JPH0684995B2 - Control rod control device, reactor core status display device, and control rod operation determination device - Google Patents
Control rod control device, reactor core status display device, and control rod operation determination deviceInfo
- Publication number
- JPH0684995B2 JPH0684995B2 JP63085100A JP8510088A JPH0684995B2 JP H0684995 B2 JPH0684995 B2 JP H0684995B2 JP 63085100 A JP63085100 A JP 63085100A JP 8510088 A JP8510088 A JP 8510088A JP H0684995 B2 JPH0684995 B2 JP H0684995B2
- Authority
- JP
- Japan
- Prior art keywords
- control rod
- control
- core
- fuel
- fuel assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
Description
【発明の詳細な説明】 〔産業上の利用分野〕 本発明は、制御棒制御装置、炉心状態表示装置及び制御
操作判定装置に係り、特に沸騰水型原子炉に適用され原
子炉運転停止時の制御棒操作を監視するのに好適な制御
棒制御装置、炉心状態表示装置及び制御棒操作判定装置
に関するものである。Description: TECHNICAL FIELD The present invention relates to a control rod control device, a reactor core state display device, and a control operation determination device, and is particularly applied to a boiling water reactor and The present invention relates to a control rod control device, a core state display device, and a control rod operation determination device suitable for monitoring control rod operation.
沸騰水型原子力発電所を始めとする原子力発電所では、
1つの燃料サイクルの運転が終了した後、原子炉を停止
させて燃料集合体,中性子検出器の一種である局所出力
領域モニタ(LPRM)。及び制御棒の交換、及び制御棒駆
動装置の交換等の定期検査が実施される。At nuclear power plants, including boiling water nuclear power plants,
After the operation of one fuel cycle is completed, the reactor is shut down and the fuel assembly and local power range monitor (LPRM), which is a kind of neutron detector, are operated. Periodic inspections such as replacement of control rods and control rod drive devices are carried out.
燃料交換は、特公昭58-21238号公報に示されるように運
転員の設定データをチエックし燃料交換機にて自動的に
行つている。LPRMの交換作業は、特公昭61-43676号公報
に示されるようにインコアモニタ交換装置及び据付雇を
用いて行われる。制御棒交換作業は、特開昭56-104290
号公報及び特開昭56-103399号公報に示されるように交
換する制御棒の周囲の燃料集合体を取出して燃料支持金
具を取出し、制御棒駆動装置との結合を解除した上で制
御棒を取出すことにより行われる。新しい制御棒の取付
けは制御棒の取外しと逆の順序で行われる。制御棒駆動
装置の取外し装着は、特公昭60-35035号公報に示された
制御棒駆動装置交換装置を用いて行われている。The fuel refueling is automatically performed by the fuel refueling machine by checking the setting data of the operator as shown in Japanese Patent Publication No. 58-21238. The LPRM replacement work is performed by using an in-core monitor replacement device and an installation worker as shown in Japanese Patent Publication No. 61-43676. For control rod replacement work, see JP-A-56-104290
As shown in JP-A-56-103399 and JP-A-56-103399, the fuel assembly around the control rod to be replaced is taken out, the fuel support fitting is taken out, and the control rod drive device is released, and then the control rod is removed. It is done by taking out. Installation of a new control rod is done in the reverse order of removing the control rod. The removal and mounting of the control rod drive device is performed by using the control rod drive device exchange device disclosed in Japanese Patent Publication No. 60-35035.
前述した燃料交換、LPRM交換、制御棒交換及び制御棒駆
動装置の交換の作業に要する時間は、上記した各公報に
示された方法等の採用により従来よりもかなり短縮され
ている。しかしながら、上記の4つの交換作業は原子炉
の定期点検工程の上でクリテイカルパスになつている。
従つて、定期点検工程短縮による原子炉の稼働率向上の
ために、上記クリテイカルパスに要する時間の短縮が望
まれている。The time required for the above-mentioned fuel exchange, LPRM exchange, control rod exchange, and control rod drive device exchange work is considerably shortened by the adoption of the methods disclosed in the above-mentioned publications. However, the above four replacement works are in the critical path in the periodic inspection process of the reactor.
Therefore, in order to improve the operation rate of the nuclear reactor by shortening the periodic inspection process, it is desired to shorten the time required for the above-mentioned critical path.
本発明の第1の目的は、工程上のクリテイカルパスの作
業に要する時間を短縮できる制御棒制御装置、制御操作
判定装置及び原子炉構成要素の交換方法を提供すること
にある。A first object of the present invention is to provide a control rod control device, a control operation determination device, and a reactor component replacement method that can reduce the time required for the work of a critical path in a process.
本発明の第2の目的は、構成の簡単な制御棒制御装置を
提供することにある。A second object of the present invention is to provide a control rod control device having a simple structure.
本発明の第3の目的は、操作可能な制御棒が容易に確認
できる炉心状態表示装置を提供することにある。A third object of the present invention is to provide a reactor core state display device in which operable control rods can be easily confirmed.
本発明の第4の目的は、炉心及び燃料貯蔵プール内にお
ける燃料集合体の装荷状態を容易に把握できる原子炉構
成要素の状態表示装置を提供することにある。It is a fourth object of the present invention to provide a reactor component status display device capable of easily grasping the loading status of fuel assemblies in the core and fuel storage pool.
上記第1の目的は、制御棒の操作の可否を、炉心内の燃
料集合体の装荷状態を示す装荷情報に基づいて判定し、
その判定結果を原子炉の停止状態において出力し、制御
棒の操作指令及び判定結果を入力し、判定結果が可であ
る場合に操作指令に基づく制御棒駆動信号を出力するよ
うに構成することによつて達成できる。The first purpose is to determine whether or not the control rod can be operated based on loading information indicating a loading state of the fuel assembly in the core,
The determination result is output when the reactor is stopped, the control rod operation command and the determination result are input, and the control rod drive signal based on the operation command is output when the determination result is acceptable. Can be achieved.
本発明の第2の目的は、燃料つかみ手段を現在位置から
指定された移動先である目標位置までに移動させ、燃料
つかみ手段による燃料集合体の移動に基づいて記憶手段
に記憶されている燃料集合体の装荷情報を更新し、制御
棒の操作指令にて指示された制御棒の操作の可否を入力
した前記装荷情報に基づいて判定し、その判定結果を出
力する燃料交換制御手段を設けることによつて達成でき
る。A second object of the present invention is to move the fuel gripping means from a current position to a target position which is a designated destination, and to store the fuel stored in the storage means based on the movement of the fuel assembly by the fuel gripping means. A fuel exchange control means is provided for updating the loading information of the assembly, determining whether or not the control rod can be operated instructed by the control rod operation command based on the loaded information, and outputting the determination result. Can be achieved by
本発明の第3の目的は、炉心内の燃料集合体の装荷状態
を示す装荷情報及び制御棒位置信号に基づいて炉心内に
おける燃料集合体及び制御棒の有無の情報を作成する画
像情報作成手段と、制御棒の操作指令を出力する操作盤
が配置された操作室内に設置され、しかも入力した燃料
集合体及び制御棒の有無の情報を表示する表示手段とを
備えることにより達成できる。A third object of the present invention is image information creating means for creating information on the presence or absence of fuel assemblies and control rods in the core based on loading information indicating the loading state of fuel assemblies in the core and control rod position signals. And a display means installed in the operation room in which an operation panel for outputting an operation command for the control rod is arranged, and further for displaying the input information about the presence or absence of the fuel assembly and the control rod.
本発明の第4の目的は、炉心及び燃料貯蔵プール内の燃
料集合体の装荷状態を示す装荷情報を記憶している手段
と、燃料つかみ手段を現在位置から指定された移動先で
ある目標位置までに移動させ、燃料つかみ手段による燃
料集合体の移動に基づいて記憶手段に記憶されている装
荷情報を更新し、しかも装荷情報及び入力した制御棒位
置信号に基づいて炉心及び燃料貯蔵プール内における燃
料集合体の有無の情報及び炉心内における制御棒の有無
の情報をそれぞれ作成する燃料交換制御手段と、燃料交
換制御手段が配置された操作室内に設置され、しかも入
力した燃料集合体及び制御棒の有無の情報を表示する表
示手段とを備えることにより達成できる。A fourth object of the present invention is to store means for storing loading information indicating loading states of fuel assemblies in the core and fuel storage pool, and a target position which is a destination to which the fuel gripping means is designated from the current position. To update the loading information stored in the storage means based on the movement of the fuel assembly by the fuel gripping means, and in the core and the fuel storage pool based on the loading information and the input control rod position signal. The fuel assembly and the control rod which are installed in the operation room in which the fuel exchange control means and the fuel exchange control means for creating the information on the presence or absence of the fuel assembly and the information on the presence or absence of the control rod in the core, respectively, are input This can be achieved by including a display unit that displays information regarding the presence or absence of
制御棒の操作の可否を炉心内の燃料集合体の装荷状態を
示す装荷情報に基づいて判定してその判定結果を原子炉
の停止状態において出力しているので、原子炉の停止状
態においてすべての燃料集合体が取出されたセル内の制
御棒を引抜くことができ、工程上のクリテイカルパスの
作業に要する時間を短縮できる。Whether or not the control rod can be operated is determined based on the loading information indicating the loading state of the fuel assemblies in the core, and the determination result is output in the reactor stopped state. The control rod in the cell from which the fuel assembly has been taken out can be pulled out, and the time required for the work of the critical path in the process can be shortened.
燃料交換制御手段により制御棒の操作指令にて指示され
た制御棒の操作の可否を入力した前記装荷情報に基づい
て判定しているので、この判定を行なうために別の処理
装置を設ける必要がなく、制御棒制御装置の構成を単純
化できる。Since it is determined based on the loading information that the control rod operation command instructed by the fuel exchange control means is input based on the input loading information, it is necessary to provide another processing device to make this determination. Therefore, the structure of the control rod control device can be simplified.
炉心内の燃料集合体の装荷状態を示す装荷情報及び制御
棒位置信号に基づいて作成された炉心内における燃料集
合体及び制御棒の有無の情報を表示するので、制御棒操
作を行なう運転員は操作可能な制御棒を容易に確認でき
る。Since the information indicating the presence or absence of fuel assemblies and control rods in the core created based on the loading information indicating the loading state of the fuel assemblies in the core and the control rod position signal is displayed, the operator operating the control rods can The control rod that can be operated can be easily confirmed.
炉心及び燃料貯蔵プール内の燃料集合体の装荷状態を示
す装荷情報に基づいて炉心及び燃料貯蔵プール内におけ
る燃料集合体の有無の情報を表示するので、炉心及び燃
料貯蔵プール内における燃料集合体の装荷状態を容易に
把握できる。Information about the presence or absence of fuel assemblies in the core and fuel storage pool is displayed based on the loading information indicating the loading status of the fuel assemblies in the core and fuel storage pool. You can easily understand the loading status.
沸騰水型原子炉に適用した本発明の好適な実施例である
制御棒制御装置を第1図に基づいて説明する。A control rod control apparatus which is a preferred embodiment of the present invention applied to a boiling water reactor will be described with reference to FIG.
まず沸騰水型原子炉の概略構造について説明する。沸騰
水型原子炉は、原子炉圧力容器38を有している。原子炉
圧力容器38は、ペデスタル19上に設置される。制御棒駆
動装置ハウジング20が原子炉圧力容器38の底部に設けら
れる。第1図は、沸騰水型原子炉の運転停止後の定期検
査実施中の状態を示し、原子炉圧力容器38は上蓋が取除
かれ上端部が開放されている。原子炉ウエル32内に水が
張られている。第2図のように燃料集合体33が装荷され
てなる炉心34が、原子炉圧力容器38内に設けられる。制
御棒駆動装置21に着脱可能に連結される制御棒22は、原
子炉停止時において燃料集合体33間に挿入される。制御
棒駆動装置21は、制御棒駆動装置ハウジング20内に設置
されている。制御棒駆動装置21は、制御棒22に連結され
るピストンを移動させる駆動水配管23A及び23Bを接続し
ている。各駆動水配管23A及び23Bはコントロール弁24
A、24B、24C、及び24Dを有している。First, the schematic structure of a boiling water reactor will be described. The boiling water reactor has a reactor pressure vessel 38. The reactor pressure vessel 38 is installed on the pedestal 19. A control rod drive housing 20 is provided at the bottom of the reactor pressure vessel 38. FIG. 1 shows a state in which periodical inspection is being performed after the operation of the boiling water reactor has been stopped. The reactor pressure vessel 38 has an upper lid removed and an upper end opened. Water is filled in the reactor well 32. As shown in FIG. 2, a reactor core 34 having a fuel assembly 33 loaded therein is provided in a reactor pressure vessel 38. The control rod 22 detachably connected to the control rod drive device 21 is inserted between the fuel assemblies 33 when the reactor is stopped. The control rod drive device 21 is installed in the control rod drive device housing 20. The control rod drive device 21 connects drive water pipes 23A and 23B for moving a piston connected to the control rod 22. Each drive water pipe 23A and 23B has a control valve 24
It has A, 24B, 24C, and 24D.
炉心32では、1つの制御棒22を取囲む4体の燃料集合体
33にて1つのセルが構成されている(第3図)。セルを
構成する4体の燃料集合体の各上端部は、炉心34の上端
部に設置された炉心上部格子板24の1つの升目内に挿入
される。各燃料集合体33は、各々の燃料集合体33に設け
られたチヤンネルフアスナ35の弾性体にて炉心上部格子
板25に押圧されている。36は燃料集合体33に設けられた
ハンドルである。In the core 32, four fuel assemblies surrounding one control rod 22
One cell is composed of 33 (Fig. 3). The upper ends of the four fuel assemblies that form the cells are inserted into one grid of the upper core lattice plate 24 installed at the upper end of the core 34. Each fuel assembly 33 is pressed against the core upper lattice plate 25 by the elastic member of the channel asuna 35 provided in each fuel assembly 33. Reference numeral 36 is a handle provided on the fuel assembly 33.
燃料交換機31は、原子炉建屋の5階床面上に設置され、
原子炉ウエル32及び燃料貯蔵プール30をまたぐように構
成されている。原子炉建屋は、原子炉圧力容器38を内蔵
する格納容器(図示せず)を内部に設置している。燃料
貯蔵プール30及び原子炉ウエル32は、原子炉建屋5階に
開放され、燃料交換時に第4図に示すようにゲート31に
て互いに連絡される。燃料貯蔵プール30内には、多数の
燃料ラツク37が設置されている。燃料ラツク37は、炉心
34から取出された使用済みの燃料集合体33、炉心34内に
装荷される新しい燃料集合体33、炉心34から取出されて
炉心34に戻される燃料集合体33を装荷するために用いら
れる。燃料交換機31は、走行台車1、横行台車2、グラ
ツプル3、つかみ装置4及びホイスト5より構成され
る。走行台車1は、原子炉ウエル32及び燃料貯蔵プール
30の両脇に設置された1対のレール6の上を、駆動モー
タ8により移動する。横行台車2は、グラツプル3、つ
かみ装置4及びホイスト5を有し、走行台車1上に設置
された1対のレール7の上を駆動モータ9により移動す
る。グラツプル3は、ホイスト5と駆動モータ9により
上昇、下降すると共に、燃料集合体33の角度を調整する
ために駆動モータ11より回転する。又、このグラツプル
3は数本の伸縮管より構成され、下端につかみ装置4が
取付けられている。以下、走行台車1の移動方向をX、
横行台車2の移動方向をY、グラツプル3の昇降をZ、
回転をθと称する。X、Y、Z、θの移動量を示す位置
信号は、燃料交換機31の各駆動軸に取付けた各シンクロ
発信器(図示せず)によつて検出される。The refueling machine 31 is installed on the floor of the 5th floor of the reactor building,
It is configured to straddle the reactor well 32 and the fuel storage pool 30. The reactor building has a containment vessel (not shown) that houses the reactor pressure vessel 38 installed therein. The fuel storage pool 30 and the reactor well 32 are opened on the 5th floor of the reactor building and are connected to each other at the gate 31 as shown in FIG. A large number of fuel racks 37 are installed in the fuel storage pool 30. Fuel rack 37 is the core
It is used to load a used fuel assembly 33 taken out of the fuel cell 34, a new fuel assembly 33 loaded in the core 34, and a fuel assembly 33 taken out of the core 34 and returned to the core 34. The refueling machine 31 includes a traveling carriage 1, a traverse carriage 2, a grapple 3, a gripping device 4, and a hoist 5. The traveling carriage 1 includes the reactor well 32 and the fuel storage pool.
