筋 8 上端鉄筋 9 コンクリート 10 法枠部 11 交差部 12 フープ筋 13 グラウンドアンカー 1 Intersection Form 2 Ring-shaped Reinforcing 3 Crimp Wire Mesh 4 Gap 5 Crimp Wire Mesh 6 Formwork 7 Bottom Reinforcing Bar 8 Top Reinforcing Bar 9 Concrete 10 Formwork 11 Intersection 12 Hoop Rein 13 Ground Anchor

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 上下のリング状筋の間に適宜間隔を置い
て多孔性堰板を張設した交差部型枠を地山上に設置し
て、この交差部型枠の中に前記リング状筋と同心となる
リング状のフープ筋を配筋し、交差部型枠の四方に開口
した多孔性堰板間の各間隙から、左右に平行に多孔性堰
板を起立した法型枠を挿入して先端を前記フープ筋まで
近接させ、交差部型枠と法型枠内にセメント系硬化材を
打設して交差部と法枠部を構築する法面保護構造物の施
工法。
1. An intersection form frame, in which porous dam plates are stretched at appropriate intervals between upper and lower ring-shaped streaks, is installed on the ground, and the ring-shaped streaks are placed in the intersection part form. A ring-shaped hoop muscle that is concentric with is arranged, and from each gap between the porous weir plates that open on all four sides of the intersecting form, insert the legal form that stands up the porous weir plates in parallel to the left and right. Construction method of a slope protection structure in which the tip is brought close to the hoop muscle and a cement-based hardening material is placed in the intersection form and the normal form to construct the intersection and the slope form.
【請求項2】 リング状のフープ筋を地山上に配設し、
左右に平行に多孔性堰板を起立した法型枠を法面上に縦
横に並べて先端を前記フープ筋に近接させ、この法型枠
の交差部分を囲むようにリング状筋を前記法型枠の多孔
性堰板の孔に通して上下に平行に配筋し、法型枠の隅角
部を覆うように多孔性堰板を張設して交差型枠を構成
し、この交差部型枠と法型枠内にセメント系硬化材を打
設して交差部と法枠部を構築する法面保護構造物の施工
法。
2. Arranging a ring-shaped hoop muscle on the ground,
The legal formwork in which the porous weir plates are erected in parallel to the left and right are arranged vertically and horizontally on the slope and the tip is brought close to the hoop muscle, and the ring-shaped muscle is formed so as to surround the intersection of the legal formwork. Through the holes of the porous weir plate, and arrange the bars in parallel vertically, and extend the porous weir plate to cover the corners of the legal formwork to form a crossing formwork. And a construction method of slope protection structure in which cement-based hardening material is placed in the legal form to construct the intersection and the legal frame.
【請求項3】 多孔性堰板としてエキスパンドメタルを
採用したことを特徴とする請求項1又は2記載の法面保
護構造物の施工法。
3. The method for constructing a slope protection structure according to claim 1, wherein expanded metal is used as the porous dam plate.
【請求項4】 多孔性堰板としてクリンプ金網を採用し
たことを特徴とする請求項1又は2記載の法面保護構造
物の施工法。
4. The method for constructing a slope protection structure according to claim 1, wherein a crimp wire net is adopted as the porous dam plate.
JP31990991A 1991-11-06 1991-11-06 Construction method of slope protection structure Expired - Lifetime JPH0678638B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP31990991A JPH0678638B2 (en) 1991-11-06 1991-11-06 Construction method of slope protection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP31990991A JPH0678638B2 (en) 1991-11-06 1991-11-06 Construction method of slope protection structure

Publications (2)

Publication Number Publication Date
JPH05132946A JPH05132946A (en) 1993-05-28
JPH0678638B2 true JPH0678638B2 (en) 1994-10-05

Family

ID=18115587

Family Applications (1)

Application Number Title Priority Date Filing Date
JP31990991A Expired - Lifetime JPH0678638B2 (en) 1991-11-06 1991-11-06 Construction method of slope protection structure

Country Status (1)

Country Link
JP (1) JPH0678638B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018193665A (en) * 2017-05-12 2018-12-06 株式会社グリーンエース Reinforcing bar holder, reinforcing bar frame structure, and pressure plate forming method

Also Published As

Publication number Publication date
JPH05132946A (en) 1993-05-28

Similar Documents

Publication Publication Date Title
CN110499869A (en) Bracket composite beam and its construction method
JP2891167B2 (en) Pile head reinforcement structure
CN210713185U (en) Assembled steel structure and assembled building
JPH0678638B2 (en) Construction method of slope protection structure
JP2020084686A (en) Independent footing foundation structure and its construction method
JP3608131B2 (en) Building reinforcement structure
JP3242628B2 (en) Structure of the joint between a corner post and a beam in a tube frame
JPH05112943A (en) Construction method of slope protective structure
JPH04261915A (en) Slope frame constructing block and method for constructing slope frame thereof
JPH09228653A (en) Method for strengthening seismic resistance of buildings and seismic resistant block
KR102175474B1 (en) Rebar assembly
CN222730924U (en) Steel reinforcement cage with hidden column and prefabricated reinforced concrete superposed wall member thereof
JPH0685441U (en) Reinforcing bar assembly unit with weir plate
JP7430092B2 (en) Reinforcement bars, seismic isolation upper foundation structure and footing structure
JPH0197744A (en) Shear reinforcement structure of shear head part in flat plate structure building
JPH0519383Y2 (en)
JP2654597B2 (en) Reinforcement method of wall type rigid frame structure
JP3245824B2 (en) Column and beam joint structure of RC structure and its construction method
JPH02120446A (en) Precast version
JPH0116802Y2 (en)
JPH01203522A (en) Exposed type fixed column base
JPH03212513A (en) Slope protection engineering method
JPH0437133Y2 (en)
JP2700637B2 (en) Slope stable structure
JPH0743182U (en) Rebar assembly