A pair of rails 6 installed on both sides of 30 are moved by a drive motor 8. The traverse vehicle 2 has a group 3, a gripping device 4 and a hoist 5, and is moved by a drive motor 9 on a pair of rails 7 installed on the traveling cart 1. The grapple 3 is moved up and down by the hoist 5 and the drive motor 9 and is rotated by the drive motor 11 to adjust the angle of the fuel assembly 33. Further, this glass 3 is composed of several expansion tubes, and a gripping device 4 is attached to the lower end thereof. Hereinafter, the traveling direction of the traveling carriage 1 is X,
The moving direction of the traverse vehicle 2 is Y, the raising and lowering of the glass 3 is Z,
The rotation is called θ. The position signal indicating the amount of movement of X, Y, Z, and θ is detected by each synchro oscillator (not shown) attached to each drive shaft of the fuel exchanger 31.
燃料交換機制御装置12は、プロセス入出力装置13、演算
処理装置14、メモリ15、オペレータコンソール16及びプ
リンタ17を備えている。オペレータコンソール16は、表
示装置(デイスプレイ)18を有する。メモリ15は、炉心
の各位置(X−YID座標)における燃料集合体33の装荷
の有無、炉心でのブレードガイドの装荷位置及び制御棒
22の挿入引抜き状態のデータ、及び燃料貯蔵プール30に
おける燃料ラツク37の各位置(X−YID座標)での燃料
集合体33の装荷の有無及び燃料ラツク37内でのブレード
ガイドの装荷位置に関するデータを記憶している。すな
わち、メモリ15は、燃料集合体33が装荷されていない位
置には「0」、それが装荷されている位置には「1」、
及びブレードガイドが装荷されている位置には「2」を
与えてそれらの装荷状態を記憶している。The fuel exchanger control device 12 includes a process input / output device 13, an arithmetic processing device 14, a memory 15, an operator console 16 and a printer 17. The operator console 16 has a display device (display) 18. The memory 15 includes the presence or absence of loading of the fuel assembly 33 at each position (X-YID coordinates) of the core, the loading position of the blade guide in the core, and the control rod.
Data on the insertion / extraction state of 22 and data on whether or not the fuel assembly 33 is loaded at each position (X-YID coordinate) of the fuel rack 37 in the fuel storage pool 30 and the loading position of the blade guide in the fuel rack 37. I remember. That is, the memory 15 stores "0" at a position where the fuel assembly 33 is not loaded, and "1" at a position where the fuel assembly 33 is loaded,
And, "2" is given to the position where the blade guide is loaded to store the loading state thereof.
ID座標とは、X−Yの各々の絶対的な距離で示す座標で
はなく、燃料集合体装荷位置に付した符号による座標表
示である。例えば第2図のWの位置の燃料集合体33のX
−YID座標は、(11、1)となる。ID座標は、絶対的な
距離の位置に変換される。燃料交換機制御装置12は、原
子炉建屋の5階の操作室(第1操作室という)内に設置
される。The ID coordinate is not the coordinate indicated by the absolute distance of each of XY, but the coordinate display by the code attached to the fuel assembly loading position. For example, X of the fuel assembly 33 at the position W in FIG.
-The YID coordinates are (11, 1). ID coordinates are converted to absolute distance positions. The fuel exchanger control device 12 is installed in an operation room (referred to as a first operation room) on the fifth floor of the reactor building.
本実施例の制御棒制御装置は、原子炉建屋の5階とは異
なる場所にある中央操作室に設置されている。本実施例
の制御棒制御装置は、制御棒操作監視装置26、制御棒駆
動装置制御装置27及び制御棒操作ボタン29を有する操作
盤28を備えている。制御棒操作監視装置26は、原子炉の
運転時において制御棒引抜きによつて局部的に出力が上
昇した場合にその制御棒の引抜きを阻止するロツドブロ
ツクモニタとは別の装置である。制御棒操作監視装置26
及び開閉器42により制御棒操作判定装置が構成されてい
る。制御棒操作ボタン29は、第2図に示す各制御棒22に
対応して設けられている。図示されていないが、制御棒
22の挿入、引抜きを指示する操作ボタンも操作盤28に設
けられる。操作盤28は、炉心34に冷却水を供給する循環
ポンプ(図示せず)の起動、停止用の操作ボタン39及び
表示装置 (デイスプレイ)40を備えている。制御棒操作監視装置
26は、制御棒位置検出器41の出力信号及びメモリ15内を
検索することによつて得られた炉心34内の各位置におけ
る燃料集合体33の装荷の有無のデータ及び炉心34のブレ
ードガイドの装荷位置のデータを入力する。制御棒位置
検出器41は、制御棒駆動装置21毎に設けられている。制
御棒操作監視装置26の出力信号は、開閉器42を介して制
御棒駆動装置制御装置27に入力される。開閉器42は、操
作盤28に設けられた原子炉の運転モードの切替を指示す
る操作ボタン39からの信号によつて開閉される。例え
ば、操作ボタン39にて燃料交換機の操作モードが設定さ
れたときに開閉器42は閉され、操作ボタン39にて燃料交
換機の操作モードが解除されたときに開閉器42は開され
る。換言すれば、開閉器42は原子炉が停止状態あるとき
に閉され、原子炉を起動するとき(臨界状態にするとき
も含む)に開される。The control rod control device of the present embodiment is installed in the central operation room in a place different from the 5th floor of the reactor building. The control rod control device of this embodiment includes a control rod operation monitoring device 26, a control rod drive device control device 27, and an operation panel 28 having a control rod operation button 29. The control rod operation monitoring device 26 is a device different from the rod block monitor that prevents the control rod from being pulled out when the output locally rises due to the control rod withdrawal during the operation of the reactor. Control rod operation monitoring device 26
The switch 42 constitutes a control rod operation determination device. The control rod operation button 29 is provided corresponding to each control rod 22 shown in FIG. Control rod, not shown
The operation panel 28 is also provided with operation buttons for instructing the insertion and removal of 22. The operation panel 28 is provided with operation buttons 39 for starting and stopping a circulation pump (not shown) for supplying cooling water to the core 34 and a display device (display) 40. Control rod operation monitoring device
26, the output signal of the control rod position detector 41 and the data of the presence or absence of loading of the fuel assembly 33 at each position in the core 34 obtained by searching the memory 15 and the blade guide of the core 34. Enter the loading position data. The control rod position detector 41 is provided for each control rod driving device 21. The output signal of the control rod operation monitoring device 26 is input to the control rod drive device control device 27 via the switch 42. The switch 42 is opened / closed by a signal from an operation button 39 instructing switching of the operation mode of the nuclear reactor provided on the operation panel 28. For example, the switch 42 is closed when the operation mode of the fuel exchanger is set by the operation button 39, and the switch 42 is opened when the operation mode of the fuel exchanger is released by the operation button 39. In other words, the switch 42 is closed when the reactor is in a stopped state and opened when the reactor is started up (including when the reactor is in a critical state).
なお、燃料交換及び前述の制御棒交換では、作業中に制
御棒が倒れるのを防止するため、特開昭56-104291号公
報の第1図に示すブレードガイドが用いられる。ブレー
ドガイドは、燃料集合体33のチヤンネルボツクスと同じ
断面形状を有する1対のガイド部を備えている。ブレー
ドガイドの使用例は、上記公開公報の第4図及び上記公
開公報の2頁、下部左欄6行から同頁、下部右欄15行に
示されている。In the fuel exchange and the control rod exchange described above, the blade guide shown in FIG. 1 of JP-A-56-104291 is used to prevent the control rod from falling down during the work. The blade guide includes a pair of guide portions having the same sectional shape as the channel box of the fuel assembly 33. An example of the use of the blade guide is shown in FIG. 4 of the above-mentioned publication and page 2 of the above-mentioned publication, lower left column, line 6 to the same page, lower right column, line 15.
制御棒操作監視装置26は、マイクロコンピユータであ
り、原子炉停止時に第5図及び第6図の処理手順を実行
する。これらの処理手順は、制御棒操作監視装置26のメ
モリ(図示せず)内に記憶されており、制御棒操作監視
装置26の演算処理手段に呼び出され実行される。まず第
5図の処理手順について説明する。燃料交換機制御装置
12のメモリ15に記憶されている炉心内の燃料集合体33及
びブレードガイドの装荷状態に関するデータを検索して
入力する(ステツプ43A)。前回入力したデータと今回
入力したデータとを比較し、炉心34内で燃料集合体33及
びブレードガイドの装荷状態が変化したか否かを判定す
る(ステツプ43B)。その装荷状態が変化した場合に
は、ステツプ43Gの判定が「YES」となるまでステツプ43
C、43D及び43E(または43F)の処理が繰返される。ステ
ツプ43Cは、セル内に4体の燃料集合体がない場合に「Y
ES」、逆の場合に「NO」と判定する。ステツプ43Dにて
「ブレードガイドがある」と判定された場合には、ステ
ツプ43Eにて「ブレードガイドが装荷された空セル」を
制御棒操作監視装置26のメモリに記憶する。ステツプ43
Dにて「ブレードガイドがない」と判定された場合に
は、ステツプ43Fにて「ブレードガイドが装装されてい
ない空セル」が記憶される。空セルとは、4体の燃料集
合体がすべて存在しないセルを意味する。ステツプ43C
以降の処理が全セルについて行われた場合にステツプ43
Gは「YES」となり、第5図の処理が終了する。なお、ス
テツプ43Aによるメモリ15内の関連データの入力は、燃
料交換機31による燃料集合体33及びブレードガイドの移
動を考慮した周期にて行われる。The control rod operation monitoring device 26 is a microcomputer and executes the processing procedure shown in FIGS. 5 and 6 when the reactor is shut down. These processing procedures are stored in the memory (not shown) of the control rod operation monitoring device 26, and are called and executed by the arithmetic processing means of the control rod operation monitoring device 26. First, the processing procedure of FIG. 5 will be described. Fuel exchange controller
Data regarding the loading states of the fuel assembly 33 and the blade guide in the core stored in the memory 15 of 12 are retrieved and input (step 43A). The data input last time and the data input this time are compared to determine whether or not the loading states of the fuel assembly 33 and the blade guide have changed in the core 34 (step 43B). If the loading condition changes, the step 43G is checked until it becomes "YES".
The processing of C, 43D and 43E (or 43F) is repeated. Step 43C indicates "Y" if there are no four fuel assemblies in the cell.
ES "and in the opposite case, it is judged as" NO ". If it is determined in step 43D that "the blade guide is present", the "empty cell loaded with the blade guide" is stored in the memory of the control rod operation monitoring device 26 in step 43E. Step 43
When it is determined in D that "there is no blade guide", "an empty cell in which the blade guide is not mounted" is stored in step 43F. An empty cell means a cell in which all four fuel assemblies do not exist. Step 43C
If the subsequent processing is performed for all cells, step 43
G becomes "YES", and the processing of FIG. 5 is completed. It should be noted that the input of the relevant data in the memory 15 by the step 43A is performed at a cycle in consideration of the movement of the fuel assembly 33 and the blade guide by the fuel exchanger 31.
第6図の処理手順は、中央操作室にいる運転員(第1の
運転員という)が操作したい制御棒22に対応する制御棒
操作ボタン29を押したときに第5図の処理手順に優先し
て実行される。第1の運転員は、制御棒操作ボタン29を
押すと共に該当する制御棒の引抜きまたは挿入を他の操
作ボタンにて指示する。第1の運転員のこれらの指示に
伴う信号は操作盤28から制御棒操作監視装置26に入力さ
れる。第6図の処理手順は、指示された制御棒操作が引
抜き操作及び挿入操作のいずれであるかの判定(ステツ
プ44A)から開始される。引抜き操作の場合には第6図
の一点鎖線より右側のステツプ44B以降の処理が実行さ
れ、挿入挿作の場合にはその一点鎖線より左側のステツ
プ44J以降の処理が実行される。制御棒22の引抜き操作
に対する第6図に示す処理は、セル内から4体の燃料集
合体33が取出された後にそのセルの制御棒を引抜くとき
に行われる。制御棒22の挿入操作に対する第6図に示す
処理は、4体の燃料集合体が取除かれたセルに燃料集合
体を再び装荷するにあたつて、事前に制御棒を挿入する
場合に行われる。ステツプ44Bは、全セルに燃料集合体
があるか否かを判定する。「YES」の場合には、炉心34
に全制御棒が全挿入されているか否かを判定する(ステ
ツプ44C)。制御棒22の挿入状態は、入力した制御棒位
置検出器41の測定値に基づいて判定される。ステツプ44
Cの判定が「YES」であれば、ステツプ44Dが実行され
る。ステツプ44Dは、引抜き操作の対象になつている1
本の制御棒22だけに引抜き許可信号を出力する。ステツ
プ44Cの判定が「NO」であれば、すでに引抜かれている
制御棒22を除いた他の制御棒22に対する引抜き阻止信号
を出力する(ステツプ44E)。ステツプ44Bの「NO」の判
定に対しては、ステツプ44Fの判定が更に行われる。ス
テツプ44Fは、引抜き対象制御棒の位置するセル(対象
セルという)が空セルであるか否かを判定する。この判
定が「NO」の場合にはステツプ44Cの処理が行われ、「Y
ES」の場合にはステツプ44Gの対象セルにブレードガイ
ドがあるか否かが判定される。ステツプ44Gの判定が「N
O」であると、引抜き操作の対象となつている制御棒22
に対する引抜き阻止信号を出力する(ステツプ44H)。
ステツプ44Gの判定が「YES」である場合、引抜き操作の
対象である制御棒22に対する引抜き許可信号を出力する
(ステツプ44I)。The processing procedure of FIG. 6 has priority over the processing procedure of FIG. 5 when the operator in the central operation room (referred to as the first operator) presses the control rod operation button 29 corresponding to the control rod 22 desired to operate. And then executed. The first operator pushes the control rod operation button 29 and instructs the pull-out or insertion of the corresponding control rod with another operation button. Signals accompanying these instructions from the first operator are input to the control rod operation monitoring device 26 from the operation panel 28. The processing procedure of FIG. 6 is started from the judgment whether the instructed control rod operation is the pull-out operation or the insert operation (step 44A). In the pull-out operation, the processing after step 44B on the right side of the dashed-dotted line in FIG. 6 is executed, and in the case of insertion insertion, the processing after step 44J on the left-hand side of the dashed-dotted line is executed. The process shown in FIG. 6 for the pulling-out operation of the control rod 22 is performed when the control rods of the cell are pulled out after the four fuel assemblies 33 are taken out from the cell. The process shown in FIG. 6 for the insertion operation of the control rod 22 is performed when the control rod is inserted in advance when the fuel assembly is reloaded into the cell from which the four fuel assemblies have been removed. Be seen. Step 44B determines if all cells have fuel assemblies. If YES, core 34
It is determined whether or not all the control rods have been inserted in (step 44C). The insertion state of the control rod 22 is determined based on the input measurement value of the control rod position detector 41. Step 44
If the determination of C is "YES", step 44D is executed. Step 44D is the target of pull-out operation 1
The pull-out permission signal is output only to the control rod 22 of the book. If the determination of step 44C is "NO", the pull-out prevention signal for the other control rods 22 excluding the control rod 22 that has already been pulled out is output (step 44E). With respect to the judgment of "NO" at step 44B, the judgment of step 44F is further performed. Step 44F determines whether or not the cell in which the control rod to be pulled out is located (referred to as target cell) is an empty cell. If this determination is "NO", the processing of step 44C is performed, and "Y
In the case of "ES", it is determined whether or not there is a blade guide in the target cell of step 44G. The judgment of step 44G is "N
If it is "O", the control rod 22 that is the target of the pulling operation
The pull-out prevention signal for is output (step 44H).
If the determination in step 44G is "YES", a pull-out permission signal for the control rod 22 that is the target of the pulling-out operation is output (step 44I).
制御棒挿入操作を対象としたステツプ44J、44K及び44L
について説明する。ステツプ44Jは、挿入操作の対象と
なつている制御棒22が位置しているセルが空セルであつ
てそのセル内にブレードガイドが装荷されているか否か
を判定する。ステツプ44Jの判定が「NO」であれば、挿
入操作の対象である制御棒22に対する挿入阻止信号を出
力する(ステツプ44K)。ステツプ44Jの判定が「YES」
であれば、ステツプ44Lは挿入操作の対象である制御棒2
2に挿入許可信号を出力する。ステツプ44D、44E、44H、
44I、44K及び44Lの処理にて得られた信号は、原子炉の
停止状態で制御棒操作監視装置26の出力として制御棒駆
動装置制御装置27及び計算機44に伝えられる。Steps 44J, 44K and 44L for inserting control rods
Will be described. The step 44J determines whether or not the cell in which the control rod 22 which is the target of the insertion operation is located is an empty cell and the blade guide is loaded in the cell. If the determination in step 44J is "NO", an insertion blocking signal for the control rod 22 which is the target of the insertion operation is output (step 44K). The judgment of step 44J is "YES".
If so, the step 44L is the control rod 2 which is the target of the insertion operation.
Output the insertion permission signal to 2. Steps 44D, 44E, 44H,
The signals obtained by the processes of 44I, 44K, and 44L are transmitted to the control rod driving device control device 27 and the computer 44 as the output of the control rod operation monitoring device 26 when the reactor is stopped.
制御棒駆動装置制御装置27は、第1の運転員の制御棒操
作ボタン29による操作対象制御棒の設定信号及び他の操
作ボタンによる引抜き操作指令(または挿入操作指令)
を入力し、しかも制御棒操作監視装置26から操作対象制
御棒に対する引抜き許可信号(または挿入許可信号)を
入力したときに、操作対象制御棒を操作する制御棒駆動
装置 21に引抜き駆動信号(または挿入駆動信号)を出力す
る。制御棒22の引抜き、挿入は、制御棒駆動装置21のシ
リンダ内への駆動水の供給を制御する水圧制御ユニツト
を構成するコントロール弁24A〜24Dの開度制御により行
われる。制御棒駆動装置制御装置27が引抜き駆動信号を
出力するとコントロール弁24A及び24Dが開されコントロ
ール弁24B及び24Cが閉されて制御棒駆動装置21内のピス
トン(制御棒22に連結)が押下げられることにより制御
棒22が炉心34から引抜かれる。制御棒駆動装置制御装置
27が挿入駆動信号を出力すると、コントロール弁24B及
び24Cが開されコントロール弁24A及び24Dが閉されて制
御棒22が炉心34に挿入される。例えば、燃料交換機31に
て第7図に示すようにX−YID座標で(9、13)、
(9、14)、(10、13)及び(10、14)の位置の燃料集
合体33が炉心34から取出され、ブレードガイド45が
(9、14)及び(10、13)の位置に装荷されているとす
る。第7図に示す炉心34内の燃料集合体33及びブレード
ガイド45の装荷状態のデータは、メモリ15に記憶されて
いる。これらのデータを入力した制御棒操作監視装置26
は、第5図の処理手順にてセルC1が「ブレードガイドが
装荷された空セル」であるとの結果を得てそれを自分自
身のメモリに記憶する。The control rod drive control device 27 controls the setting signal of the control rod to be operated by the control rod operation button 29 of the first operator and the pull-out operation command (or insertion operation command) by another operation button.
And a pull-out permission signal (or an insertion permission signal) for the control rod to be operated from the control rod operation monitoring device 26, the pull-out drive signal (or Insertion drive signal) is output. The control rod 22 is pulled out and inserted by the opening degree control of the control valves 24A to 24D that constitute a hydraulic pressure control unit that controls the supply of driving water into the cylinder of the control rod drive device 21. When the control rod drive device control device 27 outputs a pull-out drive signal, the control valves 24A and 24D are opened, the control valves 24B and 24C are closed, and the piston (connected to the control rod 22) in the control rod drive device 21 is pushed down. As a result, the control rod 22 is pulled out from the core 34. Control rod drive controller
When 27 outputs the insertion drive signal, the control valves 24B and 24C are opened, the control valves 24A and 24D are closed, and the control rod 22 is inserted into the core 34. For example, in the refueling machine 31, as shown in FIG. 7, in X-YID coordinates (9, 13),
The fuel assemblies 33 at the positions (9, 14), (10, 13) and (10, 14) are taken out from the core 34, and the blade guides 45 are loaded at the positions (9, 14) and (10, 13). It has been done. Data on the loaded states of the fuel assemblies 33 and the blade guides 45 in the core 34 shown in FIG. 7 are stored in the memory 15. Control rod operation monitoring device that inputs these data 26
Stores the result in the processing procedure of FIG. 5 that the cell C 1 is an “empty cell loaded with the blade guide” and stores it in its own memory.
第1の運転員が操作盤28にてセルC1の制御棒22の引抜き
を指示すると、制御棒操作監視装置26はステツプ44Aで
「引抜き」、ステツプ44Bで「NO」、ステツプ44F及び44
Gで「YES」と判定し、ステツプ44Iに基づく引抜き許可
信号を出力する。制御棒駆動装置制御装置27は、操作盤
28からのセルC1の制御棒22の引抜き操作指令と制御棒操
作監視装置26のからセルC1の制御棒22の引抜き許可信号
を入力するので、該当する制御棒駆動装置21に引抜き駆
動信号を出力する。第7図の状態でセルC1以外のセルの
制御棒の引抜きを操作盤28で指示した場合には、制御棒
操作監視装置26はステツプ44Hに基づく引抜き阻止信号
を出力するので操作盤28にて指示した制御棒22の引抜き
が行われない。なお、第6図の処理手順のステツプ44B
が「NO」でステツプ44F及び44Gが「YES」の条件を満す
セルが複数ある場合には、原子炉の停止状態でそれらの
セル内の制御棒の引抜きはすべて可能となる。When the first operator gives an instruction to pull out the control rod 22 of the cell C 1 on the operation panel 28, the control rod operation monitoring device 26 causes the step 44A to "pull out", the step 44B to "NO", and the steps 44F and 44.
It is determined to be "YES" in G, and the pull-out permission signal based on step 44I is output. Control rod drive control device 27 is a control panel
Since the pull-out operation command of the control rod 22 of the cell C 1 from 28 and the pull-out permission signal of the control rod 22 of the cell C 1 from the control rod operation monitoring device 26 are input, the pull-out drive signal to the corresponding control rod drive device 21. Is output. When the control panel 28 is instructed to pull out the control rods of cells other than the cell C 1 in the state shown in FIG. 7, the control rod operation monitoring device 26 outputs a pull-out prevention signal based on step 44H, so that the control panel 28 is output. The control rod 22 is not pulled out. Incidentally, the step 44B of the processing procedure of FIG.
If there are multiple cells satisfying the conditions of "NO" and steps 44F and 44G of "YES", all the control rods can be withdrawn in those cells while the reactor is stopped.
このように本実施例の制御棒制御装置は、炉心34の各位
置での燃料集合体の装荷状態(装荷の有無)及びブレー
ドガイドの装荷状態(装荷位置)に基づいて原子炉の停
止状態における複数の空セルからの制御棒22の引抜きが
可能となる。このような複数の空セルから制御棒を引抜
いたとしても、その制御棒に隣接して燃料集合体が存在
しないので、原子炉の安全性を十分確保することができ
る。本実施例の制御棒制御装置は、燃料集合体33が存在
する複数のセルからの制御棒の引抜きを阻止することが
でき、空セル内の制御棒22の引抜きを第1の運転員が間
違つて燃料集合体33が存在するセルからの制御棒22の引
抜きに設定したとしても後者のセルからの制御棒22の引
抜きを阻止することができる。本実施例では、燃料交換
機制御装置12のメモリ15内に記憶されている炉心34内の
燃料集合体及びブレードガイド45の装荷状態のデータを
制御棒操作の許可及び不許可の判定に用いているので、
炉心34内のそれらの装荷状態を検出する検出器を新たに
設ける必要がない。本実施例の制御棒制御装置は、燃料
交換機31及びその制御装置12をあたかも炉心34内の燃料
集合体33及びブレードガイド45の装荷状態を検出する検
出器として用いている。As described above, the control rod control device of the present embodiment is based on the loading state (presence or absence of loading) of the fuel assembly at each position of the core 34 and the loading state (loading position) of the blade guide when the reactor is in the stopped state. The control rod 22 can be pulled out from a plurality of empty cells. Even if the control rod is pulled out from such a plurality of empty cells, the fuel assembly does not exist adjacent to the control rod, so that the safety of the nuclear reactor can be sufficiently ensured. The control rod control device of the present embodiment can prevent the control rods from being withdrawn from the plurality of cells in which the fuel assemblies 33 are present, and the first operator can pull out the control rods 22 in the empty cells. Even if it is set to pull out the control rod 22 from the cell in which the fuel assembly 33 exists, the pulling out of the control rod 22 from the latter cell can be prevented. In the present embodiment, the data of the loading state of the fuel assemblies and the blade guides 45 in the core 34 stored in the memory 15 of the refueling machine control device 12 is used to determine whether the control rod operation is permitted or not. So
It is not necessary to newly provide a detector for detecting the loaded state in the core 34. The control rod control device of this embodiment uses the fuel exchanger 31 and the control device 12 thereof as a detector for detecting the loading states of the fuel assemblies 33 and the blade guides 45 in the core 34.
なお、空セル内での制御棒22の引抜き及び挿入操作はブ
レードガイドがなくても可能であるため、制御棒操作監
視装置26はブレードガイドのあるなしの条件を第5図及
び第6図のように制御棒操作許可、不許可の判定に用い
なくてもよい。従つ、制御棒操作監視装置26は、引抜く
制御棒が空セルに位置していることでその制御棒の引抜
き許可信号を出力し、挿入する制御棒が空セルに位置し
ていることでその制御棒22の挿入許可信号を出力しても
よい。ブレードガイド45は、空セル内での制御棒22の傾
きを防止しその上下動を円滑に行うために用いられてい
る。Since the control rod 22 can be pulled out and inserted into the empty cell without the blade guide, the control rod operation monitoring device 26 can be operated under the condition with and without the blade guide as shown in FIGS. 5 and 6. As described above, it is not necessary to use it for determining whether the control rod operation is permitted or not. Therefore, the control rod operation monitoring device 26 outputs the pull-out permission signal of the control rod to be pulled out when the control rod to be pulled out is located in the empty cell, and the control rod to be inserted is placed in the empty cell. An insertion permission signal for the control rod 22 may be output. The blade guide 45 is used to prevent the control rod 22 from tilting in the empty cell and to perform its vertical movement smoothly.
本実施例の制御棒制御装置は、原子炉の停止状態で引抜
き可能な制御棒22を第1の運転員が的確に把握できるよ
うにしている。このため、本実施例は、計算機44を有し
ている。計算機44の機能について説明する。計算機44
は、第8図に示すように演算処理手段44A、記憶手段44
B、入力手段44C及び出力手段44Dを備えている。メモリ1
5に記憶されている炉心34内の燃料集合体33及びブレー
ドガイド45の装荷状態に関するデータ、制御棒位置検出
器41にて測定された各制御棒22の位置信号及び制御棒操
作監視装置26の出力信号が、入力手段44Cから入力さ
れ、記憶手段44に記憶される。メモリ15及び表面装置40
への出力信号は、出力手段44Dから出力される。演算処
理手段44Aは、記憶手段44Bに記憶されている第9図に示
す処理手順に基づいて表示装置40に表示する画像(燃料
集合体、ブレードガイド及び制御棒を上から見た状態の
画像)を得るための処理を実行する。第9図の処理手順
は、ステツプ46A〜46Hを有している。この処理手順に基
づいて炉心に装荷または挿入されている状態の平面図形
の画像が得られる。第10図はその画像を表示装置40に表
示した状態を示している。ここで、セルC2は、4体の燃
料集合体33及びブレードガイド45が装荷されていなく制
御棒22も挿入されていない状態にある。セルC3は4体の
燃料集合体33が装荷されていないがブレードガイド45が
装荷され、制御棒22が挿入されている状態にある。セル
C4は、4体の燃料集合体33が装荷されていないがブレー
ドガイド45が装荷されており、制御棒22も挿入されてい
ない状態にある。セルC5は、1体の燃料集合体33だけが
装荷されていない状態にある。第1の運転員は、このよ
うな画像を見ることよつてセルC3の制御棒が引抜き可能
でありセルC4の制御棒が挿入可能であることを容易に把
握できる。第1の運転員は、セルC3の制御棒の引抜きま
たはセルC4の制御棒の挿入を行うとき操作盤28にて前述
のように操作指令を出力させる。更に、ステツプ46Gに
て引抜き可能な制御棒の図形情報にフリツカ情報を付与
しているので、セルC3の制御棒の図形が点滅し、第1の
運転員は引抜き可能な制御棒を明確に認識できる。ステ
ツプ46Gは、ブレードガイドが存在ししかも制御棒が挿
入されたセルにおける制御棒が引抜き可能なものである
と認識し、その制御棒の図形にフリツカ情報を付与す
る。ステツプ46Gの処理を省略して第10図の画像で引抜
き可能な制御棒の図形をフリツカさせないようにして
も、上記画像を見るだけで第1の運転員は引抜き可能な
制御棒(セルC3の制御棒)を把握できる。第9図には示
されていないが、演算処理手段44は、各制御棒位置検出
器41から出力された各制御棒22の位置信号に基づいて各
制御棒22の炉心34内での軸方向位置を求め、メモリ15に
出力する。メモリ15は、これらの制御棒位置を記憶す
る。また、演算処理手段44は、制御棒操作監視装置26が
出力する信号の内容(引抜き許可、引抜き阻止、挿入許
可または挿入阻止)の画像情報を表示装置40に出力する
と共に引抜き阻止及び挿入阻止についてはその原因の画
像情報を表示装置に出力する。これらの画像情報を作成
するステツプは、図示されていないが第9図のステツプ
46Gとステツプ46Hとの間で行われる。得られた画像情報
の出力は、ステツプ46Hで行われる。このようにして表
示装置40は、制御棒操作監視装置26の判定結果とその結
果が「阻止」である場合の原因を表示する。なお、阻止
信号が出力される場合の原因については、制御棒操作監
視装置26がチエツクして明確にする。この原因の把握
は、具体的には、第6図の処理手順のステツプ44E、44H
及び44Kの後に設けられたステツプ(図示せず)にて行
われる。得られた原因の情報は、計算機44に入力され
る。The control rod control device of the present embodiment enables the first operator to accurately grasp the control rod 22 that can be pulled out while the reactor is stopped. Therefore, the present embodiment has the computer 44. The function of the computer 44 will be described. Calculator 44
Are arithmetic processing means 44A and storage means 44 as shown in FIG.
B, input means 44C and output means 44D are provided. Memory 1
Data on the loading state of the fuel assembly 33 and the blade guide 45 in the core 34 stored in 5, the position signal of each control rod 22 measured by the control rod position detector 41 and the control rod operation monitoring device 26. The output signal is input from the input means 44C and stored in the storage means 44. Memory 15 and surface device 40
The output signal to is output from the output means 44D. The arithmetic processing means 44A displays an image on the display device 40 based on the processing procedure shown in FIG. 9 stored in the storage means 44B (an image of the fuel assembly, the blade guide and the control rod as viewed from above). Process to obtain. The processing procedure of FIG. 9 has steps 46A to 46H. Based on this processing procedure, an image of a plane figure in a state of being loaded or inserted in the core can be obtained. FIG. 10 shows a state in which the image is displayed on the display device 40. Here, the cell C 2 is in a state in which the four fuel assemblies 33 and the blade guides 45 are not loaded and the control rod 22 is not inserted. The cell C 3 is in a state in which the four fuel assemblies 33 are not loaded but the blade guides 45 are loaded and the control rods 22 are inserted. cell
In C 4 , the four fuel assemblies 33 are not loaded, but the blade guide 45 is loaded, and the control rod 22 is also not inserted. The cell C 5 is in a state where only one fuel assembly 33 is not loaded. By seeing such an image, the first operator can easily understand that the control rod of the cell C 3 can be pulled out and the control rod of the cell C 4 can be inserted. The first operator causes the operation panel 28 to output an operation command as described above when pulling out the control rod of the cell C 3 or inserting the control rod of the cell C 4 . Furthermore, since the grant flicker information on graphic information of abstractable control rod at step 46G, blinking shapes of the control rod of the cell C 3 is the first operator is clearly an abstractable control rod Can be recognized. Step 46G recognizes that the control rod in the cell in which the blade guide is present and in which the control rod is inserted can be pulled out, and adds flickering information to the graphic of the control rod. Even if the processing of step 46G is omitted and the figure of the control rod that can be pulled out is not flicked in the image of FIG. 10, the first operator can see the above image and the first operator can pull out the control rod (cell C 3 Control rod). Although not shown in FIG. 9, the arithmetic processing means 44 determines the axial direction of each control rod 22 in the core 34 based on the position signal of each control rod 22 output from each control rod position detector 41. The position is obtained and output to the memory 15. The memory 15 stores these control rod positions. Further, the arithmetic processing means 44 outputs the image information of the content of the signal output from the control rod operation monitoring device 26 (withdrawal permission, withdrawal prevention, insertion permission or insertion prevention) to the display device 40, and withdrawal prevention and insertion prevention. Outputs the image information of the cause to the display device. The steps for creating these image information are not shown, but the steps in FIG.
It takes place between 46G and step 46H. The output of the obtained image information is performed in step 46H. In this way, the display device 40 displays the determination result of the control rod operation monitoring device 26 and the cause when the result is “block”. The cause when the blocking signal is output is clarified by the control rod operation monitoring device 26 by checking. To understand the cause, specifically, see steps 44E and 44H in the processing procedure of FIG.
And 44K after the step (not shown). The information on the obtained cause is input to the computer 44.
第11図は、計算機44にて実行される表示画像を得るため
の他の処理手順を示している。この処理手順は、ステツ
プ47A〜47Kを有している。第11図の処理手順は、第9図
の処理手順と違って炉心内に存在しない燃料集合体及び
制御棒をも表示しようとするものであり、炉心内に存在
するものの画像と炉心内に存在しないものの画像の色を
変えている。第11図の処理手順にて得られた表示画像の
例を第12図に示す。ステツプ47Jの処理を省略しても、
第12図の画像を見るだけでセルC3の制御棒が引抜き可能
であることを把握できる。FIG. 11 shows another processing procedure for obtaining a display image executed by the computer 44. This procedure has steps 47A-47K. Unlike the processing procedure of FIG. 9, the processing procedure of FIG. 11 is intended to display fuel assemblies and control rods that do not exist in the core, and an image of what exists in the core and the existence of it in the core. The color of the image is changed although it is not. An example of the display image obtained by the processing procedure of FIG. 11 is shown in FIG. Even if the processing of step 47J is omitted,
It can be understood that the control rod of cell C 3 can be pulled out simply by looking at the image in FIG.
本実施例の制御棒制御装置において、炉心34内の燃料集
合体33及びブレードガイド45の装荷状態を検出する手段
として機能する燃料交換機31及びその制御装置12を以下
に説明する。燃料交換機31の構造はすでに述べたので、
ここでは燃料交換機制御装置12について詳細に説明す
る。In the control rod control device of the present embodiment, the fuel exchanger 31 and its control device 12 that function as means for detecting the loading states of the fuel assemblies 33 and the blade guides 45 in the core 34 will be described below. Since the structure of the refueling machine 31 has already been described,
Here, the fuel exchanger control device 12 will be described in detail.
前述した各シンクロ発信器にて測定されたX、Y、Z及
びθの移動量を示す位置信号は、プロセス入出力装置13
にてデイジタル信号に変換されて演算処理装置14に入力
される。第4図に示す燃料交換機の位置的状態、すなわ
ち走行台車炉上位置(第4図のY軸に平行な一点鎖線
の位置)、横行台車ゲート通過位置(第4図のX軸に
平行で燃料貯蔵プ−ル30、ゲート31および原子炉ウエル
32を通る一点鎖線の位置)、グルツプル上限位置、中
間位置、 、をリミツトスイツチで検出し、プロセス入出力13装置
を介して演算処理装置14に入力する。演算処理装置14
は、これらの信号を、位置決め制御及び、監視のために
使用する。The position signal indicating the amount of movement of X, Y, Z and θ measured by each of the synchro oscillators described above is used as the process input / output device 13
Is converted into a digital signal and input to the arithmetic processing unit 14. The positional condition of the fuel exchanger shown in FIG. 4, that is, the position of the traveling carriage on the furnace (the position indicated by the alternate long and short dash line parallel to the Y axis in FIG. 4) and the position of the traverse carriage gate passing (the fuel parallel to the X axis in FIG. 4) Storage pool 30, gate 31 and reactor well
The position of the one-dot chain line passing through 32), the upper limit position of the gulp pull, the intermediate position, , Are detected by the limit switch and input to the arithmetic processing unit 14 via the process input / output 13 unit. Processor 14
Uses these signals for positioning control and monitoring.
演算処理装置14は、メモリ15内に記憶されている第13図
及び第14図に示す処理手順に基づいて処理を実行する。
この処理手順は、ステツプ48Aから48Rを有している。The arithmetic processing unit 14 executes processing based on the processing procedure shown in FIG. 13 and FIG. 14 stored in the memory 15.
This procedure has steps 48A through 48R.
第1操作室にいる燃料交換機31の運転員(第2の運転員
という)は、1日に実施する燃料交換において燃料交換
機31が移動するために必要なN個の目標位置(目標座標
データ)をオペレータコンソール16にて設定する。この
設定データは、例えば9桁にて設定される。この9桁を
左からイロハニホヘトチリと称すると、イは目標位置が
原子炉ウエル32か、燃料貯蔵プ−ル30かを設定する。さ
らにそこに燃料集合体(またはブレードガイド)がある
かどうかも設定する(1桁)。The operator of the refueling machine 31 in the first operation room (referred to as the second operator) has N target positions (target coordinate data) necessary for the refueling machine 31 to move during refueling carried out on one day. Is set on the operator console 16. This setting data is set in 9 digits, for example. If these 9 digits are referred to as Irohaniho het Chile from the left, i will set the target position as the reactor well 32 or the fuel storage pool 30. Furthermore, it is set whether there is a fuel assembly (or blade guide) there (one digit).
(i)原子炉ウエル32で燃料集合体(またはブレードガ
イド)がある時はC*を設定する。(I) Set C * when there is a fuel assembly (or blade guide) in the reactor well 32.
(ii)原子炉ウエル32で燃料集合体(またはブレードガ
イド)がない時はCを設定する。(Ii) Set C when there is no fuel assembly (or blade guide) in the reactor well 32.
(iii)燃料貯蔵プ−ル30で燃料集合体(またはブレー
ドガイド)がある時はP*を設定する。(Iii) Set P * when there is a fuel assembly (or blade guide) in the fuel storage pool 30.
(iv)燃料貯蔵プ−ル30で燃料集合体(またはブレード
ガイド)がない時はPを設定する。(Iv) Set P when there is no fuel assembly (or blade guide) in the fuel storage pool 30.
ロハは目標位置のX−YID座標のうちのX座標(2桁)
でありニホは目標位置のX−YID座標のうちのX座標
(2桁)である。Loha is the X coordinate (2 digits) of the X-YID coordinate of the target position.
And Niho is the X coordinate (two digits) of the X-YID coordinate of the target position.
ロハ及びニホはブレードガイド45を構成する一対のガイ
ド部に対する各目標位置のX座標であり、燃料集合体33
に対する目標位置のX座標はロハで設定して残りのニホ
は「00」と設定する。ヘトは目標位置のX−YID座標の
うちのY座標(2桁)でありチリは目標位置のX−YID
座標のうちのY座標(2桁)である。ヘト及びチリはブ
レードガイド45の一対のガイド部に対する各目標位置の
Y座標であり、燃料集合体33に対する目標位置のY座標
はヘトで設定し残りのチリは「00」と設定する。Loha and Niho are the X-coordinates of the respective target positions with respect to the pair of guide portions forming the blade guide 45.
The X coordinate of the target position for is set by Loha, and the remaining Niho is set as "00". Het is the Y coordinate (2 digits) of the X-YID coordinate of the target position, and Chile is the X-YID of the target position.
It is the Y coordinate (two digits) of the coordinates. Het and dust are Y coordinates of respective target positions with respect to the pair of guide portions of the blade guide 45. The Y coordinate of the target position with respect to the fuel assembly 33 is set as heat and the remaining dust is set as "00".
ステツプ48Aは、オペレーターコンソール16にて設定さ
れたN個の目標座標データをメモリ15に記憶させる。n
=0とおき(ステツプ48B)、n=n+1を演算する
(ステツプ48C)。メモリ15からn番目の目標座標デー
タを読込む(ステツプ48D)。ステツプ48Eで燃料集合体
33の移動操作であるかを、また、ステツプ48Nでブレー
ドガイド45の移動操作であるかを判定する。燃料集合体
33の移動操作は、ニホ及びチリの両方が「00」となつて
いるので容易に判別できる。燃料集合体の移動操作の場
合には、ステツプ48F〜48Jの処理が実行される。ここ
で、ステツプ48Gは、第15図に示すステツプ49A〜49Dを
有している。特に、ステツプ49Cの判定及びステツプ49D
を設けることによつて、空セル内に再び燃料集合体33を
装荷する作業を、高い安全性を保ちながら円滑に行うこ
とができる。すなわち制御棒が挿入されていない状態で
の空セル内への燃料集合体の装荷を避けることができ
る。ステツプ48Hは、特公昭58-21238号公報の第3図及
び第4図に示す処理手順となつている。ただし、その第
3図の一番最初のステツプ「目標座標データ読込」及び
一番最後のステツプ「起動前メツセージ印字」の処理は
実行しない。ステツプ48Hの処理の事例は、特公昭58-21
238号公報のコラム7、21行からコラム8、11行に示さ
れている。同公告公報コラム8、7及び10行の「ロギン
グタイプライタ」は、本実施例ではプリンタ17に該当す
る。ステツプ48Hまたは(後述のステツプ48R)で許可さ
れる自動運転の作業モードは、以下の8種 (ステツプ48Rは(1)、(2)、(5)〜(8)の6
種)の作業を行う。The step 48A causes the memory 15 to store the N target coordinate data set by the operator console 16. n
= 0 is set (step 48B), and n = n + 1 is calculated (step 48C). The nth target coordinate data is read from the memory 15 (step 48D). Fuel assembly at step 48E
It is determined whether the operation is the movement operation of 33 or the movement operation of the blade guide 45 at step 48N. Fuel assembly
The movement operation of 33 can be easily discriminated because both Niho and Chile are “00”. In the case of the moving operation of the fuel assembly, the processing of steps 48F to 48J is executed. Here, step 48G has steps 49A to 49D shown in FIG. In particular, the determination of step 49C and step 49D
By providing the above, it is possible to smoothly perform the work of reloading the fuel assemblies 33 in the empty cells while maintaining high safety. That is, it is possible to avoid loading the fuel assemblies into the empty cells when the control rods are not inserted. The step 48H has the processing procedure shown in FIGS. 3 and 4 of Japanese Patent Publication No. 58-21238. However, the processing of the first step "reading target coordinate data" and the last step "printing message before starting" in FIG. 3 is not executed. For an example of the treatment of step 48H, see Japanese Patent Publication No. 58-21
It is shown at columns 7, 21 to columns 8, 11 of the 238 publication. The “logging typewriter” in columns 8, 7, and 10 of the publication gazette corresponds to the printer 17 in this embodiment. There are eight types of work modes for automatic operation that are permitted in step 48H or (step 48R described later) (6 steps of (1), (2), (5) to (8)
Work).
(1)燃料ラツク33から炉心34へ燃料集合体(またはブ
レードガイド)を取りに行く(P→C*と表わす)。(1) The fuel assembly (or blade guide) is taken from the fuel rack 33 to the core 34 (denoted as P → C *).
(2)燃料ラツク33から炉心34へ燃料集合体(またはブ
レードガイド)を移す(P*→C)。(2) Transfer the fuel assembly (or blade guide) from the fuel rack 33 to the core 34 (P * → C).
(3)燃料ラツク33から別の燃料ラツク33へ燃料集合体
を取りに行く(P→P*)。(3) The fuel assembly is taken from the fuel rack 33 to another fuel rack 33 (P → P *).
(4)燃料ラツク33から別の燃料ラツク33へ燃料集合体
移す(P*→P)。(4) The fuel assembly is transferred from the fuel rack 33 to another fuel rack 33 (P * → P).
(5)炉心34から燃料ラツク33へ燃料集合体(またはブ
レードガイド)を取りに行く(C→P*)。(5) The fuel assembly (or blade guide) is taken from the core 34 to the fuel rack 33 (C → P *).
(6)炉心34から燃料ラツク33へ燃料集合体(またはブ
レードガイド)を移す(C*→P)。(6) Move the fuel assembly (or blade guide) from the core 34 to the fuel rack 33 (C * → P).
(7)炉心34のある位置から別の位置へ燃料集合体(ま
たはブレードガイド)を取りに行く(C→P*)。(7) The fuel assembly (or blade guide) is taken from one position of the core 34 to another position (C → P *).
(8)炉心34のある位置から別の位置へ燃料集合体(ま
たはブレードガイド)を移す(C*→C)。(8) The fuel assembly (or blade guide) is moved from one position of the core 34 to another position (C * → C).
ステツプ48G及び48Hとも「移動可」になると、ステツプ
48にて許可された作業モードに沿って燃料交換機31が目
標座標まで移動する(ステツプ48I)。この燃料交換機3
1の移動を燃料ラツク33のある位置Pから、炉心34のあ
る位置Qに燃料を移送する場合(P*→C)を例にとり
説明する。When both steps 48G and 48H become "movable", step
The refueling machine 31 moves to the target coordinates according to the work mode permitted in 48 (step 48I). This refueling machine 3
The movement of 1 will be described by taking as an example the case where the fuel is transferred from the position P where the fuel rack 33 exists to the position Q where the core 34 exists (P * → C).
燃料交換機31の現在位置Pにおける座標をX、Y、Z、
θ、移送目標であるQの座標をX′、Y′、Z′、θ′
とする(第4図)。The coordinates at the current position P of the fuel exchanger 31 are X, Y, Z,
θ, the coordinate of Q which is the transfer target is X ′, Y ′, Z ′, θ ′
(Fig. 4).
起動が開始されると、まずZ上昇制御が行なわれ、上
限位置で一旦停止する。次にXY同時制御が行なわれ
る。XY同時制御においては、予め基準点A、B、Cが設
定され、演算処理装置14はP→A→B→C→Qを通る直
線ルートを計算して、このルート上に乗るようX及びY
の駆動量を出力する。即ち、順次A、B、C、Qを目標
位置として、現在位置との偏差△X、△Yを計算して、
偏差の大きい方を一定速度とし、他は、偏差比で計算し
た速度とする。When the start-up is started, the Z-rise control is first performed, and the Z-stop is temporarily stopped at the upper limit position. Next, XY simultaneous control is performed. In the XY simultaneous control, the reference points A, B, and C are set in advance, and the processing unit 14 calculates a straight line route that passes through P → A → B → C → Q, and X and Y to ride on this route.
The drive amount of is output. That is, the deviations ΔX and ΔY from the current position are calculated by sequentially setting A, B, C and Q as target positions,
The one with the larger deviation is the constant speed, and the other is the speed calculated by the deviation ratio.
目標位置Qに位置決めが終了すると、次に回転角度の調
整θ制御が行なわれる。θ制御においてもθ′とθの
偏差△θを計算して駆動量を出力する。θ制御が終了す
ると次に、Z下降制御が行なわれ、燃料集合体を炉心
34に挿入して で停止する。When the positioning at the target position Q is completed, the rotation angle adjustment θ control is performed next. Also in the θ control, the deviation Δθ between θ ′ and θ is calculated and the drive amount is output. When the θ control is completed, Z lowering control is then performed to move the fuel assembly to the core.
Insert in 34 Stop at.
上記した各運動量に対応する操作信号は、演算処理装置
14よりプロセス入出力装置13を介して対応する駆動モー
タ8、9、10、11に伝えられる。これらの駆動モータの
駆動によりつかみ装置4のフツクを目標位置まで移動で
きる。演算処理装置14による自動運転においては、以上
の様に、Z上昇→XY→θ−Z下降を1サイクルとする操
作を連続的に行なうものである。The operation signal corresponding to each momentum described above is calculated by the arithmetic processing device.
It is transmitted from 14 to the corresponding drive motors 8, 9, 10, 11 via the process input / output device 13. By driving these drive motors, the hook of the gripping device 4 can be moved to the target position. In the automatic operation by the arithmetic processing unit 14, as described above, the operation in which Z rise → XY → θ−Z fall is one cycle is continuously performed.
で停止後、つかみ装置4のフツク開の操作を行なう。 After stopping at, the hook of the gripping device 4 is opened.
つかみ装置4はフツクが開いていないと、燃料集合体を
つかむことができないので、燃料集合体を取りに行く場
合は、必ずフツクを開とする。逆に、燃料集合体を燃料
交換機31にて移す場合は、必ず燃料集合体をつかんでい
なければならないので、フツクは開とする。つまり、現
在、燃料集合体をつかんでいるかどうかを、フツクの状
態で判定する。The grasping device 4 cannot grasp the fuel assembly unless the hook is opened, so the hook is always opened when going to get the fuel assembly. On the contrary, when the fuel assembly is transferred by the refueling machine 31, the hook must be opened because the fuel assembly must be grasped without fail. That is, it is determined whether or not the fuel assembly is currently grabbed in the hook state.
燃料集合体を取りに行く操作も、上記と全く同様な制御
が行なわれる。ただし、この場合、 で停止後は、フツク閉の操作を行なう。The same control as described above is performed for the operation of taking the fuel assembly. However, in this case, After stopping at, close the hook.
ステツプ48Jは、(P→C*),(P→P*),(C→
P*)及び(C→C*)の作業モードで「NO」,それら
以外の作業モードで「YES」と判定される。ステツプ48J
の判定が「YES」である場合には、ステツプ48Kでメモリ
15内のデータが更新される。すなわち、メモリ15内にお
いて、燃料集合体33が取出された位置では「1」が
「0」に、燃料集合体33が新たに装荷された位置では
「0」が「1」に更新される。Step 48J is (P → C *), (P → P *), (C →
It is determined to be "NO" in the work modes of P *) and (C → C *), and "YES" in the other work modes. Step 48J
If the judgment is “YES”, the memory is saved in step 48K.
The data in 15 is updated. That is, in the memory 15, "1" is updated to "0" at the position where the fuel assembly 33 is taken out, and "0" is updated to "1" at the position where the fuel assembly 33 is newly loaded.
ブレードガイド45の移動操作に対しては、ステツプ48P
〜48Tの処理が実行される。ステツプ48Qは、第16図に示
すステツプ50A〜50Fを有している。ステツプ48Rでは、
第17図及び第18図に示す処理が実行される。この処理
は、特公昭58-21238号公報の第3図及び第4図のうちで
は第3図の右側2つの列の処理(「目標座標プール上
か」の判定以降の処理)を削除した内容とほとんど同じ
である。ステツプ48Tの判定が「YES」の場合、ステツプ
48Kが実行される。ステツプ48Lの詳細を、第19図に示
す。ステツプ48Lは、ステツプ51A〜51Gを有している。
ステツプ51Aの処理は、前述した第11図の処理からステ
ツプ47Bをはぶいたものと同じである。ステツプ48Lにて
得られた画像情報は、オペレータコンソール16に設けら
れている表示装置18(1台もしくは2台)に表示され
る。表示される画像は、第4図(A)の燃料ラツク37が
配置された燃料貯蔵プール30及び炉心34の平面図に第12
図と同様に燃料集合体33等の有無を図形で表示したもの
である。更に中央処理装置14は、ステツプ48G,48H,48Q
及び48Rの判定結果(例えば移動可,移動不可,許可さ
れた作業モードの内容及び移動不可の原因である異常状
態の内容)を表示装置18に表示する。このため、第2の
運転員は、表示装置18を見ながら現時点における炉心34
内及び燃料貯蔵プール30内における燃料集合体の装荷状
態を容易には悪できる。For moving the blade guide 45, step 48P
~ 48T processing is executed. Step 48Q has steps 50A-50F shown in FIG. In Step 48R,
The processing shown in FIGS. 17 and 18 is executed. In this process, the process of the two columns on the right side of FIG. 3 in FIGS. 3 and 4 of Japanese Patent Publication No. 58-21238 (the process after the determination of “is it on the target coordinate pool”) is deleted? Is almost the same as. If the judgment at step 48T is "YES", step
48K is executed. Details of step 48L are shown in FIG. The step 48L has steps 51A to 51G.
The process of step 51A is the same as the process of FIG. 11 except that step 47B is omitted. The image information obtained at step 48L is displayed on the display device 18 (one or two) provided in the operator console 16. The displayed image is shown in Fig. 4 (A) in plan view of the fuel storage pool 30 in which the fuel rack 37 is arranged and the core 34.
Similar to the figure, the presence or absence of the fuel assembly 33 and the like is displayed graphically. Further, the central processing unit 14 is a step 48G, 48H, 48Q
And the determination results of 48R (for example, movement possible, movement impossible, contents of permitted work mode and contents of abnormal state causing movement impossible) are displayed on the display device 18. For this reason, the second operator looks at the display device 18 and
The loaded state of the fuel assemblies inside the fuel storage pool 30 can be easily deteriorated.
本実施例の制御棒制御装置は、燃料交換機制御装置12の
ステツプ48J,48K及び48Tの機能を炉心34内の燃料集合体
33等の装荷状態を検出するために利用している。なお、
ステツプ48J及び48Tで燃料集合体及びブレードガイドが
目標座標までの移動が完了したことは、移動許可された
作業モードの内容と の検出とによつて検知できる。本実施例に用いる燃料交
換機制御装置12は、上記した以外に下記の効果を生じ
る。The control rod control device of the present embodiment has the functions of the steps 48J, 48K and 48T of the fuel exchanger control device 12 as the fuel assembly in the core 34.
It is used to detect the loading status of 33 etc. In addition,
Completion of the movement of the fuel assembly and the blade guide to the target coordinates at steps 48J and 48T means that the movement mode is permitted. Can be detected by detecting The refueling machine control device 12 used in the present embodiment has the following effects in addition to those described above.
燃料集合体(またはブレードガイド)が挿入されている
位置に、現在つかんでいる燃料集合体(またはブレード
ガイド)を挿入しようとする異常作業を防止することが
できるとともに、実施例ではさらに、 1.設定データと記憶データのダブルチエツクを行なうの
で、信頼性が向上し、判定の結果に対する運転員の安心
感が増す。It is possible to prevent an abnormal operation of inserting the fuel assembly (or blade guide) currently grasped at the position where the fuel assembly (or blade guide) is inserted. Double checking of set data and stored data improves reliability and increases the operator's sense of security regarding the result of judgment.
2.燃料集合体(またはブレードガイド)がない位置に燃
料集合体(または)をつかみに行くという無駄な作業を
なくす。2. Eliminate the wasteful work of grabbing a fuel assembly (or) at a position where there is no fuel assembly (or blade guide).
3.燃料交換機31の1サイクルの運転開始前に移動の可否
をチエツクするので、誤操作を防止できる。3. Check the movement of the refueling machine 31 before starting the operation of one cycle, so it is possible to prevent erroneous operation.
4.制御棒位置信号をステツプ48G及び48Qで移動可否を決
める条件として用いらているので、原子炉の安全性を十
分に確保できる。4. Since the control rod position signal is used as a condition to decide whether or not to move in steps 48G and 48Q, the safety of the reactor can be sufficiently secured.
5.更に、炉心34及び燃料貯蔵プール30内の燃料集合体33
及びブレードガイド45の装荷状態を表示装置18に表示す
るので、第2の運転員は、それらの装荷状態を適切に知
ることができ、燃料交換作業の進行をチエツクできる。5. Further, the fuel assembly 33 in the core 34 and the fuel storage pool 30.
Since the loading state of the blade guide 45 and the loading state of the blade guide 45 are displayed on the display device 18, the second operator can appropriately know the loading states of these, and can check the progress of the refueling work.
第1図に示す制御棒制御装置の採用、特に燃料交換機制
御装置12のメモリ15と接続された制御棒操作監視装置26
を有する制御棒制御装置の採用により、第20図に示す交
換工程が実施できる。すなわち、本実施例の制御棒制御
装置は原子炉の停止状態において空セル内の制御棒の引
抜きを許可するので、炉心34内からの燃料集合体33の取
出し作業の先行実施が可能となる。この燃料集合体の取
出し作業では、燃料交換,LPRM交換,制御棒交換及びCDR
交換のために必要な部分の燃料集合体33の取出しを行
い、これらの燃料集合体33を燃料貯蔵プール30の所定の
燃料ラツク37内に装荷する。取出された燃料集合体33に
は、寿命がきたもの、炉心34内のもとの位置に戻される
もの、炉心34内でもとの位置とは異なる位置に装荷され
るものがあるので、これらを区分けして燃料貯蔵プール
30内に貯蔵する。この燃料集合体33の取出しにより炉心
34内に幾つかの空セルが形成されるが、空セル内の制御
棒22は前述したように操作盤28からの指示により引抜か
れる。なお、前述の各交換作業を考慮して炉心34内の一
部の領域の燃料集合体33をすべて取出して燃料貯蔵プー
ル30に移行させ、その領域内の制御棒をすべて全引抜き
状態にすることが可能である。燃料集合体の取出し作業
終了後に、LPRM交換作業,制御棒交換作業及び燃料集合
体装荷シヤフリング作業が順次行われる。LPRM及び制御
棒交換作業にも燃料交換機31が使用されるが、交換すべ
きLPRM及び制御棒の周囲で広範囲にわたつて燃料集合体
が取除かれしかも制御棒が引抜かれているので、LPRM及
び制御棒交換作業自身も従来よりも短縮できる。制御棒
交換作業においては、燃料支持金具を取外しが周囲に燃
料集合体がないため極めて容易になり、これが時間短縮
に貢献する。燃料集合体装荷、シヤフリング作業では、
燃料貯蔵プール30内に貯蔵されている新しい燃料集合体
及び前述の取出し作業で炉心34から取出された燃料集合
体を炉心34内の所定位置に装荷する。この燃料集合体の
装荷は、燃料交換機31及びその制御装置12にて実施され
る。本実施例では、燃料集合体の一括取出し、その後に
おける燃料集合体の一括装荷を行つているので、燃料の
交換に要する時間も著しく短縮される。なお、第6図の
一点鎖線より左側の処理は、燃料集合体装荷シヤフリン
グ作業時で空セル内に制御棒を挿入するときに行われ
る。1. Adoption of the control rod control device shown in FIG. 1, particularly, the control rod operation monitoring device 26 connected to the memory 15 of the fuel exchange control device 12
By adopting the control rod control device having the above, the exchange process shown in FIG. 20 can be performed. That is, since the control rod control device of the present embodiment allows the control rods in the empty cells to be pulled out when the reactor is stopped, it is possible to carry out the work of taking out the fuel assembly 33 from the core 34 in advance. This fuel assembly take-out operation includes fuel exchange, LPRM exchange, control rod exchange and CDR.
The required fuel assemblies 33 for replacement are taken out, and these fuel assemblies 33 are loaded into a predetermined fuel rack 37 of the fuel storage pool 30. Some of the taken out fuel assemblies 33 have reached the end of their lives, some are returned to their original positions in the core 34, and some are loaded in positions different from the original positions in the core 34. Fuel storage pool
Store within 30. By taking out this fuel assembly 33,
Although some empty cells are formed in 34, the control rod 22 in the empty cells is pulled out by the instruction from the operation panel 28 as described above. In consideration of the above-mentioned replacement work, all the fuel assemblies 33 in a part of the core 34 are taken out and transferred to the fuel storage pool 30, and all the control rods in the region are completely withdrawn. Is possible. After the fuel assembly unloading work is completed, LPRM replacement work, control rod replacement work, and fuel assembly loading shuffling work are performed in sequence. The fuel exchanger 31 is also used for LPRM and control rod replacement work, but since the fuel assemblies have been removed over a wide area around the LPRM and control rods to be replaced and the control rods have been withdrawn, the LPRM and The control rod replacement work itself can be shortened compared to the conventional one. In the control rod exchanging work, the removal of the fuel support fitting is extremely easy because there is no fuel assembly in the surroundings, which contributes to the reduction of time. For fuel assembly loading and shuffling work,
The new fuel assemblies stored in the fuel storage pool 30 and the fuel assemblies taken out of the core 34 by the above-mentioned taking-out operation are loaded in predetermined positions in the core 34. The loading of the fuel assembly is carried out by the fuel exchanger 31 and its control device 12. In this embodiment, since the fuel assemblies are collectively taken out and then the fuel assemblies are collectively loaded, the time required for exchanging the fuel is significantly shortened. The process on the left side of the alternate long and short dash line in FIG. 6 is performed when the control rod is inserted into the empty cell during the fuel assembly loading shuffling operation.
特公昭60-35035号公報に示された制御棒駆動装置21の制
御棒駆動装置ハウジング20からの取外し、取外した制御
棒駆動装置21の原子炉格納容器外への搬出,制御棒駆動
装置21の点検,補修,点検が終了した制御棒駆動装置21
の原子炉格納容器内への搬入及び制御棒駆動装置21のハ
ウジング20への装着の各工程を有する制御棒駆動装置交
換作業は、燃料集合体取出し作業,LPRM交換作業及び制
御棒交換作業と並行して実施される。このような並行作
業は、後者の3つの交換作業が燃料交換機31を必要と
し、前者の交換作業が燃料交換機31とは異なる制御棒駆
動装置交換装置と用いることによつて行われ、空セル内
の制御棒引抜きにより前者の交換作業と後者の交換作業
との干渉の度合いが著しく減少したことによつて可能と
なつた。制御棒交換作業と制御棒駆動装置交換作業が並
行して行われる場合には、交換対象の制御棒と交換対象
の制御棒駆動装置は、互いに連結去れていないものを選
ぶ必要がある。なぜならば、制御棒駆動装置交換作業に
おいては、引抜かれた制御棒によりハウジング20の上端
部を密封してハウジング20からの炉水の流出を防止する
必要がある。制御棒駆動装置交換作業を早く実施するた
めには、燃料集合体取出し作業の初期において、点検等
の対象である制御棒駆動装置21に連結された制御棒22が
挿入されたセル内の4体の燃料集合体の取出し及び空セ
ルからの制御棒22の引抜きを重点的に行うとよい。空セ
ル内に挿入する制御棒の順序を考慮すれば、すなわち、
早い時期に空セル内に挿入される制御棒に連結された制
御棒駆動装置を避けるようにすれば、一部の制御棒駆動
装置の交換作業を燃料集合体装荷、シヤフリング作業と
並行して実施してもよい。The control rod drive unit 21 shown in Japanese Patent Publication No. 60-35035 is removed from the control rod drive unit housing 20, and the removed control rod drive unit 21 is carried out to the outside of the reactor containment vessel. Control rod drive unit 21 after inspection, repair, and inspection
The control rod drive device replacement work including the steps of loading the control rod drive device 21 into the reactor containment vessel and mounting the control rod drive device 21 in the housing 20 is parallel to the fuel assembly unloading work, LPRM replacement work, and control rod replacement work. Will be implemented. Such parallel work is performed by using the control rod drive device exchanging device different from the fuel exchanging device 31 in the former three exchanging works requiring the fuel exchanging device 31 and the former exchanging work. This was made possible by the fact that the degree of interference between the former replacement work and the latter replacement work was remarkably reduced by pulling out the control rod. When the control rod exchange work and the control rod drive device exchange work are performed in parallel, it is necessary to select the control rods to be exchanged and the control rod drive devices to be exchanged that are not connected to each other. This is because in the control rod drive device replacement work, it is necessary to prevent the outflow of the reactor water from the housing 20 by sealing the upper end portion of the housing 20 with the pulled-out control rod. In order to quickly perform the control rod drive device replacement work, in the initial stage of the fuel assembly take-out work, four bodies in the cell in which the control rod 22 connected to the control rod drive device 21 which is the object of inspection or the like is inserted. It is preferable to focus on the removal of the fuel assembly and the extraction of the control rod 22 from the empty cell. Considering the order of the control rods inserted in the empty cells, that is,
By avoiding the control rod drive unit connected to the control rods inserted into the empty cells at an early stage, some control rod drive unit replacement work will be performed in parallel with the fuel assembly loading and shuffling work. You may.
なお燃料集合体、LPRM及び制御棒は、炉心に挿入される
原子炉構成要素である。The fuel assembly, LPRM and control rods are the reactor components that are inserted into the core.
制御棒駆動装置の交換作業は、燃料集合体取出し作業、
燃料集合体以外の炉心に挿入るされる原子炉構成要素の
交換作業及び燃料集合体の装荷作業の少なくとも1つの
作業と並行して行なわれる。The control rod drive replacement work includes fuel assembly removal work,
It is performed in parallel with at least one operation of replacing the nuclear reactor components to be inserted into the core other than the fuel assembly and loading the fuel assembly.
前述した制御棒駆動装置交換作業を円滑に行うために
は、事前に十分に検討した上で交換順序を決定しなけれ
ばならないが、現時点で交換可能な状態にある制御棒駆
動装置を表示するとよい。すなわち、制御棒駆動装置交
換装置の操作室(第2操作室という)は、中央制御室及
び燃料交換機の操作室とは異なる場所(原子炉格納容器
の外側で原子炉建屋内の場所)に設けられている。第2
操作室には、制御棒駆動装置交換装置の操作盤が設置さ
れている。第2操作室内の運転員(第3の運転員とい
う)が、原子炉圧力容器38の下方でペデスタル19内に設
置された制御棒駆動装置交換装置をテレビカメラで見な
がらそれを操作する。第2操作室内にある計算機(第2
計算機)は、制御棒位置検出器41の出力信号及びメモリ
15内の炉心での燃料集合体の装荷状態の情報を入力して
表示画像を作成する。すなわち、第2計算機は第11図に
示す処理手順であつてステツプ47Jの「引抜き可能な」
を「交換作業が可能な制御棒駆動装置に連結された」に
訂正した修正ステツプ47Jを有する処理手順を実行し、
第2操作室内の表示装置に第12図の画像を表示する。修
正ステツプ47Jの処理を実行させるために、第3の運転
員は入力装置を介して第2計算機内に今回の定期検査で
保守点検が必要な制御棒駆動装置の位置データを入力す
る。修正ステツプ47Jでは、保守点検が必要な制御棒駆
動装置に連結している制御棒が空セルから引抜かれてい
るときにその制御棒の図形(第4図形)にフリツカ情報
を付与する。第3の運転員は、表示装置の画面でフリツ
カしている制御棒の位置の制御棒駆動装置が交換可能な
状態にあると知ることができる。In order to smoothly carry out the control rod drive device replacement work described above, it is necessary to carefully consider in advance and decide the exchange order, but it is advisable to display the control rod drive device that is currently replaceable. . That is, the operation room of the control rod drive device exchanging device (referred to as the second operation room) is provided in a place different from the operation room of the central control room and the fuel exchanger (a place outside the reactor containment vessel and inside the reactor building). Has been. Second
An operation panel for the control rod drive exchange device is installed in the operation room. An operator in the second operation room (referred to as a third operator) operates the control rod drive exchange device installed in the pedestal 19 below the reactor pressure vessel 38 while watching it with a television camera. Computer in the second operation room (second
Computer) is the output signal and memory of the control rod position detector 41
The display image is created by inputting the information on the loading state of fuel assemblies in the core within 15. That is, the second computer has the processing procedure shown in FIG. 11 and is "pullable" in step 47J.
Executed the procedure with the modified step 47J which was corrected to "connected to the control rod drive device capable of exchanging work",
The image in FIG. 12 is displayed on the display device in the second operation room. In order to execute the processing of the correction step 47J, the third operator inputs the position data of the control rod drive device, which requires maintenance and inspection in the current periodical inspection, into the second computer through the input device. In the correction step 47J, flickering information is added to the control rod graphic (fourth graphic) when the control rod connected to the control rod drive device requiring maintenance is pulled out from the empty cell. The third operator can know on the screen of the display device that the control rod drive device at the flickering control rod position is in a replaceable state.
本発明の他の実施例である制御棒制御装置について述べ
る。本実施例は、構成的には第1図の実施例と同じであ
る。異なる点は、第1図の実施例で制御棒操作監視装置
26が実行していた処理手順の一部を燃料交換機制御装置
12で実行させたことである。本実施例において、燃料交
換機制御装置12の演算処理装置14で実行される処理手順
(メモリ15内に記憶)は、第13図及び第21図に示す。こ
の処理手順は、第1図の実施例で演算処理装置14で実行
される処理手順(第13図及び第14図)にステツプ48Uの
空セルの識別処理を付加したものである。ステツプ48U
は、具体的に第5図のステツプ43A〜43Gを有している。
ステツプ48Uの結果、すなわちステツプ43E及び43Fの情
報は、メモリ15内に記憶される。このため、本実施例に
おける制御棒操作監視装置26は、第5図の処理を実施せ
ずメモリ15に記憶された第5図の処理結果を入力した上
で、第6図の処理を実行する。本実施例においても、第
1図の実施例と同じ効果を奏する。A control rod control device according to another embodiment of the present invention will be described. This embodiment is structurally the same as the embodiment of FIG. The difference lies in the control rod operation monitoring device in the embodiment of FIG.
26 part of the processing procedure that the
It was executed in 12. In the present embodiment, the processing procedure (stored in the memory 15) executed by the arithmetic processing unit 14 of the fuel exchanger control unit 12 is shown in FIGS. 13 and 21. This processing procedure is the same as the processing procedure (FIGS. 13 and 14) executed by the arithmetic processing unit 14 in the embodiment of FIG. 1 with the identification processing of the empty cell of step 48U added. Step 48U
Specifically has steps 43A to 43G of FIG.
The result of step 48U, ie the information of steps 43E and 43F, is stored in memory 15. Therefore, the control rod operation monitoring device 26 in this embodiment executes the process of FIG. 6 after inputting the process result of FIG. 5 stored in the memory 15 without executing the process of FIG. . Also in this embodiment, the same effect as that of the embodiment of FIG.
本発明の他の実施例である制御棒制御装置を第22図に基
づいて説明する。本実施例は、第1図の実施例で制御棒
操作監視装置26の機能を燃料交換機制御装置12に付加し
たものである。このため、本実施例では、制御棒操作監
視装置26のハード構成が不要となり、第1図の実施例よ
りもハード構成が単純化される。本実施例におけるその
他の効果は、第1図の実施例と同じである。A control rod control device according to another embodiment of the present invention will be described with reference to FIG. In this embodiment, the function of the control rod operation monitoring device 26 in the embodiment of FIG. 1 is added to the fuel exchanger control device 12. Therefore, in this embodiment, the hardware configuration of the control rod operation monitoring device 26 is unnecessary, and the hardware configuration is simplified as compared with the embodiment of FIG. Other effects of this embodiment are the same as those of the embodiment shown in FIG.
本実施例における燃料交換機制御装置12Aの演算処理装
置14にて実行される処理手順は、第13図及び第23図に示
す通りである。この処理手順は、第21図に示す処理手順
でステツプ48Uの後にステツプ48Vを追加したものであ
る。ステツプ48Vは、第6図に示すステツプ44A〜44Lを
有している。この処理手順にて得られた操作許可信号
(または操作阻止信号)は、制御棒駆動装置制御装置27
に入力される。The processing procedure executed by the arithmetic processing unit 14 of the fuel exchanger control unit 12A in this embodiment is as shown in FIGS. 13 and 23. This processing procedure is the processing procedure shown in FIG. 21 in which step 48V is added after step 48U. Step 48V has steps 44A-44L shown in FIG. The operation permission signal (or operation blocking signal) obtained in this processing procedure is used as the control rod drive device control device 27.
Entered in.
本発明の他の実施例である制御棒制御装置を第24図に基
づいて説明する。第1図の実施例が制御棒操作監視装置
26の出力を制御棒駆動装置制御装置27に伝えているのに
対して、本実施例は制御棒操作監視装置26の出力を操作
盤28に伝えるものである。操作盤28内に開閉器52が設け
られている。制御棒操作ボタン29は制御棒操作監視装置
26に接続されていると共に開閉器52を介して制御棒駆動
装置制御装置27に接続されている。開閉器52は、制御棒
操作監視装置26から引抜き許可信号(または挿入許可信
号)が出力されたときに閉される。開閉器52の閉によつ
て制御棒操作ボタン29等で設定された制御棒の操作指令
が制御棒駆動装置制御装置27に伝えられる。制御棒駆動
装置制御装置27は、その操作指令に対応した駆動信号を
出力する。本実施例も第1図の実施例と同様な効果を生
じる。A control rod control device according to another embodiment of the present invention will be described with reference to FIG. The embodiment shown in FIG. 1 is a control rod operation monitoring device.
While the output of 26 is transmitted to the control rod drive device control device 27, in the present embodiment, the output of the control rod operation monitoring device 26 is transmitted to the operation panel 28. A switch 52 is provided in the operation panel 28. The control rod operation button 29 is a control rod operation monitoring device.
It is connected to the control rod driving device control device 27 via the switch 52 as well as being connected to the control device 26. The switch 52 is closed when the withdrawal permission signal (or the insertion permission signal) is output from the control rod operation monitoring device 26. By closing the switch 52, the control rod operation command set by the control rod operation button 29 or the like is transmitted to the control rod drive device control device 27. The control rod drive device controller 27 outputs a drive signal corresponding to the operation command. This embodiment also produces the same effect as the embodiment of FIG.
本発明の他の実施例である制御棒制御装置を以下に説明
する。本実施例は、第1図の実施例の制御棒操作監視装
置26とメモリ15との接続を解除したものであり、炉心34
内の燃料集合体等の装荷情報を演算処理装置14にて磁気
テープにて取込み、その磁気テープを中央操作室に運ん
で磁気テープに登録した上記情報を制御棒操作監視装置
26のメモリに登録するものである。第1図の実施例より
は効率が悪くなるが、同程度の効果が得られる。A control rod control device according to another embodiment of the present invention will be described below. In this embodiment, the connection between the control rod operation monitoring device 26 and the memory 15 of the embodiment shown in FIG.
The load information of the fuel assemblies and the like in the inside is taken in by the arithmetic processing device 14 by the magnetic tape, the magnetic tape is carried to the central operation room, and the above information registered in the magnetic tape is the control rod operation monitoring device.
It is to be registered in 26 memories. Although the efficiency is lower than that of the embodiment shown in FIG. 1, the same effect can be obtained.
本発明の他の実施例である制御棒制御装置を第25図に基
づいて説明する。本実施例は、制御棒操作ボタン29によ
る操作指令が制御棒操作監視装置26Aに入力されず、制
御棒駆動装置制御装置27は入力した制御棒の操作指令に
対して制御棒操作監視装置26Aから操作許可信号を入力
したときに駆動信号を出力する。制御棒操作監視装置26
Aは第26図に示すステツプ53A〜53Kの処理を実行する。
制御棒操作監視装置26Aは、まず、入力した炉心34内の
各位置における燃料集合体33の有無のデータ、炉心34に
おけるブレードガイドの装荷位置のデータ及び制御棒位
置検出器41にて測定された軸方向における制御棒22の位
置の変化の有無を判定する(ステツプ53A)。いずれの
データも変化していないときには、以下のステツプ53B
〜53Kの処理が実行されない。ステツプ53Aで変化ありと
判定された場合には、ステツプ53B以降の処理が実行さ
れる。ステツプ53C、53E、53I、53J及び53Hにて得られ
た判定結果は、ステツプ53Kにて制御棒操作監視装置26A
のメモリに記憶されると共に制御棒駆動装置制御装置27
に出力される。本実施例も、第1図の実施例と同じ効果
が生じる。さらに、信号を伝送する配線の本数が第1図
の実施例よりも少なくなり、構成が単純化される。A control rod control device according to another embodiment of the present invention will be described with reference to FIG. In this embodiment, the operation command from the control rod operation button 29 is not input to the control rod operation monitoring device 26A, and the control rod drive device control device 27 responds to the input control rod operation command from the control rod operation monitoring device 26A. The drive signal is output when the operation permission signal is input. Control rod operation monitoring device 26
A executes the processing of steps 53A to 53K shown in FIG.
Control rod operation monitoring device 26A, first, the data of the presence or absence of the fuel assembly 33 in each position in the core 34 input, data of the loading position of the blade guide in the core 34 and the control rod position detector 41 was measured. It is determined whether or not there is a change in the position of the control rod 22 in the axial direction (step 53A). If none of the data has changed, follow steps 53B below.
~ 53K processing is not executed. If it is determined that there is a change in step 53A, the processing after step 53B is executed. The judgment results obtained at steps 53C, 53E, 53I, 53J and 53H are the control rod operation monitoring device 26A at step 53K.
Control rod drive controller 27
Is output to. This embodiment also produces the same effect as the embodiment of FIG. Further, the number of wirings for transmitting signals is smaller than that of the embodiment of FIG. 1, and the structure is simplified.
第24図の制御棒操作監視装置26を、前述の制御棒操作監
視装置26Aに替えてもよい。ただし、この場合には、第2
4図に示されている制御棒操作ボタン29による操作指令
を、制御棒操作監視装置26Aに入力することが不要にな
る。このような実施例は、第25図の実施例と同じ効果を
得ることができる。The control rod operation monitoring device 26 of FIG. 24 may be replaced with the above-mentioned control rod operation monitoring device 26A. However, in this case, the second
It becomes unnecessary to input the operation command by the control rod operation button 29 shown in FIG. 4 to the control rod operation monitoring device 26A. Such an embodiment can obtain the same effect as the embodiment of FIG.
第20図にて実施される制御棒駆動装置交換作業を、特願
昭62-253702号の明細書14頁、13行から27頁、15行及び
第1図〜第9図及び第16図にに示された毎く実施すれ
ば、制御棒駆動装置21をハウジング20から取外してそれ
に取付ける時間を更に短縮でき、第20図に示すクリテイ
カル工程との干渉の度合いを絶無にすることができる。
本実施例における制御棒駆動装置21の交換作業、すなわ
ち制御棒駆動装置21の取外し取付作業は、燃料集合体取
出し作業、LPRM交換作業、制御棒交換作業及び燃料集合
体装荷作業のうち連続して行なわれる2つの作業と並行
して又はそれらの作業のうちの1つと並行して実施され
る。The control rod drive device replacement work carried out in FIG. 20 is described in Japanese Patent Application No. 62-253702 on pages 14, 13 to 27, 15 and FIGS. 1 to 9 and 16. If the control rod drive device 21 is removed from the housing 20 and attached to the housing 20, the time required to remove the control rod drive device 21 can be further shortened and the degree of interference with the critical process shown in FIG. 20 can be eliminated.
The replacement work of the control rod drive device 21 in this embodiment, that is, the removal work of the control rod drive device 21, is a fuel assembly unloading work, an LPRM replacement work, a control rod replacement work and a fuel assembly loading work. It is performed in parallel with two tasks performed or in parallel with one of those tasks.
本発明によれば、原子炉構成要素の交換工程のクリテイ
カルパスに要する時間を短縮でき、原子炉の稼働率を向
上できる。According to the present invention, it is possible to shorten the time required for the critical path in the replacement process of the reactor components and improve the operating rate of the reactor.
燃料交換制御手段により制御棒の操作指令にて指示され
た制御棒の操作の可否を入力した前記装荷情報に基づい
て判定しているので、この判定を行なうために別の処理
装置を設ける必要がなく、制御棒制御装置の構成を単純
化できる。Since it is determined based on the loading information that the control rod operation command instructed by the fuel exchange control means is input based on the input loading information, it is necessary to provide another processing device to make this determination. Therefore, the structure of the control rod control device can be simplified.
炉心内の燃料集合体の装荷状態を示す装荷情報及び制御
棒位置信号に基づいて作成された炉心内における燃料集
合体及び制御棒の有無の情報を表示するので、制御棒操
作を行なう運転員は操作可能な制御棒を容易に確認でき
る。Since the information indicating the presence or absence of fuel assemblies and control rods in the core created based on the loading information indicating the loading state of the fuel assemblies in the core and the control rod position signal is displayed, the operator operating the control rods can The control rod that can be operated can be easily confirmed.
炉心及び燃料貯蔵プール内の燃料集合体の装荷状態を示
す装荷情報に基づいて炉心及び燃料貯蔵プール内におけ
る燃料集合体の有無の情報を表示するので、炉心及び燃
料貯蔵プール内における燃料集合体の装荷状態を容易に
把握できる。Information about the presence or absence of fuel assemblies in the core and fuel storage pool is displayed based on the loading information indicating the loading status of the fuel assemblies in the core and fuel storage pool. You can easily understand the loading status.
第1図は本発明の好適な一実施例である制御棒制御装置
の構成図、第2図は第1図の炉心の概略平面図、第3図
は第2図のIII部拡大図、第4図(A)は第1図の燃料
交換機が走行する床面に設けられた燃料貯蔵プール及び
原子炉ウエルの平面図、第4図(B)は燃料貯蔵プール
及び原子炉ウエルの縦断面図、第5図及び第6図は第1
図の制御棒操作監視装置で実行される処理手順の説明
図、第7図は第2図の炉心でセル内の全燃料集合体が取
出された状態を示す説明図、第8図は第1図の計算機44
の構成図、第9図は第1図の計算機で実行される炉心状
態表示の処理手順を示す説明図、第10図は第9図の処理
手順で得られた表示画像を示す説明図、第11図は第9図
の処理手順の他の実施例の説明図、第12図は第11図の処
理手順で得られた表示画像を示す説明図、第13図及び第
14図は第1図の燃料交換機制御装置にて実行される燃料
集合体等の移動のための処理手順の説明図、第15図は第
13図のステツプ48の詳細内容を示す説明図、第16図は第
13図のステツプ48Qの詳細内容を示す説明図、第17図及
び第18図は第13図のステツプ48Rの詳細内容を示す説明
図、第19図は第14図のステツプ48Lの詳細内容を示す説
明図、第20図は交換作業工程を示す説明図、第21図及び
第23図は第14図の処理手順の他の実施例の説明図、第22
図、第24図及び第25図は本発明の他の実施例である制御
棒制御装置の構成図、第26図は第25図の制御棒操作監視
装置で実施される処理手順の説明図である。 3……グラツプル、4……つかみ装置、8、9、10、11
……駆動モータ、12……燃料交換機制御装置、14……中
央処理装置、15……メモリ、18、40……表示装置、21…
…制御棒駆動装置、22……制御棒、26……制御棒操作監
視装置、27……制御棒駆動装置制御装置、28……操作
盤、29……制御棒操作ボタン、30……燃料貯蔵プール、
31……燃料交換機、32……原子炉ウエル、33……燃料集
合体、34……炉心、41……制御棒位置検出器、44……計
算機。FIG. 1 is a block diagram of a control rod control device which is a preferred embodiment of the present invention, FIG. 2 is a schematic plan view of the reactor core of FIG. 1, and FIG. 3 is an enlarged view of a III part of FIG. FIG. 4 (A) is a plan view of the fuel storage pool and the reactor well provided on the floor on which the fuel exchanger of FIG. 1 runs, and FIG. 4 (B) is a vertical cross-sectional view of the fuel storage pool and the reactor well. , Figures 5 and 6 show the first
FIG. 7 is an explanatory view of a processing procedure executed by the control rod operation monitoring device, FIG. 7 is an explanatory view showing a state in which all fuel assemblies in the cells are taken out in the core of FIG. 2, and FIG. Figure calculator 44
FIG. 9 is an explanatory view showing a processing procedure of core state display executed by the computer of FIG. 1, FIG. 10 is an explanatory view showing a display image obtained by the processing procedure of FIG. 9, FIG. 11 is an explanatory view of another embodiment of the processing procedure of FIG. 9, FIG. 12 is an explanatory view showing a display image obtained by the processing procedure of FIG. 11, FIG.
FIG. 14 is an explanatory view of a processing procedure for moving a fuel assembly or the like which is executed by the refueling machine control device of FIG. 1, and FIG.
Explanatory diagram showing the detailed contents of step 48 in FIG. 13, FIG.
13 is an explanatory diagram showing the detailed contents of step 48Q in FIG. 13, FIGS. 17 and 18 are explanatory diagrams showing the detailed contents of step 48R in FIG. 13, and FIG. 19 is a detailed content in step 48L of FIG. Explanatory diagram, FIG. 20 is an explanatory diagram showing a replacement work process, FIGS. 21 and 23 are explanatory diagrams of another embodiment of the processing procedure of FIG. 14, and FIG.
FIG. 24, FIG. 25 and FIG. 25 are configuration diagrams of a control rod control device which is another embodiment of the present invention, and FIG. 26 is an explanatory diagram of a processing procedure carried out by the control rod operation monitoring device of FIG. 25. is there. 3 ... Grapples, 4 ... Grasping device, 8, 9, 10, 11
...... Drive motor, 12 …… Refueling machine control device, 14 …… Central processing unit, 15 …… Memory, 18, 40 …… Display device, 21 ・ ・ ・
… Control rod drive device, 22 …… Control rod, 26 …… Control rod operation monitoring device, 27 …… Control rod drive device control device, 28 …… Control panel, 29 …… Control rod operation button, 30 …… Fuel storage Pool,
31 …… Refueling machine, 32 …… Reactor well, 33 …… Fuel assembly, 34 …… Core, 41 …… Control rod position detector, 44 …… Calculator.
Claims (19)
内の燃料集合体の装荷状態を示す装荷情報を記憶してい
る手段と、前記炉心内の制御棒の操作指令を出力する操
作盤と、前記操作指令にて指示された前記制御棒の操作
の可否を入力した前記装荷情報に基づいて判定し、その
判定結果を原子炉の停止状態において出力する制御棒操
作判定手段と、前記操作指令及び前記判定結果を入力
し、前記判定結果が可である場合に前記操作指令に基づ
く制御棒駆動信号を出力する制御棒駆動装置制御手段と
を備えた制御棒制御装置。1. A means for storing loading information indicating a loading state of a fuel assembly in a core obtained based on movement of a fuel exchanger, and an operation panel for outputting an operation command for a control rod in the core. And a control rod operation determining means for determining whether or not to operate the control rod instructed by the operation command based on the input loading information, and outputting the determination result in a reactor in a stopped state, and the operation. A control rod control device comprising: a control rod drive device control means which inputs a command and the determination result, and outputs a control rod drive signal based on the operation command when the determination result is acceptable.
制御棒の位置及び前記装荷情報に基づいて指示された前
記制御棒の操作の可否を判定しこの判定結果を前記原子
炉の停止状態において出力する手段である請求項1の制
御棒制御装置。2. The control rod operation determining means determines whether or not the operation of the control rod is instructed based on the input position of the control rod and the input loading information, and the result of the determination is used as a shutdown state of the reactor. 2. The control rod control device according to claim 1, which is a means for outputting.
情報を記憶している手段と、前記炉心内の制御棒の操作
指令を出力する操作盤と、前記操作指令にて指示された
前記制御棒の操作の可否を入力した前記装荷情報に基づ
いて判定し、その判定結果を原子炉の停止状態において
出力する制御棒操作判定手段と、前記操作指令及び前記
判定結果を入力し、前記判定結果が可である場合に前記
操作指令に基づく制御棒駆動信号を出力する制御棒駆動
装置制御手段とを備えた制御棒制御装置。3. A means for storing loading information indicating a loading state of a fuel assembly in a core, an operation panel for outputting an operation command of a control rod in the core, and an operation command instructed by the operation command. Determined based on the loading information input whether the operation of the control rod is input, the control rod operation determination means for outputting the determination result in the reactor stopped state, the operation command and the determination result is input, A control rod control device comprising a control rod drive device control means for outputting a control rod drive signal based on the operation command when the determination result is acceptable.
内の燃料集合体の装荷状態を示す装荷情報を記憶してい
る手段と、前記炉心内の制御棒の操作指令を出力する操
作盤と、前記制御棒の操作の可否を入力した前記装荷情
報に基づいて判定し、その判定結果を原子炉の停止状態
において出力する制御棒操作判定手段と、前記操作指令
及び前記判定結果を入力し、前記判定結果が可である場
合に前記操作指令に基づく制御棒駆動信号を出力する制
御棒駆動装置制御手段とを備えた制御棒制御装置。4. A means for storing loading information indicating a loading state of a fuel assembly in a core obtained based on movement of a fuel exchanger, and an operation panel for outputting an operation command for a control rod in the core. And the operation of the control rod is determined based on the input loading information, the control rod operation determination means for outputting the determination result in the reactor stopped state, the operation command and the determination result is input. A control rod drive device control means for outputting a control rod drive signal based on the operation command when the determination result is acceptable.
内の燃料集合体の装荷状態を示す装荷情報を記憶してい
る手段と、前記炉心内の制御棒の操作指令を出力する操
作盤と、前記操作指令にて指示された前記制御棒の操作
の可否を入力した前記装荷情報に基づいて判定し、その
判定結果を原子炉の停止状態において出力する制御棒操
作判定手段と、入力した前記操作指令に基づいて制御棒
駆動信号を出力する制御棒駆動装置制御手段と、前記判
定結果が可である場合に、入力した前記操作指令を前記
制御棒駆動装置制御手段に伝える手段を備えた制御棒制
御装置。5. A means for storing loading information indicating a loading state of a fuel assembly in the core obtained based on the movement of the fuel exchanger, and an operation panel for outputting an operation command for a control rod in the core. And the control rod operation determination means for determining whether or not the control rod is instructed by the operation command based on the input loading information, and outputting the determination result in the reactor stopped state, Control rod drive device control means for outputting a control rod drive signal based on the operation command, and means for transmitting the input operation command to the control rod drive device control means when the determination result is acceptable Control rod control device.
内の燃料集合体の装荷状態を示す装荷情報を記憶してい
る手段と、前記炉心内の制御棒の操作指令を出力する操
作盤と、前記制御棒の操作の可否を入力した前記装荷情
報に基づいて判定し、その判定結果を原子炉の停止状態
において出力する制御棒操作判定手段と、入力した前記
操作指令に基づいて制御棒駆動信号を出力する制御棒駆
動装置制御手段と、前記判定結果が可である場合に、入
力した前記操作指令を前記制御棒駆動装置制御手段に伝
える手段とを備えた制御棒制御装置。6. A means for storing loading information indicating a loading state of a fuel assembly in a core obtained based on movement of a fuel exchanger, and an operation panel for outputting an operation command for a control rod in the core. And a control rod operation determining means for determining whether or not to operate the control rod based on the input loading information, and outputting the determination result in the reactor stopped state, and the control rod based on the input operation command. A control rod control device comprising: a control rod drive device control means for outputting a drive signal; and a means for transmitting the input operation command to the control rod drive device control means when the determination result is acceptable.
記操作指令を前記制御棒駆動装置制御手段に伝える手段
が前記操作盤内に設けられている請求項6の制御棒制御
装置。7. The control rod control device according to claim 6, wherein means for transmitting the operation command input when the determination result is acceptable is provided in the operation panel.
情報を記憶している手段と、前記炉心内の制御棒の操作
指令を出力する操作盤と、前記制御棒の操作の可否を入
力した前記装荷情報に基づいて判定し、その判定結果を
原子炉の停止状態において出力する制御棒操作判定手段
と、入力した前記操作指令に基づいて制御棒駆動信号を
出力する制御棒駆動装置制御手段と、前記判定結果が可
である場合に、入力した前記操作指令を前記制御棒駆動
装置制御手段に伝える手段とを備えた制御棒制御装置。8. A means for storing loading information indicating a loading state of a fuel assembly in a core, an operation panel for outputting an operation command of a control rod in the core, and whether or not the control rod can be operated. A control rod operation determination unit that makes a determination based on the input loading information and outputs the determination result when the reactor is in a stopped state, and a control rod drive device control that outputs a control rod drive signal based on the input operation command. A control rod control device comprising means and means for transmitting the input operation command to the control rod drive device control means when the determination result is acceptable.
情報を記憶している手段と、燃料つかみ手段を現在位置
から指定された移動先である目標位置までに移動させし
かも前記燃料つかみ手段による燃料集合体の移動に基づ
いて前記記憶手段に記憶されている前記装荷情報を更新
する燃料交換制御手段と、前記炉心内の制御棒の操作指
令を出力する操作盤と、前記操作指令にて指示された前
記制御棒の操作の可否を入力した前記装荷情報に基づい
て判定し、その判定結果を原子炉の停止状態において出
力する制御棒操作判定手段と、前記操作指令及び前記判
定結果を入力し、前記判定結果が可である場合に前記操
作指令に基づく制御棒駆動信号を出力する制御棒駆動装
置制御手段とを備えた制御棒制御装置。9. A means for storing loading information indicating a loading state of a fuel assembly in a core and a fuel gripping means are moved from a current position to a target position which is a designated destination, and the fuel gripping is performed. Refueling control means for updating the loading information stored in the storage means based on the movement of the fuel assembly by means, an operation panel for outputting an operation command for the control rods in the core, and the operation command Based on the loading information input whether the operation of the control rod is instructed is determined, the control rod operation determination means for outputting the determination result in the reactor stopped state, the operation command and the determination result And a control rod drive device control means for outputting a control rod drive signal based on the operation command when the determination result is acceptable.
荷情報を記憶している手段と、燃料つかみ手段を現在位
置から指定された移動先である目標位置までに移動させ
しかも前記燃料つかみ手段による燃料集合体の移動に基
づいて前記記憶手段に記憶されている前記装荷情報を更
新する燃料交換制御手段と、前記炉心内の制御棒の操作
指令を出力する操作盤と、前記制御棒の操作の可否を入
力した前記装荷情報に基づいて判定し、その判定結果を
原子炉の停止状態において出力する制御棒操作判定手段
と、入力した前記操作指令に基づいて制御棒駆動信号を
出力する制御棒駆動装置制御手段と、前記判定結果が可
である場合に、入力した前記操作指令を前記制御棒駆動
装置制御手段に伝える手段とを備えた制御棒制御装置。10. A means for storing loading information indicating a loading state of a fuel assembly in a core and a fuel gripping means are moved from a current position to a target position which is a designated destination, and the fuel gripping is performed. A fuel exchange control means for updating the loading information stored in the storage means based on the movement of the fuel assembly by means, an operation panel for outputting an operation command for the control rod in the core, and a control rod for the control rod. Control rod operation determining means for determining whether or not operation is possible based on the input loading information, and outputting the determination result in a reactor shutdown state, and control for outputting a control rod drive signal based on the input operation command A control rod control device comprising: rod drive device control means; and means for transmitting the input operation command to the control rod drive device control means when the determination result is acceptable.
荷情報を記憶している手段と、前記炉心内の制御棒の操
作指令を出力する操作盤と、燃料つかみ手段を現在位置
から指定された移動先である目標位置までに移動させ、
前記燃料つかみ手段による燃料集合体の移動に基づいて
前記記憶手段に記憶されている前記装荷情報を更新し、
前記操作指令にて指示された前記制御棒の操作の可否を
入力した前記装荷情報に基づいて判定し、その判定結果
を出力する燃料交換制御手段と、前記操作指令及び前記
判定結果を入力し、前記判定結果が可である場合に前記
操作指令に基づく制御棒駆動信号を出力する制御棒駆動
装置制御手段とを備えた制御棒制御装置。11. A means for storing loading information indicating a loading state of a fuel assembly in a core, an operation panel for outputting an operation command for a control rod in the core, and a fuel gripping means from the current position. To the target position which is the destination
Updating the loading information stored in the storage means based on the movement of the fuel assembly by the fuel gripping means,
Judgment based on the loading information that inputs whether or not to operate the control rod instructed by the operation command, and input the fuel replacement control means that outputs the judgment result, the operation command and the judgment result, A control rod control device comprising: a control rod drive device control means for outputting a control rod drive signal based on the operation command when the determination result is acceptable.
心内の燃料集合体の装荷状態を示す装荷情報を記憶して
いる手段と、前記装荷情報及び入力した制御棒位置信号
に基づいて前記炉心内における前記燃料集合体及び制御
棒の有無の情報を作成する画像情報作成手段と、前記制
御棒の操作指令を出力する操作盤が配置された操作室内
に設置され、しかも入力した前記燃料集合体及び制御棒
の有無の情報を表示する表示手段とを備えた炉心状態表
示装置。12. A means for storing loading information indicating a loading state of a fuel assembly in a core obtained based on movement of a fuel exchanger, and the means based on the loading information and an input control rod position signal. The image information creating means for creating information on the presence / absence of the fuel assembly and the control rods in the core and the operation panel for outputting the operation command of the control rods are installed in the operation room, and the fuel assembly input A core state display device having a body and display means for displaying information on the presence or absence of control rods.
荷情報を記憶している手段と、前記装荷情報に基づいて
前記炉心内に装荷されている前記燃料集合体の第1図形
情報を作成し、しかも入力した制御棒位置信号に基づい
て前記炉心内に挿入されている制御棒の第2図形情報を
作成する画像情報作成手段と、前記制御棒の操作指令を
出力する操作盤が配置された操作室内に設置され、しか
も入力した前記第1及び第2図形情報に基づいて前記燃
料集合体及び前記制御棒の図形を表示する表示手段とを
備えた炉心状態表示装置。13. Means for storing loading information indicating a loading state of a fuel assembly in the core, and first graphic information of the fuel assembly loaded in the core based on the loading information. Image information creating means for creating second graphic information of the control rod inserted into the core based on the created control rod position signal and an operation panel for outputting an operation command of the control rod are arranged. And a display means for displaying the figures of the fuel assembly and the control rod on the basis of the input first and second graphic information.
荷情報を記憶している手段と、前記装荷情報に基づいて
前記炉心内に装荷されている前記燃料集合体の第1図形
情報及び前記炉心内に装荷されていない前記燃料集合体
の第2図形情報を作成し、しかも入力した制御棒位置信
号に基づいて前記炉心内に挿入されている制御棒の第3
図形情報、前記炉心内に挿入されていない制御棒の第4
図形情報を作成する画像情報作成手段と、前記制御棒の
操作指令を出力する操作盤が配置された操作室内に設置
され、しかも入力した前記第1、第2、第3及び第4図
形情報に基づいて前記燃料集合体及び前記制御棒の図形
を表示する表示手段とを備えた炉心状態表示装置。14. Means for storing loading information indicating a loading state of a fuel assembly in a core, first graphic information of the fuel assembly loaded in the core based on the loading information, and The second graphic information of the fuel assemblies not loaded in the core is created, and the third of the control rods inserted in the core is generated based on the input control rod position signal.
Graphic information, fourth control rod not inserted in the core
The image information creating means for creating graphic information and the operation panel for outputting the operation command of the control rod are installed in the operation room, and the input first, second, third and fourth graphic information A core state display device comprising display means for displaying graphics of the fuel assembly and the control rod based on the display.
引抜き可能な前記制御棒に対する識別情報を作成ししか
もこの識別情報を前記表示手段に出力するように構成さ
れた請求項12又は13又は14の炉心状態表示装置。15. The image information creating means is configured to create identification information for the control rod that can be pulled out from the core and to output the identification information to the display means. Core status display device.
の装荷状態を示す装荷情報を記憶している手段と、燃料
つかみ手段を現在位置から指定された移動先である目標
位置までに移動させ、前記燃料つかみ手段による燃料集
合体の移動に基づいて前記記憶手段に記憶されている前
記装荷情報を更新し、しかも前記装荷情報及び入力した
制御棒位置信号に基づいて前記炉心及び前記燃料貯蔵プ
ール内における前記燃料集合体の有無の情報及び前記炉
心内における制御棒の有無の情報をそれぞれ作成する燃
料交換制御手段と、前記燃料交換制御手段が配置された
操作室内に設置され、しかも入力した前記燃料集合体及
び制御棒の有無の情報を表示する表示手段とを備えた原
子炉構成要素の状態表示装置。16. A means for storing loading information indicating a loading state of a fuel assembly in a core and a fuel storage pool, and a fuel gripping means are moved from a current position to a target position which is a designated destination. Updating the loading information stored in the storage means based on the movement of the fuel assembly by the fuel gripping means, and further based on the loading information and the input control rod position signal, the core and the fuel storage pool Installed in the operation room in which the fuel exchange control means is arranged, and the fuel exchange control means for creating the information regarding the presence or absence of the fuel assembly in the interior and the information regarding the presence or absence of the control rod in the core A display unit for displaying the status of a fuel assembly and control rods, and a display unit for displaying information on the presence or absence of control rods.
た前記制御棒の操作の可否を、入力した炉心内の燃料集
合体の装荷状態を示す装荷情報に基づいて判定し、その
判定結果を原子炉の停止状態において出力する制御棒操
作判定装置。17. The control rod operation command instructed by the input control rod operation command is determined based on the input loading information indicating the loading state of the fuel assembly in the core, and the determination result. Is a control rod operation determination device that outputs a signal when the reactor is stopped.
た前記制御棒の操作の可否を、入力した前記制御棒の位
置及び炉心内の燃料集合体の装荷状態を示す装荷情報に
基づいて判定する手段と、その判定結果を原子炉の停止
状態において出力する手段とを備えた制御棒操作判定装
置。18. The control rod operation instructed by the input control rod operation command is determined based on the input position of the control rod and the loading information indicating the loading state of the fuel assembly in the core. A control rod operation determination device comprising a determination means and a means for outputting the determination result when the reactor is in a stopped state.
成される複数のセルを有する炉心から複数の燃料集合体
を取出し、すべての前記燃料集合体が取出された前記セ
ル内から前記制御棒を引抜き、前記燃料集合体の取出し
作業終了後に、前記燃料集合体とは異なり前記炉心内に
挿入される原子炉構成要素の交換作業を行い、前記原子
炉構成要素の交換作業終了後に、燃料集合体を前記炉心
内へ装荷し、制御棒駆動装置の交換作業を、前記燃料集
合体取出し作業,前記原子炉構成要素交換作業及び前記
燃料集合体装荷作業の少なくとも1つの作業と並行して
実施する原子炉構成要素の交換方法。19. A plurality of fuel assemblies are taken out of a core having a plurality of cells composed of a plurality of fuel assemblies surrounding a control rod, and the control is performed from inside the cells from which all the fuel assemblies are taken out. After the rod is pulled out and the work of taking out the fuel assembly is completed, unlike the fuel assembly, the work of replacing the reactor component inserted into the core is performed, and after the work of replacing the reactor component is completed, the fuel is The assembly is loaded into the core, and the control rod drive device replacement work is performed in parallel with at least one of the fuel assembly unloading work, the reactor component replacement work, and the fuel assembly loading work. To replace nuclear reactor components.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63085100A JPH0684995B2 (en) | 1988-04-08 | 1988-04-08 | Control rod control device, reactor core status display device, and control rod operation determination device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP63085100A JPH0684995B2 (en) | 1988-04-08 | 1988-04-08 | Control rod control device, reactor core status display device, and control rod operation determination device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH01259298A JPH01259298A (en) | 1989-10-16 |
| JPH0684995B2 true JPH0684995B2 (en) | 1994-10-26 |
Family
ID=13849193
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP63085100A Expired - Lifetime JPH0684995B2 (en) | 1988-04-08 | 1988-04-08 | Control rod control device, reactor core status display device, and control rod operation determination device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPH0684995B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6453262B2 (en) * | 2016-03-09 | 2019-01-16 | 日立Geニュークリア・エナジー株式会社 | Control rod operation monitoring method and control rod operation monitoring system |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6193993A (en) * | 1984-10-16 | 1986-05-12 | 株式会社東芝 | Core monitor device for routine inspection |
| JPS62165189A (en) * | 1986-01-17 | 1987-07-21 | 株式会社日立製作所 | Parallel work method for control rod replacement and control rod drive device inspection |
-
1988
- 1988-04-08 JP JP63085100A patent/JPH0684995B2/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH01259298A (en) | 1989-10-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP2061037B1 (en) | Method and apparatus for permissive control of a mast and grapple | |
| JPH0684995B2 (en) | Control rod control device, reactor core status display device, and control rod operation determination device | |
| JPS60159693A (en) | Nuclear fuel aggregate treater and nuclear fuel aggregate fitted to said device | |
| KR20100088334A (en) | Refueling machine operation system of fuel assembly | |
| JPH08262182A (en) | Automatic refueling device | |
| JP3192812B2 (en) | Fuel transfer planning method, fuel transfer planning device, and fuel transfer device | |
| JP2003227895A (en) | Fuel exchange control device and fuel exchange control system | |
| JPS58638B2 (en) | nuclear reactor refueling machine | |
| JPS5821238B2 (en) | Control device for nuclear reactor fuel exchange equipment | |
| JP2014228483A (en) | Method and system for controlling refueling machine | |
| JPH0423758B2 (en) | ||
| JP2002014191A (en) | Core inspection work monitoring device and monitoring method at regular inspection | |
| JP2544387B2 (en) | Fast fuel change method | |
| JPH0875893A (en) | Automatic exchange device for nuclear fuel | |
| JP3432269B2 (en) | Fuel transfer control device and method | |
| JP2003215283A (en) | Refueling machine control unit | |
| JP5166575B2 (en) | Display method in semiconductor manufacturing apparatus and semiconductor manufacturing apparatus | |
| JP2012227539A (en) | Display method for wafer mounting status, display program, and display method in semiconductor manufacturing apparatus and semiconductor device | |
| JPS59690A (en) | Control rod operation procedure display device | |
| JP2621886B2 (en) | Reactor fuel replacement | |
| JP2005308624A (en) | Reactor facility | |
| WO2022118401A1 (en) | Nuclear reactor core design assistance system and nuclear reactor core design assistance method | |
| JPS63147797A (en) | Crane positioning control method | |
| JPS5973797A (en) | Automatic exchange system of fuel | |
| JPH0228597A (en) | Fuel exchange system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20071026 Year of fee payment: 13 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| R371 | Transfer withdrawn |
Free format text: JAPANESE INTERMEDIATE CODE: R371 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081026 Year of fee payment: 14 |
|
| S111 | Request for change of ownership or part of ownership |
Free format text: JAPANESE INTERMEDIATE CODE: R313111 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081026 Year of fee payment: 14 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| EXPY | Cancellation because of completion of term | ||
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20081026 Year of fee payment: 14 |